QA/QC WEEKLY REPORTFOR WEEK ENDING 19-02-2014
Weekly QA/QC Report for week ending19-2-2014Page 1 of 2
GREEN FLAG
- Device Installation Inspection of CO2 System was carried out for MP1 of Shah Gas
Field Project. It was inspected and accepted by PLL and Gasco.(CA138175)- Device Installation Inspection of CO2 System was carried out for SP3 of Shah Gas
Field Project. It was inspected and accepted by PLL and Gasco. .(CA138175)
-
-
RED FLAG
-
QHSE
Near miss
Work Injuries
Vehicle Incidents
Training by QA/QC Engineers
Nonconformance
Site QHSE Inspection Report for the week
QHSE Management Walkthrough Report for the week
Monthly QHSE Meeting
OTHERS
- Test package for CO2 System was prepared and submitted to PLL for review and
approval for Shah Gas Field Project. (CA138175)
- Visual Inspection of Wall opening was carried out for Substation 03 of CO2 Project with
M/S EMCO. It was inspected and accepted by me.(CA137892)
- Visual Inspection of Excavation works was carried out for Substation 00 of CO2 Project
with M/S EMCO. It was inspected and accepted by me. (CA137892)
- Visual Inspection of Excavation works was carried out for Substation 02 of CO2 Project
with M/S EMCO. It was inspected and accepted by me. (CA137892)
- Visual Inspection of Excavation works was carried out for Substation 03 of CO2 Project
with M/S EMCO. It was inspected and accepted by me. (CA137892)
- Visual Inspection of Shuttering & Reinforcement works was carried out for Substation
00 of CO2 Project with M/S EMCO. It was inspected and accepted by me. (CA137892)
-
7/22/2019 Weekly QC Report 19-02-14).docx
2/2
QA/QC WEEKLY REPORTFOR WEEK ENDING 19-02-2014
Weekly QA/QC Report for week ending19-2-2014Page 2 of 2
- Visual Inspection of Shuttering & Reinforcement works was carried out for Substation
02 of CO2 Project with M/S EMCO. It was inspected and accepted by me. (CA137892)
- Visual Inspection of Shuttering & Reinforcement works was carried out for Substation
03 of CO2 Project with M/S EMCO. It was inspected and accepted by me. (CA137892)
- Visual Inspection of Water Proofing for Neck column and Footing of Container was
carried out for Substation 00 of CO2 Project with M/S EMCO. It was inspected and
accepted by me. (CA137892)
- Visual Inspection of Water Proofing for Neck column and Footing of Container was
carried out for Substation 02 of CO2 Project with M/S EMCO. It was inspected and
accepted by me. (CA137892)
- Visual Inspection of Water Proofing for Neck column and Footing of Container was
carried out for Substation 03 of CO2 Project with M/S EMCO. It was inspected and
accepted by me. (CA137892)
- As built drawings for Marine Terminal Building of Sprinkler System were prepared and
submitted to Techint to revise and reissue for RSHT-II Project. (CA137891)
- As built drawings for Fire Hall Building of Sprinkler System were prepared and
submitted to Techint to revise and reissue for RSHT-II Project. (CA137891)
- As built drawings for Maintenance Building of Hose Reel System were prepared and
submitted to Techint to revise and reissue for RSHT-II Project. (CA137891)