Project Limits
Silver Birch Lane
Research Drive
-
Tentative Schedule:• 25% Design – Winter 2014/2015• 25% Design Public Hearing – Fall 2015• 75% Design – Winter 2015/2016• 100% Design – Fall 2016• Final Submission – Winter 2016/2017• Construction Fall 2017 – Fall 2019
-
What do I see…
TrafficVolume• 13k to 18k ADT
Speed• Exceed Posted
-
What do I see…
Pavement
-
AccessibilityIssues
What do I see…
-
What do I see…Accessibility
Issues
-
What do I see…
Delay…45 seconds of it…
-
What do I see…Safety
Concerns
Crash RateHigher than Statewide and
District‐wide Average
-
What do I see…SafetyConcerns
-
What do I see…
SafetyConcerns
-
What do I see…
Neighborhoods!
-
What do I see…
Disconnect
-
What can be done…
Traffic• Volume• SpeedPavement
-
What can be done…
Accessibility
-
What can be done…
Disconnect Connect
-
What can be done…
Disconnect Connect
-
What can be done…Delay/Safety
Lake St
-
What can be done…Delay/Safety
Forest St
-
What can be done…Welcome to our neighborhood!
-
What can be done…Welcome to our neighborhood!
-
What can be done…Welcome to our neighborhood!
-
What can be done…Welcome to our neighborhood!
-
What can be done…Welcome to our neighborhood!
-
What can be done…Welcome to our neighborhood!
-
What can be done…Welcome to our neighborhood!
-
What can be done…Welcome to our neighborhood!
-
What can be done…Welcome to our neighborhood!
-
What did I miss…What are your thoughts…