Finals Status After Substantially Completed as of 8/22/2018 Wisconsin Department of Transportation Statewide Report Sorted by Region and Contract Contractor Region: NC Payroll Clear Date Final Acceptance Mat'l Clear Date SF to Contractor SF from Contractor Project Manager County / Hwy / Description Main Project ID Contract ID Substantially Complete Pack MASHUDA CONTRACTORS, INC. 1166-07-76 Packwaukee - Coloma 39 Marquette 20151110022 Dan Holloway 08/04/2017 9/6/2017 Remarks: None Code Description CDLY Contractor Delay Mars MASHUDA CONTRACTORS, INC. 6350-01-62 Marshfield - Stevens Point P Wood 20160308027 Jeff Stewart 05/18/2018 6/11/2018 Remarks: None Waus 6/28/2018 AMERICAN ASPHALT OF WISCONSIN 1053-02-60 Wausau - Wittenberg 29 Marathon 20160412035 Mark Steidl 09/15/2017 2/15/2018 Remarks: 3/15/18-Materials issues associated with the project, Contractor and PL have been slow to get these issues resolved, jt Code Description CDLY Contractor Delay MTLS Nonconforming Materials PLFC Project Leader Delay/Finals Corrections Needed Page 1 of 59 Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Upload: duongtram

Post on 26-Sep-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: NC

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

Pack

MASHUDA CONTRACTORS, INC.

1166-07-76

Packwaukee - Coloma39Marquette

20151110022 Dan Holloway 08/04/2017 9/6/2017

Remarks: None

Code DescriptionCDLY Contractor Delay

Mars

MASHUDA CONTRACTORS, INC.

6350-01-62

Marshfield - Stevens PointPWood

20160308027 Jeff Stewart 05/18/2018 6/11/2018

Remarks: None

Waus

6/28/2018

AMERICAN ASPHALT OF WISCONSIN

1053-02-60

Wausau - Wittenberg29Marathon

20160412035 Mark Steidl 09/15/2017 2/15/2018

Remarks: 3/15/18-Materials issues associated with the project, Contractorand PL have been slow to get these issues resolved, jt

Code DescriptionCDLY Contractor Delay

MTLS Nonconforming Materials

PLFC Project Leader Delay/Finals Corrections Needed

Page 1 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 2: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: NC

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

Waus

AMERICAN ASPHALT OF WISCONSIN

1170-01-75

Wausau - Merrill51Marathon

20160510030 Stacy Hagenbucher 06/02/2017 7/31/2017

Remarks: None

City C

1/18/2018

PETERS CONCRETE COMPANY

6250-01-78

City Clintonville, Main St22Waupaca

20160614016 Mark Steidl 10/27/2017 2/27/2018

Remarks: Plant establishment period expires 10-15-18.

Mars

MASHUDA CONTRACTORS, INC.

6350-07-80

Marshfield - Stevens Point10Wood

20160712016 Jeff Stewart 06/09/2017 8/22/2017

Remarks: None

Merri

PITLIK & WICK, INC.

9030-03-70

Merrill - Rhinelander STH 64 - N JctCTH G

Lincoln20161108014 Stacy Hagenbucher 07/21/2017 9/18/2017

Remarks: None

Page 2 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 3: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: NC

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

Wood

6/25/2018

AMERICAN ASPHALT OF WISCONSIN

9231-08-70

Woodruff - Manitowish LowerSugar Bush Ln - USH 51

47Iron

20161108015 Dan Erva 10/25/2017 1/8/2018

Remarks: 1/24/18-Contractor need to complete road repairs in the Town ofMercer – they ran out of time before the snow came.5/16/18-Haul road release needed

Code DescriptionPLST Punch List Items to be Completed

OTHR Other

Park

PHEIFER BROTHERS CONSTRUCTIONCO., INC.

9240-08-70

Park Falls - Springstead N ForkFlambeau Rvr Brdge B-50-0082

182Price

20161108027 Dan Erva 05/29/2018

Remarks: HMA paving to be done in spring.

Colom

ZENITH TECH., INC. - WAUKESHA

1166-06-64

Coloma - Plainfield B-69-13,15,16,22, 23

IH39Waushara

20161108029 Dan Holloway 05/25/2018 7/12/2018

Remarks: None

Merri

7/17/2018

ZENITH TECH., INC. - WAUKESHA

1176-23-62

Merrill - Minocqua51Lincoln

20170411026 Robin Stafford 07/02/2018 7/12/2018

Remarks: None

Page 3 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 4: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: NC

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

Plain

AMERICAN ASPHALT OF WISCONSIN

1166-05-79

Plainfield - Stevens PointIH39Portage

20170613009 Dan Holloway 05/24/2018 7/12/2018

Remarks: None

Mont

4/10/2018 4/11/2018

D L GASSER CONSTRUCTION

6150-01-76

Montello - Wautoma22Marquette

20170613011 Dan Holloway 09/29/2017 12/14/2017

Remarks: Delay of guardrail materials that were ordered late due to a planerror, and installed after substantial completion.

Code DescriptionOTHR Other

Saxo

PHEIFER BROTHERS CONSTRUCTIONCO., INC.

1185-05-70

Saxon - Hurley2Iron

20170912007 Dan Erva 07/27/2018

Remarks: None

WAU

7/24/2018

PHEIFER BROTHERS CONSTRUCTIONCO., INC.

1176-15-71

Wausau - Merrill051Lincoln

20170912009 Stacy Hagenbucher 05/18/2018 6/25/2018

Remarks: None

Page 4 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 5: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: NC

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

STH

NORTHEAST ASPHALT, INC

6986-01-70

Sth 73 - Spring LakeFWaushara

20171212022 Dan Holloway 07/02/2018 8/15/2018

Remarks: None

STH

PHEIFER BROTHERS CONSTRUCTIONCO., INC.

9480-00-70

Sth 13 - S Airport RoadHPrice

20180213022 Jesse Jefferson 08/06/2018

Remarks: None

Winc

PETERS CONCRETE COMPANY

6430-07-71

Winchester - New London045Outagamie

20180313034 Wendy Arneson 08/17/2018

Remarks: None

Page 5 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 6: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: NCL

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

I 39 -

8/7/2018 8/7/2018

INTEGRITY GRADING AND EXCAVATING,INC.

6711-00-70

Ih 39 - Cth KDMarquette

20170711015 Mike Novey DAAR 05/15/2018 6/19/2018

Remarks: None

Page 6 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 7: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: NE

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

De P

5/18/2018

LUNDA CONSTRUCTION COMPANY

1133-03-77

De Pere - Suamico41Brown

20130723001 Eric Gwidt 10/17/2016 12/16/2016

Remarks: WCLC=Wage Investigation opened 7/11/16 TMR; closed 12/1/16TMRMTLS=Due to size of project and issues found during reviews ittook significant amout of time to complete reviews. Materialsissues resolved. Semi-estimate sent. ESG

Code DescriptionWCLC Wage Claim/Investigation Labor Compliance

MTLS Nonconforming Materials

Ush

LUNDA CONSTRUCTION COMPANY

1517-07-76

Ush 10 - Ush 10/Sth 44110Winnebago

20140812012 Kurt Peters 10/13/2016 12/13/2016

Remarks: CDLY-Prime contractor still has to complete Armour Caprepairs-extremely past deadline. SLV 9/07/17.

SFST - Staff/budget shortages. Materials records review delayfinals process. Materials review/corrections not completed as of03-06-18. SLV

Code DescriptionCDLY Contractor Delay

SFST Staff Shortages

Page 7 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 8: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: NE

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

De P

3/23/2018

HOFFMAN CONSTRUCTION COMPANY

1133-10-75

De Pere - Suamico, Memorial Dr -CTH M

41Brown

20150310023 Eric Gwidt 06/15/2017 8/14/2017

Remarks: WCLC=wage investigation opened 7/11/16 TMR; closed 12/1/16TMROTHR= 2 year Plant Establishment Period until Fall of 2018. (KPN)

Code DescriptionWCLC Wage Claim/Investigation Labor Compliance

OTHR Other

Fond

MASHUDA CONTRACTORS, INC.

1420-23-71

Fond du Lac Bypass151Fond Du Lac

20150512053 Bryan Learst 11/24/2016 1/20/2017

Remarks: None

Page 8 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 9: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: NE

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

Sturg

12/19/2017 12/22/2017

ZENITH TECH., INC. - WAUKESHA

4430-16-60

Sturgeon Bay Bridge42Door

20150811009 Jeremy Ashauer 09/27/2016 11/16/2016

Remarks: CLMS - Claim submitted on 1/20/18. Project on hold until claimrectified. LLL

PLFC - Materials records not in good order. A few reviews werenecessary. Completed on 12/19/2017. ESG

CNQI - Contractor must finish painting in machine room. LLL 4/6/17

Code DescriptionCLMS Claims

CNQI Construction Quality Issues/Repairs to be Addressed

PLFC Project Leader Delay/Finals Corrections Needed

Fond

2/14/2018

MASHUDA CONTRACTORS, INC.

1420-22-71

Fond Du Lac Bypass151Fond Du Lac

20151110019 Bryan Learst 12/28/2016 1/23/2017

Remarks: None

Villag

4/18/2018

PETERS CONCRETE COMPANY

1491-12-71

Village Wausaukee141Marinette

20160308017 Paul Zoellner 06/08/2017 8/1/2017

Remarks: Plant establishment until fall 2018. LLL

Page 9 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 10: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: NE

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

USH

8/10/2018

MICHELS CORPORATION

1517-75-76

USH 10/STH 44110Winnebago

20160412029 Kurt Peters 10/04/2016 12/2/2016

Remarks: MTRLS - Materials records submitted to NE Region office on12-8-16, SLVMaterials review/corrections not completed as of 03-06-18. SLV

CLMS-Contractor submitted a claim on 2-20-17 concerning curband gutter removal. SLV

Code DescriptionSFST Staff Shortages

CLMS Claims

Maso

ZENITH TECH., INC. - WAUKESHA

9210-17-60

Mason St, City Green Bay54Brown

20160510027 Andrew Fulcer 04/07/2017 6/5/2017

Remarks: PLFC - PCL turned in records two months past goal date. ESG

CDLY - Contract change order negotiation and a few materialscerts. Records complete 11/15/2017, materials review ongoing. ESG

SFST - TSS Workload.

Code DescriptionCDLY Contractor Delay

PLFC Project Leader Delay/Finals Corrections Needed

SFST Staff Shortages

Page 10 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 11: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: NE

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

USH

LUNDA CONSTRUCTION COMPANY

1517-07-77

USH 10/STH 44110Winnebago

20160712001 Kurt Peters 07/02/2018

Remarks: None

USH

7/6/2017

HIGHWAY LANDSCAPERS, INC.

1517-75-87

USH 10/STH 441 CTH CB - OneidaSt

10Winnebago

20161108026 Kurt Peters 06/09/2017 8/8/2017

Remarks: Plant establishment period until fall 2018.

Apple

NORTHEAST ASPHALT, INC

1130-44-71

Appleton - Green Bay CTH J -Orange Ln

41Brown

20161213016 Tim Rank 06/29/2018 8/14/2018

Remarks: None

Linco

3/28/2018

VINTON CONSTRUCTION COMPANY

1470-18-71

Lincoln Ave, City Two Rivers 22ndSt - 35th Pl

42Manitowoc

20161213019 Brian Haen 10/23/2017 2/2/2018

Remarks: Plant establishment until October 2019. LLL

Page 11 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 12: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: NE

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

USH

7/23/2018 7/30/2018

LUNDA CONSTRUCTION COMPANY

1517-75-88

USH 10/STH 441 CTH CB - OneidaSt

10Winnebago

20161213023 Kurt Peters 05/17/2018 7/17/2018

Remarks: None

8th S

VINTON CONSTRUCTION COMPANY

4085-42-71

8th St, City De Pere Main Ave -Ashland Ave

32Brown

20161213024 Andrew Fulcer 05/03/2018 5/3/2018

Remarks: CNQI - Stairs to a business need repair. PCL working with thecontractor on the repair and finalizing the CCO. CCO approved on5/24/2018. ESG

Code DescriptionCNQI Construction Quality Issues/Repairs to be Addressed

Richm

7/23/2018

VINTON CONSTRUCTION COMPANY

6240-26-71

Richmond St, City Appleton CTHOO Intersection

47Outagamie

20161213028 Tim Rank 09/01/2017 11/21/2017

Remarks: None

Page 12 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 13: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: NE

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

STH

MICHELS CORPORATION

6525-06-71

STH 28 - Random Lake144Sheboygan

20170314018 Kyle Treml 11/11/2017 1/4/2018

Remarks: OTHR - WisDOT project leader left state service. Consultantcontract needed amendment to finish finals. Submitted finalsrecords 2 months past goal date. ESG

CCO pending 5/25/18 ESG

Code DescriptionOTHR Other

City o

LUNDA CONSTRUCTION COMPANY

9995-03-61

City Marinette, Lift Structure

Marinette20170411025 Paul Zoellner 03/16/2018 3/29/2018

Remarks: None

USH

MICHELS CORPORATION

1517-75-83

Ush 10 - Ush 10/Sth 44110Winnebago

20170509016 Kurt Peters 06/29/2018

Remarks: CDLY - Electrical subcontractor (Bodart) delayed Conditional FinalAcceptance by not turning in proper materials certifications in atimely manner. SLV 8-2-18.

Code DescriptionCDLY Contractor Delay

Page 13 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 14: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: NE

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

WCL

NORTHEAST ASPHALT, INC

1590-16-71

Wcl - Ush 141008Marinette

20170509017 Paul Zoellner 06/08/2018 8/14/2018

Remarks: None

Baile

NORTHEAST ASPHALT, INC

4150-17-71

Baileys Harbor - Sister Bay57Door

20170509018 Jeremy Ashauer 06/12/2018 8/14/2018

Remarks: None

STH

5/25/2018

CONCRETE STRUCTURES, INC.

6570-08-72

Main Street, City Of Seymour055Outagamie

20170509027 Tim Verhagen 11/14/2017 1/4/2018

Remarks: PLFC - Records submited 1 month past goal date. LLLMTLS - Non-performance issue resolution requiring CCO. ESGAwaiting contractor decision on concrete core testing. LLL

Code DescriptionMTLS Nonconforming Materials

PLFC Project Leader Delay/Finals Corrections Needed

Gree

NORTHEAST ASPHALT, INC

4125-08-71

Green Bay-Kewaunee29Brown

20170613032 Andrew Fulcer 07/06/2018

Remarks: None

Page 14 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 15: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: NE

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

Town

RADTKE CONTRACTORS INC.

4376-06-71

T Carlton, St Peters RdTownKewaunee

20171114018 Jeremy Ashauer 07/24/2018 8/14/2018

Remarks: None

Apple

ZENITH TECH., INC. - WAUKESHA

1120-60-71

Appleton-Kaukauna

Outagamie20171114039 Tim Rank 08/07/2018

Remarks: None

SHEB

JAMES PETERSON SONS, INC.

1223-17-71

Sheboygan-Manitowoc43Sheboygan

20171114040 Brian Haen 08/17/2018

Remarks: None

Seym

NORTHEAST ASPHALT, INC

6570-08-71

Seymour - Angelica55Outagamie

20171114041 Tim Verhagen 07/20/2018

Remarks: None

Ocon

PHEIFER BROTHERS CONSTRUCTIONCO., INC.

9087-01-71

Oconto Co, Cth AaAAOconto

20180109018 Matt Ternes 07/13/2018

Remarks: None

Page 15 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 16: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: NE

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

USH

R & R WASH MATERIALS, INC.

4530-06-73

Ush 45 - Ecl067Fond Du Lac

20180410012 Bryan Learst 07/31/2018

Remarks: None

Fond

NORTHEAST ASPHALT, INC

1440-38-60

Fond Du Lac-Plymouth023Sheboygan

20180508016 Paul Brauer 08/16/2018

Remarks: None

Page 16 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 17: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: NEL

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

City M

8/13/2018

KENNY CONSTRUCTION COMPANY

9995-05-71

City Marinette, Hattie St,Menominee River Bridge &Approach

CSMarinette

20170214013 Craig Treadway-JT 06/17/2018 8/1/2018

Remarks: None

City S

DRAX INC.

4996-19-71

C Sheboygan, 8th StreetLOCSheboygan

20170613041 Craig Treadway-JT 04/30/2018 5/8/2018

Remarks: None

Page 17 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 18: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: NW

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

Supe

CHIPPEWA CONCRETE SERVICES, INC.

1190-43-71

Superior - Rockmont Rd2Douglas

20141111015 Brendan Dirkes 06/30/2016 10/3/2016

Remarks: CNQI - DOT submitted letter to contractor regarding the weigh inmotion (WIM) system not passing the Continuous Operating Testper special provisions. 1/4/2017 - KG, Contract Spec.

Code DescriptionCNQI Construction Quality Issues/Repairs to be Addressed

Baldw

3/27/2017

LUNDA CONSTRUCTION COMPANY

1020-01-88

Baldwin - MenomonieBBSt Croix

20160209021 Stacie Lambele 10/31/2016 7/2/2018

Remarks: 12/4/2017 - Additional work needed due to washout repairs.8/15/2018 - Retainage reduced to $5,000.00. JLO

Code DescriptionCNQI Construction Quality Issues/Repairs to be Addressed

1 box Czec

MATHY CONSTRUCTION COMPANY

7730-00-60

Czechville - Mondovi88Buffalo

20160209026 Nicole Passuello 12/02/2016 1/3/2017

Remarks: None

Code DescriptionOTHR Other

Page 18 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 19: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: NW

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

City S

5/15/2017 5/19/2017

PCIROADS, LLC

1198-03-72

City Superior, E 2nd St53Douglas

20160510046 Brendan Dirkes 10/29/2016 12/9/2016

Remarks: Quantity dispute involving subcontractor.

Code DescriptionQTYD Quantity Disputes

PLFC Project Leader Delay/Finals Corrections Needed

1 BoxCity L

6/4/2018

HAAS SONS, INC.

7040-01-73

City Loyal, South & Main St HelmSt - Elm Dr

98Clark

20161213040 Dave Koepp 05/30/2018 7/6/2018

Remarks: 8/13/2018 - Waiting on conditional final acceptance until someissues are worked out. Expect to have done in the next few weeks.JLO

Code DescriptionOTHR Other

Page 19 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 20: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: NW

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

1 BoxAshla

3/8/2018 4/9/2018

A-1 EXCAVATING INC.

8160-04-64

Ashland - Bayfield13Bayfield

20161213042 Philip Keppers 07/27/2017 3/20/2018

Remarks: 2/21/2018 - Pipe job completed in middle of summer & PL hadpaving project that followed. Last summer Andy Stensland saidthat finals for 8160-04-64 would be done on schedule for pavingproject 8160-03-71. - JLO5/14/2018 - Will have additional work to be done spring 2018. Willsend new TF when that is complete - JLO.

Code DescriptionOTHR Other

Villag

8/21/2018

A-1 EXCAVATING INC.

1570-02-73

V Turtle Lake, USH 88Barron

20170314030 Brendan Dirkes 04/23/2018

Remarks: 12/12/2017 - Waiting to send conditional final acceptance. Projectis suspended until spring 2018. Time charges stop date will beremoved once contract mod to extend time is completed to ensurethat liquidated damages are not charged. JLO6/20/2018: Village is not accepting proposal for repairs. Conditionalfinal acceptance on hold until that is resolved. JLO

Melle

4/10/2018

MUSSON BROS., INC.

1610-08-77

Mellen - Ashland, Golf Course Rdto Buttersworth Rd

13Ashland

20170314031 Matthew Dickenson 10/31/2017 1/16/2018

Remarks: 12/19/2017 - Will wait until spring to send cond final acceptancedue to late finish to project. Will check in spring. JLO

Code DescriptionPLST Punch List Items to be Completed

Page 20 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 21: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: NW

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

St Cr

MATTISON CONTRACTORS, INC.

1570-01-74

St Croix Falls - Turtle Lake8Polk

20170509041 Beth Cunningham 06/29/2018 8/14/2018

Remarks: 7/10/2018 - Punch list items still need to be completed beforeconditional final acceptance letter can be sent. JLO

Spoo

LUNDA CONSTRUCTION COMPANY

1560-00-71

Spooner - Hayward63Washburn

20170613037 Matt Dickenson 11/02/2017 1/3/2018

Remarks: 12/13/2017 - Contractor repairs needed in the spring. Conditionalfinal acceptance withheld until repairs have been completed. - JLO

Code DescriptionCNQI Construction Quality Issues/Repairs to be Addressed

NW R

B & B ELECTRIC, INC.

1000-08-81

Nwregion,Var SgnlizedIntersections

Northwest Region Wide20170711017 Dave Koepp 07/11/2018 8/6/2018

Remarks: None

Town

LARSON CONSTRUCTION CO., INC.

8449-00-70

T Edgewater, Harvest LaneTownSawyer

20171114025 Matt Dickenson 06/26/2018 7/20/2018

Remarks: None

Page 21 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 22: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: NW

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

Huds

MONARCH PAVING COMPANY

1020-03-81

Hudson - Baldwin094St Croix

20171114043 Jesse Larson 08/01/2018

Remarks: None

Luck

MONARCH PAVING COMPANY

8010-01-77

Luck - Siren35Polk

20171114044 Beth Cunningham 08/17/2018

Remarks: None

1 BoxMeno

NORCON CORPORATION

1022-03-83

Menomonie - Eau Claire

Dunn20171212024 Matthew Thornsen 06/22/2018 7/6/2018

Remarks: 7/10/2018 - Waiting for punch list items to be complete beforeconditional final acceptance letter can be sent. JLO

Town

CONCRETE STRUCTURES, INC.

7239-00-70

T Adams, W Kenyon RoadTownJackson

20171212025 Tyler Rongstad 06/22/2018 7/9/2018

Remarks: None

Town

LARSON CONSTRUCTION CO., INC.

8421-00-70

T Atlanta, Fetke RoadTownRusk

20171212028 Mohamad Hayek 06/28/2018

Remarks: None

Page 22 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 23: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: NW

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

CTH

HAAS SONS, INC.

7175-00-71

Cth Oo - Cth H

Trempealeau20180109027 Nicole Passuello 07/20/2018

Remarks: None

CTH

LARSON CONSTRUCTION CO., INC.

7322-00-70

Cth D - Cth NHJackson

20180109028 Tyler Rongstad 07/05/2018

Remarks: None

Town

LARSON CONSTRUCTION CO., INC.

8394-00-71

T Summit, Pelkey RoadTownDouglas

20180109031 Phil Keppers 08/15/2018

Remarks: None

Mino

MONARCH PAVING COMPANY

1196-00-70

Minong - Solon Springs053Washburn

20180213026 Brendan Dirkes 08/21/2018

Remarks: None

CTH

LARSON CONSTRUCTION CO., INC.

7175-00-70

Cth E - Cth Oo

Trempealeau20180213028 Nicole Passuello 06/22/2018 8/22/2018

Remarks: None

Page 23 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 24: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: NW

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

STH

LARSON CONSTRUCTION CO., INC.

7178-00-70

Sth 95 - Cth D

Trempealeau20180213029 Jesse Larson 06/12/2018 7/9/2018

Remarks: None

Town

LARSON CONSTRUCTION CO., INC.

8888-00-70

T Holway, Wren DriveTownTaylor

20180213031 Mohamad Hayek 06/12/2018 7/10/2018

Remarks: None

Alma

HEGG CONTRACTORS, INC.

7110-00-72

Alma - Mondovi

Buffalo20180313037 Matthew Thornsen 08/15/2018

Remarks: 8/13/2018 - Partial acceptance given for work completed betweenStation 18+00 & end of project per standard specification105.11.11. effective 8/1/2018. JLO

T Arc

LARSON CONSTRUCTION CO., INC.

7276-00-72

T Arcadia, Mill RoadTownTrempealeau

20180313039 Jesse Larson 05/21/2018 7/30/2018

Remarks: 7/10/2018 - Waiting for one more document from contractor beforeconditional final acceptance can be sent. JLO

1 BoxNW R

NORCON CORPORATION

1020-11-82

St Croix County, Interstate 94094St Croix

20180508032 Tyler Rongstad 07/26/2018 8/22/2018

Remarks: None

Page 24 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 25: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: NW

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

Dairy

JANKE GENERAL CONTRACTORS, INC.

8010-02-78

Dairyland - Superior, Black RiverBrg B-16-0085

DouglasEM8010-02-78 Phil Keppers 07/03/2018

Remarks: None

Page 25 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 26: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: NWL

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

STH

JAMES PETERSON SONS, INC.

8896-05-72

STH 73 - STH 13 (FR 13)MTaylor

20170314036 Chris Ehlert KL Engineering 09/23/2017

Remarks: Waiting for signed CCOs to close project.Records turned in late.

Code DescriptionCNQI Construction Quality Issues/Repairs to be Addressed

PLFC Project Leader Delay/Finals Corrections Needed

Villag

ZENITH TECH., INC. - WAUKESHA

7831-03-72

V Fairchild - NCLHEau Claire

20170411031 Chris Ehlert KL Engineering Inc. 12/01/2017

Remarks: None

City E

KRAEMER NORTH AMERICA, LLC

7995-02-46

C Eau Claire, Grand Avenue

Eau Claire20170411033 Chris Ehlert KL Engineering 11/17/2017 1/10/2018

Remarks: None

Hawt

JAMES PETERSON SONS, INC.

8766-00-71

Hawthorne - PoplarDDouglas

20170411037 Chris Ehlert KL Engineering 09/13/2017

Remarks: None

Page 26 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 27: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: NWL

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

T Ha

JANKE GENERAL CONTRACTORS, INC.

8891-00-70

T Hammel, Center AvenueTownTaylor

20170509049 Chris Ehlert KL Engineering 05/21/2018

Remarks: None

STH

LARSON CONSTRUCTION CO., INC.

8780-00-71

Sth 40 - Sth 27JRusk

20170711020 Chris Ehlert KL Engineering 06/06/2018

Remarks: None

MILL

12/15/2008 11/7/2008 12/15/2008

TREMPEALEAU COUNTY HIGHWAYCOMMISSIONER

7286-01-70

MILL RDSTTrempealeau

LFA7286-01-70 Chris Ehlert 12/03/2007

Remarks: None

Sawy

8/3/2017

SAWYER COUNTY HIGHWAYCOMMISSIONER

8450-00-70

Sawyer County Bike & Ped TrailSystem

HwySawyer

LFA8450-00-70 Jim Bednar 09/20/2016

Remarks: None

Hayw

SAWYER COUNTY HIGHWAYCOMMISSIONER

8452-05-72

Hayward - Sth 27TSawyer

LFA8452-05-72 Jim Bednar 07/24/2014

Remarks: None

Page 27 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 28: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: NWL

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

Lamp

2/17/2017

WASHBURN COUNTY HIGHWAYCOMMISSIONER

8801-00-71

Lampson - Ush 63FWashburn

LFA8801-00-71 Jim Bednar 10/20/2015

Remarks: None

Sth 4

1/22/2015 11/5/2013 5/2/2013 5/29/2013

CHIPPEWA COUNTY HIGHWAYCOMMISSIONER

8913-06-70

Sth 40 - Sth 124BChippewa

LFA8913-06-70 Stacie Lambele 10/28/2011

Remarks: None

Page 28 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 29: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: SE

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

S 27t

11/3/2016 12/13/2016 1/23/2017

ZIGNEGO COMPANY, INC.

2265-08-70

S 27th St241Milwaukee

20140114005 Christine Hanna 06/30/2015

Remarks: Plant Proving Period until 10-15-16Cedarburg Landscaping Wage Complaint - Margaret Powers LCSCDLY-Semi-Final not returned in the required 30 days

Code DescriptionCDLY Contractor Delay

PLFC Project Leader Delay/Finals Corrections Needed

WCLC Wage Claim/Investigation Labor Compliance

N-S F

10/11/2016 11/7/2016 12/19/2016

ZIGNEGO COMPANY, INC.

1033-02-72

N-S Freeway, Sth 20 Interchange94Racine

20140211007 Steve Kuhl 11/24/2015 12/23/2015

Remarks: OTHR - A section of concrete pavement was found to be defectiveover the winter months of 2015 and needed to be replaced. Thiswas done this year by the contactor Zignego at no cost to theDepartment.CDLY - Semi-Final not returned in the required 30 days.CLMS- Claim filed

Code DescriptionCDLY Contractor Delay

CLMS Claims

OTHR Other

Page 29 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 30: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: SE

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

Bay V

4/4/2018 4/5/2018 5/3/2018

LALONDE CONTRACTORSINCORPORATED

1302-00-71

Bayview - Downtown BikewayHWYMilwaukee

20140408014 Christine Hanna 02/08/2018 1/8/2015

Remarks: QTYD - given until the end of October 2018 to go through thedispute process.

Code DescriptionQTYD Quantity Disputes

Milwa

J.P. CULLEN & SONS, INC.

1000-40-70

Milwaukee Intermodal StationHWYMilwaukee

20140513019 Tony Minto 06/03/2016 8/2/2016

Remarks: None

Code DescriptionCNQI Construction Quality Issues/Repairs to be Addressed

Page 30 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 31: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: SE

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

East-

1/16/2018 1/3/2018 8/14/2018

MICHELS CORPORATION

1060-30-70

East-West Freeway94Waukesha

20141209005 Steven Kuhl 09/30/2016

Remarks: WCLC - Cedarburg Landscaping, LCS NataliaSFST - no staff available to review recordsCLMS- Michels filed a claim that is going to CO for a decision. -Denied per Steve

Code DescriptionCLMS Claims

SFST Staff Shortages

WCLC Wage Claim/Investigation Labor Compliance

27th

8/15/2018 8/15/2018

MICHELS CORPORATION

2265-16-70

27th St, City Franklin/Oak Creek241Milwaukee

20150210013 Charles Krummel 05/26/2017 2/23/2017

Remarks: None

Code DescriptionPLFC Project Leader Delay/Finals Corrections Needed

Page 31 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 32: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: SE

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

Zoo I

8/31/2017 12/4/2017 1/17/2018

ZIGNEGO COMPANY, INC.

1060-34-73

Zoo Ic, Dpw Site Facilities45Milwaukee

20150310014 Sean Race 10/15/2017

Remarks: Cedarburg Landscaping Wage Complaint -Natalia Vega Invest. LCSCraftmaster Wage Audit - Margaret Powers 8-29-16 closed 11-22-16Proving Period until 10-15-17Time Charges Stopped date of 5-20-16 removed.

Code DescriptionWCLC Wage Claim/Investigation Labor Compliance

Sumn

10/4/2016 10/6/2016 12/12/2016

PAYNE AND DOLAN, INC

2310-19-70

Sumner St, City Hartford60Washington

20150512026 John Kanzenbach 11/04/2015

Remarks: CDLY- McGuire and Habermehl would not respond to materialinquiries; Semi-Final not returned in the required 30 days.MTLS - McGuire would not agree to penalities associated withnon-performanceCedarburg Landscaping Wage Complaint - Margaret Powers LCS

Code DescriptionCDLY Contractor Delay

MTLS Nonconforming Materials

WCLC Wage Claim/Investigation Labor Compliance

North

3/5/2018

STARK PAVEMENT CORPORATION

2290-17-70

Northwestern Ave, City Racine38Racine

20150915005 Charles Krummel 11/30/2016 2/20/2017

Remarks: Proving Period ends 10-15-18

Page 32 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 33: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: SE

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

Zoo I

4/12/2017 4/17/2017 5/16/2017

ZENITH TECH., INC. - WAUKESHA

1060-34-84

Zoo IC, Center St Bridge45Milwaukee

20151208010 Sara Feuling 10/01/2016

Remarks: Choice Electric investigation - LCS Natalia - closed 11-16-17

Cedarburg Landscaping Wage Investigation Active 9-6-16

Code DescriptionWCLC Wage Claim/Investigation Labor Compliance

Highw

5/29/2018 6/7/2018

OUTDOOR LIGHTING CONST CO INC

1000-68-91

Highway Maintenance LightingHwySoutheast Region Wide

20160510010 John Kanzenbach 04/13/2017 5/1/2017

Remarks: OTHR - Waiting on PM to approve CCOQTYD - Disputing 3 quantities

Code DescriptionQTYD Quantity Disputes

OTHR Other

Loom

SUPER WESTERN, INC.

2240-13-60

Loomis Rd, City Muskego36Racine

20160510019 John Kanzenbach 05/22/2017 7/13/2017

Remarks: CNQI - curb replacement neededPLST - punch list items to be completed

Code DescriptionPLFC Project Leader Delay/Finals Corrections Needed

CNQI Construction Quality Issues/Repairs to be Addressed

Page 33 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 34: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: SE

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

104th

7/30/2018 8/2/2018

CORNERSTONE USA LLC.

1310-16-70

STH 50 at Des Plaines River165Kenosha

20160614010 Brian Boothby 08/04/2017 1/25/2018

Remarks: Margaret Powers-Inherited this project with major payroll issues9-20-17. I am working with Penhall to resolve issues. Resolved1-25-18CDLY & MTLS - waiting on ancillary QMP testsQTYD - Open Graded and CABC volumes

Code DescriptionCDLY Contractor Delay

MTLS Nonconforming Materials

QTYD Quantity Disputes

N 76t

ZENITH TECH., INC. - WAUKESHA

2140-13-70

N 76th St, City Milwaukee181Milwaukee

20160913004 Kurt Flierl 11/13/2017 12/20/2017

Remarks: MTLS - Hit List rec'd in May. Working on closing per Kurt

Code DescriptionMTLS Nonconforming Materials

Page 34 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 35: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: SE

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

Fond

4/23/2018

PAYNE AND DOLAN, INC

2475-12-60

Fond Du Lac Ave, VilillageGermantown Mequon Rd - CTH P

145Washington

20160913006 Kurt Flierl 09/20/2017 9/29/2017

Remarks: CDLY - contractor missing material documentation specifically - buyAmerica cert

Code DescriptionCDLY Contractor Delay

Meno

MICHELS CORPORATION

3360-09-72

Menomonee Falls - Slinger MapleRd - STH 60

175Washington

20161108030 John Kanzenbach 06/01/2018 3/5/2018

Remarks: None

Summ

6/19/2018 6/25/2018

PAYNE AND DOLAN, INC

3100-06-60

Summit Ave, Village Summit USH18 - CTH DR

67Waukesha

20161213013 Brian Boothby 08/25/2017 7/11/2017

Remarks: OTHR - PCL was ill and unable to complete the work on time.CDLY - S/F not returned in the required 30 days.

Code DescriptionCDLY Contractor Delay

OTHR Other

Page 35 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 36: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: SE

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

Zoo I

MICHELS CORPORATION

1060-39-90

Zoo IC, 2017 TMP ProjectsVarMilwaukee

20170314013 Sara Feuling 11/01/2017 12/11/2017

Remarks: CNQI - Working with BOS regarding S-40-456 may do someadditioanl work related to the sign structure.

Code DescriptionMTLS Nonconforming Materials

CNQI Construction Quality Issues/Repairs to be Addressed

Capit

LUNDA CONSTRUCTION COMPANY

2025-13-71

Capitol Drive Vil & City Pewaukee190Waukesha

20170314014 Lance Fischer 05/24/2018

Remarks: DNR - NOT required for closeout

Sign

HIGHWAY LANDSCAPERS, INC.

1000-20-69

Sign Bridge Repair&Replacement2017

I-43Southeast Region Wide

20170411012 Kurt Flierl 11/16/2017 1/3/2018

Remarks: OTHR - Plan issue required refabrication of Sign Supports per Kurt

Code DescriptionOTHR Other

Page 36 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 37: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: SE

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

Gree

PAYNE AND DOLAN, INC

2390-09-70

Green Bay Road31Racine

20170411017 Brian Boothby 05/18/2018 7/5/2018

Remarks: DNR - NOT required for closeout

Milwa

ZENITH TECH., INC. - WAUKESHA

1100-36-72

Milwaukee - Fond Du Lac41Waukesha

20170509007 Steven Kuhl 07/13/2018

Remarks: DNR - NOT required for closeout

Ocon

ZIGNEGO COMPANY, INC.

1370-15-71

Oconomowoc - Waukesha16Waukesha

20170509008 John Kanzenbach 04/20/2018 7/31/2018

Remarks: DNR - NOT required for closeout

N-S F

CORNERSTONE USA LLC.

1030-11-71

N-S Freeway, CTH K Interchange94Racine

20170613006 Ken Kiepczynski 07/11/2018

Remarks: DNR - NOT required for closeout

North

6/4/2018 8/15/2018

FAHRNER ASPHALT SEALERS, LLC

1228-03-64

North South Freeway43Ozaukee

20170613020 Steven Kuhl 05/02/2018 6/7/2018

Remarks: None

Page 37 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 38: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: SE

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

STH

HIGHWAY LANDSCAPERS, INC.

1370-15-72

Sth 1616Waukesha

20170613029 John Kanzenbach 06/29/2018

Remarks: DNR - NOT required for closeout

STH

LALONDE CONTRACTORSINCORPORATED

2375-07-70

STH 32

Milwaukee20170912006 Brian Boothby 07/06/2018

Remarks: DNR - NOT required for closeout

N-S F

HOFFMAN CONSTRUCTION COMPANY

1030-24-70

N-S Freeway, Sth 11 InterchangeIH94Racine

20171114036 Heather Sackman 06/20/2018

Remarks: DNR - NOT required for closeout

Zoo I

WALSH CONSTRUCTION COMPANY II,LLC

1060-34-88

Zoo Ic, Ih 894 Sb Noise Wall894Milwaukee

20180109012 Mike Burns 08/10/2018 8/13/2018

Remarks: None

Wash

STARK PAVEMENT CORPORATION

2250-16-70

Washington Ave, V Mount Pleasant

Racine20180213008 Heather Sackman 05/15/2018

Remarks: None

Page 38 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 39: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: SE

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

N-S F

ZIGNEGO COMPANY, INC.

1035-04-71

N-S Freeway, Ken&Rac Work ZonePrep

041Racine

20180213034 Ken Kiepczynski 07/31/2018

Remarks: DNR - NOT required for closeout

Page 39 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 40: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: SEL

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

S Wh

9/26/2016 11/7/2016 11/23/2016

ZENITH TECH., INC. - WAUKESHA

2660-05-70

S Whitnall AveStMilwaukee

20150210014 DAAR Fred Moeller 06/01/2016

Remarks: WCLC - 2/19/16 Wage Investigation preventing Payroll Clear Date

Code DescriptionWCLC Wage Claim/Investigation Labor Compliance

W No

8/4/2016 10/28/2016 11/23/2016

ZENITH TECH., INC. - WAUKESHA

2135-03-70

W North Ave BridgeStMilwaukee

20150414018 DAAR Joe Klarkowski 06/08/2016

Remarks: WCLC - 2/19/16 Wage Investigation preventing Payroll Clear DatePLFC - 9/15/16 Finals corrections needed. Resolved 10/28/16.QTYD - 11/23/16 Semi-Final quantity dispute. Resolved 1/4/17.

Code DescriptionPLFC Project Leader Delay/Finals Corrections Needed

QTYD Quantity Disputes

WCLC Wage Claim/Investigation Labor Compliance

N 27t

3/23/2018 8/3/2018

MILWAUKEE GENERAL CONSTRUCTIONCOMPANY, INC.

2265-00-74

N 27th StStMilwaukee

20160614009 DAAR Fred Moeller 04/29/2017

Remarks: OTHR 7/1/17 Water box in curb ramp to be addressed. Input fromcity needed. 8/23/17 Waiting for decision from LPPM.

Code DescriptionOTHR Other

Page 40 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 41: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: SEL

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

CTH

LALONDE CONTRACTORSINCORPORATED

2160-01-72

CTH U Intersection CTH U & CTHBB

CT UMilwaukee

20161213011 DAAR Scott Friedl 06/05/2018 6/11/2018

Remarks: None

S 76t

LALONDE CONTRACTORSINCORPORATED

2160-15-70

S 76th StreetUMilwaukee

20170411016 DAAR Scott Friedl 01/19/2018

Remarks: None

Beloi

SUPER WESTERN, INC.

2790-00-70

Beloit RoadLOCWaukesha

20170411019 DAAR Scott Friedl 07/13/2018

Remarks: None

N 51s

3/9/2018 7/10/2018

LUNDA CONSTRUCTION COMPANY

2984-07-75

North 51st BlvdLOCMilwaukee

20170411021 DAAR Scott Friedl 12/22/2017 1/9/2018

Remarks: None

CTH

7/30/2018 8/3/2018

VINTON CONSTRUCTION COMPANY

4880-01-71

Cth D (Main Street)DOzaukee

20170509012 DAAR Scott Friedl 11/22/2017 1/2/2018

Remarks: None

Page 41 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 42: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: SEL

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

CTH

J & A POHL, INC.

2753-01-70

Cth VVVVWaukesha

20170711011 DAAR Joe Klarkowski 05/02/2018 5/7/2018

Remarks: None

Page 42 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 43: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: SW

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

Moun

HOFFMAN CONSTRUCTION COMPANY

1206-07-84

Mount Horeb - Madison18Dane

20140708003 Christopher Fredrick 05/31/2017 7/20/2017

Remarks: CNQI - Paint on B-13-653 bridge railings began to peel and isunacceptable. The department is requiring the contractor to fix dueto it being defective work. The punch list will remain open until thiswork is completed. (CF 11/16/2017)

Code DescriptionCNQI Construction Quality Issues/Repairs to be Addressed

Lake

7/30/2018

MASHUDA CONTRACTORS, INC.

1674-00-80

Lake Delton - Sauk City Road12Sauk

20141209001 Gregory Brecka 11/11/2016

Remarks: CDLY - Still waiting on Mashuda to submit CCO information.GB9/6/17ka

Code DescriptionCDLY Contractor Delay

Page 43 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 44: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: SW

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

I 90 -

GERKE EXCAVATING INC

7570-02-77

I 90 - West Salem16La Crosse

20160112007 Daniel Kleinertz 11/14/2016 7/17/2017

Remarks: 5/2/17 Serveral attempts to contact concrete sub to correct errors inmaterials and contractrual doc still needs to be remedied.8/8/17 Still waiting on materials and contract docs.9/26/17 PL has multiple projects to final and unable to work OT.5/2/17 Review revealed the need for reseeding, minor clean-up,and addressing property owner complaints. DH Completed12/11/17 Still addressing Property Owner's draining issues. 7/11/18Same issue.

Code DescriptionCDLY Contractor Delay

PLST Punch List Items to be Completed

SFST Staff Shortages

La C

2/9/2018

CHIPPEWA CONCRETE SERVICES, INC.

1070-00-71

La Crosse - Sparta Safety RestArea No. 31 IH 90 (Eastboun

90La Crosse

20160308003 Craig Fisher 05/15/2017 12/8/2017

Remarks: 12/11/17 Repair work & landscaping delays. Documentation notsubmitted. DH7/10/18 HVAC issue require conmod. Cont care cycles.

Code DescriptionCNQI Construction Quality Issues/Repairs to be Addressed

CDLY Contractor Delay

Page 44 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 45: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: SW

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

Type

7/23/2018

ARBOR GREEN, INC.

1000-20-74

Type 1 Sign ReplacementHwySouthwest Region Wide

20160614001 Iver Peterson 09/21/2017 12/21/2017

Remarks: Payroll Clear: Missed due to Arbor Green still working on doingreplacement signs.-BP

Illinoi

1/24/2018

ROCK ROAD COMPANIES, INC.

1003-10-74

Illinois State Line - Madison39Rock

20160614003 Jamie Grainger 10/13/2017 1/8/2018

Remarks: QTYD-Rock Road has had the final earthwork volumes sinceJanuary, but have delayed meeting with the project team.Fortunately, this has just been resolved this week. Therefore, wewill process the final earthwork within the next week to week and ahalf. Rock Road needs to get us one more small piece ofinformation first regarding grading under Woodman Road, butexpect to see that next week.-6/29/18 Jason Schrandt

Code DescriptionQTYD Quantity Disputes

Sauk

J F BRENNAN COMPANY, INC.

1206-04-63

Sauk City - Cambridge12Dane

20160614004 Gregory Brecka 06/20/2018

Remarks: None

Madi

ZENITH TECH., INC. - WAUKESHA

1010-02-78

Madison - Portage39Dane

20160712002 Marc Schweiger 07/15/2018

Remarks: None

Page 45 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 46: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: SW

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

Moun

SPEEDWAY SAND & GRAVEL, INC.

1206-07-74

Mount Horeb - Madison18Dane

20160712004 Christopher Fredrick 10/27/2017 3/21/2018

Remarks: punch list is unable to be completed due to the freezing weather.The punch list is scheduled to be completed in the Spring of 2018(CF 2/13/18)

Code DescriptionPLST Punch List Items to be Completed

Lake

TRIERWEILER CONSTRUCTION &SUPPLY COMPANY, INC.

1674-00-81

Lake Delton - Sauk City12Sauk

20160712006 Gregory Brecka 09/12/2017

Remarks: None

Wiota

1/9/2018

IVERSON CONSTRUCTION, A DIV. OFMATHY CONSTRUCTION

5590-03-60

Wiota - Argyle78Lafayette

20160913002 Alex Hagen 11/02/2017

Remarks: None

Page 46 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 47: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: SW

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

Illinoi

HOFFMAN CONSTRUCTION COMPANY

1007-11-75

Illinois State Line - Madison S DaneCounty Line - E Church

39Dane

20161108001 Christopher Fredrick 11/18/2017 4/18/2018

Remarks: The punch list is unable to be completed due to the freezingweather. The punch list is scheduled to be completed in the Springof 2018 (CF 2/13/18)

Code DescriptionPLST Punch List Items to be Completed

WCLC Wage Claim/Investigation Labor Compliance

Madi

D L GASSER CONSTRUCTION

1010-02-84

Madison - Portage, CTH CS -Portage Interchange

39Columbia

20161108002 Matthew Dapp 11/24/2017 3/13/2018

Remarks: no late codes needed, SC date enter was temp issue to resolveissue per CO 12/21/17

City C

1/19/2018 7/26/2018

MICHELS CORPORATION

1401-02-71

City Columbus, James St IndustrialDr - River Rd

16Columbia

20161108005 Karla Knorr 11/16/2017 1/25/2018

Remarks: None

Page 47 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 48: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: SW

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

Monr

1/24/2018 1/29/2018

MATHY CONSTRUCTION COMPANY

5660-00-63

Monroe - Evansville Weiss Ln - SJct STH 104

59Green

20161108009 Karla Knorr 09/26/2017

Remarks: CLMS - Claim at Bureau level KKka5/16/18 Resolved 7/20/18KKkaWCLC - Payroll clear date recalled due to issues with trucking firmsassociated with McGuire RBka 7/16/18

Code DescriptionWCLC Wage Claim/Investigation Labor Compliance

CLMS Claims

Maus

LUNDA CONSTRUCTION COMPANY

1018-00-71

Mauston - New Lisbon STH 80Overhead & Approaches

Juneau20161108022 Travis Buros 12/01/2017 12/28/2017

Remarks: 6/1/18 Late winter caused delay in completing spring punch listitems and review of overlay repair. 6/8/18 Resolved.7/10/18 Working on finals. DH

Code DescriptionPLST Punch List Items to be Completed

Page 48 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 49: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: SW

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

Cass

11/16/2017 11/17/2017 12/21/2017

GERKE EXCAVATING INC

7575-08-72

Cass St, City La Crosse 4th St - 7thSt

16La Crosse

20161108025 Todd Waldo 07/07/2017 9/5/2017

Remarks: 1/4/18: Inadvertently sent SF b/f Landscaping Care CyclesComplete. Final is October 15, 2018. DH12/13/17 Subcontractor disputing quantity at SF PL reviewing.Done. DH

Code DescriptionQTYD Quantity Disputes

OTHR Other

IL Sta

3/7/2018 8/13/2018

ROCK ROAD COMPANIES, INC.

1007-10-81

Illinois State Line - Madison CTHAB Bridge B-13-726

I39Dane

20161213001 Mark Sponem 09/14/2017 11/15/2017

Remarks: CDLY-Contractor not responding to correspondence and delay ingetting a resolution for issuesQTYD-Went back and forth regarding plan/change order quantitiesand waiting on change order signaturesPLFC-Revisions to finals checkSFST-Had to conduct inspection on two projects, due to shortage instaff, taking away from project finals being performed

Code DescriptionCDLY Contractor Delay

PLFC Project Leader Delay/Finals Corrections Needed

QTYD Quantity Disputes

SFST Staff Shortages

Page 49 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 50: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: SW

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

La C

MICHELS CORPORATION

1071-06-82

La Crosse - Galesville Livingston St- W George St

53La Crosse

20161213002 Robert Winterton 05/24/2018

Remarks: None

Cash

5/14/2018

GERKE EXCAVATING INC

5100-08-72

Cashton - Hillsboro STH 27 -Village Cashton EVL

33Monroe

20161213004 Anthony VanderWielen 10/30/2017 12/12/2017

Remarks: 7/26/18 Add'l work req'd by property owners for the drainageissues.

Code DescriptionCNQI Construction Quality Issues/Repairs to be Addressed

Cam

ROCK ROAD COMPANIES, INC.

3671-00-71

Cambridge - London, USH 12 -CTH O

134Dane

20170110001 Mahesh Shrestha 09/25/2017 2/5/2018

Remarks: PLFC - Org PL had left the job and replacement PL is busy withother projects which delays project delivery. MSka 3/1/18CLMS - Contactor had submitted claim which SWR has beencommunicating for some time; is delaying project. MSka 3/1/18

Code DescriptionCLMS Claims

PLFC Project Leader Delay/Finals Corrections Needed

Page 50 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 51: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: SW

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

State

WESTERN REMAC, INC.

1000-20-75

Statewide Type I SignReplacement, Locations on STNper Annu

NONWaupaca

20170214023 Iver Peterson 11/17/2017 4/10/2018

Remarks: Intitially the Prime delayed the initial start of the project. On7/31/18, Prime filed a claim indicating a lack of soil information andthe need to mobilize several times delayed their progress.

Code DescriptionCLMS Claims

CDLY Contractor Delay

Illinoi

3/7/2018 8/2/2018

ROCK ROAD COMPANIES, INC.

1005-10-75

Illinois State Line - Madison39Rock

20170314001 Mark Sponem 09/20/2017 11/7/2017

Remarks: CDLY-Contractor not responding to correspondence and delay ingetting a resolution for issuesQTYD-Went back and forth regarding plan/change order quantitiesand waiting on change order signaturesSFST-Had to conduct inspection on two projects, due to shortage instaff, taking away from project finals being performed

Code DescriptionCDLY Contractor Delay

PLFC Project Leader Delay/Finals Corrections Needed

QTYD Quantity Disputes

SFST Staff Shortages

Page 51 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 52: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: SW

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

Lanc

2/19/2018 8/1/2018

H. JAMES & SONS, INC

1650-06-73

Lancaster - Boscobel

Grant20170314003 Daniel Kleinertz 11/03/2017

Remarks: 4/18/18 Punchlist work to be comple May 20186/12/18 PL items still to be completed. DH6/27/18 PL completed. Proceed to process final.7/10/18 Ready for SF. Not all payments to 1st tier and DBE enteredwhich is delaying payroll clear. DH

Code DescriptionCDLY Contractor Delay

PLST Punch List Items to be Completed

Sun P

3/26/2018

MICHELS CORPORATION

3050-02-72

Sun Prairie - Watertown19Jefferson

20170314005 Craig Hardy 11/13/2017 5/24/2018

Remarks: CDLY - Contractor did not finish the project until well after thecompletion date resulting in need for a final acceptance review inspring 2018. Mid-April snowfall delayed completion of the finalinspection review until late April. Contractor has a new work itemremaining list to address before project construction finals can becompleted. CHka 5-17-18

Code DescriptionCDLY Contractor Delay

STH

2/7/2018 8/9/2018

D L GASSER CONSTRUCTION

5098-00-72

STH 23 - Rock Springs154Sauk

20170314008 Gregory Brecka 05/18/2018 12/21/2017

Remarks: None

Page 52 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 53: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: SW

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

USH

ZENITH TECH., INC. - WAUKESHA

5300-01-83

Sauk City - Madison12Dane

20170613003 Greg Brecka 06/29/2018

Remarks: None

Maus

D L GASSER CONSTRUCTION

5880-03-63

Mauston - Wisconsin Dells12Juneau

20170613026 Gregory Brecka 10/26/2017

Remarks: CNQI - Epoxy edge line needed to removed and replaced. Workcompleted GBka 5/15/18

Code DescriptionCNQI Construction Quality Issues/Repairs to be Addressed

HOLL

IVERSON CONSTRUCTION, A DIV. OFMATHY CONSTRUCTION

5970-02-64

Hollandale - New Glarus39Green

20170613027 Jim Simpson 11/03/2017

Remarks: CNQI - There is concern over the pavement condition and aremedy is being negotiated with the contractor. JSka 5-17-18; HMAconcerns. Contractor is correcting issues in 2018. JOka5/24/18

Code DescriptionCNQI Construction Quality Issues/Repairs to be Addressed

WISC

NORCON CORPORATION

1014-00-65

Wisconsin Dells - Portage90Sauk

20170711002 Gregory Brecka 06/26/2018

Remarks: None

Page 53 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 54: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: SW

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

CITY

ZENITH TECH., INC. - WAUKESHA

6131-00-61

C Wisconsin Dells, BroadwayStreet

13Sauk

20170711007 Gregory Brecka 05/15/2018

Remarks: None

City W

LUNDA CONSTRUCTION COMPANY

3997-00-70

C Watertown, North Second Street

Dodge20170808003 Craig Hardy 08/08/2018

Remarks: None

Clayt

LARSON CONSTRUCTION CO., INC.

5001-00-70

Clayton - Soldiers GroveCCrawford

20170808012 Daniel Kleinertz 05/31/2018

Remarks: None

Town

CONCRETE STRUCTURES, INC.

5018-00-71

T Sheldon, Opal Road

Monroe20170912002 Todd Waldo 07/02/2018

Remarks: None

Town

8/10/2018

CONCRETE STRUCTURES, INC.

5671-00-76

T Darlington, Holland RoadTownLafayette

20170912003 Mahesh Shrestha 05/11/2018

Remarks: None

Page 54 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 55: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: SW

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

Maus

8/22/2018

JANKE GENERAL CONTRACTORS, INC.

1009-10-76

Mauston - Wisconsin Dells090Juneau

20170912010 Brian Meyer 06/13/2018

Remarks: None

State

7/12/2018 8/7/2018

CONCRETE STRUCTURES, INC.

5695-00-72

State Line - Sth 11

Lafayette20170912012 Mahesh Shrestha 05/10/2018 8/3/2018

Remarks: None

City M

LUNDA CONSTRUCTION COMPANY

1002-01-71

C Of Madison

Dane20171114002 Brad Schultz 06/29/2018

Remarks: None

Onta

MATHY CONSTRUCTION COMPANY

5130-02-62

Ontario - Tomah131Monroe

20171114008 Todd Waldo 06/14/2018

Remarks: None

Town

RADTKE CONTRACTORS INC.

5719-00-72

T Kendall, Bethel Grove Road

Lafayette20171114013 Mahesh Shrestha 06/05/2018

Remarks: None

Page 55 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 56: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: SW

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

Madi

QUALITY SANDBLASTING ANDCOATINGS, LLC

1111-02-63

Madison - Sun Prairie151Dane

20171114034 Alex Hagen 06/29/2018

Remarks: None

MAD

MICHELS CORPORATION

1112-07-60

Madison - Sun Prairie151Dane

20171114035 Alex Hagen 06/28/2018

Remarks: None

STH

D L GASSER CONSTRUCTION

5070-01-71

Sth 58 - Rock Springs154Sauk

20171212006 Daniel Kleinertz 08/03/2018

Remarks: None

I 94 -

7/12/2018

NORTHEAST ASPHALT, INC

3060-02-71

Ih 94 - Columbus73Columbia

20180109005 Jim Simpson 06/07/2018 8/8/2018

Remarks: None

STH

8/1/2018

RADTKE CONTRACTORS INC.

5289-00-72

Sth 56 - Sth 82SVernon

20180109006 John Bainter 06/12/2018

Remarks: None

Page 56 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 57: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: SW

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

Ft Atk

SUPER WESTERN, INC.

3575-03-72

Fort Atkinson - Whitewater12Jefferson

20180213001 Craig Hardy 07/28/2018

Remarks: None

Town

8/8/2018

CONCRETE STRUCTURES, INC.

5707-00-72

T Washington, Disch RoadTownGreen

20180213004 Mahesh Shrestha 06/06/2018

Remarks: None

Shull

CONCRETE STRUCTURES, INC.

5769-00-72

Shullsburg - Sth 81ULafayette

20180213005 Mahesh Shrestha 07/17/2018

Remarks: None

City L

MATHY CONSTRUCTION COMPANY

5991-05-19

C La Crosse, Market Street

La Crosse20180213006 Craig Fisher 08/03/2018

Remarks: None

CTH

LARSON CONSTRUCTION CO., INC.

5126-00-72

Cth W - Cth ANMonroe

20180313005 Anthony Vander Wielen 06/06/2018

Remarks: None

Page 57 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 58: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: SW

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

Fall R

LUNDA CONSTRUCTION COMPANY

6707-00-82

Fall River - Cambria146Columbia

20180410005 Mahesh Shretha 08/16/2018

Remarks: None

Boaz

MATTISON CONTRACTORS, INC.

5198-01-60

Boaz - Richland CenterQRichland

20180508004 Daniel Kleinertz 08/10/2018

Remarks: None

Page 58 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved

Page 59: Wisconsin Department of Transportation Finals Status … · Mat'l Clear Date SF to Contractor SF from Contractor Project Manager Contract ID Main Project ID County / Hwy / Description

Finals Status After Substantially Completed as of 8/22/2018Wisconsin Department of Transportation

Statewide Report Sorted by Region and Contract

Contractor

Region: SWL

Payroll Clear Date

FinalAcceptance

Mat'l ClearDate

SF toContractor

SF fromContractor

Project ManagerCounty / Hwy / DescriptionMain Project IDContract ID

SubstantiallyComplete

Villag

6/13/2017 6/15/2017

CONCRETE STRUCTURES, INC.

6218-00-72

Village Deforest, North StVDane

20160308009 Scott LaCoursiere OTIE 05/08/2017 6/14/2017

Remarks: Settlement in asphalt paving near storm sewer work in underinvestigation. Village and County have requested repairs be made.Resolution is expected Spring 2018. SAL

Code DescriptionCNQI Construction Quality Issues/Repairs to be Addressed

City J

ROCK ROAD COMPANIES, INC.

5990-00-36

City Janesville, Austin Rd, W CourtSt - Mineral Point Ave

LCLRock

20170110005 Mike Novey 10/16/2017 1/31/2018

Remarks: None

Page 59 of 59Printed 08/22/18 On - Substantially Complete Off: Final Estimate Approved