QA/QC WEEKLY REPORT FOR WEEK ENDING 29-04-2015 GREEN FLAG - Final Paint Inspection was carried out for Base Frames of Novec System Skids. It was inspected and accepted by ZADCO PMC. RED FLAG - QHSE Near miss Work Injuries Vehicle Incidents Training by QA/QC Engineers Nonconformance Site QHSE Inspection Report for the week QHSE Management Walkthrough Report for the week Monthly QHSE Meeting OTHERS - HSE Action Tracking Register was prepared for Halon Rep. Project of ZADCO. - Document review was carried out of Material Handling Procedure for ADMA OPCO Project and comments from client mended. - Document review was carried out of Project Overall Execution Philosophy and comments from client mended. - REPORT END Weekly QA/QC Report for week ending29-04-2015 Page 1 of 1

Upload: moazam-ali-awan

Post on 12-Nov-2015

9 views

Category:

Documents


2 download

DESCRIPTION

fgfdgdfgfdgfdgfd

TRANSCRIPT

GREEN FLAG

QA/QC WEEKLY REPORT FOR WEEK ENDING 29-04-2015

GREEN FLAG

Final Paint Inspection was carried out for Base Frames of Novec System Skids. It was inspected and accepted by ZADCO PMC.RED FLAG

QHSE

Near missWork Injuries Vehicle Incidents Training by QA/QC EngineersNonconformanceSite QHSE Inspection Report for the week QHSE Management Walkthrough Report for the week Monthly QHSE Meeting

OTHERS

HSE Action Tracking Register was prepared for Halon Rep. Project of ZADCO. Document review was carried out of Material Handling Procedure for ADMA OPCO Project and comments from client mended. Document review was carried out of Project Overall Execution Philosophy and comments from client mended. REPORT ENDWeekly QA/QC Report for week ending29-04-2015 Page 1 of 1