wire meshes the system design or near-surace instabilities ...€¦ · bw. sap z/ a a w ak a bj aa...

8
Geotechnics 17 GeoResources Journal 1 | 2020 Gröner and Roduner: Long-term Experience in Stabilising Slopes with high-tensile Wire Mesh www.georesources.net - Introduction S 2000, ad - w (- > 1,770 N/²) a b d ab p aa k ad k p d- a (Fig. 1). I ay a, a a - pad a y a - ad w w . A p d d aaab aaa k. T ay ad aby a ay a w a a. T aaby ad y ab y a b dd by ak x- pd a. T y a , aby a b - ad ad a a aaby ad. T pap d a d p a- ba w - w da ya 2000 ad 2005. A a dp a b d aa, a d, a a, ab , d- a ad d d p 11, 13 ad 17 ya a aa a dbd. I add- a p, Z/A a w ady xad abay d a xpd . F a b dad a d, a a xpaa ab y w - w ad d by . Slope Stabilisation with high-tensile Wire Meshes The System I 1999, Gb AG, Ra, Swzad, dpd ad - w w a b-apd . T bd ay a- d w ad . D dp y ba a a a ad a a paa pa. T, a pa b d, -ad pk pa, w adapd w q z, y ad bd a. Tak > 1,770 N/² - w d, Gb’ adad - G65/3 , xap, ab p ad 180 90 kN b ad pp k bd a. I way, p ab- a y a b ay p-d aa b (Fig. 2). T - pday ab a bw p w. Design or near-surace Instabilities and Slips T d y, - w bd w y pk pa ad a, wa ad ad Ruvolum d - p appa a pd. T - ay ad ad a b d d a-a ab a w a y d k p. T d bad ba a dda p, w w dd a, paab . T d p wa dbd da by Rüegger [1, 2]. I d

Upload: others

Post on 19-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Wire Meshes The System Design or near-surace Instabilities ...€¦ · bw. Sap Z/ A a w ak a bj aa w xpd a a pa-wa a-a aa aa dy, a w a aa w wa w a a. Case Study Mülheim an der Ruhr,

Geotechnics 17

GeoResources Journal 1 | 2020Gröner and Roduner:Long-term Experience in Stabilising Slopes with high-tensile Wire Mesh www.georesources.net

-

Introduction

S���� 2000, ���� �ad� �� ����-������� ����� w��� (���-���� �������� > 1,770 N/��²) �a� b��� ���d �� ��ab����� ���p�� �� a��a� �� ����� ���k a�d ���k p���� �� d������-��a���� (Fig. 1). I� �a�y �a���, ���� �� a� ��������a� ��-������ ���pa��d �� ����������a� �y����� ���� a� ����-����� a�d w��� ���� �� ��w ������� ��������. A p����� d����� �����d �� a�a��ab�� ��� �a����a���a� ����k���. T� �a���y ����� a�d ����ab����y a�� ��������� �������a���y ������ ��a� w��� ������������a� ��a�����.

T� ����a��ab����y a�d �������� �������y �� ���� ��ab������� �y����� �a� b� d��������d by �ak��� ����� �x-p����d ������� ���� ���� a������. T� ������ ��� �y����� a�� �� ���, ��� ���� ����ab�y ����� ������� ���� �a� b� ����-�a��d a�d a ��a������ �� ����a��ab����y �ad�.

T�� pap�� d�������� ����� �a�� ���d��� �� ���p� ��a-b����a���� w��� ����-�������� w��� ���� da���� ���� ��� y�a�� 2000 a�d 2005. A��� a d�����p���� �� ��� ����a���� b����� �� d����� ����a��a����, ��� ����a�� ���d�����, ��� ��a�� �� ��� �����a����, ��� ��ab������� �����, ��� d����-�a����� a�d ��� ���d����� �� �������d ���p������ 11, 13 a�d 17 y�a�� a��� ����a��a���� a�� d�����b�d. I� add�-���� �� ��� ����a� ���p������, ��� Z�/A� ��a����� �� ��� ������ w��� �a�d���y �xa����d �� ��� �ab��a���y �� ��d�� �� �����a�� ����� �xp����d ������� ����. F�� a b����� ��d����a�d��� �� ��� �a�� ���d���, a �����a� �xp�a�a���� �� ��� ��ab������� �y���� w��� ����-������� w��� ���� a�d ��� d����� �� b����y �����.

Slope Stabilisation with high-tensile Wire Meshes

The System

I� 1999, G��b���� AG, �� R��a������, Sw��z���a�d, d�����p�d ������ �ad� �� ����-������� ����� w��� w��� a ����b��-��ap�d ���������. T�� ���b���d ��� �a�y �a�-d���� �� w��� ���� a�d ��� ���� ������� ��������. D����� ��� d�����p���� �� ��� �y���� �� b��a�� ���a� ��a� ��� ��a��������� �� ��ad� ��a ��� ���� ���� ��� �a����� �� �� pa�a����� ��p���a���. T�������, ��� a����� p�a��� �� b� ���d, ��-�a���d �p�k� p�a���, w��� adap��d �� ��� ��w ��q��������� �� ����� �� ��z�, �������y a�d b��d��� ������a���.

Ta�k� �� ��� ���� ������� �������� �� > 1,770 N/��² �� ��� ����-������� w��� ���d, G��b����’� ��a�da�d ���-�� G65/3 ����, ��� �xa�p��, ��ab��� p������� ��ad� �� 180 �� 90 kN �� b� ��a�������d ���� ���pp��� ���� ��

���k b�d��� ���� ��� �a�����. I� ���� way, ��� ���p� ��ab�-���a���� �y���� �a� b� a������y p��-��������d a�a���� ��� ��b���� (Fig. 2). T� �����-������� �� ��� p��d����a���y ����ab�� �a�� ���� b��w��� ��� p������� ����� ���w�.

Design �or near-sur�ace Instabilities and Slips

T� d����� �� ��� �y����, ���������� �� ����-������� w��� ���� ���b���d w��� �y���� �p�k� p�a��� a�d �a�����, wa� �a����d ��� a����d��� �� ��� Ruvolum d����� ���-��p� ��� ��� app���a���� �a��� p�������d. T�� �� �����-a��y �a��d a�d �a� b� ���d ��� ��� d����� ��� ��a�-����a�� ����ab������� �� ���� a� w��� a� �� �������y �������d ���k ���p��. T� d����� �� ba��d �� ��� b�a���� ������a���� �� ��� ��d���d�a� ���p������, w���� w��� d��������d �� ��a������, ��p�a�ab�� �����. T� d����� �����p� wa� d�����b�d �� d��a�� by Rüegger [1, 2]. I� �����d�� ���

Page 2: Wire Meshes The System Design or near-surace Instabilities ...€¦ · bw. Sap Z/ A a w ak a bj aa w xpd a a pa-wa a-a aa aa dy, a w a aa w wa w a a. Case Study Mülheim an der Ruhr,

18 Geotechnics

GeoResources Journal 1 | 2020 Gröner and Roduner:Long-term Experience in Stabilising Slopes with high-tensile Wire Meshwww.georesources.net

��������a���� �� ��a�-����a��, ���p�-pa�a���� ����ab���-���� (Fig.  3) a� w��� a� ��� ��������a���� �� ���a� ����a-b������� b��w��� ��� ��d���d�a� �a��� (Fig. 4). I�������� �� ���pa�� p������� a�d �a���q�ak� ������ �a� a��� b� �ak�� ���� a������. T� d����� �����p� wa� �����d �� a ����a��� p��j��� w��� 31 �a��� ���d ����� (Fig. 5) ���� 2012 �� 2015 a�d ��� ����ab����y ��� p�a����a� app���a���� wa� p����� [3].

Case Studies – Execution, Inspections and Sampling

General

F�� a ����-���� ���dy, ����� ���p�� w��� �������d w���� �ad b��� ��ab�����d ab��� 13 a�d 18 y�a�� a�� (Table 1) a�d �� w���� ���p������� ����d �a��� b� �a����d ���. E�ba�k����� a���� ��ad� w��� p�������d b��a��� �� ����� b����� a������b����y. T� ���p������� w��� �a����d ��� w��� �a�d�� �a�p��� a� ��� �pp�� a�d ��w�� �d��� �� ��� ��ab�����d a��a a�d a� �������d�a�� p�����. T� ���-��w��� �a�� p����� w��� �����d���d ��� ��� a���������:

▶ O���a�� ���d����� �� ��� ��ab�����d a��a ▶ S�a�� �� ��� �����a���� ▶ E������, a�d ����b�� ��������� ▶ C�a���� b����d ��� ���� ▶ V���a� a��������� �� ��� ���p������ ▶ C��d����� �� ��� ��������� p���������

T� ��d���� �� ��� ���p������� a�� d�����b�d ��d���d�-a��y ��� �a�� �� ��� ����� �a�� ���d��� a�d d�������d ��-������ b���w. Sa�p��� �� ��� ������ ��� ������� ��� Z�/A� ��a���� w��� �ak�� a��� ��bj������ ��������� �� a��a� w��� �xp����d ���� �����a� �a��� �� ��� �p�a��-wa��� a�-�a� �� �� a��a� �� a�����a���� ����d��y, a� w��� a� �� a��a� w��� ����w�a� ��w�� �����a� �a���.

Case Study Mülheim an der Ruhr, Germany

T� ��ab�����d ��ba�k���� �x���d� a���� ��� ����� R��� ���� a ������ �� app��x. 350  � w��� ������� �� a����d 8 �� 15  � a�d a �����-�a���� ������a����. T� ��w�� a��a �������� �� ���k �������d a� b��w��� 50 a�d 80 °, a�d ��� �pp�� a��a �� ���� w��� ������a����� �� ab��� 30 �� 50 °.

P���� �� ��� ����a��a���� �� ��� ��ab������� �y����, �� add����� �� ����a��d ���k�a��, a����d 1  � �� ��� ��a�-����a�� �ay�� �ad ���pp�d ���� ��� ��ad �� �����a� a��a� b��a��� �� w�a�������. Fig. 6 ���w� ��w ��� ��ba�k-���� wa� ���a��d �� ����� �a����a� a�d �����a���� �� 2000. S��� ����� w��� ��� ��a�d��� �� b� ������a��d ���� ��� ��ab�����d a��a.

A��� ��� �a��� a�d ��� ���� w��� ����a���d, ����� wa� �a�d �� ��� ��ba�k���� �� ��� ���� a��a a�d w�� ���d�d. T� ������� �� ��� �����a���� �� ���w� �� Fig. 7. T� a��������� a��� 17 y�a�� �� S�p���b�� 2017 ���w� ���� �����a���� (Fig.  8). I� �a� b� ���� ��a� ��� a��a ��a� ��� ��ad �a� b��� �����a��y ������d. F������ �p

Page 3: Wire Meshes The System Design or near-surace Instabilities ...€¦ · bw. Sap Z/ A a w ak a bj aa w xpd a a pa-wa a-a aa aa dy, a w a aa w wa w a a. Case Study Mülheim an der Ruhr,

Geotechnics 19

GeoResources Journal 1 | 2020Gröner and Roduner:Long-term Experience in Stabilising Slopes with high-tensile Wire Mesh www.georesources.net

��� ���p� a�� ��a���� b����� a�d ��d�����w��, a�d ���� �a���� ����� a�d b�����. C��pa����� �� Figs. 6 and 8 ���w� ��� d�����p���� �� ��� �����a����.

O� ����� ���p������, ����� w��� ����d w���� �ad ���w� ���p�����y ���� ��� ����. T� ���� ����k� �ad d�a������ �� �p �� ab��� 70 ��. T� ���� �� ����� �� ����� ����a�� w��� ��� ���p� a�d �a� ��� b��� p����d �p (Fig. 9).

N� �������a�� ��a���� w��� ����d �� ��� ����, �d�� ��p��, �p�k� p�a��� a�d �a�������. I� ��� a��a �� ���� �a�� ��ad�, a ��dd��� d��������a���� d�� �� �����a� �� ��� p��������� ��a���� wa� �b�����d, b�� ���� �� ��� a p��b-��� (Fig. 10).

T� ������ �x��b���d ���y a ������ a����� �� b���-���. I� ���� a��a� ��� ��a�� �ad d���d ��� d�� �� ��a-���a� ���������. S�a�� b�a�����, ��a��� a�d ������ w��� ���a���d by ��� ���a��� �� �����a���� (Fig. 10).

Sa�p��� ��� ������� ��� Z�/A� ��a���� w��� �ak�� a� ����� ��������d p����� �� ��� �pp�� ���p� a�d a� ����� p����� �� ��� �p�a��-wa��� a��a a���� ��� ��ad.

Case Study Vaduz, Principality o� Liechtenstein

T� ����a��a���� �� ���a��d �� a ������ ��ad �� Vad�z �� ��� P�����pa���y �� L������������. T� ������ �� ��� ��ba�k���� �� ab��� 150  � w��� a ������ �� ab���

Table 1:

Case study Mülheim an der Ruhr, Germany

Vaduz, Principality o� Liechtenstein

Grabenstetter Steige, Germany

Year of installation 2000 2005 2005

approx� 350 m approx� 150 m approx� 40 m

approx� 8 to 15 m approx� 6 to 10 m approx� 8 to 10 m

bottom 50 to 80 °, top 30 to 50 °

about 50 °, in the rock approx� 80 °

30 to 45°

Orientation South-west West East

bottom rock, top loose rock

on the surface mostly weathered rock with a high proportion of fines, small area of rock

cohesive soils with a high proportion of fines

Previous situation isolated rockfall, in several areas near-surface layer slipped onto the road

replacement for wooden shoring in the slope cutting

landslip in the road area

nails, Tecco G65/3 mesh, in upper area topsoil and wet seeding

nails, Tecco G65/3 mesh, edge ropes at top of embankment, tree trunks as collision protection at bottom, no active vegetation and no erosion protection

Tecco G65/3 mesh, in the lower area erosion-protection mat made of coconut/jute fibres

Inspection September 2017 March 2018 July 2016

Page 4: Wire Meshes The System Design or near-surace Instabilities ...€¦ · bw. Sap Z/ A a w ak a bj aa w xpd a a pa-wa a-a aa aa dy, a w a aa w wa w a a. Case Study Mülheim an der Ruhr,

20 Geotechnics

GeoResources Journal 1 | 2020 Gröner and Roduner:Long-term Experience in Stabilising Slopes with high-tensile Wire Meshwww.georesources.net

������a��� �� ��� �a���, b�� ���� �� ��� ���� a� a p��b���. Sa�p��� ��� ����k��� ��� Z�/A� ��a���� ����d ���y b� �ak�� ���� ��� �pp�� a��a d�� �� ��� way �� w���� ��� ���� �ad b��� ����a���d. A� �xp���d a��a w��� a ���a�-a��� �� 1 �� 3 �� ���� ��� ��b���� wa� �������d, a� w��� a� a� a��a ���� w���� ��� ���� �� �� ����a�� w��� ��� ��b����, w���� �� wa� a�����d ��a� ����d��y ���d������ w���d �a�� b��� ��a���ab��.

Case Study Grabenstetter Steige, Germany

T� ����a��a���� �� ���a��d �� a ����pa�� �� ��� Swab�a� A�b �����, a�d �� ab��� 40 � ���� w��� ������� �� a����d 8 �� 10 �. I� �� ���p�d a� b��w��� 30 a�d 45 °. I� �� a� ��ba�k���� w��� �������� ����� a�d a ���� p��p������ �� ����. T� ��ab����a���� w��� ��� ����-������� ���� wa� �a����d ��� �� 2005. A� �������-p��������� �a� �ad� �� ������� �� j��� �b��� wa� ���d �� ��� a��a w���� �ad ���pp�d �� b��� ���d�d (��w�� a��a). D�� �� ��a�y �a��-�a�� a��� ��� ����a��a����, ��� �������-������� �a� �ad �����d �������y, a�d ���� �ad ��d �� pa���a� wa����� ��� �� ��� ���� (Fig. 14). W��� ��� ���p������ wa� �a����d ��� a��� 11 y�a�� �� J��y 2016, a �a��� pa�� �� ��� ��ab�-����d ���p� wa� �������w� w��� ����b� a�d b�����, a�d ab��� a q�a���� �� ��� ���p� ���a���d �p�� a� a ��ad�w (Fig. 15). T� �����a���� wa� ��x���a�� a�d ������d ���

6 �� 10  �. I�� ����a�� �������� �a���y �� ���p� d�b��� w��� a ���� p��p������ �� ��� pa������� a�d �� �������d a� a����d 50 °. A ��a���� ������� ���� �� ��� ���k a��a w��� a� ������a���� �� �p �� 80 ° (Fig. 11). T� ��ba�k-���� wa� ��ab�����d �� 2005 w��� ����-�������� ���� �� ���b��a���� w��� �a�����. A� ��� ����� �� ��� ���p�, �d�� ��p�� w��� ���d �� ����� ��� ����a��a����. A� ��� ��w�� �d��, ��� ���� wa� �a�d ��d�� ��� pa�� a�d p�������d by ���� ����k� a�a���� ��������� da�a�� (Fig.  11). N� a����p� a� �����a���� wa� �ad�, ��� wa� a� �������-p��������� �a� ����a���d.

T� ���p������, 13 y�a�� �a��� �� Ma��� 2018, ���w�d ��a� ��a���a� �����a���� �ad ���ab�����d ������ q���� w��� (Fig. 12). A� ������ �� ��� ��a����� ��� �� ��� pa�������, ����� wa� ���� �����a���� �� a��a� w��� a ������ p��p������ �� ��a���. I� ��� ��w�� a��a, ���ppa�� �ad ��d �� a �a������� �� ��� ����. T�� ��a�� ��a� ��� ���p a��a� w��� �d�a��y ��ab�����d. I� ��� �pp�� pa�� �� ��� ���p� ���-��a� �a������ w��� ����b�� b����d ��� ����. T�� �ad ��d �� a �ap �� �p �� 30 �� b��w��� ��� ���� a�d ��� ��b-����. T� d������ w��� ������d �� a ��a�� a��a a�d d�d ��� �������� �� ��� ��p (Fig. 13). T� ���� ����k� ����a���d a� ��������� p��������� ���w�d ���a� ����� �� d��������a-���� d�� �� ��� ��a����� ����d��y ���d������.

T� ��d���d�a� �y���� ���p������ ���w�d ���y ��-��� ��a����. T� ���y ��a��� �� ��������� w��� �� ���

Page 5: Wire Meshes The System Design or near-surace Instabilities ...€¦ · bw. Sap Z/ A a w ak a bj aa w xpd a a pa-wa a-a aa aa dy, a w a aa w wa w a a. Case Study Mülheim an der Ruhr,

Geotechnics 21

GeoResources Journal 1 | 2020Gröner and Roduner:Long-term Experience in Stabilising Slopes with high-tensile Wire Mesh www.georesources.net

w���� a��a �� ��� ��ad�w. R����a� ������� ba�k wa� ���-d��� ��a� ��� ��adway. C����� ���p������ �� ��� b���-������d a��a ���w�d ��� ��������� �� ��a����� ����� w��� ����k d�a������ �� ab��� 5 �� 15 �� (Fig.  16). D�� �� �����a� ���� ��������, ��� ���� �� ��� ��ad�w a��a �� �� ����� ����a�� w��� ��� ��b����. W���� ����� a�� �����, ��� ���� �a� a ���a�a��� �� �p �� 5 ��. T� ���-��������� ����� a�d ���p������ ���w�d �� ������ab�� ��a���� a�d app�a��d �� b� �� ���d ���d�����. I� ��� a��a �� ��� ��ad�w a �a���y �a��� da�a��d �p�� �� ��� ���� wa� ����d. T�� app�a�� �� b� d�� �� ����a�� w��� �� ��a����� by ��� ��w�� (Fig. 17).

N� ���� �a�p��� w��� �ak�� �� ���� ���p�.

Testing o� the Zn/Al Coatings and Estimation o� the Service Li�e

I� ���a�, �a�p��� �� ����� G65/3 ���� w��� �ak�� a� ����� p�a��� �� ��� ��ab����a���� ��a����� �� M������ a� d�� R��� a�d Vad�z �� ���� ��� Z�/A� ��a���� a� d�-����b�d. Sa�p��� ���� �a�p���� p����� w��� a�����pa��d ������ �����a� �a��� �� �p�a��-wa��� a��a� �� �� a��a� �� a�����a���� ����d��y w��� �a�k�d w��� (w), a�d ���� ���� p�������d a��a�, w���� ��w�� �����a� �a��� a�� �� b� �xp����d, w��� (�). O� ����� �a�p���, 45 ��d���d�a� w���� w��� �xa����d a�d ��� �a���� �� ��� ���a�����

area

Table 2:

Project

Average mass o� coating [g/m²] / [%]*

protected (g) alternating humid (w)

149/82 108/60

103/57 83/46

130/72 79/44

130/72 115/64

* % in relation to the initial value of approx� 180 g/m²

��a���� w��� d��������d (Table 2). T� d�������a���� wa� �ad� ����� ��� �a�-���������� �����d a����d��� �� DIN EN 10244-2 [4]. T�� �������� d��������� ��� ��a�-��� w��� �yd��������� a��d a�d d���������� ��� �a� ���-���, w���� �� ���� ��������d �� a ��a���� �a�� �� �/�² ���� ��� ����a�� a��a �� ��� w���. T� ���� �� p�������d a�a���� ��������� w��� a ���a���� Z�/A� ��a���� a����d-��� �� DIN EN 10244-2 [4]. T� ����� G65/3 ���� ���a��y �a� a ��a���� �a�� > 150  �/�² (�� �q���a����). Ba��d �� �xp������� ���� q�a���y �������, ��a���� �a��-�� �� +20 % �a� b� a�����d, w���� �q�a��� �� 180 �/�².

Page 6: Wire Meshes The System Design or near-surace Instabilities ...€¦ · bw. Sap Z/ A a w ak a bj aa w xpd a a pa-wa a-a aa aa dy, a w a aa w wa w a a. Case Study Mülheim an der Ruhr,

22 Geotechnics

GeoResources Journal 1 | 2020 Gröner and Roduner:Long-term Experience in Stabilising Slopes with high-tensile Wire Meshwww.georesources.net

��� ��a����� a� ��� b��������. T� ��� �� �������-���-���� �a�� p������� �����a���� a�d �a� ��d��� p������a� d�����a���� a�d ���� d��p�a������.

Care and Trimming o� the Vegetation

Va����� �����p�� w��� �d������d �� ��� d������� �����a-���� ��a�����. T� ������ �� �����p� ����� �� d�p��d �� a �a��� �x���� �� �����d��a����� �� ��� ��q�������� �� �a����a�d ��a��. N� da�a�� �� ��� ������ �a���d by ��� �����a���� ����d b� d������d, ���� w��� �a��� b����� a�d ����� �ad p�����a��d. T� ���y da�a�� �� ��� p�a�� wa� p��bab�y �a���d by ��� ��w��. I� ��d�� �� p������ ���� ��-��������� �� �����a� p��j����, ����a� wa������ w��� p����d�d ��� ��� �p��a���� �� �����a�� �q��p����. T� da�a�� d��� ��� ��������y ��p������ a ��ab����y p��b���. R�p�a������ �a� b� �a����d ��� by ���p�y ������� ��� a�d ��������� a p���� �� ����. T� �x���� �� w���� �a���� �������a���� p�ay�d a ���� �� ��� ��a����� �� ��� k��w�.

Erosion and visible Movements

E������ �a���� b� ���p�����y �x���d�d �� p�������d by ��� �p�� �y����. I� ��� p��j���� a������d, ����� a�d ��a�� ������ w��� ����d a� ��� b����� �� ��� ��ab�����d a��a�. H�w����, d�� �� ��� ��w d���� �����a����, ����� ��������� app�a� �����a�. T� ����� ����d a��� b� a ������ �� d����p������� �� ��� �����a����.

Changes behind the Mesh

B����� ��� �����a���� �ad �a���d a �������d, ��a���� b����d ��� ���� w��� ����b�� �� ��� w��k� a� Vad�z a�d G�ab���������. I� ���� �a��� ���� w��� wa���d ���. I� ��� �a�� �� G�ab���������, ��� �������-������� �a� ���k �� a ��pp������ ��������. T� �������� a�� ��w w��� ���-�����d a�d ��� ��ab����a���� ��a����� a�� p�ay��� a �����-���a� ����. A� Vad�z ���� p������ �a� �ak�� ������. O� a������ �� ��� ��p���ap�y, �������y �a���� d�����a����� �������d. T� �y���� �� ��w ���y w��� p��-��������d a�d ��������� ��� ��������a� ��������. I� ��� �pp�� a��a �� ��� Vad�z p��j���, ��a����� ���a����d d������ �a� b� ����. T�y ��������y d� ��� app�a� �� b� ������a�, a�d ������� �����a���� �����w�� �� ����� a��a� �a� b� �xp����d. I� d������ �������� �� ��� �a���� �� ��z�, ��� ���� �a� b� �a�d ������ �� ��� ���p� a�d ��� p��-������� �����a��d by ���������� ��� ����.

Visual Assessment o� the Components

T� ���p������ �� ��� �a���y �y���� ���w�d ���y ��-��� ��a���� �� ab����a������. W��� ��� �x��p���� �� ��� �a�� ������a���, �� ��a��� �� ��������� w��� ����d.

Corrosion Protection

A� �����a�� �� ��� �xp����d ������� ���� �� d������ a�d d�p��d� �� �a�y �a�����. T��� �yp��a��y �x��b�� a w�d�

T� �xp����d ������� ���� w��� ���a�d �� ��������� d�-p��d� ��� ���y �� ��� ��������� p��������� b�� a��� �� ��� �����������a� ���d������ a�d ��� ������p��d��� �����-�a� w�a�. DIN EN ISO 12944-2 [5] d���d�� ��� �������-����a� ���d������ ���� ��x ������������� �a�������� C ��� ��� a����p���� a�d a������ �����a� �a��� �� �����. Exp������� a�����a��d w��� ����� wa� p�������d �� 2013 ba��d �� ��� �a��d ��a�da�d� a�d �������a� �����a���� [6]. I� ���� �����x�, Nünninghoff �������d �� ����-���� �xp������� w��� Z�/A� ��a����� (Ga��a�) [7]. H�� ��-p����a� �a���� a��� 10, 20 a�d 22 y�a�� a�� ���w� w��� ������� �� Fig. 18 a�d �x��ap��a��d. A����d��� �� Nün-ninghoff, a ���w�� �a�� �� �����a� �a� b� a�����d ���� ���� [8, 9]. T� �a���� d��������d �� ��� �a�p��� ���� Vad�z a�d M������ a� d�� R��� a�� ���w� a� d�a-���d� �� Fig. 18 a�d w��� �x��ap��a��d �� ��� ba��� �� ��� �p���a���� �����a���� [7, 9]. T��� �a���� �x��b�� a p��-������d ��a����. T�� ��a�� ��a� �� ��� a�d ��� �a�� p��j���, d������� �����a� �a��� �a� b� a�����d d�p��d-��� �� ��� ����a����. I� �x����� �a���, d������� ���������-���� �a�������� �a� ����� �� ��� ����a��a����.

O� ���� ba���, a� �xp����d ������� ���� �� ���� ��a� 50 y�a�� ��� a ������ �a�p��, a�d ���� ��a� 70 y�a�� ��� a�� ������, �� �����a��d ��� ��� �a���� d��������d (Fig. 18). A ��p������a���� �� �a���� ��� ���� ��a� 70 y�a�� wa� d��p����d w���.

Summary o� Conclusions

Condition o� the Vegetation

T� ����� �a�� ���d��� ���w ��� ��p���a��� �� �����a-���� �� ��� ��ab����a���� �� ��� ���� ���p��, a�d ��� ��� ������� �� �������. 11, 13 a�d 17 y�a�� ���p�������y a��� ��� ����a��a����, a�� ��� ���p�� �x��b���d a ���y ���d ���-��a���� ���� ����� w���� a��a, d��p��� d������� �����a�-

Page 7: Wire Meshes The System Design or near-surace Instabilities ...€¦ · bw. Sap Z/ A a w ak a bj aa w xpd a a pa-wa a-a aa aa dy, a w a aa w wa w a a. Case Study Mülheim an der Ruhr,

Geotechnics 23

��a����, �� ��a� �����a��� a�� ������p��d����y ��a����a��. I� add����� �� ��� �a���� �� ��� Z�/A� ��a���� d����-����d by �a�d�� �a�p����, ���� ��a�da�d� a�d ������-�a� �����a���� ���� b� ��������d �� �����a�� ��� p������� �� �����a�. F�� ��� a�b���� ���d������ �� ��� a������d ����a��a�����, a ������� ���� �� ���� ��a� 50 a�d ���� ��a� 70 y�a�� �a� b� a�����d �� ��� ba��� �� ��� �a���� d��������d. D�p��d��� �� ��� ���a����, ��� �������d ��������� p��������� a�d ��� ������������� �a�����y, ��� ������� ���� �ay a��� b� �������. I� ���� �� ��� �a��, ���� ��� �xa�p�� �y����� ��������� ��a������ ����� w��� a �������a���y ������ ������� ���� �����d b� ������. I� ���pa�����, a����d��� �� Kr�uter, p��� z��� ��a����� �� �q�a��-���� ������� �a�� a ������� ���� �� 20 �� 25 y�a�� [10].

Outlook

I� �� a �a�� �� ���� ��a� p��������� ���������� �� w��� ���� w��� app��a�� ��� ��d �� ����� ������� ���� a� ���� pa��-��. R����a� ����k� ���� ��������� b� �a����d ��� [12]. I����a� ��d��a����� �ay b����� ����b�� �� ���p������ w��� a ��w�� ��a���� �a��.

S���� �����a� �ab��a���y ����k� �� ��� ����d�a� z��� ��a���� a�� ���y ����-��������� a�d �xp������, �� ���� �a��� a ����a� a��������� �� �a����d ���. R�dd��� d�����-���a����� �a� ��d��a�� ��a� ������ ��������� p��������� �� ����� a�a��ab��. T��� ���� b� app��p��a���y d��������d

�� ��d�� �� ��a�k ��� �x���� a�d d�����p���� �� ��� d��-������a�����.

Alc�l�e R�sch p������� a ��d�� �� ��� ���a��-��� p��������� �������� [11]. T� ��-�a���d a�������� ������� �� ��d���d �� ��� ������ �� ��� ��a�� p�a�� (Fig.  19). T� ��d�� ���w� ���� ��p������� ��� d�-����p���� �� a�������� �� a ���p����d �a���� ����� a �����. T� a�������� ������� (y-ax��) �� 100 % w��� ��� ���p����� �� ���� p�� ���� ���. O��� ����, ���� ������� w��� b� ��d���d by ��a�� a�d �x����a� ���������. W��� ��� da�a�� ��������d �� �x���d�d, ��� a�������� ������� �� �� ��w ��a� da�a�� �� ��� ���p����� ������. F��a� �a����� ������ a� a� a�������� ������� �� 0 %, a�d ���� �� ��� �a���� p���� a� w���� ��� a�������� ������� ���� b�

THE LEADING GEOSYNTHETICS MANUFACTURER IN THE WORLD

Page 8: Wire Meshes The System Design or near-surace Instabilities ...€¦ · bw. Sap Z/ A a w ak a bj aa w xpd a a pa-wa a-a aa aa dy, a w a aa w wa w a a. Case Study Mülheim an der Ruhr,

24 Geotechnics

GeoResources Journal 1 | 2020 Gröner and Roduner:Long-term Experience in Stabilising Slopes with high-tensile Wire Meshwww.georesources.net

Pa�� 2: Z��� �� z��� a���y ��a�����. G���a� ������� EN 10244-2:2009. DIN D�������� I������� ��� N������ �. V, 2009

[5] DIN �a�����b��� 286: K��������������z ��� S�a�� d���� B������������� ��d Üb��z��� 4; DIN EN ISO 12944-1 b�� DIN EN ISO 12944-8; B���� 1998

[6] G�ö��� E.; R�d����, A.: Z� ��wa����d� N��z����da�-�� ��� „S��������a������z���z��“: K��������������z, La��z�������a����, P���p�k�����. W�����b��d��������-�a� d�� F��������������� R����������, Ma��z 2013

[7] N���������, R.: L���-���� �xp������� w��� Ga��a�; W��� 3/2003

[8] N���������, R.; S�z�pa��k�, K.: Ga��a� – ��� ���a���-���, ���b�������� K��������������z ��� S�a��d�a��. D�a�� 38, N�. 1&2, 1987

[9] N��������� R.: V����������d� K���������k��zz���-����� a� ��������z��k��� ��d �a��a�-���z��k��� S�a��-d������; B�������� U���������� W�pp���a�, 19988

[10] K�a����, E.; S����z, W.: La��z�������a���� ��� S����z���z������������ ����� S��������a�; G������-��k 19, N�. 2, 1996

[11] A��a�d� Ra���, A.: E������p������a� I���a�d�a�����: T���������� U����������� ��d E��w��� ����� �a�z-���������� I���a�d�a�������a�a�������. B�����: E���� S����d� V���a�, 2000

[12] G��b���� AG: �ECCO Sy����3 Ha�db��k. O�����: www.���b����.��� �yG��b����, 2017

Dipl.-Geol. Eberhard Gröner

-

Contact:

Dipl.-Ing. Armin Roduner

-

Contact:

�������d by �a�����a��� ��a�����. Ta�k� �� �������a� ��p���������, �� �� p����b�� �� �����a�� ��� a�������� ��-����� �� ab��� ��� 100 % �����.

Re�erences

G�ö���, E.; R�d����, A. (2019): La��z������a������� ��� Bö���������ab������������ ��� ���������� D�a��-���������. G��R�������� Z��������� (3-2019), pp. 15–23. O�����: ���p�://www.������������.���/d�w���ad/G��R��������-Z���������-3-2019.pd�

[1] R������, R.; F���, D.; Ha����, B.: H�������� G������� a�� S�a��d�a�� ��� d�� Ob����������������� �� K��-b��a���� ��� V���a�������� ��d V��a�k������� (A��-��������� B������������w����). ���������� Akad���� E��������, B����a� ��� 2. K����q���� „Ba��� �� B�d�� ��d F���“, Ja��a� 2002

[2] R������, R.; W����a��, K.; B��k��, M.: F��x�b�� Ob��-�����������������y����� a�� ���������� D�a��������-��� �� K��b��a���� ��� B�d��- ��d F���������, 3 Fa��-b���p����. ���������� Akad���� E��������, B����a� ��� 3. K����q���� „Ba��� �� B�d�� ��d F���“, Ja��a� 2004

[3] F���, D.; S���z, M.; R�d����, A.: G�������d�������� ��� ��x�b��� Bö���������ab������������y������. ���������� Akad���� E��������, B����a� ��� 7. K����q���� „Ba��� �� B�d�� ��d F���“, Ja��a� 2014

[4] DIN EN 10244-2:2009-08: S���� w��� a�d w��� p��d-���� – N��-������� ���a���� ��a����� �� ����� w��� –