weir management as structural measures for flood reduction
TRANSCRIPT
![Page 1: WEIR MANAGEMENT AS STRUCTURAL MEASURES FOR FLOOD REDUCTION](https://reader036.vdocuments.mx/reader036/viewer/2022081506/56649f1c5503460f94c320a0/html5/thumbnails/1.jpg)
WEIR MANAGEMENT AS STRUCTURAL MEASURES
FOR FLOOD REDUCTION
![Page 2: WEIR MANAGEMENT AS STRUCTURAL MEASURES FOR FLOOD REDUCTION](https://reader036.vdocuments.mx/reader036/viewer/2022081506/56649f1c5503460f94c320a0/html5/thumbnails/2.jpg)
Contents
I. Introduction
What is weir? Weir formulas?
II. Approaches
Research Based Approach
Modelling Based Approach
III. Conclusion
![Page 3: WEIR MANAGEMENT AS STRUCTURAL MEASURES FOR FLOOD REDUCTION](https://reader036.vdocuments.mx/reader036/viewer/2022081506/56649f1c5503460f94c320a0/html5/thumbnails/3.jpg)
Weir -
Small overflow-type dam generally used to increase the level of a river or stream.
Introduction
![Page 4: WEIR MANAGEMENT AS STRUCTURAL MEASURES FOR FLOOD REDUCTION](https://reader036.vdocuments.mx/reader036/viewer/2022081506/56649f1c5503460f94c320a0/html5/thumbnails/4.jpg)
Weir Formula (for Mike 11)
I. Villemonte (Villemonte, 1947) formula for sharp crested weirs
![Page 5: WEIR MANAGEMENT AS STRUCTURAL MEASURES FOR FLOOD REDUCTION](https://reader036.vdocuments.mx/reader036/viewer/2022081506/56649f1c5503460f94c320a0/html5/thumbnails/5.jpg)
Weir FormulaII. Honma formula (we use this)
III. Extended Honma formula
![Page 6: WEIR MANAGEMENT AS STRUCTURAL MEASURES FOR FLOOD REDUCTION](https://reader036.vdocuments.mx/reader036/viewer/2022081506/56649f1c5503460f94c320a0/html5/thumbnails/6.jpg)
Dry Mode
Round Nosed Broad Crested Weir (free flow)
Weir Formulas (for ISIS)
Free Flow (we use this for ISIS)
Q = 0
Drowned Flow
![Page 7: WEIR MANAGEMENT AS STRUCTURAL MEASURES FOR FLOOD REDUCTION](https://reader036.vdocuments.mx/reader036/viewer/2022081506/56649f1c5503460f94c320a0/html5/thumbnails/7.jpg)
Research Based Approach
1st Solution – Cut Off the Crest
High Overflow
![Page 8: WEIR MANAGEMENT AS STRUCTURAL MEASURES FOR FLOOD REDUCTION](https://reader036.vdocuments.mx/reader036/viewer/2022081506/56649f1c5503460f94c320a0/html5/thumbnails/8.jpg)
Research Based Approach
2nd Solution – Adding Geotextile
High Overflow
![Page 9: WEIR MANAGEMENT AS STRUCTURAL MEASURES FOR FLOOD REDUCTION](https://reader036.vdocuments.mx/reader036/viewer/2022081506/56649f1c5503460f94c320a0/html5/thumbnails/9.jpg)
Research Based Approach
3rd Solution – Automated Gate
![Page 10: WEIR MANAGEMENT AS STRUCTURAL MEASURES FOR FLOOD REDUCTION](https://reader036.vdocuments.mx/reader036/viewer/2022081506/56649f1c5503460f94c320a0/html5/thumbnails/10.jpg)
Modelling approach
Define objectives1. Reduce downstream flooding
2. Find optimal heights for sediment equilibrium Calibrate MIKE11 against observed levels Build same model in ISIS Compare results using ‘multi-model
approach’
![Page 11: WEIR MANAGEMENT AS STRUCTURAL MEASURES FOR FLOOD REDUCTION](https://reader036.vdocuments.mx/reader036/viewer/2022081506/56649f1c5503460f94c320a0/html5/thumbnails/11.jpg)
Multi-model approach
Model is the sum of the experience of the person who wrote the code
![Page 12: WEIR MANAGEMENT AS STRUCTURAL MEASURES FOR FLOOD REDUCTION](https://reader036.vdocuments.mx/reader036/viewer/2022081506/56649f1c5503460f94c320a0/html5/thumbnails/12.jpg)
Reduce downstream flooding
No changes
0
20
40
60
80
100
120
140
0 5000 10000 15000 20000 25000 30000
ISIS
measured
Bed Level
MIKE11
![Page 13: WEIR MANAGEMENT AS STRUCTURAL MEASURES FOR FLOOD REDUCTION](https://reader036.vdocuments.mx/reader036/viewer/2022081506/56649f1c5503460f94c320a0/html5/thumbnails/13.jpg)
Reduce downstream flooding
Downstream weir removed
0
20
40
60
80
100
120
140
0 5000 10000 15000 20000 25000 30000
ISIS
measured
Bed Level
MIKE11
![Page 14: WEIR MANAGEMENT AS STRUCTURAL MEASURES FOR FLOOD REDUCTION](https://reader036.vdocuments.mx/reader036/viewer/2022081506/56649f1c5503460f94c320a0/html5/thumbnails/14.jpg)
Reduce downstream flooding
Four downstream weirs removed (1, 4, 5, 6)
0
20
40
60
80
100
120
140
0 5000 10000 15000 20000 25000 30000
ISIS
measured
Bed Level
MIKE11
![Page 15: WEIR MANAGEMENT AS STRUCTURAL MEASURES FOR FLOOD REDUCTION](https://reader036.vdocuments.mx/reader036/viewer/2022081506/56649f1c5503460f94c320a0/html5/thumbnails/15.jpg)
Reduce downstream flooding
Weirs removed and manning’s reduced
0
20
40
60
80
100
120
140
0 5000 10000 15000 20000 25000 30000
ISIS
measured
Bed Level
MIKE11
![Page 16: WEIR MANAGEMENT AS STRUCTURAL MEASURES FOR FLOOD REDUCTION](https://reader036.vdocuments.mx/reader036/viewer/2022081506/56649f1c5503460f94c320a0/html5/thumbnails/16.jpg)
Sediment transport
Meyer-Peter formula
qs related to q, s0, d50
steady-state model • Mean flow depth
• Mean channel width
• Mean velocity
• Channel Slope
• Particle diameter d50
http://ponce.sdsu.edu/onlinemeyerpeter.php
![Page 17: WEIR MANAGEMENT AS STRUCTURAL MEASURES FOR FLOOD REDUCTION](https://reader036.vdocuments.mx/reader036/viewer/2022081506/56649f1c5503460f94c320a0/html5/thumbnails/17.jpg)
Sediment transport
Results
qs (kg/sec/m) Qs (kg/sec) Weir No.
1.6 340 16
0.54 144 10
0 0 9
0 0 8
0.56 47 7
0.3 32.4 6
0 0 5
2.7 274 4
0.012 2.6 1
![Page 18: WEIR MANAGEMENT AS STRUCTURAL MEASURES FOR FLOOD REDUCTION](https://reader036.vdocuments.mx/reader036/viewer/2022081506/56649f1c5503460f94c320a0/html5/thumbnails/18.jpg)
Conclusions
MIKE11 results more sensitive to weir removal
Cannot conclude on effectiveness of weir removal due to model disagreement
Reduction of channel roughness better Proposals:
1. Vegetation clearance downstream
2. Alteration of weirs to improve sediment regime
![Page 19: WEIR MANAGEMENT AS STRUCTURAL MEASURES FOR FLOOD REDUCTION](https://reader036.vdocuments.mx/reader036/viewer/2022081506/56649f1c5503460f94c320a0/html5/thumbnails/19.jpg)
Sean and Ahmed who persistently work on Mike 11 and ISIS
Kim - our hydrological analysis expert
![Page 20: WEIR MANAGEMENT AS STRUCTURAL MEASURES FOR FLOOD REDUCTION](https://reader036.vdocuments.mx/reader036/viewer/2022081506/56649f1c5503460f94c320a0/html5/thumbnails/20.jpg)
Alex – Partially involved to Mike 11 and Hydrological Analysis.
Our report maker.
Stephane – our GIS expert
![Page 21: WEIR MANAGEMENT AS STRUCTURAL MEASURES FOR FLOOD REDUCTION](https://reader036.vdocuments.mx/reader036/viewer/2022081506/56649f1c5503460f94c320a0/html5/thumbnails/21.jpg)
Fazlul is working on Mike 11 and ISIS
Prima and Rajmund are working on Mike SHE report
![Page 22: WEIR MANAGEMENT AS STRUCTURAL MEASURES FOR FLOOD REDUCTION](https://reader036.vdocuments.mx/reader036/viewer/2022081506/56649f1c5503460f94c320a0/html5/thumbnails/22.jpg)
Amandine – our hydrological analysist & web designer
![Page 23: WEIR MANAGEMENT AS STRUCTURAL MEASURES FOR FLOOD REDUCTION](https://reader036.vdocuments.mx/reader036/viewer/2022081506/56649f1c5503460f94c320a0/html5/thumbnails/23.jpg)
Acknowledgment
Prof. Dr.-Ing. habil Klaus-Peter Holz as team 5 supervisor and his patience for assisting us during Hydroeurope 2010
![Page 24: WEIR MANAGEMENT AS STRUCTURAL MEASURES FOR FLOOD REDUCTION](https://reader036.vdocuments.mx/reader036/viewer/2022081506/56649f1c5503460f94c320a0/html5/thumbnails/24.jpg)
References
Wikipedia (2010). Weir. Wikipedia Foundation, Inc. http://en.wikipedia.org/wiki/Weir
White, Frank (2006). Fluid Mechanics. Mcgraw-Hill Education
Villemonte, James R. 1947. Submerged-Weir Discharge Studies, Engineering News. 1943. Engineering News Record, pp. 118-120. Record, pp. 54-57