SIBUR ZAPSIB-2 NEFTEKHIM PETROCHEMICAL COMPLEX

14 /15

PORTOVAYA LNG PLANT PROJECT

16 /17

COMPANY HISTORY /ABOUT US 5

FIELD OF ACTIVITIES 5

ONGOING PROJECTS 6 /11

AMUR GAS PROCESSING PLANT 8 /9

OMSK LNG PLANT PROJECT 10 /11

COMPLETED PROJECTS 12 /43

YAMAL LNG PLANT PROJECT 18 /19

PHOSAGRO AMMONIA PLANT PROJECT 20 /21

LINDE AZOT AMMONIA & HYDROGEN PLANT PROJECT 22 /23

GAZPROM NEFTEKHIM ACRYLIC ACID PLANT PROJECT 24 /25

LUKOIL VGO DEEP CONVERSION PLANT PROJECT 26 /27

RUSVINYL IKRA PROJECT INTEGRATED VINYLS PLANT PROJECT 28 /29

SIBUR POLYOLEFINS PLANT PROJECT 30 /31

FERTILIZER PLANT PROJECT 32 /33

ELECTROMETALLURGICAL PLANT PROJECT 34 /35

400MW COMBINED CYCLE POWER PLANT (CPR) 36 /37

800 MW COMBINED CYCLE POWER PLANT (CCCP) 38 /39

STAN 5000 METALLURGICAL PLANT PROJECT 40 /41

170 MW DISTRICT HEATING POWER PLANT, DHP 42 /43

CERTIFICATES 45 /51

REFERENCES 53 /55CON

TEN

TS

Page 4: web pondera ng

Pondera was founded in Moscow, in 2007 by a group of specialists who succesfully had carried out industrial mechanical installation works. Pondera has become a distinguished company in it’s field of activities and got the status of reliable company in short period of time, due to it’s success at construction fields.

Pondera has become a company appreciated by it’s workers as well as by clients. And pays atten-tion to team spirit and solidarity, observing discipline, effective time management and good working conditions. The fact that all our staff have an amateur working spirit, makes us more dynamic and professional in our work.Pondera means “balance” in Latin. The most important issue for us is always keeping in balance of our business, customer satisfaction and the rest of our staff. Therefore, we always take care of worker’s safety. Safety of a worker is safety of our business and guarantee of our future.So here is the “balance” will be our goal forever.

COM

PAN

Y H

ISTO

RY

FIEL

D O

F AC

TIVI

TIES

ABOUT US

5

Piping Prefabrication And Erection

Equipment Erection

Structural Steel Erection

Cladding

Gas And Steam Turbine Erection

Recycling Steam Boiler Erection

Insulation

Sandblasting And Painting

www.pondera.ru

Page 5: web pondera ng

ON

GO

ING

PROJEC

TS

7

Piping Erection : 612.000 wdi

Steel Erection Works : 13.000 ton

Sandwich Panel Cladding : 45.000 m²

Steam Tracing Works : 100.000 m

Flare Erection Works : 650 ton

www.pondera.ru

Page 6: web pondera ng

www.pondera.ru www.pondera.ru

SVOB

ODN

Y /

RU

SSIA

AMURSKAYA GPP

Region

: 28 months

: Svobodny, Russia

Contsruction Period

Start Date : September 2018

Estimated Completion Date : December 2020

Employer : Renaissance Heavy Industries

Scope of Works :

8 9

Piping Erection Works (562.000 wdi)

Steel Erection Works (Sandwich Panel Cladding ( 45.000 m² )

13.000 ton)

Steam Tracing Works (100.000 m)

Flare Erection Works (650 ton)

Page 7: web pondera ng

www.pondera.ru www.pondera.ru

OM

SK /

RU

SSIA

OMSK NPZ PLANT

10 11

Region : Omsk, Russia

Construction Period : 21 months

Start Date : November 2018

Estimated Completion Date : July 2020

Employer : Renaissance Heavy Industries

Scope of Works : Piping Erection Works (50.000 wdi)

Page 8: web pondera ng

COM

PLET

EDPR

OJEC

TS

13Heat Recovery Steam Generator Erection Works : 5.400 ton

Piping Erection and Prefabrication Works : 1.926.000 wdi

Structural Steel Erection Works : 31.780 ton

Pipe Steam Tracing Works : 55.000 m

Pipe and Equipment Insulation Works : 55.000 m²

Sandwich Cladding Works : 102.500 m²

www.pondera.ru

Page 9: web pondera ng

www.pondera.ru www.pondera.ru

TOB

OLS

K /

RU

SSIA

SIBUR ZAPSIB-2 NEFTEKHIM PETROCHEMICAL COMPLEX

Region : Tobolsk, Russia

Start Date : August 2016

Date of Completion

Construction Period : 38 months

: September 2019

Employer : Renaissance Heavy Industries

Scope of Works

: Piping Erection Works (620.000 wdi)

Furnace Erection Works (3ea x 1.900 ton, 5.700 ton)

14 15

Page 10: web pondera ng

www.pondera.ru www.pondera.ru

VYB

OR

G /

RU

SSIA

PORTOVAYA LNG PLANT PROJECT

16 17

Region : Vyborg, Russia

Start Date : January 2018

Date of Completion : December 2019

Construction Period : 24 months

Employer : Renaissance Heavy Industries

Scope of Works :

Piping Erection Works (10.000 wdi)

Structural Steel Erection Works (1.000 ton)

Page 11: web pondera ng

www.pondera.ru www.pondera.ru

SAB

ETTA

/ R

USS

IA

YAMAL LNG PLANT PROJECT

18 19

Region : Sabetta, Russia

Construction Period : 12 months

Start Date : January 2017

Date of Completion : December 2017

Employer : REGA JV

Scope Of Works

: Piping Prefabrication Works (20.000 wdi)

Piping Erection Works (80.000 wdi)

Page 12: web pondera ng

www.pondera.ru www.pondera.ru

CHER

EPO

VETS

/ R

USS

IA

PHOSAGRO AMMONIA PLANT PROJECT

20 21

Region : Cherepovets, Russia

Construction Period : 20 months

Start Date : January 2015

Date of Completion : August 2016

Employer : Renaissance Heavy Industries

Scope of Works

: Piping Prefabrication Works (45.000 wdi)

Piping Erection Works (35.000 wdi)

Underground Piping Erection Works (40.000 wdi)

Page 13: web pondera ng

www.pondera.ru www.pondera.ru

Region : Togliatti, Russia

Construction Period : 14 months

Start Date : July 2015

Date of Completion : August 2016

Employer : Renaissance Heavy Industries

Scope of Works

: Piping Prefabrication Works (35.000 wdi)

Piping Erection Works (45.000 wdi)

TOG

LIAT

TI /

RU

SSIA

LINDE AZOT AMMONIA & HYDROGEN PLANT PROJECT

22 23

Page 14: web pondera ng

www.pondera.ru www.pondera.ru

SALA

VAT

/ R

USS

IA

GAZPROM NEFTEKHIM ACRYLIC ACID PLANT PROJECT

24 25

Region : Salavat, Russia

Construction Period : 30 months

Start Date : January 2014

Date of Completion : June 2016

Employer : Renaissance Heavy Industries

Scope of Works

: Piping Prefabrication Works (165.000 wdi)

Piping Erection Works (120.000 wdi)

Pipe Steam Tracing Works (55.000 m)

Pipe and Equipment Insulation Works (25.000 m²)

Page 15: web pondera ng

www.pondera.ru www.pondera.ru

VOLG

OG

RAD

/ R

USS

IA

LUKOIL VGO DEEP CONVERSION PLANT PROJECT

26 27

Region : Volgograd, Russia

Construction Period : 22 months

Start Date : May 2014

Date of Completion : February 2016

Employer : Renaissance Heavy Industries

Scope of Works

: Piping Prefabrication Works (160.000 wdi)

Piping Erection Works (80.000 wdi)

Page 16: web pondera ng

www.pondera.ru www.pondera.ru

NIZ

HN

Y N

OVG

OR

OD

/ R

USS

IA

RUSVINYL IKRA PROJECT INTEGRATED VINYLS PLANT PROJECT

28 29

Region : Nizhny Novgorod, Russia

Construction Period : 23 months

Start Date : May 2012

Date of Completion : March 2014

Employer : Renaissance Heavy Industries

Scope of Works

: Piping Prefabrication Works (45.000 wdi)

Piping Erection Works (55.000 wdi)

Sandwich Cladding Works (7.000 m²)

Structural Steel Erection Works (3.000 ton)

Equipment Erection Works (330 ton)

Pipe and Equipment Insulation Works (30.000 m²)

Page 17: web pondera ng

www.pondera.ru www.pondera.ru

TOB

OLS

K /

RU

SSIA

SIBUR POLYOLEFINS PLANT PROJECT

30 31

Region : Tobolsk, Russia

Construction Period: 15 months

Start Date : January 2012

Date of Completion : March 2013

Employer : Renaissance Heavy Industries

Scope of Works : Piping Prefabrication and Erection Work (40.000 wdi)

Stell Structure Erection Works (600 ton)

Page 18: web pondera ng

www.pondera.ru www.pondera.ru

FERTILIZER PLANT PROJECT

32 33

Region : Mary, Turkmenistan

Construction Period : 27 months

Start Date : October 2011

Date of Completion : December 2013

Employer : Renaissance Heavy Industries

Scope of Works :

Structural Steel Erection Works (4.200 ton)

Piping Prefabrication Works (105.000 wdi)

Piping Erection Works (50.000 wdi)

Pannel Cladding Works (Sandwich and Trapeze) (7.500 m²)

Equipment Erection Works (650 ton) such as,

- Air Cooled Heat Exchangers Erection Works

- Bagging Building Equipment Works

- Conveyor System Erection Works

- Overhead Crane Erection Works

MAR

Y /

TUR

KM

ENIS

TAN

Page 19: web pondera ng

www.pondera.ru www.pondera.ru

KAL

UG

A /

RU

SSIA

ELECTROMETALLURGICAL PLANT PROJECT

34 35

Region : Kaluga, Russia

Construction Period : 47 months

Start Date : October 2009

Date of Completion : August 2013

Employer : Gama Industrial Plants Manufacturing and Erection Incorp

Scope of Works

: Structural Steel Erection Works (15.000 ton)

Panel Cladding Works (Sandwich and Trapeze) (16.000 m²)

Dedusting System Equipment Erection Works (1.000 ton)

Piping Erection Works (30.000 wdi)

Chemical Cleaning of Hydraulic System

Page 20: web pondera ng

www.pondera.ru www.pondera.ru

SHAT

UR

A /

RU

SSIA

400MW COMBINED CYCLE POWER PLANT (CPR)

36 37

Region : Shatura, Russia

Construction Period : 25 months

Start Date : December 2008

Date of Completion : December 2010

Employer : Gama Power Systems Engineering and Contracting lng.

Scope of Works : HRSG Piping and Stack Erection Work (2.700 ton)

Page 21: web pondera ng

www.pondera.ru www.pondera.ru

SUR

GU

T /

RU

SSIA

800 MW COMBINED CYCLE POWER PLANT (CCCP)

38 39

Region : Surgut, Russia

Construction Period : 28 months

Start Date : June 2009

Date of Completion : September 2011

Employer : Gama Power Systems Engineering and Contracting lng.

Scope of Works

: HRSG Erection Works (2.700 ton)

BOP Piping Erection Works (72.000 wdi)

Page 22: web pondera ng

www.pondera.ru www.pondera.ru

VYK

SA /

RU

SSIA

STAN 5000 METALLURGICAL PLANT PROJECT

40 41

Region : Vyksa, Russia

Construction Period : 15 months

Start Date : October 2010

Date of Completion : December 2011

Employer : STRABAG

Scope of Works

: Piping Erection Works (24.000 wdi)

Equipment Erection Works (100 ton)

Heating and Ventilating Works

Steel Structure Erection Works (200 ton)

Chemical Cleaning Works of Hydraulic Systems

Page 23: web pondera ng

www.pondera.ru www.pondera.ru

MO

SCO

W /

RU

SSIA

170 MW DISTRICT HEATING POWER PLANT, DHP

42 43

Region : Moscow, Russia

Construction Period : 37 months

Start Date : February 2008

Date of Completion : February 2011

Employer : Zorlu Industrial Plants and Power Plants Construction Co

Scope of Works

: Piping Erection Works (50.000 wdi)

Fin Fan Cooler (auxiliary cooling tower) Installation

Page 24: web pondera ng

CER

TIFI

CATE

S

45www.pondera.ru

Page 25: web pondera ng

www.pondera.ru www.pondera.ru

RU

SSIA

CERTIFICATES

46 47

Page 26: web pondera ng

www.pondera.ru www.pondera.ru

48 49

RU

SSIA

CERTIFICATES

Page 27: web pondera ng

www.pondera.ru www.pondera.ru

RU

SSIA

CERTIFICATES

50 51

Page 28: web pondera ng

REF

EREN

CES

53www.pondera.ru

Page 29: web pondera ng

www.pondera.ru www.pondera.ru54 55

REF

EREN

CES

Page 30: web pondera ng
Page 31: web pondera ng

Beregovoy proezd, 5А Bldg.1 Moscow, Russia

[email protected]

www.pondera.ru