white mesa mill site reclamation energy … · 2018-03-15 · energy fuels interim fill grading...

14
Area of Drawings TRC-1 - TRC-3 TITLE SHEET AND PROJECT LOCATION MAP REC-0 WMM COVER C VICINITY MAP LOCATION MAP U T A H ENERGY FUELS RESOURCES (USA) INC. SAN JUAN COUNTY, UTAH INDEX OF DRAWINGS SHEET TITLE See Vicinity Map TITLE SHEET AND PROJECT LOCATION MAP REV INTERIM FILL GRADING PLAN COMPACTED COVER GRADING PLAN FINAL COVER SURFACE LAYOUT COVER OVER CELL 2 CROSS SECTION COVER OVER CELL 3 CROSS SECTIONS COVER OVER CELL 2 CROSS SECTIONS SITE MAP Cell 1 Cell 2 Cell 3 Cell 4B Cell 4A RECLAMATION COVER EROSION PROTECTION SEDIMENTATION BASIN DETAIL COVER OVER CELL 4A & 4B CROSS SECTIONS PLAN VIEW OF RECLAMATION FEATURES MILL SITE AND ORE PAD AREA GRADING PLAN prepared for WHITE MESA MILL SITE RECLAMATION Mill Site White Mesa RECLAMATION COVER DETAILS (SHEET 1 OF 2) TRC-9 C TRC-8 C TRC-7 C TRC-6 C TRC-5 C TRC-4 C TRC-3 C TRC-2 C TRC-1 C REC-3 C REC-2 C REC-1 C REC-0 C RECLAMATION COVER DETAILS (SHEET 2 OF 2) TRC-10 C WHITE MESA MILL SITE RECLAMATION BLANDING, UTAH AUG 2016 ENERGY FUELS NOTE: DRAWINGS REC-0 THROUGH REC-3 PRESENT THE OVERALL RECLAMATION PLANS FOR THE ENTIRE WHITE MESA MILL SITE. DRAWINGS TRC-1 THROUGH TRC-10 PRESENT THE RECLAMATION PLANS FOR THE CELLS USED FOR TAILINGS DISPOSAL OR PROCESS WATER EVAPORATION (CELLS 1, 2, 3, 4A, AND 4B). CELLS 1 AND 4B ARE CURRENTLY USED FOR PROCESS WATER EVAPORATION. THE RECLAMATION PLANS REFLECTED IN THESE DRAWINGS ARE BASED ON POTENTIAL USE OF CELL 4B IN THE FUTURE FOR TAILINGS DISPOSAL.

Upload: lexuyen

Post on 09-Sep-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

Area of Drawings

TRC-1 - TRC-3

TITLE SHEET AND PROJECT LOCATION MAP

REC-0

WMM COVER

C

VICINITY MAPLOCATION MAP

U T A H

ENERGY FUELS RESOURCES (USA) INC.

SAN JUAN COUNTY, UTAH

INDEX OF DRAWINGS

SHEET TITLE

See Vicinity Map

TITLE SHEET AND PROJECT LOCATION MAP

REV

INTERIM FILL GRADING PLAN

COMPACTED COVER GRADING PLAN

FINAL COVER SURFACE LAYOUT

COVER OVER CELL 2 CROSS SECTION

COVER OVER CELL 3 CROSS SECTIONS

COVER OVER CELL 2 CROSS SECTIONS

SITE MAP

Cell 1

Cell 2

Cell 3

Cell 4B

Cell 4A

RECLAMATION COVER EROSION PROTECTION

SEDIMENTATION BASIN DETAIL

COVER OVER CELL 4A & 4B CROSS SECTIONS

PLAN VIEW OF RECLAMATION FEATURES

MILL SITE AND ORE PAD AREA GRADING PLAN

prepared for

WHITE MESA MILL SITE RECLAMATION

Mill Site

White Mesa

RECLAMATION COVER DETAILS (SHEET 1 OF 2)

TRC-9 C

TRC-8 C

TRC-7 C

TRC-6 C

TRC-5 C

TRC-4 C

TRC-3 C

TRC-2 C

TRC-1 C

REC-3 C

REC-2 C

REC-1 C

REC-0 C

RECLAMATION COVER DETAILS (SHEET 2 OF 2)

TRC-10 C

WHITE MESA MILL SITE RECLAMATION

BLANDING, UTAH

AUG 2016

ENERGY FUELS

NOTE:

DRAWINGS REC-0 THROUGH REC-3 PRESENT THE OVERALL RECLAMATION PLANS FOR THE

ENTIRE WHITE MESA MILL SITE. DRAWINGS TRC-1 THROUGH TRC-10 PRESENT THE

RECLAMATION PLANS FOR THE CELLS USED FOR TAILINGS DISPOSAL OR PROCESS WATER

EVAPORATION (CELLS 1, 2, 3, 4A, AND 4B).

CELLS 1 AND 4B ARE CURRENTLY USED FOR PROCESS WATER EVAPORATION. THE

RECLAMATION PLANS REFLECTED IN THESE DRAWINGS ARE BASED ON POTENTIAL USE OF

CELL 4B IN THE FUTURE FOR TAILINGS DISPOSAL.

RESTRICTED AREA BOUNDARY

RESTRICTED AREA BOUNDARY

FINAL FOOTPRINT FOR TAILINGS CELLS

AND CELL 1 DISPOSAL AREA

DISCHARGE CHANNEL

(SEE SHEET REC-3)

CELL 1 DISPOSAL AREA

CELL 2

CELL 3

CELL 4A

CELL 4B

BLACK MESA RD

HW

Y 1

91

SEDIMENTATION BASIN

(SEE SHEET REC-3)

MILL SITE BOUNDARY

(SEE SHEET REC-2)

MILL SITE

PLAN VIEW OF RECLAMATION FEATURES

REC-1

WMM REC-1

C

LEGEND:

WHITE MESA MILL SITE RECLAMATION

BLANDING, UTAH

AUG 2016

ENERGY FUELS

5605

MILL SITE BOUNDARY

RESTRICTED AREA BOUNDARY

RESTRICTED AREA BOUNDARY

CELL 1 DISPOSAL AREA

CELL 2

BLACK MESA RD

HW

Y 1

91

ORE PAD

MILL YARD

SEDIMENTATION BASIN

NOTES:

LEGEND:

WHITE MESA MILL SITE RECLAMATION

BLANDING, UTAH

AUG 2016

ENERGY FUELS MILL SITE AND ORE PAD AREA GRADING PLAN

REC-2

WMM REC-2

C

5605

MILL SITE BOUNDARY

SEDIMENTATION BASIN

DISCHARGE CHANNEL

CELL 2

CELL 3

RESTRICTED AREA BOUNDARY

ROCK APRON

CELL 1 DISPOSAL AREA

AREA OF CELL TO BE BREACHED

3:1 (TYP)

EXCAVATION

INTO DAKOTA

SANDSTONE

MILL SITE

0.1%

1

.

3

%

NOTES:

LEGEND:

WHITE MESA MILL SITE RECLAMATION

BLANDING, UTAH

AUG 2016

ENERGY FUELS SEDIMENTATION BASIN DETAIL

REC-3

WMM REC-3

C

5605

APPROXIMATE LIMIT OF

ADDITIONAL INTERIM FILL

DISCHARGE CHANNEL

CELL 2

CELL 4A

CELL 4B

MILL SITE

CELL 1 DISPOSAL AREA

SEDIMENTATION

BASIN

CELL 3

RESTRICTED AREA BOUNDARY

LEGEND:

WHITE MESA MILL SITE RECLAMATION

BLANDING, UTAH

AUG 2016

ENERGY FUELS INTERIM FILL GRADING PLAN

TRC-1

WMM TRC-1

C

5605

5605

CELL 2

CELL 4A

CELL 4B

MILL SITE

CELL 1 DISPOSAL AREA

SEDIMENTATION

BASIN

CELL 3

APPROXIMATE LIMIT OF

COMPACTED COVER

DISCHARGE CHANNEL

RESTRICTED AREA BOUNDARY

LEGEND:

WHITE MESA MILL SITE RECLAMATION

BLANDING, UTAH

AUG 2016

ENERGY FUELS COMPACTED COVER GRADING PLAN

TRC-2

WMM TRC-2

C

5605

5605

0.5%

0

.5

%

0.5%

-0

.8

%

-0

.8

%

1

.

1

%

1.0

%

CELL 2

CELL 4A

CELL 4B

MILL SITE

SEDIMENTATION

BASIN

CELL 3

HIG

H P

OIN

T

CELL 1 DISPOSAL AREA

APPROXIMATE LIMIT OF

FINAL COVER SURFACE

DISCHARGE CHANNEL

G

R

A

D

E

B

R

E

A

K

RESTRICTED AREA BOUNDARY

LEGEND:

WHITE MESA MILL SITE RECLAMATION

BLANDING, UTAH

AUG 2016

ENERGY FUELS FINAL COVER SURFACE LAYOUT

TRC-3

WMM TRC-3

C

5605

5605

RESTRICTED AREA BOUNDARY

RESTRICTED AREA BOUNDARY

1

.

1

%

0.5%

0

.5

%

0.5%

0

.8

%

0

.8

%

1

0.8-1.0% SLOPES: TOPSOIL MIXED

WITH 25% 1-INCH MINUS GRAVEL

FLOW PATH ABOVE LONGEST

5H:1V SIDE SLOPE IN CELL 4A

LONGEST FLOW PATH

ACROSS CELLS 2, 3 AND 4A

5H:1V SLOPES: ROCK (D

50

= 5.3 INCHES)

WITH FILTER LAYER BETWEEN EROSION

PROTECTION AND RANDOM FILL

0.1%

SLOPES: TOPSOIL

AND VEGETATION

DISCHARGE CHANNEL

BEDROCK

CELL 2

CELL 3

CELL 4A

MILL SITE

BLACK MESA RD

HW

Y 191

CELL 1 DISPOSAL AREA

SEDIMENTATION BASIN

HIG

H P

OIN

T

ROCK APRON B

1

ROCK APRON C

5H:1V SLOPES: D

50

= 5.3

INCHES WITH FILTER

LAYER BETWEEN EROSION

PROTECTION AND

GROWTH MEDIUM

G

R

A

D

E

B

R

E

A

K

LEGEND:

WHITE MESA MILL SITE RECLAMATION

BLANDING, UTAH

AUG 2016

ENERGY FUELS RECLAMATION COVER EROSION PROTECTION

TRC-4

WMM TRC-4

C

5605

0.5% SLOPES: TOPSOIL

AND VEGETATION

1.0% SLOPES: TOPSOIL MIXED

WITH 25% 1-INCH MINUS GRAVEL

1

ROCK APRON A

NON-ACCUMULATING SIDE

SLOPES: ROCK (D

50

= 1.7 INCHES)

(NO FILTER LAYER REQUIRED)

5605

ELE

VA

TIO

N, F

EE

T

ELE

VA

TIO

N, F

EE

T

DISTANCE, FEET

5560

5580

5600

5620

5550

5560

5580

5600

5620

0 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500

BOTTOM OF CELL FROM DESIGN DRAWINGS

EXISTING SURFACE FROM 2012 LIDAR SURVEY

FINAL COVER SURFACE

-1%

CELL 4B

CELL 3

(SEE SHEET TRC-6)

-1%

MAXIMUM PERMITTED TAILINGS SURFACE

MAXIMUM PERMITTED TAILINGS ELEVATION AT 5600.0'

MAXIMUM PERMITTED TAILINGS ELEVATION AT 5610.0'

1

5

9.5' (MIN)

9.5' (MIN)

5

3

6

ELE

VA

TIO

N, F

EE

T

ELE

VA

TIO

N, F

EE

T

DISTANCE, FEET

5580

5600

5620

5560

5580

5600

5620

0 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500

FINAL COVER SURFACE

-1%

CELL 4A

-1%

9.5' (MIN)

3

5

MAXIMUM PERMITTED TAILINGS ELEVATION AT 5600.0'

EXISTING SURFACE FROM 2012 LIDAR SURVEYMAXIMUM PERMITTED TAILINGS SURFACE

MAXIMUM PERMITTED TAILINGS ELEVATION AT 5610.0'

6

1

5

CELL 3

(SEE SHEET TRC-6)

EXISTING SURFACE FROM 2007 LIDAR SURVEY

9.5' (MIN)

COVER OVER CELL 4A & 4B CROSS SECTIONS

TRC-5

WMM TRC-5

C

A TAILINGS COVER

0

0

SCALE IN FEET

VERT

HORZ 50 100

10 20

B TAILINGS COVER

0

0

SCALE IN FEET

VERT

HORZ 50 100

10 20

VERTICAL EXAGGERATION = 5X

VERTICAL EXAGGERATION = 5X

LEGEND:

WHITE MESA MILL SITE RECLAMATION

BLANDING, UTAH

AUG 2016

ENERGY FUELS

ELE

VA

TIO

N, F

EE

T

ELE

VA

TIO

N, F

EE

T

DISTANCE, FEET

5580

5600

5620

5640

5560

5580

5600

5620

5640

1300 1400 1500 1600 1700 1800 1900 2000 2100 2200 2300 2400 2500

BOTTOM OF CELL FROM AS-BUILT DRAWINGS

FINAL COVER SURFACE

-0.5%

CELL 3

CELL 2 (SEE SHEET TRC-7)CELL 4B (SEE SHEET TRC-5)

10' (MIN)

EXISTING SURFACE FROM 2012 LIDAR SURVEY

MAXIMUM PERMITTED TAILINGS ELEVATION AT 5613.5'

MAXIMUM PERMITTED TAILINGS ELEVATION AT 5608.5'

9.5' (MIN)

6

7

ELE

VA

TIO

N, F

EE

T

ELE

VA

TIO

N, F

EE

T

DISTANCE, FEET

5580

5600

5620

5640

5570

5580

5600

5620

5640

1300 1400 1500 1600 1700 1800 1900 2000 2100 2200 2300 2400

-0.5%

BOTTOM OF CELL FROM AS-BUILT DRAWINGS

FINAL COVER SURFACE

CELL 3

CELL 2 (SEE SHEET TRC-7)CELL 4A (SEE SHEET TRC-5)

10' (MIN)

6

7

EXISTING SURFACE FROM 2012 LIDAR SURVEY

MAXIMUM PERMITTED TAILINGS ELEVATION AT 5613.5'

MAXIMUM PERMITTED TAILINGS ELEVATION AT 5608.5'

9.5' (MIN)

WHITE MESA MILL SITE RECLAMATION

BLANDING, UTAH

AUG 2016

ENERGY FUELS COVER OVER CELL 3 CROSS SECTIONS

TRC-6

WMM TRC-5

C

A TAILINGS COVER

0

0

SCALE IN FEET

VERT

HORZ 50 100

10 20

B TAILINGS COVER

0

0

SCALE IN FEET

VERT

HORZ 50 100

10 20

VERTICAL EXAGGERATION = 5X

VERTICAL EXAGGERATION = 5X

LEGEND:

ELE

VA

TIO

N, F

EE

T

ELE

VA

TIO

N, F

EE

T

DISTANCE, FEET

5580

5600

5620

5640

5570

5580

5600

5620

5640

2300 2400 2500 2600 2700 2800 2900 3000 3100 3200 3300 3400

-0.5%

-0.5%

BOTTOM OF CELL FROM AS-BUILT DRAWINGS

FINAL COVER SURFACE

CELL 2 CELL 1

CELL 3 (SEE SHEET TRC-6)

-1.0%

10.5' (MIN)

1

5

EXISTING SURFACE FROM 2012 LIDAR SURVEY

MAXIMUM PERMITTED TAILINGS

ELEVATION AT 5613.5'

MAXIMUM PERMITTED TAILINGS ELEVATION AT 5615.0'

MILL DEBRIS /

CONTAMINATED

SOILS

9.5' (MIN)

4

7E

LE

VA

TIO

N, F

EE

T

EL

EV

AT

IO

N, F

EE

T

DISTANCE, FEET

5580

5600

5620

5640

5570

5580

5600

5620

5640

2200 2300 2400 2500 2600 2700 2800 2900 3000 3100 3200 3300 3400 3500 3600

-0.5%

-1.0%

-0.5%

BOTTOM OF CELL FROM AS-BUILT DRAWINGS

FINAL COVER SURFACE

CELL 2 CELL 1

CELL 3 (SEE SHEET TRC-6)

7

1

5

EXISTING SURFACE FROM 2012 LIDAR SURVEY

10.5' (MIN)

MAXIMUM PERMITTED TAILINGS ELEVATION AT 5613.5'

MAXIMUM PERMITTED TAILINGS ELEVATION AT 5615.0'

MILL DEBRIS /

CONTAMINATED

SOILS

9.5' (MIN)

4

WHITE MESA MILL SITE RECLAMATION

BLANDING, UTAH

AUG 2016

ENERGY FUELS COVER OVER CELL 2 CROSS SECTIONS

TRC-7

WMM TRC-5

C

A TAILINGS COVER

0

0

SCALE IN FEET

VERT

HORZ 50 100

10 20

B TAILINGS COVER

0

0

SCALE IN FEET

VERT

HORZ 50 100

10 20

VERTICAL EXAGGERATION = 5X

VERTICAL EXAGGERATION = 5X

LEGEND:

EL

EV

AT

IO

N, F

EE

T

EL

EV

AT

IO

N, F

EE

T

DISTANCE, FEET

5600

5620

5640

5660

5580

5600

5620

5640

5660

0 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400

BOTTOM OF CELL FROM AS-BUILT DRAWINGS

-1%

FINAL COVER SURFACE

CELL 2

1

5

EXISTING SURFACE FROM 2012 LIDAR SURVEY

MAXIMUM PERMITTED TAILINGS ELEVATION AT 5613.5'

MAXIMUM PERMITTED TAILINGS ELEVATION AT ~5623'

(MAXIMUM PERMITTED TAILINGS ELEVATION ALONG

NORTH EDGE OF CELL 2 BETWEEN MILL SITE AND

CELL 1 RANGES FROM 5615'-5626')

CELL 3

7

10.5' (MIN)

8

10.5' (MIN)

WHITE MESA MILL SITE RECLAMATION

BLANDING, UTAH

AUG 2016

ENERGY FUELS COVER OVER CELL 2 CROSS SECTION

TRC-8

WMM TRC-5

C

C TAILINGS COVER

0

0

SCALE IN FEET

VERT

HORZ 50 100

10 20

VERTICAL EXAGGERATION = 5X

LEGEND:

TABLE 2 - ROCK APRON SCHEDULE

ROCK APRON

TYPE

APRON

RIPRAP D

50

(MINIMUM)

W

1

W

2

DEPTH (D)

A 3.4" 4.5' 5.0' 1'

B 10.6" 13.5' 13' 3'

C 9.0" 11.5' 11' 3'

TABLE 1 - RIPRAP ON SIDE SLOPES

SIDE SLOPE AREA

RIPRAP D

50

FILTER

D

50

THICKNESS D

100

THICKNESS

EAST & WEST SIDES 1.7" 6"

(NOT NEEDED)

-

CELL 4A & 4B SOUTHERN 5.3" 8" 3" 6"

CELL 1 DISPOSAL AREA 5.3" 8" 3" 6"

W1 (SEE TABLE 2)

D (SEE TABLE 2)

FILTER THICKNESS 1% SLOPE

1

5

RIPRAP (SEE TABLE 1)

ELEVATION

COVER

RIPRAP THICKNESS

W₂ (SEE TABLE 2)

RIPRAP FILTER (SEE TABLE 1)

T

1

0.5'

3.5'

T

2

2.5' (MIN)

EROSION PROTECTION LAYER

(TOPSOIL OR GRAVEL ADMIXTURE)

LAYER 3 - GROWTH MEDIUM

LAYER 1 - INTERIM FILL

LAYER 2 - COMPACTED COVER

TAILINGS

VEGETATION

RIPRAP

THICKNESS

VARIES

FILTER THICKNESS

1

5

1

3

EXISTING

BERM

RANDOM FILL

RIPRAP = (SEE TABLE 1)

RIPRAP FILTER (SEE TABLE 1)

RECLAMATION COVER DETAILS (SHEET 1 OF 2)

TRC-9

WMM TRC-9

C

WHITE MESA MILL SITE RECLAMATION

BLANDING, UTAH

AUG 2016

ENERGY FUELS

1 ROCK APRON AT BASE OF TOE CELL OUTSLOPES

2 COVER DETAIL FOR TOP SURFACE OF TAILINGS

-

3 COVER DETAIL FOR SIDE SLOPES

-

CELLS 2-4 AND CELL 1 DISPOSAL AREA

COVER THICKNESS TABLE

CELL

COVER

(T

1

)

RADON

ATTENUATION

LAYER (T

2

)

1 9.5' 3.0'

2 10.5' 4.0'

3 10.0' 3.5'

4A & 4B 9.5' 3.0'

LEGEND:

NOT TO SCALE

12" CLAY LINER

BERM

CELL 2 CELL 1 DISPOSAL AREA

0.5%

1.0%

2

MILL DEBRIS / CONTAMINATED SOILS

1

5

1

3

1

5

1

RANDOM FILL

3

1

8' MIN

3'

MINIMUM 10'

CELL 3CELL 4

BERM

TAILINGS

TAILINGS

0.8%

MAXIMUM PERMITTED

TAILINGS ELEV AT 5608.5'

0.5%

C

L

CELL 2CELL 3

BERM

TAILINGS

TAILINGS

MAXIMUM PERMITTED

TAILINGS ELEV AT 5613.5'

0.5%

0.5%

C

L

BERM

MAXIMUM PERMITTED

TAILINGS ELEV AT 5600.0'

TAILINGS

5

1

CELL 4

0.8%

RANDOM FILL

1

MAXIMUM PERMITTED TAILINGS

ELEVATION VARIES

5

1

CELL 2

1%

TAILINGS

RECLAMATION COVER DETAILS (SHEET 2 OF 2)

TRC-10

WMM TRC-10

C

WHITE MESA MILL SITE RECLAMATION

BLANDING, UTAH

AUG 2016

ENERGY FUELS

4 COVER DETAIL FOR CELL 1 DISPOSAL AREA

5 COVER DETAIL OVER BERM - SOUTHERN EDGE CELL 4 6 COVER DETAIL OVER BERM - BETWEEN CELL 4 AND CELL 3

7 COVER DETAIL OVER BERM - BETWEEN CELL 3 AND CELL 2

0 5 10 0 5 10

0 5 10

0 10 20

6

77

LEGEND:

8 COVER DETAIL OVER BERM - NORTHEASTERN EDGE OF CELL 2

0 5 10

MINIMUM 10'

ROCK APRON

MINIMUM 10'