Page 1: Wind Turbine Installation Vessels

SNAME Luncheon14 Sept 2010

Wind Turbine Installation Vessels

Page 2: Wind Turbine Installation Vessels

Wind Turbine Installation Vessels

IntroductionsSBM Offshore and GustoMSCWind Turbine Vocabulary / Components

Offshore VesselsTypical Installation MethodsMarket Evolution

Vessels of OpportunityFit For Purpose Vessels

Comparison to LiftboatMarket Forecast

Offshore Wind TurbinesVessels

Page 3: Wind Turbine Installation Vessels

Wind Turbine Installation VesselsDutch holding of international companies working in offshore and marine industries

SBM Offshore NVSBM Atlantia IncGustoMSC

Houston, Texas

Gusto BVMarine Structure Consultants (MSC) BV

Schiedam, the NetherlandsSBM Malaysia Sdn Bhd

Kuala Lumpur, Malaysia

Single Buoy Moorings

Monaco

Page 4: Wind Turbine Installation Vessels

Wind Turbine Installation Vessels

1862 Start of Gusto shipyard1959 First SBM SPM mooring ordered by Shell1969 Start of Single Buoy Moorings Inc1977 Start of Marine Structure Consultants B.V.1978 Start of Gusto B.V.1984 Formation of IHC Caland2003 Start GustoMSC Alliance2005 Split-up of SBM Offshore and IHC Merwede

Page 5: Wind Turbine Installation Vessels

Wind Turbine Installation Vessels

Exploration Construction Production

Jack-up

Semi-submersible

Vessel

Page 6: Wind Turbine Installation Vessels

Wind Turbine Installation Vessels

178 Mobile Offshore Units since 1959

32 Mobile Offshore Units currently under construction

ExplorationExploration ConstructionConstruction ProductionProduction TotalTotalJack-up 4 16 2 22Semi 3 - --- 3Vessel 5 2 --- 7

ExplorationExploration ConstructionConstruction ProductionProduction TotalTotalJack-up 43 56 3 102Semi 27 11 2 40Vessel 21 15 --- 36

Page 7: Wind Turbine Installation Vessels

Wind Turbine Installation Vessels

Wind Turbine Vocabulary & Data

Rotor: 126 m dia, 150 mt

Nacelle: 330 mt

Tower: 80 m, 300 mt

Foundation: 800 mt (monopile)

Page 8: Wind Turbine Installation Vessels

Wind Turbine Installation Vessels

Page 9: Wind Turbine Installation Vessels

Wind Turbine Installation Vessels

Source: www.Areva.com

Page 10: Wind Turbine Installation Vessels

Wind Turbine Installation VesselsPresent offshore wind market

Europe is largest market at the moment

Page 11: Wind Turbine Installation Vessels

Wind Turbine Installation Vessels

Page 12: Wind Turbine Installation Vessels

Wind Turbine Installation Vessels

Courtesy: NREL

Page 13: Wind Turbine Installation Vessels

Wind Turbine Installation VesselsPresent installation methods

Install in several steps:

Install foundationInstall transition piece (if applicable)

Install steel towerInstall turbine: nacelle, hub, blades

several sequences and assemblies possible

Often done with jack-up

Page 14: Wind Turbine Installation Vessels

Wind Turbine Installation Vessels

Present installation methodsGravity base foundation

CourtesyNysted OffshoreWind Farm165 MW, 72 x 2.3 MW Bonus/Siemens6-9.5 m water

Page 15: Wind Turbine Installation Vessels

Wind Turbine Installation VesselsPresent installation methods

Transition piece (grouted)

Photo’s courtesy MammoetPhoto courtesy Ballast Nedam: GustoMSC designed Svanen

Page 16: Wind Turbine Installation Vessels

Wind Turbine Installation VesselsPresent installation methods

Steel towers

Photo courtesy Mammoet Photo courtesy A2Sea

Page 17: Wind Turbine Installation Vessels

Wind Turbine Installation VesselsPresent installation methodsBlades: install complete rotor

Photo’s courtesy A2Sea, Deme / GeoSea

Page 18: Wind Turbine Installation Vessels

Wind Turbine Installation VesselsPresent installation methods

Nacelle / hub / blades: bunny ears

Photo’s courtesy RePower, Vestas, A2Sea, MPI

Page 19: Wind Turbine Installation Vessels

Wind Turbine Installation VesselsPresent installation methods

Blades: 3rd blade of bunny ears or blade per blade

Photo courtesy Mammoet

Page 20: Wind Turbine Installation Vessels

Wind Turbine Installation VesselsPresent installation methods

Installation in 1 piece: test unit in China

Photo courtesy COOEC : GustoMSC designed crane vessel Lan Jiang

Page 21: Wind Turbine Installation Vessels

Wind Turbine Installation Vessels

Due to the lack of Installation Jack-upsother tools are converted and used

HLV Svanen

Sheerlegs

Sea Energy

Page 22: Wind Turbine Installation Vessels

Wind Turbine Installation Vessels

Page 23: Wind Turbine Installation Vessels

Wind Turbine Installation Vessels

SEASEA--800800 SEASEA--900900 SEASEA--20002000 SEASEA--32503250

Number 1 1 + 1 5 1

Hull (m) 43.5 x 22.5

48 x 23.5 55.5 x 32.2 72 x 40

Leg length (m) 57.5 60 m 73.2 92

Water depth (m)

30 30 40 45

Var. load (t) 1,000 1,100 1,600 2,500

Built or Under Construction

Page 24: Wind Turbine Installation Vessels

Wind Turbine Installation Vessels

SEA-800 “Vagant”

SEA-2000 “JB-114” & “JB-115”

SEA series non-propelled GustoMSC designs

SEA-1250 “IB-909” SEA-1250 “Zeebouwer”

SEA-2000 “Goliath” GeoSea

SEA-2000 “Sea Worker”

SEA-1150 “HERON”

SEA-2000 “Seafox 7”

Page 25: Wind Turbine Installation Vessels

Wind Turbine Installation Vessels

NGNG--2500X2500X NGNG--53005300--HPEHPE

NGNG--5500C5500C NGNG--7500/67500/6 NGNG--9000C9000C

Number 2 + 3 1 1 (+ 1 optional)

2 4

Hull 61 x 36 m 93 x 36 m 81 x 40 m 137 x 40 130 x 39 m

Power Gen. set 4 x 1,600 kW 4 x 2,600 kW 6 x 1,600 kW 6 x 2,250 kW 4 x 4,150 kW

Crane 200 t @ 22 m 500 t @ 31 m 800 t @ 24 m 1,000 t @ 25.5 m

800 t @ 24 m

Water depth 60 m 45 m 45 m 40 m 45 m

Var. load 1,000 t 2,700 t 3,000 t 7,000 t 6,500 t

Page 26: Wind Turbine Installation Vessels

Wind Turbine Installation VesselsGustoMSC NG series

NG-9000C, installing NG-10000X4

Seajacks Kraken and Leviathan,ready to go

Seajacks Leviathan,in operation

NG-9000C, sailing

Wind Lift I

Page 27: Wind Turbine Installation Vessels

Wind Turbine Installation VesselsFour NG-9000C units under construction at Drydocks World S.E.A., Lamprell Energy and Cosco ShipyardContinuous Jacking System of 9,000 t/leg Heavy Lift Leg Crane of 800 t @ 24 m

Main particulars•Hull length 130.8 m•Hull width 39.0 m•Hull depth 9.0 m•Hull draft 5.6 m•Leg length max. (incl. spud-can) 81 m

•Propulsion and DP 3x 3,500 kW 3x 1,500 kW

•Transit speed 10-12 kn•Accommodation 70 POB•Payload 5,400 t

Page 28: Wind Turbine Installation Vessels

Wind Turbine Installation Vessels

Four individual yokes around a tubular leg

Three out of four yokes are active and one in recycle stroke

Hull jacking speed improved to 24 m/hr

References: NG-5500C and NG-9000C

Performances: Type : 5500C- Max. Jacking capacity 3,250 t - Max. Holding capacity 5,500 t

Type: 9000C- Max. Jacking capacity 5,300 t - Max. Holding capacity 9,000 t

Jacking speeds:- Platform lifting speed 24 m/hr- Platform lowering speed 30 m/hr- Leg handling speeds up to 40 m/hr

Continuous Jacking system

Page 29: Wind Turbine Installation Vessels

Wind Turbine Installation Vessels

Fully integrated Crane & Jacking

System

Page 30: Wind Turbine Installation Vessels

Wind Turbine Installation Vessels

Main hoist 800 t @ 24 m Minimum radius ± 18 mHoisting height ± 102 m(reference upper bearing level)Hoisting speed (full load) 0-7 m/minHoisting speed (reduced load) 0-11.6 m/minMax. Wind speed 16 m/s

Aux hoist 50 t @ 90 m suitable for (3 t man-riding)Minimum radius ± 20 mHoisting height ± 111 m

Load Tugger winches 10 tonHigh outreach & Short radiusSpecial boom tip for WTIFully revolving n x 360ºClass certificationElectric drivenBogie roller slewing system

Page 31: Wind Turbine Installation Vessels

Wind Turbine Installation Vessels

WTI - Liftboat Comparison

NG9000 230 Class LBDimensions (m) 130x39x9 42x24x4

Deck Area (m2) 2,600 492

VDL (mt) 5,400 561

Crane Cap (mt) 800 150

Jacking System Continuous Single Acting

Accomodations 70 36

Page 32: Wind Turbine Installation Vessels

Wind Turbine Installation Vessels

Page 33: Wind Turbine Installation Vessels

Wind Turbine Installation Vessels

Page 34: Wind Turbine Installation Vessels

Wind Turbine Installation Vessels

Page 35: Wind Turbine Installation Vessels

Wind Turbine Installation Vessels

Page 36: Wind Turbine Installation Vessels