Transportation Improvement Program, FY 2017 to FY 2021Western Federal Lands Highway Division

Federal Highway AdministrationApril 2017

ProjectProgram Fiscal Year

State County FLMA Accessed Description Type of Work Program Funds From Title Phase  Program Amount  Delivered By Latitude LongitudeCongressional 

DistrictFLMA Region

AK PRA DENA 10(36) Removal of Ghiglione Bridge 2017 AK Denali Borough Denali National ParkThis project will eliminate or replace Ghiglione Bridge, one of 2 seismically deficient bridges on the Denali Park Road. Reconstruction FLTP‐NPS Title 23 In Design  $          4,112,287.00 

Western Federal Lands Highway Division, FHWA 63.512897 ‐149.980803 AK‐at large NPS Alaska Region

AK PRA DENA 10(39) Sable Pass Area Repair 2017 AK Denali Borough Denali National Park

Repair 5.81 miles of road between Tattler Creek & East Fork Bridge (MP 37.4 to MP 43.3). Major work items include repairing subgrade, installing drains, replacing culverts, eliminating oversteep outside road edges, & applying a maintainable road surface. Reconstruction FLTP‐NPS Title 23 Planned  $          4,779,875.00 

Western Federal Lands Highway Division, FHWA 63.555319 ‐149.663143 AK‐at large NPS Alaska Region

AK PRA DENA 10(41) Repair Dyea Old Townsite Road and Lost Lake Road 2017 AK

Skagway‐hoonah‐angoon Borough Denali National Park

Improve access to the Historic Town Site, Slide Cemetary, area trailheads, concessionaires, and the Tiaya Inlet waterfront. Planning FLTP‐NPS Title 23 In Design  $             632,288.00 

Western Federal Lands Highway Division, FHWA 59.504051 ‐135.360769 AK‐at large NPS Alaska Region

AK SITKA 2015(2) Sawmill Creek Transportation Corridor Improvements 2017 AK Sitka Borough Sitka National Historic Park

Produce a corridor improvement study for the section of Sawmill Creek Road adjacent to Sitka National Historical Park. The study will examine modifications that better accommodate pedestrian travel to and from the NationalPark across Sawmill Creek Road. Planning FLAP Title 23 Planned  $             150,000.00 

Western Federal Lands Highway Division, FHWA 57.052240 ‐135.317631 AK‐at large NPS Alaska Region

AK SITKA 2017(1) Sitka Sea Walk Phase II 2017 AKCity and Borough of Sitka Sitka National Historic Park

This pedestrian facility provides both physical and grade separa on from traffic on theO'Connell Bridge solving a long‐standing safety issue with pedestrians making uncontrolled crossings of the State of Alaska owned and maintained Harbor Drive. Construction FLAP Title 23 In Design  $          1,700,000.00  City and Borough of Sitka 57.049101 ‐135.339201 AK‐at large NPS Alaska Region

AK BLM AFO 2014(1) CTF Alternate Entrance Alignment 2018 AK Anchorage Borough BLM ‐ Anchorage DistrictRelocate CTF 260 feet to align with East 68th Avenue with intersection improvements to include bus stop and intergration to exist signalized intersection. Reconstruction FLAP Title 23 In Design  $          2,550,000.00 

Western Federal Lands Highway Division, FHWA 61.159167 ‐149.804444 AK‐at large

BLM Alaska Region

AK DOT 110(4) Community ‐ Refuge Trail Project 2018 AKKenai Peninsula Borough FWS ‐ Kenai National Wildlife Refuge

Construct two (beginning and end) trailheads with parking facilities connecting a 1.7 mile long trail located along Ski Hill Road in Soldotna, Alaska. Reconstruction FLAP Title 23 In Design  $          1,975,000.00 

Western Federal Lands Highway Division, FHWA 60.469425 ‐151.099321 AK‐at large

FWS Alaska ‐ Region 7

AK DOT 135(1) Glenn Highway: MP 66.5 – 92 2018 AKMatanuska‐susitna Borough

NA ‐ Access is to State Land, Nelchina Public Use Area Fund assistance from WFL in developing the complete PS&E for a 3R project on the Glenn Highway. Reconstruction OTHER Title 23 In Design  $          2,500,000.00 

Alaska Department of Transportation and Public Facilities 61.735509 ‐148.755612 AK‐at large Not Applicable

AK DOT 135(4) Glenn Highway Rehabilitation Long Lake Section: MP 84.5 to 92 2018 AK Anchorage Borough

NA ‐ Access is to State Land, Nelchina Public Use Area

Survey, geotechnical investigation, pavement analysis, preliminary engineering, NEPA documentation, permitting, ROW, utility relocation, bid solicitation, and construction administration. Reconstruction OTHER Title 23 In Design  $       93,600,000.00 

Western Federal Lands Highway Division, FHWA 61.806204 ‐148.227932 AK‐at large Not Applicable

AK DOT 170(2) Parks Hwy MP 231 Enhancements 2018 AKFairbanks North Star Borough Denali National Park Enhance safety and accommodations for motorized and non‐motorized traffic near Parks Highway MP 231. Rehabilitation FLAP Title 23 In Design  $          2,000,000.00 

Alaska Department of Transportation and Public Facilities 63.642500 ‐148.798333 AK‐at large NPS Alaska Region

AK DOT T 2915(1) Settlers Cove State Recreation Site Access Improvements 2018 AK Ketchikan Tongass National Forest This project funds trailhead, trail, signage, and safety improvements for the Lunch Creek Trail. Enhancement FLAP Title 23 In Design  $             701,800.00 

Alaksa Department of Natural Resources, Division of Parks and  55.420048 ‐131.772465 AK‐at large

FS Alaska ‐ Region 10

AK FNSB BIRCH HILL(1) Birch Hill Recreation Area Trailhead Parking 2018 AK

Fairbanks North Star Borough

Fort Wainwright ‐ Department of the Army

Construction of a 110‐space gravel parking area south of the existing upper parking lot, expand the lower gravel parking area to the west providing approximately 16,000ft2 of staging space, and reconstructing the displaced terrain park. Enhancement FLAP Title 23 In Design  $          1,175,000.00 

Fairbanks North Star Borough 64.867809 ‐147.647809 AK‐at large

Department of the Army

AK FWS TET 2016(1) Tetlin NWR Visitor Center Parking 2018 AKSoutheast Fairbanks Borough Tetlin National Wildlife Refuge Regravel and grade the parking lot at the Tetlin National Wildlife Refuge Visitor Center. Rehabilitation FLTP‐FWS Title 23 In Design  $             402,000.00 

Tetlin National Wildlife Refuge 63.335754 ‐142.988720 AK‐at large

FWS Alaska ‐ Region 7

AK GUSTAVUS 2015(1) Pedestrian/Bicycle connector trail between Gustavus and Boundary of Glacier Bay National Park 2018 AK Haines Borough Glacier Bay National Park

Construct 8 to 10 feet wide asphalt surfaced pedestrian/bicycle trail within the right of way of the existing state roadway and parallel to that roadway for 3.2 miles. Construction FLAP Title 23 In Design  $             510,000.00 

Western Federal Lands Highway Division, FHWA 58.412778 ‐135.755278 AK‐at large NPS Alaska Region

AK HOLLIS 2015(1) Harris River Bridge Replacement Project 2018 AK

Prince Of Wales‐outer Ketchikan Borough Tongass National Forest

Purchase a regional standard OHV width (10 ft) bridge for the Harris River Crossing estimated to be 90‐100 feet in length. Reconstruction FLAP Title 23 In Design  $             246,600.00  Tongass National Forest 55.459363 ‐132.716395 AK‐at large

FS Alaska ‐ Region 10

AK KASAAN 2015(1) Kasaan Access Road MP 1.5 to MP  3.0 2018 AK

Prince Of Wales‐outer Ketchikan Borough Tongass National Forest

1.5 miles of road rehabilitition and reconstruction of the horizontal and vertical alignment to a 35 mph design speed from MP 1.5 to 3.0. Reconstruction FLAP Title 23 In Design  $          2,198,527.00 

Organized Village of Kasaan 55.687501 ‐132.645556 AK‐at large

FS Alaska ‐ Region 10

AK SITKA T CROSS(2) Cross Trail Multimodal Pathway Phase 6 2018 AK Sitka Borough Tongass National ForestPlan, design, complete environmental clearance and permitting, and construction for the Cross Trail Multimodal Pathway, Phase 6. Construction FLAP Title 23 In Design  $          2,250,000.00  City and Borough of Sitka 57.077901 ‐135.369301 AK‐at large

FS Alaska ‐ Region 10

AK TAZLINA 0013(1) Tazlina Bike and Pedestrian Pathway 2018 AKMatanuska‐susitna Borough

Wrangell‐St. Elias National Park & Preserve

Design a 10’ wide pedestrian/bicycle pathway from Glennallen, Alaska through Tazlina and onto Copper Center, Alaska (10.9 miles) within the existing right‐of‐way (ROW). The project includes an approximately 469’ foot pedestrian bridge. Construction FLAP Title 23 In Design  $          2,000,000.00 

Western Federal Lands Highway Division, FHWA 62.107175 ‐145.474777 AK‐at large NPS Alaska Region

AK TR KAW 2016(1) Taylor Road Enhancement Access 2018 AK Unincorporated Bering Land Bridge Natural Preserve This project funds 6 miles of trail reconditioning, including 25 new culverts and drainage improvements. Rehabilitation FLAP Title 23 In Design  $          1,167,501.00  Kawerak, Inc 65.445516 ‐164.667986 AK‐at large NPS Alaska Region

AK WRANGELL 2016(1) North Country Trailhead Access Road Repair 2018 AK Wrangell Tongass National Forest

Project includes road repair, including ditching, culvert replacements, spot road surfacing, capping/trimmming alders. Maintenance FLAP Title 23 In Design  $               61,768.00 

City and Borough of Wrangell 56.467334 ‐132.328289 AK‐at large

FS Alaska ‐ Region 10

AK ANCHORAGE T 2016(1) Connecting Anchorage 2019 AK Anchorage BLM, Campbell Tract This project funds trail improvements, bridge replacements, wayfinding, and safety improvements. Construction FLAP Title 23 In Design  $          1,636,500.00 Western Federal Lands Highway Division, FHWA 61.156000 ‐149.751626 AK‐at large

BLM Anchorage District Office

AK COFFMAN 51(1) Luck Lake Access Improvement 2019 AK Unincorporated Tongass National Forest This shovel‐ready project funds two culvert replacements and paving of a .46 mile section of road. Rehabilitation FLAP Title 23 In Design  $             764,975.00  City of Coffman Cove 56.078967 ‐132.820300 AK‐at largeFS Alaska ‐ Region 10

AK DOT 294024(2) Raven Trail Phase 2 2019 AK

Wrangell‐petersburg Borough FS ‐ Tongass National Forest This project improves 2.2 miles of trail. Reconstruction FLAP Title 23 In Design  $          1,286,425.00  Tongass National Forest 56.792223 ############ AK‐at large

FS Alaska ‐ Region 10

AK DOT T 130(1) Seward Highway Iditarod NHT Enhancement 2019 AK Anchorage Chugach National ForestThis project funds planning, design, and construction of a pedestrian overcrossing, parking, and trailheads for improved connectivity along the Iditarod Htional Historic Trail. Construction FLAP Title 23 In Design  $          2,000,000.00 

Alaska Department of Transportation and Public Facilities 60.820028 ‐149.001621 AK‐at large

FS Alaska ‐ Region 10

AK FNSB CHENA LAKE(1) Chena Lake Recreation Area Restroom Replacement & Access Improvements 2019 AK

Fairbanks North Star Borough

Chena Lake Recreation Area ‐ US Army Corps of Engineers

Remove and replace 4 vault style restrooms and 2 vault restroom/change house facilities with 8 CTX Concrete Buildings Model: Double Rocky Mountain vault toilets (or equivalent). Enhancement FLAP Title 23 In Design  $          1,152,500.00 

Fairbanks North Star Borough 64.788482 ‐147.191850 AK‐at large

USACE Pacific Ocean Division

AK FS TNF 33748(1) Bonnie Brae Access to Treadwell Ditch Trail Corridor Plan 2019 AK Juneau Tongass National Forest

This planning effort will develop a conceptual reconstruction plan for a sustainable acess trail between the Bonnie Brae subdivision on Douglas Island and Treadwell Ditch Planning FLAP Title 23 In Design  $               95,000.00  Tongass National Forest 58.329323 ‐134.501637 AK‐at large

FS Alaska ‐ Region 10

Page 2 of 13 Approval signature is shown on page 1 only.

Transportation Improvement Program, FY 2017 to FY 2021Western Federal Lands Highway Division

Federal Highway AdministrationApril 2017

ProjectProgram Fiscal Year

State County FLMA Accessed Description Type of Work Program Funds From Title Phase  Program Amount  Delivered By Latitude LongitudeCongressional 

DistrictFLMA Region

AK FWS KNA SWAN(1) Swan Lake Road 2019 AKKenai Peninsula Borough Kenai National Wildlife Refuge Regravel and grade 12.62 miles of the Swan Lake Road. Rehabilitation FLTP‐FWS Title 23 In Design  $             502,000.00 

Kenai National Wildlife Refuge 60.737984 ‐150.802554 AK‐at large

FWS Alaska ‐ Region 7

AK WRANGELL 2015(1) City and Borough of Wrangell Non‐Motorized Transportation System 2019 AK

Wrangell‐petersburg Borough Tongass National Forest

Improve and/or create off‐road parking and new connector trails by providing hardened and delineated pathways to a network of existing informal footpaths, thus making them passable for practical, secondary transportation purposes. Construction FLAP Title 23 In Design  $             484,700.00 

City and Borough of Wrangell 46.483611 ‐132.383889 AK‐at large

FS Alaska ‐ Region 10

AK DOT T 170(1) Parks Highway MP 231 Enhancements 2020 AK Denali Denali National Park & PreserveThis project will reconstruct the Parks Highway from MP229.7 to 232.3 and replace the existing Nenana River Bridge No.694 to meet current design standards. Reconstruction FLAP Title 23 In Design  $          2,000,000.00 

Alaska Department of Transportation and Public Facilities 63.631421 ‐148.783490 AK‐at large NPS Alaska Region

AK FNSB Tanana(1) Tanana River Recreation Access Improvements 2020 AK Fairbanks

Department of the Army, Fort Wainwright This project proposes to create new access to the Tanana Lakes Recreation Area Construction FLAP Title 23 In Design  $          2,487,827.00 

Fairbanks North Star Borough 64.801854 ‐147.744539 AK‐at large

USACE Pacific Ocean Division

AK FWS IZM GRANT(1) Grant Point Road 2020 AKAleutians East Borough Izembek National Wildlife Refuge Re‐gravel and grade an 8.62‐mile segment of Grant Point Road within the Izembek National Wildlife Refuge. Rehabilitation FLTP‐FWS Title 23 In Design  $             502,000.00 

Izembek National Wildlife Refuge 55.292666 ‐162.683346 AK‐at large

FWS Alaska ‐ Region 7

AK FWS IZM RUSSELL(1) High Russell Creek Road 2020 AKAleutians East Borough Izembek National Wildlife Refuge

Regravel and grade 9.85 miles of the High Russell Creek Road to enhance safety and improve visitor opportunities. Rehabilitation FLTP‐FWS Title 23 In Design  $             502,000.00 

Izembek National Wildlife Refuge 55.293912 ‐162.685046 AK‐at large

FWS Alaska ‐ Region 7

AK PFH 58(1) Neck Lake Rd. Reconstruction: NPOWI Hwy. to Marine Access Facility Jct. 2020 AK

Prince Of Wales‐outer Ketchikan Borough FS ‐ Tongass National Forest To reconstruct Neck Lake Road. Reconstruction OTHER Title 23 In Design  $       34,754,527.00 

Western Federal Lands Highway Division, FHWA 56.090637 ‐133.207253 AK‐at large

FS Alaska ‐ Region 10

AK PFH 58(2) Neck Lake Rd. Reconstruction: Marine Access Facility Jct. to Whale Pass 2020 AK

Prince Of Wales‐outer Ketchikan Borough FS ‐ Tongass National Forest To reconstruct Neck Lake Road. Reconstruction OTHER Title 23 In Design  $       28,519,310.00 

Western Federal Lands Highway Division, FHWA 56.126529 ‐133.195400 AK‐at large

FS Alaska ‐ Region 10

AK WHITTIER 2016(1)  Shotgun Cove Road Extension 2020 AK Valdez‐Cordova Chugach National Forest This project constructs a new extension to an existing 2 mi route within the City limits of Whittier. Construction FLAP Title 23 In Design  $          2,000,000.00 Western Federal Lands Highway Division, FHWA 60.786761 ‐148.625373 AK‐at large

FS Alaska ‐ Region 10

Arizona

AZ NPS PP 2016(7) Pavement Preservation Arizona 2017 AZ Various Counties Various National ParksProvide support and pavement preservation expertise in scoping for 1R Pavement Preservation for all of our NPS projects in the state of Arizona. Rehabilitation FLTP‐NPS Title 23 In Design  $          8,141,893.00 

Western Federal Lands Highway Division, FHWA 36.133575 ‐109.471234 AZ 9th

NPS Intermountain Region

California

CA NPS BP 2017(1) Yosemite Bridge Preservation 2017 CA Madera County Yosemite National Park Bridge preservation in Yosemite National Park Rehabilitation FLTP‐NPS Title 23 In Design  $          3,051,000.00 Western Federal Lands Highway Division, FHWA 37.851989 ‐119.575256 CA 4th

NPS Pacific‐West Region

CA NPS PP DEVA 2016(8) Pavement Preservation Death Valley 2017 CASan Bernardino County Death Valley National Park

Resurfacing of about 56 miles of the Badwater Road within Death Valley National Park. Project includes a chip seal application and microseal surface treatments. The project will re‐setablish existing striping, pavement marking and incidental items. Rehabilitation FLTP‐NPS Title 23 In Design  $          5,025,000.00 

Western Federal Lands Highway Division, FHWA 36.532702 ‐117.082537 CA 8th

NPS Pacific‐West Region

CA NPS PP 2016(9) Pavement Preservation Northern California 2018 CA Humboldt CountyRedwood NP, Lava Beds NM, Whiskey Town NRA

Apply a chip seal and microseal surface treatments on paved parking areas in Redwood NP, Lava Beds NM, and Whiskey Town NRA. The project inludes re‐establishing existing striping, pavement marking and incidental items. Rehabilitation FLTP‐NPS Title 23 In Design  $          6,800,000.00 

Western Federal Lands Highway Division, FHWA 41.300067 ‐124.023424 CA 2nd

NPS Pacific‐West Region

CA NPS PP DEVA 2016(10) Pavement Preservation Death Valley Phase 2 2018 CA

San Bernardino County Death Valley National Park

Resurface about 40 miles of the Beatty Cutoff, Daylight Pass, Mud Canyon, Dante's View, and Bonnie Claire roads in Death Valley NP. Project includes chip seal & microseal surface treatments. Rehabilitation FLTP‐NPS Title 23 In Design  $          3,400,000.00 

Western Federal Lands Highway Division, FHWA 36.532702 ‐117.082537 CA 8th

NPS Pacific‐West Region

CA NPS SEKI 11(1) Upper and Lower Kings River Bridge Repair 2018 CA Tulare County Kings Canyon National Park Repair the upper and lower Kings River bridges in Kings Canyon National Park. Rehabilitation FLTP‐NPS Title 23 In Design  $             400,000.00 Western Federal Lands Highway Division, FHWA 36.783150 ‐118.623223 CA 21st

NPS Pacific‐West Region

CA NPS YOSE 2018(1) Pavement Preservation Yosemite 2018 CA Mariposa County Yosemite National ParkThis project provides for cyclic pavement preservation by chipsealing or micro surfacing of various routes and parking areas within Yosemite National Park. Rehabilitation FLTP‐NPS Title 23 In Design  $          3,580,000.00 

Western Federal Lands Highway Division, FHWA 37.852000 ‐119.575250 CA 4th

NPS Pacific‐West Region

Idaho

ID AMFALLS MARINA(1) Marina Road; SH‐39 to Pacific Road 2017 ID Power County American Falls Reservoir BORTo construct an emergency access road between SH‐39 and the intersection of Marina Road and Pacific Road and to reduce the skew of the Marina Road & SH 39 intersection by realigning Marina Rd. Construction FLAP Title 23 In Design  $          1,074,630.00 

Western Federal Lands Highway Division, FHWA 42.797085 ‐112.849417 ID 2nd

BOR Pacific Northwest Region

ID CANYON 2013(1) Riverside Road and Lake Shore Drive Rehabilitation 2017 ID Canyon County Deer Flat NWR

Lower maintenance costs and lower severity of crashes on Riverside Road between Orchard Avenue and Lake Shore Drive and Lake Shore Drive between Riverside Road and Marsing road. Reconstruction FLAP Title 23 In Design  $          5,308,796.00 

Western Federal Lands Highway Division, FHWA 43.596239 ‐116.722910 ID 1st

FWS Pacific ‐ Region 1

ID DOT 93(1) Lost Trail Pass Slope Stabilization 2017 ID Lemhi County Salmon‐Challis NF, Bitteroot NF

To rebuild a failing slope stabilization system installed during the Lost Trail Pass reconstruction project of over a decade ago using a TECCO© slope stabilization system or equivalent, which uses flexible steel mesh to stabilize steep slopes. Reconstruction FLAP Title 23 In Design  $          1,620,000.00 

Western Federal Lands Highway Division, FHWA 45.669019 ‐113.949750 ID 2nd

FS Intermountain ‐ Region 4

ID FS NEZ 233(1) Crooked River Road Regravel 2017 ID Idaho County Clearwater‐Nez Perce National ForestsPlace gravel, install retaining walls, install culverts, rehabilitate/replace bridges along a 6.8‐mile stretch of the Crooked River Road (FDR 233). Rehabilitation FLTP‐USFS Title 23 In Design  $          1,052,280.00  Nez Perce National Forest 45.719175 ‐115.535102 ID 1st

FS Northern ‐ Region 1

ID FS SAW 214(2) Redfish Lake Road Improvements, Phase 2 2017 ID Custer County Sawtooth National Forest

Construct new section of road to eliminate a deficient bridge & to improve access to Redfish Lake Recreation Complex. Phase 2 connects the new road & roundabout  constructed in phase 1 to the recreation sites on the eastern shore of lake. Construction FLTP‐USFS Title 23 In Design  $          1,927,626.00  Sawtooth National Forest 44.146217 ‐114.921394 ID 2nd

FS Intermountain ‐ Region 4

ID FWS HAGR 101(1) Hagerman NFH Rehab Oster Lakes Road Rte 101 2017 ID Gooding County Hagerman National Fish Hatchery Rehabilitate a portion of the Oster Lakes Road at the Hagerman National Fish Hatchery. Rehabilitation FLTP‐FWS Title 23 In Design  $             545,000.00 

Western Federal Lands Highway Division, FHWA 42.760863 ‐114.860747 ID 2nd

FWS Pacific ‐ Region 1

ID NPS PP CRMO 2016(6) Pavement Preservation Craters of the Moon 2017 ID Blaine County

Craters of the Moon National Monument & Preserve

This project will include pavement preservation treatments for Craters of the Moon National Monument and Preserve (CRMO). Rehabilitation FLTP‐NPS Title 23 Construction  $          1,020,000.00 

Western Federal Lands Highway Division, FHWA 43.527670 ‐113.502666 ID 2nd

NPS Pacific‐West Region

ID PFH 60(5) Salmon River Road Rock Fall Project 2017 ID Idaho County Nez Perce‐Clearwater NF To peform fock fall and erosion mitigation on 9 sites on this corridor from MP 0 to MP 6. Reconstruction FLAP Title 23 In Design  $             897,000.00  Idaho County 45.411314 ‐116.305867 ID 1stFS Northern ‐ Region 1

ID SHOSHONE 5711(1) St. Joe River Road Pavement Rehabilitation 2017 ID Shoshone County Idaho Panhandle NF

To rehabilitate the roadway and improve public safety by subgrade repair, pavement repair, guardrail installation, guardrail repair and pavement milling and hot mix asphalt overlay. Rehabilitation FLAP Title 23 Planned  $          5,000,000.00 

Western Federal Lands Highway Division, FHWA 47.321187 ‐116.565808 ID 1st

FS Northern ‐ Region 1

Page 3 of 13 Approval signature is shown on page 1 only.

Transportation Improvement Program, FY 2017 to FY 2021Western Federal Lands Highway Division

Federal Highway AdministrationApril 2017

ProjectProgram Fiscal Year

State County FLMA Accessed Description Type of Work Program Funds From Title Phase  Program Amount  Delivered By Latitude LongitudeCongressional 

DistrictFLMA Region

ID ADA 3789(2) Bogus Basin Road Safety, Maintenance, and Trailhead 2018 ID Boise County Boise NF

Complete safety improvements and pavement rehabilitation on Bogus Basin Road from Milepost 9 to Bogus Basin Mountain Recreation Area (MP 16.2), and add a trailhead. Reconstruction FLAP Title 23 In Design  $          5,378,000.00 

Ada County Highway District 43.718300 ‐116.160200 ID 1st

FS Intermountain ‐ Region 4

ID DOT 75(1) Galena Summit Slide 2018 ID Blaine County Sawtooth NFTo stabilize an historic slide area by adding more buttressing material at the foot of the slide area and over the surface of the slide and providing a revegetated surface. Reconstruction FLAP Title 23 In Design  $          3,925,000.00 

Idaho Transportation Department 43.877164 ‐114.703869 ID 2nd

FS Intermountain ‐ Region 4

ID DOT T 33(1) Idaho Teton Centennial Trail 2018 ID Teton County Caribou‐Targhee NFDecrease the probably and severity of vehicle/bicycle/pedestrian crashes on State Route 33 from Moose Creek to the Idaho/Wyoming border. Construction FLAP Title 23 In Design  $          2,093,800.00 

Western Federal Lands Highway Division, FHWA 43.563834 ‐111.068022 ID 2nd

FS Intermountain ‐ Region 4

ID PFH 21(7) Warren Wagon Road 2018 ID Valley County Payette NFDecrease the probabilty and severity of crashes, lower maintenance costs, lower probability of vehicles hitting rock falling in the road, and improve ride quality on the Warren Wagon Road from MP 2.23 to MP 9.60. Reconstruction FLAP Title 23 In Design  $       15,000,000.00 

Western Federal Lands Highway Division, FHWA 44.940792 ‐116.112647 ID 1st

FS Intermountain ‐ Region 4

ID USACE NWW LUCK(1) Lucky Peak Dam Viewpoint 2018 IDAda County Highway District Lucky Peak Dam Recreational Area Patch areas where the pavement is failing at the viewpoint and repair the shoulders of the entrance road. Rehabilitation

FLTP‐USACE Title 23 In Design  $             273,000.00 

USACE Walla Walla District 45.527531 ‐116.048026 ID 2nd

USACE Northwestern Division

ID CLARK 6805(1) Yale‐Kilgore Roadway Improvement 2019 ID Clark County Caribou‐Targhee NFTo widen the roadway to a consistent 30 feet and improve the roadway base through excavation and adding additional base aggregate and improving the roadway surface from gravel to hot mix asphalt pavement. Reconstruction FLAP Title 23 Planned  $          5,400,000.00 

Western Federal Lands Highway Division, FHWA 44.488801 ‐111.617301 ID 2nd

FS Intermountain ‐ Region 4

ID DOT 57(1) Priest River Boat Access 2019 ID Bonner County Idaho Panhandle NFIncrease length and width of Highway 57 pull‐out used for parking and accessing the Forest Service angler access and light watercraft launch site on the Priest River. Reconstruction FLAP Title 23 Planned  $             196,499.00 

Idaho Transportation Department 48.494571 ‐116.890260 ID 1st

FS Northern ‐ Region 1

ID ELMORE 61(1) Pine‐Featherville Road Surface Treatment‐ SH 20 to Pine Bridge 2019 ID Elmore County Boise NF Surface preservation on the Pine‐Featherville Road surface course by a bituminous surface treatment. Rehabilitation FLAP Title 23 Planned  $             841,461.41 

Glenns Ferry Highway District 43.313747 ‐115.265101 ID 2nd

FS Intermountain ‐ Region 4

ID FREMONT 6805(1) Yale‐Kilgore Road Improvement 2019 ID Fremont County

Caribou‐Targhee NF, Upper Snake Field Office BLM, Upper Snake Field Office BOR

New gravel trail running parallel to the road on the south side; ideally this trail would be paved but due to the size of the project, this phase will only include a gravel trail. Reconstruction FLAP Title 23 Planned  $          6,560,285.00 

Western Federal Lands Highway Division, FHWA 44.488801 ‐111.861730 ID 2nd

FS Intermountain ‐ Region 4

ID IDAHO 222(1) Dixie Road Crack/Chip Seal 2019 ID Idaho County Nez Perce‐Clearwater NF Crack seal and chip seal 26.1 miles of pavement. Rehabilitation FLAP Title 23 Planned  $          1,458,549.60 Western Federal Lands Highway Division, FHWA 45.808442 ‐115.475661 ID 1st

FS Northern ‐ Region 1

ID LEHMI 93(1) 2L Trails Highway 93 South 2019 ID Lemhi CountySalmon‐Challis NF, Salmon Field Office BLM

Construct paved trail in the Highway 93 right of way from Salmon to Shoup Bridge BLM site and improvements to BLM site. Construction FLAP Title 23 Planned  $          1,542,070.00 

Western Federal Lands Highway Division, FHWA 45.229092 ‐113.895556 ID 2nd

FS Intermountain ‐ Region 4

ID BONVIL 2016(1) Snake River Road and Bear Creek Road 2020 ID Bonneville County Caribou‐Targhee NFPlace asphalt concrete pavement on the existing gravel roadway connecting US‐26 to Calamity Boat Ramp and Campground. Reconstruction FLAP Title 23 Planned  $          3,387,330.00 

Western Federal Lands Highway Division, FHWA 43.333027 ‐111.198447 ID 2nd

FS Intermountain ‐ Region 4

ID BOUNDARY 5806(1) Riverside Road Improvements 2020 ID Boundary CountyPanhandle NF, Kootenai NWR, Coeur d'Alene Field Office BLM Reconstruct the existing roadway base, widen and pave with HMA. Reconstruction FLAP Title 23 In Design  $          4,495,076.00 

Western Federal Lands Highway Division, FHWA 49.693617 ‐116.391356 ID 1st

FS Northern ‐ Region 1

ID CASSIA 972(1) West Milner Road ‐ 700W to 850W 2020 ID Cassia County Burley Field Office BLMImprove the access roadway to the Milner Historic / Recreation Area. The overall objective of the project work is to reconstruct and pave 1.5 miles of West Milner Road from 700 W to 850 W (currently gravel). Reconstruction FLAP Title 23 In Design  $          2,282,877.00 

Western Federal Lands Highway Division, FHWA 42.525778 ‐113.931806 ID 2nd BLM Idaho Region

ID KOOTENAI 5762(1) Bunco Road Improvements 2020 ID Kootenai County Panhandle NFImprove safety on the roadway and preserve the pavement on Bunco Road. The project begins  just west of the intersection of Hatch Road  and ends at the USFS Parking area. Reconstruction FLAP Title 23 In Design  $          2,160,125.00 

Western Federal Lands Highway Division, FHWA 47.903946 ‐116.661398 ID 1st

FS Northern ‐ Region 1

Montana

MT BEAVERHEAD 273(1) Elk Lake Road 2017 MT Beaverhead CountyRed Rock Lakes NWR, BLM, Bearverhead‐Deerlodge NF Provide reliable all weather access to the north side of Red Rock Lakes NWR and lower maintenance costs. Construction FLAP Title 23 Construction  $          5,915,000.00 

Western Federal Lands Highway Division, FHWA 44.613311 ‐111.632822 MT‐at large

FWS Mountain‐Prairie ‐ Region 6

MT DAR 2017(1) Minuteman Missile Base Roads 2017 2017 MT Judith Basin CountyDefense Access Road Program ‐ No Federal Lands Accessed

Maintenance of the C, D, and L roads for the Defense Access Road Program in the vicinity of Standford, Montana. Maintenance DAR Title 23 In Design  $          8,690,000.00 

Western Federal Lands Highway Division, FHWA 47.153522 ‐110.218516 MT‐at large Not Applicable

MT DAR 2017(2) Defense Access Roads By‐Mile 2017 2017 MT Various CountiesDefense Access Road Program ‐ No Federal Lands Accessed Maintenance of county roads within Montana for the Defense Access Road Program. Maintenance DAR Title 23 In Design  $             750,000.00 

Western Federal Lands Highway Division, FHWA 47.504404 ‐111.179098 MT‐at large Not Applicable

MT DOT 2(1) US 2 Hungry Horse West 2017 MT Flathead County Flathead NF, Glacier NPReduce probability and severity of crashes, ensure continued access by replacing deficient structures, and reduce maintenance costs. Reconstruction FLAP Title 23 In Design  $       15,365,000.00 

Montana Department of Transportation 43.380000 ‐114.095000 MT‐at large

FS Northern ‐ Region 1

MT DOT 543(1) North of Jordan 2017 MT Garfield CountyCMR National Wildlife Refuge, BLM, Fort Peck Lake

Replace or repair two 6 foot culverts at approximately RP 8.5 and RP 16.4 and to repair a 12 foot structural steel plate culvert and add inlet armoring to the face to prevent future damage at approximately RP 20.0, surface pres RP16 to 20 with stabilizer. Reconstruction FLAP Title 23 In Design  $             554,000.00 

Western Federal Lands Highway Division, FHWA 47.575412 106.947170 MT‐at large

FWS Mountain‐Prairie ‐ Region 6

MT DOT 86(1) Bozeman to Bridger Mountains Trail 2017 MT Gallatin County Gallatin National ForestDecrease the probability and severity of pedestrian‐bicycle/Vehicle crashes on MT 86 from Story Mill Road (MP ) to the "M" and Drinking Horse Mountain trail heads. Construction FLAP Title 23 In Design  $          3,930,000.00 

Western Federal Lands Highway Division, FHWA 45.702809 ‐111.021153 MT‐at large

FS Northern ‐ Region 1

MT DOT 89(2) US 89 East of Kiowa Junction 2017 MT Glacier County Glacier NP (SADT 877, 50%)Lower maintenance costs and reduce the probability and severity of crashes on US‐89 from MP 5.8 (Browning) to MP 9.94. Reconstruction FLAP Title 23 In Design  $          7,767,408.00 

Montana Department of Transportation 48.540739 ‐113.225519 MT‐at large

NPS Intermountain Region

MT DOT 89(3) US 89 North and South of Kiowa Junction 2017 MT Glacier County Glacier NP (SADT 1440, 50%)Lower maintenance costs and reduce the probability and severity of crashes on US‐89 from MP 9.94 to MP 14.50. Reconstruction FLAP Title 23 In Design  $       11,810,000.00 

Montana Department of Transportation 48.540739 ‐113.225519 MT‐at large

NPS Intermountain Region

MT FERGUS 2016(1) Horse Ranch Road Bridge Replacement 2017 MT Fergus CountyUS Air Force Project ‐ No Federal Lands Accessed

Replace Armells Creek Bridge located along Horse Ranch Road. This bridge supports access to an Air Force Launch Facility. The bridge is functionally obsolete and will be replaced. Construction OTHER Title 23 Construction  $          1,930,000.00 

Western Federal Lands Highway Division, FHWA 47.396378 ‐109.131874 MT‐at large Not Applicable

MT FLATHEAD 917(2) Blacktail Road Surface Improvement Phase 2 2017 MT Flathead County Flathead National Forest

Surface (gravel to asphalt) and drainage improvements, slope stabilization, and fish passage along 2.11 miles of Blacktail Road (milepost 3.43 to 5.54). The FLAP funding request is for second segment of this road. Reconstruction FLAP Title 23 In Design  $          5,858,222.00 

Western Federal Lands Highway Division, FHWA 48.014690 ‐114.261215 MT‐at large

FS Northern ‐ Region 1

Page 4 of 13 Approval signature is shown on page 1 only.

Transportation Improvement Program, FY 2017 to FY 2021Western Federal Lands Highway Division

Federal Highway AdministrationApril 2017

ProjectProgram Fiscal Year

State County FLMA Accessed Description Type of Work Program Funds From Title Phase  Program Amount  Delivered By Latitude LongitudeCongressional 

DistrictFLMA Region

MT FS KOT 228(2) Forest Development Road NFSR 228 2017 MT Lincoln County Kootenai National ForestThis is a Surface Preservation project to maintain FDS 228 to current standards. The project will improve the longevity by preserving the exisitng pavement and extending its life by about 10 years. Rehabilitation FLTP‐USFS Title 23 In Design  $             601,412.00  Kootenai National Forest 48.786904 ‐115.315057 MT‐at large

FS Northern ‐ Region 1

MT FTFW BZMN 100(1) Bozeman Fish Technical Center Entrance Road 2017 MT Gallatin County Bozeman Fish Technical Center Reconstruct the 0.56‐mile long entrance road to the Bozeman Fish Technical Center. Reconstruction FLTP‐FWS Title 23 In Design  $             350,000.00 

Bozeman Fish Technical Center 45.707720 ‐110.978745 MT‐at large

FWS Mountain‐Prairie ‐ Region 6

MT FTFW RRLA 104(1) Elk Springs Creek Bridge 2017 MT Beaverhead CountyRed Rock Lakes National Widlife Refuge Restore fish passage to part of the refuge through the installation of a bridge. Construction FLTP‐FWS Title 23 In Design  $             200,000.00 

Red Rock Lakes National Wildlife Refuge 44.594758 ‐111.801274 MT‐at large

FWS Mountain‐Prairie ‐ Region 6

MT PRA GLAC 10(41) GTSR Final Phase 2017 MT Flathead County Glacier National Park Make repairs to the tunnel along the Going to the Sun Road. Reconstruction FLTP‐NPS Title 23 In Design  $             750,000.00 Western Federal Lands Highway Division, FHWA 48.696239 ‐113.716533 MT‐at large

NPS Intermountain Region

MT PRA GLAC 14(3) Rehabilitate Many Glacier Road Slide 2017 MT Glacier County Glacier National ParkImprove the stability of an active landslide on the Many Glacier Road at MP 6.2. The stability of the slide will be improved by lowering the static water table through the installation of horizontal drains. Reconstruction FLTP‐NPS Title 23 In Design  $       11,059,456.50 

Western Federal Lands Highway Division, FHWA 48.806820 ‐113.617957 MT‐at large

NPS Intermountain Region

MT PRA GLAC 14(4) Rehabilitate Many Glacier Road (Inside Park) 2017 MT Glacier County Glacier National Park Rehabilitate Many Glacier Road inside Glacier National Park. Reconstruction FLTP‐NPS Title 23 In Design  $       11,706,826.00 

Western Federal Lands Highway Division, FHWA 48.796648 ‐113.672349 MT‐at large

NPS Intermountain Region

MT SILVERBOW 8495(1) Moulton Road Safety and Realignment Project Corridor Study 2017 MT Silver Bow County Beaverhead‐Deerlodge National Forest

Study only for a possible widening and paving the existing road and maximizing the current right‐of‐way(ROW) alignment; mitigating current erosion issues to protect riparian and stream resources;and designing and installing an engineered pavement section. Reconstruction FLAP Title 23 In Design  $             200,000.00 

Western Federal Lands Highway Division, FHWA 42.030000 ‐112.530000 MT‐at large

FS Northern ‐ Region 1

MT SWEETGRASS 210(1) Main Boulder River Road Improvements 2017 MT Sweet Grass County Gallatin NF

Lower the probability/severity of crashes, provide a safe egress route out of a closed canyon, decrease maintenance costs, and increase operating speeds on the Main Boulder River Road (CR #210) from Two Mile Bridge (MP 30.94) to Miller Cr Bridg (MP 37.70) Reconstruction FLAP Title 23 Construction  $          7,600,000.00 

Western Federal Lands Highway Division, FHWA 45.488045 ‐110.217712 MT‐at large

FS Northern ‐ Region 1

MT BLAINE 2015(1) Cow Island Trail and Lloyd Road Preservation 2018 MT Blaine County BLM

Improve the surface condition of the Cow Island Trail and the Lloyd Road.  This project will accomplish this through the addition of four (4) inches of gravel to the surface of both roads. Rehabilitation FLAP Title 23 In Design  $             960,000.00 

Western Federal Lands Highway Division, FHWA 47.935953 ‐109.398413 MT‐at large

BLM Montana‐Dakotas Region

MT BOR 2015(1) Fresno Reservoir Road Surface Preservation Project 2018 MT Hill County BOR ‐ Fresno Reservoir

Crack seal approximately 10,296 lineal feet, 37,267 square yards chip sealing, 7,944 square yards double shot on existing millings, 47,520 lineal feet pavement stripping, pavement marking at railroad crossing, and traffic control during construction. Rehabilitation FLAP Title 23 In Design  $             456,000.00 

Western Federal Lands Highway Division, FHWA 48.560000 ‐109.940000 MT‐at large

BOR Great Plains Region

MT DAR 2018(1) Defense Access Roads FY 2018 2018 MT Fergus CountyDefense Access Road Program ‐ No Federal Lands Accessed

Maintenance of the E, N, and O roads for the Defense Access Road Program in the vicinity of Lewistown, Montana. Maintenance DAR Title 23 In Design  $       10,860,000.00 

Western Federal Lands Highway Division, FHWA 47.101545 ‐109.167218 MT‐at large Not Applicable

MT DOT 544(1) Biddle East 2018 MTPowder River County

Bureau of Land Management Oil Field Lease

Rebuild a portion of the existing Ranch Creek Road or State Route 544 for 4.5 miles including over excavating soft spots, hauling in sub‐base and base material, paving , right of way fencing, stock water piping for relocation, and removal for car gates. Reconstruction FLAP Title 23 In Design  $          8,302,500.00 

Western Federal Lands Highway Division, FHWA 45.110000 ‐105.330000 MT‐at large

BLM Montana‐Dakotas Region

MT DOT 569(3) North of Moose Creek North 2018 MT Deer Lodge County

Beaverhead‐Deerlodge National Forest, Anaconda‐Pintler Wilderness, BLM,Fishtrap‐Mount Haggin 

Reconstruct existing paved surface to include improving the driving surface, improving safety by widening the roadway and improving the horizontal and vertical curves. Upgrading of guardrail, pavement markings, signing and fencing will be included. Reconstruction FLAP Title 23 In Design  $          7,418,500.00 

Western Federal Lands Highway Division, FHWA 45.930000 ‐113.100000 MT‐at large

FS Northern ‐ Region 1

MT DOT 89(4) US 89 North of Kiowa Junction 2018 MT Glacier County Glacier NP (SADT 1823, 50%)Lower maintenance costs and reduce the probability and severity of crashes on US‐89 from MP 14.50 to MP 20.70. Reconstruction FLAP Title 23 In Design  $       19,775,000.00 

Montana Department of Transportation 48.580000 ‐113.280000 MT‐at large

NPS Intermountain Region

MT NPS GLAC 2017(1) Pavement Preservation Glacier 2018 MT Flathead County Glacier National ParkThis project provides for cyclic pavement preservation by chipsealing or micro surfacing of various routes and parking areas within Glacier National Park. Rehabilitation FLTP‐NPS Title 23 Planned  $          7,874,000.00 

Western Federal Lands Highway Division, FHWA 48.693961 ‐113.712442 MT‐at large

NPS Intermountain Region

MT PARK 63(1) Tom Miner Creek Road Capital Improvements Project 2018 MT Park County

Custer Gallatin National Forest/ Yellowstone National Park

Complete bridge rehabilitation, approach and departure improvements, bridge replacement, minor ditch reconstruction and surfacing improvement. Reconstruction FLAP Title 23 In Design  $          2,423,732.00 

Western Federal Lands Highway Division, FHWA 45.198948 ‐110.908295 MT‐at large

FS Northern ‐ Region 1

MT PARK NF486(1) Mill Creek Road Surface Preservation Project 2018 MT Park County Custer‐Gallatin NF

Chip seal and crack seal on approximately six miles of the existing asphalt surface and applying aggregate course with some stabilization on approximately six miles of the existing gravel surface. Rehabilitation FLAP Title 23 In Design  $          1,956,250.00 

Western Federal Lands Highway Division, FHWA 45.426246 ‐110.645038 MT‐at large

FS Northern ‐ Region 1

MT STILLWATER 83(1) Nye Road Chip Seal Project 2018 MT Stillwater County Custer NFChip sealing 7.5 miles of the Nye Road leading into the Custer National Forest.  As well restriping 5 miles of the road after the chip seal. Rehabilitation FLAP Title 23 Planned  $             475,000.00 

Western Federal Lands Highway Division, FHWA 45.446456 ‐109.517451 MT‐at large

FS Northern ‐ Region 1

MT TETON 144(1) North Fork Project 2018 MT Teton County Lewis and Clark NF Regravel and stabilize road surface. Rehabilitation FLAP Title 23 In Design  $             537,500.00 Western Federal Lands Highway Division, FHWA 47.980000 ‐112.710000 MT‐at large

FS Northern ‐ Region 1

MT Broadwater 2016(1) Goose Bay Road 2019 MT Broadwater County Canyon Ferry ReservoirProposed work includes regrading Goose Bay Road, adding a new 6" aggregate base course to the existing road, installing new culverts, and paving.

Capital Improvement FLAP Title 23 In Design  $          1,501,541.00  Broadwater County 46.573989 ‐111.576622 MT‐at large

BOR Pacific Northwest Region

MT BSilvrBow 2016(9) Roosevelt Drive Upgrade Study 2019 MTButte Silver Bow County Beaverhead‐Deerlodge National Forest

Conduct an engineering study to evaluate the existing road corridor & provide design information to improve the geometry of Roosevelt Drive to County road standards; improve safety & access to recreational areas; & mitigate erosion and drainage issues. Planning FLAP Title 23 In Design  $             210,000.00 

Western Federal Lands Highway Division, FHWA 45.873188 ‐112.456086 MT‐at large

FS Northern ‐ Region 1

MT DOT 14203(1) Maiden Road 2019 MT Fergus County BLMRehabilitate the existing Double Shot surface to include improving the driving, gravel the last mile with CaCl dust paliative, pavement markings and signing. Reconstruction FLAP Title 23 In Design  $          4,320,000.00 

Western Federal Lands Highway Division, FHWA 47.190000 ‐109.330000 MT‐at large

BLM Montana‐Dakotas Region

MT DOT 399(1) Boulder South 2019 MT Jefferson County Beaverhead‐Deerlodge National Forest

Reconstruct 10.2 to 19.3 (gravel to gravel) and reconstruct/rehabilitate 23.5 to 25.0 (pavement to pavement) to improve alignment, slopes, drainage, and safety.  Additional intersection, signage, and safety improvements will be made from 10.2 to 23.5. Reconstruction FLAP Title 23 In Design  $          2,571,709.00 

Montana Department of Transportation 46.020000 ‐112.110000 MT‐at large

FS Northern ‐ Region 1

MT Glacier 14(1) Many Glacier Road 2019 MT Glacier County Glacier National Park Reconstruction of 4.8 miles of primary access through the Blackfeet Indian Reservation to Glacier National Park.Capital Improvement FLAP Title 23 In Design  $       11,434,511.00 

Western Federal Lands Highway Division, FHWA 48.856969 ‐113.435961 MT‐at large

NPS Intermountain Region

MT Lewisclark 695(1) Rimini Road Surfacing 2019 MTLewis and Clark County Helena National Forest

Proposed Work is to chip seal Rimini Road from US Highway 12 to the end of asphalt placed in the summer of 2016. The total length of chip seal is 6.5 miles. (LCC priority 2 of 9)

Surface Preservation FLAP Title 23 In Design  $             373,439.99  Lewis and Clark County 46.573470 ‐112.218200 MT‐at large

FS Northern ‐ Region 1

MT MADISON 2015(1) Cliff and Wade Lake Road Gravel Surface Preservation Project 2019 MT Madison County Beaverhead‐Deerlodge NF

Improve the driving surface for three adjacent gravel roads. A total of 13 miles is proposed. Included in the work shall be: aggregate placement, spot subgrade repair, culvert installation, drainage improvement and sign installation. Rehabilitation FLAP Title 23 Planned  $             635,250.63 

Western Federal Lands Highway Division, FHWA 44.803296 ‐111.560931 MT‐at large

FS Northern ‐ Region 1

Page 5 of 13 Approval signature is shown on page 1 only.

Transportation Improvement Program, FY 2017 to FY 2021Western Federal Lands Highway Division

Federal Highway AdministrationApril 2017

ProjectProgram Fiscal Year

State County FLMA Accessed Description Type of Work Program Funds From Title Phase  Program Amount  Delivered By Latitude LongitudeCongressional 

DistrictFLMA Region

MT Park 2016(10) Old Yellowstone Trail South Planning Project 2019 MT

Park County and the National Park Service Custer Gallatin National Forest

Conduct a corridor planning study on Old Yellowstone Trail South to identify improvements for safety; operational & geometric conditions; & environmental resources. Planning FLAP Title 23 In Design  $             235,000.00 

Western Federal Lands Highway Division, FHWA 45.205877 ‐110.904291 MT‐at large

FS Northern ‐ Region 1

MT Park 34(1) Shields River Road Planning Project 2019 MT Park County Custer Gallatin National Forest

Conduct a planning study to identify possible alternatives to rehabilitate Shields River Road to improve the road surface & bridges; roadside safety structures; safety enhancements; & parking areas, pullouts & interpretive sites. Planning FLAP Title 23 In Design  $             180,000.00 

Western Federal Lands Highway Division, FHWA 45.998883 ‐110.661496 MT‐at large

FS Northern ‐ Region 1

MT PHILLIPS 2015(1) Charles M Russell Wildlife Refuge Access Road Reconstruction and Resurfacing 2019 MT Phillips County

CMR Wildlife Refuge, BLM, Army Corps of Engineers

Reshape the current road to proper crown and width, and replace several culverts in the roadway.  Install fabric underlayment product in several soft spots of the road.  The regravel the 23 miles with crushed road base gravel. Rehabilitation FLAP Title 23 Planned  $          3,055,000.00 

Western Federal Lands Highway Division, FHWA 47.718773 ‐106.160184 MT‐at large

FWS Mountain‐Prairie ‐ Region 6

MT PHILLIPS 364(1) Short Oil Road Asphalt Overlay 2019 MT Phillips CountyCM Russell Wildlife Refuge, USACE Campground, Fort Peck Lake, BLM Install an asphalt overlay to protect the existing road. Reconstruction FLAP Title 23 Planned  $          1,940,500.00 

Western Federal Lands Highway Division, FHWA 48.347359 ‐107.874888 MT‐at large

FWS Mountain‐Prairie ‐ Region 6

MT Beaverhead 73(1) Pioneer Mountain Scenic Byway Pavement Marking 2020 MT Beaverhead County Beaverhead‐Deerlodge National Forest

Improve safety of the existing paved Pioneer Mountain Scenic Byway by painting pavement markings and placing reflective shoulder delineators for the full length of the road (49 miles).

Surface Preservation FLAP Title 23 In Design  $             364,481.00  Beaverhead County 45.792356 ‐112.955801 MT‐at large

FS Northern ‐ Region 1

MT DOT 89(5) Hudson Bay Divide ‐ South 2020 MT Glacier County Glacier National ParkRealignment and reconstruction of 4.82 miles of primary highway on the Blackfeet Indian Reservation accessing Glacier National Park. Reconstruction FLAP Title 23 In Design  $          5,780,671.00 

Montana Department of Transportation 48.647437 ‐113.315275 MT‐at large

NPS Intermountain Region

MT Lewisclark 123(1) Gates of the Mountains Road Resurfacing 2020 MT

Lewis and Clark County Helena National Forest

Proposed Work is to chip seal Gates of the Mountains Road from the Interstate 15, 2.51 miles to the Gates of the Mountains Marina. The roadway width is 24 feet wide.(LCC priority 7 of 9)

Surface Preservation FLAP Title 23 In Design  $             203,062.00  Lewis and Clark County 46.820270 ‐111.996114 MT‐at large

FS Northern ‐ Region 1

MT Lewisclark 208(1) Sun Canyon Road Resurfacing 2020 MTLewis and Clark County Lewis and Clark National Forest

Proposed Work is to resurface 4.9 miles of the upper Sun Canyon Road with 6 inches of crushed aggregate surface course with dust palliative to COMPLETE the gravel corridor. (LCC priority 1 of 9)

Surface Preservation FLAP Title 23 In Design  $             987,206.99  Lewis and Clark County 47.604440 ‐112.599400 MT‐at large

FS Northern ‐ Region 1

MT Lewisclark 280(1) York Road Resurfacing 2020 MT

Lewis and Clark County (maintenance  Helena National Forest Apply chip seal to York Road from York bridge to end of asphalt. The total length of chip seal is 6.4 miles.

Surface Preservation FLAP Title 23 In Design  $             495,278.00  Lewis and Clark County 46.712530 ‐111.804300 MT‐at large

FS Northern ‐ Region 1

MT NPS GLAC 11(3) Camas Road Slump 2020 MT Flathead County Glacier National Park

Rehabilitate 4 miles of Camas Road within Glacier NP by applying a 3‐inch overlay. In existing areas that have been damaged by frost heave and the surface is broken up, we will dig the base out and replace with better material. Rehabilitation FLTP‐NPS Title 23 In Design  $          3,459,066.00 

Western Federal Lands Highway Division, FHWA 48.590630 ‐114.032317 MT‐at large

NPS Intermountain Region

MT Big Horn 46(1) Warman Loop Road 2021 MT Big Horn CountyBighorn Canyon National Recreation Area

4.2  miles pulverize, recondition, compact, and overlay 3" asphalt surface, culvert replacements, minor surface, shoulder, and bridge deck repairs, signage improvements, guardrail, pavement marking and ancilliary parking improvement

Capital Improvement FLAP Title 23 In Design  $          3,639,218.00 

Western Federal Lands Highway Division, FHWA 45.347819 ‐107.802503 MT‐at large

NPS Intermountain Region

MT DOT 86(2) Bridger Canyon Road 2021 MT Gallatin Cty Custer Gallatin National Forest

Make improvements at two locations along Bridger Canyon Road to implement alternative transportation systems that will increase the safety and convenience of accessing federal recreational areas surrounding Bozeman.

Capital Improvement FLAP Title 23 In Design  $          3,160,954.99 

Western Federal Lands Highway Division, FHWA 45.708056 ‐110.981111 MT‐at large

FS Northern ‐ Region 1

MT Flathead 486(1) North Fork of the Flathead River 2021 MT Flathead County Flathead National Forest

Improve 20.75 miles of North Fork Road, including aggregate surfacing; road widening; dainage; slope reinforcement; culvert replacement; raise road grade in areas; aggregate surfacing of parking areas; & signing.

Capital Improvement FLAP Title 23 In Design  $          2,243,201.59  Flathead National Forest 48.782300 ‐114.282300 MT‐at large

FS Northern ‐ Region 1

MT Ft Peck 2016(4) Yellowstone Road ‐ Fort Peck 2021 MT Valley County Fort Peck Dam Replacement of culverts and resurfacing of .4 mi existing roadway.Surface Preservation FLAP Title 23 In Design  $             249,840.01 

Western Federal Lands Highway Division, FHWA 48.008889 ‐106.448611 MT‐at large

USACE Northwestern Division

MT Granite 8686(1) Georgetown Lake Road Rehabilitation 2021 MT Granite County Beaverhead‐Deerlodge National Forest

Rehabilitate 3.1 miles of Forest Road No. 8686. Work items include subgrade; roadside ditches; culvert replacement; aggregate surfacing; widening from 18' to 24'; improve/construct pullouts; drainage improvements; & signing.

Capital Improvement FLAP Title 23 In Design  $          1,464,750.00 

Western Federal Lands Highway Division, FHWA 46.194690 ‐113.305014 MT‐at large

FS Northern ‐ Region 1

MT Lewisclark 2016(5) Snowdrift Road Surface Preservation 2021 MTLewis and Clark County BLM ‐ North Hills Area

Resurface 1 mile of Snowdrift Road beginning at the intersection of Snowdrift Road & Collins Drive. Project includes applying gravel with dust palliative over the width of the road to increase stability & extend the life of the road surface.

Surface Preservation FLAP Title 23 In Design  $             167,078.71  Lewis and Clark County 46.740690 ‐111.978001 MT‐at large

BLM Montana‐Dakotas Region

MT Lewisclark 2016(7) Ferry Drive Surface Preservation 2021 MTLewis and Clark County BLM ‐ North Hills Area

Resurface 1.5 miles of Ferry Drive.  Apply gravel with a dust palliative to limit road dust, increase stability, & extend road life. Also, recondition surface near intersection of Fantasy Road to resolve drainage issues.

Surface Preservation FLAP Title 23 In Design  $             262,863.46  Lewis and Clark County 46.718930 ‐111.957240 MT‐at large

BLM Montana‐Dakotas Region

MT Lewisclark 2016(8) Collins Drive Surface Preservation 2021 MTLewis and Clark County BLM ‐ North Hills Area

Resurface 1.5 miles of Collins Drive. Apply gravel and dust palliative. Replace crushed culverts along the easter road dtich and located at the intersections of Collins Drive with Tea and Fantasy Roads.

Surface Preservation FLAP Title 23 In Design  $             241,176.57  Lewis and Clark County 46.719280 ‐111.978450 MT‐at large

BLM Montana‐Dakotas Region

MT Liberty 366(1) Lake Elwell BOR Lands Access 2021 MT Liberty County BOR‐ Lake Elwell

Apply a surface course of crushed aggregate to MT Hwy 366 from the intersection of MT Hwy 223 to Tiber Dam including Sanford Park access road and adjacent vehicle parking/viewpoint. Narrow MT Hwy 366 surface width to 28 feet.

Surface Preservation FLAP Title 23 In Design  $          1,209,177.19 

Western Federal Lands Highway Division, FHWA 48.320960 ‐110.937110 MT‐at large

BOR Great Plains Region

MT Lincoln 2016(2) Sophie Lake Road Reconstruction 2021 MT Lincoln County Kootenai National ForestProposed work includes regrading 5.6 mi. of Sophie Lake Road, adding a new 6" aggregate base course to the existing road, installation of one (1) large culvert, realigning a dangerous section of road, and paving

Capital Improvement FLAP Title 23 In Design  $             818,000.00  Lincoln County 48.905443 115.117355 MT‐at large

FS Northern ‐ Region 1

MT Musselshell 195(1) Old Divide & S Fattig Creek Road Surfacing 2021 MT Musselshell County

BLM Signal Peak Energy Federal Coal Lease Area

Conduct a crack seal, chip seal, and striping of routes of Old Divide Rd and a portion of Fattig Creek Rd that service a local coal mine that is operating, in part, under a Federal coal lease.

Surface Preservation FLAP Title 23 In Design  $             532,835.60 

Western Federal Lands Highway Division, FHWA 46.198785 ‐108.450618 MT‐at large

BLM Montana‐Dakotas Region

MT NPS GLAC 1041(2) Apgar Loop Reconstruction 2021 MT Flathead County Glacier National Park

This project will rehabilitate the .8 mile portion of the Apgar Loop Road from the intersection with the Going‐to‐the‐Sun Road to the curve where the Loop Road meets the circle drive and parking leading from the boat rental concession area. Rehabilitation FLTP‐NPS Title 23 In Design  $          1,008,036.00 

Western Federal Lands Highway Division, FHWA 48.527002 ‐113.985857 MT‐at large

NPS Intermountain Region

MT PowdrRivr 2016(6) Belle Creek Road Surface Preservation 2021 MTPowder River County BLM Oil Field Lease

Shape existing Belle Creek Road for 12.4 miles from State Highway 59 to State secondary 544 intersection. Haul in state spec material, apply as base and treat with stabilization compound. Replace old signs and add new as needed.

Surface Preservation FLAP Title 23 In Design  $          1,400,099.80 

Western Federal Lands Highway Division, FHWA 45.199860 ‐105.330700 MT‐at large

BLM Montana‐Dakotas Region

MT PRA LIBI 10(2) Little Bighorn Park Road 2021 MT Big Horn CountyLittle Bighorn Battlefield National Monument

Widen the eixsting 5‐mile road that connects the Custer Battlefield and the Reno‐Benteen Battlefield. The finished route will be 24 feet wide with two 11‐foot travel lanes and 1‐foot shoulders. Reconstruction FLTP‐NPS Title 23 In Design  $       11,428,125.00 

Western Federal Lands Highway Division, FHWA 45.570359 ‐107.427001 MT‐at large

NPS Intermountain Region

MT Prairie 2016(3) Milwaukee Bridge Resurfacing and Rehabilitation 2021 MT Prairie County Terry Badlands WSA

Rehabilitation of the existing Milwaukee Road Bridge, including installation of new precast concrete deck panels and installation of concrete armor units for scour remediation.

Capital Improvement FLAP Title 23 In Design  $          1,617,049.99 

Western Federal Lands Highway Division, FHWA 46.779612 ‐105.411445 MT‐at large

BLM Montana‐Dakotas Region

MT Teton 109(1) South Fork Teton River Road 2021 MT Teton County Lewis and Clark National Forest Replace bridge, reshape 5 mi. of road, new gravel surface and stabalize surface (Teton County''s priority #2 of 2)Capital Improvement FLAP Title 23 In Design  $          2,789,752.00 

Western Federal Lands Highway Division, FHWA 45.881508 ‐112.611542 MT‐at large

FS Northern ‐ Region 1

Page 6 of 13 Approval signature is shown on page 1 only.

Transportation Improvement Program, FY 2017 to FY 2021Western Federal Lands Highway Division

Federal Highway AdministrationApril 2017

ProjectProgram Fiscal Year

State County FLMA Accessed Description Type of Work Program Funds From Title Phase  Program Amount  Delivered By Latitude LongitudeCongressional 

DistrictFLMA Region

MT Teton 144(1) North Fork Teton River Road Chip Seal 2021 MT Teton County Lewis and Clark National Forest Chip seal 18.2 miles of paved road with striping (Teton County''s Priority #1 of 2)Surface Preservation FLAP Title 23 In Design  $          1,197,731.71 

Western Federal Lands Highway Division, FHWA 47.860833 ‐112.261589 MT‐at large

FS Northern ‐ Region 1

Oregon

OR BAKER 1009(1) Fish Lake Road 2017 OR Baker County Wallowa‐Whitman National Forest Is to patch and apply a chip seal to the entire paved roadway. Rehabilitation FLAP Title 23 In Design  $             259,120.48  Baker County 44.882318 ‐117.114098 OR 2nd

FS Pacific Northwest ‐ Region 6

OR DESCHUTES 21(1) Paulina Lake Road Chip Seal 2017 OR Deschutes County Deschutes National Forest

The application of a 3/8" ‐ #8 chip seal surface to the existing road surface from Highway 97 to the end of County maintenance including  striping of the new surfacing, installation of new shoulder material, and replacement of damaged signs. Rehabilitation FLAP Title 23 In Design  $          1,193,098.00  Deschutes County 43.751884 ‐121.459802 OR 2nd

FS Pacific Northwest ‐ Region 6

OR DESCHUTES 42(1) South Century Drive Chip Seal 2017 OR Deschutes County Deschutes National Forest

The application of a 3/8" ‐ #8 chip seal surface to the existing road surface from Maxwell Bridge to intersection with Burgess Road including striping of the new surfacing, installation of new shoulder material and replacement of damaged signs and signs. Rehabilitation FLAP Title 23 In Design  $             737,910.00  Deschutes County 43.744704 ‐121.782126 OR 2nd

FS Pacific Northwest ‐ Region 6

OR DOT 20(2) US 20 Barclay (Sisters) Roundabout 2017 OR Deschutes County Deschutes National Forest

Construct a single‐lane roundabout at the intersection of US20@Barclay in the City of Sisters, and provide an aesthetically pleasing gateway feature for Central Oregon and for the McKenzie Pass ‐Santiam Pass National Scenic Byway. Reconstruction FLAP Title 23 In Design  $          4,789,322.00 

Oregon Department of Transportation 44.296702 ‐121.560608 OR 2nd

FS Pacific Northwest ‐ Region 6

OR DOT 2016(1) Sharing the Roads to Federal Lands 2017 OR Wallowa County

Mt Hood National Forest, Willamette National Forest, Wallowa‐Whitman National Forest

Develop a guidance document/handbook for road agencies that are considering designation of roads as Scenic Bikeways. This study proposes to evaluate two routes that provide a comprehensive cross sample of the issues facing these road agencies. Operations FLAP Title 23 Planned  $             162,500.00 

Western Federal Lands Highway Division, FHWA 45.109623 ‐116.852205 OR 2nd

FS Pacific Northwest ‐ Region 6

OR DOT 2016(2) Historic Columbia River Highway Congestion Management 2017 OR Multnomah County

Columbia River Gorge National Scenic Area

Develop a multimodal strategy to address congestion‐related issues along the Historic Columbia River Highway and I‐84 at the Multnomah Falls interchange. Planning FLAP Title 23 In Design  $             367,770.00 

Oregon Department of Transportation 45.578872 ‐122.117395 OR 3rd

FS Pacific Northwest ‐ Region 6

OR DOT 2016(3) Columbia Gorge Express 2017 OR Multnomah CountyColumbia River Gorge National Scenic Area Increase mobility to and decrease congestion in the Columbia River Gorge through the Columbia Gorge Express. Operations FLAP Title 23 In Design  $          3,279,663.00 

Oregon Department of Transportation 45.530914 ‐122.563578 OR 3rd

FS Pacific Northwest ‐ Region 6

OR DOT 26(2) Mirror Lake Trailhead Relocation 2017 OR Clackamas County Mt Hood National ForestReduce the probability and severity of vehicle/vehicle and vehicle/pedestrian crashes on US 26 between MP 51 and MP 54 where access will be provided to the Mirror Lake trailhead. Reconstruction FLAP Title 23 In Design  $          6,635,000.00 

Western Federal Lands Highway Division, FHWA 45.306678 ‐121.791895 OR 3rd

FS Pacific Northwest ‐ Region 6

OR DOT 36(1) OR 36 ‐ Florence‐Eugene Highway to Greenleaf Creek 2017 OR Lane County Siuslaw National Forest

Place an emulsified chip seal from MP 0.01 to 21.38, update signs to current MUTCD standards, replace damaged or aging signs and update guardrail to standards where needed. Rehabilitation FLAP Title 23 In Design  $          1,716,358.00 

Western Federal Lands Highway Division, FHWA 44.031388 ‐123.859550 OR 4th

FS Pacific Northwest ‐ Region 6

OR DOT 372(1) Haul Trail Undercrossing 2017 OR Deschutes County Deschutes National ForestConstruct a new 14' paved undercrossing of Hwy 372/Cascade Lakes Scenic Byway at the Rimrock Trailhead (MP 5.09 ‐ MP 5.19). Reconstruction FLAP Title 23 In Design  $             785,470.00 

Oregon Department of Transportation 44.019392 ‐121.374450 OR 2nd

FS Pacific Northwest ‐ Region 6

OR FS FWI 28(2) Thomas Creek Road Reconstruction 2017 OR Lake County Fremont‐Winema National ForestsReconstruct 6.88 miles of the Thomas Creek Road (Forest Service Road 28) from the junction with FSR 3724 to the cattle guard at MP 80.8. Reconstruction FLTP‐USFS Title 23 In Design  $          2,112,163.00 

Fremont‐Winema National Forests 42.324069 ‐120.576690 OR 2nd

FS Pacific Northwest ‐ Region 6

OR FS RRS 33(1) Coal Creek Bridge 2017 OR Coos County Rogue River‐Siskiyou National Forest Replace two 85‐foot‐long, 10‐foot diameter culverts with a bridge on Coal Creek. Construction FLTP‐USFS Title 23 In Design  $          1,400,000.00 Rogue River‐Siskiyou National Forest 42.823466 ‐124.013057 OR 4th

FS Pacific Northwest ‐ Region 6

OR FS UMP T 1460(1) Dellenback Trail Reconstruction 2017 OR Douglas County Umpqua National ForestUnder this project sections of the 11‐mile Dellenback Trail will be reconstructed to keep the trail open to public use. Reconstruction FLTP‐USFS Title 23 In Design  $             160,000.00  Umpqua National Forest 43.174434 ‐122.137786 OR 4th

FS Pacific Northwest ‐ Region 6

OR FWS CHRU 10(2) Entrance Road Resurfacing, dust abatement 2017 OR Marion County Ankeny National Wildlife Refuge Resurface current gravel entrance to the Ankeny National Wildlife Refuge and apply dust abatement measures. Reconstruction FLTP‐FWS Title 23 In Design  $               50,000.00 

Western Federal Lands Highway Division, FHWA 44.801923 ‐123.063495 OR 5th

FWS Pacific ‐ Region 1

OR FWS OCNWRC 101(1) Oregon Coast NWRC Refuge Entrances 2017 OR

Coos, Douglas, Lane, Lincoln, Tillamook, Clatsop 

Oregon Coast National Wildlife Refuge Complex Refuge Entrances off Highway 101, safety improvements. Construction FLTP‐FWS Title 23 In Design  $             145,000.00 

Western Federal Lands Highway Division, FHWA 44.135280 ‐124.128585 OR 5th

FWS Pacific ‐ Region 1

OR HOOD RIVER 2016(1) Mt Hood Gorge Loop Transit 2017 OR Hood River CountyMt. Hood National Forest,  Cascades Resource Area

create a new public transportation route to connect visitors, residents, employees, and recreational populations to key destinations in the Mt Hood National Forest along Hwy 35 and complete a public transportation loop around Mt Hood. Operations FLAP Title 23 In Design  $             620,000.00 

Hood River County Transportation District 45.711900 ‐121.535670 OR 2nd

FS Pacific Northwest ‐ Region 6

OR JACKSON 1102(1) Tiller Trail Highway Chip Seal 2017 OR Jackson County Umpqua National Forest

The preparation (deep patch, blade patch and crack fill) of the existing pavement at all required locations, topped with a single pass chip seal followed by a fog seal. The work will be from MP 41.46 (Jackson/Douglas County Line) to MP 52.71 (Highway 62). Rehabilitation FLAP Title 23 In Design  $             590,000.00  Jackson County 42.774100 ‐122.868802 OR 2nd

FS Pacific Northwest ‐ Region 6

OR LANE 6154(1) High Prairie Road Chip Seal 2017 OR Lane County Willamette National ForestDouble shot chip seal  on High Prairie Road beginning at M.P. 2.50 north of the City of Oakridge, extending to the end of High Prairie at M.P. 6.62, and then extending to include .29‐mile Huckleberry Road. Rehabilitation FLAP Title 23 In Design  $             365,000.00  Lane County 43.764283 ‐122.436746 OR 4th

FS Pacific Northwest ‐ Region 6

OR LANE 6178(1) Kitson Springs Slide Repair at MP 2.6 2017 OR Lane County Willamette National ForestAddress a continuing slide on Kitson Springs Road southeast of Oakridge. Final scoping will evaluate the most cost effective solution to dewater, stabilize and repair the slide area. Reconstruction FLAP Title 23 In Design  $             205,000.00  Lane County 43.708832 ‐122.407828 OR 2nd

FS Pacific Northwest ‐ Region 6

OR MALHEUR 846(1) Owyhee Lake Road Overstreet Road ‐ Owyhee Reservoir 2017 OR Malheur County Owyhee River

Peform planning and engineering to enhance approximately 20.5 miles of Owyhee Lake Road. The components include 2" structural overlay, shoulder widening, informational kiosk, additional parking, scenic and safety features, and falling boulder prevention. Reconstruction FLAP Title 23 In Design  $             125,000.00 

Western Federal Lands Highway Division, FHWA 43.754994 ‐117.158676 OR 2nd

BLM Oregon‐Washington Region

OR PFH 46(13) Fall Creek Bridge Replacement 2017 OR Deschutes County Deschutes National ForestEliminate load limits and debris accumulation on the Fall Creek Bridge on the Cascade Lakes Highway at MP 26.52. Reconstruction FLAP Title 23 In Design  $          2,569,100.00 

Western Federal Lands Highway Division, FHWA 44.030164 ‐121.738376 OR 2nd

FS Pacific Northwest ‐ Region 6

OR RRP HAMO 10(1) Hart Mountain NWR Improve Access Road and turn lane from SR 140 2017 OR Lake County

Hart Mountain National Wildlife Refuge

Improve the current intersection from SR 140 onto the entrance road for the Hart Mountain National Wildlife Refuge. Construction FLTP‐FWS Title 23 In Design  $             150,000.00 

Western Federal Lands Highway Division, FHWA 42.177642 ‐119.899001 OR 2nd

FWS Pacific ‐ Region 1

OR UMATILLA 1378(1) East Birch Creek Road Resurfacing 2017 OR Umatilla CountyUmatilla National Forest, Wallowa‐Whitman National Forest Add 4 inches of crushed road to existing road surface. Rehabilitation FLAP Title 23 In Design  $             619,708.00  Umatilla County 45.397047 ‐118.724594 OR 2nd

FS Pacific Northwest ‐ Region 6

OR WALLOWA 798(1) Zumwalt Road Surface Preservation 2017 OR Wallowa County Wallowa‐Whitman National Forest Perform surface preservation on a portion of the Zumwalt Roadway. Rehabilitation FLAP Title 23 Planned  $             708,880.00 Western Federal Lands Highway Division, FHWA 45.467298 ‐117.076959 OR 2nd

FS Pacific Northwest ‐ Region 6

Page 7 of 13 Approval signature is shown on page 1 only.

Transportation Improvement Program, FY 2017 to FY 2021Western Federal Lands Highway Division

Federal Highway AdministrationApril 2017

ProjectProgram Fiscal Year

State County FLMA Accessed Description Type of Work Program Funds From Title Phase  Program Amount  Delivered By Latitude LongitudeCongressional 

DistrictFLMA Region

OR WASCO 102(1) Tygh Valley ‐ Wamic Road Improvements 2017 OR Wasco County Mt Hood National Forest

Perform road prep work including sweeping, cleaning, and crack sealing, place 2" asphalt overlay, replace sub‐standard guardrail, add shoulder material and install new Chevron‐type warning signs and apply new pavement markings. Reconstruction FLAP Title 23 Planned  $             325,175.76 

Western Federal Lands Highway Division, FHWA 45.244900 ‐121.454397 OR 2nd

FS Pacific Northwest ‐ Region 6

OR WASH 2015(1) Hagg Lake Perimeter Road 2017 OR Washington County Scoggins Dam & Henry Hagg Lake

Improve the road condition of West Shore Drive and provide safe, year round access to Scoggins Valley Park, over 200 residences, and commercial timberlands, as well as over 650,000 vehicles and bicycles that travel around the lake annually. Reconstruction FLAP Title 23 In Design  $          8,562,421.00 

Western Federal Lands Highway Division, FHWA 45.476900 ‐123.196100 OR 1st

BOR Pacific Northwest Region

OR WHEELER 7(1) Rowe Creek Pavement Preservation 2017 OR Wheeler CountyJohn Day Fossil Beds National Monument Perform road preperation including sweeping and cleaning, repair road bed and lay down double lift chip seal. Rehabilitation FLAP Title 23 Planned  $          1,258,000.00 

Western Federal Lands Highway Division, FHWA 44.818884 ‐120.159446 OR 2nd

BOR Pacific Northwest Region

OR BENTON 482(1) South Fork Road Comprehensive Corridor Plan 2018 OR Benton County BLM ‐ Marys Peak Resrouce Area

Develop a comprehensive and coheisve plan for private and commercial use of the road, including roadway capacity improvements, pull‐outs, way finding, parking, and recreation site improvements. Planning FLAP Title 23 In Design  $             197,000.00 

Western Federal Lands Highway Division, FHWA 44.368050 ‐123.598827 OR 4th

BLM Oregon‐Washington Region

OR COOS 1(1) Sitkum Lane Double OTTA Seal, Safety Features 2018 OR Coos County Bureau of Land ManagementReplace guardrail to current AASHTO standards at retaining walls (MP 6.6, 18.8, 22.9, 23.2, 23.3) and bridge and approach guardrail replacement to AASHTO standards (MP 13.1). Rehabilitation FLAP Title 23 In Design  $             175,000.00  Coos County 43.117161 ‐124.018713 OR 4th

BLM Oregon‐Washington Region

OR COOS 122(1) Weekly Creek Road Dust Abatement 2018 OR Coos County BLM ‐ Umpqua Resource AreaPave a portion of  Weekly Creek Road to minimize sediment entering the North Fork Coquille River. Improve roadway drainage. Repair two small slide areas. Minimize fugitive dust along 1.8 mile segment of the road. Reconstruction FLAP Title 23 In Design  $             791,328.00  Coos County 43.067958 ‐124.107869 OR 4th

BLM Oregon‐Washington District

OR DESCHUTES 46(3) Cascade Lakes Highway Bicycle Facilities Evaluation and Master Plan 2018 OR Deschutes County Deschutes National Forest

Planning project to study the use of the facility by various modes and recommend near, medium, and long term safety improvements and operational strategies for the entire length of the facility. Planning FLAP Title 23 In Design  $             100,000.00 

Western Federal Lands Highway Division, FHWA 43.999648 ‐121.663867 OR 2nd

FS Pacific Northwest ‐ Region 6

OR DETROIT 2016(1) Detroit Area Visitor Portal, Bikeway and Day Use Enhancements 2018 OR Marion County Willamette National Forest

Construct the Detroit Recreation Area Visitor Portal. Construct/reconstruct parking areas and the interior road at the Detroit Flats Day Use Parking Area.  Construct ADA accesible path between the Detroit Visitor Portal and the Detroit Flats Day Use Area. Enhancement FLAP Title 23 In Design  $          2,225,610.00 

Western Federal Lands Highway Division, FHWA 44.734675 ‐122.152517 OR 5th

FS Pacific Northwest ‐ Region 6

OR DOT 2016(4) Multnomah Falls Pedestrian Circulation and Parking Lot Improvement 2018 OR Multnomah County

Columbia River Gorge National Scenic Area

Perform planning and design work to identify and implement traffic and pedestrian safety mititgation work at existing Parking Lots on HCRH and I‐84, and enhance visitor experience.  Also determine ROW along the HCRH at Multnomah Falls Lodge Parking Areas. Planning FLAP Title 23 In Design  $             150,000.00 

Western Federal Lands Highway Division, FHWA 45.577244 ‐122.120565 OR 3rd

FS Pacific Northwest ‐ Region 6

OR DOT 2016(5) Vision Around the Mountain 2018 OR Clackamas County Mt Hood National ForestPlanning Project to determine coordination oppurtunities between various Transit Operations around Mt Hood, including the Mt. Hood Express, Columbia Gorge Express, and Mt. Hood Gorge Loop Transit Planning FLAP Title 23 In Design  $             120,000.00 

Oregon Department of Transportation 45.283528 ‐121.713693 OR 3rd

FS Pacific Northwest ‐ Region 6

OR DOT 224(1) Clackamas Highway Pavement Restoration 2018 OR Clackamas County Mt Hood National Forest Resurface roadway, restriping and replace signing on OR 224 between MP 44.94 and 45.82. Maintenance FLAP Title 23 In Design  $             400,521.00 Western Federal Lands Highway Division, FHWA 45.130000 ‐122.780000 OR 5th

FS Pacific Northwest ‐ Region 6

OR DOT 224(2) OR 224 Pavement Restoration MP 31.8 to 32.8 2018 OR Clackamas County Mt Hood National Forest Provide roadway resurfacing, guardrail adjustment, and striping of OR 224, between MP 31.8 and 32.8. Rehabilitation FLAP Title 23 Planned  $             864,465.00 Western Federal Lands Highway Division, FHWA 45.272922 ‐122.319045 OR 5th

FS Pacific Northwest ‐ Region 6

OR DOT CRGNSA 100(2) Historic Columbia River Highway State Trail Phase 2 2018 OR Hood River County

Columbia River Gorge National Scenic Area Construct new trailhead for Historic Columbia River Highway State Trail. Enhancement OTHER Title 23 In Design  $             662,339.00 

Western Federal Lands Highway Division, FHWA 45.690252 ‐121.770744 OR 2nd

FS Pacific Northwest ‐ Region 6

OR DOT T 97(1) US 97 ‐ Multi‐Use Trail Planning Study 2018 OR Deschutes County Deschutes National Forest

Identify and evaluate planning corridors for a bicycle and pedestrian multi‐use trail connecting Bend to the Lava Lands Visitor Center along the US 97 corridor (MP 143.45 ‐ MP 149.58).  Also, identify parking alternatives and Transit Service integration. Planning FLAP Title 23 In Design  $             270,000.00 

Oregon Department of Transportation 43.992119 ‐121.335117 OR 2nd

FS Pacific Northwest ‐ Region 6

OR DOUGLAS 17(1) Little River Road Rock Slope Stabilization MP 24.6 2018 OR Douglas County Umpqua National Forest

Stabilization of the rock slope through a combination of excavation, rock scaling, and rock bolting, as well as the rehabilitation of the existing pavement and reinstallation of new guardrail within the impacted roadway section. Reconstruction FLAP Title 23 In Design  $          2,166,361.00 

Western Federal Lands Highway Division, FHWA 43.250144 ‐122.907554 OR 4th

FS Pacific Northwest ‐ Region 6

OR FS CRG T 441(1) Tish Creek Trail Bridge Replacement 2018 OR Hood River CountyColumbia River Gorge National Scenic Area

The purpose of this project is to replace the Tish Creek Bridge along the Eagle Creek Trail No 441 in the Columbia River Gorge. The bridge was destroyed in 2015 when a large tree fell on it. Reconstruction FLTP‐USFS Title 23 In Design  $             110,000.00 

Columbia River Gorge National Scenic Area 45.568996 ‐122.085828 OR 3rd

FS Pacific Northwest ‐ Region 6

OR FS DES 2016(1) Cascade East Transit Winter Shuttle 2018 OR Deschutes County Deschutes National ForestFund limited‐duration transit operations and two new buses to complete the Cascades East Transit winter recreation shuttle and conduct transit feasibility study. Operations FLAP Title 23 In Design  $             360,200.00 

Central Oregon Intergovernmental Council 44.048201 ‐121.327134 OR 2nd

FS Pacific Northwest ‐ Region 6

OR FS FWI 28(1) Thomas Creek Road AOP 2018 OR Lake County Fremont‐Winema National ForestThe project consists of replacing a fish barrier culvert on Forest Service Raod 28, Thomas Creek Road at MP 42.6. AOP FLTP‐USFS Title 23 In Design  $             289,500.00 

Fremont‐Winema National Forests 42.222530 ‐120.414674 OR 2nd

FS Pacific Northwest ‐ Region 6

OR FS FWI 28(3) Boulder Crossing Culvert AOP 2018 OR Lake County Fremont‐Winema National ForestsReplace a fish barrier culvert structure at Boulder Crossing along the Thomas Creek Road (FSR 28). The existing culvert will be replaced with an aquatic organism passage structure at MP 42.6. AOP FLTP‐USFS Title 23 In Design  $             289,500.00 

Fremont‐Winema National Forests 42.215508 ‐120.414753 OR 2nd

FS Pacific Northwest ‐ Region 6

OR FS FWI 31(1) Sevenmile Bridge Replacement 2018 OR Klamath County Fremont‐Winema National Forest The project consists of reconstruction of the Sevenmile Bridge on FSR 31. Reconstruction FLTP‐USFS Title 23 In Design  $             442,000.00 Fremont‐Winema National Forests 42.704943 ‐122.072089 OR 2nd

FS Pacific Northwest ‐ Region 6

OR FWS BKS 2016(1) Baskett Slough Headquarters Access Design 2018 OR Polk County

Baskett Slough Natonal Wildlife Refuge

Complete Preliminary Engineering to relocate entrance to Baskett Slough NWR from Oregon Route 22, including the addition of a right and left auxillary turn lane.  Work includes NEPA Decision and completion of Design. Reconstruction FLAP Title 23 In Design  $             365,000.00 

Western Federal Lands Highway Division, FHWA 44.946482 ‐123.254775 OR 5th

FWS Pacific ‐ Region 1

OR GRANT 18(1) Keeney Fork Road Chipseal 2018 OR Grant County Malheur National Forest

To chip seal and fog seal two sections of County Road 18, covering 19.1 miles,including preperation work of cracksealing, polypatching, culvert, and catteguard cleaning or repairs, ditching, brushing, and other repairs as needed. Rehabilitation FLAP Title 23 Planned  $             470,119.00  Grant County 44.563756 ‐118.882972 OR 2nd

FS Pacific Northwest ‐ Region 6

OR GRANT 73(1) Silvies‐Hopper Lane Reconstruction and Overlay Project 2018 OR Grant County Malheur National Forest

Reconstruct and pave a 3" asphalt overlay of the existing roadway including excavating of subgrade material, grinding existing pavement surface, correcting any drainage issues and repaving the surface with a cold mix pavement. Reconstruction FLAP Title 23 Planned  $          2,046,456.00 

Western Federal Lands Highway Division, FHWA 44.011030 ‐118.924075 OR 2nd

FS Pacific Northwest ‐ Region 6

OR JEFF 3‐10(1) Perry South Campground Connection 2018 OR Jefferson County Deschutes National Forest

Reconstruct roadbed, install proper drainage, place 8 inches of crushed rock, and chip seal the roadway.  Also provide 2‐3 foot gravel shoulders, and new signing and striping.  Provide a hard surface to the ancillary parking area. Reconstruction FLAP Title 23 In Design  $          1,065,948.00  Jefferson County 44.584335 ‐121.456229 OR 2nd

FS Pacific Northwest ‐ Region 6

OR JOSEPH 2401(1) Galice Road Improvements 2018 OR Josephine CountyRogue River‐Siskiyou National Forest,  Grants Pass Resource Area

Improve safety along Galice Road by repairing and replace aging guardrail and end treatments with new guardrail, and adding guardrail where appropriate.  Rehabilitate and Improve existing turnouts, and add new turnout signage. Rehabilitation FLAP Title 23 In Design  $          1,829,760.00 

Western Federal Lands Highway Division, FHWA 42.518278 ‐123.439222 OR 4th

FS Pacific Northwest ‐ Region 6

OR LAKE 4‐12(1) East Bay Road Rehabilitation 2018 OR Lake County Fremont‐Winema National Forest

Recontruct the failing roadway surface by grinding the existing roadway, consisting of 12 inches of aggregate base and 4 inches of asphalt concrete pavement, replace drainage culverts as needed, and one major culvert will be replaced. Reconstruction FLAP Title 23 In Design  $          8,008,450.00 

Western Federal Lands Highway Division, FHWA 43.127889 ‐121.055083 OR 2nd

FS Pacific Northwest ‐ Region 6

Page 8 of 13 Approval signature is shown on page 1 only.

Transportation Improvement Program, FY 2017 to FY 2021Western Federal Lands Highway Division

Federal Highway AdministrationApril 2017

ProjectProgram Fiscal Year

State County FLMA Accessed Description Type of Work Program Funds From Title Phase  Program Amount  Delivered By Latitude LongitudeCongressional 

DistrictFLMA Region

OR LANE 24(2) Row River Trail Crossings Safety Improvements 2018 OR Lane County

Willamette Valley Project,  Upper Willamette Resource Area,  Umpqua National Forest Construct signing and lighting at the two remaining Row River Trail crossings at County Roads. Enhancement FLAP Title 23 In Design  $             410,937.00  Lane County 43.749904 ‐122.891734 OR 4th

USACE Northwestern Division

OR LANE 24(3) Row River Road Culvert Replacements 2018 OR Lane County

Willamette Valley Project,  Upper Willamette Resource Area,  Umpqua National Forest Replace four failing deep culverts serving Row River Road adjacent to Dorena Lake. Rehabilitation FLAP Title 23 In Design  $          1,423,229.00  Lane County 43.789300 ‐122.954400 OR 4th

USACE Northwestern Division

OR LANE 27(1) London Road Overlay and Culvert Replacements 2018 OR Lane County

Upper Willamette Resource Area,  Willamette Valley Project

Overlay London Road along the west side of Cottage Grove Lake, and replace three culverts at mile point 5.82 with one fish passable culvert; and replace one culvert at milepoint 4.60 with a fish passable culvert. Reconstruction FLAP Title 23 In Design  $          1,888,769.00  Lane County 43.716300 ‐123.059800 OR 4th

BLM Oregon‐Washington Region

OR LINN 938(1) Foster Dam Road Public Access Improvement Project 2018 OR Linn County Foster Dam & Green Peter Reservoir

Repair, preserve, and improve Foster Dam Road as well as the parking area that provides access to the Corps Foster Dam public area. Reconstruction FLAP Title 23 Planned  $          1,470,200.00  Linn County 44.409415 ‐122.665838 OR 4th

USACE Northwestern Division

OR MARION 960(1) North Fork Road Slide Stabilization 2018 OR Marion County Willamette National ForestRestoring the three distinct areas that are experiencing recurring landslide and stability problems within a 0.6 mile section of North Fork Road SE, or a portion thereof. Construction FLAP Title 23 Planned  $          7,322,809.00 

Western Federal Lands Highway Division, FHWA 44.800529 ‐122.477194 OR 5th

FS Pacific Northwest ‐ Region 6

OR MULTNOM 558(1) Larch Mountain Road Improvements 2018 OR Multnomah CountyColumbia River Gorge National Scenic Area

Repair and apply overlay to Larch Mountain Road between MP 7 and MP 9.  Additional work includes adding gravel to shoulders, repair and replacement of existing guardrail and signs, minor drainage improvement, and revegetation work. Rehabilitation FLAP Title 23 In Design  $             864,005.00  Multnomah County 45.519827 ‐122.150370 OR 3rd

FS Pacific Northwest ‐ Region 6

OR PFH 163(21) Multnomah Falls Viaducts Repairs 2018 OR Multnomah CountyColumbia River Gorge National Scenic Area

Restore two historic viaducts on the Historic Columbia River Highway (US 30) and restore serviceability of parking lots by Mulnomah Falls Lodge3. Reconstruction FLAP Title 23 In Design  $          5,217,750.00 

Western Federal Lands Highway Division, FHWA 45.577722 ‐122.117223 OR 3rd

FS Pacific Northwest ‐ Region 6

OR PFH 51(6) Fish Lake Historic Site Interpretive and Accessibility Enhancements 2018 OR Linn County Willamette National Forest

This project will link the gateway interpretive facility to the Fish Lake Historic Site by developing: an ADA accessible pathway; onsite information & interpretation guide; & a focal point for self‐guided group tours. Enhancement FH Title 23 In Design  $             306,000.00 

Willamette National Forest 44.403161 ‐122.005846 OR 4th

FS Pacific Northwest ‐ Region 6

OR PFH 60(3) Powers ‐ Agness, State Section including Burma Slide 2018 OR Coos County Rogue River ‐ Siskiyou National Forest

Lower maintenance costs and improve safety by decreasing the probability of landslide failure (including Burma Slide) on OR 542. Reconstruction FLAP Title 23 In Design  $       21,309,661.00 

Oregon Department of Transportation 42.986315 ‐124.145943 OR 4th

FS Pacific Northwest ‐ Region 6

OR WALLOWA 4602(1) Wallowa Mountain Loop Road Reconstruction 2018 OR Wallowa County Wallowa‐Whitman National Forest Reconstruction and re‐paving of roadway and replacement of culverts with bridge over Little Sheep Creek. Reconstruction FLAP Title 23 In Design  $          8,000,000.00 

Western Federal Lands Highway Division, FHWA 45.340664 ‐117.074712 OR 2nd

FS Pacific Northwest ‐ Region 6

OR DESCHUTES 305(1) George Millican Road Chip Seal 2019 OR Deschutes County BLM ‐ Deschutes Resource Area

Chip seal the existing road surface along with striping of the new surface from the intersection with Reservoir Road located in Crook County to the intersection with Highway 20 located in Deschutes County. Install three cattle guards, and new signing. Rehabilitation FLAP Title 23 In Design  $             747,028.00  Deschutes County 43.871452 ‐120.847871 OR 2nd

BLM Oregon‐Washington Region

OR DESCHUTES 46(2) Cascade Lakes Highway Chip Seal, Phase 2 2019 OR Deschutes County Deschutes National Forest

Apply a chip seal  to the existing road surface from Elk Lake south to the Klamath County Line.  Also includes new striping and replacement of damaged signs. Rehabilitation FLAP Title 23 In Design  $          1,787,832.00  Deschutes County 43.985234 ‐121.804801 OR 2nd

FS Pacific Northwest ‐ Region 6

OR DOT 140(1) OR 140 ‐ Klamath County Boat Marina to Lakeshore Drive 2019 OR Klamath County Fremont‐Winema National Forest

Perform preliminary engineering, design and acquire right of way for corridor from MP ~57 to MP ~63.  Construct Phase 1 from between MP ~57 and MP ~59. Reconstruction FLAP Title 23 In Design  $       13,782,166.18 

Western Federal Lands Highway Division, FHWA 42.316908 ‐121.942402 OR 2nd

FS Pacific Northwest ‐ Region 6

OR DOT 140(2) OR 140 ‐ Klamath County Boat Marina to Lakeshore Drive, Phase 2 2019 OR Klamath County Fremont‐Winema National Forest

Realign roadway, construct embankment, widen roadway to 12' travel lanes with 6' shoulders. Construct wetland mitigation area if required, install guardrail, install high performance pavement markings, shoulder and centerline rumble strips Reconstruction FLAP Title 23 In Design  $          6,435,575.00 

Western Federal Lands Highway Division, FHWA 42.293295 ‐121.929834 OR 2nd

FS Pacific Northwest ‐ Region 6

OR DOT 20(1) US 20 Lower Sunken Grade Slide Repair MP 55.4 2019 OR Linn County Willamette National Forest Provide a more permanent fix to the Lower Sunken Grade slide area, and lower overall maintenance costs. Reconstruction FLAP Title 23 In Design  $          4,553,128.08 Western Federal Lands Highway Division, FHWA 44.401790 ‐122.230745 OR 4th

FS Pacific Northwest ‐ Region 6

OR DOT 204(1) Westin‐Elgin Highway Resurfacing 2019 OR Union County Umatilla National Forest Resurface the highway with a grind/inlay. Also overlay the Sno‐Parks in the project limits. Rehabilitation FLAP Title 23 In Design  $          5,241,922.00 Western Federal Lands Highway Division, FHWA 45.774815 ‐118.078645 OR 2nd

FS Pacific Northwest ‐ Region 6

OR DOT 35(1) Highway 35 Safety Improvements at Meadows Creek & Mt Hood Meadows Ski Area 2019 OR Hood River County Mt Hood National Forest

Replace the undersized Meadows Creek Culvert and implement safety improvements through the construction of a left turn lane for NB traffic, and a right turn lane for SB traffic to access the lower parking lots at Mt Hood Meadows Ski Area from Hwy 35. Reconstruction FLAP Title 23 Planned  $          3,446,936.00 

Western Federal Lands Highway Division, FHWA 45.319762 ‐121.627891 OR 2nd

FS Pacific Northwest ‐ Region 6

OR DOUGLAS 200(1) North Bank Road Reconstruction 2019 OR Douglas County Swiftwater Resource Area

Widening of approximately 0.30 miles of roadway, The replacement of two culverts, Full Depth Reclamation, excavation and embankment, aggregate subbase and base, paving, installation of guardrail, and other miscellaneous items ofwork. Reconstruction FLAP Title 23 In Design  $          2,141,524.00 

Western Federal Lands Highway Division, FHWA 43.314489 ‐123.303378 OR 4th

BLM Oregon‐Washington Region

OR GILLIAM 532(1) Lower Rock Creek Lane 2019 OR Gilliam County Central Oregon Resource AreaImprove public access to the John Day River. Chip seal 5.6 miles, with recycled asphalt grindings, stripe, new signs and posts. Place 6" of 3/4" road suface on 0.9 mile of road. Rehabilitation FLAP Title 23 In Design  $             293,188.00  Gilliam County 45.571929 ‐120.298309 OR 2nd

BLM Oregon‐Washington Region

OR HARNEY 127(1) Hines Logging Road Overlay 2019 OR Harney County

Three Rivers Resource Area,  Malheur National Forest,  Ochoco National Forest Broom the existing surface and overlaying with 2" of  asphalt. Rehabilitation FLAP Title 23 In Design  $          1,419,206.00 

Western Federal Lands Highway Division, FHWA 43.546980 ‐119.083500 OR 2nd

BLM Oregon‐Washington Region

OR HARNEY 303(1) Juntura Cutoff Road 2019 OR Harney County Bureau of Land ManagementReconstruct two lane road along or near the existing horizontal and vertical alignment including culvert pipes, ditches and associated structures as needed. Reconstruction FLAP Title 23 In Design  $          6,654,938.00 

Oregon Department of Transportation 43.773310 ‐118.222346 OR 2nd

BLM Oregon‐Washington Region

OR KLAMATH 600(1) Williamson River Road Chip Seal 2019 OR Klamath County Fremont‐Winema National Forest Chip seal Williamson River Road (25.09 miles) Rehabilitation FLAP Title 23 In Design  $             638,217.00  Klamath County 42.602377 ‐121.781700 OR 2nd

FS Pacific Northwest ‐ Region 6

OR LANE 5070(1) North Fork Siuslaw Landslide Repair 2019 OR Lane County Siuslaw National ForestComplete PE for the repair and stabilization of an unstable, 300‐foot long section uphill of North Fork Siuslaw Road. Reconstruction FLAP Title 23 In Design  $             334,336.00 

Western Federal Lands Highway Division, FHWA 44.072600 ‐123.909300 OR 4th

FS Pacific Northwest ‐ Region 6

OR LINCOLN 807(1) Five Rivers Road Overlay 2019 OR Lincoln County Siuslaw National ForestAddress pavement failures along Five River Roads, and construct a new overlay with crack sealing and subexcavation where necessary, along with guardrail and bridge rail improvements. Reconstruction FLAP Title 23 In Design  $          2,881,568.00 

Western Federal Lands Highway Division, FHWA 44.359417 ‐123.829953 OR 5th

FS Pacific Northwest ‐ Region 6

OR LINN 35(1) North River Drive Improvements 2019 OR Linn County

Willamette Valley Project,  Cascade Resource Area,  Willemette National Forest

Reconstruct and realign North River Drive; widen gravel shoulders, asphalt overlay, construct parking lot at Lewis Creek Park, improve entrances to Gedney Creek boat ramp, and stabilize existing slide area. Reconstruction FLAP Title 23 In Design  $          3,135,312.00  Linn County 44.418800 ‐122.670400 OR 4th

USACE Northwestern Division

OR MARION 2016(1) North Fork and Gates Hill Road Chip Seal 2019 OR Marion CountyWillamette National Forest,  Cascades Resource Area Construct a double chip seal on North Fork and Gates Hill Roads. Rehabilitation FLAP Title 23 In Design  $          1,456,275.00  Marion County 44.790664 ‐122.601887 OR 5th

FS Pacific Northwest ‐ Region 6

Page 9 of 13 Approval signature is shown on page 1 only.

Transportation Improvement Program, FY 2017 to FY 2021Western Federal Lands Highway Division

Federal Highway AdministrationApril 2017

ProjectProgram Fiscal Year

State County FLMA Accessed Description Type of Work Program Funds From Title Phase  Program Amount  Delivered By Latitude LongitudeCongressional 

DistrictFLMA Region

OR MORROW 847(1) Road 847 Surface Improvements 2019 OR Morrow County Umatilla National ForestPave 0.5 miles of East of Morphine Road between highway 207 and OHV Park.  Repair and regravel the 10.35 miles of East of Morphine Road between OHV Park and Tupper Road. Rehabilitation FLAP Title 23 In Design  $             710,458.00  Morrow County 45.026677 ‐119.678045 OR 2nd

FS Pacific Northwest ‐ Region 6

OR PLD 2013(1) Celilo Park Safe Access, Rest Area, Recreation Improvements 2019 OR Wasco County

Celilo Recreational Park and Treaty Fishing Access Site

Lower the probability and severity of crashes on the access road into Celilo Park and railroad crossing and enhance visitor experience within the rest area. Enhancement FLAP Title 23 In Design  $          3,780,000.00 

Oregon Department of Transportation 45.650843 ‐120.960331 OR 2nd

USACE Northwestern Division

OR WASCO 104(2) Ramsey Creek Overlay 2019 OR Wasco County Mt Hood National ForestOR‐FY16‐21 ‐ Perform road prep work including sweeping, cleaning and crack sealing. Then place 2" asphalt overlay, add shoulder material and apply new pavement markings. Rehabilitation FLAP Title 23 In Design  $             712,320.00 

Western Federal Lands Highway Division, FHWA 45.432222 ‐121.216417 OR 2nd

FS Pacific Northwest ‐ Region 6

OR BPRD T 372(1) Bend Haul Road Trail Improvements 2020 OR Deschutes County Deschutes National ForestReconstruct the original 2 mile  stretch of the Haul Road Trail.  Improvements include reconstruction of existing pavement, base, safety improvements at intersections, paving of unpaved segments, and ADA Compliance. Reconstruction FLAP Title 23 In Design  $          2,482,460.00 

Western Federal Lands Highway Division, FHWA 44.048990 ‐121.321370 OR 2nd

FS Pacific Northwest ‐ Region 6

OR CLACK 2639(1) East Salmon River Road Surface Preservation 2020 OR Clackamas County Mt Hood National Forest

Apply a 2 inch asphalt overlay on 2.03 miles of roadway extending 2.03 miles from US26 to the edge of the Mt. Hood National Forest and the Salmon Huckleberry Wilderness. Including with guardrail adjustments and striping. Rehabilitation FLAP Title 23 In Design  $             493,099.00  Clackamas County 45.342867 ‐121.946017 OR 3rd

FS Pacific Northwest ‐ Region 6

OR CLACK 37005(2) Lolo Pass Road Stabilization and Surface Preservation 2020 OR Clackamas County Mt Hood National Forest

Stabilize and improve Lolo Pass Road by extending an already existing revetment and also by improving and preserving the road surface with the addition of 2 inches of pavement. Reconstruction FLAP Title 23 In Design  $          4,052,403.00  Clackamas County 45.343898 ‐121.942753 OR 3rd

FS Pacific Northwest ‐ Region 6

OR DOT 20(3) US 20 Upper Sunken Grade and Double Gate Slide Repair 2020 OR Linn County Willamette National Forest Repair and stabilize Upper Sunken Grade Slide (MP 56.1) and Double Gate Slide (MP 53.7). Reconstruction FLAP Title 23 In Design  $          4,969,100.00 

Western Federal Lands Highway Division, FHWA 44.399100 ‐122.261583 OR 4th

FS Pacific Northwest ‐ Region 6

OR DOT CRGNSA 100(4) Historic Columbia River Highway State Trail, Mitchell Point Crossing 2020 OR Hood River County

Columbia River Gorge National Scenic Area

Develop plans for the Historic Columbia River Highway State Trail from Viento State Park to the City of Hood River, and construct the trail segment between Perham Creek Bridge and I‐84, including Mitchell Point crossing. Construction FLAP Title 23 Planned  $       32,904,838.00 

Western Federal Lands Highway Division, FHWA 45.696591 ‐121.667578 OR 2nd

FS Pacific Northwest ‐ Region 6

OR POLK 2016(1) Mitchell Street and Black Rock Road Reconstruction 2020 OR Polk County Mary''s Peak Resource Area

Reconstructing and paving Mitchell Street and Black Rock Road, including the replacement of Little Luckiamute Bridge and Dutch Creek Crossing. Reconstruction FLAP Title 23 In Design  $          4,832,178.00  Polk County 44.869340 ‐123.441320 OR 5th

BLM Oregon‐Washington Region

OR TILLAMOOK B780(1) Cape Meares Road Relocation 2020 OR Tillamook County Cape Meares National Wildlife Refuge Relocate a county road accessing Federal Lands that is currently closed due to a landslide. Reconstruction FLAP Title 23 In Design  $       12,661,027.00 Western Federal Lands Highway Division, FHWA 45.484833 ‐123.939667 OR 5th

FWS Pacific ‐ Region 1

OR DOT 97(1) US 97 ‐ South Century Drive to USFS Boundary 2021 OR Deschutes County Deschutes National Forest Construction of a functional 2‐stage crossing at the Vandevert/Lambertiana (FS 9720) and US 97 Intersection. Reconstruction FLAP Title 23 In Design  $          3,262,429.00 Oregon Department of Transportation 43.870507 ‐121.402369 OR 2nd

FS Pacific Northwest ‐ Region 6

OR FS MTH 50(1) Timberline Lodge Parking Area Improvements 2021 OR Clackamas County Mt Hood National Forest

Enhance the approach to the Timberline Complex by directing visitors towards the Wy’East Day Lodge to help them find their way to the entrance of the Timberline Complex, and improve pedestrian and vehicle circulation. Reconstruction FLAP Title 23 In Design  $             282,500.00 

Western Federal Lands Highway Division, FHWA 45.330449 ‐121.710083 OR 3rd

FS Pacific Northwest ‐ Region 6

OR GRANT 24(1) Granite Hill Road Reconstruction 2021 OR Grant CountyWallowa‐Whitman National Forest,  Umatilla National Forest Rehabilitate 9.32 miles of roadway pavement surface; including a 3" overlay. Reconstruction FLAP Title 23 In Design  $          7,907,183.00 

Western Federal Lands Highway Division, FHWA 44.754367 ‐118.286333 OR 2nd

FS Pacific Northwest ‐ Region 6

OR SHERMAN 2016(1) Starvation Lane Improvements 2021 OR Sherman County Central Oregon Resource Area

Restore and resurface Starvation Lane, including drainage improvements.  Resurface the first 5 miles to include 2 uniform lanes, keeping within existing Right of Way.  Resurface the remaining 1.5 miles, maintaining a single‐lane with turnouts. Reconstruction FLAP Title 23 In Design  $          1,714,769.00 

Western Federal Lands Highway Division, FHWA 45.511164 ‐120.462316 OR 2nd

BLM Oregon‐Washington Region

OR UMATIL 582(1) Mill Creek Road 2021 OR Umatilla County Umatilla National Forest Pave Mill Creek Road, maintaining it's existing width, and provide turnouts. Rehabilitation FLAP Title 23 In Design  $          3,198,484.00 Western Federal Lands Highway Division, FHWA 46.000168 ‐118.114123 OR 2nd

FS Pacific Northwest ‐ Region 6

OR UNION 101(1) North Powder River Lane Reconstruction 2021 OR Union CountyWallowa‐Whitman National Forest,  Umatilla National Forest

Reconstruct N Powder River Lane from I‐84 to Ellis Road, and reconstruct Ellis Road from the intersection of N Powder River Lane to Anthony Lakes.  Includes the improvements to the intersection of N Powder River Lane and Ellis Road. Reconstruction FLAP Title 23 In Design  $          3,421,790.00 

Western Federal Lands Highway Division, FHWA 45.025100 ‐117.927700 OR 2nd

FS Pacific Northwest ‐ Region 6

Washington

WA BOR GCAO 1(1) Grand Coulee Area Paving 2017 WA Grant County Grand Coulee Dam Rehabilitate the paved areas within the Grand Coulee Project. Rehabilitation OTHER Title 23 In Design  $          6,500,000.00  Grant County 47.948702 ‐118.991902 WA 4thBOR Pacific Northwest Region

WA Chelan 40040(1) Eagle Creek Road, Phase II 2017 WA Chelan County Wenatchee National ForestPavement full‐depth reclamation (FDR), drainage and clear zone enhancement to the final 2.5 mile section of Eagle Creek Road. Construction FLAP Title 23 In Design  $          1,152,808.00  Chelan County 47.627044 ‐120.645029 WA 12th

FS Pacific Northwest ‐ Region 6

WA CHELAN 933(1) Chiwawa Loop Road Phase III 2017 WA Chelan County Okanogan‐Wenatchee NFIncrease safety, lower maintenance costs, restore pavement, and correct fish passage barriers on Chiwawa Loop Road (CR #93300). Reconstruction FLAP Title 23 In Design  $          3,262,000.00  Chelan County 47.796103 ‐120.628721 WA 4th

FS Pacific Northwest ‐ Region 6

WA Clallam 92210(1) East Beach Road 2017 WA Clallam County Olympic National Park Mill, reshape, replace culverts and pave to existing width. Reconstruction FLAP Title 23 In Design  $          2,072,000.00 Western Federal Lands Highway Division, FHWA 48.090466 ‐123.798873 WA 6th

NPS Pacific‐West Region

WA DOT 101(1) US 101 Lake Crescent Bus Stop and Pullout 2017 WA Clallam County Olympic National Park Decrease the probabiliy of vehicle/pedestrian crash along US 101 at MP 227.1. Construction FLAP Title 23 In Design  $             125,000.00 Western Federal Lands Highway Division, FHWA 48.051515 ‐123.797970 WA 6th

NPS Pacific‐West Region

WA DOT 20(5) SR 20 Corridor Motorcycle Safety Study 2017 WA Okanogan County Okanoga Wenatchee National Forest Complete a safety assessment study. Planning FLAP Title 23 In Design  $               40,000.00 

Washington State Department of Transportation 48.350619 ‐119.607124 WA 4th

FS Pacific Northwest ‐ Region 6

WA FRANKLIN 2013(1) Juniper Dunes Access Road 2017 WA Franklin CountyJuniper Dunes Wilderness Area and OHV open area, BLM Provide legal access to the Juniper Dunes OHV area and wilderness. Construction FLAP Title 23 In Design  $          2,250,000.00  Franklin County 46.284535 ‐118.929885 WA 4th

BLM Oregon‐Washington Region

WA FS COL T 14(1) Swan Lake Trail No 14 Reconstruction 2017 WA Ferry County Colville National ForestThe purpose of this project is to repair the Swan Lake Trail No 14 through the construction of about 160 feet of new boardwalk, reconstructing the tread on 1.78 miles of trail, and constructing roack retaining walls. Reconstruction FLTP‐USFS Title 23 In Design  $               52,400.00  Colville National Forest 48.515654 ‐118.835644 WA 5th

FS Pacific Northwest ‐ Region 6

WA FWS LWS 10(1) Little White Salmon Entrance Road & Parking 2017 WA Skamania County

Little White Salmon National Fish Hatchery

The FWS will repave the entrance road, install new signs, provide a centerline, and create 11 new parking spaces. Ditches and culverts also will be repaired along the road corridor. Reconstruction FLTP‐FWS Title 23 In Design  $             971,000.00 

Little White Salmon National Fish Hatchery 45.719134 ‐121.644704 WA 3rd

FWS Pacific ‐ Region 1

Page 10 of 13 Approval signature is shown on page 1 only.

Transportation Improvement Program, FY 2017 to FY 2021Western Federal Lands Highway Division

Federal Highway AdministrationApril 2017

ProjectProgram Fiscal Year

State County FLMA Accessed Description Type of Work Program Funds From Title Phase  Program Amount  Delivered By Latitude LongitudeCongressional 

DistrictFLMA Region

WA FWS QUIL 2014(1) Quilcene NFH Safety Improvements 2017 WA Jefferson County Quilcene National Fish Hatchery

Conduct a study to assess the safety situation at the entrance of the Quilcene National Fish Hatchery and identify possible improvements to increase the safety of the public entering and exiting the facility along Highway 101. Planning FLTP‐FWS Title 23 In Design  $             170,000.00 

Western Federal Lands Highway Division, FHWA 47.811241 ‐122.910179 WA 6th

FWS Pacific ‐ Region 1

WA NPS LARO 208(1) Hawk Creek Road Stabilization 2017 WA Lincoln CountyLake Roosevelt National Recreation Area Realign and stabilize road Reconstruction FLTP‐NPS Title 23 In Design  $             500,000.00 

Western Federal Lands Highway Division, FHWA 47.814133 ‐118.323135 WA 5th

NPS Pacific‐West Region

WA NPS MORA 2015(1) ITS Phase II 2017 WA Pierce County Mount Rainier National Park

Under this project, the NPS will continue implementation of multi‐phased Intelligent Transportation System components at Mount Rainier NP. Components for the network at Nisqually entrance, Longmire and Paradise will be installed. Operations FLTP‐NPS Title 23 In Design  $             200,000.00 

Mount Rainier National Park 46.741524 ‐121.919381 WA 8th

NPS Pacific‐West Region

WA NPS OLYM 107(1) Upper Hoh River Emergency Repair 2017 WA Clallam County Olympic National Park Provide bank stabilization for 250’ of road along the Hoh River. Reconstruction FLTP‐NPS Title 23 In Design  $             410,000.00 Western Federal Lands Highway Division, FHWA 47.810563 ‐124.080590 WA 7th

NPS Pacific‐West Region

WA NPS OLYM 11(9) Rehab Route 011, Lake Crescent Road (US Hwy 101) 2017 WA Clallam County Olympic National Park

Pulverization of 12.29 miles of two‐lane asphaltic concrete, repair of the road base where necessary, and installation of a minimum of six inches of new asphaltic concrete, 44,269 linear feet of guardrail will be replaced. Reconstruction FLTP‐NPS Title 23 In Design  $       21,693,389.00 

Western Federal Lands Highway Division, FHWA 48.079685 ‐123.743820 WA 6th

NPS Pacific‐West Region

WA NPS OLYM 207(1) Rehabilitate Staircase Road 2017 WA Clallam County Olympic National Park Design the rehabilitation of this road, no construction identified yet. Rehabilitation FLTP‐NPS Title 23 In Design  $               80,000.00 Western Federal Lands Highway Division, FHWA 47.514697 ‐123.327326 WA 6th

NPS Pacific‐West Region

WA NPS PP PWR 17(1) Pavement Preservation NPS PWR 2017 WA Various Counties NPS Washington and Oregon Parks Preliminary Engineering for Pavement Preservation in Washington and Oregon Rehabilitation FLTP‐NPS Title 23 Planned  $               60,000.00 Western Federal Lands Highway Division, FHWA 46.772659 ‐121.766269 OR & WA

NPS Pacific‐West Region

WA PFH 16(2) Lewis River Road FDR 90 2017 WA Skamania County Gifford Pinchot National ForestThe Lewis River Road Maintenance Project consists of the maintenance of 29 prioritized sites along Forest Road 90 between the Skamania County Line near the Canal Bridge to the junction of the Curly Creek Road. Maintenance FH Title 23 In Design  $          1,146,747.00 

Gifford Pinchot National Forest 46.060418 ‐122.230165 WA 3rd

FS Pacific Northwest ‐ Region 6

WA PFH 29‐1(5) Middle Fork Snoqualmie River Road Slope Stabilization 2017 WA King County Mt. Baker‐Snoqualmie National Forest Slope stabilization, rock blasting, excavation, aggregate base, paving, striping and guardrail. Construction FLAP Title 23 In Design  $          1,200,000.00 

Western Federal Lands Highway Division, FHWA 47.467500 ‐121.675088 WA 8th

FS Pacific Northwest ‐ Region 6

WA PORT ANGELES (1) Race Street 2017 WA Clallam County Olympic National Park

The purpose of the project is to increase the safety for non‐motorized travelers visiting Olympic National Park, the Olympic National Park Visitor Center, Park Headquarters and create an attractive protal for entry into the Parks most popular entrance. Planning FLAP Title 23 In Design  $             472,300.00  City of Port Angeles 48.107889 ‐123.423668 WA 6th

NPS Pacific‐West Region

WA RRP RIDG 2012(1) RIDGEFIELD NWR PEDESTRIAN ACCESS 2017 WA Clark County Ridgefield National Wildlife Refuge Rte 100 Safe access to Carty Unit from NW Main St. Design FLTP‐FWS Title 23 Planned  $             325,000.00 Western Federal Lands Highway Division, FHWA 45.827424 ‐122.746553 WA 3rd

FWS Pacific ‐ Region 1

WA RRP WINT 10(1) Winthrop NFH Rehab Entrance Road Route 010 2017 WA Okanogan County Winthrop National Fish Hatchery Rehab Entrance Road Rte 010. Reconstruction FLTP‐FWS Title 23 In Design  $             450,000.00 

Western Federal Lands Highway Division, FHWA 48.471858 ‐120.187542 WA 4th

FWS Pacific ‐ Region 1

WA Snohomish 20(1) Mountain Loop Highway Feasibility Study 2017 WA Snohomish Mt Baker‐Snoqualmie National Forest

The proposed planning project is to determine the feasibility of improving the MLH to improve access to recreational opportunities while also improving operational safety and reducing maintenance. This includes portions of the MLH that are maintained by. Planning FLAP Title 23 In Design  $             578,035.00 

Western Federal Lands Highway Division, FHWA 48.074660 ‐121.704927 WA 1st

FS Pacific Northwest ‐ Region 6

WA DOT 2(1) Money Creek to Tye Creek 2018 WA King County Mt. Baker‐Snoqualmie National Forest Pave and stripe US 2 from MP 46.01 to MP 54.00. Construction FLAP Title 23 In Design  $          1,890,875.00 

Washington State Department of Transportation 47.730556 ‐121.407222 WA 1st

FS Pacific Northwest ‐ Region 6

WA FS COL 53(1) Scatter Creek Road FSR 53 Rehabilitation 2018 WA Stevens County Colville National ForestThe purpose of this project is to rehabilitate 7.7 miles of the existing road surface of the Scatter Creek Road (FSR 53). Rehabilitation FLTP‐USFS Title 23 In Design  $          1,430,000.00  Colville National Forest 48.508245 ‐118.823263 WA 5th

FS Pacific Northwest ‐ Region 6

WA FS MBS T 723(1) Big Four Ice Caves Trail Bridge Replacement 2018 WA Snohomish County Mt. Baker‐Snoqualmie National Forest

The purpose of this project is to replace 0.15 miles of boardwalk and a 35‐foot‐span wood trail bridge on the Big Four Ice Caves Trail. Construction FLTP‐USFS Title 23 In Design  $             472,000.00 

Mt Baker‐Snoqualmie National Forest 48.065900 ‐121.510700 WA 1st

FS Pacific Northwest ‐ Region 6

WA FS OKW 7600(1) Road 7600 Rock Fall Mitigation 2018 WA Chelan CountyOkangogan Wenatchee National Forest The purpose of this project is to address the unstable slopes causing rock fall on about 1.5 miles of FSR 7600. Rehabilitation FLTP‐USFS Title 23 In Design  $          2,345,000.00 

Okanogan‐Wenatchee National Forests 47.543350 ‐120.731256 WA 8th

FS Pacific Northwest ‐ Region 6

WA JEFF 91420(1) Upper Hoh River Road Phase 2 2018 WA Jefferson County Olympic National Park Reduce risk of catastrophic road failure on the Upper Hoh River Road (County Road # 91420). Reconstruction FLAP Title 23 In Design  $       13,966,000.00 Western Federal Lands Highway Division, FHWA 47.823148 ‐124.190721 WA 6th

NPS Pacific‐West Region

WA KITTITAS (1) Teanaway Road Hydraulics Improvements 2018 WA Kittitas County Okanogan Wenatchee National ForestApply structural and hydraulic improvements are proposed for the section north of Red Bridge Road and South of North Fork Teanaway Road. Enhancement FLAP Title 23 In Design  $          2,440,221.00 

Western Federal Lands Highway Division, FHWA 47.203434 ‐120.772986 WA 8th

FS Pacific Northwest ‐ Region 6

WA NPS OLYM 16(1) Mora Road Repairs 2018 WA Clallam County Olympic National Park Repair damage to Mora Road that occurred during a storm event. Rehabilitation FLTP‐NPS Title 23 In Design  $               60,000.00 Western Federal Lands Highway Division, FHWA 47.922281 ‐124.628270 WA 6th

NPS Pacific‐West Region

WA NPS OLYM 16(2) Crystal Creek Bridge Repairs 2018 WA Clallam County Olympic National Park Assess damage to bridge over Crystal Creek on the Boulder Creek Trail. No construction identified yet. Rehabilitation FLTP‐NPS Title 23 In Design  $               10,000.00 Western Federal Lands Highway Division, FHWA 47.981811 ‐123.688029 WA 6th

NPS Pacific‐West Region

WA NPS OLYM 2016(1) Spruce Railroad Trail Segment A 2018 WA Clallam County Olympic National Park Rehabilitate Spruce railroad trail. Rehabilitation OTHER Title 23 In Design  $          1,950,000.00 Western Federal Lands Highway Division, FHWA 48.070147 ‐123.905564 WA 6th

NPS Pacific‐West Region

WA NPS OLYM 2017(1) Spruce Railroad Trail Segment B 2018 WA Clallam County Olympic National ParkThis segment  will include the short tunnel (180’) retrofit, rockfall mitigation work, one or two bridges, rebuilding 4 crib walls, and rebuilding of an historic dry stack wall. Construction OTHER Title 23 In Design  $          2,580,000.00 

Western Federal Lands Highway Division, FHWA 48.070147 ‐123.905564 WA 6th

NPS Pacific‐West Region

WA Pacific 2015(1) Public Access Enhancement to Willapa National Wildlife Refuge 2018 WA Pacific County Willapa National Wildlife Refuge

Replace a failing culvert, repair deteriorating county road, construct designated parking area, safe turnaround point, and provide safe pedestrian access to South Bay Trail, and to  provide kiosk/signs to provide information. Construction FLAP Title 23 In Design  $          1,107,000.00 

Western Federal Lands Highway Division, FHWA 46.413763 ‐123.933055 WA 3rd

FWS Pacific ‐ Region 1

WA PRA OLYM 12(2) Hurricane Ridge Road, Phase II 2018 WA Clallam County Olympic National ParkRehabilitate about 5 miles of the Hurrican Ridge Road from the intersection of Mt. Angeles Road to the Heart of the Hills Entrance Station. Reconstruction FLTP‐NPS Title 23 In Design  $          8,750,000.00 

Western Federal Lands Highway Division, FHWA 48.036033 ‐123.429807 WA 6th

NPS Pacific‐West Region

WA RIDGE MAIN(1) Main Avenue Access Improvements 2018 WA Clark County Ridgefield National Wildlife Refuge Construct new multi‐modal bicycle and pedestrian facility from existing sidewalk near the Ridgefield city limits. Reconstruction FLAP Title 23 In Design  $          3,654,127.30 Western Federal Lands Highway Division, FHWA 45.831286 ‐122.746683 WA 3rd

FWS Pacific ‐ Region 1

Page 11 of 13 Approval signature is shown on page 1 only.

Transportation Improvement Program, FY 2017 to FY 2021Western Federal Lands Highway Division

Federal Highway AdministrationApril 2017

ProjectProgram Fiscal Year

State County FLMA Accessed Description Type of Work Program Funds From Title Phase  Program Amount  Delivered By Latitude LongitudeCongressional 

DistrictFLMA Region

WA Clallam 2016(1) Dungeness NWR and Recreation Area 2019 WA Clallam Dungeness National Wildlife Refuge Expand and resurface existing parking lots, create speed table, and renovate restroom. Enhancement FLAP Title 23 In Design  $             724,808.00 Western Federal Lands Highway Division, FHWA 48.141403 ‐123.192192 WA 6th

FWS Pacific ‐ Region 1

WA Columbia 2330(1) Tucannon Road Preservation Project 2019 WA Columbia Umatilla National Forest Chip Seal Tucannon Rd from MP 15.38 to MP 20.73. Rehabilitation FLAP Title 23 In Design  $             520,741.00  Columbia County 46.448199 ‐117.784368 WA 5th

FS Pacific Northwest ‐ Region 6

WA DOT 2(3) US 2, MP 60.45 Avalanche Redirection Berm 2019 WA KingMt Baker‐Snoqualmie National Forest, Okanogan‐Wenatchee National Forest

This project is to build an avalanche deflection berm in the tunnel Creek drainage area adjacent to US 2 just west of Stevens Pass. Reconstruction FLAP Title 23 In Design  $             510,000.00 

Washington State Department of Transportation 47.746538 ‐121.095406 WA 1st

FS Pacific Northwest ‐ Region 6

WA DOT 2(5) US 2 Vicinity Variable Message Sign 2019 WA KingMt Baker‐Snoqualmie National Forest, Okanogan‐Wenatchee National Forest

This project will design and install a variable message Sign (VMS) on US 2 in the vicinity of MP 45.0 near the community of Grotto (just North of the town of Baring). Informational Signs on roadways have proven to be among the State's most popular travel. Enhancement FLAP Title 23 In Design  $             201,156.00 

Washington State Department of Transportation 47.735724 ‐121.425131 WA 1st

FS Pacific Northwest ‐ Region 6

WA DOT 20(6) SR 20 / Banta Road ‐ Intersection Improvement 2019 WA IslandNaval Air Station (NAS) Whidbey Island

This project proposes to improve the intersection of SR 20 and Banta Road. Improvement solutions such as a roundabout or signal will improve traffic operations and reduce the risk of collisions. For the purpose of this application, a roundabout will be u. Reconstruction FLAP Title 23 In Design  $          2,467,945.00 

Washington State Department of Transportation 48.369373 ‐122.653155 WA 2nd

Department of Defense

WA DOT 20(7) SR 20 Preservation Project 2019 WA Skagit

North Cascades National Park, Mt. Baker‐Snoqualmie National Forest, Okanogan‐Wenatchee National Forest, 

Bituminous Surface Treatment (BST) of SR 20 from MP 102.09 to MP 148.12. Parking area paving with Hot Mix Asphalt (HMA) at the Ross Dam Trailhead for the National Parks Service. Rehabilitation FLAP Title 23 In Design  $          7,013,370.00 

Washington State Department of Transportation 48.504228 ‐121.501306 WA 1st

NPS Pacific‐West Region

WA DOT 542(4) SR 542 Preservation Project 2019 WA Whatcom Mt Baker‐Snoqualmie National ForestBituminous surface treatment and striping of SR 542 from MP 46.58 to MP 54.73, and the Mount Baker Couplet from MP 54.60 to MP 54.97 Rehabilitation FLAP Title 23 In Design  $          1,479,998.00 

Washington State Department of Transportation 48.905679 ‐121.694318 WA 1st

FS Pacific Northwest ‐ Region 6

WA Ferry 6510(1) Day Creek Road Re‐alignment 2019 WA Ferry Colville National ForestRealign the first 0.7 mile of Day Creek Rd., and relocate the approach onto Boulder Highway to the vicinity of MP 5.25. This action will improve safety for the traveling public on both Boulder Hwy., and Day Creek Rd. Reconstruction FLAP Title 23 In Design  $             212,886.00  Ferry County 48.889390 ‐118.508387 WA 5th

FS Pacific Northwest ‐ Region 6

WA Jefferson 4309(1) Oil City Road Engineering Assessment 2019 WA Jefferson Olympic National Park

To preserve vehicular access to Olympic National Park Wilderness: South Coast Trail, the Pacific Northwest National Scenic Trail, Washington State Dept. of Natural Resources land, Hoh River Trust land, and private property, Jefferson County proposes WFLH. Planning FLAP Title 23 In Design  $             250,000.00 

Western Federal Lands Highway Division, FHWA 47.746030 ‐124.377610 WA 6th

NPS Pacific‐West Region

WA NPS MORA 12(1) Rehabilitate Mather Memorial Parkway, Sunrise Road to Cayuse Pass 2019 WA Pierce County Mount Rainier National Park Work would include correcting the irregular 5.4 miles of roadway alignment/width. Rehabilitation FLTP‐NPS Title 23 In Design  $          9,500,000.00 

Western Federal Lands Highway Division, FHWA 47.158362 ‐121.838325 WA 8th

NPS Pacific‐West Region

WA NPS OLYM 2015(3) Elwha Road Rehabilitation 2019 WA Clallam County Olympic National Park Rehabilitate about 8 miles of Elwha Road. Rehabilitation FLTP‐NPS Title 23 In Design  $       16,813,470.00 Western Federal Lands Highway Division, FHWA 47.983922 ‐123.646595 WA 6th

NPS Pacific‐West Region

WA Okanogan 9140(1) Lost River Road Preservation Project 2019 WA Okanogan Okanogan‐Wenatchee National Forest Chip seal and prelevel on Lost River Road from MP 0.0 to MP 6.96 using County Forces. Rehabilitation FLAP Title 23 In Design  $             369,220.00  Okanogan County 48.587090 ‐120.409290 WA 4th

FS Pacific Northwest ‐ Region 6

WA Pacific 2016(1) Willapa NWR Bicycle/Pedestrian Trail 2019 WA PacificWillapa National Wildlife Refuge, Lewis and Clark National Historic Park

Planning study to create a bicycle/pedestrian path connecting Willapa National Wildlife Refuge to Lewis and Clark National Historic Park and vehicle turn lane(s) from Sandridge Road to 95th Street to allow safe access to the planned Refuge Visitor Center. Planning FLAP Title 23 In Design  $             420,000.00 

Western Federal Lands Highway Division, FHWA 46.413942 ‐123.933299 WA 3rd

FWS Pacific ‐ Region 1

WA Pend Orei  1100(1) Flowery Trail Pavement Preservation Project 2019 WA Pend Oreille Colville National Forest Rehabilitate and resurface pavement structure with full‐depth reclamation and hot‐mix asphalt paving. Reconstruction FLAP Title 23 In Design  $          2,618,388.00  Pend Oreille County 48.303100 ‐117.352400 WA 5th

FS Pacific Northwest ‐ Region 6

WA Pend Orei 7140(1) Smackout Pass Bridge Replacement 2019 WA Pend Oreille Colville National Forest Replace single lane timber bridge with two lane concrete bridge. Reconstruction FLAP Title 23 In Design  $             710,190.00  Pend Oreille County 48.746000 ‐117.463000 WA 5th

FS Pacific Northwest ‐ Region 6

WA Snohomish 63(1) Index Galena Road Relocation 2019 WA Snohomish Mt. Baker‐Snoqualmie National ForestRelocation of a road accessing Federal lands, the Mt. Baker‐Snoqualmie National Forest and the Wild Sky Wilderness, that is currently closed due to an irreparable washout. Reconstruction FLAP Title 23 In Design  $       22,900,000.00 

Western Federal Lands Highway Division, FHWA 47.857889 ‐121.498545 WA 1st

FS Pacific Northwest ‐ Region 6

WA Clallam 112(1) Joyce Piedmont Road Reconstruction 2020 WA Clallam Olympic National Park

The proposed project includes major road reconstruction, widening, slope failure repair, drainage repair, fish passage culvert replacement, partial road realignment to address extreme horizontal alignment problems and full repaving. Reconstruction FLAP Title 23 In Design  $          7,500,000.00 

Western Federal Lands Highway Division, FHWA 48.137250 ‐123.745894 WA 6th

NPS Pacific‐West Region

WA Jefferson 0009(1) Undie Road Relocation 2020 WA JeffersonOlympic National Park, Olympic National Forest

Undie Road is built on an unstable slope. The proposal is to preserve vehicular access to Olympic National Forest and Olympic National Park: Bogachiel Rain Forest Trail Proposed Work Summary 825, the Pacific Northwest National Scenic Trail, and private p. Reconstruction FLAP Title 23 In Design  $          2,001,815.00 

Western Federal Lands Highway Division, FHWA 47.877410 ‐124.323310 WA 6th

NPS Pacific‐West Region

WA Pierce 2016(1) Fairfax Forest Reserve Road East 2020 WA PierceMount Rainier National Park, Mt. Baker‐Snoqualmie National Forest

This project will include the construction of new culverts, the addition of guardrail, and pavement resurfacing between Mile post 5.67 and Milepost 7.70 on Fairfax Forest Reserve Road East. We will replace and enlarge failing or undersized existing culve. Reconstruction FLAP Title 23 In Design  $          4,361,001.00  Pierce County 46.985348 ‐121.955194 WA 8th

NPS Pacific‐West Region

WA RRP RIDG 100(2) Design for River S Bridge Replacement 2020 WA Clark County Ridgefield National Wildlife Refuge Replace the bridge accessing the River "S" Unit. Design FLTP‐FWS Title 23 In Design  $             950,000.00 Western Federal Lands Highway Division, FHWA 45.830365 ‐122.748625 WA 3rd

FWS Pacific ‐ Region 1

Wyoming

WY DOT 22(1) Wyoming Teton Pass Centennial Trail 2017 WY Teton County Caribou‐Targhee National Forest

Construct a mixed‐use pathway from the WY/ID state line to the Trail Creek Campground ;  plan, permit, and design a pathway from Trail Creek Campground to Coal Creek Trailhead; plan and permit a pathway from Coal Creek Trailhead to the Teton Pass summit. Construction FLAP Title 23 In Design  $             378,747.00 

Western Federal Lands Highway Division, FHWA 43.540000 ‐111.039167 WY‐at large

FS Intermountain ‐ Region 4

WY NPS GRTE 2015(1) FOUR BRIDGES 2017 WY Teton County Grand Teton National Park

Covers Four Bridges within Grand Teton National Park, but this initial phase of the project is for work on Arizona Creek Box Culvert (1460‐016P).  This this project will repair scour, and erosion which is undermining through the structure site. Reconstruction FLTP‐NPS Title 23 In Design  $          1,719,625.00 

Western Federal Lands Highway Division, FHWA 43.973401 ‐110.645577 WY‐at large

NPS Intermountain Region

WY NPS GRTE 217(1) Deadmans Bar Road, Parking Area and Ramp Improvements 2017 WY Teton County Grand Teton National Park

Improve drainage and create a stable base and then overlay with three inches of asphalt along its entire one mile length from the Outside Highway to the Deadman’s Bar boat launch parking area. Reconstruction OTHER Title 23 In Design  $          1,500,000.00 

Western Federal Lands Highway Division, FHWA 43.758114 ‐110.619666 WY‐at large

NPS Intermountain Region

WY NPS GRTE 700(4) Grand Teton Park Pathways, Phase IV Roundabout 2017 WY Teton County Grand Teton National Park Road construction intersection. Reconstruction OTHER Title 23 In Design  $          3,665,000.00 

Western Federal Lands Highway Division, FHWA 43.574266 ‐110.733261 WY‐at large

NPS Intermountain Region

WY NPS GRTE 700(5) Grand Teton Park Pathways, Phase V Connection 2017 WY Teton County Grand Teton National Park

Pathway (bike and pedestrian) construction which is the 3/4 of a mile beyond the end of the connection coming from the roundabout to the city pathway. Reconstruction OTHER Title 23 In Design  $          1,465,000.00 

Western Federal Lands Highway Division, FHWA 43.574266 ‐110.733261 WY‐at large

NPS Intermountain Region

Page 12 of 13 Approval signature is shown on page 1 only.

Transportation Improvement Program, FY 2017 to FY 2021Western Federal Lands Highway Division

Federal Highway AdministrationApril 2017

ProjectProgram Fiscal Year

State County FLMA Accessed Description Type of Work Program Funds From Title Phase  Program Amount  Delivered By Latitude LongitudeCongressional 

DistrictFLMA Region

WY NPS PRES 17(1) Pavement Preservation Yellowstone 2017 2017 WY Teton County Yellowstone National ParkThis project provides for cyclic pavement preservation by micro surfacing various routes and parking areas within Yellowstone National Park. Rehabilitation FLTP‐NPS Title 23 In Design  $          2,030,000.00 

Western Federal Lands Highway Division, FHWA 44.414074 ‐110.578637 WY‐at large

NPS Intermountain Region

WY NPS YELL 10(24) Grand Loop Road Norris to Golden Gate, Phase 3 2017 WY Park County Yellowstone National Park Reconstruction Norris to Golden Gate. Reconstruction FLTP‐NPS Title 23 In Design  $       26,300,000.00 

Western Federal Lands Highway Division, FHWA 44.738012 ‐110.698505 WY‐at large

NPS Intermountain Region

WY NPS YELL 13(11) RECONSTRUCT FISHING BRIDGE TO INDIAN POND 4R 2017 WY Park County Yellowstone National Park

Widen the East Entrance road from Fishing Bridge to Indian Pond. Include turn lanes through the Fishing Bridge developed area. Reconstruction FLTP‐NPS Title 23 In Design  $          1,450,000.00 

Western Federal Lands Highway Division, FHWA 44.566379 ‐110.381699 WY‐at large

NPS Intermountain Region

WY NPS YELL 2015(2) Yellowstone 3 Parking Lots 2017 WY Park County Yellowstone National ParkReconstruct three parking areas within Yellowstone National Park. These parking areas are located at Norris Geyser Basin, Roosevelt Lodge, and at the Brink of Upper Falls. Rehabilitation FLTP‐NPS Title 23 In Design  $       12,500,000.00 

Western Federal Lands Highway Division, FHWA 44.726513 ‐110.703608 WY‐at large

NPS Intermountain Region

WY NPS GRTE 2017(1) Moose Wilson Corridor Management Support 2018 WY Teton County Grand Teton National Park Provide design and program management support for delivery of Moose Wilson Corridor Construction Rehabilitation FLTP‐NPS Title 23 In Design  $               50,000.00 

Western Federal Lands Highway Division, FHWA 43.656819 ‐110.721416 WY‐at large

NPS Intermountain Region

WY PRA GRTE 104(1) Gros Ventre Bank Stabilization 2018 WY Teton County Grand Teton National Park

Stabilize an eroding bank along the Gros Ventre Road in Grand Teton NP. Armor the bank of the Gros Ventre river with a linear rip rap revetment, and install rip rap stream barbs to deflect stream flow back into the main channel of the river. Reconstruction FLTP‐NPS Title 23 In Design  $          3,244,800.00 

Western Federal Lands Highway Division, FHWA 43.611031 ‐110.441755 WY‐at large

NPS Intermountain Region

WY NPS YELL 10(22) Canyon to Tower, Phase 3 2020 WY Park County Yellowstone National ParkCanyon to Tower, phase 3 reconstruct 8.7 miles of road from Canyon (Chittenden road) to Tower jct. to a 24 foot top width. Reconstruction FLTP‐NPS Title 23 In Design  $       26,610,013.00 

Western Federal Lands Highway Division, FHWA 44.735942 ‐110.493364 WY‐at large

NPS Intermountain Region

WY PRA GRTE 100(2) Moose Wilson Rd Realignment 2020 WY Teton County Grand Teton National ParkPreferred alternative is $32 million with minor re‐alignment, improvements along the road way and movement of 2 entrance stations. Reconstruction FLTP‐NPS Title 23 Planned  $       31,250,000.00 

Western Federal Lands Highway Division, FHWA 43.656819 ‐110.721416 WY‐at large

NPS Intermountain Region

Page 13 of 13 Approval signature is shown on page 1 only.