westshore area interchange (i-275/sr 60) and i-275 ... · 3 3 3 3 3 1 2 • 4-level interchange •...

19
February 7, 2020 Westshore Area Interchange (I-275/SR 60) and I-275 Improvements Marshall Hampton, P.E. FDOT District 7

Upload: others

Post on 10-May-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Westshore Area Interchange (I-275/SR 60) and I-275 ... · 3 3 3 3 3 1 2 • 4-Level Interchange • All flyover ramps are 2-lanes wide, except for the express lane ramps to/from HFB

February 7, 2020

Westshore Area Interchange (I-275/SR 60) and I-275 Improvements

Marshall Hampton, P.E.FDOT District 7

Page 2: Westshore Area Interchange (I-275/SR 60) and I-275 ... · 3 3 3 3 3 1 2 • 4-Level Interchange • All flyover ramps are 2-lanes wide, except for the express lane ramps to/from HFB

3

Page 3: Westshore Area Interchange (I-275/SR 60) and I-275 ... · 3 3 3 3 3 1 2 • 4-Level Interchange • All flyover ramps are 2-lanes wide, except for the express lane ramps to/from HFB

Westshore Area Interchange Reconstruction and I-275 Tolled Express Lanes

4

6.4 miles

Section 4 Section 5

Page 4: Westshore Area Interchange (I-275/SR 60) and I-275 ... · 3 3 3 3 3 1 2 • 4-Level Interchange • All flyover ramps are 2-lanes wide, except for the express lane ramps to/from HFB

5

Page 5: Westshore Area Interchange (I-275/SR 60) and I-275 ... · 3 3 3 3 3 1 2 • 4-Level Interchange • All flyover ramps are 2-lanes wide, except for the express lane ramps to/from HFB

Schedule

6

Calendar Years

2020 2021 2022 2023 2024

SEIS Public Hearing

SEIS ROD (Anticipated Approval)

Preliminary Engineering

Right of Way (Acquisition, Relocation, Demo)

Draft RFP

Prepare & Obtain Permits

Industry Forum

Design-Build Advertisement

Technical Proposals

Bid Opening

Notice to Proceed

Page 6: Westshore Area Interchange (I-275/SR 60) and I-275 ... · 3 3 3 3 3 1 2 • 4-Level Interchange • All flyover ramps are 2-lanes wide, except for the express lane ramps to/from HFB

7

Right of Way & Staging Areas

Page 7: Westshore Area Interchange (I-275/SR 60) and I-275 ... · 3 3 3 3 3 1 2 • 4-Level Interchange • All flyover ramps are 2-lanes wide, except for the express lane ramps to/from HFB

Potential Project Segmentation

8

~$62 Million5%

~$52 Million4%

~$870 Million75%

~$180 Million16%

Page 8: Westshore Area Interchange (I-275/SR 60) and I-275 ... · 3 3 3 3 3 1 2 • 4-Level Interchange • All flyover ramps are 2-lanes wide, except for the express lane ramps to/from HFB

Estimated Roadway Quantities

9

Section 4FPID 433535-7

Section 5FPID 434045-2

Clearing and Grubbing 267 Acres 79 Acres

Embankment 3.6 Million CY 817,000 CY

Stabilization 911,000 SY 229,000 SY

Superpave Asphalt 106,000 TN 12,000 TN

Concrete Pavement 11.5” 55,000 SY 36,000 SY

Concrete Pavement 14” 255,000 SY 101,000 SY

Page 9: Westshore Area Interchange (I-275/SR 60) and I-275 ... · 3 3 3 3 3 1 2 • 4-Level Interchange • All flyover ramps are 2-lanes wide, except for the express lane ramps to/from HFB

Estimated Structural Quantities

10

Bridges Quantities

New Bridges 46

New Deck Area 1.7 Million SF

Widened Bridges 24

Widened Deck Area 159,000 SF

Retaining Walls 1.4 Million SF

Page 10: Westshore Area Interchange (I-275/SR 60) and I-275 ... · 3 3 3 3 3 1 2 • 4-Level Interchange • All flyover ramps are 2-lanes wide, except for the express lane ramps to/from HFB

Sign Structures

11

• 60 Cantilever

• 54 Spans

Page 11: Westshore Area Interchange (I-275/SR 60) and I-275 ... · 3 3 3 3 3 1 2 • 4-Level Interchange • All flyover ramps are 2-lanes wide, except for the express lane ramps to/from HFB

Roadway: SR 60 north of Cypress St.

12

Page 12: Westshore Area Interchange (I-275/SR 60) and I-275 ... · 3 3 3 3 3 1 2 • 4-Level Interchange • All flyover ramps are 2-lanes wide, except for the express lane ramps to/from HFB

Bridges

13

4+

4-

3

3

3

3

3

1

2

• 4-Level Interchange• All flyover ramps are

2-lanes wide, except for the express lane ramps to/from HFB

• 12 bridges with spans >200 feet

Page 13: Westshore Area Interchange (I-275/SR 60) and I-275 ... · 3 3 3 3 3 1 2 • 4-Level Interchange • All flyover ramps are 2-lanes wide, except for the express lane ramps to/from HFB

Section at Highest Point

14

Page 14: Westshore Area Interchange (I-275/SR 60) and I-275 ... · 3 3 3 3 3 1 2 • 4-Level Interchange • All flyover ramps are 2-lanes wide, except for the express lane ramps to/from HFB

Box Culvert Relocation

Proposed Relocation

15

Existing Location

Page 15: Westshore Area Interchange (I-275/SR 60) and I-275 ... · 3 3 3 3 3 1 2 • 4-Level Interchange • All flyover ramps are 2-lanes wide, except for the express lane ramps to/from HFB

Longitudinal Roadways Under I-275

16

Lemon Street

NB on-ramp

Page 16: Westshore Area Interchange (I-275/SR 60) and I-275 ... · 3 3 3 3 3 1 2 • 4-Level Interchange • All flyover ramps are 2-lanes wide, except for the express lane ramps to/from HFB

Roadway: I-275 in Section 5

17

Page 17: Westshore Area Interchange (I-275/SR 60) and I-275 ... · 3 3 3 3 3 1 2 • 4-Level Interchange • All flyover ramps are 2-lanes wide, except for the express lane ramps to/from HFB

New Bridges to/from Downtown Tampa

18

• SB on-ramp bridge over river • 3rd level express lane braided ramps w/straddles• Bridge piers within river to align with existing • Limited ROW at Julian B. Lane Park• No Riverwalk impacts• Anticipated aesthetic enhancements and lighting

Existing Condition: Riverwalk Facing North

Page 18: Westshore Area Interchange (I-275/SR 60) and I-275 ... · 3 3 3 3 3 1 2 • 4-Level Interchange • All flyover ramps are 2-lanes wide, except for the express lane ramps to/from HFB

Transportation Management Plan (TMP)• Traffic Management

• Safe and effective TCP• Improve diversion routes prior to construction

• Demand Management• Enhanced bus service• Business initiatives to encourage flex time and

telecommuting opportunities

• Smart Work Zones• ITS/Technology to enhance mobility and safety• Real-time information sharing

• Public Engagement• Proactive push of information• Partnerships

19

Page 19: Westshore Area Interchange (I-275/SR 60) and I-275 ... · 3 3 3 3 3 1 2 • 4-Level Interchange • All flyover ramps are 2-lanes wide, except for the express lane ramps to/from HFB

20

Thank You. Questions?