West Lake UpdateMarch 24, 2016
EPA Releases First Round of Comprehensive Phase 1 Investigation Information
EPA is releasing selected data, tables, and figures collected during the Phase 1 site investiga-tion to determine the extent of RIM in Operable Unit 1, Area 1, of the West Lake Landfill. The data, tables, and figures depict the locations of soil borings, sampling locations, and gamma scans that were used to determine the extent of RIM in the landfill. EPA is conducting a thorough Quality Control/Quality Assurance review of the Compre-hensive Phase 1 report and will release it once it’s finalized.
EPA Region 7 has conducted a quality control review of the Comprehensive Phase I investigation data and information provided by the Potentially Responsible Parties (PRPs). The information and data, including a map depicting the revised ex-tent of radiologically-impacted material (RIM) is now available on the agency’s West Lake Landfill website.
The information and map released today pro-vide data from the field work including the Gam-ma Cone Penetrometer Testing. EPA is releasing the information consistent with its past practices of releasing final information after completion of an extensive review and qual-ity control process. EPA’s review process that is still underway for the final report is a robust effort designed to ensure that the PRPs’ work, and analy-ses meet the agency’s strict scientific standards and the goals of the investigation. As soon as the final report is complete and approved, EPA will post that document to the website. The data and map released help answer the follow-ing three questions:
1.Where is the radiologically-impacted mate-rial (RIM)?
The Extent of RIM map depicts areas of RIM based on sampling points included in the Phase 1 Investigation and from historical site investiga-tions. The Phase 1 investigation was conducted to determine the extent of RIM in Operable Unit
1 (OU-1), Area 1 of the West Lake Landfill. To accom-plish the Phase 1 objective, contractors for the responsible parties under EPA oversight collected more than 120 soil samples from 110 borings and conducted gamma scans from across Area 1, to determine areas with RIM present. The soil samples were then analyzed in a certified labora-tory to ensure the scientific accuracy and integrity of the data. The Phase 1 investigation identified RIM in areas of the landfill not identified during previous site investiga-tions as shown on the Extent of RIM map. The Phase 1 investigation also determined that RIM was not present in certain areas previously presumed to contain RIM.
2. Is there any change to health risks associated with the site as a result of the new data?
While the footprint of RIM within the West Lake Landfill has been revised, the health risks associated with the site remain consistent with previous studies. For the community surrounding the site, there are no significant health risks posed by the radiological wastes contained at the West Lake Landfill. Health risks for on-site work-ers also remain consistent with previous studies. On-site workers that conduct activities on Area 1 and Area 2 are subject to strict health and safety protocols while on-site, including scanning for radiological contamination before exiting the controlled exclusion zones. Additionally, risks associated with the potential for surface fires occurring in areas where RIM is near the surface are being mitigated by the current Removal Action to install the non-combus-tible cover in portions of Areas 1 and 2 of OU-1.
3. How does this new data relate to the subsurface smoldering event (SSE) in the Bridgeton Landfill?
The Phase 1 data indicate that RIM has been identi-fied further south and beneath a portion of the Bridgeton landfill known as the “Muffin Top”. However, on-site monitoring from temperature monitoring probes, gas extraction wells, and landfill subsidence, indicate that the SSE remains in the South Quarry, hundreds of feet from the RIM and that there is no rapid movement of the SSE towards the North Quarry or the RIM in OU-1. The SSE is monitored and managed under the regulatory author-ity of the Missouri Department of Natural Resources. All information related to oversight and monitoring of the Bridgeton Landfill is posted on their website (http://dnr.mo.gov/bridgeton/). In December, EPA announced
http://dnr.mo.gov/bridgeton/http://dnr.mo.gov/bridgeton/
-
Find Us Onwww.facebook.com/WestLakeLandfillSuperfundSite
www.twitter.com/WestLakeSitewww.scribd.com/eparegion7
www3.epa.gov/region07/cleanup/west_lake_landfill
Community InquiriesBen Washburn913-551-7364
its decision to require the Potentially Respon-sible Parties at the site to construct a physical isolation barrier, as well as install additional engineering controls, to prevent the SSE from contacting or impacting the RIM in OU-1. EPA will release additional information regarding the isolation barrier when the technical and legal details of this work are complete.
Progress on Surface Fire Mitigation Field Work
In December 2015, EPA Region 7 issued a unilateral order to the parties at the site to prepare and implement surface fire mitigation measures in Operable Unit 1, Areas 1 and 2, of the West Lake Landfill where radiologically impacted material (RIM) may be at or near the surface. The work includes cutting and laying in place brush, covering the brush with a per-meable geotextile cover, and then placing eight inches of crushed rock on top of the geotextile cover. This layered cover is collectively known as the non-combustible cover. This work will alleviate concerns with potential surface fires in areas where RIM is at or near the surface and reduces the risk of off-site migration of con-taminants that could result from removing the
vegetation. In addition to reducing the risk of surface fires, the non-combustible cover also reduces the health risks for on-site workers who enter OU-1 by providing additional shielding between the RIM and the workers.Work crews under EPA oversight began installing the non-combustible cover in February 2016, and the work is progressing at a steady pace. Construction of the non-combustible cover in Operable Unit 1, Area 1, is complete. Final confirmation from soil sampling will ensure that all areas with RIM known to be at or near the surface are cleared of vegetation and covered. Re-sults from recently collected soil samples are being ana-lyzed for confirmation that identified areas of surface RIM have been covered. In Area 1, about two acres have been covered with the non-combustible cover, while in Area 2, more than eight acres have been covered so far, totaling 21,000 tons of crushed rock for both areas. Crews working for the PRPs under EPA oversight are continuing to work on placing the non-combustible cover in Area 2.
EPA expects the surface fire mitigation field work to be completed later this spring. EPA is providing regu-lar updates, including progress photographs of the site work, to its Facebook and Twitter pages. Links to those pages are included in the West Lake Update.
http://www.facebook.com/WestLakeLandfillSuperfundSitehttp://www.twitter.com/WestLakeSitehttps://www.scribd.com/user/193013012/EPA-Region-7-Midwesthttp://www3.epa.gov/region07/cleanup/west_lake_landfill
-
GC
PT
1-1A
GC
PT
1-1
GC
PT
1-2
GC
PT
2-1
GC
PT
2-2
GC
PT
2-2A
GC
PT
2-2B
GC
PT
2-3
GC
PT
3-1
GC
PT
3-1A
GC
PT
3-2
GC
PT
4-1
GC
PT
4-2
GC
PT
5-1
GC
PT
5-2 G
CP
T 5-
3
GC
PT
5-4A
GC
PT
5-4
GC
PT
6-2
GC
PT
6-3
GC
PT
6-4
GC
PT
6-5
GC
PT
7-1
GC
PT
7-2
GC
PT
7-3
GC
PT
8-1
GC
PT
9-1 G
CP
T 9-
2
GC
PT
9-3A
GC
PT
9-3
GC
PT
10-1
GC
PT
10-2
GC
PT
10-3
AG
CP
T 10
-3G
CP
T 10
-4A
GC
PT
10-4
GC
PT
11-1
GC
PT
11-2
GC
PT
11-3 GC
PT
11-4
GC
PT
12-1
GC
PT
12-2
GC
PT
12-3
GC
PT
12-4
GC
PT
12-5
GC
PT
12-6G
CP
T 13
-1
GC
PT
13-2
AG
CP
T 13
-2
GC
PT
13-3
GC
PT
13-4
GC
PT
13-5
GC
PT
13-6
GC
PT
13-7
GC
PT
14-1
GC
PT
14-2
GC
PT
14-3
GC
PT
14-4 G
CP
T 14
-5
GC
PT
14-6
GC
PT
14-7
GC
PT
15-1
GC
PT
15-2
GC
PT
15-3
GC
PT
15-4
GC
PT
15-5
GC
PT
15-6
GC
PT
15-7
GC
PT
15-8
GC
PT
16-1
GC
PT
16-2
GC
PT
16-4
GC
PT
16-5
GC
PT
16-6
GC
PT
16-7
GC
PT
16-8
GC
PT-
108
GC
PT-
111A
GC
PT-
28A
GC
PT-
25
GC
PT-
36
GC
PT
2-4
GC
TP 9
-4
GC
PT
1C-1
AG
CP
T 1C
-1 GC
PT
1C-2
GC
PT
1C-3
GC
PT
1C-4
GC
PT
1C-5
GC
PT
1C-5
A
GC
PT
1C-7
GC
PT
1C-8
GC
PT
1C-9
GC
PT
1C-1
0
GC
PT
1C-1
1
GC
PT
1C-1
3
GC
PT
28
GC
PT
111
GC
PT
5-5
GC
PT
5-6 G
CP
T 6-
6
GC
PT
13-4
S
GC
PT
13-5
S
GC
PT
13-6
S GC
PT
13-7
S
GC
PT
14-3
S
GC
PT
14-5
S
GC
PT
14-6
S
GP
CT
1C-4
R
GC
PT
1C-6
GC
PT
1C-6
T1
GC
PT
1C-6
T
PV
C-2
5R
GP
1-2
GP
1C
-12
GP
1C
-12B
GP
1C
-12C
GP
1C
-2R
A
GP
1C
-4R
B
GP
1C
-6T1
GP
2-2
GP
2-3
GP
8-1
GP
8-1
BG
P W
L-11
9G
P W
L-11
9B
GP
WL-
119C
S1-
2
S2-
2
S5-
3
S8-
1
S12
-5S13
-3
S13
-6
S14
-2
S14
-4
S14
-5
S14
-7
S15
-2A
S15
-2
S16
-6
S1C
-6
SW
L-11
9
1D-1
1D-2
1D-3
1D-4
1D-5
1D-6 1D
-7
1D-8
A1D
-8
1D-9
A1D
-9
1D-1
0
1D-1
1A
1D-1
1
1D-1
2
1D-1
3B1D
-13A
1D-1
3 1D-1
3C
1D-1
4
1D-1
51D
-16
1D-1
6A
1D-1
7A1D
-17
1D-1
8
1D-1
8A
1D-1
S
1D-2
S1D
-3S
1D-4
S
1D-5
S
1D-6
S
1D-7
S
1D-8
S
1D-9
S
1D-1
0S
1D-1
1S
1D-1
2S
1D-1
3S
1D-1
4S
1D-1
5S1D
-16S
1D-1
7S
1D-1
8S
1D-1
9S
1D-2
0S
PV
C-2
4
PV
C-2
6
PV
C-2
7
PV
C-2
8
PV
C-2
9
PV
C-3
6
PV
C-3
7
PV
C-3
8
PV
C-4
1
WL-
101
WL-
102
WL-
103
WL-
104
WL-
105A
WL-
105B
WL-
105C
WL-
106
WL-
106A
WL-
107
WL-
108
WL-
109A
WL-
109B
WL-
109C
WL-
109D
WL-
110
WL-
111
WL-
112
WL-
113
WL-
114
WL-
115
WL-
116
WL-
117
WL-
118
WL-
119
WL-
120
WL-
121
WL-
122
WL-
123
WL-
124
S16
-3G
CP
T 16
-3
GP
1C
-4R
GC
PT
1C-1
2
GC
PT-
119
S8-
1A
GC
PT
2-2C
GC
PT
2-3A
GC
PT
1C-2
R
PV
C-2
5
Eng
inee
ring
Man
agem
ent S
uppo
rt, In
c.EM
SI
Wes
t Lak
e La
ndfil
l Sup
erfu
nd S
ite
Figu
re 1
5
M:\clients\EMSI\westlake\2015\Comp Report\WL-Fig-15-Extent ofRIM.dwg
NO
TES
:
AE
RIA
L TO
PO
GR
AP
HY
PR
OV
IDE
D B
YC
OO
PE
R A
ER
IAL
SU
RV
EY
S C
O. A
ND
ISD
ATE
D F
EB
RU
AR
Y 1
0, 2
015
A
LL E
LEV
ATI
ON
S A
RE
AB
OV
E M
EA
N S
EA
LE
VE
L (A
MS
L)
EX
TEN
T O
F R
IM
OU
-1 W
AS
TE D
ISP
OS
AL
AR
EA
1
OU
-1 A
PP
RO
XIM
ATE
ED
GE
OF
RE
FUS
E
LEG
EN
D
BO
RIN
GS
WIT
H E
LEV
ATE
D G
AM
MA
AN
D/O
RR
AD
IUM
OR
TH
OR
IUM
AB
OV
E U
NR
ES
TRIC
TED
US
E L
EV
ELS
AP
PR
OX
IMA
TE E
DG
E O
F R
EFU
SE
ED
GE
OF
QU
AR
RY
HIG
HW
ALL
Ext
ent o
f Rad
iolo
gica
lly-Im
pact
edM
ater
ial i
n A
rea
1