welcome & news · detector integration and integration 25 02.02.20 macier, nessi | meeting...
TRANSCRIPT
![Page 1: Welcome & News · Detector Integration and Integration 25 02.02.20 Macier, Nessi | Meeting Welcome DUNE Consortia Integration Office (DUNE Support Funded) •Integration Office provides](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb72554dd9e5409f152f5f6/html5/thumbnails/1.jpg)
Long-Baseline Neutrino FacilityLBNF
Welcome & News
Jolie Macier, Marzio Nessi
FS Installation/Integration Planning
2-4 February 2020
![Page 2: Welcome & News · Detector Integration and Integration 25 02.02.20 Macier, Nessi | Meeting Welcome DUNE Consortia Integration Office (DUNE Support Funded) •Integration Office provides](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb72554dd9e5409f152f5f6/html5/thumbnails/2.jpg)
LBNF
About the region & this venue, Kartause Ittingen
02.02.20 Macier, Nessi | Meeting Welcome2
![Page 3: Welcome & News · Detector Integration and Integration 25 02.02.20 Macier, Nessi | Meeting Welcome DUNE Consortia Integration Office (DUNE Support Funded) •Integration Office provides](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb72554dd9e5409f152f5f6/html5/thumbnails/3.jpg)
LBNF
Outline
02.02.20 Macier, Nessi | Meeting Welcome3
• Welcome
• Meeting Logistics
• Management Updates
• News on Tools
• Tracking Actions
![Page 4: Welcome & News · Detector Integration and Integration 25 02.02.20 Macier, Nessi | Meeting Welcome DUNE Consortia Integration Office (DUNE Support Funded) •Integration Office provides](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb72554dd9e5409f152f5f6/html5/thumbnails/4.jpg)
LBNF
Say that again….
02.02.20 Macier, Nessi | Meeting Welcome4
![Page 5: Welcome & News · Detector Integration and Integration 25 02.02.20 Macier, Nessi | Meeting Welcome DUNE Consortia Integration Office (DUNE Support Funded) •Integration Office provides](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb72554dd9e5409f152f5f6/html5/thumbnails/5.jpg)
LBNFThis Photo by Unknown Author is licensed under CC BY-SA
Swiss German for Dummies!
![Page 6: Welcome & News · Detector Integration and Integration 25 02.02.20 Macier, Nessi | Meeting Welcome DUNE Consortia Integration Office (DUNE Support Funded) •Integration Office provides](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb72554dd9e5409f152f5f6/html5/thumbnails/6.jpg)
LBNF
Hello = Grüezi
![Page 7: Welcome & News · Detector Integration and Integration 25 02.02.20 Macier, Nessi | Meeting Welcome DUNE Consortia Integration Office (DUNE Support Funded) •Integration Office provides](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb72554dd9e5409f152f5f6/html5/thumbnails/7.jpg)
LBNF
Good Bye = (Uf) Widerluege
![Page 8: Welcome & News · Detector Integration and Integration 25 02.02.20 Macier, Nessi | Meeting Welcome DUNE Consortia Integration Office (DUNE Support Funded) •Integration Office provides](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb72554dd9e5409f152f5f6/html5/thumbnails/8.jpg)
LBNF
Thanks a Lot = Merci vilmal
![Page 9: Welcome & News · Detector Integration and Integration 25 02.02.20 Macier, Nessi | Meeting Welcome DUNE Consortia Integration Office (DUNE Support Funded) •Integration Office provides](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb72554dd9e5409f152f5f6/html5/thumbnails/9.jpg)
LBNF
Have a Nice Meal = En guete
![Page 10: Welcome & News · Detector Integration and Integration 25 02.02.20 Macier, Nessi | Meeting Welcome DUNE Consortia Integration Office (DUNE Support Funded) •Integration Office provides](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb72554dd9e5409f152f5f6/html5/thumbnails/10.jpg)
LBNF
yeah, right, exactly =
Äbä, genau
![Page 11: Welcome & News · Detector Integration and Integration 25 02.02.20 Macier, Nessi | Meeting Welcome DUNE Consortia Integration Office (DUNE Support Funded) •Integration Office provides](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb72554dd9e5409f152f5f6/html5/thumbnails/11.jpg)
LBNF
BathroomsMan = Herren
Woman = Damen
![Page 12: Welcome & News · Detector Integration and Integration 25 02.02.20 Macier, Nessi | Meeting Welcome DUNE Consortia Integration Office (DUNE Support Funded) •Integration Office provides](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb72554dd9e5409f152f5f6/html5/thumbnails/12.jpg)
LBNF
More for overachievers!https://www.omniglot.com/language/phrases/swissgerman.php
Hello (General greeting)
Grüezi (frm)Sali (inf)Grüezi mittenand (pl/frm)Sali zämme (pl/inf)
How are you?Wie goots Ihne? (frm)Wie goots? (inf)
Reply to 'How are you?'Dangge, guet, und Ihne? (frm)Dangge, guet, und dir? (inf)
My name is ...I heisse ...Mi name isch ...
Good morning (Morning greeting)
Guete Morge
Good afternoon (Afternoon greeting)
Gueten AbigGuete Daag
![Page 13: Welcome & News · Detector Integration and Integration 25 02.02.20 Macier, Nessi | Meeting Welcome DUNE Consortia Integration Office (DUNE Support Funded) •Integration Office provides](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb72554dd9e5409f152f5f6/html5/thumbnails/13.jpg)
LBNF
Who is here?
02.02.20 Macier, Nessi | Meeting Welcome13
• Your name
• Institution
• Role on LBNF/DUNE
• Your Favorite….
![Page 14: Welcome & News · Detector Integration and Integration 25 02.02.20 Macier, Nessi | Meeting Welcome DUNE Consortia Integration Office (DUNE Support Funded) •Integration Office provides](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb72554dd9e5409f152f5f6/html5/thumbnails/14.jpg)
LBNF
Meeting Agenda – Today, 2 February
02.02.20 Macier, Nessi | Meeting Welcome14
![Page 15: Welcome & News · Detector Integration and Integration 25 02.02.20 Macier, Nessi | Meeting Welcome DUNE Consortia Integration Office (DUNE Support Funded) •Integration Office provides](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb72554dd9e5409f152f5f6/html5/thumbnails/15.jpg)
LBNF
Meeting Agenda –
Monday, 3 February
02.02.20 Macier, Nessi | Meeting Welcome15
![Page 16: Welcome & News · Detector Integration and Integration 25 02.02.20 Macier, Nessi | Meeting Welcome DUNE Consortia Integration Office (DUNE Support Funded) •Integration Office provides](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb72554dd9e5409f152f5f6/html5/thumbnails/16.jpg)
LBNF
Meeting Agenda – Tuesday, 4 February
02.02.20 Macier, Nessi | Meeting Welcome16
![Page 17: Welcome & News · Detector Integration and Integration 25 02.02.20 Macier, Nessi | Meeting Welcome DUNE Consortia Integration Office (DUNE Support Funded) •Integration Office provides](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb72554dd9e5409f152f5f6/html5/thumbnails/17.jpg)
LBNF
Did we do what we said we’d do?
02.02.20 Macier, Nessi | Meeting Welcome17
• Action items are being recorded during this meeting
• Follow-up for priority 1 & 2 action items from August 2019 should
be included in presenter talks (modify now if necessary!)
![Page 18: Welcome & News · Detector Integration and Integration 25 02.02.20 Macier, Nessi | Meeting Welcome DUNE Consortia Integration Office (DUNE Support Funded) •Integration Office provides](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb72554dd9e5409f152f5f6/html5/thumbnails/18.jpg)
LBNF
The Team
02.02.20 Macier, Nessi | Meeting Welcome18
International DUNE DetectorConst Project
![Page 19: Welcome & News · Detector Integration and Integration 25 02.02.20 Macier, Nessi | Meeting Welcome DUNE Consortia Integration Office (DUNE Support Funded) •Integration Office provides](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb72554dd9e5409f152f5f6/html5/thumbnails/19.jpg)
LBNF
The Integration Team
02.02.20 Macier, Nessi | Meeting Welcome19
Integration Project Office
Mechanical Integration
Electrical Integration
Compliance office
Review office
Schedule office
QC librarian/EDMS
FS detectors installation
NS detectors installationSouth Dakota Service
Division (SDSD)
Jack FowlerDimitar Mladenov
Olga Beltramello
Steve Kettell
Mohammed Elrafih
Hiring in process
Jim StewartPatrick Weber, Joe Pygott
![Page 20: Welcome & News · Detector Integration and Integration 25 02.02.20 Macier, Nessi | Meeting Welcome DUNE Consortia Integration Office (DUNE Support Funded) •Integration Office provides](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb72554dd9e5409f152f5f6/html5/thumbnails/20.jpg)
LBNF
How we make this happen ($!)
02.02.2020
• LBNF/DUNE-US = DOE Project $$
- Working to define Total Project Cost
- Plan to baseline in 2020 -> more about this on Tuesday
• In-kind contributions
• DUNE Support funds = DOE, but not project
- Supports DUNE collaboration activities, including Technical
Coordination and Integration Project Office
(Non-DOE)
DUNE Support Costs (DOE Funded)
LBNF (Non-DOE funded) In Kind Contributions
LBNF (DOE Funded)
SURF Operations - Cooperative Agreement (DOE Funded)
DU
NE
US
(DO
E F
un
de
d)
DUNE
(Non-DOE
Funded)
Inte
gra
tio
n (
DO
E F
un
de
d)
For this meeting, we will ensure we know who is doing what, rather than who is paying. We want to be sure we have no scope gaps!
![Page 21: Welcome & News · Detector Integration and Integration 25 02.02.20 Macier, Nessi | Meeting Welcome DUNE Consortia Integration Office (DUNE Support Funded) •Integration Office provides](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb72554dd9e5409f152f5f6/html5/thumbnails/21.jpg)
LBNF
Detector Design and Construction
02.02.20 Macier, Nessi | Meeting Welcome21
• Design and fabrication
of detector subsystems
is organized through
the DUNE institutional
consortia
• Individual subsystem
deliverables are taken
on (and become the
responsibility of) the
national-level detector
construction projects
- Includes some DUNE-US
(DOE) project contributions
DUNE Consortia
![Page 22: Welcome & News · Detector Integration and Integration 25 02.02.20 Macier, Nessi | Meeting Welcome DUNE Consortia Integration Office (DUNE Support Funded) •Integration Office provides](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb72554dd9e5409f152f5f6/html5/thumbnails/22.jpg)
LBNF
Detector Design and Construction
02.02.20 Macier, Nessi | Meeting Welcome22
DUNE Consortia
DUNE Technical Coordination (DUNE Support Funded)
• DUNE Technical
Coordination provides
project support and
overall coordination
- Subsystem Interfaces
- ES&H
- QA/QC
- Scheduling
- Risk Management
- Change Control
- Review Oversight
![Page 23: Welcome & News · Detector Integration and Integration 25 02.02.20 Macier, Nessi | Meeting Welcome DUNE Consortia Integration Office (DUNE Support Funded) •Integration Office provides](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb72554dd9e5409f152f5f6/html5/thumbnails/23.jpg)
LBNF
Detector Integration and Installation
02.02.20 Macier, Nessi | Meeting Welcome23
• The integration element of
the DOE project contains the
resources for the core team
needed to support the
detector installation effort
- Hoist Operators
- Transport Crews
- Riggers
- General Technicians
- Safety Coordinators
- Survey/Alignment Team
• Also provides required M&S
resources for common detector
infrastructure and installation
equipment
Core Installation (DOE Project Funded)
![Page 24: Welcome & News · Detector Integration and Integration 25 02.02.20 Macier, Nessi | Meeting Welcome DUNE Consortia Integration Office (DUNE Support Funded) •Integration Office provides](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb72554dd9e5409f152f5f6/html5/thumbnails/24.jpg)
LBNF
Detector Integration and Integration
02.02.20 Macier, Nessi | Meeting Welcome24
DUNE Consortia• DUNE Consortia
provide scientific and
technical personnel to
support the installation
and commissioning of
their subsystems
- Includes some DUNE-US
(DOE) project contributions
Core Installation (DOE Project Funded)
![Page 25: Welcome & News · Detector Integration and Integration 25 02.02.20 Macier, Nessi | Meeting Welcome DUNE Consortia Integration Office (DUNE Support Funded) •Integration Office provides](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb72554dd9e5409f152f5f6/html5/thumbnails/25.jpg)
LBNF
Detector Integration and Integration
02.02.20 Macier, Nessi | Meeting Welcome25
DUNE Consortia
Integration Office (DUNE Support Funded)
• Integration Office provides
overall coordination of the
integration and installation
effort
- Integration of the detector
elements within the supporting
infrastructure and facilities
- Management of safety
compliance process
- Review organization
- Detector installation planning
- Coordination of installation
activities
Core Installation (DOE Project Funded)
![Page 26: Welcome & News · Detector Integration and Integration 25 02.02.20 Macier, Nessi | Meeting Welcome DUNE Consortia Integration Office (DUNE Support Funded) •Integration Office provides](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb72554dd9e5409f152f5f6/html5/thumbnails/26.jpg)
LBNF
LBNF/DUNE WBS (DUNE Project Office)
02.02.20 Macier, Nessi | Meeting Welcome26
131.02 DUNE131.02.01 Project Office – DUNE
131.02.01.01 DUNE US Project Office131.02.01.02 DUNE Technical Coordination131.02.01.03 DUNE Collaboration Management
DOE Project ElementsDUNE Support Fund Elements
131.04 Integration131.04.01 Far Site Integration
131.04.01.01 FS Integration Project Office131.04.01.01.01 Integration Project Office131.04.01.01.02 General Operations
131.04.01.02 FS Facility Support & Services131.04.01.02.01 General Site Support131.04.01.02.02 Power at SURF131.04.01.02.03 Warehouse/Transportation131.04.01.02.04 Support Services131.04.01.02.05 Ross Shaft Hoisting Services
131.04.01.03 FS Cavern Outfitting131.04.01.03.01 Design/Procurement131.04.01.03.03 Cavern #1 Preparation131.04.01.03.05 Cold Cryostat #1 Installation131.04.01.03.06 Cavern #2 Preparation131.04.01.03.08 Cold Cryostat #2 Installation
131.04.01.04 Far Detector Installation131.04.01.04.01 Design/Procurement131.04.01.04.02 Clean Room #1 Installation131.04.01.04.03 Detector #1131.04.01.04.04 Clean Room #2 Installation131.04.01.04.05 Detector #2
![Page 27: Welcome & News · Detector Integration and Integration 25 02.02.20 Macier, Nessi | Meeting Welcome DUNE Consortia Integration Office (DUNE Support Funded) •Integration Office provides](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb72554dd9e5409f152f5f6/html5/thumbnails/27.jpg)
LBNF
News on Tools – helping us get work accomplished
02.02.20 Macier, Nessi | Meeting Welcome27
• EDMS to be used for project technical documentation
- Training resources available; Integration PO hiring a staff resource
at Fermilab
• CERN & FNAL IDs – help info in backup to keep them current
• Mailing lists – need updating; see backup
![Page 28: Welcome & News · Detector Integration and Integration 25 02.02.20 Macier, Nessi | Meeting Welcome DUNE Consortia Integration Office (DUNE Support Funded) •Integration Office provides](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb72554dd9e5409f152f5f6/html5/thumbnails/28.jpg)
LBNF
Final Comments
02.02.20 Macier, Nessi | Meeting Welcome28
• This is a forum to share information
• Respect others’ perspectives – we all come to this enterprise
with differing priorities, but a common interest in the best
outcome (science!)
• We will table issues that require further analysis or additional
input -> action items
• Keep dialogue going, especially now that you know your
colleagues better
![Page 29: Welcome & News · Detector Integration and Integration 25 02.02.20 Macier, Nessi | Meeting Welcome DUNE Consortia Integration Office (DUNE Support Funded) •Integration Office provides](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb72554dd9e5409f152f5f6/html5/thumbnails/29.jpg)
LBNF
Backup Information
02.02.20 Macier, Nessi | Meeting Welcome29
![Page 30: Welcome & News · Detector Integration and Integration 25 02.02.20 Macier, Nessi | Meeting Welcome DUNE Consortia Integration Office (DUNE Support Funded) •Integration Office provides](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb72554dd9e5409f152f5f6/html5/thumbnails/30.jpg)
LBNF
Maintaining DUNE Listservs
LIST Serv
• Is your list serv up to date?
• We have an extensive amount of list servs. Please make sure your lists
are being kept up to date. If you have questions on this issue, please
contact [email protected]
• Do you need a new list serv?
• You can apply for a new list serv at https://listserv.fnal.gov/
- You must have a person with a FNAL email address or use your FNAL email
address for the request. This person should be the first owner. You are required to
have 2nd owner, this does not have to a person with an FNAL email address.
- If you need assistance, please contact Maxine
- All DUNE list serv requests must begin with “DUNE-”
![Page 31: Welcome & News · Detector Integration and Integration 25 02.02.20 Macier, Nessi | Meeting Welcome DUNE Consortia Integration Office (DUNE Support Funded) •Integration Office provides](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb72554dd9e5409f152f5f6/html5/thumbnails/31.jpg)
LBNF
Collaboration Tools
• DUNE tools may be found at
https://atwork.dunescience.org/tools/
- If you see a tool missing from this page, please contact Maxine
- Commonly requested items on this page:
• Computing account requests
• DocDB access
• Wiki access
• DUNE Collaborator Database access
• For DOE project team, we’re updating LBNF, DUNE-US and
Integration mailing lists to reflect organization updates
![Page 32: Welcome & News · Detector Integration and Integration 25 02.02.20 Macier, Nessi | Meeting Welcome DUNE Consortia Integration Office (DUNE Support Funded) •Integration Office provides](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb72554dd9e5409f152f5f6/html5/thumbnails/32.jpg)
LBNF
Getting a new CERN User ID
• Information for a “new” ID
- Information may be found at this link
• http://usersoffice.web.cern.ch/content/arrival-what-you-need-do
• You can only apply for a CERN User ID within 30 days of your planned
arrival
• To preregister you will need the following:
- Home Institution Declaration (signature required of team leader or division
head)
- Registration Form
- Copy of your passport
- Preregistration needs to be done by your institution leader/admin.
• Note – the request can be done for a 3 year term.
![Page 33: Welcome & News · Detector Integration and Integration 25 02.02.20 Macier, Nessi | Meeting Welcome DUNE Consortia Integration Office (DUNE Support Funded) •Integration Office provides](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb72554dd9e5409f152f5f6/html5/thumbnails/33.jpg)
LBNF
Renewing Contracts – CERN Users
• You will receive an email from CERN informing you of your contract expiring.
- It’s important that you have your CERN email forwarded to your most used email address.
- Verify your contract information. The renewal can be done for up to 5 years.
- A new Home Institution Declaration form will be required. (note on the previous page)
- Attach the new HID to the online renewal.
- Submit
• If this is not done in a timely fashion, your contract will expire.
• When your contract expires, you will not be able to enter CERN.
• Your ID card may have longer dates, however you contract is not active. Entry will be denied
![Page 34: Welcome & News · Detector Integration and Integration 25 02.02.20 Macier, Nessi | Meeting Welcome DUNE Consortia Integration Office (DUNE Support Funded) •Integration Office provides](https://reader034.vdocuments.mx/reader034/viewer/2022042213/5eb72554dd9e5409f152f5f6/html5/thumbnails/34.jpg)
LBNF
Applying for a FNAL computer account
• All needed information is at https://get-connected.fnal.gov/users/
• You will be required to have a contact person at FNAL.
- Your contact person should be the FNAL person that you will be
working with, however DUNE people may also use Maxine as their
contact person.
- Please make sure your training is also done and up to date.
NOTE: We are aware the the ID and account information is difficult.
Please contact Maxine for additional information and contact
information.