we design foraveva bocad 3d 3d modeling our engineering is supported by professional software for...

22
www.mta-online.net We design for demanding Clients COMMITMENT, EXCELLENCE, INNOVATION www.mta-online.net MTA ENGINEERING SP. Z O.O Przemysłowa 14 PL 35-105 Rzeszów POLAND tel.: +48 17 850 59 20 e-mail: [email protected]

Upload: others

Post on 13-Mar-2020

24 views

Category:

Documents


1 download

TRANSCRIPT

www.mta-online.net

We design fordemanding Clients

COMMITMENT, EXCELLENCE, INNOVATION

www.mta-online.net

MTA ENGINEERING SP. Z O.O

Przemysłowa 14PL 35-105 RzeszówPOLAND

tel.: +48 17 850 59 20e-mail: [email protected]

Index04

06

07

10

20

28

32

39

42

Company Profile

Engineering Services

Software

Power Energy Sector

Industrial Objects

Public Utility Objects

Automotive Industry

Reference Letters

Why to work with us?

www.mta-online.net

003

Executive design

Since 1996 MTA Engineering has provided design services in the industrial, energy, automotive and general construction sectors. Many

years of design experience, cost-effective, practical solutions and successful track record of designed objects in the whole world, make

us a credible and trustworthy business partner. The company offers a wide range of design services and comprehensive project

management based on innovative, proprietary IT platforms using BIM technology. MTA Engineering team is committed to excellence and

our designing is based on responsibility, care for quality, timeliness and engagement. Our goal is to provide ever-increasing services and

to ensure our clients contentment.

We designfor demanding clients

Scope of our servicesincludes

BIM

Basic engineering: planning

and structural analysis of

the structure

Building projects, executive

designs and workshop

designs for steel and

reinforcement concrete

structures

Project supervision,

technical arrangement,

consulting, coordination,

project management,

BIM coordination

Building project

Workshopdocumentation

Basic design

3D Modeling

Static calculationof nodes

www.mta-online.net

005004

Tekla Structures

3D Modeling, Planning

ANSYS

Structural analysis

Autodesk Revit Structure

Concrete structure designing

MicroStation V8 XM Edition

3D Modeling, Planning

Aveva Bocad 3D

3D Modeling

Our engineering is supported by professional softwarefor designing

Power Energy Sector

Power plants, biomass-fired

power plants, WTE plants, CHP

plants, incineration plants,

desulphurization plants, flue

gas and air ducts, silos, tanks,

absorbers, pipe racks.

Industrial Objects

Industrial plants, cement plant,

wood processing plants,

chemical plants, refineries,

logistic centers, ducts, silos,

tanks, warehouses, production

halls.

Public Utility Objects

Commercial centers, sports

halls, office buildings, bridges,

exhibition halls, sports

stadiums, road gantries.

We deliver designservices within thefollowing areas

Automotive Industry

Paint shops, assembly halls,

technological transport

systems (EHB, Power&Free,

Skid), process tanks.

Robot Structural Analysis

Structural analysis

SCIA Engineer

Structural analysis

IDEA StatiCA

Structural analysis

ShareProject

Project management, BIM coordination

www.mta-online.netwww.mta-online.net

007006

Completed Projects

www.mta-online.netwww.mta-online.net

009008

Power EnergySector

11 coal power stations projectsboiler supporting structures, boiler

houses, ducts supporting structures,

auxiliary objects

25 waste treatment plants and biomass-fired plantsboiler supporting structures, boiler

houses, pipe racks, flue and air ducts

Power Plant OpoleExecutive design of boiler house and boiler buckstays in the energy units

5 and 6, 900 MW each in Power Plant Opole.

Weight: 11 000 t

Client: PGE

Location: Poland

Years: 2013/2015

80 Projectsexecuted for 35 Clients in 20 European

countries and Chile, Jordan, South Korea

18 000 tonsthe biggest project – Power Plant

Bełchatów

35 clientsengineering companies and steel

fabrication plants

160 000 tonsdesigned structure for power plant

industry

Power Plant KozieniceExecutive design of the energy unit 1075 MW in Power Plant Kozienice. The scope of

works included: boiler house, bunker house, air preheater building, flue gas and air

ducts, auxiliary buildings.

Weight: 18 000 t

Client: ENEA Wytwarzanie S.A

Location: Poland

Years: 2014/2015

011010

www.mta-online.netwww.mta-online.net

Power Plant BełchatówExecutive design of the energy unit 833 MW in BOT Power Plant Bełchatów. The scope

of works included: suspended and standing parts of boiler house, furnace installation

elements, air and flue gas ducts.

Weight: 18 500 t

Client: Elektrownia Bełchatów S.A.

Location: Poland

Year: 2009

Weight: 12 000 t

Client: Termoelektrarna Šoštanj

Location: Slovenia

Year: 2012

Power Plant ŠoštanjExecutive design of the energy unit 600 MW in Power Plant Šoštanj.

The scope of works included: boiler house standing and hanging part

and ducts.

Power Plant JaworznoPlanning and executive design of the energy unit 910 MW in Power Plant Jaworzno III.

The scope of works included: planning and structural analysis for a part of the boiler

house and workshop project for the boiler house, bunker house, air preheater building

and SCR.

Weight: 15 000 t

Client: TAURON

Location: Poland

Years: 2015/2016

013012

www.mta-online.netwww.mta-online.net

Weight: 860 t

Client: E.ON Group

Location: France

Year: 2013

Biomass Conversion Plant GardanneExecutive design of supporting steel structures as a part of the project;

conversion of one boiler at the French coal-fired facility to biomass.

Weight: 5 600 t

Client: Trial Energy

Location: Germany

Year: 2009

Power Plant LünenExecutive design of boiler main steel structure in the hard coal - fired

power plant with the output of 550 MW.

Weight: 570 t

Client: Mjölby-Svartadalen Energi

Location: Sweden

Year: 2014

Biomass – Fired Power Plant MjölbyExecutive design of boiler supporting steel structure in the

biomass-fired power plant.

Weight: 4 500 t

Client: Public Power Corporation SA

Location: Greece

Year: 2018

Power Plant Ptolemais - ductsStructural analysis, design and workshop documentation for 3 external

flue gas ducts and workshop documentation for 4 internal air and flue

gas ducts.

015014

www.mta-online.netwww.mta-online.net

Power Plant BoxbergExecutive design of boiler house structure in the power production

unit R in Power Plant Boxberg.

Weight: 1 900 t

Client: Vattenfall Europe

Location: Germany

Year: 2008

Power Plant LedviceExecutive design of the enery unit 660 MW in Power Plant Ledvice. The scope of works

included: boiler house and boiler buckstays.

Weight: 12 400 t

Client: CEZ a.s.

Location: Czech Republic

Year: 2010

Biomass – Fired Power Plant UmeaExecutive design of boiler house structure, boiler supporting structure and flue gas

cleaning building structure.

Weight: 1 800 t

Client: Umea Energi

Location: Sweden

Year: 2013

Waste Power Plant Riverside LondonExecutive design of building steel structure and supporting structure in the waste

power station 66 MW in England.

Weight: 2 900 t

Client: Von Roll Inova

Location: England

Year: 2009

017016

www.mta-online.netwww.mta-online.net

Biomass – Fired Power Plant MoerdijkExecutive design of boiler house structure and supporting structure for the silo.

Weight: 1 500 t

Client: BMC Moerdijk BV

Location: Netherlands

Year: 2007

Waste Incineration Plant MarseilleExecutive design of steel structures for 6 reactors, silos and ducts in France.

Weight: 400 t

Client: LAB S.A.

Location: France

Year: 2007

Waste Power Plant HertenExecutive design of supporting steel structure in the waste power plant

in Germany.

Weight: 330 t

Client: AGR mbh

Location: Germany

Year: 2018

Thermal Waste to Energy Plant in KrakówStructural analysis and detail engineering for the supporting structure.

Weight: 1 200 t

Client: Krakowski Holding

Location: Poland

Year: 2013

019018

www.mta-online.netwww.mta-online.net

IndustrialObjects

Pulp Mill in UruguayStructural analysis and executive design for pipe racks in a pulp mill in

Montes del Plata in Uruguay.

Weight: 3 200 t

Client: Energia Punta Pereira S.A.

Location: Uruguay

Year: 2013

Production Hall RostockExecutive design of two halls for shipbuilding industry in Rostock in Germany.

The scope of works included single- and three- aisle halls.

Weight: 3 500 t

Client: MV Werften

Location: Germany

Year: 2018

70 projectscarried out for 37 Clients in 6 European

countries and in Egypt, Brazil and Bahrain

30 000 tonsdesigned structure for industrial

plants

20 projects of hallsassembly halls, multi-purpose halls,

production halls, warehouses

25 projects of industrial plantsrefineries, pharmaceutical plants,

chemical plants, cement plants

021020

www.mta-online.netwww.mta-online.net

Chemical Park Bayer DormagenExecutive design of pipe bridges and building structure in Chemical Park

Bayer in Germany.

Weight: 4 500 t

Client: Bayer BTS

Location: Germany

Years: 2012/2013

Miro KarlsruheExecutive design of steel structure in the refinery in Karlsruhe.

Weight: 600 t

Client: MIRO

Location: Germany

Year: 2014

Weight: 860 t

Client: Lubelski Węgiel „Bogdanka S.A.”

Location: Poland

Year: 2011

Coal Processing Plant „Bogdanka S.A.”Workshop documentation of steel structure as a part of the project:

development of coal dressing plant “Bogdanka S.A.” The scope of works

included the documentation for 38 objects (dump station, conveyor

bridges, tanks, washing machine).

023022

www.mta-online.netwww.mta-online.net

Weight: 3 000 t

Client: BASF

Location: Germany

Years: 2016/2018

Production Plant LudwigshafenExecutive design of steel structure in the acetylene production plant

in Germany.

Kirikkale RefineryDesign of supporting steel structure of steam generator SteamGen™4 and

SteamGen™6 in the refinery in Kirikkale in Turkey. The scope of works included:

planning, structural calculation, modeling and project documentation.

Weight: 380 t

Client: Tüpraș

Location: Turkey

Year: 2016

Alba BahrainStructural analysis and detail engineering for reinforced concrete and steel structure in

Aluminium production plant Alba in Bahrain

Client: Aluminium Bahrain B.S.C.

Location: Bahrain

Year: 2018

025024

www.mta-online.netwww.mta-online.net

Shavings Preparation LineExecutive design of buliding supporting structure and structure under shavings

preparation line.

Weight: 710 t

Client: Kronospan Szczecinek Polska

Location: Poland

Year: 2006

Delivery Center AQUExecutive design of steel structure as a part of reconstruction of the factory building.

Weight: 980 t

Client: Wärtsilä Finland Oy

Location: Brazil

Year: 2013

Zarqa RefineryDesign of supporting steel structure of steam generator SteamGen™4 and design

of MCC building casing in the refinery in Zarqa in Jordan. The scope of works

included: planning, structural calculation, modeling and project documentation

of steel structure and foundation.

Weight: 53 t of steel, 29 t

of reinforced concrete

Client: Jordan Petroleum Refinery

Location: Jordan

Year: 2016

Production Hall ZapelAll – discipline building permit design and executive design of production hall

structure in the porcelain insulators factory.

Area: 5 200 m²

Client: Zapel S.A.

Location: Poland

Year: 2007

027026

www.mta-online.netwww.mta-online.net

Public UtilityObjects

Commercial Center Rzeszów GalleryAll – discipline building permit design of shopping – service center Rzeszów Gallery in

Rzeszów. The projection of the object is an irregular polygon of dimensions: 114 m wide

and 320 m long. It consists of three connected in a functional way parts: a hotel, an

office building and a shopping space.

Area: 135 000 m²

Client: Semako Sp. z o.o.

Location: Poland

Years: 2006/2007

Commercial Center BiałaExecutive design, as – built documentation and authorship supervision in a scope of

steel structure of shopping – service – recreative centre in Białystok.

Area: 42 500 m²

Location: Poland

Year: 2007

30 projectsexecuted in 4 European countries:

commercial centers, office buildings,

bridges, exhibition halls, sports stadiums

10 sports objectstribune structures, sports halls

20 clientsengineering companies, general

contractors from Poland and Germany

12 commercial objects commercial centers, commercial facilities,

large area shops

029028

www.mta-online.netwww.mta-online.net

Client: Rzeszow City

Department

Location: Poland

Year: 2009

Sports StadiumExecutive design of the first phase of tribunes structure of the city stadium

in Rzeszów with the minimal capacity of 4 700. The whole stadium

capacity is 18 000 people.

Facade of Railway Station StrasburgExecutive design of structural steelwork of railway station facade in

Strasburg in France. The total weight of the structure amounted to 444 t.

Complicated construction with arc girders supported on the columns with

purlins and tie bracings constitutes the support framework for glass coating.

Dimensions: 150m x 26,5m x22m

Client: Seele S.A.R.L

Location: France

Year: 2006

Church Biała near RzeszówExecutive design of church structure in Poland.

Location: Poland

Year: 2002

031030

www.mta-online.netwww.mta-online.net

AutomotiveIndustry

Paint Shop SaarlouisPlanning, structural analysis and executive design of EMS and skid

conveyor systems.

Weight: 180 t

Client: Ford AG

Location: Germany

Year: 2006

Assembly Line, VW WolfsburgExecutive design of supporting structure for the skid conveyors system.

Weight: 550 t

Client: Volkswagen AG

Location: Germany

Year: 2001

35 projectssupporting structures in paint shops,

assembly halls, technological transport

systems (EHB, Power&Free, Skid),

process tanks

15 000 tonsdesigned structure for objects in

automotive structures

18 clientssuppliers of technological transport

systems, suppliers of painting plants

and paint application systems, industrial

equipment assembly companies

13 countries of project executionEuropean countries and China, India,

USA, Brazil

033032

www.mta-online.netwww.mta-online.net

Area: 7 900 m²

Client: Magna

Location: Germany

Year: 2017

Paint Shop Magna NukleusBasic engineering of steel technological platforms in Paint Shop

Magna in Slovenia.

Area: 12 700 m²

Client: Volkswagen AG

Location: China

Year: 2013

Paint Shop Volkswagen NingboStructural analysis and executive design of technological platforms

in Paint Shop Volkswagen in Ningbo in China.

Weight: 130 t

Location: Czech Republic

Year: 2008

Paint Shop KTL Anlage BroseStructural analysis and executive design of KTL line in the paint shop in

Kropnivice in the Czech Republic.

Weight: 410 t

Client: Volkswagen AG

Location: Slovakia

Year: 2001

Paint Shop VW BratislavaExecutive design of supporting structure for EMS conveyors system.

035034

www.mta-online.netwww.mta-online.net

Biomass-FiredPower Plant

Tilbury (England)

Biomass – FiredPower Plant

Mjölby (Sweden)

Flue GasPurification PlantLanesborough (Ireland)

KirikkaleRefinery (Turkey)

Incineration PlantHeimdal (Norway)

Mercedes BenzVitoria (Spain)

Biomass - FiredPower PlantHallein (Austria)

Railway Stationin Strasburg (France)

Power Plant Sostanj (Slovenia)

BioethanolProduction Factory

Biowanze (Belgium)

SPPM Palmela(Portugal)

Power PlantPtolemais (Greece)

Assembly Hallin Trnava (Slovakia)

Flue Gas PurificationPlant Oroschlany(Hungary)

Power PlantLünen (Germany)

Incineration PlantTallin (Estonia)

Incineration Plantin Voimala (Finland)

Steam GenerationAcron (Russland)

Power PlantKozienice (Poland)

Power PlantLedvice(Czech Republic)

MegamarketArsen (Ukraine)

Power PlantLAB Harlingen

(Holland)

Incineration plantLeudelange(Luxemburg)

A4 S19

RZESZÓW

WARSAW

LONDON

MUNICH

PN-EN ISO 9001:2015 CERTIFICATE

Quality management system applied in the company

meets the requirements of the standard PN-EN ISO

9001:2015

Management System Certificate

www.mta-online.netwww.mta-online.net

037036

Reference lettersfrom our clients

EXHIBITION HALL, MESSEHALLE FRANKFURT

Germany, 2017

PULP MILL, MONTES DEL PLATA

Urugway, 2012

JORDAN REFINERY

Jordan, 2014

1

Letter of reference on our 10050 Jordan project MTA Engineering has for our company carried out, and completed the design, calculation and work shop documentation of secondary steel structures, including foundations and Civil works structures below ground level, in accordance with the Eurocode and UBC 1997 Code. The steel structure amounting to approximately 55.5 metric tons and the Civil works amounting to approximately 750 metric tons of concrete and rebar. The work was done on a project delivery of a new steam generator for Jordan. We have been satisfied with the work done by MTA Engineering. They have completed the commissioned scope of work in accordance with good engineering practice, requirements of the specifications, valid rules and standards. The project was completed within the overall timeframe. Coordination between our company and the design office has been very efficient and comments on any project deliveries have been implemented with great success during the entire project. We also confirm high qualifications of company employees. As we are pleased with the results and professional level of services offered by MTA Engineering, we can recommend this company as a solid and trustworthy partner that we hope to do further cooperation with.

Kind regards Kristian Boelskift Project Engineer - Structural Steel

Sofiendalsvej 93 DK-9200 Aalborg SV Denmark Mobile: +45 29 68 22 63 Switchboard: +45 96 31 39 50 Fax: +45 96 31 39 51 Email: [email protected] Skype: ae.kristian.boelskift Website: www.aalborg-engineering.com

STEAM GENERATOR

Russia, 2013

1

Letter of reference on project 10047 Acron MTA Engineering has for our company completed design of secondary structures amounting to approximately 77.5 metric tons. The work was done on a project delivery of a new steam generator for Russia. We have been satisfied with the work done by MTA Engineering. They have completed the commissioned scope of work in accordance with good engineering practice, requirements of the specifications, valid rules and standards. The project was completed within the overall timeframe. Coordination between our company and the design office has been very efficient and comments on any project deliveries have been implemented with great success during the entire project. We also confirm high qualifications of company employees. As we are pleased with the results and professional level of services offered by MTA Engineering, we can recommend this company as a solid and trustworthy partner that we hope for further cooperation with.

Kind regards Simon H. Hørlyck Project Manager

Sofiendalsvej 93 DK-9200 Aalborg SV Denmark Mobile: +45 4178 3601 Switchboard: +45 96 31 39 50 Fax: +45 96 31 39 51 Email: [email protected] Skype: ae.simon.have.hoerlyck Website: www.aalborg-engineering.com

039038

www.mta-online.netwww.mta-online.net

Reference lettersfrom our clients

POWER PLANT LEDVICE

The Czech Republic, 2010

POWER PLANT LÜNEN

Germany, 2009

COAL PROCESSING PLANT, BOGDANKA SA

Poland, 2010

POWER PLANT BEŁCHATÓW

Poland, 2007

041040

www.mta-online.netwww.mta-online.net

Why to workwith us?

We have great experienceWe have carried out over 250 diverse projects for 100 Clients from different countries. We understand

varied project needs and expectations of our Clients. Our aim is the highest safety of designed

structures and our Clients’ contentment.

We have a high design capabilityWe are a group of over 60 experienced engineers which allows us to carry out a large scope of works in

short terms. We own over 130 licenses of special software for designing steel and concrete structures.

We are flexibleHaving a team of programmers cooperating with engineers we are able to meet the most specific

project’s needs. We choose the best solutions for our Clients. Additionally to designing, we are also

concentrated on the development of designing tools and engineering methods.

We are highly competentFor our engineers designing is not only the job to do, but also a great passion. We are always eager to

gain knowledge, to create solutions and explore new designing methods.

We offer moreTo our Client we offer not only the highest safety of designed structures, optimal design solutions and

short terms of project execution, but also special platforms for communication, project management and

monitoring of project progress.

042

www.mta-online.netwww.mta-online.net

043