wbs element
TRANSCRIPT
-
7/28/2019 Wbs Element
1/5
2 Part 1 CASE STUDY 2 3
Extraction Steim System
WBS Element DescriptionWBS Element Title:
600MW Fossil Unit
WBSElement No:
ParentWBSNo: 6.1ParentWBSTitle: Steam System
D. Mitchell
WBS Level:4
WBS Element Description: The scope of this element includes all engineering and designeffort required for the development of the extraction steam system.
Project:
Example 1
Originator:
Revision No:Revision Date:
Page14Of 27- WBS Element No:6.1.4
-
7/28/2019 Wbs Element
2/5
Extraction Steam System
W BS ElementDescriptionWBS Elenient Title:
. .
600MW Fossil Unit
I
J. Jones
I
WBS Element No:
Parent WBS No: 6.1Parent WBS Title: Steam System
WBS Element Description: The scope of this element includes all engineering work related
to piping systems, mechamcal equipment, electrical power, instrumentationand control for theextraction steam system. This includes determination of design pressures and temperatures, pipesizes, wall thickness, plpe material, insulationrequirements, pipe supports, and control schemes.The scope ofthis element includes all supporting studies and calculationsusedin determination
of the previously mentioned design definition.
WBS Level:
4
Related Work Excluded
1. Associated supervision (included in WBS Element 3.16)2. System Design Review (included inWBS Element 3.20)3. Engineering input to schedule logic development (included inWBS Element 4.11)
Project:
Example 2
Originator:
Revision No:
Revision Date:Page14Of 27
WBS Element No:
6.1.4
-
7/28/2019 Wbs Element
3/5
64 Part 1 CASE STUDY 2.3
I1 originator:
I
WBS Element Description
600MW Fossil Unit
WBS Element Title:Extraction Steam System
Parent WBS No: 6.1Parent WBS Title: Steam System
A. Thompson
WBS Element No:
6.1.4
WBS Level:
4
I
WBS Element Description: The scope ofthis element includes the engineering and deslgn effort forthe extraction steam system, as defined in the control element work products defined below.Svstem DescriotionsSDlOl Extract ion SteamProcurement Packages
NoneDrawings
Control Logic Diagram C L D l O l Extraction Line Control, LP and HP HeatersControl Logic Diagram CLD102-Extraction Line Control, Deaerator P&ID101- Extraction SteamElectrical Elementary Diagram EED 101-Extraction Line Control, LP and HP HeatersElectrical Elementary Diagram EED102-Extraction Line Control, DeaeratorPiping Drawing PDlOl - First, Second & Third Point Extraction Steam PipingPiping Drawing PD102 - Fourth & Fifth Point Extraction Steam PipingPiping Isometric PI101-First, Second & Third Point Extraction steam IsometricPiping Isometric PI1 02-Fourth & Fifth Point Extraction Steam IsometricPipe Supports PS 101-Supports for First, Second &Third Point Extraction Steam PipingPipe Suppo a PSI02-Supports for Fourth& Fifth Extraction Steam PipingCalculations
Pressure drops for Extraction Steam Lines
Related Work Excluded1. Associated supervision (included in WBS Element 3.16)2. System Design Review (included in WBS Element 3.20)3 . Engineering input to schedule logic development and review (included in WBS Element 4.11)
Example 3
Revision No:Revision Date:
Page14Of 27- WBS Element No:6.1.4
-
7/28/2019 Wbs Element
4/5
-
7/28/2019 Wbs Element
5/5
66 Part1 CASE STUDY2.3
WBS Element Description1 WBS Element Title: I WBS Element No:Extraction Steam System
I
600MW Fossil Unit
ParentWSS No: 6.1Parent WSS Title: Steam System
4
R. Smith
WBS Level:
Project:
WBSElement Description: The scope ofthis element includes the engineering and design effortfor the extraction steam system, as defined in the WBS element work products defmed below.
Originator:
I System Descriptions- 1, estimated50 pages longI mcurementPackages- 0
Drawings-73 sheets, as broken down below;
15 sheets control logic diagrams2 sheet P t I D
21 sheets elementav wiring diagram26 sheets piping drawings
5 sheets piping isometrics4 sheets pipe support drawings
Example 5
WBS Element No:6.1.4
Revision No:Revision Date:
Page14Of 27-