Wireless Deployment : Site Survey Access Network
SID ETP – Groupement Télécoms - 25 Mai 2005
![Page 2: Wireless Deployment : Site Survey Access Network SID ETP – Groupement Télécoms - 25 Mai 2005](https://reader036.vdocuments.mx/reader036/viewer/2022070306/55168a21550346a25b8b4c5a/html5/thumbnails/2.jpg)
40 GHz
Survey of Candidate Site
Site Engineering Solutions
Objectives
MSC/HLR
BTSBSC OMC-R
TCU
![Page 3: Wireless Deployment : Site Survey Access Network SID ETP – Groupement Télécoms - 25 Mai 2005](https://reader036.vdocuments.mx/reader036/viewer/2022070306/55168a21550346a25b8b4c5a/html5/thumbnails/3.jpg)
Site Construction and Preparation
Design
Contractsignature
ContractConsolidation
SubscribersForecast
PreliminaryNetworkDesign
Operations
Site Acquisition & Zoning
Installation & Commissioning
Network Acceptance
Network Integration
Pilot Integration TestingIn
Service
Systems & Network Integration Plans
Systems & Network Design
Detailed Consolidation
Test Plans
Detailed Engineering
Manufacturing & Delivery
TAS
Radio & Site Survey
Systems & Network Planning
Microwave Clearing
Systems Integration RF Verification
Project Management&
Network Design Authority
Project Management&
Field System Engineering
Extension&
Upgrade
RF OptimizationNetwork Optimization
Performance Monitoring
Cellular Network Engineering Process
![Page 4: Wireless Deployment : Site Survey Access Network SID ETP – Groupement Télécoms - 25 Mai 2005](https://reader036.vdocuments.mx/reader036/viewer/2022070306/55168a21550346a25b8b4c5a/html5/thumbnails/4.jpg)
Network Design andimplementation
strategy
Detailed analysis andField Preparation
NetworkOptimization
Pilot NetworkRoll out and
in service
CustomerInfo
GatheringMeasuring Equipment
BidProject
SystemDesign
Contract
Network Design
Cell Planning
BTS
Field TestsRadioFreq.
Qualif.
Network(VO,
NetworkOptimization
ApplicationEng'g
SiteSurvey
Radio Survey
Site Eng'g
Roll Out(VO,
Instal.)
SS and SE Activities in the Network Roll-out
![Page 5: Wireless Deployment : Site Survey Access Network SID ETP – Groupement Télécoms - 25 Mai 2005](https://reader036.vdocuments.mx/reader036/viewer/2022070306/55168a21550346a25b8b4c5a/html5/thumbnails/5.jpg)
Site Surveys + Reports
Site Engineering
Site Preparation
Aerial VerificationRF Model
Site Preparation Coordination
Site Preparation Coordination
Local Tests
Cabinet Installation
Site Document
Site Preparation AcceptedAs Built Document
Site InstallationAcceptance
Commissioning
The Site Installation Process
![Page 6: Wireless Deployment : Site Survey Access Network SID ETP – Groupement Télécoms - 25 Mai 2005](https://reader036.vdocuments.mx/reader036/viewer/2022070306/55168a21550346a25b8b4c5a/html5/thumbnails/6.jpg)
Cell Planning
BTS
Zone of search
The Site Specifications
Scope and Goals
![Page 7: Wireless Deployment : Site Survey Access Network SID ETP – Groupement Télécoms - 25 Mai 2005](https://reader036.vdocuments.mx/reader036/viewer/2022070306/55168a21550346a25b8b4c5a/html5/thumbnails/7.jpg)
Ease of:
• Handling
• Installation
• Commissioning
• Equipment functioning
• Maintenance
The Site Specifications
Collected Information
![Page 8: Wireless Deployment : Site Survey Access Network SID ETP – Groupement Télécoms - 25 Mai 2005](https://reader036.vdocuments.mx/reader036/viewer/2022070306/55168a21550346a25b8b4c5a/html5/thumbnails/8.jpg)
• General access
• Building access
• Unloading requirements
• BTS Room dimension requirements
?BTS
BTS
+
*x
?
The Site Specifications
Constraints Site Investigation Constraints
![Page 9: Wireless Deployment : Site Survey Access Network SID ETP – Groupement Télécoms - 25 Mai 2005](https://reader036.vdocuments.mx/reader036/viewer/2022070306/55168a21550346a25b8b4c5a/html5/thumbnails/9.jpg)
• Cable trays
• Equipment Power Supply
• Lighting
• Grounding System
• Equipotentiality System
• Connection Requirements (RF signals, PCM, and others)
• Environmental constraints
The Site Specifications
Equipment Constraints
![Page 10: Wireless Deployment : Site Survey Access Network SID ETP – Groupement Télécoms - 25 Mai 2005](https://reader036.vdocuments.mx/reader036/viewer/2022070306/55168a21550346a25b8b4c5a/html5/thumbnails/10.jpg)
Floor # 2
DDF
AC
A U T H O R I Z A T I O N
The Site Survey
Constraints
![Page 11: Wireless Deployment : Site Survey Access Network SID ETP – Groupement Télécoms - 25 Mai 2005](https://reader036.vdocuments.mx/reader036/viewer/2022070306/55168a21550346a25b8b4c5a/html5/thumbnails/11.jpg)
Site !
Site Survey (questionnaire)
Site Survey Report
?!
SiteSpecifications
The Site Survey
Process Overview
![Page 12: Wireless Deployment : Site Survey Access Network SID ETP – Groupement Télécoms - 25 Mai 2005](https://reader036.vdocuments.mx/reader036/viewer/2022070306/55168a21550346a25b8b4c5a/html5/thumbnails/12.jpg)
Width
Heigth
Number of floors
Depth
Access?
The Site Survey
The Building Survey
![Page 13: Wireless Deployment : Site Survey Access Network SID ETP – Groupement Télécoms - 25 Mai 2005](https://reader036.vdocuments.mx/reader036/viewer/2022070306/55168a21550346a25b8b4c5a/html5/thumbnails/13.jpg)
GPS
The Site Survey
The Building Survey
![Page 14: Wireless Deployment : Site Survey Access Network SID ETP – Groupement Télécoms - 25 Mai 2005](https://reader036.vdocuments.mx/reader036/viewer/2022070306/55168a21550346a25b8b4c5a/html5/thumbnails/14.jpg)
Grounding System
DDFlocation
AC Power
Tower
BTSlocation
B T S
The Site Survey
The Building Survey
![Page 15: Wireless Deployment : Site Survey Access Network SID ETP – Groupement Télécoms - 25 Mai 2005](https://reader036.vdocuments.mx/reader036/viewer/2022070306/55168a21550346a25b8b4c5a/html5/thumbnails/15.jpg)
• Dimensions (raised floor, false ceiling, etc.)
• Location and dimensions of the existing equipment
• Location of BTS cabinet
• Location of power and grounding system
• Location of the DDF
• Location, dimensions, and availability of the cable trays
• Location, dimensions, and availability of the feeder input
The Site Survey
The BTS Room Survey
![Page 16: Wireless Deployment : Site Survey Access Network SID ETP – Groupement Télécoms - 25 Mai 2005](https://reader036.vdocuments.mx/reader036/viewer/2022070306/55168a21550346a25b8b4c5a/html5/thumbnails/16.jpg)
1
3
2
5
4
7
8
12
14
11
10
Weak current,feeder and alarm zone
Strong current zone
15
10
913
6
The Site Survey
The BTS Room Survey
![Page 17: Wireless Deployment : Site Survey Access Network SID ETP – Groupement Télécoms - 25 Mai 2005](https://reader036.vdocuments.mx/reader036/viewer/2022070306/55168a21550346a25b8b4c5a/html5/thumbnails/17.jpg)
The Site Survey
The Outdoor BTS Room Survey
![Page 18: Wireless Deployment : Site Survey Access Network SID ETP – Groupement Télécoms - 25 Mai 2005](https://reader036.vdocuments.mx/reader036/viewer/2022070306/55168a21550346a25b8b4c5a/html5/thumbnails/18.jpg)
X + Y + Z = 2 meters
The Site Survey
The Outdoor BTS Room Survey
![Page 19: Wireless Deployment : Site Survey Access Network SID ETP – Groupement Télécoms - 25 Mai 2005](https://reader036.vdocuments.mx/reader036/viewer/2022070306/55168a21550346a25b8b4c5a/html5/thumbnails/19.jpg)
The Site Survey
The Outdoor BTS Room Survey
![Page 20: Wireless Deployment : Site Survey Access Network SID ETP – Groupement Télécoms - 25 Mai 2005](https://reader036.vdocuments.mx/reader036/viewer/2022070306/55168a21550346a25b8b4c5a/html5/thumbnails/20.jpg)
• North direction in relation to the building and tower
• Location and orientation of the existing antennas
• Quantity, location and azimuth of the antennas
• Sector/azimuth
• Type of fixation
• Lightning protection system, existing or not
The Site Survey
The Aerial Survey
![Page 21: Wireless Deployment : Site Survey Access Network SID ETP – Groupement Télécoms - 25 Mai 2005](https://reader036.vdocuments.mx/reader036/viewer/2022070306/55168a21550346a25b8b4c5a/html5/thumbnails/21.jpg)
Tools Used During these Activities
![Page 22: Wireless Deployment : Site Survey Access Network SID ETP – Groupement Télécoms - 25 Mai 2005](https://reader036.vdocuments.mx/reader036/viewer/2022070306/55168a21550346a25b8b4c5a/html5/thumbnails/22.jpg)
Site Engineering activities
SiteEng’g
activities