Page 1: Western Bridge Engineers’ Seminar · 10th Avenue over Indian Creek Bridge Replacement (Caldwell, Idaho) Sean Murphy P.E. M. ASCE • Jacobs Engineering Inc. Under the Neon Lights:

September 4 – 6, 2019The Boise Center | Boise, Idaho

BRIDGES – CURRENT CHALLENGES AND EFFECTIVE SOLUTIONS

MANAGEMENT BY

Professional EducationAcademic Outreach and Innovation

WesternBridgeEngineers’Seminar

Page 2: Western Bridge Engineers’ Seminar · 10th Avenue over Indian Creek Bridge Replacement (Caldwell, Idaho) Sean Murphy P.E. M. ASCE • Jacobs Engineering Inc. Under the Neon Lights:

Key

no

te S

pea

ker

s

Ex

ecu

tiv

e B

oard

Chair

MATTHEW FARRARIdaho Transportation Department

[email protected]

Board Members

RICHARD A. PRATTAlaska Department of Transportation and Public Facilities

[email protected]

DAVE EBERHARTArizona Department of Transportation

[email protected]

TOM OSTROMCalifornia Department of Transportation

[email protected]

JESSEN MORTENSENNevada Department of Transportation

[email protected]

VACANTOregon Department of Transportation

MARK GAINESWashington State Department of Transportation

[email protected]

BARRY BRECTOFederal Highway Administration

[email protected]

Page 3: Western Bridge Engineers’ Seminar · 10th Avenue over Indian Creek Bridge Replacement (Caldwell, Idaho) Sean Murphy P.E. M. ASCE • Jacobs Engineering Inc. Under the Neon Lights:

Key

no

te S

pea

ker

s STEVE MacLENNAN P.E.

Senior Vice President & Program Director • WSP USA

Stephen MacLennan is a Senior Vice President for WSP USA and currently the Program Director for the $1.4B Gerald Desmond Bridge in Long Beach, CA. He is a Registered Professional Engineer in California and Idaho.

With more than 40 years of experience in the construction and engineering industries, his areas of expertise include civil engineering, construction and project management, claims analysis and transportation engineering. His past project experience includes roads and highways, bridges, ports and harbors, rail and transit, Stephen is expert at pre-construction; project planning; contract preparation, negotiation and award for multimillion-dollar public works projects. He is very knowledgeable of state and federal regulations and specifications, as well as the documentation requirements for state and federal highway projects, including fund segregation. Stephen is an energetic and dynamic mega-program manager. His exceptional communication skills enable him to manage highly skilled teams in accomplishing aggressive program goals and successfully deliver complex projects and programs. He excels at negotiating with multiple project stakeholders, each with their own special interest, and finding equitable resolution to complex project issues.

Page 4: Western Bridge Engineers’ Seminar · 10th Avenue over Indian Creek Bridge Replacement (Caldwell, Idaho) Sean Murphy P.E. M. ASCE • Jacobs Engineering Inc. Under the Neon Lights:

MICHAEL BORZOK P.E.

Senior Engineering Manager • WSP USA

Michael Borzok is a Senior Engineering Manager for WSP USA. He earned his Bachelor of Science degree in Civil Engineering from Lehigh University in 1994 and has over 25 years of experience working on complex bridge projects. He is currently the Design Review Manager for the $1.4B Gerald Desmond Bridge Replacement Project in Long Beach, California which will be the first vehicular cable stayed bridge on the state’s highway system. Michael is a registered Professional Engineer in California, Arizona, and Pennsylvania.

BENJAMIN A. GRAYBEAL PH.D. P.E.

Team Leader for Bridge Engineering Research • Federal Highway Administration

Ben Graybeal is the team leader for Bridge Engineering Research in the FHWA Office of Infrastructure Research. He also leads FHWA’s structural concrete research efforts. His expertise includes bridge engineering, structural concrete, concrete materials, and forensic investigations. He has a wealth of experience with UHPC, having been a leader in the UHPC community since FHWA began focusing on this topic in 2001. Benjamin is the chairman of the American Concrete Institute technical committee on UHPC and is the co-chairman of the International Interactive Symposium on UHPC series most recently delivered in June 2019. He is leading the ongoing effort to develop UHPC structural design guidance as a supplement to the AASHTO LRFD Bridge Design Specification.

2

Page 5: Western Bridge Engineers’ Seminar · 10th Avenue over Indian Creek Bridge Replacement (Caldwell, Idaho) Sean Murphy P.E. M. ASCE • Jacobs Engineering Inc. Under the Neon Lights:

THOMAS MURPHY, PH.D. P.E. S.E.

Vice President • Modjeski and Masters

Dr. Thomas Murphy is a Vice President and Chief Technical Officer of Modjeski and Masters, a bridge design and engineering firm headquartered in Pennsylvania.

DANIEL JENSEN P.E.

Civil Bridge Engineer • Michael Baker International

Daniel has been working as a detail-oriented bridge designer for over five years most recently for Michael Baker International in Salt Lake City. Over the past few years he has been involved in 3D bridge design detailing and construction for UDOT. Along with digital delivery methods Daniel is very versed is design of single to multiple span bridges dealing with multiple different conditions.

3

Page 6: Western Bridge Engineers’ Seminar · 10th Avenue over Indian Creek Bridge Replacement (Caldwell, Idaho) Sean Murphy P.E. M. ASCE • Jacobs Engineering Inc. Under the Neon Lights:

Conference WifiThe Boise Centre wireless network is available for the use of attendees throughout the Conference.

To access the network, look for the just connect to the BoiseCentre SSID. No password is needed.

SSID BoiseCentrePassword N/A

4

Page 7: Western Bridge Engineers’ Seminar · 10th Avenue over Indian Creek Bridge Replacement (Caldwell, Idaho) Sean Murphy P.E. M. ASCE • Jacobs Engineering Inc. Under the Neon Lights:

Tuesday, September 3

6:00 – 8:00 PM ICEBREAKER RECEPTION EXHIBIT HALL

Sem

inar

Sch

edu

le

Wednesday, September 4

7:30 AM – 5:00 PM EXHIBIT HALL OPEN EXHIBIT HALL

7:30 – 8:30 AM CONTINENTAL BREAKFAST EXHIBIT HALL

8:30 – 10:00 AM WELCOME & OPENING REMARKS

MODERATOR: Matt Farrar, Idaho Transp. Dept. ROOM 400

� Welcome and Opening RemarksMatt Farrar • Idaho Transportation Department

� Welcome to IdahoBlake Rindlisbacher

• Idaho Transportation Department

� Keynote: Gerald Desmond Bridge Replacement ProjectSteve MacLennan P.E., Michael Borzok P.E.

• WSP USA

10:00 – 10:30 AM EXHIBIT BREAK EXHIBIT HALL

Reception Sponsor

5

Page 8: Western Bridge Engineers’ Seminar · 10th Avenue over Indian Creek Bridge Replacement (Caldwell, Idaho) Sean Murphy P.E. M. ASCE • Jacobs Engineering Inc. Under the Neon Lights:

10:30 AM – Noon TECHNICAL SESSIONS

2A PRESTRESSED CONCRETE BRIDGESMODERATOR: Glen Scoggins, Washington State DOT ROOM 100DE

� Recent Advances in Precast/Prestressed Concrete Bridge Girder DesignRichard Brice • Washington State DOT

� 10th Avenue over Indian Creek Bridge Replacement (Caldwell, Idaho)Sean Murphy P.E. M. ASCE • Jacobs Engineering Inc.

� Under the Neon Lights: Project Neon HOV FlyoverNicholas Eggen • HDR Engineering Inc.

2B HYDRAULICS, SCOUR, AND ANIMAL PASSAGEMODERATOR: Ed Miltner, FHWA Idaho Division ROOM 100C

� Hydraulic and Scour Analyses for a Mission Critical BridgeWeixia (Way-sha) Jin Ph.D. • Moffatt and Nichol

� Real-Time Pier Scour Monitoring of Arctic BridgesMark McBroom P.E. • Michael Baker International

� I-90 Animal Overpass StructureMichael Carfagno P.E. • Contech Engineered Solutions LLCBrian White • Washington State DOT

2C BRIDGE REHABILITATION & LOAD RATINGMODERATOR: Troy Martin, Nevada DOT ROOM 110ABC

� Rehabilitation of the Historic Rockville TrussBrian Byrne P.E., Guy Evans P.E. • Lochner

� NSM Titanium Alloy Bar Shear Strengthening of PT Box Girder BridgeTravis Kinney • Oregon DOT

� Simplified Approach to Load Rating of Corrugated Steel CulvertsVietanh Phung Ph.D. S.E., Kash Nikzad Ph.D. P.E.

• Trans Tech Engineering

Noon LUNCH ROOM 400

6

Page 9: Western Bridge Engineers’ Seminar · 10th Avenue over Indian Creek Bridge Replacement (Caldwell, Idaho) Sean Murphy P.E. M. ASCE • Jacobs Engineering Inc. Under the Neon Lights:

1:30 – 3:00 PM TECHNICAL SESSIONS

3A BRIDGE RESEARCH TOPICSMODERATOR: Barry Brecto, FHWA Bridge Safety Engineer ROOM 100DE

� Long Term Bridge Performance Program Status Update and the Recently Released Cloud-Based InfoBridge™ Web PortalJean Nehme • FHWA

� Shear Strengthening of Steel Bridge Girders Using Small-Diameter Carbon Fiber Reinforced Polymer (CFRP)Hamid Kazem, Ph.D. • Kleinfelder

� Use of High Early Strength Concrete Class 50AF with Polypropylene Fibers as a Cost-Effective Alternative for Connecting Precast Bridge Girders in the FieldArya Ebrahimpour Ph.D P.E. • Idaho State UniversityLeonard Ruminski P.E. • Idaho Transportation Department

3B STEEL BRIDGE DESIGNMODERATOR: Elmer Marx, Alaska DOT&PF ROOM 100C

� Cross Frame Design for Curved and Skewed Bridges Using AASHTO LRFD 8th EditionTravis Butz S.E., Jeff Hunter P.E. • Burgess and Niple

� 8th Street BridgeEric Bonn, P.E. • OBEC Consulting Engineers, a DOWL LLC Co.

� Steel Bridge Member Resistance: AASHTO Compared to Other International CodesTerry Cakebread • LUSAS

3C ABC PROJECTS- MOVERS AND SLIDERSMODERATOR: Pe-Shen Yang, Arizona DOT ROOM 110ABC

� US-12 Wildcat Creek Rapid Bridge ReplacementKali Dickerson P.E. • StantecMichael Carfagno P.E. • Contech Engineered Solutions

� Accelerated Construction of Unbraced Network Arch BridgeMike LaViolette • HDR Engineering Inc.

� Milton Madison Bridge: The Largest Bridge Slide in North AmericaMichael Killian P.E., Travis Butz S.E. • Burgess and Niple

3:00 – 3:30 PM EXHIBIT BREAK EXHIBIT HALL

7

Page 10: Western Bridge Engineers’ Seminar · 10th Avenue over Indian Creek Bridge Replacement (Caldwell, Idaho) Sean Murphy P.E. M. ASCE • Jacobs Engineering Inc. Under the Neon Lights:

3:30 – 5:00 PM TECHNICAL SESSIONS

4A BRIDGE INSPECTION AND EVALUATIONMODERATOR: Elizabeth Hunt, Oregon DOT ROOM 100DE

� M7.0 Anchorage Earthquake: AkDOT Bridge Inspection ResponseJesse Escamilla III • Alaska DOT&PF

� Nondestructive Load Testing of Bridges: An Oregon PerspectiveTravis Kinney • Oregon DOT

� Resistograph Inspection and Repair Methods for Timber BridgesAmanda Blankenship, Laura Baughman

• David Evans and Associates, Inc.

4B BRIDGE SEISMIC DESIGNMODERATOR: Rich Pratt, Alaska DOT&PF ROOM 100C

� Seismic Analysis and Design of Earth Retaining SystemsGary Wang • CalTrans

� Probabilistic Damage Control Assessment (PDCA) Part 1: Introduction, Theoretical Background & ProceduresMark Mahan Ph.D. • CalTrans

� Probabilistic Damage Control Assessment (PDCA) Part 2: Example Applications to Caltrans Bridge Seismic DesignYeo (Tony) Yoon • CalTrans

4C BRIDGE DESIGN AND CONSTRUCTIONMODERATOR: Rebecca Burrow, Oregon DOT ROOM 110ABC

� Design Considerations for the Manning Crevice Bridge ReplacementKenneth C. Saindon P.E. S.E. • Neel-Schaffer, Inc.Alex Whitney P.E. • HDRBenn Oltmann P.E. • FHWA

� Construction Considerations for the Manning Crevice Bridge ReplacementBen Oltmann P.E. • FHWAJesse Webb • Idaho Transportation DepartmentKenneth C. Saindon P.E. S.E. • Neel-Schaffer, Inc.

� Design and Construction of the Keechelus Lake Avalanche BridgesCory Caywood P.E. S.E. • Jacobs Engineering Inc.

5:00 – 7:00 PM EXHIBITOR RECEPTION EXHIBIT HALL

Co-Authors:Amir Malek • CaltransSusan Hida • Caltrans

Co-Authors:Sam Ataya • CaltransToorak Zokaie • Caltrans

8

Page 11: Western Bridge Engineers’ Seminar · 10th Avenue over Indian Creek Bridge Replacement (Caldwell, Idaho) Sean Murphy P.E. M. ASCE • Jacobs Engineering Inc. Under the Neon Lights:

Thursday, September 5

7:30 AM – 3:30 PM EXHIBIT HALL OPEN EXHIBIT HALL

7:30 – 8:30 AM CONTINENTAL BREAKFAST EXHIBIT HALL

8:30 – 10:00 AM TECHNICAL SESSIONS

5A ABC & UHPCMODERATOR: Tom Ostrom, CalTrans ROOM 100DE

� Replacement of a Multi-Span Bridge Over the Snake River Applying Accelerated Bridge Construction Methods Shane Brown P.E. S.E. • Parametrix

� OR 22: Sougrass Creek Culvert Replacement (UHPC Joint Fill in Side by Side Deck Bulb Tees)Robert Tovar P.E. • Oregon DOT

� Design and Construction of the Tacoma I-5/SR-16 Interchange HOV Connections: Implementing Features to Accelerate ConstructionThomas Wilson • WSP USA

5B BRIDGE PRESERVATIONMODERATOR: Jesse Escamilla, Alaska DOT&PF ROOM 100C

� “Bridge Apocalypse”: Emergency Bridge Strike SupportJared Levings S.E., Nicholas Murray • Alaska DOT&PF

� Development of Seismic Retrofits for RC Bridge Columns Using Titanium Alloy BarsChristopher Higgins • Oregon State University

� Yesler Way Over 4th Avenue S Bridge: Reconstruction and PreservationYanqiang (Carl) Gao • Seattle DOTLee Andrews P.E. S.E. • HDR

5C LIGHT RAIL BRIDGESMODERATOR: Ray Bottenburg, Oregon DOT ROOM 110ABC

� High Load Multirotational Bearings for the HART Project in HawaiiRonald J. Watson • R.J. Watson, Inc.

� CMGC Design and Construction for a New Transit Corridor in San Diego: Genesee Viaduct Spliced GirdersPooya Haddadi, Amiri Ebrahim, Nathan Johnson • WSP USA

� Design and Construction of the Light Rail Transit Overhead Crossing Seismic Fault ZonesSami Megally Ph.D., Keith Gazaway P.E. • Kleinfelder

10:00 – 10:30 AM EXHIBIT BREAK EXHIBIT HALL

9

Page 12: Western Bridge Engineers’ Seminar · 10th Avenue over Indian Creek Bridge Replacement (Caldwell, Idaho) Sean Murphy P.E. M. ASCE • Jacobs Engineering Inc. Under the Neon Lights:

10:30 – Noon TECHNICAL SESSIONS

6A SEISMIC DESIGN AND RETROFITMODERATOR: DeWayne Wilson, Washington State DOT ROOM 100DE

� Strong Ground Motions of the 2018 Anchorage EarthquakeNicholas Murray • Alaska DOT&PF

� Widening and Phase 2 Seismic Retrofit: Sunnyside Road over I-205 Design ChallengesDouglas Kirkpatrick P.E., Guy Hakanson P.E.

• OBEC Consulting Engineers, a DOWL LLC Co.

� Seismic Retrofit of the Approach Bridges to the I-90 Floating Bridge Over Lake WashingtonYakov Polyakov, Matthew Barber • WSP USA

6B ABC PROJECTSMODERATOR: Rafael Davis, Arizona DOT ROOM 100C

� ABC Techniques on the Garnet Interchange ProjectJared Olsen S.E., Adam Drinkwalter • Horrocks EngineersPercy Penafiel • Nevada DOTDan Ferris • Ames Construction, Inc.

� Constructability Based Design for Accelerated Bridge ConstructionGregg Reese P.E., Andrew Mish P.E. • Modjeski and Masters

� A Precast Pier System for Accelerated Bridge Construction in High SeismicityMustafa Mashal Ph.D. P.E. • Idaho State UniversityLeonard Ruminski P.E. • Idaho Transportation Department

6C BRIDGE ASSET MANAGEMENT AND LOAD RATINGMODERATOR: Mike Mayberry, Nevada DOT ROOM110ABC

� Inspection Data in ActionElizabeth Hunt • Oregon DOT

� Redundancy Analysis of the St. Johns Suspended SpansGreg Griffin, Tim Link P.E. • David Evans and Associates

� Bridge Economy and Life Cycle Costs of Steel and Concrete BridgesMichael Barker Ph.D. P.E. • University of Wyoming

Noon LUNCH ROOM 400

10

Page 13: Western Bridge Engineers’ Seminar · 10th Avenue over Indian Creek Bridge Replacement (Caldwell, Idaho) Sean Murphy P.E. M. ASCE • Jacobs Engineering Inc. Under the Neon Lights:

1:30 - 3:00 PM TECHNICAL SESSIONS

7A RAILINGS, BEARING & JOINTSMODERATOR: Shanon Murgoito, Idaho Transp. Dept. ROOM 100DE

� 2019 MASH Two-Tube Bridge RailSara Manning P.E., Elmer Marx P.E. S.E. • Alaska DOT&PF

� Experiences in the Performance of Bridge Bearings and Expansion Joints Used For Highway BridgesBijan Khaleghi Ph.D. P.E. S.E. • Washington State DOT

� Simple Approach to Calculate Displacements and Rotations in Integral Abutment BridgesSuhail Albhaisi Ph.D. P.E., Mohammed Maqbool • Stantec

7B LONG SPAN CONCRETE BRIDGESMODERATOR: Rick Jensen, Idaho Transp. Dept. ROOM 100C

� Designing Precast/Prestressed Concrete Bridge Girders for Lateral StabilityRichard Brice • Washington State DOT

� Long-Span Lightweight Concrete Bridges… and the Parrotts Ferry BridgeReid W. Castrodale Ph.D., P.E. • Expanded Shale, Clay and

Slate Institute

� Design and Construction of the Centennial Bowl Interchange (Las Vegas, NV)Michael Taylor • Nevada DOT

7C LESSONS LEARNED FROM DESIGN & CONSTRUCTIONMODERATOR: Amjod Alzubi, Arizona DOT ROOM 110ABC

� San Mateo Bridges Replacement Project, San Mateo, CaliforniaBenjamin L. Consolacion • WSP USA

� Lightweight Backfill Solutions to Bridge ProblemsJason Hickey P.E. S.E. • Mark ThomasTyler Bodnar • California Nevada Cement Association

� Structures Design and Construction for the Historic Columbia River Highway State Trail – Wyeth to Starvation Creek SegmentsGary Conner P.E. S.E. • Jacobs Engineering Inc.

11

Page 14: Western Bridge Engineers’ Seminar · 10th Avenue over Indian Creek Bridge Replacement (Caldwell, Idaho) Sean Murphy P.E. M. ASCE • Jacobs Engineering Inc. Under the Neon Lights:

7D INNOVATIONSMODERATOR: Chris Long, FHWA California Division ROOM 120

� Design Challenges of a Cut-and-Cover Tunnel WideningBrad Wilton • T.Y. Lin InternationalPatrick Wilson • Earth Mechanics, Inc.

� Moving Forward from Failure: Adhesive AnchorsTanarat Potisuk S.E. • Oregon DOT

� 10' Diameter CMP Replacement under High Fill with In-Place Tunnel Liner Jonathan Tronson, Tom Greer • Burns & McDonnellDarren LaMay • Idaho Transportation Department

3:00 – 3:30 PM EXHIBIT BREAK

3:30 – 5:00 PM TECHNICAL SESSIONS

8A BRIDGE PRESERVATIONMODERATOR: Dale Wegner, FHWA Nevada Division ROOM 100DE

� Proposed AASHTO Historic Bridge Preservation Guide SpecificationRay Bottenberg P.E. S.E. • Oregon DOT

� When Concrete Isn’t Concrete: Preserving the Dry Canyon BridgeRebecca Burrow • Oregon DOT

� WSDOT’s Bridge Deck Preservation Plan for Notable Large BridgesDeWayne Wilson • Washington State DOT

8B SUBSTRUCTURE AND SEISMIC DESIGNMODERATOR: Ruth Fernandez, CalTrans ROOM 100C

� Post-Earthquake Functionality of ABC Bridges with Column Connections with Self-Centering CapabilityBijan Khaleghi Ph.D. P.E. S.E. • Washington State DOT

� Innovative Ductile Seismic Shear KeysMajid Sarraf • Michael Baker International

� Trancas Creek Bridge Replacement ProjectAhmadreza Mortezaie Ph.D. • CalTrans

12

Page 15: Western Bridge Engineers’ Seminar · 10th Avenue over Indian Creek Bridge Replacement (Caldwell, Idaho) Sean Murphy P.E. M. ASCE • Jacobs Engineering Inc. Under the Neon Lights:

8C UNIQUE BRIDGE SOLUTIONSMODERATOR: Mark Mahan, CalTrans ROOM 110ABC

� Construction of the Lewis and Clark Cable-Stayed Bridge over the Ohio RiverMarcos P Loizias P.E. • Jacobs Engineering Inc.

� Elkhorn Drop Ramp StructurePercy Penafiel • Nevada DOT

� Keller Ferry Landings ProjectAmy Leland P.E. S.E. • Washington State DOT

8D STEEL BRIDGE TOPICSMODERATOR: Dan Gorley, Idaho Transp. Dept. ROOM 120

� AASHTO-NSBA Guidelines for Resolution of Steel Fabrication ErrorsHeather Gilmer • HRV Conformance Verification Associates, Inc.

� Steel Girder Heat Straightening from ImpactTyler Thomas • Flame-On, Inc.

� New and Exciting in Bridge Welding ChangesRonnie Medlock P.E. • High Steel Structures

13

Page 16: Western Bridge Engineers’ Seminar · 10th Avenue over Indian Creek Bridge Replacement (Caldwell, Idaho) Sean Murphy P.E. M. ASCE • Jacobs Engineering Inc. Under the Neon Lights:

Friday, September 6

7:30 – 8:30 AM CONTINENTAL BREAKFAST EXHIBIT HALL

8:30 – 10:00 AM TECHNICAL SESSIONS

9A INNOVATIVE SOLUTIONSMODERATOR: Bijan Khalegi, Washington State DOT ROOM 100DE

� Use of Cone Penetration Test (CPT) in Design of Bridge Foundation Piles Subject to LiquefactionSharid Amiri Ph.D. P.E. • CalTrans

� Latest Advances in Large Span Flexible Buried BridgesJoel Hahm P.E. • Big R Bridge

� WSDOT Ferry Terminal at Colman Dock: Pedestrian Bridge Utilizing Innovative Materials for ABCGeoff Swett • Washington State DOT

9B BRIDGE REHABILTATION AND INSPECTIONMODERATOR: Mike Johnson, Idaho Transp. Dept. ROOM 100C

� Rehabilitation & Deck Replacement of the Columbia River Bridge at UmatillaAnthony Mizumori S.E. • Washington State DOT

� Overview of WSDOT’s Bridge Deck Replacements on Prestress Girder BridgesAndre’ La Foe • Washington State DOT

� Implementation of and Recommendations for AASHTO Guidelines for Complex Bridge InspectionBrian Leshko P.E. • HDR Engineering Inc.

9C SEISMIC PAST AND PRESENTMODERATOR: TBD, Nevada DOT ROOM 110ABC

� A General Overview of SDC 2.0 Changes to Caltrans Seismic Design CriteriaChristian Unanwa Ph.D., Mark Mahan • CalTrans

� The Use of U-Shaped Flexural Plates for Supplemental Damping in Seismic Resilient BridgesJared Cantrell, Mustafa Mashal Ph.D. P.E.

• Idaho State University

� The Evolution of Seismic Design Requirements for Oregon Highway BridgesAlbert Nako P.E. • Oregon DOT

10:00 – 10:30 BREAK EXHIBIT HALL

14

Page 17: Western Bridge Engineers’ Seminar · 10th Avenue over Indian Creek Bridge Replacement (Caldwell, Idaho) Sean Murphy P.E. M. ASCE • Jacobs Engineering Inc. Under the Neon Lights:

10:30 – Noon CLOSING GENERAL SESSIONMODERATOR: Matt Farrar, Idaho Transp. Dept. ROOM 400

� UHPC: The Game Change of the FutureBen Graybeal Ph.D. P.E. • FHWA

� The AASHTO Service Life Design Guide Will Be in Your FutureTom Murphy Ph.D. P.E. S.E. • Modjeski and Masters

� Model Based Design/Construction: “Planless” Delivery of Utah BridgesDaniel Jensen P.E. • Michael Baker International

� Closing RemarksMatt Farrar • Idaho Transportation Department

� Invitation to WBES 2021Tom Ostrom • CalTrans

Noon ADJOURN

15

Page 18: Western Bridge Engineers’ Seminar · 10th Avenue over Indian Creek Bridge Replacement (Caldwell, Idaho) Sean Murphy P.E. M. ASCE • Jacobs Engineering Inc. Under the Neon Lights:

1 Perryman Company

2 Sumiden Wire Products Corporation

3 Willamette Valley Company

4 Computers and Structures Inc.

5 Michael Baker International

6

7

8

9

10

11

12

13

14

15 Sika Corporation

16 Mateenbar

17 Dayton Superior

18 Owens Corning

19 Michels Corporation

20 Wheeler

21 Vector Corrosion Technologies Inc.

22 Case Foundation Company

23 Hayward Baker Inc.

24 CRSI

25 Terracon Constultants, Inc.

26 Loadtest

27 Hilfiker Retaining Walls

28 Freyssinet, Inc.

29 Williams Form Engineering Corp.

30 SSL LLC

31 Hilman Rollers

32 TRC Engineers, Inc.

33 R. J. Watson, Inc.

34 U.S. Bridge

35 National Steel Bridge Alliance

36 West Coast Chapter of ADSC

37 Atkore International

38 Dynamic Isolation Systems

39 Contech Engineered Solutions

40 Bentley Systems

41 Campbell Scientific, Inc.

42 D.S. Brown

43 Western Wood Preservers Institute

44 Foundation Technologies, Inc.

45 LUSAS

46 Nucor Skyline

47 Eriksson Technologies, Inc

48 Mageba USA

49 Western Coating

50 LARSA, Inc.

Ex

hib

ito

rs

16

Page 19: Western Bridge Engineers’ Seminar · 10th Avenue over Indian Creek Bridge Replacement (Caldwell, Idaho) Sean Murphy P.E. M. ASCE • Jacobs Engineering Inc. Under the Neon Lights:

23456789 110

6869707172737475 6776

34333231

35363738

39404142

46454443

161514131211

25262728

20191817

212223242930

515253545556

62616059

47484950

666564635857

REG

EXHIBIT HALL

EXHIBIT HALLENTRANCE

EXHIBIT HALLENTRANCE

REGISTRATIONDESK

BREAKOUTSESSIONS

BREAKOUTSESSIONS

BREAKOUTSESSIONS

SPEAKERLOUNGE

LOADINGDOCK

51 Precast/Prestressed Concrete Institute

52 Big R Bridge

53 Burgess & Niple, Inc.

54 BridgeSight Inc.

55 Viathor, Inc.

56 Utelite Lightweight Aggregates

57 CH Bull Co.

58 CMC-MMFX Technologies

59 PNE dba CCS

60 Watson Bowman Acme Corp.

61 Collins Engineers

62 BDI

63 GCP Applied Technologies

64 Fyfe Co, LLC

65 Epoxy Interest Group of CRSI

66 Headed Reinforcement Corporation (HRC)

67 The Reinforced Earth Company

68 Kwik Bond Polymers

69 iBeam Construction Cameras

70 ITT Enidine

71 Acrow Corporation of America

72 Scougal Rubber

73 EMSEAL Joint Systems, LTD

74

75

76

REGI

STRA

TIO

N*Booth assignments are subject to change. Revised August 16, 2019.

17

Page 20: Western Bridge Engineers’ Seminar · 10th Avenue over Indian Creek Bridge Replacement (Caldwell, Idaho) Sean Murphy P.E. M. ASCE • Jacobs Engineering Inc. Under the Neon Lights:

Co

nfe

ren

ce S

po

nso

rs

Bronze

G A L V A B A R

Platinum

Reception Sponsor

Gold Silver