west side bridges retrofit project

22
West Side Bridges Retrofit Project Retaining Wall Treatment

Upload: others

Post on 17-Apr-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: West Side Bridges Retrofit Project

West Side Bridges Retrofit ProjectRetaining Wall Treatment

Page 2: West Side Bridges Retrofit Project

2

Project Location

Page 3: West Side Bridges Retrofit Project

3

(Fall 2021 - Fall 2024)

3

Page 4: West Side Bridges Retrofit Project

4

Existing project site

4

Page 5: West Side Bridges Retrofit Project

ProjectOverview

The Yerba Buena Island West Side Bridges Seismic Retrofit (Project) encompasses

eight (8) existing bridge structures on the west side of Yerba Buena Island (YBI).

• These structures generally comprise a viaduct along Treasure Island Road,

just north of the San Francisco-Oakland Bay Bridge (SFOBB).

• The Project limits along Treasure Island Road are from the SFOBB to

approximately 2000-feet northward.

• This stretch of Treasure Island Road includes the bridge structures and

portions of “at-grade” roadway.

5

Page 6: West Side Bridges Retrofit Project

ProjectOverview

The current bridges were constructed from 1937 through to 1964 and have been

determined to be seismically deficient.

This project is funded by the Federal Highway Bridge Program and Prop 1B Seismic

Retrofit Bridge Program.

The SFCTA, in cooperation with Caltrans, TIDA, and the FHWA, are bringing the bridge

structures up to current seismic safety standards. The Project consists of the following

work.

• Demolish seven (7) bridge structures;

• Realign roadway into the hillside;

• Construct six (6) retaining walls;

• Construct one undercrossing structure; and

• Seismically retrofit one bridge structure.

6

Page 7: West Side Bridges Retrofit Project

ProjectOverview

Additional steps taken in our process since the first presentation with CDR:

1. Expanded team to include CMG

2. Conducted a rigorous search for an artist

3. Worked in coordination SFAC staff

4. Interviewed four outstanding artists

5. Selected Muzae Sesay as the artist for this project

7

Page 8: West Side Bridges Retrofit Project

Identification of the project’s six retaining walls

1

4

2

5

6

3

8

Page 9: West Side Bridges Retrofit Project

95

Multi-Use Pathway

9

Page 10: West Side Bridges Retrofit Project

6

Multi-Use Pathway

10

Page 11: West Side Bridges Retrofit Project

1111

Page 12: West Side Bridges Retrofit Project

12

Page 13: West Side Bridges Retrofit Project

13

Page 14: West Side Bridges Retrofit Project

14

Page 15: West Side Bridges Retrofit Project

15

Page 16: West Side Bridges Retrofit Project

16

Page 17: West Side Bridges Retrofit Project

17

Page 18: West Side Bridges Retrofit Project

18

Page 19: West Side Bridges Retrofit Project

1919

Page 20: West Side Bridges Retrofit Project

2020

Page 21: West Side Bridges Retrofit Project

NextSteps

Next steps following SFAC CDR approval would include:

1. Integration of design to overall project plan/schedule

2. Collaboration with General Contractor and necessary subcontractors

3. Continued collaboration with Muzae Sesay and SFAC CDR as construction begins

4. Provide project updates to SFAC CDR as outlined in your process

21

Page 22: West Side Bridges Retrofit Project

Thank you.Any Questions?sfcta.org