wilkes elementary school – comparable schools from neighboring school districts opened: 2012 gross...

Download Wilkes Elementary School – Comparable Schools from Neighboring School Districts Opened: 2012 Gross Square Feet: 70,509 Construction Bid: $21,359,000 Construction

If you can't read please download the document

Upload: reginald-allen

Post on 23-Dec-2015

214 views

Category:

Documents


0 download

TRANSCRIPT

  • Slide 1
  • Wilkes Elementary School Comparable Schools from Neighboring School Districts Opened: 2012 Gross Square Feet: 70,509 Construction Bid: $21,359,000 Construction Final Cost: $21,714,411 Cost per Square Foot: $308 Architect: Mahlum General Contractor: Spee West Construction Wilkes Elementary School Bainbridge Island School District
  • Slide 2
  • Wilkes Elementary School Comparable Schools from Neighboring School Districts Opened: 2012 Gross Square Feet: 76,950 Construction Bid: $22,349,000 Construction Final Cost: $22,838,769 Cost per Square Foot: $297 Architect: NAC Architecture General Contractor: Bayley Construction Cherry Crest Elementary School Bellevue School District
  • Slide 3
  • Wilkes Elementary School Comparable Schools from Neighboring School Districts Opened: 2011 Gross Square Feet: 70,370 Construction Bid: $20,045,867 Construction Final Cost: $21,355,894 Cost per Square Foot: $303 Architect: NAC Architecture General Contractor: Graham Construction Machias Elementary School Snohomish School District
  • Slide 4
  • Wilkes Elementary School Comparable Schools from Neighboring School Districts Opened: 2012 Gross Square Feet: 66,580 Construction Bid: $20,674,700 Construction Final Cost: $21,720,911 Cost per Square Foot: $326 Architect: NAC Architecture General Contractor: Spee West Construction Carl Sandburg Elementary School Lake Washington School District
  • Slide 5
  • Wilkes Elementary School Comparable Schools from Neighboring School Districts Opened: 2008 Square Feet: 56,506 Construction Bid: $16,100,000 Construction Cost: $17,500,000 Cost per Square Foot: $310 Architect: Integrus Architecture General Contractor: Kassel Construction Rachel Carson Elementary School Lake Washington School District
  • Slide 6
  • Wilkes Elementary School Comparable Schools from Neighboring School Districts Opened: 2008 Square Feet: 55,000 Construction Bid: Not available Construction Final Cost: $19,500,000 Cost per Square Foot: $355 Architect: Bassetti Architects General Contractor: Sellen Construction St. Thomas School Medina, Washington
  • Slide 7
  • Wilkes Elementary School Comparable Schools from Neighboring School Districts Opened: 2013 Square Feet: 67,250 Construction Bid: $23,765,374 Construction Cost: $24,873,086 Cost per Square Foot: $370 Architect: Integrus Architecture General Contractor: Mortenson Construction Benjamin Rush Elementary School Lake Washington School District
  • Slide 8
  • Wilkes Elementary School Energy Consumption Comparison Old School New School 2010 2013 Comparative Period Nov. 6-Dec. 7 Nov. 6-Dec. 7 PSE KWH 41,852 72,600 Propane KWH 71,315 0 Total Monthly KWH 113,167 72, 600 Invoice Amount PSE $4,700 $9,320 Invoice Amount Propane $4,348 0 Total Invoice Amounts $9,047 $9,320 Heated Square Footage 44,958 63,462 Cost per Square Foot $ 0.201 $0.147 Todays Relative Cost $14,528 $9,320 = Percent Savings 36% Wilkes Elementary School ENERGY CONSUMPTION COMPARISON