why lost foam
DESCRIPTION
Description of the Lost Foam Casting process and explanation of what makes the Lost Foam Casting Process preferable to other forms of casting techniques.TRANSCRIPT
WHY LOST FOAM ?
Presented by Karel Cermak
1.CASTING TOLERANCES ARE SMALLER
• DIMENSION [mm]• < 25 • 25 to 80• 80 to 125• 125 to 175• 175 to 250• > 250• Rough guide <175
>175
• TOLERANCE [+/-mm]• 0.17
• 0.25
• 0.30
• 0.43
• 0.003 per mm
• 0.002 per mm
• 0.50
• 0.80
2.NO CORES ARE REQUIRED
• LARGE DESIGN FREEDOM
• “CONTROLLABLE” WALL THICKNESS
• NO CHAPLETS
• NO FINS
• NO MISMATCH
• NO CORE DEFECTS
• NO SAND MIX PROBLEMS
3.NO PARTING LINES
• NO DEMOLD DRAFT
• SEVERAL LAYERS POSSIBLE
• DOWNSPRUE AND RISERS CAN BE POSITIONED OPTIMALLY
• NO MISMATCH OR FINS
4.COMBINATION/CONSOLIDATION OF PARTS
IS POSSIBLE
• “GLUE INSTEAD OF FASTENERS”
• DECISIONS IN THE EARLY DESIGN PHASES ENABLE A HIGH ADDED VALUE TO BE ACHIEVED
• Al-alloy ( 319 T5 )
• 11.8 kg.
• 490 x 330 x 135
• Semi-Permanent mold and cores
• Lighter
• Reduced machining
• No fettling
• Higher productivity
• Smoother
• Product performance
• Combination.
– Fewer parts
• Less leaks
• Reduced machining
• Fewer fasteners
• Reduced assembly
• Fewer seals
CYLINDER HEAD 16 V
SATURN / GM1200 PER DAY
IN-HOUSE FOUNDRY
so far 1.7 million castings produced
• Al-alloy (319 T5)
• 18.2 kg.
• 435 x 445 x 280
• Semi-Permanent mold and cores
• Lighter
• Reduced machining
• Reduced fettling
• Higher productivity
• Smoother
• Product performance
• Combination
– Fewer parts
• Less leaks
• Reduced machining
• Fewer fasteners
• Reduced assembly
• Fewer seals
• Tooling costs
ENGINE BLOCK
SATURN / GM / 1.9 l / 124 PS1,200 PER DAY
IN-HOUSE FOUNDRY
so far 1.7 million castings produced
• Al-alloy
• 22 kg.
• 600 x 300 x 400.
• Die-cast with salt cores
• Lighter
• Reduced machining
• Reduced fettling
• Higher productivity
• Smoother
• Product performance
• Combination
– Fewer parts
• Less leaks
• Reduced machining
• Fewer fasteners
• Reduced assembly
• Fewer seals
• Tooling costs
ENGINE BLOCK V6
MERCURY MARINE300 PER DAY
IN-HOUSE FOUNDRY
• Al-alloy
• 12.4 kg.
• 400 x 300 x 350
• No comparison possible
• Lighter
• Reduced machining
• Reduced fettling
• Higher productivity
• Smoother
• Product performance
• Combination
– Fewer parts
• Less leaks
• Reduced machining
• Fewer fasteners
• Reduced assembly
• Fewer seals
• Tooling costs
ENGINE BLOCK V2
KOHLER OHC / 16 PS350 PER DAY
INTERMET
OIL COOLER
IVECO300 PER DAY
ALUMINIUM DONGO
• Al 319.
• 2.5 kg.
• 250 x 150 x 30
• Semi-Permanent mold and cores
• Lighter
• Reduced machining
• Less fettling
• Higher productivity
• Product performance
• Combination
– Fewer parts
• Less leaks
• Reduced machining
• Fewer fasteners
• Reduced assembly
• Fewer seals
INTAKE MANIFOLD
FIAT3,500 PER DAY
ALUMINIO DONGO
• Al 319.
• ca. 5 kg.
• 280 x 220 x 50
• Semi-Permanent mold and cores
• Lighter
• Reduced machining
• Less fettling
• Higher productivity
• Product performance
• Combination
– Fewer parts
• Less leaks
• Reduced machining
• Fewer fasteners
• Reduced assembly
• Fewer seals
so far 3.5 million castings produced
CYLINDER HEAD
FIAT - FIRE ENGINE - PUNTO 1600 PER DAY
ALUMINIO DONGO
• Al 319.
• 12 kg.
• 370 x 140 x 120
• Semi-Permanent mold and cores
• Lighter
• Reduced machining
• Less fettling
• Higher productivity
• Smoother
• Product performance
• Combination
– Fewer parts
• Less leaks
• Reduced machining
• Fewer fasteners
• Reduced assembly
• Fewer seals
• Tooling costs
INTAKE MANIFOLD
GM-OPEL CORSA1,200 PER DAY
ALUMINIUM DONGO
• Al- alloy.
• 2.45 kg.
• 260 x 220 x 190.
• Comparison difficultSand casting?
• Lighter
• Reduced machining
• Less fettling
• Higher productivity
• Smoother
• Product performance
• Combination
– Fewer parts
• Less leaks
• Reduced machining
• Fewer fasteners
• Reduced assembly
• Fewer seals
• Tooling costs
INTAKE MANIFOLD
FORD 2.3 l / 4 Cyl.1,200 PER DAY
INTERMET
• Al - alloy
• 5.2 kg.
• 450 x 220 x 85.
• Semi- Permanent mold and cores
• Lighter
• Reduced machining
• Less fettling
• Higher productivity
• Smoother
• Product performance
• Combination
– Fewer parts
• Less leaks
• Reduced machining
• Fewer fasteners
• Reduced assembly
• Fewer seals
• Tooling costs
• Al-alloy
• 12 kg.
• 450 x 420 x 180.
• Sand casting and cores
• Lighter
• Reduced machining
• Less fettling
• Higher productivity
• Smoother
• Product performance
• Combination
– Fewer parts
• Less leaks
• Reduced machining
• Fewer fasteners
• Reduced assembly
• Fewer seals
• Tooling costs
GEAR HOUSING
SAUER SUNDSTRAND220 PER DAY
WILLARD INDUSTRIES
FMC250 PER DAY
WILLARD INDUSTRIES
• Al-alloy
• 1.04 kg.
• 139 x 125
• Comparison difficult
• Lighter
• Reduced machining
• Less fettling
• Higher productivity
• Smoother
• Product performance
• Combination
– Fewer parts
• Less leaks
• Reduced machining
• Fewer fasteners
• Reduced assembly
• Fewer seals
• Tooling costs
CLUSTER HUB
• Al-alloy
• 0.7 kg.
• 90 x 90 x 32.
• Die-cast
• Lighter
• Reduced machining
• Less fettling
• Higher productivity
• Smoother
• Product performance
• Combination
– Fewer parts
• Less leaks
• Reduced machining
• Fewer fasteners
• Reduced assembly
• Fewer seals
• Tooling costs
HEATED COVER
XXXX1,000 PER DAY
INTERMET
HYDRAULIC HOUSING
SAUER SUNDSTRAND210 PER DAY
WILLARD INDUSTRIES
• Al- alloy
• 13 kg.
• 350 x 200 x 200.
• Sand casting and cores
• Lighter
• Reduced machining
• Less fettling
• Higher productivity
• Smoother
• Product performance
• Combination
– Fewer parts
• Less leaks
• Reduced machining
• Fewer fasteners
• Reduced assembly
• Fewer seals
• Tooling costs
• Al-alloy
• 2.8 kg.
• 350 150 x 150.
• No comparison possible
• Lighter
• Reduced machining
• Less fettling
• Higher productivity
• Smoother
• Product performance
• Combination
– Fewer parts
• Less leaks
• Reduced machining
• Fewer fasteners
• Reduced assembly
• Fewer seals
• Tooling costs
SUCTION PIPE
MERCEDES BENZ200 PER DAYHANDTMANN
ALUMINIUM FAILURES
• Wrong product choice
• Reluctance to adapt design
• Underestimation of development costs
• Inexperience
• Al-alloy
• 0.78 kg.
• 190 x 170 x 130.
• Semi-Permanent mold and cores
• Lighter
• Reduced machining
• Less fettling
• Higher productivity
• Smoother
• Product performance
• Combination
– Fewer parts
• Less leaks
• Reduced machining
• Fewer fasteners
• Reduced assembly
• Fewer seals
• Tooling costs
SUPPORT/CARRIER
FLOP 1
• Al-alloy
• 5.1 kg.
• 300 x 300 x 310
• Semi-Permanent mold and cores
• Lighter
• Reduced machining
• Less fettling
• Higher productivity
• Smoother
• Product performance
• Combination
– Fewer parts
• Less leaks
• Reduced machining
• Fewer fasteners
• Reduced assembly
• Fewer seals
• Tooling costs
CYLINDER HEAD
FLOP 2
• Al-alloy
• 1,1 kg.
• 110 x 220
• Welded part
• Lighter
• Reduced machining
• Less fettling
• Higher productivity
• Smoother
• Product performance
• Combination
– Fewer parts
• Less leaks
• Reduced machining
• Fewer fasteners
• Reduced assembly
• Fewer seals
• Tooling costs
EXHAUST PIPE
FLOP 3
DUCTILE IRON• PROs
– No fixed mold process available - very good accuracy
– All parts, like for Al, pourable
– Cleaning room cost savings greater than for Al
– Environmentally cleaner than sand casting processes
• CONs– The process is
sensitive to uncontrolled carbon pickup
• GGG 60 ( US 0.7060)
• 11.34 kg.
• 450 x 200
• Mask tool & 9 cores
• Lighter
• Reduced machining
• Less fettling
• Higher productivity
• Smoother
• Product performance
• Combination
– Fewer parts
• Less leaks
• Reduced machining
• Fewer fasteners
• Reduced assembly
• Fewer seals
• Tooling costs
CRANK SHAFT
SATURN / GM1,200 PER DAY
IN-HOUSE FOUNDRY
• GGG 50 / 60
• 4.2 kg.
• 150 x 140
• Sand casting with cores
• Lighter
• Reduced machining
• Less fettling
• Higher productivity
• Smoother
• Product performance
• Combination
– Fewer parts
• Less leaks
• Reduced machining
• Fewer fasteners
• Reduced assembly
• Fewer seals
• Tooling costs
DIFFERENTIAL CASE
SATURN / GM1,200 PER DAY
IN-HOUSE FOUNDRY
• GGG 40
• 11.1 kg.
• 250 x 200 x 160
• Sand casting with cores
• Lighter
• Reduced machining
• Reduced fettling
• Higher productivity
• Smoother
• Product performance
• Combination
– Fewer parts
• Less leaks
• Reduced machining
• Fewer fasteners
• Reduced assembly
• Fewer seals
• Tooling costs
SPRING HANGER A
VOLVO - GM HEAVY TRUCK240 PER DAY
CITATION FOAM CASTING COMPANY
SPRING HANGER B
VOLVO - GM HEAVY TRUCK240 PER DAY
CITATION FOAM CASTING COMPANY
• GGG 40
• 13.4 kg.
• 280 x 200 x 160
• Sand casting with cores
• Lighter
• Reduced machining
• Reduced fettling
• Higher productivity
• Smoother
• Product performance
• Combination
– Fewer parts
• Less leaks
• Reduced machining
• Fewer fasteners
• Reduced assembly
• Fewer seals
• Tooling costs
• GGG
• 12.3 kg.
• 400 x 250 x 160.
• Sand casting with cores
• Lighter
• Reduced machining
• Reduced fettling
• Higher productivity
• Smoother
• Product performance
• Combination
– Fewer parts
• Less leaks
• Reduced machining
• Fewer fasteners
• Reduced assembly
• Fewer seals
• Tooling costs
CLAMP GUIDE
XXXXX200 PER DAY
CITATION FOAM CASTING COMPANY
• GGG 40
• 5.9 kg.
• 260 x 230 x 220.
• Sand casting with cores
• Lighter
• Reduced machining
• Reduced fettling
• Higher productivity
• Smoother
• Product performance
• Combination
– Fewer parts
• Less leaks
• Reduced machining
• Fewer fasteners
• Reduced assembly
• Fewer seals
• Tooling costs
SUPPORT / CARRIER
MERCEDES BENZ, COMPR. MOTOR120 PER DAY
CITATION FOAM CASTING COMPANY
DUCTILE IRON FAILURES• Wrong product
choice
• Reluctance to adapt design
• Underestimation of development costs
• Inexperience
• GGG !!!
• 2.0 kg.
• 280 x 300
• Sand casting & 4 cores
• Lighter
• Reduced machining
• Reduced fettling
• Higher productivity
• Smoother
• Product performance
• Combination
– Fewer parts
• Less leaks
• Reduced machining
• Fewer fasteners
• Reduced assembly
• Fewer seals
• Tooling costs
STATOR FRAME
EXPERIMENT
• GGx-highly magnetic
• 0.8 kg
• from 80 to 140 mm x 70
• No comparison possible
• Lighter
• Reduced machining
• Reduced fettling
• Higher productivity
• Smoother
• Product performance
• Combination
– Fewer parts
• Less leaks
• Reduced machining
• Fewer fasteners
• Reduced assembly
• Fewer seals
• Tooling costs
EL.-MAGN. CLUTCH FOR CAR A/C - ROTOR
EXPERIMENT
GRAY IRON
• Thinner hard iron surface
• More even solidification– Reduced stress
• Quicker machining
• Increased machine tool life
• GG
• 10 - 80 kg
• up to 800 x 1000
• Sand casting with cores
• Lighter
• Reduced machining
• Reduced fettling
• Higher productivity
• Smoother
• Product performance
• Combination
– Fewer parts
• Less leaks
• Reduced machining
• Fewer fasteners
• Reduced assembly
• Fewer seals
• Tooling costs
STATOR FRAMESIEMENS, ABB, BALDOR, DIEZ
CA.1000 PER DAYCITATION FOAM, VSETIN
ELECTRIC MOTOR END SHIELD
BALDOR40 PER DAY
CITATION FOAMS
• GG
• 12 kg.
• 400 x 100
• Sand casting and cores
• Lighter
• Reduced machining
• Less fettling
• Higher productivity
• Smoother
• Product performance
• Combination
– Fewer parts
• Less leaks
• Reduced machining
• Fewer fasteners
• Reduced assembly
• Fewer seals
• Tooling costs
• GG 25.
• 4.5 kg.
• 360 x 200 x 130.
• Sand casting
• Lighter
• Reduced machining
• Reduced fettling
• Higher productivity
• Smoother
• Product performance
• Combination
– Fewer parts
• Less leaks
• Reduced machining
• Fewer fasteners
• Reduced assembly
• Fewer seals
• Tooling costs
WATER INLET / COMPONENT BRACKET
CUMMINS ENGINE CO180 PER DAY
CITATION FOAM CASTING COMPANY
• GG 40
• 22 kg
• 600 x 300 x 100.
• Sand casting with cores
• Lighter
• Reduced machining
• Reduced fettling
• Higher productivity
• Smoother
• Product performance
• Combination
– Fewer parts
• Less leaks
• Reduced machining
• Fewer fasteners
• Reduced assembly
• Fewer seals
• Tooling costs
EXHAUST MANIFOLDMERCURY INBOARD
120 PER DAYCITATION FOAMS
• GG
• 10 kg.
• 280 x 350 x 220
• Sand casting with cores
• Lighter
• Reduced machining
• Reduced fettling
• Higher productivity
• Smoother
• Product performance
• Combination
– Fewer parts
• Less leaks
• Reduced machining
• Fewer fasteners
• Reduced assembly
• Fewer seals
• Tooling costs
COOLING WATER PUMP
DETROIT DIESEL120 PER DAY
CITATION FOAM
• GG
• 22 kg.
• 300 x 400 x 400
• Sand casting with cores
• Lighter
• Reduced machining
• Reduced fettling
• Higher productivity
• Smoother
• Product performance
• Combination
– Fewer parts
• Less leaks
• Reduced machining
• Fewer fasteners
• Reduced assembly
• Fewer seals
• Tooling costs
WATER VALVE BODYM & H NW 15080 PER DAY
CITATION FOAMS
• GG
• 53 kg.
• 550 x 225 x 100.
• Sand casting with cores
• Lighter
• Reduced machining
• Reduced fettling
• Higher productivity
• Smoother
• Product performance
• Combination
– Fewer parts
• Less leaks
• Reduced machining
• Fewer fasteners
• Reduced assembly
• Fewer seals
• Tooling costs
CYLINDER HEAD - DIESEL
JIN HONG400 PER DAY
IN-HOUSE FOUNDRY
ELECTRICAL MOTOR END SHIELD
80 PER DAYCITATION FOAM
• GG
• 26 kg.
• 711 x 120
• Sand casting with cores
• Lighter
• Reduced machining
• Reduced fettling
• Higher productivity
• Smoother
• Product performance
• Combination
– Fewer parts
• Less leaks
• Reduced machining
• Fewer fasteners
• Reduced assembly
• Fewer seals
• Tooling costs
STEEL CASTINGS
• High accuracy• Good surface quality• Also 3 + mm wall
thickness possible• Reduced machining• Increased machine tool
life• Reduced cleaning room
costs• Complicated castings
possible
ADVANTAGES LIMITATIONS
• Alloys with C < 0.15 %
• GS - Heat resistant
• 1.2 kg.
• 180 x 200 x 30.
• Furan Sand
• Lighter
• Reduced machining
• Reduced fettling
• Higher productivity
• Smoother
• Product performance
• Combination
– Fewer parts
• Less leaks
• Reduced machining
• Fewer fasteners
• Reduced assembly
• Fewer seals
• Tooling costs
ANCHOR CLUSTER
EXPERIMENT
“DRILL HOOK”
PAALS2,000 PER YEAR
GUSSTAHL LIENEN
• GS 25CrMo4
• 1.6 kg.
• 150 x 100
• No comparison possible
• Lighter
• Reduced machining
• Reduced fettling
• Higher productivity
• Smoother
• Product performance
• Combination
– Fewer parts
• Less leaks
• Reduced machining
• Fewer fasteners
• Reduced assembly
• Fewer seals
• Tooling costs
WATER COOLED GRATING BODY
NOELL5,000 PER YEAR
GUSSTAHL LIENEN
• GX 40CrNiSi27-4
• 32 kg
• 650 x 260 x 100.
• Furan Sand
• Lighter
• Reduced machining
• Reduced fettling
• Higher productivity
• Smoother
• Product performance
• Combination
– Fewer parts
• Less leaks
• Reduced machining
• Fewer fasteners
• Reduced assembly
• Fewer seals
• Tooling costs
CERMAK ENGINEERING PFAHLER STR.21,
65 193 WIESBADEN, TEL.+49 611-1509 9495 E-Mail : [email protected]
PLEASE ENQUIRE ABOUT OUR PRESENTATION PART 2
“HOW IS LOST FOAM CONTROLLABLE?”