what's new in sap hana sps 11 platform lifecycle management (operations)

29
1 2014 SAP AG or an SAP affiliate company. All rights reserved. SAP HANA SPS 11 - What’s New? SAP HANA Platform Lifecycle Management SAP HANA Product Management December, 2015 (Delta from SPS 10 to SPS 11)

Upload: sap-technology

Post on 06-Jan-2017

2.382 views

Category:

Data & Analytics


3 download

TRANSCRIPT

Page 1: What's New in SAP HANA SPS 11 Platform Lifecycle Management (Operations)

1© 2014 SAP AG or an SAP affiliate company. All rights reserved.

SAP HANA SPS 11 - What’s New? SAP HANA Platform Lifecycle Management

SAP HANA Product Management December, 2015(Delta from SPS 10 to SPS 11)

Page 2: What's New in SAP HANA SPS 11 Platform Lifecycle Management (Operations)

© 2015 SAP SE or an SAP affiliate company. All rights reserved. 2Public

Agenda

SAP HANA platform LCM service portfolio overview

Optimized update for a reduced downtime update for the SAP HANA server and SAP HANA options

Support for the new XS advanced runtime

Other supportability enhancements

Other usability enhancements

Parameter changes

Previous release information

Page 3: What's New in SAP HANA SPS 11 Platform Lifecycle Management (Operations)

© 2015 SAP SE or an SAP affiliate company. All rights reserved. 3Public

SAP HANA Platform Lifecycle ManagementService Portfolio

Installation & Upgrade• Single or Multiple Hosts• Single or Multiple Software Components• Multitenancy Support• SAP HANA Options

• SAP HANA Dynamic Tiering• SAP HANA Smart Data Streaming• SAP HANA Accelerator for SAP ASE• SAP HANA Remote Data Sync (SPS 10)

Configuration• System Scale Up/Down• System Scale Out (Add Hosts)• Remove Hosts• System Copy• System Rename• System Landscape Directory

Registration• Uninstallation of System

SAP HANAPlatform LCM

Page 4: What's New in SAP HANA SPS 11 Platform Lifecycle Management (Operations)

© 2015 SAP SE or an SAP affiliate company. All rights reserved. 4Public

Optimized phased system update for reduced downtimeSAP HANA server and SAP HANA options

A optimized system update reduces the system downtime for SAP HANA systems that, in addition to the SAP HANA database server, also run one or more of the supported SAP HANA options. In the past, SAP HANA system update performed the checks, binary switch and restart for each component consecutively, extending the system downtime. With SAP HANA SPS 11, the checks, and binary switches are performed for each component at the same time, and all components are restarted together. This process is graphically represented on the next slide.

The optimized system update can be combined with the two-phase reduced downtime update released with SPS 10.

The following components support optimized update:– SAP HANA server– SAP HANA accelerator for SAP ASE– SAP HANA remote data sync– SAP HANA smart data streaming

The optimized update execution mode is enabled by default if more than one of the above components is selected to be installed or updated.

Page 5: What's New in SAP HANA SPS 11 Platform Lifecycle Management (Operations)

© 2015 SAP SE or an SAP affiliate company. All rights reserved. 5Public

Optimized phased system update for reduced downtimeSAP HANA server and SAP HANA options

SAP HANA Database Server

SAP HANA Smart Data Streaming

SAP HANA Accelerator for

SAP ASE

SAP HANA Remote Data Sync

Prepare

Finalize

Stop System

HDBLCM

executes…

1

2

Check and validate, extract new binaries

Switch to new binaries, deploy autocontent or delivery units, restart

Uptime

Downtime

1.1 1.2 1.3 1.4

2.1 2.2 2.3 2.4

Page 6: What's New in SAP HANA SPS 11 Platform Lifecycle Management (Operations)

© 2015 SAP SE or an SAP affiliate company. All rights reserved. 6Public

Support for XS advanced runtime

• SAP HANA SPS 11 includes an additional, new runtime environment for application development: SAP HANA extended application services (XS), advanced model. For more information about the XS advanced model, see the SAP HANA Developer Guide for SAP HANA XS Advanced Model.

• The XS advanced runtime is handled by the SAP HANA platform lifecycle management tools with the existing host role concept. The XS_WORKER role is by default assigned to all SAP HANA database worker hosts, and the XS_STANDBY role is by default assigned to all SAP HANA database standby hosts.

• In addition to setting host roles, the HDBLCM tool also configures the following:• XS advanced administrator user• Customer organization name• Customer space name

Host

Roles: WORKER, XS_WORKER

HANA System

nameserver

indexserver

compileserver

preprocessor

webdispatcher xsengine

daemon

sapstartsrv

diserver

xsuaaserver

applicationxsexecagent

xscontroller

Host 3

Roles: STANDBY, XS_STANDBY

HANA System

nameserver

indexserver

compileserver

preprocessor

daemon

sapstartsrv

xscontroller*

xsexecagent*

xsuaaserver *

* starts during failover

Page 7: What's New in SAP HANA SPS 11 Platform Lifecycle Management (Operations)

© 2015 SAP SE or an SAP affiliate company. All rights reserved. 7Public

Other Usability Enhancements

Enhancements to inter-service communication configuration– Enable the internal network address parameter when the listen

interface is set to “global” to increase performance– No restart after changing inter-service communication from “global”

to “internal”

Resume action improvements– HDBLCM now stores installation parameters in its own persistence

file so that upon resume the administrator is only asked for passwords.

Server platform check rejects HANA server installations on SLES 11 SP 1– SAP HANA SPS 11 and higher cannot be installed on SLES 11

SP1 due to GCC compiler runtime incompatibilities. For more information, see SAP Note 2228351.

Page 8: What's New in SAP HANA SPS 11 Platform Lifecycle Management (Operations)

© 2015 SAP SE or an SAP affiliate company. All rights reserved. 8Public

Other Supportability Enhancements

Installation and update of the new SAP HANA cockpit for offline administration– The SAP HANA cockpit for offline administration is a version of the SAP HANA cockpit that communicates with SAP HANA

using the SAP Host Agent.– You can use it to perform administration tasks, such as starting the system or troubleshooting a system experiencing

performance problems, as operating system user <sid>adm.

Custom configuration (INI files) of the SAP HANA system during installation– Custom configuration can be performed during installation to reduce post-installation configuration and additional system

restarts.– After preparing the INI files, save them to a local directory and run the SAP HANA server installation with HDBLCM on the

command line with the call option --custom_cfg=<path to custom config directory>.

Support of new Eclipse Mac OS file system layout for the SAP HANA studio– The installation path and the file system layout for the SAP HANA studio installation on Mac OS has been changed. The

SAP HANA studio is installed as a Mac OS application. – The default installation path is: /Applications/sap/hdbstudio.app

Page 9: What's New in SAP HANA SPS 11 Platform Lifecycle Management (Operations)

Parameter Changes

Page 10: What's New in SAP HANA SPS 11 Platform Lifecycle Management (Operations)

© 2015 SAP SE or an SAP affiliate company. All rights reserved. 10Public

install update configure_internal_network update_components rename_systemregister_rename_system add_hosts

ase_datapath Added

ase_logpath Added

autoadd_xs_roles Added Added Added Added

autostart Added

checkmnt Removed

continue_update Added

custom_cfg Added

extract_components

hostname Removed

import_xs_content Added Added Added Added

install_hostagent Added

isc_mode Added Added Added

load_initial_xs_content

nostart Added

org_manager_user Added Added Added

org_name Added Added Added

prepare_update Added

prod_space_name Added Added Added

update_execution_mode Added Added

xs_components Added Added Added

HDBLCM parametersNew, added, removed

Page 11: What's New in SAP HANA SPS 11 Platform Lifecycle Management (Operations)

© 2015 SAP SE or an SAP affiliate company. All rights reserved. 11Public

Parameter Change

addhosts Options xs_worker and xs_standby added. The xs_worker is additionally assigned to any host with the worker role, and xs_standby is assigned to any host with the standby role.

add_local_roles Options xs_worker and xs_standby added. Options worker and standby removed.

components Option xs added.

HDBLCM parametersChanged

Page 12: What's New in SAP HANA SPS 11 Platform Lifecycle Management (Operations)

© 2015 SAP SE or an SAP affiliate company. All rights reserved. 12Public

Description Default

autoadd_xs_roles Assigns xs_worker and xs_standby host roles. By default, the host role xs_worker will be assigned to all worker hosts, the host role xs_standby will be assigned to all standby hosts.

(on)

continue_update Continues the pending update with the persisted parameters. (on)

custom_cfg Specifies the path to the directory in which custom configuration (*.ini) files are saved. ---

extract_components

Extracts content that was downloaded from the SAP Service Marketplace for installation or update. --extract_components --component_archives_dir --extract_temp_dir=<component_archives_dir>/extracted --sapcar_location=<install path>/<SID>/global/hdb/saphostagent_setup/SAPCAR --tar_executable_location=</bin/tar>

import_xs_content Imports SAP HANA XS advanced runtime content. (on)

load_initial_xs_content Imports SAP HANA XS advanced runtime content if --import_xs_content=off was selected during installation of the system.

(on)

isc_mode Used during the installation of the SAP HANA XS advanced runtime. ---

org_manager_user Creates a SAP HANA XS advanced runtime admin user. An admin user can add and manage users, view users, edit organization roles, view the organization quota, and perform other administrative tasks.

XSA_ADMIN

org_nameSets the name of the customer organization. Organizations enable developers to collaborate by sharing resources, services, and applications. Access to the shared resources, services, and applications is controlled by the organization manager.

orgname

prod_space_name Sets the name of the customer space for the SAP HANA XS advanced runtime. In an organization, spaces enable users to access shared resources that can be used to develop, deploy, and maintain applications.

PROD

update_execution_mode Specifies the update mode of HDBLCM to be either standard or optimized. If the optimized update mode is selected, the update process will be carried out in a phased approach to minimize system downtime.

standard

xs_components Specifies the components to be installed or updated in combination with XS advanced runtime. all

New HDBLCM parametersDescription

Page 13: What's New in SAP HANA SPS 11 Platform Lifecycle Management (Operations)

Previous Releases

Page 14: What's New in SAP HANA SPS 11 Platform Lifecycle Management (Operations)

© 2015 SAP SE or an SAP affiliate company. All rights reserved. 14Public

What’s New in SPS 10

Additional software components Integration of SAP HANA remote data sync (Sybase MobiLink) Finalized integration of SAP HANA accelerator for SAP ASE

SAP HANA HDBLCM Web UI functionality Host addition and host removal functionality Integration in the SAP HANA cockpit (Web-based administration tool)

Supportability improvements Improved SSL connectivity LCMsdk enhancements for Data Provisioning Agent installer

Usability improvements Support multiple host roles for non productive systems Support two-step approach for SAP HANA server update (prepare in uptime, then finalize)

Page 15: What's New in SAP HANA SPS 11 Platform Lifecycle Management (Operations)

© 2015 SAP SE or an SAP affiliate company. All rights reserved. 15Public

What’s New in SPS 09

Support of Additional Software Components Integration of SAP HANA options: SAP HANA dynamic tiering, SAP HANA smart data streaming, SAP HANA

accelerator for SAP ASE

Supportability Installation of multitenant database container enabled systems SAP HANA Lifecycle Manager (HLM) is no longer supported or shipped SAP Landscape Transformation (LT) replication is no longer possible using the SAP HANA platform LCM tools

Usability Introduction of a Web user interface for HDBLCM administration and update actions Support for performing some LCM actions as the <sid>adm user System un-registration performed in HDBLCM graphical user interface

Page 16: What's New in SAP HANA SPS 11 Platform Lifecycle Management (Operations)

© 2015 SAP SE or an SAP affiliate company. All rights reserved. 16Public

Recommended Tool per SPS – Installation and Update

Installation:Single-Host System

Installation:Multiple-Host System Update Uninstallation

SPS 11

SPS 10

SPS 09

SPS 08

HDBLCM HDBLCM HDBLCM HDBLCM (resident)

SPS 07 HDBLCM HDBLCMHDBLCM

orLifecycle Manager (HLM)

HDBLCM (resident)

SPS 06Unified Installer

orhdbinst

Unified Installeror

hdbinst and hdbaddhost

Lifecycle Manager (HLM)or

hdbupd

Unified Installeror

hdbuninst

Page 17: What's New in SAP HANA SPS 11 Platform Lifecycle Management (Operations)

© 2015 SAP SE or an SAP affiliate company. All rights reserved. 17Public

Recommended Tool per SPS – Administration

Add Host Remove Host Configure Internal Network

Configure Connection to SLD System Rename System Registration and

Unregistration

SPS 11

SPS 10

SPS 09

SPS 08

HDBLCM (resident) HDBLCM (resident) HDBLCM (resident) HDBLCM (resident) HDBLCM (resident) HDBLCM (resident)

SPS 07Lifecycle Manager (HLM)

orhdbaddhost

Lifecycle Manager (HLM)or

hdbremovehost

hdbnsutil Lifecycle Manager (HLM)Lifecycle Manager (HLM)

orhdbrename

hdbreg

SPS 06Lifecycle Manager (HLM)

orhdbaddhost

Lifecycle Manager (HLM)or

hdbremovehosthdbnsutil Lifecycle Manager (HLM)

Lifecycle Manager (HLM)or

hdbrenamehdbreg

Page 18: What's New in SAP HANA SPS 11 Platform Lifecycle Management (Operations)

More Information

Page 19: What's New in SAP HANA SPS 11 Platform Lifecycle Management (Operations)

© 2015 SAP SE or an SAP affiliate company. All rights reserved. 19Public

SAP HANA Platform Lifecycle ManagementMore Information

Documentation: SAP Help PortalSAP HANA Installation and Update GuideSAP HANA Administration Guide – Chapter 3: Lifecycle ManagementSAP HANA Smart Data Streaming – Installation GuideSAP HANA Dynamic Tiering – Installation GuideSAP HANA Accelerator for SAP ASE – Installation GuideSAP HANA Remote Data Sync – Installation Guide

Training: HA200: SAP HANA - Operations & Administration Certification: SAP Training and Certification Shop

C_HANATEC151 – SAP HANA (Edition 2015)E_HANAINS151 SAP Certified Technology Specialist (Edition 2015) – SAP HANA Installation

SAP Note Title

2078425 Troubleshooting note for SAP HANA Platform Management tool hdblcm

2082466 hdblcm SAP HANA – Troubleshooting

Further SAP notes are available on component HAN-DB-PLT, HAN-LM-INS, and HAN-LM-UPG

Page 20: What's New in SAP HANA SPS 11 Platform Lifecycle Management (Operations)

© 2015 SAP SE or an SAP affiliate company. All rights reserved. 20Public

Further information can be found on http://hana.sap.com/abouthana/hana-technology/administration.htmlHere you will find more information on:• Monitoring and Troubleshooting• Security• Sizing• SAP Platform LCM• What‘s new slides

SAP HANA Platform Lifecycle ManagementHow To Stay Up-to-Date

SAP HANA space on SAP Community Network: http://scn.sap.com/community/hana-in-memory

In addition, you find SAP HANA documentation on SAP Help Portal knowledge center at http://help.sap.com/hana_platform.• SAP HANA platform lcm related guides:

SAP HANA Server Installation and Update Guide• SAP HANA Administration Guide

Page 21: What's New in SAP HANA SPS 11 Platform Lifecycle Management (Operations)

© 2015 SAP SE or an SAP affiliate company. All rights reserved. 21Public

SAP Education and Certification Opportunitieswww.sap.com/education (HA200, C_HANATEC141, E_HANAINS141)

Watch SAP d-code Onlinehttp://events.sap.com/teched/en/home

SAP Public WebSAP HANA space on SAP community network• http://scn.sap.com/community/hana-in-memory Features of SAP HANA• http://hana.sap.com/abouthana.html SAP HANA guides• http://help.sap.com/hana_platform

SAP HANA Platform Lifecycle ManagementHow To Stay Up-to-Date

Page 22: What's New in SAP HANA SPS 11 Platform Lifecycle Management (Operations)

© 2015 SAP SE or an SAP affiliate company. All rights reserved. 22Public

Disclaimer

This presentation outlines our general product direction and should not be relied on in making a purchase decision. This presentation is not subject to your license agreement or any other agreement with SAP.

SAP has no obligation to pursue any course of business outlined in this presentation or to develop or release any functionality mentioned in this presentation. This presentation and SAP’s strategy and possible future developments are subject to change and may be changed by SAP at any time for any reason without notice.

This document is provided without a warranty of any kind, either express or implied, including but not limited to, the implied warranties of merchantability, fitness for a particular purpose, or non-infringement. SAP assumes no responsibility for errors or omissions in this document, except if such damages were caused by SAP intentionally or grossly negligent.

Page 23: What's New in SAP HANA SPS 11 Platform Lifecycle Management (Operations)

© 2015 SAP SE or an SAP affiliate company. All rights reserved.

Thank you

Contact information

Stephanie LewellenSAP HANA Product [email protected]

Page 24: What's New in SAP HANA SPS 11 Platform Lifecycle Management (Operations)

© 2015 SAP SE or an SAP affiliate company. All rights reserved. 24Public

<Topic> - What’s New in SPS 10?

First levelSecond level Third level

Page 25: What's New in SAP HANA SPS 11 Platform Lifecycle Management (Operations)

© 2015 SAP SE or an SAP affiliate company. All rights reserved. 25Public

Insert page titleSubtitle

First levelSecond level Third level

Page 26: What's New in SAP HANA SPS 11 Platform Lifecycle Management (Operations)

© 2015 SAP SE or an SAP affiliate company. All rights reserved. 26Public

Insert page title

First levelSecond level Third level

Click icon to add picture

Page 27: What's New in SAP HANA SPS 11 Platform Lifecycle Management (Operations)

© 2015 SAP SE or an SAP affiliate company. All rights reserved. 27Public

Insert page title

First levelSecond level Third level

Click icon to add picture

Page 28: What's New in SAP HANA SPS 11 Platform Lifecycle Management (Operations)

© 2015 SAP SE or an SAP affiliate company. All rights reserved. 28Public

Insert page title

First levelSecond level Third level

Click icon to add picture

Page 29: What's New in SAP HANA SPS 11 Platform Lifecycle Management (Operations)

© 2015 SAP SE or an SAP affiliate company. All rights reserved. 29Public

Insert page title

Headline hereLorem ipsum dolor sit amet, consectetur adipiscing elit. Maecenas pellentesque laoreet urna molestie placerat ipsum.

Headline hereLorem ipsum dolor sit amet, consectetur adipiscing elit. Maecenas pellentesque laoreet urna molestie placerat ipsum.

Click icon to add picture Click icon to add picture