Building the Future Current Activities this Week : Mass Excavation : Backfilling of on-grade seating is ongoing in Area 2 and Area 3. Site Utilities : Storm Sewer installation (Line 3000) is ongoing along Village West Parkway. Storm Line Installation (Line 6000 and Sanitary Sewer Line E installation is ongoing on east side of France Family Dive is ongoing. Foundations : Area 3 Field Level – Isolated footing installation is ongoing and is currently to Column Line 3.5. Concrete Flatwork : Area 1 – Mezzanine slab-on deck is complete, Main Concourse structural slab is complete, Suite Level slab on deck is complete, Press Level slab on deck is complete. Field Level Area 1 slab-on-grade is complete from column line 32-29. Structural Steel Erection : Area 1 – Detailing and decking in sequence 1-3 is ongoing. Erection of Steel Sequence 2-1 is ongoing. To: David Ficklin - OnGoal Rory O’Connor – OnGoal Lee Turner – OnGoal Andy Heitmann – Turner Dave Dudzik - Turner From: Brandon Valdez Office: Kansas City Date: 7.7.2010 Re: Wizards Stadium Project Update – Week of 7.5.2010 Concourse Level Area 2 – Underground plumbing and electrical rough-in for the Concourse Buildings is ongoing. Field Level Area 1 – Concrete placement for slab-on-grade between column lines 32-29. Field Level Area 1 – Cast-in-place concrete riser installation has started.

Upload: kansas-city-wizards

Post on 26-Jun-2015

150 views

Category:

Business


4 download

TRANSCRIPT

Page 1: Weekly Construction Update 07-07-2010

Building the Future

Current Activities this Week:

Mass Excavation:

Backfilling of on-grade seating is ongoing in Area 2

and Area 3.

Site Utilities:

Storm Sewer installation (Line 3000) is ongoing along

Village West Parkway.

Storm Line Installation (Line 6000 and Sanitary Sewer

Line E installation is ongoing on east side of France

Family Dive is ongoing.

Foundations:

Area 3 Field Level – Isolated footing installation is

ongoing and is currently to Column Line 3.5.

Concrete Flatwork:

Area 1 – Mezzanine slab-on deck is complete, Main

Concourse structural slab is complete, Suite Level slab

on deck is complete, Press Level slab on deck is

complete. Field Level Area 1 slab-on-grade is complete

from column line 32-29.

Structural Steel Erection:

Area 1 – Detailing and decking in sequence 1-3 is ongoing.

Erection of Steel Sequence 2-1 is ongoing.

To: David Ficklin - OnGoal

Rory O’Connor – OnGoal

Lee Turner – OnGoal

Andy Heitmann – Turner

Dave Dudzik - Turner

From: Brandon Valdez

Office: Kansas City

Date: 7.7.2010

Re: Wizards Stadium Project

Update – Week of

7.5.2010

Concourse Level Area 2 – Underground

plumbing and electrical rough-in for the

Concourse Buildings is ongoing.

Field Level Area 1 – Concrete placement for

slab-on-grade between column lines 32-29.

Field Level Area 1 – Cast-in-place concrete

riser installation has started.

Page 2: Weekly Construction Update 07-07-2010

Building the Future

Structural Steel Erection:

Area 1 – Detailing and decking in sequence 1-3 is ongoing.

Erection of Steel Sequence 2-1 is ongoing.

Underground MEP:

Electrical Secondary Distribution is ongoing in Area 3.

MEP Rough-in:

Area 1 – Shallow electrical and plumbing rough-in will

continue.

Metal Stud Framing:

Area 1 Suite Level – Metal stud framing for Suites is

ongoing.

Projected Activities occurring next Week:

Mass Excavation:

Backfilling of on-grade seating areas will continue in Area

3.

Site Utilities:

Installation of the Storm Line 6000 on the East Side (France

Family Drive) of the site will continue.

Deep Underground MEP:

Deep Sanitary and Electrical Distribution installation

in Area 3 will continue.

Foundations:

Area 3 Field Level – Foundation installation will continue.

Area 4 Mezzanine Level – Foundation Wall installation will

continue.

Area 1 – Shot of the West Building from the

south concourse area.

Suite Level Area 1 – Metal stud framing for

Suites are ongoing.

Area 2 –Steel erection in Sequence 2-1 is in

full swing.

Page 3: Weekly Construction Update 07-07-2010

Building the Future

Concrete Flatwork:

Area 1 Field Level – Prep for concrete placement for

slab-on-grade will continue.

Area 1 Field Level – Installation of on-grade seating risers

will continue.

Structural Steel Erection:

Erection of Structural Steel in Sequence 2-1 will

continue. Decking and detailing in Sequence 2-1 will begin.

Erection of the Canopy Trusses will begin.

Underground MEP:

Electrical Secondary will continue in Area 3.

MEP Rough-in:

Plumbing and Electrical rough-in for Area 1 Field Level slab

on grade will continue.

Metal Stud Framing:

Area 1 Suite Level – Metal stud framing for Suites will

continue.

Area 1 Press Level – Metal stud framing for Suites will

begin.

Area 1 – Shot from Roof Level showing

precast concrete and curvature of steel

structure.

Field Level Area 3 – Foundation installation

is ongoing.

Page 4: Weekly Construction Update 07-07-2010

Building the Future

Additional Photos:

Area 1 – Shot of the West Building from the

northeast.

Field Level Area 3 – Cauldron Club field wall

reinforcing in place.

Suite Level Area 1 – Precast tub being picked

by crane on its way to be installed.

Suite Level Area 1 – Metal Stud Framing

installation is ongoing.

Suite Level Area 1 – Ironworkers setting and

fastening precast seating tubs.

Mezzanine Level Area 4 – Shot of north

foundation wall installation.