welcome – asew 2015, sydney, australia · 10/28/2015  · refine ram final design design ram...

27
Welcome – ASEW 2015, Sydney, Australia Jim Modrouvanos, Executive Director Asset Standards Authority, Transport for NSW 28 October 2015

Upload: others

Post on 07-Nov-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Welcome – ASEW 2015, Sydney, Australia · 10/28/2015  · Refine RAM Final Design Design RAM Report Material Procurement, Fabrication / Manufacturing Construction / Installation

Welcome – ASEW 2015, Sydney, Australia Jim Modrouvanos, Executi ve Director Asset Standards Authority, Transport for NSW

28 October 2015

Page 2: Welcome – ASEW 2015, Sydney, Australia · 10/28/2015  · Refine RAM Final Design Design RAM Report Material Procurement, Fabrication / Manufacturing Construction / Installation
Page 3: Welcome – ASEW 2015, Sydney, Australia · 10/28/2015  · Refine RAM Final Design Design RAM Report Material Procurement, Fabrication / Manufacturing Construction / Installation

•r•1• ~¥ Transport ~E~w forNSW

BY 2031 THE POPULATION OF NSW IS EXPECTED TO INCREASE BY 2 MILLION

3

Page 4: Welcome – ASEW 2015, Sydney, Australia · 10/28/2015  · Refine RAM Final Design Design RAM Report Material Procurement, Fabrication / Manufacturing Construction / Installation

•r•1•~¥ Transport~E~w forNSW

II

WILL L VE

Page 5: Welcome – ASEW 2015, Sydney, Australia · 10/28/2015  · Refine RAM Final Design Design RAM Report Material Procurement, Fabrication / Manufacturing Construction / Installation

(it) Transport NSW forNSWGOVERNMENT

Page 6: Welcome – ASEW 2015, Sydney, Australia · 10/28/2015  · Refine RAM Final Design Design RAM Report Material Procurement, Fabrication / Manufacturing Construction / Installation

KEY TRANSPORT INFRASTRUCTURE PROJECTS

MAKING IT HAPPEN

Further NSW projects • Pacific Highway

Duplication (final stages)

• Fixing Country Roads

• Fixing Country Rail

• Bridges for the Bush

• Public Transport Enhancement annual programs

• Congestion Management annual programs

Western Sydney Infrastructure Plan

ROUSE HILL

HORNSBY

BLACKTOWN

CHATSWOOD

WestConnex PROSPECT

.. ___________ .... - ~ ....... . - ,# ~.. • ,,,,, .

6

Page 7: Welcome – ASEW 2015, Sydney, Australia · 10/28/2015  · Refine RAM Final Design Design RAM Report Material Procurement, Fabrication / Manufacturing Construction / Installation

7

Pipeline by project

Automatic Train Protection - ETCS Level 1, Tranche 1 Clearways Digital Train Radio System

Lidcombe Granville Corridor Upgrade

Inner West Light Rail

Northern Sydney Freight Corridor

South West Rail Link

New Intercity Fleet + Maintainence Fleet

New (XPT) Fleet

New (TAP2) Multisites

New Ferry Fleet

-

0.5

1.0

1.5

2.0

2.5

Page 8: Welcome – ASEW 2015, Sydney, Australia · 10/28/2015  · Refine RAM Final Design Design RAM Report Material Procurement, Fabrication / Manufacturing Construction / Installation

Sydney Metro

8

Page 9: Welcome – ASEW 2015, Sydney, Australia · 10/28/2015  · Refine RAM Final Design Design RAM Report Material Procurement, Fabrication / Manufacturing Construction / Installation

Sydney Metro

9

Page 10: Welcome – ASEW 2015, Sydney, Australia · 10/28/2015  · Refine RAM Final Design Design RAM Report Material Procurement, Fabrication / Manufacturing Construction / Installation

Light Rail

10

Page 11: Welcome – ASEW 2015, Sydney, Australia · 10/28/2015  · Refine RAM Final Design Design RAM Report Material Procurement, Fabrication / Manufacturing Construction / Installation

CBD to Sou th East Light Rail

11

Page 12: Welcome – ASEW 2015, Sydney, Australia · 10/28/2015  · Refine RAM Final Design Design RAM Report Material Procurement, Fabrication / Manufacturing Construction / Installation
Page 13: Welcome – ASEW 2015, Sydney, Australia · 10/28/2015  · Refine RAM Final Design Design RAM Report Material Procurement, Fabrication / Manufacturing Construction / Installation
Page 14: Welcome – ASEW 2015, Sydney, Australia · 10/28/2015  · Refine RAM Final Design Design RAM Report Material Procurement, Fabrication / Manufacturing Construction / Installation

Newcastle Light Rail

14

Page 15: Welcome – ASEW 2015, Sydney, Australia · 10/28/2015  · Refine RAM Final Design Design RAM Report Material Procurement, Fabrication / Manufacturing Construction / Installation

15

Norther n Beaches Bus Rapi d Transit

North Sydney

Willoughby

Mosman

Warringah

Pittwater

Mona Vale

City of Sydney

Page 16: Welcome – ASEW 2015, Sydney, Australia · 10/28/2015  · Refine RAM Final Design Design RAM Report Material Procurement, Fabrication / Manufacturing Construction / Installation

Sydney’s ferries

16

Page 17: Welcome – ASEW 2015, Sydney, Australia · 10/28/2015  · Refine RAM Final Design Design RAM Report Material Procurement, Fabrication / Manufacturing Construction / Installation

17

Roads

Page 18: Welcome – ASEW 2015, Sydney, Australia · 10/28/2015  · Refine RAM Final Design Design RAM Report Material Procurement, Fabrication / Manufacturing Construction / Installation

m

MS

M5 Widening completed 201 4

t Connection

• Surface

•• Tunnel DO New extensions under investigation

Existing MS East connection

WestConnex indicallve corridor

Punchbowl

... Stralhfield

South

M5 Completed 2019

\• Peters ham

St Peters I •

Roselands

't'i> \

21.., Hurstvllle .p'\.

Botany Bay

Alexandna

Airport and Port Botany enabling works

Pc · Botany

Parramatta Ryde

··,*· Parrama11aHomebush ••••• Flo"u

('\ ~" Stralhlield \ Burwood

Chullora i Sydney's Orbital Network

Junction

J Auburn I

I Concord

M4 Completed 2019

\

·-•._.-.... Haberfield

... ,!Leichhardt

Summer Hi~._,•••• Bondi

Page 19: Welcome – ASEW 2015, Sydney, Australia · 10/28/2015  · Refine RAM Final Design Design RAM Report Material Procurement, Fabrication / Manufacturing Construction / Installation

28 October 2015

Freight

Page 20: Welcome – ASEW 2015, Sydney, Australia · 10/28/2015  · Refine RAM Final Design Design RAM Report Material Procurement, Fabrication / Manufacturing Construction / Installation

28 October 2015

Systems Engineerin g – what we’re doing

Page 21: Welcome – ASEW 2015, Sydney, Australia · 10/28/2015  · Refine RAM Final Design Design RAM Report Material Procurement, Fabrication / Manufacturing Construction / Installation

Demand/ Plan Acquire Operate/Maintain Dispose

Need

Exploratory Concept Development Production Utilisation and Support Retirement

Operate and Need Concept Specify Procure Design Build Integrate Accept Evolve Dispose

Maintain

Lifecycle Cost Annual Asset Define Need, OCD/MCD, Feasibility, Operate & Maintain Disposal Analysis (RAM) Maintenance Plans

early Con Ops, Service Business (Replace, Refurbish, planning &

draft T/T Design Case, BRS Renew, Upgrade) execution Draft System Operational

RAM Targets Readiness Maintain Asset Condition

TRAIL model Define Service Ref Design, System FRACAS Surveys Technical (or similar) Availability/OTR SRS, Funct Validation & Maintenance Plans

Architecture Acceptance

Maintenance Analyse Draft Physical Reliability Final RAM

RAM Targets Architecture Concept (RAM) Growth Tests Report Sys Design, System

Conduct Geographical Physical Integration System FTA Architecture Architecture & Test Establish

FRACAS “Soak”

RAM Targets

Review Conduct Sub-Tests System RBD Subsystem

Subsystem Integration

Design Conduct Sub- & Test Witness Sub-

System FMEA System FAT

Refine RAM

Logistic Support

Analysis�

Targets� Unit Level Unit Level Design, Final Inspection &

Prelim Design Design Test Witness Unit Environmental

RAM Report FAT Acceleration Test

Refine RAM Final Design Design RAM Report Material Procurement,

Fabrication / Manufacturing Witness Construction / Installation Product RAM FAI

Specification

CMAAC Gate 0 Gate 1 Gate 2 Gate 3 Gate 4 Gate 5 Gate 6 Gates Initiation Reqmnts Initial For Ready to Accept Asset

(Need) complete Design Construction Test Assets Review�

Page 22: Welcome – ASEW 2015, Sydney, Australia · 10/28/2015  · Refine RAM Final Design Design RAM Report Material Procurement, Fabrication / Manufacturing Construction / Installation

A mode l base d approach

Implementer

(Design & Construct)

Planner

Maintainer

Operator

Page 23: Welcome – ASEW 2015, Sydney, Australia · 10/28/2015  · Refine RAM Final Design Design RAM Report Material Procurement, Fabrication / Manufacturing Construction / Installation

TRA K Metamodel adopte d b y TfNSW

Page 24: Welcome – ASEW 2015, Sydney, Australia · 10/28/2015  · Refine RAM Final Design Design RAM Report Material Procurement, Fabrication / Manufacturing Construction / Installation

Metamodel relationships

Page 25: Welcome – ASEW 2015, Sydney, Australia · 10/28/2015  · Refine RAM Final Design Design RAM Report Material Procurement, Fabrication / Manufacturing Construction / Installation

pac kage SV-0 1 R esourc e I ASA TRAK model exa mple - Sta t ion & Buikfing.s

,,­ --------­! Ente rprise V iewpo int

c Orga nisatioll• Transport for N SW

c Enterp rise• NS'W T ran sportat ion

crequi~S•

has parb

c OrgantsaUon• Planning and Pr-ograms Division

c Orga.Nsation• Sydney T.-ains

c Oroan.isation• State Transit Authority

cEnterprlse• NSIN Transport lnf.-astr-uctur-e and

Asset Planning

cEnterpr1se• NSW Public Trans portation Se rvices

csupports»

1 I

_,j

I I

_,j

I I ~

Conce pt Viewpotnt r=======~.,,-~---,--,-...,,-.,,.-~~~~-•,haspart.""=;==~~,,.-=-~--,--,-.,..,-,,.-~~~~--,.

c Concept Activity• c Concept Activity» lnff"astructure prov i s ion lnfrastructu.-e m anagem e n t

c has parb ~~~~~~~~~~~~~~~~~~~ c h a spa rt•

c Concept ActJVity• Inf rastructure operations

c ha.s part.

cConcept Activity» Station Opef"ations

cConcept Actrvlty• Infrastructure planning

chas part.

c Concept Activity» Station p lanning

cCapabitity» Providing efficient services

cCapa bility• Providing convenie nt services

cCapability:it Prov iding a comfortable/ ambient

environment

cCapabifrty» Urban Rev italisation t hrough

i nfr a structur e developm e nt and future planning

cCapability• Maximising transport network

efficiency

c h as p arb

. concept Activ ity:. Infrastructure maintenance

c has parb· • a s

c Concept Acttvity» Support safe and efficie n t c-u stome.­

circulation

cTra ce» -:i;

I I -l I I' -1 I I l. _I I I I I

J.. _ I I I I

crequire.s

- - --­ ........

cOocumenb NSW Long Ter m Tra nsport Mas ter

Plan (201 3 )

cEnterprise Goal. Improve quality of service ( L TTMP)

SolutiOn v iewpoint - - - - c~al~es~ - - - - - - - - - I T - 1- L­- - - - - - ----------­- ---­ --­- - -c r e a lise-S•r----­ -------­ kc;reaus..es.

c Function• Facmtate smooth pedestrian flows

between spaces

c Function• Allow efficient pedestrian

movem ent through different means of move.ment

part• «function» Facilitate horizontal circulatfon of

people

cFunction• Facilitate vertical c-ircu~ation of

people

c.Physica t. Escalator

cPhysical• Staif"s

cPhysicabt Lifts

c Function• Provide an efficient ticketing and

fare control system

c function• Implement a common ticketing system for all transport modes

where possible

cfunction• Provide an Automate d Fare

Collection (AFC) ticketfng system

-part,»-~~~~~~~~~~~~~

cfunction• Provide office machines (TOMs) to s upplementTVMs where required

rte»-----.,.--,-------~cfunction•

Provide customer services to handle t icketing and gateline

problems

rreallse.!h

c Function• Support customer decision making

and wayfinding

c functton» P.-ovide easity recognisable and distinctive route identrtications

c functton:. P.-ovide design t hat supports easy

spatial orientation

cFunctk>n» Provide d irectional s ignage to

significant external d estinations

cFunctton• Provide station wayfinding to

relevant locat io ns

c FunctM>n• Provide a safe and secure

environment

art• cfunction» Provide adequate egress routes for

emergencies

art• cFunction• Provide adequate -waiting spaces to

prevent overcrowding

cfunction» 8~ovlde an adequate fire fighting

system to ensure a tenable condition for escape

art. cFunction» Adopt CPTED principle s whe r e

approprlate and provide s ufficient lighting

cFunction» Provide access and facilities for t n e disabled as per ODA requirements

Page 26: Welcome – ASEW 2015, Sydney, Australia · 10/28/2015  · Refine RAM Final Design Design RAM Report Material Procurement, Fabrication / Manufacturing Construction / Installation

(it) Transport NSW forNSWGOVERNMENT

Page 27: Welcome – ASEW 2015, Sydney, Australia · 10/28/2015  · Refine RAM Final Design Design RAM Report Material Procurement, Fabrication / Manufacturing Construction / Installation