Week 7 Journal Submission Constructing Environments University of Melbourne

TRANSCRIPT

At 60% completion stage9 storey55 1-2 bedroom residential apartmentsConcrete post tension slabs Steel roof structure Pre-cast panels Ban beam hold slab upBoard pile for heavier buildings loading at end of piles Concrete reinforced only on perimeter to minimise costs 200mm steel slab - $8,000 per tonneOnly steel column on the top level Approximately $350- 500,000 $13 million construction budget Up to 40 people on site per day

Copper PVC storm water, sewage Reinforced concrete block work Steel sheeting stairs form work

Hatch access panel service componentsWith insulation fibreglass

Fire-check fire rating (dividing wall metal stud wall) 90-90-90Concrete slab

Sprinkler for fire rating

Extruded aluminium door frames rubber seal

General Building Details

1st Floor

Ground Floor

Cara BrognoConstructing EnvironmentsWeek 7 Journal('Off Campus' Construction Site Visit)

DuctsExtraction fansStandard galvanised steel sections purlins Cant run flexiduct over 5 metresCast in plates set in concrete

Steel trussCircular bar braces- stop from twistingBatterns to plaster finishes, not studs

Ply used for cabinet and towel rack

Storm water In-situ concrete Brass tap fittings

Single stud wall

Double stud wall offset (gap) for sound infiltration

Steel rods for diagonal bracing

Bolted connection

Drain pipe

9th Floor

Cara BrognoConstructing EnvironmentsWeek 7 Journal('Off Campus' Construction Site Visit)

Cara BrognoConstructing EnvironmentsWeek 7 Journal('Off Campus' Construction Site Visit)

8th Level

Concrete column stacks run through entire building and break the span of slabs Concrete on lower floor are thicker and heavier Seams of floor ply where ply wood joins form work Every slab 2 direction, post tension Steel reinforcement bars connecting panels

Holes to be filled with grout

Crane own footing system (eventually removed by a mobile crane full day time period)Crane has a counter weight on it for balance

3mm steel sheeting To eventually be installed solar panels, duct work & anchoring system

Roof