welcome lindsay whalin, ms, pg leona heights sulfur mine & creek cleanup darin ranelletti

34
WELCOME Lindsay Whalin, MS, PG Leona Heights Sulfur Mine & Creek Cleanup Darin Ranelletti

Upload: penelope-lindsey

Post on 19-Jan-2016

219 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: WELCOME Lindsay Whalin, MS, PG Leona Heights Sulfur Mine & Creek Cleanup Darin Ranelletti

WELCOME

Lindsay Whalin, MS, PG

Leona Heights Sulfur Mine & Creek Cleanup

Darin Ranelletti

Page 2: WELCOME Lindsay Whalin, MS, PG Leona Heights Sulfur Mine & Creek Cleanup Darin Ranelletti

PROJECT PURPOSE & DESIGN

Lindsay Whalin, MS, PGSan Francisco Bay Water Board

Leona Heights Sulfur Mine & Creek Cleanup

Page 3: WELCOME Lindsay Whalin, MS, PG Leona Heights Sulfur Mine & Creek Cleanup Darin Ranelletti

1. Lindsay1. Lindsay

Purpose of Cleanup

Project Goals

Current

Design

Presentation Outline3

2. Phil2. Phil

Construction Management Project

Duration Construction

days/hours Road use/

Traffic Noise control Dust control Access route Staging areas

3. Darin3. Darin

City PermitsEnvironment

al Review

Timeline

Next Steps

Page 4: WELCOME Lindsay Whalin, MS, PG Leona Heights Sulfur Mine & Creek Cleanup Darin Ranelletti

Location

Mining Waste

Piles

McDonell

Ave. Leona

St.

4

N

Page 5: WELCOME Lindsay Whalin, MS, PG Leona Heights Sulfur Mine & Creek Cleanup Darin Ranelletti

The Problem

5

Leona Heights Sulfur Mine & Creek Cleanup

Page 6: WELCOME Lindsay Whalin, MS, PG Leona Heights Sulfur Mine & Creek Cleanup Darin Ranelletti

The Problem: Mining Waste6

Page 7: WELCOME Lindsay Whalin, MS, PG Leona Heights Sulfur Mine & Creek Cleanup Darin Ranelletti

The Problem: Acid Mine Drainage7

Page 8: WELCOME Lindsay Whalin, MS, PG Leona Heights Sulfur Mine & Creek Cleanup Darin Ranelletti

The Problem

Leona Creek:Not just ugly…

MercuryCadmiumCopperLead

Arsenic

8

10 to 10,000 x levels toxic to wildlife

(no pathway to humans)

: It’s Toxic to Wildlife

Page 9: WELCOME Lindsay Whalin, MS, PG Leona Heights Sulfur Mine & Creek Cleanup Darin Ranelletti

Agencies InvolvedAgencies InvolvedProject GoalsProject Goals

Cleanup mine site, eliminate acid mine drainage

Cleanup Leona Creek

Minimize impacts Disturbance of neighbors

(dust, noise, traffic) Tree removal Wildlife

Water Board Required and oversees

cleanup, design, stream habitat protection

City of Oakland Permits & environmental

review (CEQA)

US Army Corps Engineers Stream protection

Ca Dept. Fish &Wildlife Endangered species &

stream protection

The Goals, Actions, & Actors9

Page 10: WELCOME Lindsay Whalin, MS, PG Leona Heights Sulfur Mine & Creek Cleanup Darin Ranelletti

The Solution

10

Leona Heights Sulfur Mine & Creek Cleanup

Page 11: WELCOME Lindsay Whalin, MS, PG Leona Heights Sulfur Mine & Creek Cleanup Darin Ranelletti

Current Condition

Natural Hillside

11

Mining W

aste

Page 12: WELCOME Lindsay Whalin, MS, PG Leona Heights Sulfur Mine & Creek Cleanup Darin Ranelletti

Natural Hillside

12

The Solution: Isolate Mining Waste

Mining W

aste

Page 13: WELCOME Lindsay Whalin, MS, PG Leona Heights Sulfur Mine & Creek Cleanup Darin Ranelletti

PresentPresent FutureFuture

The Results13

: Green, Stable Hillsides

Images courtesy of LSA Associates and Andrew McNichol

Run-on Prevention

Channel

Page 14: WELCOME Lindsay Whalin, MS, PG Leona Heights Sulfur Mine & Creek Cleanup Darin Ranelletti

PresentPresent FutureFuture

The Results: : Expanded Cul-de-sac on McDonell

14

Images courtesy of LSA Associates and Andrew McNichol

Run-on Prevention Channels

Page 15: WELCOME Lindsay Whalin, MS, PG Leona Heights Sulfur Mine & Creek Cleanup Darin Ranelletti

PresentPresent FutureFuture

The Results: Green, Stable Hillsides15

Images courtesy of LSA Associates and Andrew McNichol

Page 16: WELCOME Lindsay Whalin, MS, PG Leona Heights Sulfur Mine & Creek Cleanup Darin Ranelletti

PresentPresent FutureFuture

Skelly and Loy Inc.

16

The Results:Clean, Stable Creek

Page 17: WELCOME Lindsay Whalin, MS, PG Leona Heights Sulfur Mine & Creek Cleanup Darin Ranelletti

CONSTRUCTION MANAGEMENT

17

Leona Heights Sulfur Mine & Creek Cleanup

Phil Goalwin, PGE2C Remediation

Page 18: WELCOME Lindsay Whalin, MS, PG Leona Heights Sulfur Mine & Creek Cleanup Darin Ranelletti

Construction Management

Staging Areas

Access Route

Logistics of Using McDonell Ave

Dust Control

Noise Control

Construction Days/Hours

Project Duration

18

Page 19: WELCOME Lindsay Whalin, MS, PG Leona Heights Sulfur Mine & Creek Cleanup Darin Ranelletti

Staging Areas

Primary Staging Area McDonell Cul-De-Sac and Site Entrance

Materials Staging Area Leona Lodge Overflow Parking Lot

19

Page 20: WELCOME Lindsay Whalin, MS, PG Leona Heights Sulfur Mine & Creek Cleanup Darin Ranelletti

Haul Route And Staging Areas20

Page 21: WELCOME Lindsay Whalin, MS, PG Leona Heights Sulfur Mine & Creek Cleanup Darin Ranelletti

Access Route

McDonell Ave. vs. Fire Road Why not Fire Road?

Segments with Steep grades (up to 15%) 180 degree Switchbacks Appr0ximately 3.0 miles roundtrip Shuts down trail for 5 months Larger air emissions Habitat for Alameda whip snake Biological mitigation/Vernal Pools Only emergency access Need improvements to use Still need to cross and use McDonell Ave

21

Page 22: WELCOME Lindsay Whalin, MS, PG Leona Heights Sulfur Mine & Creek Cleanup Darin Ranelletti

Fire Road22

Page 23: WELCOME Lindsay Whalin, MS, PG Leona Heights Sulfur Mine & Creek Cleanup Darin Ranelletti

Access Route

McDonell Ave. vs. Fire Road Why McDonell Ave?

Right at the primary staging area

Appr0ximately 0.6 miles from materials staging area

Paved road with gentle slope

Less air emissions

No biological mitigation

Do not need improvements to use

Reduced environmental impacts

23

Page 24: WELCOME Lindsay Whalin, MS, PG Leona Heights Sulfur Mine & Creek Cleanup Darin Ranelletti

McDonell Use Logistics

5 Materials Staging Events

Each Event lasts 5 days (Monday~Friday)

Flagmen with radios to implement traffic control

Small Haul Trucks (with payload <10 tons)

Truck speeds to be kept under 10 mph

Residents will be given priority to truck traffic

24

Page 25: WELCOME Lindsay Whalin, MS, PG Leona Heights Sulfur Mine & Creek Cleanup Darin Ranelletti

Dust Control

Limited water spray to soils graded, excavated,

truck loaded., etc.

Amount to control dust, but not cause runoff

Cover soil stockpiles with weighted plastic

sheeting

Vehicles <5mph

Minimize material drop heights during unloading

25

Page 26: WELCOME Lindsay Whalin, MS, PG Leona Heights Sulfur Mine & Creek Cleanup Darin Ranelletti

Noise Control

Smaller Equipment

Noise Reduction Blankets on Perimeter

Fence

Noise Reduction Blankets on Temporary

Fence

No Construction Work at night, on weekends

or holidays

26

Page 27: WELCOME Lindsay Whalin, MS, PG Leona Heights Sulfur Mine & Creek Cleanup Darin Ranelletti

Construction Days/Hours

Weekdays only (Monday-Friday)

Working Hours - In Accordance With

City Of Oakland Conditions Of Approval

No Holidays

27

Page 28: WELCOME Lindsay Whalin, MS, PG Leona Heights Sulfur Mine & Creek Cleanup Darin Ranelletti

Project Duration

Construction Start

Early to Mid May 2014

Construction Completion

September 30, 2014

28

Page 29: WELCOME Lindsay Whalin, MS, PG Leona Heights Sulfur Mine & Creek Cleanup Darin Ranelletti

PERMITTING

29

Leona Heights Sulfur Mine & Creek Cleanup

Darin Ranelletti, PlannerCity of Oakland

Page 30: WELCOME Lindsay Whalin, MS, PG Leona Heights Sulfur Mine & Creek Cleanup Darin Ranelletti

City of Oakland Permits30

Creek Permit For clean-up work in creek

Tree Removal Permit To remove and replace trees impacted by project

Grading Permit To ensure stable slopes

Street Permit For work in McDonall Avenue cul-de-sac

Page 31: WELCOME Lindsay Whalin, MS, PG Leona Heights Sulfur Mine & Creek Cleanup Darin Ranelletti

Environmental Review (CEQA)31

AestheticsAir QualityBiologicalCultural

Environmental analysis to include topics such as:

GeologyHydrologyNoiseTraffic

CEQA document = Mitigate Negative DeclarationAll impacts reduced to less-than-significant levels

Page 32: WELCOME Lindsay Whalin, MS, PG Leona Heights Sulfur Mine & Creek Cleanup Darin Ranelletti

Timeline32

Nov 2013: Permit applications submitted to City

Feb 2014: Community meeting

Mar 2014: Public notices sent out Starts official 30-day public review period

May 2014: Permits issued

May 2014: Project starts

Sept 2014: Project complete

Page 33: WELCOME Lindsay Whalin, MS, PG Leona Heights Sulfur Mine & Creek Cleanup Darin Ranelletti

Next Steps33

Public notices sent out (March)

Environmental document available on City’s website and in City offices

30-day public review period

Permits issued

Page 34: WELCOME Lindsay Whalin, MS, PG Leona Heights Sulfur Mine & Creek Cleanup Darin Ranelletti

Thank you34

Questions or comments?