winston 600 presentation - nebula.wsimg.com
TRANSCRIPT
➢ Burlington, Kendall
➢ Burlington, Lake Park
➢ CVS, Hollywood
➢ BBW, Melbourne
➢ Dollar Tree, Davie
➢ TD Bank, Hialeah
➢ BBW, Brandon
➢ Dollar Tree, Coral Springs
➢ Wing Stop, Wesley Chapel
➢ Affordable Dentures , North Lauderdale
➢ Tesla, Aventura
➢ TD Bank, South Miami
➢ Pure Point, Boca Raton
➢ SunTrust, Naples
➢ Fire Rescue Station, Pompano Beach
➢ Ross, Miami Gardens
➢ DDs , Miami Gardens
➢ Crescent Point, Miami Lakes
➢ Men's Warehouse , Aventura.
Recent Projects
➢ 1060 Brickell Condominium Associations
➢ 500 Brickell, East, West and Master Condominium Association
➢ Icon Brickell Master Association
➢ Carbonell at Brickell Key Condominium Association
➢ TDR 1, TDR 3, and TDR Towers Master Condominium Association
➢ Jade Ocean Condominium Association
➢ Hyde Resorts and Residences Condominium Association
➢ Jade Residences and Brickell Bay
➢ Fortune House Condominium Association
➢ Brickell Townhouse Condominium Association
➢ Continuum South Condominium Association
➢ Solimar Condominium Association
➢ Champlain Towers Condominium Association
➢ Portofino Tower, Towers 1, 2 and 3.
➢ The South Bay Club
➢ Portugal Towers Condo Association
➢ Beach Club Two Condominium Association
➢ Pinnacle Condominium Association
➢ Ocean 2 Condominium Association
➢ And more….
Job Description Being Proposed
• Rtus Replacement• Rtus Pumps Replacement• Rtus Duct Work• Protect Cooling Tower Repairs• Marley Cooling Tower Repairs• Marley Pillars Springs • Marley Cooling Tower Pumps • Marley Cooling Tower Pump
Platform
Proposed Thermo Plus Outside Water-Cooled Unit
For illustration purposes only
o R-410a Refrigerant. Unit Performance in
accordance with ARI/ISO Standards
o Outdoor Construction, Single Piece
o Motorized O/A Damper & Hood
o Modulating Hot Gas Reheat
o VFD Plenum Supply Fan
o 2” MERV 8 Filters
o DDC Controls + BACnet
o Drain Pan Overflow switch
o Limited 1 Year Parts Warranty
o Limited 5 Year Compressor Warranty
o 10,000 HR Salt Spray Coating on Evaporator
and Reheat Coils
o Start Up Service
Units Lead Time 10-12 Weeks
Proposed New (Dual) Armstrong Pumps for Protec Cooling towers.
For illustration purposes onlyPumps Lead Time 4-6 weeks
Hot Dipped Vibration Isolator Deflection Springs
For illustration purposes onlyParts Lead Time In Stock