    QA/QC WEEKLY REPORTFOR WEEK ENDING 19-02-2014

    Weekly QA/QC Report for week ending19-2-2014Page 1 of 2

    GREEN FLAG

    - Device Installation Inspection of CO2 System was carried out for MP1 of Shah Gas

    Field Project. It was inspected and accepted by PLL and Gasco.(CA138175)- Device Installation Inspection of CO2 System was carried out for SP3 of Shah Gas

    Field Project. It was inspected and accepted by PLL and Gasco. .(CA138175)

    -

    -

    RED FLAG

    -

    QHSE

    Near miss

    Work Injuries

    Vehicle Incidents

    Training by QA/QC Engineers

    Nonconformance

    Site QHSE Inspection Report for the week

    QHSE Management Walkthrough Report for the week

    Monthly QHSE Meeting

    OTHERS

    - Test package for CO2 System was prepared and submitted to PLL for review and

    approval for Shah Gas Field Project. (CA138175)

    - Visual Inspection of Wall opening was carried out for Substation 03 of CO2 Project with

    M/S EMCO. It was inspected and accepted by me.(CA137892)

    - Visual Inspection of Excavation works was carried out for Substation 00 of CO2 Project

    with M/S EMCO. It was inspected and accepted by me. (CA137892)

    - Visual Inspection of Excavation works was carried out for Substation 02 of CO2 Project

    with M/S EMCO. It was inspected and accepted by me. (CA137892)

    - Visual Inspection of Excavation works was carried out for Substation 03 of CO2 Project

    with M/S EMCO. It was inspected and accepted by me. (CA137892)

    - Visual Inspection of Shuttering & Reinforcement works was carried out for Substation

    00 of CO2 Project with M/S EMCO. It was inspected and accepted by me. (CA137892)

  • 7/22/2019 Weekly QC Report 19-02-14).docx

    2/2

    QA/QC WEEKLY REPORTFOR WEEK ENDING 19-02-2014

    Weekly QA/QC Report for week ending19-2-2014Page 2 of 2

    - Visual Inspection of Shuttering & Reinforcement works was carried out for Substation

    02 of CO2 Project with M/S EMCO. It was inspected and accepted by me. (CA137892)

    - Visual Inspection of Shuttering & Reinforcement works was carried out for Substation

    03 of CO2 Project with M/S EMCO. It was inspected and accepted by me. (CA137892)

    - Visual Inspection of Water Proofing for Neck column and Footing of Container was

    carried out for Substation 00 of CO2 Project with M/S EMCO. It was inspected and

    accepted by me. (CA137892)

    - Visual Inspection of Water Proofing for Neck column and Footing of Container was

    carried out for Substation 02 of CO2 Project with M/S EMCO. It was inspected and

    accepted by me. (CA137892)

    - Visual Inspection of Water Proofing for Neck column and Footing of Container was

    carried out for Substation 03 of CO2 Project with M/S EMCO. It was inspected and

    accepted by me. (CA137892)

    - As built drawings for Marine Terminal Building of Sprinkler System were prepared and

    submitted to Techint to revise and reissue for RSHT-II Project. (CA137891)

    - As built drawings for Fire Hall Building of Sprinkler System were prepared and

    submitted to Techint to revise and reissue for RSHT-II Project. (CA137891)

    - As built drawings for Maintenance Building of Hose Reel System were prepared and

    submitted to Techint to revise and reissue for RSHT-II Project. (CA137891)

    REPORT END