The World Bank-financed Ma'anshan Cihu River Basin Improvement Project Environmental Management Plan E4068 v1 rev

Upload: others

Post on 06-Feb-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1documents.worldbank.org/.../NonAsciiFileName0.docx · Web viewUse cement to harden the construction field. The project construction should be carried out in stages and batches. Mitigation

The World Bank-financed

Ma'anshan Cihu River Basin Improvement Project

Environmental Management Plan

Leading Group Office for Ma’anshan Cihu River Project under

E4068 v1 rev

Page 2: 1documents.worldbank.org/.../NonAsciiFileName0.docx · Web viewUse cement to harden the construction field. The project construction should be carried out in stages and batches. Mitigation

World Bank Loan

Nov. 2012

Page 3: 1documents.worldbank.org/.../NonAsciiFileName0.docx · Web viewUse cement to harden the construction field. The project construction should be carried out in stages and batches. Mitigation

Content

1 Preface...........................................................................................................................................12 Basis for preparation.................................................................................................................1

2.1 Laws on environmental protection................................................................................12.2 Regulations, bylaws and normative documents on environmental protection..............22.3 Technical standards on environmental protection.........................................................32.4 Relevant documents of the World Bank........................................................................32.5 Other relevant documents.............................................................................................42.6 Documents related to the Project..................................................................................52.7 assessment standards...........................................................................................................5

3. Basic Information of the Project...................................................................................................63.1 Construction tasks.........................................................................................................63.2 Flood control and drainage design indicators...............................................................63.3 Consist of the project..........................................................................................................73.4 Impact of Land Acquisition and Resettlement..................................................................10

4 Environmental impact analysis....................................................................................................104.1 Identification of environmental impact factors...........................................................104.2 Environmental impact analysis.........................................................................................11

5 Environmental management procedures......................................................................................145.1 Generic Environmental Code of Practices........................................................................145.2 Site-specific environmental Mitigation Measures.............................................................18

6. Environmental Management.......................................................................................................196.1 Environmental Protection Management Plan....................................................................19

6.1.1 The overall goal of environmental management....................................................196.1.2 Environmental management institutions................................................................206.1.3 Duties and personnel allocation of the environmental management system agencies........................................................................................................................................22

6.2 Environmental Monitoring Plan........................................................................................246.2.1 Formulate objectives and principles.......................................................................246.2.2 Environment monitoring agency............................................................................246.2.3 Environmental monitoring scheme........................................................................24

6.3 EMP training program......................................................................................................276.3.1 Training purpose....................................................................................................276.3.2 Training objects......................................................................................................276.3.3 Training content.....................................................................................................276.3.4 Training plans.........................................................................................................28

6.4 Environmental Supervision & Management Plan (ESMP)...............................................296.4.1 Environmental supervision organization during the construction period...............296.4.2 Guideline of environmental supervision................................................................296.4.3 Environmental supervision scope..........................................................................296.4.4 Work pattern of environmental supervision...........................................................306.4.5 Specific working procedure of environmental supervision....................................30

I

Page 4: 1documents.worldbank.org/.../NonAsciiFileName0.docx · Web viewUse cement to harden the construction field. The project construction should be carried out in stages and batches. Mitigation

6.4.6 Environmental supervision organization and work system....................................316.4.7 Engineering environmental supervision plan.........................................................326.4.8 Document compilation of environmental supervision...........................................346.4.9 Environmental supervision archives management.................................................34

6.5 Public complaints and feedback mechanism.....................................................................356.5.1 Public complaints mechanism................................................................................356.5.2 Public feedback mechanism...................................................................................36

6.6 Report mechanism of Environmental management plan...................................................376.6.1 Reorganize and save of Monitoring data................................................................376.6.2 Information exchange............................................................................................376.6.3 Recording...............................................................................................................376.6.4 Reports...................................................................................................................37

6.7 Investment Estimation of Environment Protection...........................................................38

II

Page 5: 1documents.worldbank.org/.../NonAsciiFileName0.docx · Web viewUse cement to harden the construction field. The project construction should be carried out in stages and batches. Mitigation

1 Preface

This Environmental Management Plan, which based on the EIA report of The World Bank-financed Ma'anshan Cihu River Basin Improvement Project, as an free-standing document, include the arrangement of institutions, environmental management plan during construction period and operation period, and provided an action principles and work frame for the mitigation measures, environmental management and monitoring plan of the project during construction period and operation period. The main content include:(1) Project overview(2) Potential environmental impact of the project(3) The project organization and responsibility(4) Environmental management plan(5) Environmental monitoring planFeasibility study and environmental impact assessment has been taken on the World Bank-financed Ma'anshan Cihu River Basin Improvement Project, in order to reduce and alleviate the negative impact of the project to the society and environment, and to develop a series mitigation measures to solve the environmental issue. The purpose of Environmental management plan is to list the environmental mitigation measures and monitoring and supervision organization plan, to avoid or mitigate the negative impacts during the construction period and operation period. The environmental management plan will be the important connection between implemention and the management defined in the EIA, for the aim to achieve management objectives through the implementation of the environmental management plan.

2 Basis for preparation

2.1 Laws on environmental protection

1. Environmental Protection Law of the PRC (1989.12.26);

2. Environmental Impact Assessment Law of the PRC (2003.9.1);

3. Law of the PRC on Ambient Noise Pollution Prevention and Control (1997.3.1);

4. Law of the PRC on Atmospheric Pollution Prevention and Control (2000.9.1);

5. Law of the PRC on Water Pollution Prevention and Control (2008.2.28);

6. Law of the PRC on Solid Waste Pollution Prevention and Control (2005.4.1);

7. Law of the PRC on Water and Soil Conservation (2011.3.1);

1

Page 6: 1documents.worldbank.org/.../NonAsciiFileName0.docx · Web viewUse cement to harden the construction field. The project construction should be carried out in stages and batches. Mitigation

8. Flood Control Law of the PRC (1998.1.1);

9. Land Administration Law of the PRC (2004.8.28);

10. Law of the PRC on the Preservation of Cultural Relics (2007.12.29)

2.2 Regulations, bylaws and normative documents on environmental

protection

1. Decision of the State Council on Several Issues Concerning Environmental Protection, SC [1996] No.31;

2. Regulations on the Administration of Environmental Protection in Construction Projects, Decree No.253 of the State Council (1998);

3. Notice on Issuing the National Environmental Protection Outline, SC [2000] No.38;

4. Regulations on the Protection of Basic Farmland, Decree No.257 of the State Council (1998);

5. Regulations for the Implementation of the Law of the PRC on Water and Soil Conservation, Decree No.120 of the State Council (1993);

6. Regulations of the PRC on Nature Reserves, Decree No.167 of the State Council (1994);

7. Categorized Administrative List of Environmental Impact Assessment for Construction Projects, Decree No.2 of the Ministry of Environmental Protection (2008);

8. Interim Measures for Public Participation in Environmental Impact Assessment, MEP [2006] No.28;

9. Administrative Measures for Water and Soil Conservation Programs for Development and Construction Projects, WSC [1994] No.512;

10. Opinions on Further Improvements in the Protection of Basic Agricultural Land, MLR [2005] No.196;

11. Guiding Catalogue for Industrial Structure Adjustment (2011), Decree No.9 of the National Development and Reform Commission of the PRC;

12. National Ecological Function Zoning, Announcement No.35 of the Ministry of Environmental Protection (2008);

13. Notice on Strengthening the Administration of Environmental Impact Assessment in Projects Financed by International Financial Organizations, EM [1993] No.324;

14. Environmental Protection Regulations of Anhui Province (2010.11.1);

15. Notice on Issuing the Measures of Anhui Province for the Implementation of Environmental Supervision Trials in Construction Projects (2012.4.1);

16. Measures of Anhui Province for the Implementation of the Law of the PRC on Solid Waste Pollution Prevention and Control (2006.6.29);

17. Measures of Anhui Province for the Implementation of the Land Administration Law of the PRC (2004.7.1);

2

Page 7: 1documents.worldbank.org/.../NonAsciiFileName0.docx · Web viewUse cement to harden the construction field. The project construction should be carried out in stages and batches. Mitigation

18. Regulations on Agricultural Environmental Protection of Anhui Province (1999.8.1);

19. Decision of the Anhui Provincial Government on Strengthening Environmental Protection Practically (1997.4.17);

20. Opinions of the Anhui Provincial Government on the Implementation of the Decision of the State Council on Carrying out a Scientific Outlook on Development and Strengthening Environmental Protection (2006.9.14)

2.3 Technical standards on environmental protection

1. Technical guidelines for environmental impact assessment—General program (HJ2.1-2011);

2. Technical guidelines for environmental impact assessment—Atmospheric environment (HJ2.2-2008);

3. Technical guidelines for environmental impact assessment—Surface water environment (HJ/T2.3-1995);

4. Technical guidelines for environmental impact assessment—Groundwater environment (HJ610-2011);

5. Technical guidelines for environmental impact assessment—Acoustic environment (HJ2.4-2009);

6. Technical guidelines for environmental impact assessment—Ecological impacts (HJ19-2011);

7. Technical guidelines for environmental impact assessment—Hydropower and water resources projects (HJ/T88-2003);

8. Technical code on soil and water conservation for development and construction projects (SL204-98)

2.4 Relevant documents of the World Bank

The Project includes river course management and dike reinforcement mainly. Based on the Feasibility Study Report and the field investigation, the Project involves no resettlement, and no nature reserve, protected cultural relic or any other sensitive target. The World Bank has 10 safeguard policies in total, and the policies related to the Project is OP 4.01 and OP 4.12. The EHS of IFC considered in the EA development include the General EHS Guideline and the Waste Management Guideline, see Table 1-1.

Table 1 Correlation Analysis between the Project and World Bank Safeguard Policies

No. World Bank safeguard policyRelevance with the Project

Remarks

1OP4.01: Environmental Assessment

Relevant

3

Page 8: 1documents.worldbank.org/.../NonAsciiFileName0.docx · Web viewUse cement to harden the construction field. The project construction should be carried out in stages and batches. Mitigation

2 OP4.04: Natural Habitats IrrelevantThere is no nature reserve in the project area.

3 OP4.09: Pest Management Irrelevant —

4 OP4.10: Indigenous Peoples Irrelevant The Project involves no ethnic minority.

5OP4.11: Physical Cultural Resources

Irrelevant

The municipal-level cultural relic Wudangang is located in the project area. The nearest distance between the project area and this relic is about 210m. and this relic will not be affected by the Project during construction.

6OP4.12: Involuntary Resettlement

Relevant

7 OP4.36: Forests Irrelevant

8 OP4.37: Safety of Dams Irrelevant

9OP7.50: Projects on International Waterways

Irrelevant

10OP7.60: Projects in Disputed Areas

Irrelevant

2.5 Other relevant documents

1. Urban Master Plan of Ma’anshan Municipality (2002-2020), 2004.03;

2. Urban Drainage Engineering Plan of Ma’anshan Municipality (2005-2020), 2006.03;

3. Urban Flood Control Planning Report of Ma’anshan Municipality, 2006.11;

4. Plan for Integrated Water Environment Management of the Cihu River Basin of Ma’anshan Municipality, 2011.08;

5. Preliminary Design for the Ma’anshan Middle Cihu River (East Ring Road—Linli Road) Integrated Management Project, 2012.02;

6. Feasibility Study Report for the Upper Cihu River Surface Water Management Project, 2009.08;

7. Feasibility Study Report for the Ma’anshan Yuanxiang Mountain Troilite Mine Geologic Environment Management Project, 2010.04;

8. Measures for Division of Urban Suitable Functional Areas for Surface Water, Atmospheric and Noise Environment of Ma’anshan Municipality, 2011.6;

9. Notice of the Ma’anshan Municipal Government on Issuing the Integrated Environmental Management Plan for the Cihu River Basin (MMG [2008] No.48);

10. Master Plan for Mineral Resources of Ma’anshan Municipality (2006-2015);

11. Outline of the Master Land Utilization Plan of Ma’anshan Municipality (2006-2020);

4

Page 9: 1documents.worldbank.org/.../NonAsciiFileName0.docx · Web viewUse cement to harden the construction field. The project construction should be carried out in stages and batches. Mitigation

12. Master Ecological Construction Plan of Ma’anshan Municipality (2004-2020)

2.6 Documents related to the Project

1. Feasibility Study Report for the World Bank-financed Ma'anshan Cihu River Basin Improvement Project, Central and Southern China Municipal Engineering Design and Research Institute;

2. Notice of the National Development and Reform Commission, and the Ministry of Finance on the Request for Instructions on China’s Plan for Candidate Projects to be Financed by the World Bank in Fiscal Years 2011-2013 (NDRC FC [2010] No.2617);

3. Notice of the National Development and Reform Commission, and the Ministry of Finance on China’s Plan for Candidate Projects to be Financed by the World Bank in Fiscal Years 2011-2013 forwarded by the Anhui Provincial Development and Reform Commission (ADRC FC [2010] No.1306)

2.7 assessment standards

The standards proposed for the EIA are as follows:

1. Environmental quality standards

Table 2 Environmental Quality Standards

Item Standards Class

Ambient air:Ambient Air Quality Standard (GB3095-

1996), and the 2000 AmendmentClass II

Surface waterEnvironmental Quality Standard for

Surface Water (GB3838-2002)Class III (Yangtze river) and V

(Cihu river) standards

GroundwaterQuality Standard for Groundwater

(GB/T14848-93)Class III

Acoustic environment

Acoustic Environment (GB3096-2008)

Class 4 standard in the Quality Standard for Acoustic Environment

(GB3096-2008) for both sides of trunk traffic lines, Class 3 standard for Cihu Industrial Zone, and Class

2 standard for other areas

Soil environment

Quality Standard for Soil Environment (GB15618-1995)

Class III

2. Pollutant emission standards

Table 3 Emission Standards

5

Page 10: 1documents.worldbank.org/.../NonAsciiFileName0.docx · Web viewUse cement to harden the construction field. The project construction should be carried out in stages and batches. Mitigation

Item Emission Standard Class

Raise dustIntegrated Emission Standard for Air

Pollutants (GB16297-1996)---

Odor pollutantsEmission Standard for Odor Pollutants

(GB14554-93)Class II

Construction noise

Environment Noise for Boundary of Construction Site (GB12523-2011)

---

Noise of pump station

operation

Environment Noise for Boundary of

factory(GB12348-2008) Class III

Solid wasteAgricultural sediment the pollutant control

standard(GB4284-84) ---

3. Basic Information of the Project

3.1 Construction tasks

1. To improve the flood carrying capacity of the Cihu River by improving the Cihu River and the branch river systems, increase the flood control standard of both banks, and improve the flood control system of Ma’anshan Municipality;

2. To improve water quality and landscape, create a harmonious and efficient society in which human and nature coexist, and improve urban environment and people’s living standard;

3.2 Flood control and drainage design indicators

According to the Urban Flood Control Planning Report of Ma’anshan Municipality and Urban Drainage Plan of Ma’anshan Municipality (2005-2020), the design flood control standard of the Cihu River is resisting floods that occur every 20 years, to be reviewed based on the standard of resisting floods that occur every 50 years; the design flood drainage standard for the pump drainage area of the Cihu River is resisting floods that occur once a year.

3.3 Consist of the project

(1) Component 1: Rehabilitation of Cihu River and Improvement of Urban Drainage

Management of the Cihu River course in which the upper river course is 6.8km long,

6

Page 11: 1documents.worldbank.org/.../NonAsciiFileName0.docx · Web viewUse cement to harden the construction field. The project construction should be carried out in stages and batches. Mitigation

including ecological revetment construction, landscaping and dike top road construction; and the lower river course is 6.24km long, including dredging, dike body reinforcement, revetment, landscaping, dike top road construction etc.; demolition and re-construction of 5 flood control pumping stations.

(2) Component 2: Rehabilitation of Tributaries

This Component comprises management of 22 branch rivers including 2 ponds as rainwater regulation systems, with a total length of 32.05 km, including ecological revetment construction and landscaping. This Component also comprise management of left side of Lijianwan river, including dike reinforcement, slope protection, landscaping and dike top road construction, and 19 branch river systems, including dredging, slope protection, landscaping, and dike top road construction.

(3) Component 3: Environmental management and monitoring

This Component comprise Installation of an auto surface water quality monitoring station; development and implementation of water resource monitoring plan; preparation of mine closure guideline..

(4) Component 4: Capacity Building and Implementation Support

This Component comprise hiring consulting companies to support the project management, training and abroad investigation of staff in project office and construction units, facilities of the project office and operation agency.

See detailed in table 4

7

Page 12: 1documents.worldbank.org/.../NonAsciiFileName0.docx · Web viewUse cement to harden the construction field. The project construction should be carried out in stages and batches. Mitigation

Table 4 list of the constructions contents

No. Name Standard Material / un amou The scope of construction

Componen Management of Cihu river          1.1 Upper Cihu river        1.1.1 Provincial Highway 313-hunan bottom width23.5m,top width33.0m,canal soil m 3800 Ecological revetment, greening, road construction

1.1.2 Hunan east road – East ring road bottom width33.0m,top width44.0m,canal soil m 3000 Ecological revetment , greening , road construction

1.2 Lower Cihu river          1.2.1 Tianran river mouth – Linli bottom width25.0m,top width69.0m,dike soil m 890 Dike reinforcement , revetment , greening , road construction on dike top , pond

1.2.2 Cihu river mouth – Tianran river bottom width20.0m,top width68.0m,dike soil m 5350 Dike reinforcement , revetment , greening , road construction on dike top , pond

1.3 Drainage pumping station          3.1.1 Tongyi (2) Design discharge 6.3m3/s Reinforced set 1  3.1.2 Jiandanzha Design discharge 11.5m3/s Reinforced set 1  3.1.3 Zhaoming Design discharge 6.9m3/s Reinforced set 1  3.1.4 Tailai Design discharge 4.2m3/s Reinforced set 1  3.1.5 Xiaonanwei Design discharge 5.2m3/s Reinforced set 1  Componen Management of branch river          2.1.1 Jiandan river water system bottom width4~6m,top width4~6m,canal rubble m 1210 dredging , ecological revetment , greening

2.1.2 Hupo pond water system Revetment height 4.0m rubble m 3320 ecological revetment , greening

2.1.3 Yaochang pond water system Revetment height 4.0m rubble m 1770 ecological revetment , greening

2.1.4 Ditch of dianye road bottom width6m,top width12m,canal rubble m 1086 dredging , ecological revetment , greening

2.1.5 East side ditch of Ningwu rail road

bottom width10m,top width16m,canal rubble m 1642 dredging , ecological revetment , greening

2.1.6 North side ditch of tianran river bottom width10m,top width16m,canal rubble m 1233 dredging , ecological revetment , greening

8

Page 13: 1documents.worldbank.org/.../NonAsciiFileName0.docx · Web viewUse cement to harden the construction field. The project construction should be carried out in stages and batches. Mitigation

No. Name Standard Material / un amou The scope of construction

2.1.7 Nantang river bottom width11m,top width11m,canal rubble m 1898 dredging , ecological revetment , greening

2.1.8 Cross stream in Xindu community bottom width5m,top width12.5m,canal rubble m 1169 dredging , ecological revetment , greening

2.1.9 Wangebaitan water system bottom width17m,top width23m,canal rubble m 820 dredging

2.1.10 Yangqiao stream water system bottom width14m,top width14m,canal rubble m 772 dredging

2.1.11 Xitang water system bottom width15m,top width21m,canal rubble m 1094 dredging , ecological revetment , greening

2.1.12 Xiaohecha main stream bottom width19m,top width25m,canal rubble m 240 dredging , ecological revetment , greening

2.1.13 Xiaohecha branc stream bottom width8m,top width14m,canal rubble m 1230 dredging , ecological revetment , greening

2.1.14 Qiaoshan stream bottom width8m,top width8m,canal rubble m 1253 dredging , ecological revetment , greening

2.1.15 Geyang water system bottom width10m,top width10m,canal rubble m 539 dredging , ecological revetment , greening

2.1.16 Wudangang east stream bottom width10.5m,top width18m,canal rubble m 1980 dredging , ecological revetment , greening

2.1.17 Wudangang west stream bottom width14.5m,top width22m,canal rubble m 2120 dredging , ecological revetment , greening

2.1.18 North stream on right bank of bottom width1.5m,top width9m,canal rubble m 990 dredging , ecological revetment , greening

2.1.19 Shanghu river bottom width18.5m,top width26m,canal rubble m 3670 dredging , ecological revetment , greening

2.1.20 Fengshou south stream bottom width9m,top width9m,canal rubble m 900 dredging

2.1.21 Qianjin stream bottom width10m,top width10m,canal rubble m 1410 dredging , ecological revetment , greening

2.1.22 Left side of Lijianwan river soil m 1700 Dike reinforcement, grouting , revetment , road construction on dike top , pond

Componet

3Environmental management and monitoring Including Cihu river watershed management system, Cihu river water quality monitoring system, Cihu river

watershed environmental warning system and mining management system.

Componet

4Ability building and project implementationsupport Including hiring consulting companies to support the project management, training and abroad investigation of

staff in project office and construction units, facilities of the project office and operation agency.

9

Page 14: 1documents.worldbank.org/.../NonAsciiFileName0.docx · Web viewUse cement to harden the construction field. The project construction should be carried out in stages and batches. Mitigation

10

Page 15: 1documents.worldbank.org/.../NonAsciiFileName0.docx · Web viewUse cement to harden the construction field. The project construction should be carried out in stages and batches. Mitigation

3.4 Impact of Land Acquisition and Resettlement

According to the ‘Resettlement Action Plan of Ma'anshan Cihu River Basin Improvement Project’ compiled by the Immigrations Center of Hehai University, the project impacting scope include three districts (Huashan district, Jinjiazhuang district, Cihugaoxin district), one county, two blocks (Cihu county and Huoli block), with 552 households and 1714 persons. This project doesn’t involve housing demolition and relocation. The main impacts are the acquisition of collective-owned and state-owned land. The total land acquisition are 1788.89 mu., including 1253.89mu. collective-owned land, which are all non-prime arable land. The permanent land acquisition of national-owned land is 535 mu., which are all unused land along the river and branches. The temporary land acquisitions are all inside the blueline of Cihu river, without extra land acquisition or demolition.

See detailed in table 5.

Table 5 Land acquisition and resettlement of the project

Items UnitsRiver management

BranchesPumping station

TotalUpper river

Lower river

Permanent land acquisition of

collective -ownedMu. 445 266.85 533.84 8.2 1253.89

Permanent land acquisition of national-

ownedMu. 0 150.35 367.65 17 535

Directly impact

Household

140 35 377 0 552

Person 434 116 1164 0 1714

4 Environmental impact analysis

4.1 Identification of environmental impact factors

The environmental impact factors of the Project at the construction and operation stages have been identified based on its environmental impact profile and the surrounding environmental characteristics, as shown in Table 6

Table 6 Identification of Environmental Impact Factors

Construction behavior Construction stage Operation stage

11

Page 16: 1documents.worldbank.org/.../NonAsciiFileName0.docx · Web viewUse cement to harden the construction field. The project construction should be carried out in stages and batches. Mitigation

Environmental resourcesRiver course broadening

River course dredging

Dike reinforcement

Pumping station construction

Pumping station operation

Social environment

Employment +1D +1D +1D +1D +1C

Economy +1D +1D +1D +1D +2C

Quality of life -1D -1D -1D -1D +2C

Ecological environment

Landscape -1D -1D -1D -1D

Soil -1D -1D -1D -1D

Agriculture -1D -1D -1D -1D

Vegetation -1D -1D -1D -1D

Fauna -1D -1D -1D -1D

Water loss and soil erosion

-1D -1D -1D -1D

Environmental quality

Surface water environment

-1D

Acoustic environment

-1D -1D -1D -1D -1C

Atmospheric environment

-1D -1D -1D -1D

Notes: 1. In the above table, “+” denotes a positive benefit and “-” a negative benefit’2. The numbers in the table indicate relative degree of impact, where “1”

denotes a minor impact, “2” a medium impact and “3” a major impact;3. “D” denotes a short-term impact and “C” a long-term impact.

4.2 Environmental impact analysis

4.2.1 Construction period

The term of this construction work, which will be divided into sections and done by stages, runs from 2013 to March, 2017. During the construction, it is inevitable to occupy the land and tread on plants, causing damage to local ecological environment. Besides, noise, waste water, fugitive dust, stench, mud and other side effects resulted from construction will exert ill influence on the surrounding environment.

1. Wastewater

Sand gravels used in this project are outsourced with no need for washing in site, and only some simple mechanical maintenance will be done on the construction site without cleaning. Therefore, the waste water, generated within construction time, were mainly the remaining water of dredging engineering and sewage of the construction crew’ life.

(1) Remaining water of dredging engineering

The project applies dredging of cofferdam dry field way in its branches, and hydraulic

12

Page 17: 1documents.worldbank.org/.../NonAsciiFileName0.docx · Web viewUse cement to harden the construction field. The project construction should be carried out in stages and batches. Mitigation

dredging in the downstream of Cihu river. The sediments will be transported to the sediment yard through piles. So the waste water from the dredging engineering was mainly the supernatant fluid. The main pollution factors of the supernatant fluid is SS, which affects little to the surface water after precipitation, and could discharge into Cihu river directly.

(2) Sewage of the construction crew’ life

The sewage of the construction crew’ life containing water pollution factors such as COD, NH3-N and SS. See Table 3-1 for the number of workers and construction period for each construction section.

2. Waste gas

The impact upon air environment mainly comes from air pollutants within the construction period, mainly fugitive dust, malodorous gas , and waste gas emission.

(1) Fugitive dust

Fugitive dust is mainly generated in the processes such as the transportation and stacking of materials, river dredging, dam reinforcement etc., where with the help of wind, the construction site and their surrounding will be polluted. In addition, passing transport vehicles will cause second pollution of fugitive dust on the road. Measures, such as regular road-surface watering, stacked materials covering and transport vehicles blanketing, are designed in this project to control fugitive dust within construction period.

(2) Malodorous gas

Malodorous gas , mainly NH3-N and H2S, will emerge during dredging and the stacking of bottom mud, and its intensity generally ranks level two or three, according to analog data.

(3) Influence of waste gas emission

Waste gas, which is mainly caused by the fuel burning of construction machinery and transport vehicles, includes smoke, sulphur dioxide, nitrogen oxides, carbon monoxide, and other pollutants.

3. Noises

Noises, engendered by construction machinery such as excavators, auto-dumpers,

bulldozers, dredge pumps, generally range from 90 to 95 dB(A) and will have certain

negative influence on sound-sensitive places along the river.

Therefore, low-noise equipments are planned to be used in this project, and other measures will also be carried out in order to alleviate noise impact, such as reasonable time management, proper equipment arrangement, and fencing etc.

4. Solid waste

Solid waste produced in this construction includes dredging sediments, waste solid and domestic garbage of workers.

(1) River bottom sediment

This project will carry out dredging with hydraulic way in the downstream of Cihu, which amounts to 77,000m3,. This project will also carry out dredging with cofferdam dry field in its branches, which amounts to 95,000 m3. The sediments will transport to the Xiangshan Life landfill site as the sealing field overlying soil.

13

Page 18: 1documents.worldbank.org/.../NonAsciiFileName0.docx · Web viewUse cement to harden the construction field. The project construction should be carried out in stages and batches. Mitigation

(2) Waste slag

This project is balance of cut and fill, without any need to set up borrow area or spoil ground. The earth from slope cutting and revetment could be used in the dike enforcement. The waste slag are mainly the construction waste from the reconstruction of the 5 pumping stations, which the estimated area of demolition is 1000 m2, the waste slag index from demolition area is 1350kg/m2, so the estimated construction slag is 1350t. The waste slag will be transported to the third construction slag deposition field, which located in the upstream watershed of Cihu river, 12km away from downstream.

(3)Domestic garbage

Within construction time, domestic garbage will be produced by workers in their daily life. Domestic garbage shall be stacked at fixed point instead of mixing with building waste, and should be delivered to places designated by sanitation departments to be treated timely.

5. Impact on ecological environment

The influences on the ecological environment within construction period fall into the following four aspects: firstly, disturbance and damage to soil and plants caused by the trampling of machines, vehicles and workers during watercourse dredging and widening, pumping station construction and so on; secondly, change of land use patterns resulted from temporary or permanent land occupation; thirdly, reduction of farming and vegetation area due to land occupation, which will have a negative effect on agricultural production; and finally, certain soil erosion may happen if re-vegetation fails in temporary occupied area.

6. Impact on social environment

This project doesn’t involve housing demolition and relocation. The main impacts of immigration are the acquisition of collectively-owned and national-owned land. The total land acquisition are 1788.89 mu., including 1253.89mu. collective-owned land, which are all non-prime arable land. The permanent land acquisition of national-owned land is 535 mu., which are all unused land along the river and branches. According to Measures for Land Expropriation Compensation and Resettlement in Ma’anshan Municipality, compensation will be made to the affected persons.

4.2.2 Operation period

Since this is a water environment treatment project, no waste gas or water will be produced during runtime. And the impact on surrounding environment comes from the operation noises of pumping stations.

This project plans to demolish and re-construct the five pumping stations along the downstream of Cihu River, each of which will be equipped with 3 pumps. And the power of each pump in Tongyi (No.2), Zhaoming, and Xiaonanwei pumping stations will come to 250kw and that in Sulfuric Acid Plant and Tailai 180kw. In the operation of pumping stations, noises mainly come from the operation pump motors, the noise intensity of each of which ranges between 75 and 85dB (A)

14

Page 19: 1documents.worldbank.org/.../NonAsciiFileName0.docx · Web viewUse cement to harden the construction field. The project construction should be carried out in stages and batches. Mitigation

5 Environmental management procedures

Environmental management procedures cover design, construction and operation periodsEnvironmental management procedures include the General environmental management

measures during construction and operation period, specific environmental management measures during construction period (related to the sensitive points).

5.1 Generic Environmental Code of Practices

The generic ECOPs showed in table 7

Table 7 Generic ECOPs

Items PMitigation MeasuresImplementation units

Supervision units

Design period

Balance the earthwork, do not setup extra spoil ground

Design consulting unit

Municipality project office

The sediment yard should be set up within the blue line of land acquisition to avoid the exact land occupation.

Construction periodPreparation period

Confirm land occupation and Relevant formalities

contractors

Ma’anshan Caishi River & Cihu River Comprehensive Development Co. LTD,, Environmental Protection Bureau of Ma’anshan municipality

Atmospheric environment

Materials that are easy to produce dust shall be humidified or shielded with tarpaulin from wind in temporary storage.

Watering over dust points and roads 4-5 times at regular time every day.

Strengthen the management of transport vehicles; in the process of transportation, the materials should be sealed with tarpaulin.

Earthwork should stop in the windy days of greater than Level 4 winds

Use commercial concrete

Machines and vehicles should be chosen according to the National health protection standard, to guarantee the tail gas and smoke

to meet emission standards.。

15

Page 20: 1documents.worldbank.org/.../NonAsciiFileName0.docx · Web viewUse cement to harden the construction field. The project construction should be carried out in stages and batches. Mitigation

Surface water environment

The constructors could use the civil infrastructure in the nearby villages

contractors

Ma’anshan Caishi River & Cihu River Comprehensive Development Co. LTD,, Environmental Protection Bureau of Ma’anshan municipality

Apply advance equipments to control strictly leakage of the construction machinery.

Apply Cotton, wood chip, oil absorption to absorb the machinery leakage.

Establish equipment maintenance, maintenance records, conduct regular maintenance according to the operation of equipment;

Repair construction machinery only in nearby private workshop, only consider the replacement of mechanical parts on construction site

Acoustic environment

Strictly control of construction time to avoid

the construction between (22:00 ~ 06:00), otherwise permit for construction in night must be applied and approved and the public should agree

contractors

Ma’anshan Caishi River & Cihu River Comprehensive Development Co. LTD,, Environmental Protection Bureau of Ma’anshan municipality

Sludge pump should be at least 60m away from the residential areas.

Temporary barrier should be set for the sensitivity points within 40m from the site

Fixed strong noise source should be equipped with sound insulation cover or placed in indoor for operation

Construction unit should only choose the construction machinery and transport vehicles which meet the relevant national standards, try choosing low noise construction machinery

Strengthen the maintenance of all construction equipment, in order to fundamentally reduces the noise and vibration

Solid waste The construction solid waste should be transported to the third construction waste disposal field of Ma’anshan in time

contractors Ma’anshan Caishi River & Cihu River Comprehensive Development Co. LTD,, Environmental Protection Bureau of

Domestic solid waste should be stockpiled on the construction site and transported out for disposal by the sanitation department.

Solid waste and spoil storage sites should be established far away from the river.

16

Page 21: 1documents.worldbank.org/.../NonAsciiFileName0.docx · Web viewUse cement to harden the construction field. The project construction should be carried out in stages and batches. Mitigation

Ma’anshan

Sediments

Set up 4 sediments stockpiling sites within the land to be permanently occupiedDredging works should not be conducted in summer; meanwhile, the boundary of the sediments storage yard should be controlled. And the distance from the yard to the residential buildings should be more than 30m

contractors

Ma’anshan Caishi River & Cihu River Comprehensive Development Co. LTD,, Environmental Protection Bureau of Ma’anshan municipality

The transportation vehicle should be sealed to avoid scattered and reeking. The transportation line should be away from residential area. the sediments should be transported to the Xinagshan Sanitary Landfill for further drying and use as cover soil.

Landscaping with vegetation after construction is finished

Set sedimentation tank and discharge supernatant from the sediment storage site into Cihu river after sedimentation.

Water and soil loss

It is better to construct during dry seasons.

contractors

Ma’anshan Caishi River & Cihu River Comprehensive Development Co. LTD,, Environmental Protection Bureau of Ma’anshan municipality

With the aim of restoring the original surface productivity, topsoil layer must be removed and stockpiled before the project construction. The stripping thickness is 0.3m.Conduct land reclamation at the end of construction and refills the topsoil with 30cm thickness for

vegetation recovery.。Retained with woven bag around temporary sediments stockpiling site along the river, to avoid the soil loss to runoff.

Use cement to harden the construction field.

The project construction should be carried out in stages and batches. Mitigation measures should be taken for the exposed surface excavated, trying to minimize the exposure time and reduce the soil and water losses.

Landscape impact control

Enlarging the environmental propaganda, improve the environmental protection consciousness of the management and construction person. Discarding domestic

contractors Ma’anshan Caishi River & Cihu River Comprehensiv

17

Page 22: 1documents.worldbank.org/.../NonAsciiFileName0.docx · Web viewUse cement to harden the construction field. The project construction should be carried out in stages and batches. Mitigation

waste without control is banned.e Development Co. LTD,, Environmental Protection Bureau of Ma’anshan municipality

Strictly define the area of operation

After the completion of the project, garbage should be cleared in time in the construction site. Leveling the ground, try to restore original landform and vegetation,

Cultural relics

If physical cultural relics are found during construction, (including ancient sites and ancient tombs), construction should be suspended immediately. The construction site should be closed and protected under the supervision of the engineering supervisor and report to local cultural departments. Without the permit from the cultural department the construction should not be resumed.

contractors

Ma’anshan Caishi River & Cihu River Comprehensive Development Co. LTD,,, City culture committee

Construction traffic management

Reasonably arrange the project construction schedule, to shorten the temporary land occupation.

contractors

Ma’anshan Caishi River & Cihu River Comprehensive Development Co. LTD,, Environmental Protection Bureau of Ma’anshan municipality

Construction should be scheduled on the basis of section by section to reduce the impact on local residents’ travleling.

Arrange the vehicle route to ensure that local residents travel unimpeded

Before the start of the construction, access roads should be reinforced and reconstructed, or service road connecting with the original road should be built. Serious damage of the road shall be promptly repaired or pay compensation to the local road management departments.

Transportation of construction materials during night should be banned, where there are residents within 50m from the roads.

Construction transport vehicles should avoid local road traffic peak time.

Construction vehicles should be stipulated in the driveway of the road, it is strictly

prohibited to change driving route。Construction safety

Set up warning marks contractors Ma’anshan Caishi River & Equipped the constructors with safety helmets,

18

Page 23: 1documents.worldbank.org/.../NonAsciiFileName0.docx · Web viewUse cement to harden the construction field. The project construction should be carried out in stages and batches. Mitigation

belts, suits and shoes etc.

Cihu River Comprehensive Development Co. LTD,,

Apply low noise equipment, automation technology, to reduce the mechanical noise. Provide earplugs to the workers.

During the high temperature, cooling equipment or materials should be provided in site and the rest schedule should be carefully arranged.

Public participation

At the entrance of the construction site, a bulletin should be set up indicating the project information and content, schedule, and the contact people and hotline;

Ma’anshan Caishi River & Cihu River Comprehensive Development Co. LTD,, Environmental Protection Bureau of Ma’anshan municipality

Environmental professionals will be designated to respond to the public concerns on environmental impacts;.

Where construction at night is necessary, the relevant procedure should be followed and public announcement should be made to the adjacent residents which indicates the timing of the construction and the permit issued by local EPB;

The public concerns or questions raised by local people should be recorded and responded immediately. All the information of the question and response should be kept file and subject to the review of the supervision institution.

Operation period

Pump station noise

Pumps with low noise should be selected in the pumping stations and the base for the pumps should be cushioned.

Contractors

Ma’anshan Caishi River & Cihu River Comprehensive Development Co. LTD,,

5.2 Site-specific environmental Mitigation Measures

The Environment Mitigation Measures to the sensitive points are showed in table 8.

Table 8 Site-specific Mitigation Measures

19

Page 24: 1documents.worldbank.org/.../NonAsciiFileName0.docx · Web viewUse cement to harden the construction field. The project construction should be carried out in stages and batches. Mitigation

IssueProtection and

Mitigation MeasuresUnit price

(yuan) Amount

total price(10

thousan yuan)

Implement units

Supervison units

Noise

Setup temporary fences at Anhui

industial universitywith height of 1.8m,

length of 230m

300 230 6.9

Engineering contractors

Ma’anshan Caishi River &

Cihu River Comprehensive Development

Co. LTD,, Environmental

Protection Bureau of Ma’anshan

municipality

Setup temporary fences at Fenzhuang village Xiaxi group with height of 1.8m,

length of 50 m

300 50 1.5

Setup temporary fences at Shuguang

No.1 village and Cihu community,

with height of 1.8m, length of 220m

300 220 6.6

Setup temporary fences at Tangchalou

village,height of 1.8m, length of 320m

300 320 9.6

Setup temporary fences at Shiqiao village, height of

1.8m, length of 50m

300 50 1.5

6. Environmental Management

6.1 Environmental Protection Management Plan

6.1.1 The overall goal of environmental management

Gradually implement the design, construction and operation of the proposed projects on the basis of project design scheme and the prevention and mitigation measures laid down in environmental evaluation documents by formulating systematic, scientific environmental management plan to achieve the coordination between project construction and environmental protection by coinciding the design, construction and utilization of environmental protection measures and main construction work and reducing the impacts of project construction and operation on ecological environment, acoustic environment and ambient air to the limited

20

Page 25: 1documents.worldbank.org/.../NonAsciiFileName0.docx · Web viewUse cement to harden the construction field. The project construction should be carried out in stages and batches. Mitigation

scope required by relevant laws & regulations and standards.

6.1.2 Environmental management institutions

Institutions of environmental management showed in Fig. 8-1 and table 8-1.

Table 8-1 Institutions of environmental management

Type Name Duty

Management institutions

Municipality project office

Responsible for project implementation and management, Appoint special environment administrator, Responsible for the project environmental protection work in planning, design and implementation stages, Determine the working procedures to meet the domestic and the world bank’s requirements of environmental assessment and environmental management, Responsible for monitoring the implementation of the environmental management plan, Ensure environmental reduction measures were included in the bidding documents and contract, Responsible for the implementation of Component 4, See detailed in chapter ‘8.1.3 Duties and personnel allocation of the environmental management system agencies’

Ma’anshan Caishi River &

Cihu River Comprehensive Development

Co. LTD.

Responsible for the implementation of Component 1 and 2, Appoint special environmental protection specialist, for environmental protection acceptance after project completion, for daily environmental supervision and management during project construction period, make the environmental adverse effect reduced to minimal or acceptable level, Implement all the necessary project funds of environmental protection work, collected and archive the relevant documents, See detailed in chapter ‘8.1.3 Duties and personnel allocation of the environmental management system agencies’.

Environmental Protection Bureau of Ma’anshan

municipality

Responsible for the implementation of Component 3

Supervision institutions

The world bank

inspection Group

Send environmental technology experts, Supervise and inspect the implementation of the environmental protection practice, See detailed in chapter ‘8.1.3 Duties and personnel allocation of the environmental management system agencies’.

Environmental Protection Bureau of Ma’anshan

Supervise and inspect whether the project procedures meet China's environmental management requirements, and whether the pollution prevention and control measures meet the needs of environmental protection in China. See detailed in chapter ‘8.1.3

21

Page 26: 1documents.worldbank.org/.../NonAsciiFileName0.docx · Web viewUse cement to harden the construction field. The project construction should be carried out in stages and batches. Mitigation

municipalityDuties and personnel allocation of the environmental management system agencies’.

Implementation institutions

Civil engineering contractors

Appoint site environment supervision engineers,Carry out the environmental protection and water and soil conservation content in the contract and the bidding documents, Meet the environmental protection requirements of the world bank and the local administrative department of environmental protection, Preparation and submission environmental report during construction period monthly, See detailed in chapter ‘8.1.3 Duties and personnel allocation of the environmental management system agencies’.

Consulting services institutio

ns

EIA consulting unit

Prepare the EIA report, See detailed in chapter ‘8.1.3 Duties and personnel allocation of the environmental management system agencies’.

Design consulting unit

Prepare feasible research report and construction design scheme, and to ensure that the measures in environmental management plan applied in the feasible research report and construction design scheme. See detailed in chapter ‘8.1.3 Duties and personnel allocation of the environmental management system agencies’.

Environmental supervision

unit

supervision and management the daily production of the construction unit, See detailed in chapter ‘8.1.3 Duties and personnel allocation of the environmental management system agencies’.

Monitoring institutions

Environmental monitoring age

ncy

Responsible for the environmental monitoring during the project construction period and operation period, See detailed in chapter ‘8.1.3 Duties and personnel allocation of the environmental management system agencies’.

22

Page 27: 1documents.worldbank.org/.../NonAsciiFileName0.docx · Web viewUse cement to harden the construction field. The project construction should be carried out in stages and batches. Mitigation

Municipality project office

Contractors

Ma’anshan Caishi River & Cihu River Comprehensive Development Co. LTD.

Environmental

monitoring agency

Design consulting

unit

EIA consulting

unit

Environmental Protection Bureau of Ma’anshan municipality

Environmental

supervision unit

Municipality project office

Environemtal Management and implementation institutions during operation period

Environemtal Management and implementation institutions during Design stage, construction period

Fig.8-1 Institutions setup

6.1.3 Duties and personnel allocation of the environmental management system agencies

The integrated environmental management system comprises project management institution, regulatory institution, implementation institution, consulting service institution, monitoring institution. All institutions have different duties. The Leading Group Office for Ma’anshan Cihu River Project under World Bank Loan is leading the operation of the projects, ensure the local and world bank’s requirements are fulfilled. The implementation unit is Ma’anshan Caishi River & Cihu River Comprehensive Development Co. LTD. see detailed in table 8-2.

Table 8-2 Duties and personnel allocation of the environmental management system agencies

Name Type Person Duties

23

Page 28: 1documents.worldbank.org/.../NonAsciiFileName0.docx · Web viewUse cement to harden the construction field. The project construction should be carried out in stages and batches. Mitigation

World bankSupervision ins

titutions1

1. Sent inspection group to conduct special inspection on project implementation every year

2. Inspect implementation of the agreement of loan and the EMP

Environmental Protection Bureau of Ma’anshan

municipality

Supervision institutions

1

1. Environmental monitoring and supervise and manage this project in accordance with the process, including: approvement of project environmental impact assessment report, Environmental monitoring and supervision and management during contruction and operation

Municipality project office

Management institutions

2

1. Supervise the implementation of EMP, Ensure EMP measures were included in the bidding documents and contract, organize trainings2. Coordinate the implementation of local and world bank’s requirements of environmental managemnt3. Submit the related report to the world bank every half year4. Check the environmental management work5. Coordinate with other departments on major environmental problems6. Entrust external environment expert group for the project inspection

Ma’anshan Caishi River & Cihu River Comprehensive Development Co. LTD.

Management institutions

1

1. Supervise the implementation of the project environment management rules and regulations

2. Supervises and coordinates the engineering supervision (Qualification, responsibilities, management)

3. Organization research or the relevant investigation

4. Record the complaints during the engineering construction and operation process, public the processing results, solve problems of public appeal

5. Review environmental supervision and environmental consulting report

6. submit reports or forms every quarter7. sign the Site check list of construction units

and supervision units reported, checked and documented.

8. Accept environmental work inspection (including the world bank’s inspection)

24

Page 29: 1documents.worldbank.org/.../NonAsciiFileName0.docx · Web viewUse cement to harden the construction field. The project construction should be carried out in stages and batches. Mitigation

EIA consulting unit

EIA consulting institutions

Several

1. Conduct field surey and assess the environmental impacts,2. Prepare the EMP and provide consulting service

Engineering Project

Supervisor (

Environmental supervision)

Consulting service institutions

1-2

1. Engineering Project Supervisor hired by the project office individually, supervise the implementation of the water and soil loss control, garbage, exhaust gas and noise control measures,

2. Regular fill in the environmental management check list of Environmental protection Norms and procedures

3. Propose solution to the environmental problem raised in the construction period

4. Submit reports or forms every week to the project office

Engineering contractors

Implementation institutions

Several

1. Prepare environmental protection measures during construction period

2. Accept the environmental supervision and inspection from Engineering Project Supervisor, World Bank and Environmental Protection Bureau,

3. Establish a feedback mechanism to conduct rectify and reform in 3 days after informed, (ten days if coordination with management institutions is needed)

4. Finish the Construction site check list with Engineering Project Supervisor, and submit to the project office.

5. report to the Engineering Project Supervisor every week.

Environmental monitoring age

ncy

Monitoring institutions

1-21. Conduct environmental monitoring during

project construction and operation periods, according to the monitoring scheme

6.2 Environmental Monitoring Plan

6.2.1 Formulate objectives and principles

Environmental monitoring shall be carried out promptly on the basis of the environmental impact prediction results to keep track of the potential new problems and the various degrees of impact the project may have on environment and provide foundation for implementation time and scheme of environmental protection measures by promptly adjusting

25

Page 30: 1documents.worldbank.org/.../NonAsciiFileName0.docx · Web viewUse cement to harden the construction field. The project construction should be carried out in stages and batches. Mitigation

action plan on the basis of monitoring results.

6.2.2 Environment monitoring agency

Monitoring can be entrusted to Ma’anshan municipal environmental monitoring station Construction unit shall sign monitoring agreement related to construction period with monitoring station before construction and sign monitoring agreement related to operation period before the delivery for use of the project.

6.2.3 Environmental monitoring scheme

Take sensitive focus points with more apparent character for pollution as the monitoring points on the basis of the environmental impact prediction results and select acoustic environment, ambient air easily to be impacted as monitoring content on the basis of pollution conditions during construction period and operation period. Monitoring factor shall be determined by pollution characteristics factor in project analysis, monitoring analysis methods adopt that related to the project specified in Environmental Monitoring Technical Specifications and evaluation criterion follows national standards confirmed by Environmental Impact Assessment (EIA).Confirm environmental monitoring content during construction period and operation period, according to project and environmental characteristics. See Table 8-3 for specific information.

Table 8-5 Environmental monitoring plan during construction period and operation period

PeriodEnvironmental factor

Monitoring

content

Monitoring indicators

Monitoring

location

Monitoring time

and frequenc

y

Executive

standards

Monitoring cost

(RMB Ten

thousand

Yuan)

Daily monitorin

g unit

Regular supervision

unit

Construction period

Atmospheric

environment

Construction raised dust

TSP 5 Sensiti

ve points along the line

Once each year

during construc

tion peak

period

Class II standard

for Ambient

Air Quality

Standard

0.10 Municipal

environmental

monitor station or qualified monitor

Environmental

protection bureau

26

Page 31: 1documents.worldbank.org/.../NonAsciiFileName0.docx · Web viewUse cement to harden the construction field. The project construction should be carried out in stages and batches. Mitigation

unitsOdour H2S, NH3

Sediment

yardXiangs

han Landfil

l

Once within usage period of 4

sediment yards

Sediment drying site in landfill

Class II Emission standards for odor

pollutants

0.32

Acoustic environ

ment

Noise from

construction

machinery

Leq

5 Sensiti

ve points along the line

One construc

tion peak time each

year and monitoring its

operation once at

both daytime

and night.

Class II of

Environmental quality

standard for Noise

in

0.10

Wastewater

Supernatant from settling tanks of sediments yards

SS Sediments settling tanks

Once per week

Class II of Wastewater integrated Discharge Standard

0.4

27

Page 32: 1documents.worldbank.org/.../NonAsciiFileName0.docx · Web viewUse cement to harden the construction field. The project construction should be carried out in stages and batches. Mitigation

Sediments1

Sediments quality in the section to be dredged in Cihu River

Total metal

Same location with the surface water monitoring points

One time, one columnar sample each time

Ambient Soil Quality Standard

1.0

Qualified Environmental Monitoring Institute

Surface water

Surface water quality in Cihu River

COD, NH3-N,TP,pH, SS,DO

Auto monitoring station financed under the project

Once per month

Class V of Surface Water Environmental Standard

200

Ma’anshan Environmental Monitoring Center

Operation period

Acoustic environment

Draining pump station running noise

Leq

1m out of pump station field

Monitoring its operation once each year during draining pump station operation period and once at both daytime and night

Class III of Industrial enterprise Field Environmental Noise standard

0.10

Total 202.02

Note: 1. prior to the dredging works in Cihu River, the contractor should engage an independent qualified institute to sample and test the sediments in accordance with relevant domestic requirements. In case that if the sediments are found to be hazardous materials, they should be handled on site with relevant hazardous waste management regulations and requirements in Chin and EHS, and sent to the secured facility for proper disposal. Based on the information available, there is only one hazardous waste disposal center in Shenyang capable of disposing of hazardous

28

Page 33: 1documents.worldbank.org/.../NonAsciiFileName0.docx · Web viewUse cement to harden the construction field. The project construction should be carried out in stages and batches. Mitigation

soil/sediments in such large quantity. So if the sediments are found to be hazardous, they will sent to Shenyang Hazardous Waste Disposal Center.

6.3 EMP training program

6.3.1 Training purpose

The purpose of the EMP training is to guarantee the successful operation of the

environmental management, to make the associate staff to be familiar with the content and

procedure of the environmental management, to build ability of environmental management

and to ensure the effectively implement of all environmental protection measures. The main

objects of environment ability construction are environmental managers and environmental

superviser. Their training is a part of the project technical support. The training objects also

include constructors and workers. Before the construction, all the construction units and

management units are require and forced to attend the Environmental, health and safety

training.

6.3.2 Training objects

Training objects:project office, implementation untis of each project compenent, all

environmental supervisers 、 represents of environemental monitoring units, major

contractors.

6.3.3 Training content

1. The understood and application of The world bank environmental policy and the

domestic environmental protection laws and regulations, environmental standards;

2. Environmental management pattern and the environmental loan agreement terms in

the World Bank loan project;

3. EMP of the project;

4. the duties and relationships of Environmental management, environmental supervision

personnel, environmental monitoring staff and contractors;

5. the preparation of Environmental management work report, environmental supervision

work report, environmental monitoring report, the contractor log, monthly report, interim

29

Page 34: 1documents.worldbank.org/.../NonAsciiFileName0.docx · Web viewUse cement to harden the construction field. The project construction should be carried out in stages and batches. Mitigation

report and annual reports.

6.3.4 Training plans

The major negative environemental impacts came from the contruction period, the

relative environmental protection staff should be trained, to enhance the level of

environmental management. see detailed in table 8-6.

Table 8-6 Ability building and training plans

topicTrainging

objectscontents

times

day/time

persons/time

budget(ten

thousands)

Environmental protection

laws,regulations and policy

Project office, Water

Resources Bureau of Ma’anshan

municipality, Ma’anshan

Caishi River & Cihu River Comprehensi

ve Development

Co. LTD., contractors

** Expression isfaulty ** Environmental protection laws and regulations

1 0.5 4

0.45

** Expression is faulty ** Environmental policy and planning

1 0.5 4

** Expression isfaulty ** EMP

1 0.5 4

Implementation of EMP

Project office, Water

Resources Bureau of Ma’anshan

municipality, Ma’anshan

Caishi River & Cihu River Comprehensi

ve Development

Co. LTD.,

** Expression isfaulty **Environmental protection duties during project construction period

1 0.5 4

0.9

** Expression isfaulty ** main task of environmental protection during project construction period

1 0.5 4

** Expression isfaulty ** main

1 0.5 4

30

Page 35: 1documents.worldbank.org/.../NonAsciiFileName0.docx · Web viewUse cement to harden the construction field. The project construction should be carried out in stages and batches. Mitigation

topicTrainging

objectscontents

times

day/time

persons/time

budget(ten

thousands)

contractors

contents of environmental protection during project construction period

** Expression isfaulty **Reports in EMP

1 0.5 4

** Expression isfaulty **Improvement or fixed of EMP

1 0.5 4

** Expression isfaulty **Monitoring method, data collection method

1 0.5 4

Total 1.35

6.4 Environmental Supervision & Management Plan (ESMP)

6.4.1 Environmental supervision organization during the construction period

Environmental supervision during the construction period means the environmental protecting efforts to be implemented during the construction period. Environmental supervision work during the construction period must be undertaken by relatively authorized construction supervision organization, which has to have special environmental supervision engineer taking charge of environmental management and supervision during the construction period.

The environmental supervision unit is responsible for establishing an Environmental Supervision Team (EST) to implement specific supervision and management.

The Environmental Supervision Team EST needs to initiate the specific environmental supervision plan, in accordance with Environmental Impact Report hereto in terms of content of environmental supervision, meanwhile, conforming to the practical situation, and afterwards, Environmental Supervision Team should submit such environmental supervision plan to the related environmental authority and the construction unit.

6.4.2 Guideline of environmental supervision

Any unit performing environmental supervision shall practice under the guideline of legal principle, integrity and reasonability. In order to establish and identify the core-principle of environmental supervision p, as a Third Party, the obligation of environmental supervision

31

Page 36: 1documents.worldbank.org/.../NonAsciiFileName0.docx · Web viewUse cement to harden the construction field. The project construction should be carried out in stages and batches. Mitigation

unit & property owner and the authority must be strictly separated, and environmental supervision unit shall firmly stick to the principle of serving the property owner and the authority. It is especially important to maintain and confirm the inter-relationships among the property owner, the construction unit, the Engineering Supervision& Management Unit, the environmental supervision unit, the environmental monitoring unit, and the related authorities, for the purpose of creating favorable condition for the ESM works. The environmental supervision unit shall, according to the characteristics of the engineering hereto, establish a supervision and management rule that is regular and suitable for the practical condition, in order to standardize the engineering hereof.

6.4.3 Environmental supervision scope

1. Environmental supervision scope

The construction area and the project direct-influencing area include the construction site, walkway of the permanent and temporary work and the existed local roads involved with large number of transportation.

Content of environmental supervision: comprehensive ecological protection, planting, pollution control, public environment, etc.

2. Scopes of Project

Include all the areas polluted by the construction sites, construction roads and the construction above mentioned.

3 Periods of environmental supervision

The environmental supervision of the construction project comprises three main periods, which namely are preparing period, construction period, and delivery, acceptance, and defect liability period.

6.4.4 Work pattern of environmental supervision

Environmental supervision must be dynamically managed according to the project progress. Environmental supervision of the project is based on regular inspection, at large, and necessary environmental monitoring as supplement in order to promptly adjust the environmental supervision strength. Major pollutant construction procedure shall be supervised and managed throughout the entire construction in order to make sure all the contractors have fulfilled their obligation in accordance with the related environmental protection law, administrative regulations and conditions and terms as stated in the Contract.

The environmental supervisor is required to learn the content, in the Environment Impact Report, concerned of the said engineering

6.4.5 Specific working procedure of environmental supervision

An Environmental Supervising Unit, who strictly complies with the conditions and terms as stated in the Contract and the relative laws and administrative regulations, is a economically independent third party standing alone with regard to the property owner and the contractor. Such Environmental Supervising Unit’s obligation is implementing every work under the guideline of justice and independence, that is, it shall secure the legal rights and

32

Page 37: 1documents.worldbank.org/.../NonAsciiFileName0.docx · Web viewUse cement to harden the construction field. The project construction should be carried out in stages and batches. Mitigation

interests of both the property owner and the contractor. Meanwhile, as a environmental supervision Unit is a important component of environmental supervision, it is closely related to ESM and stand alone and boast differences to some extent. The specific environmental supervision procedure is as follows:

1. Review whether the environmental protection measures devised in preliminary design drawing of project has been implemented in line with the approved environmental protection

measures in environmental impact statement;2. Assist the construction unit to organize the environmental protection training for staff

in construction, design and management;3. Verification of the Tender Document and the terms of Engineering Contract involved

with environmental protection.

4 Presentation of environmental-protection advice and suggestion concerning with construction organization plan, technical plan, and construction progress plan, on-site verification of construction equipment, etc.

5 Supervise the measures of reducing the influence generated thereby to the ecological environment, the water, the atmosphere and the acoustic environment and the construction quality of the environmental protection engineering, and conduct stage acceptance and signature in accordance with the relative standards.

6 Conduct regular patrol and supervision on a daily basis; and systematically record environmental influence, practical effect, and construction quality of the environmental protection engineering.

7 As for any environmental problem found in the inspection, Record and give oral notification or form memorandum and demand the contractor to make a rectification within a deadline.

8 Supervise the main polluting source in the site of construction area; if necessary, advice the property owner on employing specialist and qualified monitoring unit to implement environmental implementation; and appropriately deal with existing environmental problem according to the monitoring result. As for major environmental problem, which is required the contractor to deal within a deadline, issue the Rectification Notice for Environmental Problems after negotiation with the owner

9 Promptly reflect to the Leading Team of environmental supervision on the concerned problem of environmental protection design and emerging construction problems, and present solution advice.

10. Take responsibility for drafting the environmental supervision work plan and summary

6.4.6 Environmental supervision organization and work system.

In order to make the environmental management work conduct smoothly, the engineering environmental supervision is included into the engineering supervision system. The construction unit shall entrust a unit with engineering qualification and has been trained

33

Page 38: 1documents.worldbank.org/.../NonAsciiFileName0.docx · Web viewUse cement to harden the construction field. The project construction should be carried out in stages and batches. Mitigation

for environmental protection operation to undertake the engineering environmental supervision.

The main work content of the environmental supervision mainly includes: work record, worker environment training, report, correspondence, regular meeting, award & punishment and filing of environmental supervision,.

6.4.7 Engineering environmental supervision plan

1. Construction preparation stage

Examine the practical implementation of the environmental protection specified in the Construction Contract, verify the concerned environmental protection measures of the construction organization plan, verify, optimize and review the construction area with the undertaking unit, design unit, engineering supervision unit, and the construction unit. See Table 8-7 for environmental supervision plan.

Table 8-7 Environmental supervision emphasis during the construction preparation period

Construction Activities

Supervision emphasisSupervision

methodsMeans

Construction bidding

Compile engineering environment supervision work Plan

Review and terms on environmental protection in the Construction Contract

Document review

Review of sensitive items and protected object on the construction site.

Inspection Field recording

Review the environmental measures of the construction organization plan made by the contractor.

Document review

Verification of the environmental managing plan during the construction period made by the contractor.

Document review

Verification of the construction plan and the related environmental protection plan during the application of the sections.

Document review

34

Page 39: 1documents.worldbank.org/.../NonAsciiFileName0.docx · Web viewUse cement to harden the construction field. The project construction should be carried out in stages and batches. Mitigation

2. Construction stage

The environmental supervision during the construction shall be implemented along with the engineering, which mainly include river desilting, dam reinforcement, pumping station construction, etc. See Table 8-8 for Supervision Plan

Table 8-8 Main environmental supervision content during the Construction Period

Environmental factor

Supervision object

Main environmental supervision content

Main environmental supervision forms

Solutions of excessive pollutants or violation.

Water environment

Construction sites

Reinforce management and maintenance of the construction machines, discharge remaining water of sediment yard into Cihu river after sedimentation.

Patrolling and inspecting the temporary land occupancy.

Notice the undergoing unit and the construction unit for remedial measure.

Ambient air

①Transportation and stocking of building materials; ②Sediment yard

① Transporting vehicles need to transport materials with all the materials sealed; the unloading site needs to be prepared with dust-control measure, and such sites need to be watered on a regular basis. ②There shall be no more than 30m distance between the Sediment yard and residential area

Conduct air quality monitoring and inspect all the construction areas and the temporary land occupancy.

Notification of remedies to the undergoing unit and the construction unit.

Acoustic environment

①Construction and transportation Road②Construction area

① Appropriately arrange construction Time Plan②Using low-noise equipment

③ Setup fences around sensitivity points

Conduct acoustic environment monitoring and inspect all the construction areas and the temporary land occupancy.

Notify the undergoing unit and the construction unit for remedial measure.

Social environment

Major construction sites

①Reduce the influence of the construction on transportation to the local city, for example, by avoiding the rush hour.

Inspect the construction site during the construction period, and learn the local inhabitants’ feelings who live about the construction sites.

Noticing the undergoing unit and the construction unit for remedial measure.

Ecological environment

Temporary land occupation

Ecological restoration of temporarily-occupied areas

Identify the location of temporarily-occupied areas which should be patrolled

Notify for remedies to the contractor and the

35

Page 40: 1documents.worldbank.org/.../NonAsciiFileName0.docx · Web viewUse cement to harden the construction field. The project construction should be carried out in stages and batches. Mitigation

during the construction time, and an inspection of the restoration shall be guaranteed when construction is finished

construction unit.

3. Delivery, Acceptance and Defects Liability Period

Summarizing the data on environment protection acceptance after the completion of the project, construction of the environment protection engineering, and restoration and maintenance of the construction site and temporarily-occupied areas in the defects liability period are among the main tasks during this period.

6.4.8 Document compilation of environmental supervision

1. General plan compilation of environmental protection supervision

General plan of environmental protection supervision refers to that when an environmental protection supervision unit accepting a business entrustment , it shall develop a plan on the environmental protection supervision of the project according to the Contract, environment assessment requirements, construction plan and the actual conditions of construction , to identify the range, content, methods and goals of the work of environmental protection supervision.

2. Implementing rules compilation of environmental protection supervision

Based on the general plan of environmental protection supervision, the implementing rules of environmental protection supervision are interpreted as the executable documents made by professional environmental protection supervision engineers from the project environmental protection supervision institution for the purpose of the compilation of single construction. Implementing rules shall be made according to the actual conditions of the construction and environment assessment requirements.

3. General report compilation of environmental supervision

When environmental supervision work ends, the environmental supervision organization shall make a prompt summery and deliver the construction unit a general report, which mainly includes the implementation summary of the commission supervision Contract, evaluation of supervision tasks and goals implementation.

6.4.9 Environmental supervision archives management

Environmental supervision archives shall include relevant documents and data of environmental supervision.

1. Documents of environmental supervision mainly include plan, implementing rules, general report, etc of environmental supervision.

2. Environmental supervision data mainly include:

① Daily work log: Mainly recording the work of environmental supervision, and the measures environmental supervision members take and their implementation when

36

Page 41: 1documents.worldbank.org/.../NonAsciiFileName0.docx · Web viewUse cement to harden the construction field. The project construction should be carried out in stages and batches. Mitigation

unexpected situation happens;

②Monthly environmental supervision report: Summarizing and documenting the work of environmental supervision during the month and record the work content and the measures environmental supervision members take and their implementation when unexpected situation happens;

③Correspondences between the environmental supervision unit and the property owner and other documents on construction unit and other relevant materials.

Archives management of the environment supervision shall formulate relevant management systems and assign the specified staff to be responsible for the gathering, classification, sorting and filing of various environmental supervision data, which are significant to the acceptance and management of the project environment protection.

6.5 Public complaints and feedback mechanism

6.5.1 Public complaints mechanism

Public complaints mechanism of the immigrants should be established, besides the

official ones, in order to make the problems rasied during compilation and implementation of

the project can be effectively solved, and to gurantee the implementation of land acquisition

and project construction. The public complaints mechanism should be as following:

Stage 1 If any rights violations happened during the land acqusition, the immigrants

could report to local management departments, or to the municipality petition offices directly.

The petition office should record the complaints and negociate with local management

departments and petitioners for solutions in 2 weeks.

Stage 2 If the petitioners do not satisfied with the solutions come out in stage 1, the

petitioners could lodge a complaint to the Leading Group Office for Ma’anshan Cihu River

Project under World Bank Loan, after the solution decision of stage 1 was made. The project

office should response in 2 weeks.

Stage 3 If the petitioners do not satisfied with the solutions come out in stage 2, after the

solution decision of stage 2 was made, the petitioners could lodge a complaint to the

administrative departments, according to the ‘Administrative Procedure Law of the Peoples

Republic of China’. Ask for arbitration.

Stage 4 If the petitioners still do not satisfied on the arbitration, they could prosecute to

37

Page 42: 1documents.worldbank.org/.../NonAsciiFileName0.docx · Web viewUse cement to harden the construction field. The project construction should be carried out in stages and batches. Mitigation

the Civil court, according to the Civil Procedural Law.

The immigrants could complain about all aspects including the compasation standard,

during the immigration resettlement.

The Public complaints mechanism will be inform to the immigrants through meentings

and other effective ways, including the media.

No charge on the petitioners, all cost paid by the contingencies.

6.5.2 Public feedback mechanism

Establish a pulic feedback mechanism, The EIA units and construction units should

respond to the environmental complaint and rectification notice immediately, and public the

solutions. Problems should be solved in 3 days (10 days if coordination with management

institutions is needed)

The feedback mechanism divided into 2 stages:

Stage 1: The construction unit and the EIA unit should conduct meetings and

questionnaires to collect residents’s opinions. The public could purpose suggestions and

opnions through meetings, questionnaires, letters, phonecalls, fax, emails. Also written

opinion to the administrative department of environmental protection is available. The

construction unit, the EIA unit and the administrative department of environmental protection

should backup and document the original files.

Stage 2: The public could purpose suggestions and opnions through letters, phonecalls,

fax, emails, petition office and Environmental Protection Bureau of Ma’anshan municipality

to the construction unit, during the project construction and operation period;

According to the public opinions, based on the environmental monitoring reports and

supervision reports, modifications and improvement should be made in the EMP.

If major deviations are found, or the modification of project will raise extra massive

negative environmental impacts or extra influened people, the project office should consult

the EIA cousulting units and the EIA group founded by World Bank, to conduct extra EIA. If

necessary, extra public consulting is needed as well. The modified EMP shold be copied to

the construction units and contractors to inform them the modified contents.

38

Page 43: 1documents.worldbank.org/.../NonAsciiFileName0.docx · Web viewUse cement to harden the construction field. The project construction should be carried out in stages and batches. Mitigation

6.6 Report mechanism of Environmental management plan

6.6.1 Reorganize and save of Monitoring data

Implement based on the ‘Environmental monitoring technical specifications’ and ‘Soil

and water conservation monitoring procedures’. 4 copies of original monitoring data and files

should be submitted to the administrative department of environmental protection as backup

and to the designing units as a information feedback.

6.6.2 Information exchange

Necessary information exchange was required among the different departments and duties by the environmental management, meanwhile to the external (relative units and public).

Internal information exchange could be conducted by meetings and briefs, at least once a month of the meeting. All information exchanged should be recorded and filed.

External information exchange could be held annually or once half year, which also should be recorded and filed.

6.6.3 Recording

For the effective operation of environmental management, the organization should establish a comprehensive recording system, include following aspects of recording:

(1)Laws and regulations;(2)license;(3)Environmental factors and the relevant environmental impact;(4)training;(5)Examination, check and maintenance activities

(6)Monitoring data

(7)problem in Environmental management and environmental protection work

(8) Corrective and preventive measures effectiveness;(9)Related party information;

39

Page 44: 1documents.worldbank.org/.../NonAsciiFileName0.docx · Web viewUse cement to harden the construction field. The project construction should be carried out in stages and batches. Mitigation

In addition, necessary control should be done on above all kinds of records, including: Records identification, collection, cataloging, filing, storage, management, maintenance, query, retention time, disposal and so on.

6.6.4 Reports

The project office, environement supervision units should record and report to the relevant departments in time, of the progress of the project, management plan (EMP) implementation, environmental quality monitoring results, etc in the project implementation process, including:

(1) Records of the execution of the EMP and the Monitoring data should be submitted to the project office as weekly report and monthly report, by the environmental supervision engineer.

(2) Quarterly project progress report, including the progress of EMP, should be prepared by the Ma’anshan Caishi River & Cihu River Comprehensive Development Co. LTD., and submitted to the project office and the Environmental Protection Bureau of Ma’anshan municipality.

(3) The monitoring report should submitted to the project office and environmental supervision engineer in time as long as it been prepared.

(4) Project progress report prepared by the project office (such as monthly report, quarterly report and yearly report) should be included the progress of EMP and effects, especially the monitoring results.

(5) Environmental supervision engineer and the project office should report to the local administrative department of environmental protection, even the higher administrative department, when violation in environment happens.

(6) Annual implementation report of EMP should be hand into the world bank before the March 31st of the next year. Annual implementation report of EMP should include:

a The implementation of the training plan;b Project progress,c Implementation of environmental protection measures, environmental monitoring and

results,d Whether there is any public complaint, if there is any complaint, records the main

content, solutions and public satisfaction,e The implementation plan of EMP next year.

6.7 Investment Estimation of Environment Protection

The total cost of environmental management is 69.7 thousand yuan, see table 8-9.

Table 8-9 Estimation of Environmental Management Cost

Item Environmental monitoring

Environmental supervision

Training(Thousand yuan)

合计(Thousand yuan)

40

Page 45: 1documents.worldbank.org/.../NonAsciiFileName0.docx · Web viewUse cement to harden the construction field. The project construction should be carried out in stages and batches. Mitigation

(Thousand yuan) (Thousand yuan)

The World Bank-financed

Ma'anshan Cihu River Basin

Improvement Project

6.2 50 13.5 69.7

41