welcome: first vocals meeting second rex preparatory workshop second modeling workshop

6
QuickTime™ and a TIFF (Uncompressed) decompressor are needed to see this picture. QuickTime™ and a TIFF (Uncompressed) decompressor are needed to see this picture. TIFF (Uncompressed) decompressor are needed to see this picture. QuickTime™ an TIFF (Uncompresse are needed to se QuickTime™ TIFF (Uncompre are needed to WELCOME: First VOCALS Meeting Second Rex Preparatory Workshop Second Modeling Workshop 17 - 20 March 2008, Boulder, CO www.eol.ucar.edu/projects/vocals

Upload: faith

Post on 08-Jan-2016

37 views

Category:

Documents


0 download

DESCRIPTION

WELCOME: First VOCALS Meeting Second Rex Preparatory Workshop Second Modeling Workshop 17 - 20 March 2008, Boulder, CO www.eol.ucar.edu/projects/vocals. VOCALS Targets. Unresolved issues in heat and nutrient budgets Important links between clouds and aerosol. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: WELCOME: First VOCALS Meeting Second Rex Preparatory Workshop Second Modeling Workshop

QuickTime™ and aTIFF (Uncompressed) decompressor

are needed to see this picture.QuickTime™ and a

TIFF (Uncompressed) decompressorare needed to see this picture.

QuickTime™ and aTIFF (Uncompressed) decompressor

are needed to see this picture.

QuickTime™ and aTIFF (Uncompressed) decompressorare needed to see this picture.

QuickTime™ and aTIFF (Uncompressed) decompressorare needed to see this picture.

WELCOME: First VOCALS MeetingSecond Rex Preparatory Workshop

Second Modeling Workshop

17 - 20 March 2008, Boulder, CO

www.eol.ucar.edu/projects/vocals

Page 2: WELCOME: First VOCALS Meeting Second Rex Preparatory Workshop Second Modeling Workshop

•Unresolved issues in heat and nutrient budgets

•Important links between clouds and aerosol

QuickTime™ and aTIFF (LZW) decompressor

are needed to see this picture.

QuickTime™ and aTIFF (LZW) decompressor

are needed to see this picture.

•Influences on and from remote climates

•Better simulation by atmosphere-ocean GCMs

VOCALS Targets

Page 3: WELCOME: First VOCALS Meeting Second Rex Preparatory Workshop Second Modeling Workshop

VOCALS Calendar Since 1 September 2006

• Proposal submitted to NSF/NOAA (R. Wood PI; C. Bretherton, B. Huebert, C. R. Mechoso, R. Weller): 1 Sep 06

• NSF/NOAA decides that “VOCALS is GO”: 6 Dec 06• VOCALS Workshop at VAMOS VPM10, Santiago, Chile: 3-4

April 07• First Modeling Workshop at NCAR: 18-29 May 07• First Rex Preparatory Workshop at NCAR: 11-12 June 07 • NCAR EOL Facility Request: 1 Jul 07• NSF deadline for VOCALS proposals: 15 Jul 07• VOCALS-UK Consortium Planning Meeting, Reading,

England: 27 Jul 07• NOAA deadline for VOCALS proposals: 21 Sep 07• Joint NSF/NOAA Panel on VOCALS 15-16 Oct 07• VOCALS-UK Proposal Submitted to NERC: 30 Nov 07• NSF/NOAA funding decisions in late 07; Internacional and

other national agency decisions in early 08.• First VOCALS Meeting at NCAR: 17-20 March 07

Page 4: WELCOME: First VOCALS Meeting Second Rex Preparatory Workshop Second Modeling Workshop

Operational Centers

BMRC AustraliaCPTEC Brazil ECMWF Int. JMA Japan NCEP US UKMO UK

Institutions Collaborating in VOCALS

UniversityArizona StateConcepción, ChCSUDrexel U.HawaiiManchester UKMiamiNorth Carolina StateOregon StateReadingU. ArizonaU. ChileUCLAU. ColoradoUCSDU. Leeds UKU. WashingtonU. Wyoming

Research Labs

Brookhaven Nat. COLACNRS/LMD FranceIMARPEIPRCLEGOSNASA GSFCNCARNOAA/CIRES NOAA/GFDLNRLPacific NorthwestWoods Hole

Logistic Support: UCAR JOSS

Funding $25M+

Page 5: WELCOME: First VOCALS Meeting Second Rex Preparatory Workshop Second Modeling Workshop

Monitoring Buoys,

Satellites, Cruises

QuickTime™ and aTIFF (Uncompressed) decompressorare needed to see this picture.

AIRBORNE NCAR C130 DOE EG-1 CIRPAS Twin

Otter UK146 NERC Dornier 228?

SHIPRV Ron BrownRV Jose Olaya

REX

MODELINGOperational Centers,

Reseach Labs, Universities

WCRP/CLIVAR/VAMOS appoints the

VOCALS SWG

Page 6: WELCOME: First VOCALS Meeting Second Rex Preparatory Workshop Second Modeling Workshop

Goals of First VOCALS Meeting

(1) To conduct preparations for mission-critical tasks in VOCALS-REx;

(2) To coordinate modeling tasks;

(3) To build links between modeling and observational groups and ensure the best use is made of the REx data in model development;

(4) To review preliminary results of PreVOCA.