welcome to berlin - ziekenhuisdirecteurs energy... · • further improved market position and...
TRANSCRIPT
Unrestricted © Siemens AG 2014 All rights reserved. http://siemens.com/energy/power-generation/gas-turbines
Welcome to Berlin Geert De Gucht, Carl Laurent, Petra Michalke
Unrestricted © Siemens AG 2014.
Agenda
14.00 Welcome
14.15 Portfolio Siemens Healthcare; G. De Gucht, C. Laurent
14.45 Siemens Power Generation; P. Michalke
15.25 Shop tour in two groups; P. Michalke, H. Stavorinus
16.30 Q&A
16.45 Good-bye
Unrestricted © Siemens AG 2014.
Siemens-Cerner Announcement – August 6th, 2014
1
2
Cerner plans to take over Siemens’ Health Services unit, encompassing the Hospital Information Systems (HIS) business
• Further improved market position and expertise – positive perspective for HS employees and customers
• Increased quality of Healthcare's core portfolio
Siemens Healthcare and Cerner enter into a strategic alliance in the area of Next-Generation-Healthcare-IT
• Offers Siemens the option to collaborate in additional Next-Generation-Healthcare-IT areas, while concentrating on its strengths
Two elements of the Siemens – Cerner transaction
Unrestricted © Siemens AG 2014.
Cerner Footprint1) Siemens HS Footprint1)
Combined strengths
Siemens strong
not covered
Siemens present Cerner strong Cerner present
1) Source: Cerner Publications/KLAS, Siemens
Strong market position of combined business will benefit customers and employees
Cerner: • Strong growth (revenue CAGR of 12% between 2005-
2013) • Strong profitability • Currently #2 in market share according to KLAS (hospitals
>200 beds) Cerner + Siemens HS • Complementary footprint (U.S. and internationally) • Strong international product portfolio
One of the globally leading HIS providers with positive perspectives for … … Customers • Best-in-class portfolio • Ability to execute • Focus on healthcare
IT • > 15.000 client
facilities
… Employees • > 20.000 employees
Unrestricted © Siemens AG 2014.
Some details on the agreement
Process • Agreement is subject to regulatory approvals and expected to close in first
quarter of CY 2015
Products • The product bases will remain in place for the foreseeable future (at least for
10 years) • Products in scope for Belux Market : Soarian, Clinicom, ishMed OpenLink,
Share, Sense
Services • Cerner expects to utilize the Siemens services portfolio, including Customer
Managed Services & data centers
People • Cerner intends to retain the vast majority of the Siemens HS staff • Legal entities will be raised in the countries where Cerner is not yet present
Unrestricted © Siemens AG 2014.
Strengthened focus of Siemens Healthcare Our innovation is driven by customer needs
Clinical utility
Workflow efficiency
Cost efficiency
Lowest possible dose CT with “FORCE”
Breast cancer test (HER-2)
Congestive heart failure test (BNP)
MR for improved patient experience
Workflow-enabled Processing SYNGO
Lab automation Increased productivity with syngo TimCT
Doubling throughput PET/CT & PET/MR
Leading service and support excellence
Mobile X-ray system
Affordable ultrasound equipment
Hybrid rooms with lowest dose ARTIS Q
siemens.com/answers Unrestricted © Siemens AG 2014. All rights reserved.
Siemens Building Technologies The future is smart
Unrestricted © Siemens AG 2014. All rights reserved.
Fire safety
Security
Comfort
Energy efficiency
• Fire, smoke and gas detection • Evacuation • Extinguishing • Danger management
• Access control • Video surveillance • Intrusion detection
• Building management/automation • Heating, ventilation, air conditioning • Lighting and shading
• Energy Performance Contracting • Energy management • Energy consulting
For energy-efficient and safe buildings and infrastructures
Building Technologies - innovative portfolio to energy-efficient and safe buildings
Life
Cyc
le M
anag
emen
t
Restricted © Siemens Healthcare Diagnostics Inc. 2014 All rights reserved. Answers for life.
Shaping and Transforming Diagnostics Helping to Change Quality of Life for Generations to Come
Restricted © Siemens Healthcare Diagnostics Inc. 2014 All rights reserved.
Siemens Healthcare Global Forces Challenge Sustainability of Healthcare
Debt Crisis Access to Healthcare
Accountable Care
Demographic Change
Restricted © Siemens Healthcare Diagnostics Inc. 2014 All rights reserved.
Global Impact
Note: Excludes point-of-care (POC) testing (FY 2012)
Tests provided per year
>9 billion
Patients tested per year with chemistry and immunoassay tests
>800 million
Siemens Healthcare Diagnostics Impacting Millions of Lives Each Year
Restricted © Siemens Healthcare Diagnostics Inc. 2014 All rights reserved.
Did you know?
Laboratory services affect 60-70% of all critical clinical decisions, such as whether to admit, discharge and/or initiate therapy for a patient – but make up only 2-3% of the hospital’s budget in the U.S. and less than 2% of total health expenditures in most European countries.
Medical Device Spending vs. National Health Expenditures, 1989 - 2010
Sources: “Estimates of Medical Device Spending in the United States,” Prepared by Gerald Donahoe and Guy King, FSA, MAAA for AdvaMed, October 2012. “Laboratory Medicine: A National Status Report Prepared for CDC.” Prepared by the Lewin Group, under subcontract to Battelle Memorial Institute, May 2008. “The European IVD Market in 2010: Press Release”, EDMA, 2011.
In 2010, medical device spending in the U.S. totaled $156.3 billion, 6.0% of total national health expenditures. This % figure has remained essentially consistent since 1992.
Uniting Clinical and Workflow Excellence The Value of Diagnostics
Restricted © Siemens Healthcare Diagnostics Inc. 2014 All rights reserved.
WORKFLOW EXCELLENCE CLINICAL EXCELLENCE
Enhanced Efficiencies Enhanced Patient Outcomes
Siemens Answers Uniting Clinical and Workflow Excellence
Restricted © Siemens Healthcare Diagnostics Inc. 2014 All rights reserved.
Enabling physicians to provide optimal patient care
Clinical Excellence
Quality Novel assays
across disease states
Accurate results that enhance
clinical knowledge
Throughout the care continuum
Diagnosis
Treatment
Follow-up
Clinical Excellence Enhancing Patient Outcomes
Restricted © Siemens Healthcare Diagnostics Inc. 2014 All rights reserved.
Immunosuppressive Drugs & TDM
Infectious Diseases
Inflammation
Metabolic
Nephropathies
Nutritional Assessment
Pancreatic Disease
Reproductive Endocrinology
Thyroid
Hepatic Diseases Allergy
Bone Metabolism
Cancer
Coagulation Disorders
Diabetes
Drugs of Abuse/Toxicology
Growth
Anemia
Autoimmune/Rheumatoid
Cardiovascular
OTHER
RESPIRATORY
URINARY
SKELETAL
CIRCULATORY
DIGESTIVE
ENDOCRINE
REPRODUCTIVE
Clinical Excellence Powered by Over 900 Assays
Restricted © Siemens Healthcare Diagnostics Inc. 2014 All rights reserved.
D-dimer Assays • Choice of point-of-care assay on
Stratus® CS Acute Care™ system or INNOVANCE central lab assay; both aid in the diagnosis of venous thromboembolism
• Point-of-care assay turn around time as little as 14 minutes
Galectin-3 Assay* • Biomarker assay for use in
the management of heart failure patients
Free Light Chains Assay (FLC) • First monoclonal antibody used in
FLC methods for the screening and monitoring of multiple myeloma, allowing lot-to-lot consistency
HER-2/neu Assay • Yields important information
about response to therapy and disease progression in metastatic breast cancer
ADVIA Centaur® Syphilis Assay** • Consolidated infectious-disease
testing for increased productivity • Sensitive, specific detection of
treponemal antibodies VERSANT® HCV RNA 1.0 Assay • Aids in the diagnosis and
management of HCV-affected individuals
Cardiovascular Oncology Infectious Disease
*Under development. Not available for sale. **Not available for sale in the U.S.
Clinical Excellence Optimizing Outcomes in Critical Disease States
Restricted © Siemens Healthcare Diagnostics Inc. 2014 All rights reserved.
WORKFLOW EXCELLENCE CLINICAL EXCELLENCE
Enhanced Efficiencies Enhanced Patient Outcomes
Siemens Answers Uniting Clinical and Workflow Excellence
Restricted © Siemens Healthcare Diagnostics Inc. 2014 All rights reserved.
Challenges in diagnostics
Increase efficiency Manage with smaller budgets
Operate with fewer people
Workflow Excellence A Growing Need
Restricted © Siemens Healthcare Diagnostics Inc. 2014 All rights reserved.
High Troughput SYSTEMS
*Available outside U.S. only.
Workflow Excellence Evolution from Systems to Solutions
Unified solution to transform laboratory operations
• Peak performance
• Adaptability
• Intelligent technologies
• Siemens’ workflow expertise
High Troughput SOLUTIONS
Restricted © Siemens Healthcare Diagnostics Inc. 2014 All rights reserved.
Medical Testing Center Changshu, China
“Siemens workflow solutions allowed our lab to double workload in the 1.5 years since installation, without adding staff.”
Workflow Excellence Automation and Workflow Solutions
Restricted © Siemens Healthcare Diagnostics Inc. 2014 All rights reserved.
Administrative Healthcare Manager, Chemical Pathology,
University of Michigan
“We’ve leaned out our processes and improved things with CentraLink. I haven’t seen on other systems the algorithms that CentraLink has for hepatitis and HIV reporting. In the outpatient group, we figured that we have cut our number of serum separator tube (SST) draws down by 60%.”
Workflow Excellence Diagnostics IT Solutions
Restricted © Siemens Healthcare Diagnostics Inc. 2014 All rights reserved.
Innovation in Healthcare
Syst
ems
Assa
ys
IT A
pplic
atio
ns
Syst
ems
Bio
mar
kers
Scan protocol: SPECT:20 mCi 99mTc-Cardiolite stress39 mCi 99mTc-Myoview restFlash 3D attenuation and scatter correctio
6 slice CT:81 eff. mAs130 kV3 mm collimation5 mm slice thicknes Corrected Stress
Clin
ical
App
licat
ions
In Vitro Diagnostics Imaging Information Technology
Knowledge-driven Healthcare
Information Connectivity Enables Knowledge-driven Healthcare
Restricted © Siemens Healthcare Diagnostics Inc. 2014 All rights reserved.
WORKFLOW EXCELLENCE CLINICAL EXCELLENCE
Enhanced Efficiencies Enhanced Patient Outcomes
Driven by advanced Automation.
ECONOMICAL EXCELLENCE
Siemens Answers Uniting Clinical and Workflow Excellence
May 2014 Page 25
Guidance
Define objectives
Analysis and Simulation
HCS Observations
Floorplans
Financials
Project set-up and installation
Follow up
Restricted © Siemens Healthcare Diagnostics Inc. 2014 All rights reserved.
Simulation & Capacity-analysis
Test Total Test Total Test Total Test TotalBHCG__HCGTM 16 CFERRI 164 CFERRI 146 AAM2 15CKMB3 8 KFOLIU 101 KFOLIU 71 AAT3 8DHEAS 4 RTSH2 178 RTSH2 175 AFPR__AFPZW 1HATOT 10 T4VR 90 T4VR 105 CARBA 1HAVM 1 VB12 120 VB12 110 CEAD__CEAM 45HBCAS 5 Grand Total 653 Grand Total 607 CLH 13HBEAG 3 CORDX__8__20 7HBEAS 2 CPEP2 1HBSAG 8 DIGOX 2HBSAS 11 DIPHA 1HEPC2 10 INSUL 2HIV 22 KFSH 14KCA153 13 KIGE 17KESTRA 9 KPROG__PROGH 10MYOGL 2 KTESTO 2PTH2 3 PROLA2 4RUBG__RUBGZ 4 PSA__D60__D 112RUBM 1 PSAC 10TOXG3 7 T3VR 122TOXM 8 VALPRO 6TROPO2 11 Grand Total 393Grand Total 158
Centaur1 Centaur2 Centaur3 Centaur4
Restricted © Siemens Healthcare Diagnostics Inc. 2014 All rights reserved.
Actual versus simulated TAT
Restricted © Siemens Healthcare Diagnostics Inc. 2014 All rights reserved.
HCS Observations : follow the tube
Restricted © Siemens Healthcare Diagnostics Inc. 2014 All rights reserved.
“Value Stream Mapping”
Load N = 5
Balance
Spin
Unload
PRE-ANALYTICAL PROCESS ANALYTICAL PROCESS POST ANALYTICAL PROCESS
Inspect Label Integrity
De-Cap
Load Analyzers
Analysis
Release Result
Unload Carrier
Rack
Re-Cap
Request
Sample Search
Transport
Transport
Triage Short
In-Pts EDOut-Pts Remote
PTS DELIVER
Register
Priority
Deliver
HematologyCoagulationChem/IA Urinalysis
InstrumentSort Centaur Integra
CNT
Hemolyzed
Rack
Transport
Pour
Re-Seat
Special Segment
Action
Sample Search
Aliquot
Store
Store
Add-On Send Out
Result
Central Processing
Pre-Sort to CPU Bench
LIS Receipt
Sort
Out Rack In Rack
CentrifugeStat
Pre-Sort to MPA
Pre-Sort to Stats
Aliquote
May 2014 Page 32
Optimized Flow
• Less manual steps
• Reduced waiting times
• Less manual tube handling
• Reduced walking distances
• Less aliquots
• Reduced error risk
• Reduced costs
• Less FTE’s
Optimized Sample
Flow
Restricted © Siemens Healthcare Diagnostics Inc. 2014 All rights reserved.
Project set-up
MS project planning
Job descriptions
Autocad Technical plans
Restricted © Siemens Healthcare Diagnostics Inc. 2014 All rights reserved.
© 2013 Siemens Healthcare Diagnostics.
Final Floorplan based on best flow
Restricted © Siemens Healthcare Diagnostics Inc. 2014 All rights reserved.
Do not under- estimate change!
Restricted © Siemens Healthcare Diagnostics Inc. 2014 All rights reserved.
Economical Excellence : critical factors
One supplier
Dependent on objectives
Future growth & devellopment plans
Openess to Change
Unrestricted © Siemens Healthcare Diagnostics Inc. 2013 All rights reserved.
Page 44 HCS/Siemens Healthcare Diagnostics Oy © 2013 Siemens Healthcare Diagnostics.
Thank you
Unrestricted © Siemens AG 2014 All rights reserved. http://siemens.com/energy/power-generation/gas-turbines
Welcome to Berlin Petra Michalke
Siemens Energy Sector – Gas Turbine Manufacturing & Service @ Berlin
Unrestricted © Siemens AG 2014 All rights reserved.
Page 46 Siemens Energy / E CC P GT BlnH September, 12th 2014 P. Michalke
Content
2
Arial 16 pt., Line spacing 1.1 lines 1
Gas Turbine Manufacturing Berlin
Siemens Energy Sector
Unrestricted © Siemens AG 2014 All rights reserved.
Page 47 Siemens Energy / E CC P GT BlnH September, 12th 2014 P. Michalke
As part of Siemens Energy we contribute to clean energy to the world
Instrumentation & Electrical (E F IE)
Conventional Island (E F CI)
Products (E F PR)
Energy Solutions (E F ES)
Energy Sector
Fossil Power Generation
Power Transmission Oil & Gas Energy Service Wind
Power
Fossil Power
Generation
Business Unit Products
I&C* Sector Energy Sector Industry Sector Healthcare Sector
* Infrastructure and Cities Sector
Gas Turbines
Steam Turbines Generators Fuel Gasifier
Energy Service (E S SF)
Unrestricted © Siemens AG 2014 All rights reserved.
Page 48 Siemens Energy / E CC P GT BlnH September, 12th 2014 P. Michalke
Enhancement of Gas Turbine Operational Flexibility Introduction
Base Load (Original Design Concept)
Top Priorities: Power Efficiency Availability
Classical Operation
Economical, Population & Political Requirements
Intermediate (Environmental Adaptions)
Top Priorities: Efficiency (CHP) Emissions Seasonal
Availability
Interim Operation
Carbon Allowances
Coal Power
Combined Cycle Power Plant
Top Priorities: Flexibility O&M Costs Emissions
Grid Code Requirements & Forecast Volatility
Today‘s* & Future Operation
Standby (Low hours, fast responses)
*global and local variations
Unrestricted © Siemens AG 2014 All rights reserved.
Page 49 Siemens Energy / E CC P GT BlnH September, 12th 2014 P. Michalke
Enhancement of Gas Turbine Operational Flexibility with Flex-Power Services™
Hot Start Conditions & Purge Credit
Base Load (P*)
Secondary Frequency Response
Peak Load & Grid Support
Minimum Load
Improvement
Fast Shut &
Cool Down
Fast Start Up
Primary Frequency Response
Standard Operation Line
Flex Operation Line
Unrestricted © Siemens AG 2014 All rights reserved.
Page 50 Siemens Energy / E CC P GT BlnH September, 12th 2014 P. Michalke
Content
2
Arial 16 pt., Line spacing 1.1 lines 1
Gas Turbine Manufacturing Berlin
Siemens Energy Sector
Unrestricted © Siemens AG 2014 All rights reserved.
Page 51 Siemens Energy / E CC P GT BlnH September, 12th 2014 P. Michalke
Gas Turbine Manufacturing Plant
Berlin Plant Huttenstraße
Port Westhafen (Assembly & Depot) Mertensstraße
(Depot)
Borsighalle 20 (Manufacturing & Depot)
Siemensstadt (Service, TACR, Manufacturing & Depot)
Ludwigsfelde Energy Logistics Center & CEC
Unrestricted © Siemens AG 2014 All rights reserved.
Page 52 Siemens Energy / E CC P GT BlnH September, 12th 2014 P. Michalke
Berlin Plant “Huttenstrasse”
■ 130,000 m² plant area
■ 68,700 m² built-up
■ About 65% under crane coverage
■ 200 customer visits / year
Unrestricted © Siemens AG 2014 All rights reserved.
Page 53 Siemens Energy / E CC P GT BlnH September, 12th 2014 P. Michalke
Berlin Plant: Staff Structure
Berlin Plant (Manufacturing and Service)
Employees
3,700
Women Proportion
19 %
Number of Nationalities
46
Proportion of non-German Employees
6 %
Apprentice
250
Unrestricted © Siemens AG 2014 All rights reserved.
Page 54 Siemens Energy / E CC P GT BlnH September, 12th 2014 P. Michalke
Shipment of 800th gas turbine
Berlin Plant: History
Foundation of turbine factory
50 MW – World largest
steam turbine
Foundation KWU
First gas turbine 62.5 MW (V93.0)
Worlds most powerful gas turbine
116 MW (V94.1)
Launch of V94.2
(SGT5-2000E)
Launch of V94.3A
(SGT5-4000F)
Merger with Westinghouse
Worlds most powerful gas turbine 375 MW
(SGT5-8000H)
Steam turbine manufacturing Global manufacturing network Gas turbine manufacturing
Opening of Field Service
Training Centre
1904 1916 1969 1972 1978 1981
1996 1998 2000 2010 2011 2013
Start of global manufacturing
Unrestricted © Siemens AG 2014 All rights reserved.
Page 55 Siemens Energy / E CC P GT BlnH September, 12th 2014 P. Michalke
Large Scale Siemens Gas Turbines: The Right Engine for Every Power Category
50 H
z
SGT5-8000H
SGT5-4000F
SGT5-2000E
307 MW
172 MW
400 MW
SGT6-8000H
114 MW
SGT6-5000F
SGT6-2000E
274 MW
232 MW
60 H
z
Unrestricted © Siemens AG 2014 All rights reserved.
Page 56 Siemens Energy / E CC P GT BlnH September, 12th 2014 P. Michalke
The Heart of a Power Plant: Siemens Heavy Duty Gas Turbine
We generate customer benefit
• Highest reliability: over 99 %
• Highest availability: over 95 %
• Power output between 114 and 400 MW
• Highest efficiency: over 40 %
• Environmental friendliness with lowest emission values
• Flexibility
Proven Technology > 950 GTs Operating in 60 Countries
Unrestricted © Siemens AG 2014 All rights reserved.
Page 57 Siemens Energy / E CC P GT BlnH September, 12th 2014 P. Michalke
Products Berlin Plant
SGT6-2000E, SGT5-2000E
SGT6-8000H, SGT5-8000H Service Components
SGT5-4000F SGT6-5000F
Unrestricted © Siemens AG 2014 All rights reserved.
Page 58 Siemens Energy / E CC P GT BlnH September, 12th 2014 P. Michalke
Siemens products to ensure Customer’s success and Competitiveness!
• Excellent product portfolio available regarding diverse market requirements.
• Product validation
• Operational experience ensure high reliability.
• Continuous product development to reflect customer’s needs.
• Siemens as Original Equipment Manufacturer (OEM) takes care!
Summary & Conclusion
Unrestricted © Siemens AG 2014 All rights reserved.
Page 59 Siemens Energy / E CC P GT BlnH September, 12th 2014 P. Michalke
Shop Tour Berlin Plant
Combustion System
Final Assembly
Blade Shop Auxiliaries
Rotor Shop
Unrestricted © Siemens AG 2014 All rights reserved.
Page 60 Siemens Energy / E CC P GT BlnH September, 12th 2014 P. Michalke
Disclaimer
This document contains forward-looking statements and information – that is, statements related to future, not past, events. These statements may be identified either orally or in writing by words as “expects”, “anticipates”, “intends”, “plans”, “believes”, “seeks”, “estimates”, “will” or words of similar meaning. Such statements are based on our current expectations and certain assumptions, and are, therefore, subject to certain risks and uncertainties. A variety of factors, many of which are beyond Siemens’ control, affect its operations, performance, business strategy and results and could cause the actual results, performance or achievements of Siemens worldwide to be materially different from any future results, performance or achievements that may be expressed or implied by such forward-looking statements. For us, particular uncertainties arise, among others, from changes in general economic and business conditions, changes in currency exchange rates and interest rates, introduction of competing products or technologies by other companies, lack of acceptance of new products or services by customers targeted by Siemens worldwide, changes in business strategy and various other factors. More detailed information about certain of these factors is contained in Siemens’ filings with the SEC, which are available on the Siemens website, www.siemens.com and on the SEC’s website, www.sec.gov. Should one or more of these risks or uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in the relevant forward-looking statement as anticipated, believed, estimated, expected, intended, planned or projected. Siemens does not intend or assume any obligation to update or revise these forward-looking statements in light of developments which differ from those anticipated.
Trademarks mentioned in this document are the property of Siemens AG, it's affiliates or their respective owners.