waterair earthenergy it and the environment consumerenabler
TRANSCRIPT
![Page 1: WaterAir EarthEnergy IT and the Environment ConsumerEnabler](https://reader035.vdocuments.mx/reader035/viewer/2022062309/5697bf811a28abf838c855be/html5/thumbnails/1.jpg)
![Page 2: WaterAir EarthEnergy IT and the Environment ConsumerEnabler](https://reader035.vdocuments.mx/reader035/viewer/2022062309/5697bf811a28abf838c855be/html5/thumbnails/2.jpg)
Water Air
Earth Energy
IT and the Environment
Consumer Enabler
![Page 3: WaterAir EarthEnergy IT and the Environment ConsumerEnabler](https://reader035.vdocuments.mx/reader035/viewer/2022062309/5697bf811a28abf838c855be/html5/thumbnails/3.jpg)
Water Air
Earth Energy
IT as a Resource Consumer
Heating & Cooling
Carbon Emissions
Electrical Power
E-Waste, Paper
![Page 4: WaterAir EarthEnergy IT and the Environment ConsumerEnabler](https://reader035.vdocuments.mx/reader035/viewer/2022062309/5697bf811a28abf838c855be/html5/thumbnails/4.jpg)
Water Air
Earth Energy
IT as a Sustainability Enabler
Consumer
Water Recycling
Paperless Operation
Environmental Control
Systems
Green Supply Chain
Green Data Center
Travel Substitution
Transportation Optimization
Measure and Optimize
Green Accounting
![Page 5: WaterAir EarthEnergy IT and the Environment ConsumerEnabler](https://reader035.vdocuments.mx/reader035/viewer/2022062309/5697bf811a28abf838c855be/html5/thumbnails/5.jpg)
IT and Sustainability
Information, Communication & Telecoms
Airline Industry
of Global CO2 Emissions2%
![Page 6: WaterAir EarthEnergy IT and the Environment ConsumerEnabler](https://reader035.vdocuments.mx/reader035/viewer/2022062309/5697bf811a28abf838c855be/html5/thumbnails/6.jpg)
Data Volumes: The Exaflood
Data Storage Growth: 60% per year
(IDC)
Internet Traffic Growth: 100% per year
Internetworldstats.com
![Page 7: WaterAir EarthEnergy IT and the Environment ConsumerEnabler](https://reader035.vdocuments.mx/reader035/viewer/2022062309/5697bf811a28abf838c855be/html5/thumbnails/7.jpg)
Growing Energy Concerns
60B
110B
80B
2006 2008 (E) 2010 (E)
Billions of Kilowatt Hours
Annual US Data Center Energy Usage
Source: EPA
![Page 8: WaterAir EarthEnergy IT and the Environment ConsumerEnabler](https://reader035.vdocuments.mx/reader035/viewer/2022062309/5697bf811a28abf838c855be/html5/thumbnails/8.jpg)
IT Power Usage
PCs and Monitors
PrintersLAN & Office Telecom
7%6%
39%
Mobile Telecom
9%
15%
39%
Servers (+cooling)
Fixed-line Telecom
![Page 9: WaterAir EarthEnergy IT and the Environment ConsumerEnabler](https://reader035.vdocuments.mx/reader035/viewer/2022062309/5697bf811a28abf838c855be/html5/thumbnails/9.jpg)
PCs and Monitors
![Page 10: WaterAir EarthEnergy IT and the Environment ConsumerEnabler](https://reader035.vdocuments.mx/reader035/viewer/2022062309/5697bf811a28abf838c855be/html5/thumbnails/10.jpg)
Oracle Austin Data Center World class technology and operational excellence
![Page 11: WaterAir EarthEnergy IT and the Environment ConsumerEnabler](https://reader035.vdocuments.mx/reader035/viewer/2022062309/5697bf811a28abf838c855be/html5/thumbnails/11.jpg)
Data Center Intro
![Page 12: WaterAir EarthEnergy IT and the Environment ConsumerEnabler](https://reader035.vdocuments.mx/reader035/viewer/2022062309/5697bf811a28abf838c855be/html5/thumbnails/12.jpg)
Taking Direct Action
Refresh/Reuse Consolidate
VirtualizeGovernance
![Page 13: WaterAir EarthEnergy IT and the Environment ConsumerEnabler](https://reader035.vdocuments.mx/reader035/viewer/2022062309/5697bf811a28abf838c855be/html5/thumbnails/13.jpg)
Capping Power Usage in Austin Data Center
$8M
$1M
$7M
$6M
$5M
$4M
$3M
$2M
2002 2003 2004 2005 2006 2007 2008
72% growth 4% growthRandall Wiley
![Page 14: WaterAir EarthEnergy IT and the Environment ConsumerEnabler](https://reader035.vdocuments.mx/reader035/viewer/2022062309/5697bf811a28abf838c855be/html5/thumbnails/14.jpg)
Drive down cost of computing
• Energy• Maintenance• Depreciation• Labor
![Page 15: WaterAir EarthEnergy IT and the Environment ConsumerEnabler](https://reader035.vdocuments.mx/reader035/viewer/2022062309/5697bf811a28abf838c855be/html5/thumbnails/15.jpg)
Case Study: Oracle University
With Grid:
• 1/6th the hardware
• CPU utilization increased from 7% to 73%
• Revenue per server increased 5X
• Servers to administrator ratio increased 10X
Enterprise Manager
Real Application Clusters
Automatic Storage Management
Mid-Tier clustersData Grids
![Page 16: WaterAir EarthEnergy IT and the Environment ConsumerEnabler](https://reader035.vdocuments.mx/reader035/viewer/2022062309/5697bf811a28abf838c855be/html5/thumbnails/16.jpg)
Building the Green Data Center
Project Sequoia: Oracle Utah Compute Facility
![Page 17: WaterAir EarthEnergy IT and the Environment ConsumerEnabler](https://reader035.vdocuments.mx/reader035/viewer/2022062309/5697bf811a28abf838c855be/html5/thumbnails/17.jpg)
Project Sequoia Phased Expansion
1 24 3
![Page 18: WaterAir EarthEnergy IT and the Environment ConsumerEnabler](https://reader035.vdocuments.mx/reader035/viewer/2022062309/5697bf811a28abf838c855be/html5/thumbnails/18.jpg)
Project Sequoia Phased Expansion
![Page 19: WaterAir EarthEnergy IT and the Environment ConsumerEnabler](https://reader035.vdocuments.mx/reader035/viewer/2022062309/5697bf811a28abf838c855be/html5/thumbnails/19.jpg)
Transition to Mukesh
0. what is an energy director?
5. What have we done in Austin
6. What are we doing for UCF?
1. When did Oracle first engage on conserving/managing energy consumption?
2. What results have you seen?
3. Beyond HQ, what has Oracle done, across NA, worldwide?
4. What are future plans/goals?
7. What are keys to success?
![Page 20: WaterAir EarthEnergy IT and the Environment ConsumerEnabler](https://reader035.vdocuments.mx/reader035/viewer/2022062309/5697bf811a28abf838c855be/html5/thumbnails/20.jpg)
Printers and Paper
• Duplex printing• No longer
distributing paper with OU classes
![Page 21: WaterAir EarthEnergy IT and the Environment ConsumerEnabler](https://reader035.vdocuments.mx/reader035/viewer/2022062309/5697bf811a28abf838c855be/html5/thumbnails/21.jpg)
Procurement
As much waste is produced by the manufacture of a computer as a mid-size car (1.4 tons).
What to buy:What not to buy?
![Page 22: WaterAir EarthEnergy IT and the Environment ConsumerEnabler](https://reader035.vdocuments.mx/reader035/viewer/2022062309/5697bf811a28abf838c855be/html5/thumbnails/22.jpg)
E-Waste
It is estimated that 50% to 80% of E-Waste collected in the U.S. is exported to other countries.
![Page 23: WaterAir EarthEnergy IT and the Environment ConsumerEnabler](https://reader035.vdocuments.mx/reader035/viewer/2022062309/5697bf811a28abf838c855be/html5/thumbnails/23.jpg)
Recycle
• Printing• Cell phones• water
32%
27%41%
Worldwide PC Disposals (160 million in 2007; 460,000/day)
Recycled Landfilled Stored
![Page 24: WaterAir EarthEnergy IT and the Environment ConsumerEnabler](https://reader035.vdocuments.mx/reader035/viewer/2022062309/5697bf811a28abf838c855be/html5/thumbnails/24.jpg)
Travel substitution/trip reduction
• Global collaboration
![Page 25: WaterAir EarthEnergy IT and the Environment ConsumerEnabler](https://reader035.vdocuments.mx/reader035/viewer/2022062309/5697bf811a28abf838c855be/html5/thumbnails/25.jpg)
Enabling an Eco-Advantage with Oracle
Eco-Efficiency Eco-Innovation Eco-Transparency• Protect business reputation
• Promote green brand
• Optimize resource utilization
• Minimize carbon footprint
• Design green products
• Implement green processes
Expand Opportunity
Reduce Waste & Cost
Enhance & Protect Brand
Product Lifecycle Management
Strategic Network Opt.Manufacturing
Sustainability Reporting and Management
Transportation Management
Asset Lifecycle Management
Self Service Governance, Risk & ComplianceData Center Management
Service Execution
Procurement
Oracle VM
Reverse Logistics
![Page 26: WaterAir EarthEnergy IT and the Environment ConsumerEnabler](https://reader035.vdocuments.mx/reader035/viewer/2022062309/5697bf811a28abf838c855be/html5/thumbnails/26.jpg)
Transition to Campbell
![Page 27: WaterAir EarthEnergy IT and the Environment ConsumerEnabler](https://reader035.vdocuments.mx/reader035/viewer/2022062309/5697bf811a28abf838c855be/html5/thumbnails/27.jpg)
Campbell Webb
• Product Development at Oracle • 17,000 employees • 40 countries, • 5 pedabytes of storage• 30,000 servers• 27,000 laptops/desktops. • continuous development and test
• new versions of each product are generated many times each day
• analogous to creating a new product CD every few hours.
• Regression testing exceeds 52,000 hours daily.
![Page 28: WaterAir EarthEnergy IT and the Environment ConsumerEnabler](https://reader035.vdocuments.mx/reader035/viewer/2022062309/5697bf811a28abf838c855be/html5/thumbnails/28.jpg)
Product Dev Server Refresh
• Next 12 months: Product Development IT $26m server refresh • Move our primary development platform from 32bit
Linux to 64 bit Linux,• Reduce server counts from 12,000 to 6,000 in our
Austin Datacenter• Reducing power by 1400kW. W• Will rely heavily on Oracle VM and Oracle Enterprise
Linux.
• Next summer: Applications (Siebel, Peoplesoft, Apps 11i) product lines reduce 50% of our server footprint.
![Page 29: WaterAir EarthEnergy IT and the Environment ConsumerEnabler](https://reader035.vdocuments.mx/reader035/viewer/2022062309/5697bf811a28abf838c855be/html5/thumbnails/29.jpg)
EM Power Consumption Management
• Oracle Enterprise Manager to manage power consumption of our newly acquired hardware
• Limiting each server to 380 watts or less. • IPMI integration with each servers BIOS. • Enterprise Manager to supply data to our BI
reporting framework, and perform workload orchestration • Could move workloads to data centers who primarily
run on green power sources like hydro. • Move workloads to data centers in a time zone were
its the evening or early morning when temperatures are often lower and require less cooling.
![Page 30: WaterAir EarthEnergy IT and the Environment ConsumerEnabler](https://reader035.vdocuments.mx/reader035/viewer/2022062309/5697bf811a28abf838c855be/html5/thumbnails/30.jpg)
Desktop and Server Power Management
• Laptops and desktops are typically only used for 33% of the work day• instituted power saving measures
• turning of the monitor and hard drive after 60 minutes of inactivity • Suspending the laptop/desktop after 180 minutes of inactivity
• Server infrastructure: we turn of the monitor and hard drive after 180 minuets of inactivity.
• Actively deploying thin clients to reduce our power footprint. • SunRay solution
• Better management• Improved Intellectual Property control• Reduces power consumption from 80 watts for a typical desktop
to 8 watts for a SunRay client. • Today Product Development has 27,000 desktop/laptop under
management• Refreshing even 25% of these unit will yield power savings of
~500kW. •Sixty percent of PCs are left on after hours - Gartner
![Page 31: WaterAir EarthEnergy IT and the Environment ConsumerEnabler](https://reader035.vdocuments.mx/reader035/viewer/2022062309/5697bf811a28abf838c855be/html5/thumbnails/31.jpg)
Acquisition Impact
• Lab and data center space has grown exponentially.
• In conjunction with our Real Estate and Facilities (REF) division • 2 year global consolidation plan
• One large 30,000sqft data center• 38 smaller labs• 5,233 servers.
• Eliminate 42,000sqft of space • Eliminate1,000kW or associated power.
![Page 32: WaterAir EarthEnergy IT and the Environment ConsumerEnabler](https://reader035.vdocuments.mx/reader035/viewer/2022062309/5697bf811a28abf838c855be/html5/thumbnails/32.jpg)
Green Education
• Education program with Product Development • Highlights how much power is being consumed by
desktops, laptops, external hard-drives, desk lamps etc. • Random placement of inline power readers within
engineering cubes that show each engineers power draw, for their respective devices.
• Placement of e-posters and posters in elevators that bring context to device consumption
• e.g. highlighting the power draw of a desktop if left up and running all evening for 8 hours,
• Green e-Waste program• locate "green" ewaste bins in elevator lobbies on a
regular bases.
![Page 33: WaterAir EarthEnergy IT and the Environment ConsumerEnabler](https://reader035.vdocuments.mx/reader035/viewer/2022062309/5697bf811a28abf838c855be/html5/thumbnails/33.jpg)