wet ash system
TRANSCRIPT
1
WET ASH SYSTEMWET ASH SYSTEMDate 14 August 2008
2
CONTENTSCONTENTS
1. Background
2. Ash plant design
3. Type of ash systems
4. Wet Ash System overviewi. Layoutii. Operating Philosophy
5. Technical data
6. Wet ash Hydrovacs
7. Wet ash pumps
8. Ash pipelines
9. Disposal of wet ash
10. Ash dams area
11. Ash water return dams
12. Protections and safety precautions
13. Conclusion and Recommendation
3
BACKGROUNDBACKGROUND
Ash is non-combustible
material in coal
Types of ash created
during combustion
- Coarse Ash (10%)
- Fly Ash (90%)
Disposal of ash
4
ASH PLANT DESIGNASH PLANT DESIGN
Plant geographic position
Environmental regulation
Size of the power plant
Market of by-product
5
TYPE OF ASH SYSTEM IN ESKOMTYPE OF ASH SYSTEM IN ESKOM
Wet Ash Systems
- Water is the primary ash transport medium
-Use excessive water consumption
Dry Ash Systems
-Semi dry with conveyor belts used for transportation
6
WET ASH SYSTEM OVERVIEWWET ASH SYSTEM OVERVIEW
7
TECHNICAL DATATECHNICAL DATA
Sluice Pump Motor 3.3 kV
Sluice Pump Capacity 1020m³/hour
Sluice Pump Pressure 1500kPa
Ash Sump - Coarse Ash 850tons/day
Ash Sump - Fly Ash 3400tons/day
Ash Dam Capacity 1500tons/day
Ash Water Return Pump (x8) 22.5m³/min (each)
Booster Pump Capacity 55.3m³/min
8
WET SYSTEM HYDRO-VACWET SYSTEM HYDRO-VAC
Mechanical agitator
Ash inlet
To ash sump
Pressure gauge
Water inlet
9
WHEN HYDROVAC IS BLOCKEDWHEN HYDROVAC IS BLOCKED
10
WET ASH PUMPWET ASH PUMP
Motor
Discharge
Suction
11
ASH AND WATER PIPELINESASH AND WATER PIPELINES
Ash pipes
Water return pipes
12
DISPOSAL OF WET ASHDISPOSAL OF WET ASH
EvaporationPipeline from Power Plant
Ash Dam
13
ASH DAM AREAASH DAM AREA
14
ASHASH WATERWATER RETURN DAMRETURN DAM
15
PROTECTIONSPROTECTIONS
Ash Sump Levels
- Trip Ash pump < 1.25m
- Start Ash pump > 3.9m
- High sump Level alarm >4.5m
- Trip sluice pumps > 4.5m
Ash Pump
- Bearing high temp alarm < 75ºC
- Bearing high temp trip > 85ºC
16
SAFETY PRECAUTIONSSAFETY PRECAUTIONS
• Safety Equipment:
- Gumboot,- Safety gloves, Dust mask,
- Overalls, Ear protection and Hard hat
• No standing in front of hoppers
• Ensure ash hopper outer door is shut
• Ensure sluice way nozzles are working
17
CONCLUSION AND RECOMMENDATIONCONCLUSION AND RECOMMENDATION
Environmental impact
Pipeline wear rates investigation
18
PIPELINE WEAR FACILITYPIPELINE WEAR FACILITY
19
RECOMMENDATIONRECOMMENDATION