welcome. energy renovation of facades – spl d.d. iva padar rudi rozman

19
WELCOME

Upload: trinity-darrin

Post on 30-Mar-2015

220 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: WELCOME. Energy renovation of facades – SPL d.d. Iva Padar Rudi Rozman

WELCOME

Page 2: WELCOME. Energy renovation of facades – SPL d.d. Iva Padar Rudi Rozman

Energy renovation of facades – SPL d.d.

Iva PadarRudi Rozman

Page 3: WELCOME. Energy renovation of facades – SPL d.d. Iva Padar Rudi Rozman

TABLE OF CONTENTS

Presentation of company SPL d.d.

Examples of energy saving measures

Page 4: WELCOME. Energy renovation of facades – SPL d.d. Iva Padar Rudi Rozman

Presentation of firm SPL d.d.

• Our company is on the market since 1965• We manage more than 35.000 units • Residential and commercial buildings• Managment of maintenance and operation• Engineering (participation in public tenders)• CERTIFIKAT ISO 9001 since 1996

Page 5: WELCOME. Energy renovation of facades – SPL d.d. Iva Padar Rudi Rozman

4xE

Energy number - indicatorEco fund, reserve fund - moneyEuropean project AFTER – scientific analysis Energy renovation – exemples

Page 6: WELCOME. Energy renovation of facades – SPL d.d. Iva Padar Rudi Rozman

Energy number and table

• Definicion: Energiy number is the ratio between annual amount of used energy and usefull surface of the building.

• Formula: EK = Q / A = consumption ( kWh) / surface ( m2 )

• Result:A simple calculation shows energy efficiency of the building and encourage residents to take action.

Page 7: WELCOME. Energy renovation of facades – SPL d.d. Iva Padar Rudi Rozman

Energy measures

Page 8: WELCOME. Energy renovation of facades – SPL d.d. Iva Padar Rudi Rozman

Eko fund, reserve fund

• Slovenian environmental public fund, Grant financial incentives, Beneficiaries are homeownersThermal insulation and heating systems

• Reserve fund of each building• Our role as a manager: representation and

implementation in the process and efficient spending of reserve fund

Page 9: WELCOME. Energy renovation of facades – SPL d.d. Iva Padar Rudi Rozman

European project AFTER

•Cost Optimum and Standard Solutions for Maintenace and Managment of the Social Housing Stock•18 partners from 6 countries•Analysis and optimisation of energy saving measures•Objectives: immediate additional savings of 5-7% of energy, contribute to the 20-20-20 by 2020 in EU

Page 10: WELCOME. Energy renovation of facades – SPL d.d. Iva Padar Rudi Rozman

Energy renovations of buildings

Energy refonovation-whole package of energy saving measures: thermal insulation of facades, roofs, ceiling,sealing windows, thermostatic valves and balancing, increase awareness of residents

The word recovery means in our case thermal insulation of facades to the standards and practices in the period of performance.

Page 11: WELCOME. Energy renovation of facades – SPL d.d. Iva Padar Rudi Rozman

No. 1 - Renovation in 1988

GRABLOVIČEVA 34-36 (16,95% lower energy consumption for heating)

Year bulit 1962: location Vodmat - Lj

Heating surface:1850 m2

In the year 1988 facade restored with 4 icm TI

Equal to the design of the building and the same heating system as Potrčeva 14 -16 (same project)

Heating energy consumption in 2010 is 245.66 MWh (€ 11,818.00)

ENERGY NUMBER : 119

Page 12: WELCOME. Energy renovation of facades – SPL d.d. Iva Padar Rudi Rozman

Photos of the buildings

• POTRČEVA 14,16 • GRABLOVIČEVA 34,36

Page 13: WELCOME. Energy renovation of facades – SPL d.d. Iva Padar Rudi Rozman

NO. 2 - Renovation in 2006

Runkova Ul. 2 - BEFORE

Year Built: 1971, location Lj-ŠIŠKA

Heating surface:7023 m2 of heating surface

Facade without additional TI

Heating energy consumption in 2008 is 809.61 MWh (€ 44,528.00)

ENERGY NUMBER : 115

Page 14: WELCOME. Energy renovation of facades – SPL d.d. Iva Padar Rudi Rozman

Photos of the building

Before After

Page 15: WELCOME. Energy renovation of facades – SPL d.d. Iva Padar Rudi Rozman

NO. 3 -renovation in 2011

PAPIRNIŠKI TRG 18, 18a, 18bBEFORE

Heating surface:2257 m2 of heating surface

Facade without additional TI

Energy consumption for heating in January and February 2011 is 13,584 m3 (€ 8582)

ENERGY NUMBER: 172

Page 16: WELCOME. Energy renovation of facades – SPL d.d. Iva Padar Rudi Rozman

Photo of the building

Before After

Page 17: WELCOME. Energy renovation of facades – SPL d.d. Iva Padar Rudi Rozman

Ljubljana Grablovičeva ulica 34-36

Runkova ulica 2 Papirniški trg 18,18a,18b

Builtyear of renovation

19621988

19712006

19682011

Thickness of thermal insulation

4 cm stiropor 10 cm stiropor 14 cm stiropor

Number of energy recovery from

152 115 172

Number of energy reconstruction

119 91 131

Difference in 33 24 41

Difference in% 21% 21% 24%

Changes in energy prices

Hot water pipes1/2010-1/2012:13%

Hot water pipes1/2011-1/2012:8,5%

Gas1/2010-1/2012:46%1/2011-1/2012:26%

Comparative table

Page 18: WELCOME. Energy renovation of facades – SPL d.d. Iva Padar Rudi Rozman

Web pages:

• www.spl.si• www.afterproject.eu• www.ekosklad.si• https://www.mojupravnik.si

Page 19: WELCOME. Energy renovation of facades – SPL d.d. Iva Padar Rudi Rozman

THANK YOU FOR LISTENINGHVALA ZA POZORNOST