w.e report

4
Work Expensive 25 th June To 29 th June 2012

Upload: ryan-grace

Post on 04-Mar-2016

243 views

Category:

Documents


1 download

DESCRIPTION

work expensive

TRANSCRIPT

Page 1: W.E Report

Work Expensive 25th June To 29th June 2012

Page 2: W.E Report

Monday 25th June 2012

Research- 1 hour 30mins

I started research different music websitetrying to find what I search to find thewebsite. I found three music video websitethat want to forces on. I put in the searchengine, music and music videos. The threewebsites I found were:

Music.comMUZU.TV.com

MTV.comYoutube.com/music

Vevo.com

Music.com main competitor are:MUZU.tv.com, and youtube.com/music.I did some compering between Music.comand Muzu.tv.com.

On the MUZU.tc.com page I liked the linkbar because every ten seconds it change from(example Rhianna to Coldplay to take that)also I liked the browse bar its a alphabeticallink section for example: C link links you to:Coldplay and Cherly Cole. On the website there was a language bar lets you change the language.

After looking at the website I through that I would making a music video sitefor example Music.com.I decide to remake Music.com, so I stared the logo.

Logo-2 hours

I started the design of the logo, I kept the same colour scheme green, white andblack. I started making the logo like the original but a bit more detail likeshadows and emboss. I finish at 30mins but I didn't like it so I started again.I then made a big M then in small I put “usic .com” next to the big M. again Ilooked at the logo and through that it need something else so I found a guitarand change to colour to the background (white) the put it on the front of the M.

Page 3: W.E Report

Then lunch

logo continue 20min

Next I made the logo more modern by put a gradient on the 'm' and 'usic.com'.

The end Product;

The last thing I started was make a website on. I started making a header withthe logo (above) on it which would go on my website but it took me a while tillI could get it on because I didn't know where to find he place where you put iton.

Then I started make picture to go where the videos would go and that all forMonday.

Tuesday 26th June 2012

Started make the report 1 hour 45min. Facebook Website Then I started Making a Facebook page for my Website

The cover picture was from:http://www.flickr.com/photos/doug88888/4542297929/

Page 4: W.E Report

Also I watched the web coding tutorial on www.w3school.comI watched all the html tutorial and the Css tutorial. Wednesday 27th June

I Started editing the website, I started filling the home page also I startedmaking post and in the post I put some names of Artist what I will fill in later.The artist are: Carly Rae Jepsen, Cheryl Cole, Coldplay, Rihanna and Adele. Iadd “New Songs” and “Top Ten”

Thursday 28th June 2012

I added more artist: Katy Perry, The Script and Bruno Mars.I started put their N.1 hits if they had any, Example Coldplay: Charlie Brown,Princess Of china and Paradise. I then went on Youtube and looked for thevideo then copyed the Http and linked it to the Hits

Then I through it needs more so I put in the latest album so Coldplay's is MyloXyloto. I then went on Youtube and looked for the video then copied the Httpand linked the list of song in the album.

Then I went looking for picture for headers. Example Coldplay I have a pictureof the band.