SIBUR ZAPSIB-2 NEFTEKHIM PETROCHEMICAL COMPLEX
14 /15
PORTOVAYA LNG PLANT PROJECT
16 /17
COMPANY HISTORY /ABOUT US 5
FIELD OF ACTIVITIES 5
ONGOING PROJECTS 6 /11
AMUR GAS PROCESSING PLANT 8 /9
OMSK LNG PLANT PROJECT 10 /11
COMPLETED PROJECTS 12 /43
YAMAL LNG PLANT PROJECT 18 /19
PHOSAGRO AMMONIA PLANT PROJECT 20 /21
LINDE AZOT AMMONIA & HYDROGEN PLANT PROJECT 22 /23
GAZPROM NEFTEKHIM ACRYLIC ACID PLANT PROJECT 24 /25
LUKOIL VGO DEEP CONVERSION PLANT PROJECT 26 /27
RUSVINYL IKRA PROJECT INTEGRATED VINYLS PLANT PROJECT 28 /29
SIBUR POLYOLEFINS PLANT PROJECT 30 /31
FERTILIZER PLANT PROJECT 32 /33
ELECTROMETALLURGICAL PLANT PROJECT 34 /35
400MW COMBINED CYCLE POWER PLANT (CPR) 36 /37
800 MW COMBINED CYCLE POWER PLANT (CCCP) 38 /39
STAN 5000 METALLURGICAL PLANT PROJECT 40 /41
170 MW DISTRICT HEATING POWER PLANT, DHP 42 /43
CERTIFICATES 45 /51
REFERENCES 53 /55CON
TEN
TS
Pondera was founded in Moscow, in 2007 by a group of specialists who succesfully had carried out industrial mechanical installation works. Pondera has become a distinguished company in it’s field of activities and got the status of reliable company in short period of time, due to it’s success at construction fields.
Pondera has become a company appreciated by it’s workers as well as by clients. And pays atten-tion to team spirit and solidarity, observing discipline, effective time management and good working conditions. The fact that all our staff have an amateur working spirit, makes us more dynamic and professional in our work.Pondera means “balance” in Latin. The most important issue for us is always keeping in balance of our business, customer satisfaction and the rest of our staff. Therefore, we always take care of worker’s safety. Safety of a worker is safety of our business and guarantee of our future.So here is the “balance” will be our goal forever.
COM
PAN
Y H
ISTO
RY
FIEL
D O
F AC
TIVI
TIES
ABOUT US
5
Piping Prefabrication And Erection
Equipment Erection
Structural Steel Erection
Cladding
Gas And Steam Turbine Erection
Recycling Steam Boiler Erection
Insulation
Sandblasting And Painting
www.pondera.ru
ON
GO
ING
PROJEC
TS
7
Piping Erection : 612.000 wdi
Steel Erection Works : 13.000 ton
Sandwich Panel Cladding : 45.000 m²
Steam Tracing Works : 100.000 m
Flare Erection Works : 650 ton
www.pondera.ru
www.pondera.ru www.pondera.ru
SVOB
ODN
Y /
RU
SSIA
AMURSKAYA GPP
Region
: 28 months
: Svobodny, Russia
Contsruction Period
Start Date : September 2018
Estimated Completion Date : December 2020
Employer : Renaissance Heavy Industries
Scope of Works :
8 9
Piping Erection Works (562.000 wdi)
Steel Erection Works (Sandwich Panel Cladding ( 45.000 m² )
13.000 ton)
Steam Tracing Works (100.000 m)
Flare Erection Works (650 ton)
www.pondera.ru www.pondera.ru
OM
SK /
RU
SSIA
OMSK NPZ PLANT
10 11
Region : Omsk, Russia
Construction Period : 21 months
Start Date : November 2018
Estimated Completion Date : July 2020
Employer : Renaissance Heavy Industries
Scope of Works : Piping Erection Works (50.000 wdi)
COM
PLET
EDPR
OJEC
TS
13Heat Recovery Steam Generator Erection Works : 5.400 ton
Piping Erection and Prefabrication Works : 1.926.000 wdi
Structural Steel Erection Works : 31.780 ton
Pipe Steam Tracing Works : 55.000 m
Pipe and Equipment Insulation Works : 55.000 m²
Sandwich Cladding Works : 102.500 m²
www.pondera.ru
www.pondera.ru www.pondera.ru
TOB
OLS
K /
RU
SSIA
SIBUR ZAPSIB-2 NEFTEKHIM PETROCHEMICAL COMPLEX
Region : Tobolsk, Russia
Start Date : August 2016
Date of Completion
Construction Period : 38 months
: September 2019
Employer : Renaissance Heavy Industries
Scope of Works
: Piping Erection Works (620.000 wdi)
Furnace Erection Works (3ea x 1.900 ton, 5.700 ton)
14 15
www.pondera.ru www.pondera.ru
VYB
OR
G /
RU
SSIA
PORTOVAYA LNG PLANT PROJECT
16 17
Region : Vyborg, Russia
Start Date : January 2018
Date of Completion : December 2019
Construction Period : 24 months
Employer : Renaissance Heavy Industries
Scope of Works :
Piping Erection Works (10.000 wdi)
Structural Steel Erection Works (1.000 ton)
www.pondera.ru www.pondera.ru
SAB
ETTA
/ R
USS
IA
YAMAL LNG PLANT PROJECT
18 19
Region : Sabetta, Russia
Construction Period : 12 months
Start Date : January 2017
Date of Completion : December 2017
Employer : REGA JV
Scope Of Works
: Piping Prefabrication Works (20.000 wdi)
Piping Erection Works (80.000 wdi)
www.pondera.ru www.pondera.ru
CHER
EPO
VETS
/ R
USS
IA
PHOSAGRO AMMONIA PLANT PROJECT
20 21
Region : Cherepovets, Russia
Construction Period : 20 months
Start Date : January 2015
Date of Completion : August 2016
Employer : Renaissance Heavy Industries
Scope of Works
: Piping Prefabrication Works (45.000 wdi)
Piping Erection Works (35.000 wdi)
Underground Piping Erection Works (40.000 wdi)
www.pondera.ru www.pondera.ru
Region : Togliatti, Russia
Construction Period : 14 months
Start Date : July 2015
Date of Completion : August 2016
Employer : Renaissance Heavy Industries
Scope of Works
: Piping Prefabrication Works (35.000 wdi)
Piping Erection Works (45.000 wdi)
TOG
LIAT
TI /
RU
SSIA
LINDE AZOT AMMONIA & HYDROGEN PLANT PROJECT
22 23
www.pondera.ru www.pondera.ru
SALA
VAT
/ R
USS
IA
GAZPROM NEFTEKHIM ACRYLIC ACID PLANT PROJECT
24 25
Region : Salavat, Russia
Construction Period : 30 months
Start Date : January 2014
Date of Completion : June 2016
Employer : Renaissance Heavy Industries
Scope of Works
: Piping Prefabrication Works (165.000 wdi)
Piping Erection Works (120.000 wdi)
Pipe Steam Tracing Works (55.000 m)
Pipe and Equipment Insulation Works (25.000 m²)
www.pondera.ru www.pondera.ru
VOLG
OG
RAD
/ R
USS
IA
LUKOIL VGO DEEP CONVERSION PLANT PROJECT
26 27
Region : Volgograd, Russia
Construction Period : 22 months
Start Date : May 2014
Date of Completion : February 2016
Employer : Renaissance Heavy Industries
Scope of Works
: Piping Prefabrication Works (160.000 wdi)
Piping Erection Works (80.000 wdi)
www.pondera.ru www.pondera.ru
NIZ
HN
Y N
OVG
OR
OD
/ R
USS
IA
RUSVINYL IKRA PROJECT INTEGRATED VINYLS PLANT PROJECT
28 29
Region : Nizhny Novgorod, Russia
Construction Period : 23 months
Start Date : May 2012
Date of Completion : March 2014
Employer : Renaissance Heavy Industries
Scope of Works
: Piping Prefabrication Works (45.000 wdi)
Piping Erection Works (55.000 wdi)
Sandwich Cladding Works (7.000 m²)
Structural Steel Erection Works (3.000 ton)
Equipment Erection Works (330 ton)
Pipe and Equipment Insulation Works (30.000 m²)
www.pondera.ru www.pondera.ru
TOB
OLS
K /
RU
SSIA
SIBUR POLYOLEFINS PLANT PROJECT
30 31
Region : Tobolsk, Russia
Construction Period: 15 months
Start Date : January 2012
Date of Completion : March 2013
Employer : Renaissance Heavy Industries
Scope of Works : Piping Prefabrication and Erection Work (40.000 wdi)
Stell Structure Erection Works (600 ton)
www.pondera.ru www.pondera.ru
FERTILIZER PLANT PROJECT
32 33
Region : Mary, Turkmenistan
Construction Period : 27 months
Start Date : October 2011
Date of Completion : December 2013
Employer : Renaissance Heavy Industries
Scope of Works :
Structural Steel Erection Works (4.200 ton)
Piping Prefabrication Works (105.000 wdi)
Piping Erection Works (50.000 wdi)
Pannel Cladding Works (Sandwich and Trapeze) (7.500 m²)
Equipment Erection Works (650 ton) such as,
- Air Cooled Heat Exchangers Erection Works
- Bagging Building Equipment Works
- Conveyor System Erection Works
- Overhead Crane Erection Works
MAR
Y /
TUR
KM
ENIS
TAN
www.pondera.ru www.pondera.ru
KAL
UG
A /
RU
SSIA
ELECTROMETALLURGICAL PLANT PROJECT
34 35
Region : Kaluga, Russia
Construction Period : 47 months
Start Date : October 2009
Date of Completion : August 2013
Employer : Gama Industrial Plants Manufacturing and Erection Incorp
Scope of Works
: Structural Steel Erection Works (15.000 ton)
Panel Cladding Works (Sandwich and Trapeze) (16.000 m²)
Dedusting System Equipment Erection Works (1.000 ton)
Piping Erection Works (30.000 wdi)
Chemical Cleaning of Hydraulic System
www.pondera.ru www.pondera.ru
SHAT
UR
A /
RU
SSIA
400MW COMBINED CYCLE POWER PLANT (CPR)
36 37
Region : Shatura, Russia
Construction Period : 25 months
Start Date : December 2008
Date of Completion : December 2010
Employer : Gama Power Systems Engineering and Contracting lng.
Scope of Works : HRSG Piping and Stack Erection Work (2.700 ton)
www.pondera.ru www.pondera.ru
SUR
GU
T /
RU
SSIA
800 MW COMBINED CYCLE POWER PLANT (CCCP)
38 39
Region : Surgut, Russia
Construction Period : 28 months
Start Date : June 2009
Date of Completion : September 2011
Employer : Gama Power Systems Engineering and Contracting lng.
Scope of Works
: HRSG Erection Works (2.700 ton)
BOP Piping Erection Works (72.000 wdi)
www.pondera.ru www.pondera.ru
VYK
SA /
RU
SSIA
STAN 5000 METALLURGICAL PLANT PROJECT
40 41
Region : Vyksa, Russia
Construction Period : 15 months
Start Date : October 2010
Date of Completion : December 2011
Employer : STRABAG
Scope of Works
: Piping Erection Works (24.000 wdi)
Equipment Erection Works (100 ton)
Heating and Ventilating Works
Steel Structure Erection Works (200 ton)
Chemical Cleaning Works of Hydraulic Systems
www.pondera.ru www.pondera.ru
MO
SCO
W /
RU
SSIA
170 MW DISTRICT HEATING POWER PLANT, DHP
42 43
Region : Moscow, Russia
Construction Period : 37 months
Start Date : February 2008
Date of Completion : February 2011
Employer : Zorlu Industrial Plants and Power Plants Construction Co
Scope of Works
: Piping Erection Works (50.000 wdi)
Fin Fan Cooler (auxiliary cooling tower) Installation
CER
TIFI
CATE
S
45www.pondera.ru
www.pondera.ru www.pondera.ru
RU
SSIA
CERTIFICATES
46 47
www.pondera.ru www.pondera.ru
48 49
RU
SSIA
CERTIFICATES
www.pondera.ru www.pondera.ru
RU
SSIA
CERTIFICATES
50 51
REF
EREN
CES
53www.pondera.ru
www.pondera.ru www.pondera.ru54 55
REF
EREN
CES