water resources investigations report 82-4044 · water resources investigations report 82-4044...
TRANSCRIPT
FLOOD OF JUNE 13-15, 1981,
IN THE BLANCHARD RIVER BASIN,
NORTHWESTERN OHIO
By Earl E. Webber
U.S. GEOLOGICAL SURVEY
Water Resources Investigations Report 82-4044
Columbus, Ohio
1982
UNITED STATES DEPARTMENT OF THE INTERIOR
JAMES G. WATT, Secretary
GEOLOGICAL SURJVEY
Dallas L. Peck, Director
For additional information write to:
District Chief Water Resources Division U.S. Geological Survey 975 West Third Avenue Columbus, Ohio 43212
Copies of this report can be purchased from:
Opeh-File Services Section Western Distribution Branch U.S^ Geological Survey Box 25425, Federal Center Denver, Colorado 80225 (Telephone: (303) 234-5888)
CONTENTS
Page
Abstract .................................................. 1Introduction .............................................. 1Acknowledgments ........................................... 3Weather conditions preceding flood ........................ 4Precipitation and runoff during flood ..................... 5High-water profiles ....................................... 8Flood-peak discharges ..................................... 8Conclusions ............................................... 31References ................................................ 32
ILLUSTRATIONS
Page
Figure 1. Map showing location of peak discharge measurement sites and isohyetal lines for storm of June 13-15, 1981, in northwestern Ohio ............................ 2
2. Graph showing daily precipitation at theFindlay NOAA weather station and dischargefor gage at station 04189000 BlanchardRiver near Findlay, Ohio, June, 1981 ......... 6
3. Graph showing hourly precipitation at the Findlay NOAA weather station and discharge for gage at station 04189000 Blanchard River near Findlay, Ohio, June 13-15, 1981 ............................. 7
4. Profile for Blanchard River flood ofJune 13-15, 1981 ............................. 21
5. Profiles of The Outlet (2), Lye Creek, and Eagle Creek for the flood of June 13-15, 1981 ............................. 26
6. Graph of peak discharge versus drainage area in the Blanchard River basin, for flood of June 13-15, 1981 .................... 30
111
TABLES
Page
Table 1.
2.
3.
4.
5.
Location and elevation of high-water marks (flood of June 13-15, 1981, Blanchard River), location of bridges and mouths of tributaries .........................
Location and elevation of high-water marks (flood of June 13-15, 1981, The Outlet (2)), and location of bridgess ..........
Location and elevation of high (flood of June 13-15, 1981, and location of bridges ...
-water marks Lye Creek),
Location and elevation of high-water marks (flood of June 13-15, 1981, Eagle Creek), and location of bridges .................
10
18
19
20
Summary of flood stages and discharges and rainfall distribution iri the Blanchard River and adjacent^ basins in Ohio, for flood of June 13-^5, 1981 .. 27
FACTORS FOR CONVERTING INCH-POUND IJJNITS TO METRIC UNITS
Multiply
inch (in)foot (ft)mile (mi)square milecubic foot per second
(ft3/s) cubic foot per second
per square mile((ft3/s)/mi2)
(mi 2 )
By Obtain
25.4 millimeter (mm) 0.3048 meter (m) 1.609 kilometer (km) 2 2.590 square kilometer (km ) 0.02832 cubic meter per second
i (m3 /s)0.01093 cubic meter per second
per square kilometer ((m3/s )/km2)
IV
FLOOD OF JUNE 13-15, 1981,
IN THE BLANCHARD RIVER BASIN,
NORTHWESTERN OHIO
By Earl E. Webber
ABSTRACT
The flood of June 13-15, 1981, in the Blanchard River basin in northwestern Ohio caused major damage in Findlay, Ottawa, and adjacent rural areas. Approximately 25 percent of Findlay and 55 percent of Ottawa were flooded. Estimated crop damage was $12 million in Hancock County, $7 million in Wyandot County, and $3 million in Putnam County.
During the flood, the maximum gage height of the Blanchard River at the U.S. Geological Survey gaging station near Findlay was 17.43 feet, gage datum. This was 0.67 foot higher than the previous peak of 16.76 feet, February 11, 1959. The corres ponding peak discharge, 13,000 cubic feet per second, was esti mated to have a recurrence interval of 50 years. Recurrence intervals of peak flows at other locations on the Blanchard River and on tributary streams were estimated to range from 25 to more than 100 years.
INTRODUCTION
The flood of June 13-15, 1981, in the Blanchard River basin (fig. 1) resulted from a series of storms after two months of excessive precipitation in northwest Ohio. The flood caused major damage throughout the basin.
Flood damage in Findlay (Hancock County) was estimated by the City Service and Safety Director to be more than $13 million. He estimated that about 25 percent of Findlay was under water when the Blanchard River crested at 1800 hours on June 14. The maximum stage at the U.S. Geological Survey (USGS) gaging station on the Blanchard River near Findlay was 17.43 ft, gage datum (771.98 ft, National Geodetic Vertical Datum (NGVD) of 1929). This was 7.5 ft above flood stage.
84 30
Base from Ohio Department of
Nalural Resources. 1973
STUDY AREA
EXPLANATIONI- I '
-4 Precipitation In Inches, June 13-15, 1981
2 /\ Current gaging site/station
A Discontinued gaging station
O« Miscellaneous site
* Drainage area boundary
10 , 20 30 40 MILES
Figure 1. Location of peak discharge measurement sites and Isohyetal lines for storm of June 13-15, 1981, In northwestern Ohio.
2
In the city of Ottawa (Putnam County), the flood crested early on the morning of June 15 at an elevation of 729.1 ft (NGVD of 1929) based on high-water marks near the U.S. Soil Conserva tion Service building on South Oak Street. About 55 percent of the city was under water at maximum stage (U.S. Federal Emergency Management Agency, 1981).
The U.S. Agricultural Stabilization and Conservation Service estimated that crop damage was $12 million in Hancock County, $7 million in Wyandot County and $3 million in Putnam County.
The purpose of this report is to provide meteorologic and hydrologic data in more detail than could be given in the monthly and annual summary publications of the National Oceanic and Atmospheric Administration (NOAA), the Ohio Department of Natural Resources, or the USGS. Data are included on weather preceding the flood, precipitation and runoff during the flood, maximum water level along 68 mi of streams in the Blanchard River basin, and peak discharges at sites having drainage areas ranging from 4.65 to 756 mi 2 .
ACKNOWLEDGMENTS
The National Oceanic and Atmospheric Administration (NOAA) provided precipitation data. The Findlay Courier and other local newspapers reported estimates of damage and additional flood information.
The City Service and Safety Directors of Findlay and Ottawa and County Engineers of Hancock and Putnam Counties furnished elevation data. The U.S. Federal Emergency Management Agency (1981) supplied flood data. Additional elevation data and February 1959 flood-profile data were furnished by the Ohio Department of Natural Resources.
WEATHER CONDITIONS PRECEDING FLOOD
Persistent precipitation in northwest Ohio during April, May, and early June set the stage for the Blanchard River basin flood of June 13-15, 1981. The following precipitation data were recorded at Findlay:
Period (1981)
Precipitatioci (inches)
Number of days precipitation was recorded
April 1-30
May 1-31
June 1-12
Total (April 1 to June 12)
4.79
3.87
3.18
I 11.84
21
15
8
44
I
The above data show that approximately one-third (12 in.) of the average yearly rainfall was recorded at Findlay during the 2 1/2-month period just preceding the flood.
The mean daily discharge of the Blanchard River at the Findlay stream gage on June 12 was 670 ft^/s. This corresponds to a flow duration of 9 percent; flow duration of 30 percent or more is usual in the middle of June.
PRECIPITATION AND RUNOFF DURING FLOOD
A series of storms swept across Ohio from west to east on June 13-14, 1981. During the 12-hour period from 0600 to 1800 hours on Saturday, June 13, a total of 4.89 in. of rain was recorded at the Findlay NOAA weather station (figs. 2 and 3), 3.0 in. falling between 0900 and 1300 hours. From NOAA precipi tation records, the author developed an isohyetal map of this storm for areas receiving more than 3 in. and 4 in. of rain (fig. 1).
All the Blanchard River basin received more than 3 in. of rain. About 67 percent of the basin received more than 4 in. during the storms. Isolated cells of more than 5 in. (unofficial readings) were reported locally. The area along the main stem of the Blanchard River was among the hardest hit; total storm pre cipitation of 4.89 in. was recorded at Findlay and 4.70 in. at Ottawa. Total recorded precipitation for June 1981 at Findlay was 10.86 in., making it one of the wettest months on record.
The only active USGS stream gaging station in the Blanchard River basin is station 04189000, Blanchard River near Findlay, which gages a drainage area of 346 mi 2 . The daily discharge hydrograph for June 1981 is shown in figure 2. The hourly dis charge hydrograph during June 13-15, 1981, is shown on figure 3.
The average discharge for June was 1,612 ft^/s, which is equivalent to 5.20 in. of runoff from over the basin. If the 10.86 in. of precipitation recorded in June were to have fallen uniformly over the Blanchard River basin above Findlay, the June coefficient of runoff would be 0.48 (5.20 divided by 10.86). The long-term runoff coefficient for the basin is 0.35.
The direct flood runoff at Findlay during June 13-18, 1981, was 2.78 in. By the Theisen polygon method, the author estimated average precipitation above Findlay during the storm period to be 3.98 in. The June 13-15 flood runoff coefficient for the Blanchard River basin above the Findlay gaging station was 0.70 (2.78 divided by 3.98).
14,000
0 12,000
z o o LU(0^ 10,000flCLJQ.
H Ul LU 8,000u.
CODO 6,000
U O 4.000
Xo(05 2,000
2 CO I- UHO 10
£ S
a0.
I I I
Peak discharge-13,000 ft. 3/s
10.06Accumulated precipitation
JUNE 1981
Figure 2. Daily precipitation at the Flndlay NOAA weather station and discharge for gage at station 04189000 Blanchard River Flndlay, Ohio.
14,000
oZ 12,000o oLU
CCUJ 10,000Q.
LU LU LL
O 5
8,000
6,000LUOCC< X
4,000
2,000
- on< I 2-°I- O
0 ZLU =CCQ.
I I I I
oO
JUNE 14
Figure 3. Hourly precipitation at the Findlay NOAA weather station and discharge
for gage at station 0418900 Blanchard River near Findlay, Ohio June 13-15, 1981.
HIGH-WATER PROFILES
High-water marks were flagged 'during June 15-17, the following streams: \\
1981, on
Blanchard River from mouth to County Road 205, upstream from Findlay I
The Outlet (2) from mouth to Township Road 251
Lye Creek from mouth to County Road 205
Eagle Creek from mouth to Township Road 204
These marks were subsequently tied into the NGVD of 1929 by field surveys. The location, description, and elevation of these 65 high-water marks are listed in tables 1 through 4. The 61- mile-long Blanchard River flood profile is plotted in figure 4, and the 2- to 3-mile-long profiles for The Outlet (2), Lye Creek, and Eagle Creek are plotted in figure 5.
In general, the profile for the Blanchard River flood of June 13-15, 1981, is slightly higher than the profile for the February 10-12, 1959, flood. The 1981 profile is fairly well defined within the city limits of Ottawa and Findlay, but should be interpreted with caution in the .long rural reaches undefined by high-water marks.
FLOOD-PEAK DISCHARGES
Flood-peak discharges were determined at eight locations in the Blanchard River basin. These locations and four daily dis charge stations on adjacent river basins (included for com parison) are shown in figure 1. Flood-peak data are summarized in table 5.
The relative magnitude of a flood can be expressed in terms of the estimated recurrence interval, in years, of the peak discharge. Four peak determinations were made on the Blanchard River and one determination each on the tributary streams: The Outlet (2), Lye Creek, Eagle Creek, and Tiderishi Creek. The recurrence interval was computed at each of the sites in the Blanchard River basin at which the bSGS has operated streamflow stations. The recurrence intervals were estimated at the four other sites by methods given by Webber and Bartlett (1977) for miscellaneous sites.
8
Discharge reached a record maximum during the June 13-15, 1981, flood at the following streamflow stations: Eagle Creek near Findlay (period of record, 1946-57, 1981); Blanchard River near Findlay (period of record, 1923-35, 1940-81); Tiderishi Creek near Jenera (period of record, 1947-77, 1981); and Blanchard River near Glandorf (period of record, 1921-28, 1946- 51, 1981).
This was the largest flood upstream from Ottawa since the historic 1913 flood. It was about the same magnitude as the February 1959 flood (previously the largest since 1913) down stream from Ottawa. The eight peak discharges were plotted against their respective drainage areas, as shown in figure 6. Six of the eight points define a line of best fit, which may be used to estimate peak discharges of the June 13-15, 1981, flood in the Blanchard River basin for drainage areas between 150 and 800 mi 2 . Unknown differences in precipitation, basin charac teristics, and time of concentration are some of the reasons The Outlet (2) and Eagle Creek plot off the line in figure 6.
Table 1. Location an
d elevation of
high-water marks (flood June 13-15, 19
81,
Blanchard River),
location of
bridges and mouths of
tributaries
Stream distance
High-water
(miles upstream
identification
from mouth)______number___
Elevation
(in
feet
, NGVD of
1929)
Description of
high-water marks
or other points
0.09
2.48
5.30
6.28
6.29
6.30
6.78
8.4 ;
L
8.42
8.43
11.61
12.28
12.41
16.10
17.35
B-0
B-l
B-2
B-3
B-4
715.26
718.45
718.86
719.99
720.29
County Road H-22, flagged nail on road at Sholte
residence, on right ba
nk.
County ro
ad bridge.
Duck Ru
n.
County Road 19,
paint mark on left downstream
bridge wingwall, at discontinued stream gage,
Blanchard River near Dupont.
County Road 19 bridge centerline.
County Road 19,
nail in
6-in.
tree,
215
ft south of
left bridge abutment, on upstream side of
road fi
ll.
Deer Creek.
State Route 11
5, paint mark on downstream
bridge beam neair right^nch at^uba.-
State Route 11
5 bridge centerline, at Cuba.
State Route 11
5, nail in first power pole on
left bank upstream from bridge at Cuba.
Bear Creek.
Miller City Cutoff.
County road bridge centerline.
Cranberry Creek.
Pike Ru
n.
Table 1. pocation an
d elevation of
high-water marks (flood June 13-15, 19
81,
Blanchard River)/
location of
bridges and mouths of
tributaries Continued
Stream distance
(miles upstream
from mouth)
High-water
identification
number
Elevation
(in
feet,
NGVD of 1929)
Description of
high-water marks
or other points
17.7
0
17.8
7
17.8
8
17
.90
19
.52
19
.97
21
.18
22
.34
22
.35
22
.37
22
.88
22
.89
22
.95
23
.01
B-5
B-6
B-7
B-l
B-9
B-1
0
B-l
l
B-1
2
B-1
3
724.7
2
724.8
3
725.0
0
72
6.1
1
727.2
5
727.3
2
728.0
4
728.1
5
72
8.6
U
Flagged nail in power pole at Bodemeir residence,
on right bank, 1000 ft downstream from
discontinued gaging station, Blanchard
River at
Glandorf, Oh
io.
County Road 11,
paint line on downstream
bridge beam, near right end at discontinued
gaging station.
County Road 11,
bridge centerline.
County Road 11,
flagged nail on right bank,
40 ft
upstream from bridge in 4-
in.
elm tr
ee,
beside private driveway at discontinued gage.
County Road bridge centerline.
State Route 15,
flagged nail in
18"
tree and
keel mark on trellis at Jim Lowdenmiller home.
Tawa Ru
n.
U.S.
22
4, flagged nail in
power pole on left
bank
, 30 ft
downstream from U.
S. 224
bridge at
Ottawa.
U.S.
22
4 bridge centerline, at Ottawa.
U.S.
224, keel mark on east sign for Saints Peter
and
Paul cemetery, on
left bank upstream from
U.S.
22
4 bridge, at Ottawa.
State Route 65,
paint line on downstream right
wingwall of State Route 65
bridge, at Ottawa.
State Route 65
bridge centerline, at Ottawa.
Keel mark at mudline on house at 266
Walnut
Street, in Ottawa.
Paint line on downstream steel beam of railway
bridge near right abutment, at Ottawa.
Table 1. Location an
d elevation of
high-water marks (flood June 13-15, 1981
, Blanchard River
),
Stream distance
(miles upstream
from fmouth)
23.02
23.04
23.05
23.07
23.61
24.35
24.52
24.5J3
24.54
24.80
26.71
26.72
26.73
27.78
29.13
location of bridges and
High-water
Elevation
identification
(in
feet,
number
NGVD of 1929)
-
3-14
728.73
-
B-15
729.10
B-16
729.24
B-17
729.72
B-18
729.85
-
B-19
729.93
B-20
730.06
B-21
731.14
-
B-22
731.28
-
-
mouths of
tributaries Continued
Description of high-water marks
or other points
Railway bridge center line, at Ottawa.
Paint line on
grain storage bin on right
bank, 60
ft
upstream from railway bridge,
at Ottawa.
South Oak Street bridge centerline, at Ottawa.
Flagged nail in 18-in. tree in
back of SCS
building on South Oak Street, at Ottawa.
Mudline on window at 51
7 Second Street, in
Ottawa.
Mudline on tree at
Second and South Hall Streets,
in Ottawa.
Mudline on downstream side of D.T.& I.
Railway
bridge over Blanchard River, at Ottawa.
D.T.& I.
Railway bridge centerline, at Ottawa.
Mudline on upstream side of D.T.& I.
Railway
bridge over Blanchard River, at Ottawa.
Mudline on
Weatherseal plant near Blanchard
River, at
Ottawa.
County Road 8,
paint line
on right downstream
bridge wingwall, upstream
bridge, at Ottawa.
County Road 8 bridge centerline.
County Road 8
bridge, paint line on right
upstream bridge wingwall, upstream from
Ottawa.
Riley Creek.
County Road 6
bridge centerline.
Table 1. Location and elevation of
high-water marks (flood June 13-15, 1981,
Blanchard River)
location of
bridges and mouths of
tributaries Continued
Stream distance
High-water
(miles upstream
identification
from mouth)
number
Elevation
(in
feet
, NGVD of 19
29)
Description of high-water marks
or other points
29.14
30.27
30.29
30.40
32.48
32.49
32.51
32.87
34.53
35.28
35.29
35.30
36.53
38.18
41.58
B-23
B-24
B-25
B-26
B-27
B-28
B-29
733.64
736.96
743.63
743.95
749.10
749.13
750.09
B-30
753.38
County Road 6
r mud line on barn on right
bank, upstream from bridge.
County Road 5 bridge centerline.
County Road 5,
flagged nail in fence post
on left bank 80 ft
upstream from bridge
abutment.
Dutch Ru
n.
Flagged nail in
pole, 20
ft downstream from
Pearl Street brfidge, on right bank, at Gilboa.
Pearl Street bridge centerline.
Flagged nail in 18-in. tree,
100
ft upstream from
Pearl Street bridge, on right bank, at Gilboa.
Dukes Ru
n.
Moffitt Ditch.
Putnam County Road 1,
paint line on left down
stream bridge wingwall.
Putnam-Hancock County line road bridge.
Hancock County Road 16
, paint line on right
upstream bridge wingwall.
U.S.
22
4, flagged nail in
fence post on south
side of U.
S. 22
4, 20
0 ft
east of County
Road 11
6.
County Road 53 bridge centerline.
Township Road 12
3, flagged nail in power pole,
downstream side of
road, 1,UOO ft north of
bridge.
Table 1. Location and elevation of high-water marks (flood June 13-15, 1981, Blanchard River)
Location of bridges and mouths of tributaries Continued
Stream distance
High-water
(miles upstream
identification
from mouth)_______number_____
Elevation
(in feet,
NGVD of 1929)
Description of high-water marks
or other points
41.59
42.27
43.05
43.07
46.06
46.07
46.08
48.26
49.75
49.76
49.78
51.16
51.17
51.18
B-31
B-32
B-33
B-34
B-35
B-36
757.03
760.20
760.55
768.72
769.72
771.41
B-37
771.85
Township Ro
ad 12
3 bridge centerline.
Ottawa Cr
eek.
Stat
e Ro
ute
235
bridge centerline.
State
Rout
e 235, flagged
nail on
park si
gn
post,
on right bank,
100
ft upstream
from bridge.
County Ro
ad 12
8, paint
line on le
ft downstream
bridge wi
ngwa
ll.
County Ro
ad 12
8 bridge centerline.
County Ro
ad 12
8, pa
int
line on
ri
ght
upstream
bridge wi
ngwa
ll.
Aurand Run
County
R
oad
139,
firs
t b
ridge
bel
ow
gag
e,
pain
t-m
ark
ed H
vu43
r4tte
on
J^£
t^ d
ow
nst
ream
w
ingw
all.
County Ro
ad 13
9 bridge centerline
County Ro
ad 13
9, flagged
nail in power po
le
on upstream side of road
, 50
0 ft north
of br
idge
.
County Ro
ad 14
0, painted mud
line on ba
ck side of
left
downstream abutment at Findlay stream gage
County Ro
ad 14
0 bridge centerline, at Findlay
stream gage.
County Ro
ad 14
0, fl
agge
d na
il in upstream side
of metal water-quality monitor ho
use,
15 ft
upstream from br
idge
, on left bank at
Findlay
stream gage.
Tabl
e 1. Location and
elevation of
high-water marks (flood Ju
ne 13
-15
f 19
81,
Blanchard River)
.location
of bridges an
d mouths of
tributaries Continued.
Stream distance
High-water
(miles upstream
identification
from
mo
uth)
____
____
___num
ber_
____
Elevation
(in
feet,
NGVD of
1929)
Description of
high-water marks
or other points
51.9
5
52.1
8
52.3
1
52.5
9
52.6
4
53
.18
53.3
6
53.4
4
53
.53
53
.55
53.8
7
53
.90
54
.02
54
.18
54.4
8
B-3
8773.3
0
B-3
9
B-4
0
B-4
1
774.6
5
776.0
2
777.1
0
County Ro
ad 22
3, flagged
nail in side doorjamb
of la
rge
umarked
building on right ba
nk,
1,30
0 ft
downstream fr
om 1-75.
Interstate 75 bridge centerline
Flagged na
il on large
sign
at
91
6 Howard St
reet
, in Findlay.
Broad Avenue bridge centerline.
Howard Run.
Paint
line
on no
rth
side
of
barn at
southwest
corner of
River Street and
Kurd
Avenue,
in
Findlay.
Norfolk & Western Railway bridge centerline.
Findlay city br
idge
, 0.10 mi west of Main
Stre
et.
Keeled na
il in
ba
ck do
or
of De
an &
Barry paint
stor
e at
22
2 No
rth
Main Street,
in Findlay.
Main Street bridge centerline.
Conrail bridge centerline.
Eagl
e Cr
eek.
Blanchard Street bridge centerline.
Lye
Cree
k.
Findlay city br
idge
, so
uth
of Riverside Park.
Tabl
e 1. Location and
elevation of
hi
gh water marks (flood Ju
ne 13-15, 19
81,
Blanchard Ri
ver)
CT>
Stream distance
(miles upstream
from mouth)
54.55
55.68
56.00
56.04
56.09
56.94
57.08
5 7.
$4
58.05
58.74
58.75
59.22
60.27
60.28
60.66
location of
bridqes and
High-water
Elevation
identification
(in
feet,
number
NGVD of
1929)
B-42
779.55
B-43
780.07
B-44
780.71
B-45
780.95
B-46
782.81
B-47
784.33
B-48
784.72
B-49
786.66
B-50
789.54
mouths of
tributaries Continued
Description of
high-water marks
or other points
Flagged
nail on
"W
ater
Fa
lls"
signpost on East Main
Cross Street,
on le
ft bank at
Findlay.
Flagged nail in 36
-in.
tree on left ba
nk at 15
15 East
Main
Cross Street,
at Findlay.
County Ro
ad 95,
flagged
nail on
pa
rk si
gnpo
st,
200
ft
downstream fr
om br
idge
on le
ft bank.
County Ro
ad 95
bridge centerline.
County Ro
ad 95,
flag
ged
nail on mailbox ra
ck,
200
ft
upstream fr
om bridge on
le
ft bank,
at Bowers Mi
ll
Stream Terrace Trailer Co
urt.
Stat
e Route 568
bridge centerline.
Mudline in barn
a.t Wiseley residence on St
ate
Rout
e 568'.
Mudline on garage tt Wolery residence^ ̂fr&tate
Rout
e 56
8.
Mudline on
Findlay Reservoir pumping station
no.
2 foundation wa
ll.
Township Ro
ad 24
1, fl
agge
d na
il in power pole,
on
left
ba
nk downstream side of ro
ad at
bridge.
Township Ro
ad 24
1 br
idge
centerline.
The
Outlet (2
) .
Township Ro
ad 20
7, paint mark on right downstream
bridge wingwall.
Township Ro
ad 207
bridge centerline.
Findlay reservoir pumping station
no.
1.
Table 1.
Location and elevation of
hiyh- water marks (flood June 13-15
1981
, Blanchard River)
'
Stream distance
(miles upstream
from mouth)
61.29
61.35
61.36
location
High -water
identification
number
- -
B-51
of brxdges and mouths of tributaries Continued
Elevation
(in
feet,
NGVD of 1929)
- -
794.23
Description of
or
other
Brights Ditch.
County Road 20
5 bridge
County Road 205, paint
high-water marks
points
centerline.
mark on steel fence post,
upstream side of ro
ad,
100
ft west of bridge.
Table 2. Location and
elevation of
high-water marks (f
lood
Ju
ne 13-15, 19
81,
The
Outlet (2
))and
location of
bridges
Stream distance
High-water
(mil
es upstream
identification
from mo
uth)
number
Elevation
(in
feet,
NGVD of 1929)
Description of
high-water marks
or other points
CO
0.0
0
0.4
9
0.5
1
0.6
0
0.6
0
1.9
7
1.9
8
1.9
9
TO
-1
TO
-2
TQ
-1
TO
-4,
(78
7.6
0)
788.2
5
788.3
2
78
9.3
8
790.3
8
Mout
h of
The
Outlet (2
).
Elevation fr
om Blanchard
River pr
ofil
e.
Stat
e Route 56
8 bridge centerline.
Mudline at
Pa
ul Kr
ing
resi
denc
e.
Abandoned ro
ad bridge centerline.
Keeled mudline on
old
steel
truss
bridge on
abandoned road.
Township Ro
ad
25__
1_, mudline on downstream left bank
wing
wall
.
Township Road 25
1 bridge centerline.
Township Ro
ad 25
1, mudline on
ri
ght
bank upstream
side of bridge.
Table 3. Location and elevation of
high-water marks (flood June 13-15, 19
81,
Lye CreekX
,and
location of
bridges
Stream distance
High-water
(miles upstream
identification
from mouth)_______number______
Elevation
(in
feet
, NGVD of 19
29)
Description of
high-water marks
or other points
0.00
0.02
0.33
0.68
1.06
1.07
2.20
2.45
2.46
2.48
(778.50)
L-l
L-2
L-3
780.63
785.49
785.71
Mouth of Lye Creek.
Elevation from Blanchard
River flood profile.
East Main Cross Street bridge centerline.
Sandusky Street bridge centerline.
Fairgrounds bridge centerline.
Fishlock bridge centerline.
High water marked by resident at 17
00 Connell
Street, 60
ft upstream from Fishlock bridge
County Road 95
bridge centerline.
County Road 20
5, mudline on fence, 50
ft
downstream from bridge, on right bank.
County Road 20
5 bridge centerline.
County Road 205, mudline on house, 100
ft
upstream from bridge, on right bank.
Table 4. Location and elevation of
high-water marks (flood June 13-15, 1981
r Eagle Creek),
and
location of bridges
Stream distance
High-water
Elevation
(miles upstream
identification
(in
feet,
from mouth)
number
NGVD of 1929)
Description of
high-water marks
or other points
r>o
CD
0.00
0.09
0.10
0.20
0.26
0.45
0.77
0.79
1.46
1.48
1.52
2.54
2.55
2.56
E-l
E-2
E-3
E-4
E-5
E-6
(777.80)
778.47
780.55
782.91
788.30
788.68
Mouth of Eagle Creek.
Elevation from Blanchard
River flood profile.
East Main Cross Street bridge centerline.
Flagged nail in
power pole at Yock's, 431 East
Main Cross Street, at
upstream side of
bridge
at Findlay.
Conrail spur bridge centerline.
Sandusky Street bridge centerline
Lincoln Street bridge centerline.
blanchard Street bridge centerline.
Flagged nail in 30
-in.
tree on left bank 80 ft
upstream from bridge at Blanchard Street, in
Findlay.
Flagged" naiTT in
Firestone l?
arfr
sign post on
right bank, 80 ft downstream from bridge at
6th
Street, in Findlay.
Sixth Street bridge centerline.
Flagged nail in 6-in.
tree on right bank, 200
ft
upstream from bridge at 6th
Street, at
Fi
ndla
y.
Township Road 20
4, flagged nail in
tr
ee,
40 ft
downstream from bridge, on right bank.
Township Road 20
4 bridge centerline.
Township Road 204, flagged nail in tree on right
bank
, 30 ft upstream from bridge.
75
0
o H h-
UJ
UJ u_
745
-
O OC
UJ o UJ o
O
O>U
J CM
O
0>
740
735
u_ o
UJ
_J
UJ
72
5
72
0
715
710
705
0>
0)
O)
o l_
03 OC
6
0) O)
* >
(0
C<*
a O
3
Q)
Q
I 5
O)
OC
(0
6
m
3 o 03
O i_ 0) i
0)
O)
CO
OC o
EX
PL
AN
AT
ION
Flo
od
o
f J
un
e 1
3-1
5,
1981
©
Hig
h-w
ate
r m
ark
34
5 678
9 10
DIS
TA
NC
E
IN
MIL
ES
AB
OV
E
MO
UT
H
OF
B
LA
NC
HA
RD
R
IVE
R
Fig
ure
4.
Pro
file
fo
r B
lan
ch
ard
Riv
er f
loo
d o
f Ju
ne
13
-15
, 1981.
1112
13
IIELEVATION, IN FEET (NATIONAL GEODETIC VERTICAL DATUM OF 1929)
(QC
i S 3 m-* mm
S 5T3 O
Q.
3D
00 O
OC
S HSI
~ O n
oo 2
o oa
z o
c.c3 (Di 30W D
A * Ol ^
(0 03
IO o35'c(Da
©
5' 2 7 i^ orf» «-
i ^ mL
X 0>
.A(n
(Do»
Cranberry Creek
PJkeJRunC.R. 11 Discontinued gage"Blanchard River at Glandorf"
CjJIvJBrJdfljt.
S.R. 15 Bridge
Tawa Run
U.S. 224 Bridge at Ottawa
S.R. 65 BridgeR-R> Brld9e South Oak Street Bridge
DT&I R.R. Bridge
O> 765
M O> U. O
760
to
I-
< 0 75
5
O g 75°
UJ
745
Q O UJ O O p
740
735
I-
UJ
UJ
U.
730
2
725
I- < >
UJ
_l U
720
EX
PL
AN
AT
ION
Flo
od
off
Jun
e 13-1
5,
19
81
O
Hig
h-w
ate
r m
ark
26
27
28
29
30
31
32
33
34
35
36D
IST
AN
CE
IN
MIL
ES
AB
OV
E M
OU
TH
O
F B
LA
NC
HA
RD
RIV
ER
37
38
Fig
ure
4.
Pro
file
fo
r B
lan
char
d R
iver
flo
od
of
13-1
5,
1981
C
on
tin
ue
d.
39
to
Flo
od
of
JuH
& T
3-1
5,
1981
O
Hig
h-w
ate
r m
ark
42
43
44
45
46
4
7
48
49
DIS
TA
NC
E I
N M
ILE
S A
BO
VE
MO
UT
H O
F B
LA
NC
HA
RD
RIV
ER
Fig
ure
4.
Pro
file
fo
r B
lan
char
d R
iver
flo
od
of
Jun
e 1
3-1
5,
19
81
C
on
tin
ued
,
ELEVATION, IN FEET (NATIONAL GEODETIC VERTICAL DATUM OF 1929)OB
§00
g1-71 Bridge
s
is3 «= Z «
A QO
7 O* m»*s m
-* z§ o o.
o O I
-* m S<0 3009^^I
O wo3
3c 2<D *a
Broad Ave. Bridge
Norfolk A Western RR. BridgeMain Street Bridge
Conrail Bridge
Lye Creekage Eagle < B'anchard St. Brfdqe Eagle Creek
TWSP. RD. 241 Bridge
TWSP. RD. 207 Bridge
Howard Run
Findlay City Bridge
01
<0 OB
mXII
H O
C.R. 205 Bridge
The Outlet (2)795
Township Road 251 Bridge
Abandoned County Road Bridge
State Route 568 Bridge
County Road 205 Bridge
County Road 95 Bridge
Fishiock Bridge
Fairground Bridge
Sanciusky St. Bridge
E. Main Cross St. Bridge
7750 123
DISTANCE IN MILES ABOVE MOUTH
Township Road 204 Bridge
6th St. Bridge
Blanchard St. Bridge
Lincoln St. Bridge
Sandusky St. Bridge
Conraii Bridge
.E. Main Cross St. Bridge
EXPLANATION
High-water mark
Figure 5. Profiles of The Outlet (2), Lye Creek, and Eagle Creek for theflood of June 13-15, 1981.
26
Table 5. Summary of flood stages and
discharges, an
d rainfall distribution in
the
aianchard Riven
and adjacent basins in
Ohio for th
e flood of June 13
-15.
1981
Maximum floods
Prior to
Permanent
Stream and
place
Drainage
June 1981
station
of determination
area
Gage
Discharge
number
Period
June 1981
height
of
Year
No.
(mi2)
Record
(time)
(ft)
(ftVs) (ftVs/mi2)
1 04186500
Auglaize River near
332
1921-35, 1959
20.30
a 12,000
Fort Jennings
1940-80
(5 p.m.)
June 14
15.80
7,930
2 04187500
Ottawa River near
150
1923-35, 1959
10.88
7,740
Allentown
1943-80
(5:3
0 a.m.)
June 14
10.09
5,850
3
The Outlet (2
) at
36.3
June 14
2,160
59.5
Percent of basin
receiving
R.I.
indicated
precipitation
(yea
rs)
3"-4
" 4"-5"
100 9
100 +
20
100+
40
60
6 04188500
Township Road 25
1,
1.98 mi upstream
from mouth, 6.8
mi
east of Findlay
Blanchard River at
County Road 95
, 2
mi east of
Findlay
Lye Creek at
County
Road 205, 2.47 mi
upstream from mouth
2.8
mi southeast of
Findlay
Eagle Creek near
Findlay, 800 ft
upstream
from
bridge on State
Route 15
, 3.1
mi
south of Findlay
243 25.7
c 55.0
1947-57,
1959
1959
June 14
June 14
June 14
9,620
b 2,460
d 5,860
6,500
39.6
95.7
107
115
100 +
100+
100 +
100+
54
46
0 100
100
0 100
Table 5. Summary of flood stages and discharges, and rainfall distribution in
the Blanchard River
and adjacent Dasins in Ohio to
r the flood of June 13-15, 1981 Continued
Permanent
station
number
Mo. 7
04189000
8 04189100
9 04189500
10
04190000
Stream and place
Drainage
of determination
area
(mi2
)
Blanchard River near
346
Findlay. At bridge
on County Road 140,
2.3
mi northwest of
Findlay
Tiderishi Creek
4.65
near Jenera at
bridge on State
Route 69
8, 2.2 mi
north of Jenera
Blanchard River at
644
Glandorf. At bridge
on County Road 11
,1.1 mi north of
Glandorf
Blanchard River
756
near Dupont.
At
Prior to
June 1981
Period
June 1981
of
Year
Record
(time)
1924-36, 1913
1941-80
(6 p.m. )
June 14
1947-77, 1959
1959
June 13
1922-28,
1947-51,
1959
1959
June 15
1928-35
1930
June 15
Maximum floods
Percent of basin
Gage
height
(ft)
18.5
17.43
15.15
16.01
27.9
27.98
26.09
27.09
Discharge
(ft3/s)
(ft3/s/mi
2)
22,000
63.6
13,000
37.6
480
103
984
212
- --
---
17,700
27.5
17,900
27.8
16,800
22.2
17,500
23.1
K.J:
.
(years)
100 +
50 30100 +
50 50 25-
25
receiving
indicated
precipitation
3"-4"
4"-5"
_
__
3b
65
__
__
0 10
0
35
65
__ 33
67bridge on County
Road 19,
4.1 mi
southeast of
Dupont
ro CD
Table
5. ^
Summ
ary
of fl
ood
stages an
d discharges,
and
rainfall distribution in the
Blanchard River
and
adjacent basins in Ohio for
the
floo
d of
June 13
-15,
]981 Continued
Perm
anen
t station
numb
er
Stre
am an
d place
of determination
No .
Drainage
area
(mi2
)
Prior to
June 1981
Period
of
Record
Year
June 1981
(tim
e)
Maximum floods
Percent of basin
Gage
Discharge
R.I.
height
(ft)
(f
t3/s
) (ft3/s/mi2
) (y
ears
) 3'
4-4"
4"-5"
receiving
indicated
precipitation
1104191500
Augl
aize
River near
2,31
8 1915-80
1950
Defiance
__June 15
or 16
626.4
f25.91
52,500
47,300
25 10
12
04192500
Maumee River near
Defiance
5,544
1924-35,
1939-80
1950
(12
p.m.)
June 15
13.70
87,000
12.35
76,500
40
f^Ab
out
Indirect measurement rated as
'estimate
1 ^Revised
Revised discharge on basis of revised drainage area
eFrom graph based on hourly powerplant tailwater readings
high-water mark in well
</* o
UJ _|10
00
UJ oc o 0) o
o Ul
0) oc Ul
Q.
Ul
Ul
IL O s Ul
O oc < X o 0)
Ul
CL
100
i r
i i
EX
PL
AN
AT
ION
3 T
he
Ou
tlet
(2)
T U
nan
char
d R
iver
at
Co
un
ty R
oad
5 L
ye C
reek
6 E
agle
Cre
ek
7 B
lan
char
d R
iver
nea
r F
ind
lay
8 T
ide
ris
hi
Cre
ek
9 B
lan
char
d R
iver
nea
r G
lan
do
rf
10
Bla
nch
ard
Riv
er n
ear
Du
po
nt i
i i
i i
j__L
i i
i i
0.1
1 10
10
0
DR
AIN
AG
E
AR
EA
, IN
S
QU
AR
E M
ILE
S
1000
Fig
ure
6.
Peak d
isch
arg
e ve
rsu
s d
rain
age
area
in
the
Bla
nch
ard
Riv
er b
asin
, fo
r fl
oo
d o
f Ju
ne
13
-15
, 1981.
CONCLUSIONS
The peak discharge of 13,000 ft 3/s at 1800 hours, June 14, 1981, at the Blanchard River near Findlay, Ohio, (USGS streamflow station 0418900) was the greatest since March 1913, when peak discharge was estimated to be 22,000 ft3/s. The recorded peak gage height of 17.43 ft was also the highest since March 1913, when a peak of 18.5 ft was estimated. Measurement of peak dis charges for the flood of June 13-15, 1981, on the Blanchard River above Findlay and on tributary streams in the Findlay area indi cate recurrence intervals greater than 100 years.
31
REFERENCES
Cross, W. P., 1967, Drainage areas of Ohio streams, supplement to Gazetteer of Ohio streams: Ohio Department of Natural Resources Division of Water,! Ohio Water Plan Inventory Report 12A, 61 p.
U.S. Department of Commerce, National Oceanic and Atmospheric Administration, 1981, Climatological data for Ohio; April, May, June.
U.S. Federal Emergency ManagementReport, Flood disaster DR tributaries, Hancock, Putnam 20 p. (unpublished).
Agency , 1981, Hazard Mitigation642, Blanchard River and
and Wyandot Counties, Ohio:
Webber, E. E., and Bartlett, W. P., Jr., 1977, Floods in Ohio, magnitude and frequency: Ohio Department of Natural Resources Division of Water Bulletin 45, 74 p.
32
USQ?0-1983 -660-689-54