29
Winston 600 Presentation Prepared by: Quamec Team

Upload: others

Post on 18-Dec-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

Winston 600 Presentation

Prepared by: Quamec Team

➢ Burlington, Kendall

➢ Burlington, Lake Park

➢ CVS, Hollywood

➢ BBW, Melbourne

➢ Dollar Tree, Davie

➢ TD Bank, Hialeah

➢ BBW, Brandon

➢ Dollar Tree, Coral Springs

➢ Wing Stop, Wesley Chapel

➢ Affordable Dentures , North Lauderdale

➢ Tesla, Aventura

➢ TD Bank, South Miami

➢ Pure Point, Boca Raton

➢ SunTrust, Naples

➢ Fire Rescue Station, Pompano Beach

➢ Ross, Miami Gardens

➢ DDs , Miami Gardens

➢ Crescent Point, Miami Lakes

➢ Men's Warehouse , Aventura.

Recent Projects

➢ 1060 Brickell Condominium Associations

➢ 500 Brickell, East, West and Master Condominium Association

➢ Icon Brickell Master Association

➢ Carbonell at Brickell Key Condominium Association

➢ TDR 1, TDR 3, and TDR Towers Master Condominium Association

➢ Jade Ocean Condominium Association

➢ Hyde Resorts and Residences Condominium Association

➢ Jade Residences and Brickell Bay

➢ Fortune House Condominium Association

➢ Brickell Townhouse Condominium Association

➢ Continuum South Condominium Association

➢ Solimar Condominium Association

➢ Champlain Towers Condominium Association

➢ Portofino Tower, Towers 1, 2 and 3.

➢ The South Bay Club

➢ Portugal Towers Condo Association

➢ Beach Club Two Condominium Association

➢ Pinnacle Condominium Association

➢ Ocean 2 Condominium Association

➢ And more….

Job Description Being Proposed

• Rtus Replacement• Rtus Pumps Replacement• Rtus Duct Work• Protect Cooling Tower Repairs• Marley Cooling Tower Repairs• Marley Pillars Springs • Marley Cooling Tower Pumps • Marley Cooling Tower Pump

Platform

Existing Cold Flow Outside Air Units

Existing Cold Flow Outside Air Units

Proposed Thermo Plus Outside Water-Cooled Unit

For illustration purposes only

o R-410a Refrigerant. Unit Performance in

accordance with ARI/ISO Standards

o Outdoor Construction, Single Piece

o Motorized O/A Damper & Hood

o Modulating Hot Gas Reheat

o VFD Plenum Supply Fan

o 2” MERV 8 Filters

o DDC Controls + BACnet

o Drain Pan Overflow switch

o Limited 1 Year Parts Warranty

o Limited 5 Year Compressor Warranty

o 10,000 HR Salt Spray Coating on Evaporator

and Reheat Coils

o Start Up Service

Units Lead Time 10-12 Weeks

Existing Corroded Duct Work

Existing Corroded Duct Work

New Duct Work Fabrication

For illustration purposes only

Existing Protect Cooling Tower

Existing Protect Cooling Tower

Proposed Refurbish of Protect Cooling Tower

Parts Lead Time 4-6 weeksFor illustration purposes only

Existing Armstrong Outside RTUs Pumps

Existing Armstrong Outside RTUs Pumps

Proposed New (Dual) Armstrong Pumps for Protec Cooling towers.

For illustration purposes onlyPumps Lead Time 4-6 weeks

Marley Cooling Tower

Marley Cooling Tower

Proposed Refurbished Cooling Tower

For illustration purposes onlyParts Lead Time 4-6 weeks

Marley Cooling Tower Spring Support

Marley Cooling Tower Spring Support

Hot Dipped Vibration Isolator Deflection Springs

For illustration purposes onlyParts Lead Time In Stock

Marley Cooling Tower Pumps

Marley Cooling Tower Pumps

(2) Wilo Pumps

For illustration purposes onlyPump Lead Time 4-6 weeks

Marley Pumps Steel Support

Pumps Steel Support

Crane Set Up