west sacramento avenue modifications presented by: justin deknoblough rusty d’anna leo villicana...

36
West Sacramento Avenue Modifications Presented By: Justin DeKnoblough Rusty D’anna Leo Villicana Todd Orange Shane Winton Israel Patterson ~Providing Tomorrows Vision Today~

Post on 22-Dec-2015

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: West Sacramento Avenue Modifications Presented By: Justin DeKnoblough Rusty D’anna Leo Villicana Todd Orange Shane Winton Israel Patterson ~Providing Tomorrows

West Sacramento Avenue Modifications

Presented By:Justin DeKnoblough

Rusty D’annaLeo VillicanaTodd OrangeShane Winton

Israel Patterson

~Providing Tomorrows Vision Today~

Page 2: West Sacramento Avenue Modifications Presented By: Justin DeKnoblough Rusty D’anna Leo Villicana Todd Orange Shane Winton Israel Patterson ~Providing Tomorrows

“Our goal at Horizon Engineering is to design quality projects that intertwine creativity, sustainability, and economic feasibility in order to provide tomorrows vision today.”

Page 3: West Sacramento Avenue Modifications Presented By: Justin DeKnoblough Rusty D’anna Leo Villicana Todd Orange Shane Winton Israel Patterson ~Providing Tomorrows

Project Location

Page 4: West Sacramento Avenue Modifications Presented By: Justin DeKnoblough Rusty D’anna Leo Villicana Todd Orange Shane Winton Israel Patterson ~Providing Tomorrows

Who is using RAC?

• CIWMB (California Integrated Waste Management Board) has awarded more than 60 grants totaling $4.2 million between January and April of this year alone.

• Many of these grants help first-time or limited-RAC users, including but not limited to San Clemente, Fremont, Rancho Cordova, Brea, San Fernando, Galt, Ripon and Nevada City.

Page 5: West Sacramento Avenue Modifications Presented By: Justin DeKnoblough Rusty D’anna Leo Villicana Todd Orange Shane Winton Israel Patterson ~Providing Tomorrows

• Individuals, businesses, local governments, universities, school districts, park districts, and qualified California Indian tribes can be awarded these grants.

• City of Thousand Oaks using RAC since 1991.

• To date, Thousand Oaks has used rubber from 1.3 million discarded tires.

Who is using RAC? (cont’d)

Page 6: West Sacramento Avenue Modifications Presented By: Justin DeKnoblough Rusty D’anna Leo Villicana Todd Orange Shane Winton Israel Patterson ~Providing Tomorrows

Why Rubberized Asphalt?

Page 7: West Sacramento Avenue Modifications Presented By: Justin DeKnoblough Rusty D’anna Leo Villicana Todd Orange Shane Winton Israel Patterson ~Providing Tomorrows

About the ProductRubberized Asphalt Concrete

•Over 30 years of research and testing has gone into the development of RAC.

•Performance

•The life cycle RAC of is twice that of standard asphalt concretes in roadway applications.

•There is a reduction in traffic noise.

•Increases tire traction

Page 8: West Sacramento Avenue Modifications Presented By: Justin DeKnoblough Rusty D’anna Leo Villicana Todd Orange Shane Winton Israel Patterson ~Providing Tomorrows

Cost Analysis

• Based on a ten mile stretch of freeway in Arizona (I-40) and current trends

1.) A 5 mile section consisting of standard AC took 2 years to complete at $45 / yd.

• After 9 years of service this section displayed major signs of distress

2.) An adjacent 10 mile stretch of highway using RAC took 4 months to complete at $10 /yd

• After 15 years the 10 mile section still looks great.

Page 9: West Sacramento Avenue Modifications Presented By: Justin DeKnoblough Rusty D’anna Leo Villicana Todd Orange Shane Winton Israel Patterson ~Providing Tomorrows

Applications

• TDA (tire derived aggregates) can be used in combination with

concrete for reduced strength applications.• Slope stabilization• Indoor and outdoor tracks.• TDA can be used for school yard fill.

Page 10: West Sacramento Avenue Modifications Presented By: Justin DeKnoblough Rusty D’anna Leo Villicana Todd Orange Shane Winton Israel Patterson ~Providing Tomorrows

Why use RAC?

• Heritage Research Institute conducted a TCLP (Toxic Characteristic Leachability Procedure) study per EPA standards SW846-1311 and SW846-351. The leachate was tested for heavy metals, volatiles, semivolatiles, organics, and PAH’s (Polynuclear Aromatic Hydrocarbons) to determine how safe the HMA, and RAC mix designs were in terms of ground water contamination.

• The results for all leachate tests per EPA standards had levels BDL (Below Detection Limits) ranging form 2.0-.005 μg/L for Barium, Arsenic, Mercury, Lead, and other heavy metals.

Page 11: West Sacramento Avenue Modifications Presented By: Justin DeKnoblough Rusty D’anna Leo Villicana Todd Orange Shane Winton Israel Patterson ~Providing Tomorrows

Why use RAC?

California currently Generates 40 million scrap tires annually.Of which about 75% are put back to work for the community through…

•TDA (Tire Derived Aggregates)•RAC (Rubberized Asphalt Concrete)

The remaining 10 million tires end up either stockpiled or in the landfill or are being dumped illegally.

Page 12: West Sacramento Avenue Modifications Presented By: Justin DeKnoblough Rusty D’anna Leo Villicana Todd Orange Shane Winton Israel Patterson ~Providing Tomorrows

Environmental Benefits

• Reduction in land fill volume !!

• Controlled insect population!!• Assured ground water safety!!• Reduction the worlds carbon

footprint!!

Page 13: West Sacramento Avenue Modifications Presented By: Justin DeKnoblough Rusty D’anna Leo Villicana Todd Orange Shane Winton Israel Patterson ~Providing Tomorrows

ProblemRoad Condition: Transverse, longitudinal, and

alligator cracking along the road. Potholes due to heavy traffic (12,996 Vehicles/day) High need of maintenance due to

an average daily traffic of 12,996

Page 14: West Sacramento Avenue Modifications Presented By: Justin DeKnoblough Rusty D’anna Leo Villicana Todd Orange Shane Winton Israel Patterson ~Providing Tomorrows

Road Congestion Limited roadway driving space on

West Sacramento Ave. Heavy flow of traffic especially during

the hours of: 11:00am to 2:00pm 4:00pm to 8:00pm

CSU Chico students complain about

arriving late to class due to the heavy traffic and limited roadway driving space. Students prefer to take other longer routes instead of having to deal with this problem.

Page 15: West Sacramento Avenue Modifications Presented By: Justin DeKnoblough Rusty D’anna Leo Villicana Todd Orange Shane Winton Israel Patterson ~Providing Tomorrows

Roadway Driveways Driveways:

1. Residents

2. Businesses

3. College Dorms:Esken, Mechoopda,

and Konkow

– Short site distances from driveways could create a traffic hazard

Page 16: West Sacramento Avenue Modifications Presented By: Justin DeKnoblough Rusty D’anna Leo Villicana Todd Orange Shane Winton Israel Patterson ~Providing Tomorrows

Railroad Intersection A potentially hazardous condition

exists! Traffic stops on the railroad

tracks constantly by physical observation due to:

1. Back up of traffic from turning vehicles onto North Cedar Street

2. High volume of pedestrian and bicycle traffic directly associated with commuting Chico State students

3. Bike crossings from the bike path that runs parallel to the railroad

Page 17: West Sacramento Avenue Modifications Presented By: Justin DeKnoblough Rusty D’anna Leo Villicana Todd Orange Shane Winton Israel Patterson ~Providing Tomorrows

Accident Data• 1 accident in 2003• No accidents associated with the back up of

traffic due to left turning vehicles onto North Cedar Street

• No pedestrian incidents along this section of road

• Dorm and business residents have no concerns about driveway site distances along West Sacramento Avenue

Page 18: West Sacramento Avenue Modifications Presented By: Justin DeKnoblough Rusty D’anna Leo Villicana Todd Orange Shane Winton Israel Patterson ~Providing Tomorrows

Conclusion From Findings:

• Overlay the existing road for a quieter, less-maintenance-required roadway for the City of Chico

Page 19: West Sacramento Avenue Modifications Presented By: Justin DeKnoblough Rusty D’anna Leo Villicana Todd Orange Shane Winton Israel Patterson ~Providing Tomorrows

Design Alternatives

• Alternative #1: Widen West Sacramento Avenue to a four lane road

• Alternative #2: Add a center turn lane down West Sacramento Avenue

• Alternative #3: Rubberized asphalt overlay of the existing corridor

Page 20: West Sacramento Avenue Modifications Presented By: Justin DeKnoblough Rusty D’anna Leo Villicana Todd Orange Shane Winton Israel Patterson ~Providing Tomorrows

Plan View of West Sacramento Avenue, Chico California

Page 21: West Sacramento Avenue Modifications Presented By: Justin DeKnoblough Rusty D’anna Leo Villicana Todd Orange Shane Winton Israel Patterson ~Providing Tomorrows

Typical Street Section

Page 22: West Sacramento Avenue Modifications Presented By: Justin DeKnoblough Rusty D’anna Leo Villicana Todd Orange Shane Winton Israel Patterson ~Providing Tomorrows

Typical Pavement Section

Page 23: West Sacramento Avenue Modifications Presented By: Justin DeKnoblough Rusty D’anna Leo Villicana Todd Orange Shane Winton Israel Patterson ~Providing Tomorrows
Page 24: West Sacramento Avenue Modifications Presented By: Justin DeKnoblough Rusty D’anna Leo Villicana Todd Orange Shane Winton Israel Patterson ~Providing Tomorrows

Specifications of Rubberized Asphalt Concrete

Consists of mixing gap graded aggregate and asphalt rubber binder

• Spread and compact the mixture

• 7 to 9 percent by mass of dry aggregate in the asphalt rubber binder/aggregate mix

• Cannot be below 55 degrees Fahrenheit to apply rubberized asphalt

• Regular asphalt layer must exist below the layer of rubberized asphalt concrete

Page 25: West Sacramento Avenue Modifications Presented By: Justin DeKnoblough Rusty D’anna Leo Villicana Todd Orange Shane Winton Israel Patterson ~Providing Tomorrows

Crumb Rubber Modifier

• Crumb rubber modifier is also referred to as the rubber binder

• Rubber binder is made from a combination of scrap tire and natural rubber

• No more than 0.01% of wire in the mix

• No more than 0.05% fabric in the mix

Page 26: West Sacramento Avenue Modifications Presented By: Justin DeKnoblough Rusty D’anna Leo Villicana Todd Orange Shane Winton Israel Patterson ~Providing Tomorrows

Monthly Averages & Records for Chico, CA °F | °C

Month Average Low Average High Average Precip. Record Low Record High

January 35° 54° 5.17 in 12° (1937) 77° (1920)

February 39° 60° 4.5 in 16° (1989) 82° (1920)

March 42° 65° 4.32 in 23° (1971) 93° (1914)

April 45° 72° 1.59 in 27° (1922) 98° (1926)

May 51° 80° 0.91 in 30° (1984) 108° (1910)

June 57° 88° 0.47 in 38° (1986) 115° (1961)

July 61° 93° 0.05 in 40° (1981) 117° (1972)

August 59° 92° 0.16 in 38° (1978) 116° (1914)

September 55° 88° 0.59 in 35° (1986) 114°

(1988)

October 47° 79° 1.34 in 23° (1971) 107° (2001)

November 40° 63° 3.5 in 20° (1916) 91° (1936)

December 35° 54° 3.63 in 11° (1932) 76° (1998)

Page 27: West Sacramento Avenue Modifications Presented By: Justin DeKnoblough Rusty D’anna Leo Villicana Todd Orange Shane Winton Israel Patterson ~Providing Tomorrows

Summary Environmental Advantages

Page 28: West Sacramento Avenue Modifications Presented By: Justin DeKnoblough Rusty D’anna Leo Villicana Todd Orange Shane Winton Israel Patterson ~Providing Tomorrows

Summary Cost Benefits Initial Cost Differences

HMA: $10,000

RAC: $13,500

8 Year Cost Differences

HMA: $20,000 RAC:

$13,500

RAC costs approximately 35% more than HMA initially

However, in the long run RAC will prove to cost less than HMA

Page 29: West Sacramento Avenue Modifications Presented By: Justin DeKnoblough Rusty D’anna Leo Villicana Todd Orange Shane Winton Israel Patterson ~Providing Tomorrows

Summary Technological Resources

We used AutoCAD 2006 3D to design our roadway profiles and typical cross-sections

We used Microsoft Excel to create graphs and tables

Page 30: West Sacramento Avenue Modifications Presented By: Justin DeKnoblough Rusty D’anna Leo Villicana Todd Orange Shane Winton Israel Patterson ~Providing Tomorrows

Summary Outside Collaboration Partners

To everyone involved in this process, thank you!

Page 31: West Sacramento Avenue Modifications Presented By: Justin DeKnoblough Rusty D’anna Leo Villicana Todd Orange Shane Winton Israel Patterson ~Providing Tomorrows

Summary Implementation of Engineering Design

We designed the typical roadway cross-sections using current Caltrans design procedures

We incorporated current Caltrans design specifications into the RAC-G overlay design

We calculated the roadway layers (RAC/HMA/AB/AS) by utilizing current design practices learned in our transportation class

Page 32: West Sacramento Avenue Modifications Presented By: Justin DeKnoblough Rusty D’anna Leo Villicana Todd Orange Shane Winton Israel Patterson ~Providing Tomorrows

Summary Effective Use of the Engineering Process

Stuff

More stuff

Page 33: West Sacramento Avenue Modifications Presented By: Justin DeKnoblough Rusty D’anna Leo Villicana Todd Orange Shane Winton Israel Patterson ~Providing Tomorrows

Summary Brainstorming Approaches

+

Flowcharts ResearchOutside Collaboration

Page 34: West Sacramento Avenue Modifications Presented By: Justin DeKnoblough Rusty D’anna Leo Villicana Todd Orange Shane Winton Israel Patterson ~Providing Tomorrows

Special Thanks To: Rachel Aviles GIS Analyst for City of

Chico Dr. Ding Cheng, Ph.D.,P.E. Assistant

Professor California Pavement Preservation Center at California State University, Chico

Alex Peterson, Hydraulics Engineer , California Department of Transportation, Caltrans

Page 35: West Sacramento Avenue Modifications Presented By: Justin DeKnoblough Rusty D’anna Leo Villicana Todd Orange Shane Winton Israel Patterson ~Providing Tomorrows

References

[1] http://thenumbersguru.com/wp-content/uploads/2006/07/Tire%20fire.jpg

[2] http://images.jupiterimages.com/common/detail/45/92/23119245.jpg

[3] http://www.abc.net.au/reslib/200710/r190100_713879.jpg

[4] http://www.sheppardsoftware.com/images/animalpics/rat2.jpg

[5] http://accessories.us.dell.com/sna/productdetail.aspx?sku=a0492003&cs=04&c=us&l=en

[6] http://office.microsoft.com/en-us/excel/FX100487621033.aspx

[7] http://www.dot.ca.gov/hq/esc/

[8] http://www.chico.ca.us/

[9] http://www.ecst.csuchico.edu/__depts/ce/Faculty_Staff/Members/Ding_Cheng.html

[10] http://h20331.www2.hp.com/hpsub/cache/301430-0-0-225-121.html

[11] http://asymptotia.com/wp-images/2007/08/homer-simpson-wallpaper-brain-1024.jpg

Page 36: West Sacramento Avenue Modifications Presented By: Justin DeKnoblough Rusty D’anna Leo Villicana Todd Orange Shane Winton Israel Patterson ~Providing Tomorrows

Questions?