Page 1: Water Resources 2012 Annual Report
Page 2: Water Resources 2012 Annual Report

The Water Resources Department wishes to acknowledge the efforts of several persons in the timely production of this document. Without their expertise, effort, and unique abilities this would not have been possible and certainly the document would not have been produced as the professional and attractive package it is. These persons are: Earl Hall, Kris Neifing, Ron Birdsong, Sam Drain, Keith Stewart, Cynthia Moore, Susan Miller, Rae Reese, and Jennifer Young and Jennifer Slack.

Page 3: Water Resources 2012 Annual Report

Population Estimate

Average Number of Active Accounts

2008 2009 2010 2011 2012

*Edmond Population 79,559 81,093 81,405 83,019 83,035

2008 2009 2010 2011 2012

Water 25,221 26,260 26,756 26,957 27,702

Wastewater 27,888 27,875 28,413 28,535 29,241

Electric 34,564 34,671 35,300 35,497 36,985

*Source: Edmond Economic Development Authority

Page 4: Water Resources 2012 Annual Report
Page 5: Water Resources 2012 Annual Report
Page 6: Water Resources 2012 Annual Report

Community Focused Water and Wastewater Utilities

To Meet the Needs of Edmond’s Customers by Providing Trustworthy Water and Wastewater Services

Maintain the Water Resources Infrastructure Maintain Market Competitiveness Through the Use of Technology and Qualified Personnel Continue to Provide Safe Water to Consumers and Return Clean Water to the Environment

Quality Water and Wastewater Services Customer Satisfaction and Involvement Professional, Honest Relationships with our Customers and with One Another A Team-Created, Positive, Safe and Enjoyable Work Environment Trained, Empowered Employees Sincere, Straightforward Communication

Page 7: Water Resources 2012 Annual Report

Water Production Division Edmond Water Treatment Plant Pumping Stations, Water Towers and Storage Tanks Water Wells (Fifty-six wells located throughout Edmond)

Wastewater Treatment Division Coffee Creek Wastewater Treatment Plant Wastewater Lift Stations

Page 8: Water Resources 2012 Annual Report
Page 9: Water Resources 2012 Annual Report
Page 10: Water Resources 2012 Annual Report
Page 11: Water Resources 2012 Annual Report
Page 12: Water Resources 2012 Annual Report
Page 13: Water Resources 2012 Annual Report

Edmond’s Coffee Creek Wastewater Treatment Plant (CCWWTP) is a continuous flow activated sludge process utilizing oxidation ditches and aeration tanks for secondary treatment. It has a total design capacity of nine (9) million gallons per day. The plant is operated under an Oklahoma Pollution Discharge Elimination System (OPDES) permit, issued by the Oklahoma Department of Environmental Quality (ODEQ). In 2009 the facility received a renewed OPDES permit effective May 1. The renewed permit will be in effect for five years. During 2012 ODEQ personnel conducted five plant inspections and did not note any significant issues. The basic features of the wastewater treatment process are, screens to remove debris from raw wastewater entering the plant, aeration basins that provide for oxygenation and mixing of active microorganisms with raw sewage (the activated sludge process), a basin or clarifier to separate solids from the treated effluent, a system to return solids, also known as activated sludge, from the clarifiers back to the aeration basins and a system to waste or remove excess solids from either the basin or clarifier thus controlling the solids mass. Operational controls include, controlling the oxygen level, the rate that activated solids are returned to the aeration basins and the rate that solids are withdrawn from the process. The treatment process is designed to remove carbonaceous organic material and oxidize ammonia to nitrate.

Page 14: Water Resources 2012 Annual Report

Treated water from the plant is also filtered to remove nearly all of the remaining solids, chlorinated to kill any potentially harmful microorganisms and then dechlorinated to eliminate excess chlorine that could be harmful to natural organisms in the receiving stream. The chlorination and dechlorination system is utilized for five months each year from May through September. These are the months most likely to have receiving stream recreational use. Biosolids, or sludge, that is wasted or removed from the wastewater treatment process is treated in facultative lagoons. After the sludge has spent a required amount of time in the lagoons it is tested for compliance with regulatory requirements and then land applied to local farmland for growth of second generation food crops, such as hay for stock feed. This program is defined in the plant Sludge Management Plan (SMP). The current SMP was approved by ODEQ in October 2006. The facility also has a storm water discharge permit, issued by ODEQ. This permit was issued in May 2012 and expires on May 2016. A new permit is pending ODEQ action. The document requires Edmond to maintain best management practices for control and containment of materials that should not contaminate plant storm water run off. The CCWWTP Division is also responsible for the operation and maintenance of the City’s nine (9) lift stations. The lift stations convey wastewater from the collection system to the CCWWTP. The stations are currently undergoing a rehabilitation effort to ensure that they remain at full operational capacity at all times.

Page 15: Water Resources 2012 Annual Report

The CCWWTP processed a total of 2,733,500,000 gallons of wastewater during 2012. Total operations and maintenance expenditures for 2012 were approximately $1,663,024. The percent removal of our major permitted parameters was above 97%. In 2012, a total of 4,721,800 gallons (1,485 dry tons) of biosolids were land applied on ODEQ approved farmland. Five (5) employees, One (1) Chief Plant Operator, One (1) Maintenance Mechanic, One (1) Laboratory Technician, two (2) Operators, and one (1) Instrumentation Technician operate and maintain the CCWWTP and the collection system lift stations. Staff is provided direction by the Water Resources Superintendent, Assistant Superintendent and the CCWWTP Chief Plant Operator.

Page 16: Water Resources 2012 Annual Report

Plant InfluentChisholm Creek

Lift Station

Influent Bar Screen

Screening to Landfill

Influent Lift Station

Influent FlowEqualization

Basin

Influent Fine Screen

Screenings To Landfill

Plant Influent Spring Creek

Lift Station

First Stage Aeration

Basin

First StageAeration

Basin

First StageClarifier

First Stage Clarifier

Phase 1

Second StageAir Basin

Second StageAir Basin

Solids Second StageClarifier

Second StageClarifier

Effluent to Sand Filters

Solids

RAS/WAS WAS to Facultative Lagoons

Solids

Solids

Sand Filters (8)

Phase 2

Oxidation Ditch

Oxidation Ditch

Clarifier Clarifier

Solids Solids

Effluent To Sand Filters

RAS/WAS WAS to Facultative Lagoons

Phase 3

OxidationDitch

Oxidation Ditch

Clarifier Clarifier

Solids Solids

ChlorinationDechlor.

To OutfallDischarge No 001

City of EdmondCoffee Creek Wastewater

Treatment Plant1600 N Midwest BlvdEdmond, OKFlow Schematic March 1, 2011

Page 17: Water Resources 2012 Annual Report

0 2 4 6 8

10

Total Precipitation Inches

Average Effluent Flow MGD

Total Precipitation

Inches

Average Effluent Flow

MGD Jan-12 0.41 7.3 Feb-12 1.74 7.5 Mar-12 4.86 8.7 Apr-12 7.68 8.9

May-12 3.63 8.1 Jun-12 3.60 7.2 Jul-12 0.60 6.6

Aug-12 3.20 7.0 Sep-12 4.38 7.1 Oct-12 2.32 6.8 Nov-12 0.86 6.7 Dec-12 0.63 6.4

Total 33.91 88.30 Average 2.83 7.4

Page 18: Water Resources 2012 Annual Report

0 50

100 150 200 250

Jan

uar

y Fe

bru

ary

Mar

ch

Ap

ril

May

Ju

ne

Ju

ly

Au

gust

Se

pte

mb

er

Oct

ob

er

No

vem

ber

D

ecem

be

r

Raw BOD mg/L

Final BOD mg/L

Raw BOD mg/L

Final BOD mg/L

Jan-12 135.5 1.5 Feb-12 150.9 1.5 Mar-12 119.5 2.1 Apr-12 110.8 1.7

May-12 123.4 2.0 Jun-12 136.0 1.6 Jul-12 155.8 3.5

Aug-12 160.3 2.1 Sep-12 148.0 2.3 Oct-12 155.0 2.3 Nov-12 166.2 3.5 Dec-12 204.8 2.1

Total 1766.2 26.2 Average 147.2 2.2

Page 19: Water Resources 2012 Annual Report

0 50

100 150 200 250

Raw TSS mg/L

Effluent TSS mg/L

Raw TSS mg/L

Effluent TSS mg/L

Jan-12 167.4 1.8

Feb-12 180.4 1.9

Mar-12 152.4 2.4

Apr-12 154.9 2.0

May-12 156.9 1.4

Jun-12 159.9 1.7

Jul-12 182.8 17.3

Aug-12 210.6 2.5

Sep-12 200.4 2.7

Oct-12 180.4 2.6

Nov-12 196.3 2.8

Dec-12 154.5 2.8

Total 2096.9 41.9

Average 174.7 3.5

Page 20: Water Resources 2012 Annual Report

35

35

ArcadiaLake

Covell Rd

Danforth Rd

Edmond Rd

15th St

33rd St

Memorial Rd

Coffee Creek Rd

Sorghum Mill Rd

Waterloo Rd

Weste

rn Av

e

Santa

Fe Av

e

Kelly

Ave

Broa

dway

Brya

nt Av

e

Coltra

ne R

d

Soon

er Rd

Air D

epot

Blvd

Midw

est B

lvd

Doug

las Bl

vd

Post

Rd

Westm

inster

Rd

Oak Tree Oak Tree Reserve

Coffee Creek

Chisholm Creek

Spring Creek

Fire Station 4

33rd Street

40th Street

Memorial

Coffee Creek PlantWWTP

Lift Stations

0 1 20.5Miles

January 14, 2009

City of Edmond

The City of Edmond disclaims any warranty or merchantability or warranty for fitness of use for a particular purpose, expressed or implied, with respect to this data. Furthermore, the City of Edmond disclaims any responsibility for the accuracy or completeness of this data.

Legend

WWTP Waste Water Treatment Plant

Lift StationCity LimitsRailroadStreets

Page 21: Water Resources 2012 Annual Report

Lift Station Name Location Number

of Pumps Motor

HP Pump GPM

CHISHOLM CREEK ¾ Mile North of Covell on Western 2 150 1500

1 300 3000

COFFEE CREEK South side of Coffee Creek, ¼ mile east of Santa Fe Ave.

3 75 1500

COFFEE CREEK TREATMENT PLANT

Coffee Creek Plant grounds 2 25 1100

1 60 3000

FIRE STATION #4 I-35 Access road, ¼ miles south of 15th Street (Decommissioned 12/26/2012)

2 5 150

MEMORIAL ROAD North side of Memorial, ½ miles west of I-35

2 3 75

OAK TREE 6340 North Santa Fe Ave 3 130 1100

OAK TREE RESERVE East side of Kelly , ¾ mile past Sorghum Mill

2 20 450

SPRING CREEK ¼ mile east of I-35 on 66 Highway

1 30 1000

1 75 2000

2 125 3100

33rd Street South side of 33rd St, ½ miles west of I-35

2 10 75

40th Street 40th St between Karen and Stevens Dr.

2 30 200

Page 22: Water Resources 2012 Annual Report

Field Name Legal Description Latitude Longitude Field Name Legal Description Latitude Longitude

CR-1 SW/4 SEC 26 T14N R1W 35o 39’ 28.613” -97o 16’ 44.667” JM-1 S/2 NW/4 SEC 8 T14N R1W 35o 42’ 28.745” -97o 19’ 29.088”

CR-2 S/2 SW/4 SEC 26 T14N R1W 35o 39’ 13.342” -97o 16’ 35.11” JM-2 S/2 NW/4 SEC 8 T14N R1W 35o 42’ 18.487” -97o 19’ 29.782

GM-1 NE 1/4 NE 1/2 SE 1/4 SEC 8 T14N R1W 35o 42’ 12.803” -97o 19’ 9.387” JM-3 S/2 NW/4 SEC 8 T14N R1W 35o 42’ 7.524 -97o 19’ 31.045”

GM-2 NE 1/4 NE 1/2 SE 1/4 SEC 8 T14N R1W 35o 42’ 32.465” -97o 19’ 21.433 JM-4 S/2 NW/4 SEC 8 T14N R1W 35o 42’ 19.92 -97o 20’ 8.191”

JG-2 W/2 NE/4 SEC 30 T14N R1W 35o 39’ 56.94” -97o 20’ 34.022” LS-1 SW/4 SEC 24 T14N R2W 35o 40’ 5.795” -97o 22’ 5.878”

JG-3 NE/4 SEC 30 T14N R1W 35o 39’ 56.993” -97o 20’ 29.663” LS-2 W/2 SE/4 SEC 19 T14N R1W 35o 40’ 15.436” -97o 20’ 36.527

JG-4 S/2 NE/4 SEC 30 T14N R1W 35o 39’ 38.531” -97o 20’ 34.857” LS-3 N/2 NE/4 SEC 28 T14N R1W 35o 39’ 59.139” -97o 18’ 20.074”

JG-5 W/2 NW/4 SEC 29 T14N R1W 35o 39’ 56.098” -97o 20’ 5.815” LS-4 NE/4 SEC 28 T14N R1W 35o 39’ 41.501” -97o 18’ 13.096”

JG-6 W/2 NW/4 SEC. 29 T14N R1W 35o 39’ 40.748” -97o 20’ 3.511” LS-5 E/2 SW/4 SEC 21 T14N R1W 35o 40’ 23.184” -97o 18’ 57.692”

JG-13 NW/4 NW/4 SEC 21 T14N R1W 35o 40’ 48.561” -97o 18’ 59.003” LS-8 W/2 NE/4 SEC 25 T14N R2W 35o 39’ 52.351” -97o 21’ 39.77

JG-14 SW/4 SW/4 SEC 16 T14N R1W 35o 41’ 1.442” -97o 18’ 49.714” LS-9 E/2 NE/4 SEC 25 T14N R2W 35o 39’ 44.149” -97o 21’ 23.639”

JG-15 W/2 SW/4 SEC 16 T14N R1W 35o 41’ 7.379” -97o 19’ 3.689” LS-11 SW/4 SEC 2 T14N R2W 35o 40’ 5.795” -97o 22’ 5.878”

JG-16 NW/4 SW/4 SEC 16 T14N R1W 35o 41’ 13.657” -97o 19’ 4.669” LS-12 E/2 SE/4 SEC 19 T14N R1W 35o 40’ 2.498” -97o 20’ 28.158”

JG-17 N/2 SW/4 SEC 16 T14N R1W 35o 41’ 14.08” -97o 18’ 58.135 LS-13 W/2 SE/4 SEC 24 T14N R2W 35o 40’ 3.011” -97o 21’ 43.151”

JG-18 E/2 SW/4 SEC 21 T14N R1W 35o 40’ 11.561” -97o 18’ 44.847” LS-14 N/2 NW/4 SEC 25 T14N R2W 350 40’ 1.465” -970 21’ 46.087”

JG-19 NE/4 NW/4 SEC 35 T14N R1W 35o 39’ 2.845” -97o 16’ 36.389” LS-15 NW/4 SEC 26 T14N R2W 350 39’ 51.827” -970 22’ 16.714”

JG-20 N/2 NE/4 SEC 35 T14N R1W 35o 39’ 4.193” -97o 16’ 19.267 LS-16 SW/4 SEC 35 T14N R1W 350 38’ 18.751” -970 16’ 52.775”

Page 23: Water Resources 2012 Annual Report
Page 24: Water Resources 2012 Annual Report
Page 25: Water Resources 2012 Annual Report
Page 26: Water Resources 2012 Annual Report

Raw Water FromArcadia Lake

LT2 Sample Site

Ozone Destruct Unit

East Contact Clarifiers

West Contact Clarifiers

Sludge

To WaterDistribution

Back Wash

Waste Washwater

GACContainers

F.W.

GWWell

DecantPS

RM107 OPS

AreaOffice

ODULOX

CO2storage

Chemical

OzoneGen

High LiftPump

Station

Maintenance

Clearwell No. 2

Clearwell No. 1

1

2

3

4

5

6

7

8

9

GACPump

StationFlocculating Clarifier #2

Flocculating Clarifier #1

RecarbBasin/Post

ozoneFilter and

Operations Building

Mixers

PreOzone

RWScreen Building

Sludge Drying Beds

Sludge Drying Beds

Washwater Basins

No. 1

No. 2

No. 3

No. 4

W a t e r t r e a t m e n t P l a n tCity of Edmond, Oklahoma

PWSID# OK1020723

Page 27: Water Resources 2012 Annual Report

Water Resources, Water Division, personnel continued to perform sampling and monitoring work at well sites and water distribution sites to meet all regulatory parameters and we are happy to report a 100% compliance rate for 2012. The total gallons produced for the Water Plant and Wells was 4, 195,457,230. Total operations and maintenance expeditures for 2012 were approximately $4,706, 408. We have completed a number of projects intended to reinvest in existing infrastructure. These include painting the plant lime silos, replacing media in the plant multi-media filters, and specifying and obtaining heavy equipment to provide the capability for staff to remove processed lime sludge from drying beds. The lime sludge removal was previously outsourced. Purchasing the heavy equipment will allow Edmond to bring the lime sludge removal process in-house where costs can be better controlled. We have also completed a number of projects to enhance water production and supply for the future. These projects include: booster stations to help maintain good system pressure, improvements in water transmission and distribution lines to allow us to deliver water more effectively, the design and construction of the Breakpoint Chlorination Facility at Mitch Park (to convert Oklahoma City water to the same type of chlorine disinfectant as Edmond water), and the design and construction of the Northwest complex for water storage and distribution.

Page 28: Water Resources 2012 Annual Report

In addition to the measures noted above Edmond has negotiated with Oklahoma City and has secured an agreement that will provide for the purchase of millions of gallons (up to a maximum of 15.0 million gallons per day) of water produced at Oklahoma City’s Hefner Road Water Treatment Plant. This water will be stored at, and distributed from, the Northwest complex. The Edmond area experienced a hot dry late summer by recent standards. This resulted in a higher water supply demand than has been seen in recent years. We continued to experience an increase in consumer demand for water through the rest of 2012. Edmond’s single day, peak demand, usage was 22,097,693 gallons on July 24, 2012. Mandatory water conservation was implemented last summer, and thanks to the cooperation of our water customers the residence addressing system was effective.

Page 29: Water Resources 2012 Annual Report

Edmond’s Treatment Plant was constructed and completed in 1987. This facility treats water from Arcadia Lake, which provides flood control, water supply, and recreation for the Upper Deep Fork River Basin. Edmond’s facility is equipped with many treatment processes to ensure a high quality of water is produced. The Edmond Water Treatment Plant is designed to treat 12.0 MGD. Major water treatment plant upgrades were completed in 2004. The following is a brief description of the treatment process, after water from Arcadia Lake is pumped to the plant headworks: Screen building: Screens remove leaves, sticks, fish, and other large debris. Air stripping: Aeration is intended to remove certain dissolved gases in the water. It can also be used to increase the waters dissolved oxygen content, which is the first step in the removal of iron and manganese. Pre-ozone: Ozone is a better virucide than chlorine. Unlike chlorine, there are no disinfection byproducts produced. Ozonation removes color, odor, and taste. This process also oxidizes iron, manganese, sulfide, and organics.

Page 30: Water Resources 2012 Annual Report

Flocculation, Clarifiers: This process gathers together the fine, light particles to form larger particles that will not readily settle or filter out of the water. The floc settles out the larger particles. Arcadia Lake raw water quality has historically been good enough to allow Edmond to forego this systems use. Chemical Building: Pebble quick lime is mixed with the water to form calcium hydroxide for softening purposes. Polymer is added as a coagulant aid. Solids Contact Clarifiers: These units are designed to allow the lime and other solids to settle out of the water after hardness reduction. Post-ozone: Ozone is a better virucide than chlorine. Unlike chlorine, there are no disinfection byproducts produced. Ozonation removes color, odor, and taste. This process also oxidizes iron, manganese, sulfide, and organics. Carbon Dioxide-Recarbonation: This process is used to lower the pH and alkalinity. It is effective in doing this, particularly in lime-softened water.

Page 31: Water Resources 2012 Annual Report

Mixed Media Filters: Filtration removes small solids from the water being treated. Filtration is the process of passing water through material, such as sand, coal, granulated carbon and/or other substances to trap particles. Granulated Activated Carbon (GAC) Filtration: GAC filtration is effective for removal of many types of organic compounds, including those that can form potentially harmful byproducts after chlorination. This process removes synthetic organic compounds such as solvents, cleaning compounds, insecticides and herbicides. The facility is operated twenty-four (24) hours per day, seven (7) days per week. Staff includes Nineteen (19) employees: One (1) Chief Plant Operator, One (1) Maintenance Supervisor, one (1) Mechanic, one (1) Instrumentation and Controls Technician, six (6) Operators, three (3) Water Well Operators, three (3) Water Well Helpers, and three (3) Laboratory Technicians. The water plant is operated under the direction of the Water Resources Superintendent, Assistant Superintendent and Chief Water Plant Operator.

Page 32: Water Resources 2012 Annual Report

Production Ratio

Plant

Well

Volume Comparison

Raw Water In

Filter Water

I-35 Pump Station

Plant Production

Well Production

Well Production

Well Number

Well Hours

Well Gallons

Well Number

Well Hours

Well Gallons

8 3,338.8 29,327,329 41 4,320.7 48,117,773

9 4,325.2 49,430,220 42 4,241.5 34,026,768

10 2,646.7 20,378,297 43 4,368.9 39,822,190

11 3,509.8 20,813,534 44 4,494.3 80,299,692

14 3,601.9 22,713,340 45 1,773.6 20,680,856

15 4,400.6 39,756,119 46 4,511.4 39,173,862

18 2,988.2 34,067,669 47 2,494.1 24,843,739

19 3,934.5 28,997,031 48 4,651.5 45,209,729

20 3,059.3 21,770,900 49 3,765.7 33,122,472

21 4,618.2 31,845,659 50 4,806.2 49,805,559

22 3,455.1 26,574,727 51 4,794.3 46,445,617

23 3,840.0 27,270,489 52 3,683.0 20,815,855

24 3,914.3 35,928,608 53 996.2 11,453,523

25 4,721.8 44,475,947 54 4,497.0 58,825,073

26 2,785.2 21,696,083 55 344.8 3,087,860

27 4,142.0 45,115,292 56 4,537.5 39,129,964

28 4,099.8 38,137,985 57 5,338.3 92,299,612

29 4,340.8 45,314,646 58 3,377.1 24,697,301

30 0.0 0 59 3,979.9 29,622,949

31 3,476.7 30,022,062 60 3,806.4 35,063,752

32 4,910.8 70,286,481 61 4,069.3 49,122,659

33 4,177.2 51,491,333 62 2,811.6 19,878,032

34 4,398.2 49,110,360 63 2,391.6 9,271,034

35 4,526.3 39,432,214 64 3,700.5 30,777,464

36 4,731.8 43,588,995 65 3,914.6 25,839,425

37 4,498.5 46,143,162 66 3,907.8 25,882,755

38 5,038.0 56,304,928 67 3,772.1 23,296,202

39 4,270.0 52,882,604 68 3,765.9 23,035,390

40 3,604.2 31,364,052

Plant Production

Location Gallons

Raw Water In 2,301,325,949

Filter Water 2,352,009,818

Finished High Lift 2,163,483,074

High Lift Return 88,866,084

I-35 Pump Station 2,134,902,373

Combined Production

Plant Production 2,163,483,074

Well Production 2,031,974,156

Total Combined

Production 4,195,457,230

2012 Annual

Page 33: Water Resources 2012 Annual Report

Production Ratio

Plant

Well

Volume Comparison

Raw Water In

Filter Water

I-35 Pump Station

Plant Production

Well Production

Well Production

Well Number

Well Hours

Well Gallons

Well Number

Well Hours

Well Gallons

8 249.3 1,782,490 41 260.0 3,417,045

9 319.7 4,363,408 42 204.5 1,752,378

10 115.4 1,068,825 43 281.3 3,416,164

11 141.6 1,047,740 44 214.5 4,765,788

14 249.1 1,720,150 45 24.1 283,299

15 205.8 1,850,396 46 265.5 2,581,470

18 88.2 1,260,567 47 193.5 1,814,330

19 185.4 1,712,292 48 284.7 3,554,972

20 20.9 133,318 49 247.2 2,521,612

21 265.1 2,073,066 50 302.1 3,463,394

22 0.0 0 51 293.7 3,266,027

23 219.6 1,847,462 52 232.9 1,545,187

24 216.2 2,305,783 53 243.0 2,935,835

25 274.0 2,555,520 54 272.3 3,782,101

26 0.0 0 55 0.0 0

27 202.7 2,475,825 56 224.0 2,027,805

28 52.0 542,485 57 288.8 4,962,873

29 257.9 3,329,678 58 235.1 1,820,106

30 0.0 0 59 258.6 2,281,146

31 232.8 2,618,479 60 223.6 2,324,594

32 234.0 3,807,293 61 224.9 3,199,479

33 192.2 2,772,945 62 236.8 1,952,785

34 213.0 2,779,666 63 176.8 815,120

35 308.1 3,414,611 64 199.8 1,880,412

36 316.2 3,638,633 65 271.7 1,955,035

37 242.3 2,585,510 66 261.5 1,938,832

38 244.8 3,030,022 67 262.0 1,733,182

39 167.7 2,219,362 68 270.4 1,787,985

40 0.4 3,160

Plant Production

Location Gallons

Raw Water In 117,889,135

Filter Water 118,426,037

Finished High Lift 110,787,932

High Lift Return 8,433,709

I-35 Pump Station 130,193,764

Combined Production

Plant Production 110,787,932

Well Production 124,717,636

Total Combined

Production 235,505,568

2012 January

Page 34: Water Resources 2012 Annual Report

Production Ratio

Plant

Well

Volume Comparison

Raw Water In

Filter Water

I-35 Pump Station

Plant Production

Well Production

Well Production

Well Number

Well Hours

Well Gallons

Well Number

Well Hours

Well Gallons

8 40.3 290,774 41 213.3 2,825,394

9 205.6 2,839,676 42 216.2 1,887,057

10 113.0 1,068,779 43 210.3 2,705,163

11 202.0 1,567,803 44 193.8 4,262,789

14 265.0 1,840,565 45 67.2 789,921

15 141.7 1,273,421 46 222.3 2,182,355

18 95.9 1,390,288 47 23.8 223,748

19 97.6 917,051 48 220.3 2,731,765

20 0.0 0 49 232.2 2,372,209

21 226.1 1,788,742 50 205.1 2,400,242

22 0.0 0 51 226.7 2,531,431

23 211.8 1,825,903 52 226.3 1,518,009

24 210.1 2,209,219 53 201.5 2,440,441

25 278.7 2,601,259 54 230.8 3,241,712

26 0.5 12,004 55 0.0 0

27 210.4 2,597,444 56 212.1 1,917,657

28 183.2 2,150,466 57 222.5 3,787,568

29 236.8 3,098,856 58 190.7 1,570,386

30 0.0 0 59 166.0 1,473,772

31 213.3 2,410,418 60 218.5 2,273,248

32 218.7 3,551,607 61 224.5 3,245,324

33 228.5 3,370,739 62 190.1 1,658,661

34 223.6 2,968,256 63 132.2 621,384

35 224.8 2,535,265 64 146.6 1,363,077

36 187.6 2,197,435 65 220.3 1,528,951

37 105.8 1,118,398 66 238.2 1,791,414

38 207.1 2,582,083 67 209.2 1,426,048

39 207.3 2,759,970 68 222.8 1,512,299

40 136.8 1,265,606

Plant Production

Location Gallons

Raw Water In 103,105,878

Filter Water 106,651,713

Finished High Lift 98,335,680

High Lift Return 7,512,835

I-35 Pump Station 116,962,856

Combined Production

Plant Production 98,335,680

Well Production 108,514,046

Total Combined

Production 206,849,726

2012 February

Page 35: Water Resources 2012 Annual Report

Production Ratio

Plant

Well

Volume Comparison

Raw Water In

Filter Water

I-35 Pump Station

Plant Production

Well Production

Well Production

Well Number

Well Hours

Well Gallons

Well Number

Well Hours

Well Gallons

8 0.0 0 41 344.2 4,221,467

9 193.4 2,619,275 42 415.3 3,516,968

10 282.4 2,387,878 43 305.1 3,605,828

11 507.0 3,505,944 44 418.3 8,994,106

14 333.4 2,175,951 45 144.0 1,399,874

15 338.3 3,070,555 46 463.8 4,289,558

18 280.5 3,656,651 47 164.0 1,336,751

19 415.4 3,807,700 48 481.1 5,643,670

20 0.1 600 49 472.3 4,547,097

21 365.1 2,837,901 50 542.3 6,105,265

22 166.5 1,183,425 51 522.0 5,729,951

23 284.6 2,370,122 52 205.8 1,314,894

24 505.0 5,101,748 53 412.8 4,706,088

25 356.2 3,381,007 54 331.9 4,566,673

26 18.2 162,116 55 0.0 0

27 342.1 4,124,827 56 443.5 4,023,595

28 344.6 3,782,102 57 500.7 8,409,385

29 424.1 5,207,316 58 192.8 1,549,391

30 0.0 0 59 335.1 2,944,885

31 400.7 4,198,105 60 243.1 2,500,790

32 394.3 6,366,294 61 400.0 5,677,720

33 138.4 1,965,883 62 152.6 1,205,019

34 478.1 5,879,790 63 161.4 722,127

35 449.0 4,677,338 64 304.6 2,708,337

36 410.8 4,478,188 65 431.2 2,943,093

37 424.6 4,541,053 66 407.9 2,815,747

38 420.0 5,096,542 67 383.2 2,439,647

39 380.9 4,876,046 68 455.9 2,667,102

40 310.2 2,801,806

Plant Production

Location Gallons

Raw Water In 72,036,937

Filter Water 73,646,099

Finished High Lift 67,720,302

High Lift Return 5,826,142

I-35 Pump Station 74,652,545

Combined Production

Plant Production 67,720,302

Well Production 194,841,192

Total Combined

Production 262,561,494

2012 March

Page 36: Water Resources 2012 Annual Report

Production Ratio

Plant

Well

Volume Comparison

Raw Water In

Filter Water

I-35 Pump Station

Plant Production

Well Production

Well Production

Well Number

Well Hours

Well Gallons

Well Number

Well Hours

Well Gallons

8 0.0 44,482 41 341.9 4,322,391

9 255.7 3,275,528 42 322.8 2,656,529

10 150.9 1,350,634 43 362.9 4,158,461

11 306.0 2,046,767 44 303.0 6,454,802

14 0.0 0 45 86.1 1,013,006

15 446.5 4,019,498 46 320.8 3,009,754

18 159.7 2,180,453 47 0.0 0

19 391.0 3,613,620 48 283.3 3,310,698

20 150.7 1,536,817 49 334.0 3,393,480

21 377.8 2,867,111 50 285.5 3,223,932

22 267.6 1,907,828 51 138.4 1,512,533

23 385.7 3,090,495 52 255.9 1,669,555

24 263.8 2,641,161 53 2.4 18,632

25 333.2 3,109,768 54 317.4 4,326,241

26 36.6 326,960 55 0.0 0

27 328.3 3,943,687 56 383.7 3,173,038

28 205.9 2,338,640 57 328.1 5,537,170

29 342.9 4,205,748 58 197.9 1,600,585

30 0.0 0 59 210.6 1,846,199

31 400.0 4,092,129 60 269.0 2,768,153

32 384.0 6,128,185 61 317.3 4,495,536

33 391.6 5,422,413 62 45.9 411,797

34 307.5 3,719,030 63 118.1 561,783

35 397.3 4,118,012 64 235.0 2,177,213

36 399.6 4,140,604 65 203.5 1,427,847

37 434.1 5,202,121 66 252.0 1,867,703

38 357.0 4,296,684 67 203.6 1,480,760

39 272.1 3,512,946 68 252.5 1,755,178

40 10.7 107,377

Plant Production

Location Gallons

Raw Water In 142,469,742

Filter Water 151,390,866

Finished High Lift 138,149,948

High Lift Return 7,271,323

I-35 Pump Station 134,689,074

Combined Production

Plant Production 138,149,948

Well Production 151,411,672

Total Combined

Production 289,561,620

2012 April

Page 37: Water Resources 2012 Annual Report

Production Ratio

Plant

Well

Volume Comparison

Raw Water In

Filter Water

I-35 Pump Station

Plant Production

Well Production

Well Production

Well Number

Well Hours

Well Gallons

Well Number

Well Hours

Well Gallons

8 314.8 3,263,144 41 421.2 5,055,824

9 444.8 5,329,543 42 493.1 3,880,204

10 241.3 2,023,894 43 551.8 5,423,822

11 402.4 2,244,231 44 384.5 8,185,903

14 333.3 2,136,918 45 98.3 1,151,361

15 514.9 4,630,833 46 476.1 4,268,782

18 285.9 3,560,585 47 0.0 0

19 425.7 3,583,982 48 472.0 4,910,123

20 367.9 3,589,507 49 507.2 4,990,879

21 450.6 3,177,243 50 508.6 5,438,092

22 443.7 2,788,269 51 525.8 5,424,253

23 466.9 3,392,117 52 443.2 2,751,225

24 440.8 4,252,367 53 0.0 0

25 484.7 4,521,227 54 517.2 6,849,692

26 367.5 3,286,454 55 1.1 2,282

27 464.4 5,223,736 56 477.2 3,529,574

28 248.1 2,413,719 57 574.8 9,471,096

29 404.0 4,626,971 58 342.0 2,634,026

30 0.0 0 59 427.4 3,470,378

31 68.3 622,104 60 462.4 4,552,992

32 503.8 7,798,427 61 435.9 5,827,826

33 531.1 6,786,544 62 231.5 1,816,464

34 370.7 4,395,651 63 166.4 731,360

35 473.1 4,338,794 64 339.7 2,997,905

36 511.6 5,051,909 65 394.0 2,742,363

37 492.7 4,762,903 66 396.3 2,781,855

38 513.6 6,029,903 67 390.1 2,619,713

39 492.9 6,239,198 68 382.8 2,438,285

40 405.7 3,649,525

Plant Production

Location Gallons

Raw Water In 172,975,797

Filter Water 176,606,691

Finished High Lift 161,810,656

High Lift Return 7,567,623

I-35 Pump Station 154,567,596

Combined Production

Plant Production 161,810,656

Well Production 217,665,971

Total Combined

Production 379,476,627

2012 May

Page 38: Water Resources 2012 Annual Report

Production Ratio

Plant

Well

Volume Comparison

Raw Water In

Filter Water

I-35 Pump Station

Plant Production

Well Production

Well Production

Well Number

Well Hours

Well Gallons

Well Number

Well Hours

Well Gallons

8 284.9 2,899,680 41 363.8 4,275,331

9 417.3 4,983,504 42 375.9 3,016,169

10 175.5 1,465,482 43 420.5 4,281,685

11 332.0 1,883,672 44 457.3 9,382,369

14 346.8 2,259,838 45 61.5 758,887

15 324.8 2,920,401 46 400.0 3,621,090

18 228.1 2,898,039 47 41.5 499,388

19 301.5 2,019,270 48 435.7 4,584,577

20 368.4 3,544,996 49 314.7 3,548,586

21 372.6 2,581,166 50 404.4 4,365,501

22 351.6 2,514,489 51 362.2 3,643,391

23 377.9 2,756,001 52 304.9 1,889,242

24 423.9 3,943,600 53 0.0 0

25 454.4 4,235,803 54 428.1 5,659,481

26 317.0 2,834,727 55 162.6 1,860,478

27 442.7 5,001,411 56 394.2 3,485,198

28 419.6 4,044,065 57 558.8 10,654,892

29 332.8 3,825,619 58 212.9 1,635,710

30 0.0 0 59 313.3 2,529,587

31 72.5 717,186 60 264.4 2,555,553

32 452.0 7,015,987 61 291.8 3,811,575

33 414.8 5,364,481 62 183.4 1,462,375

34 420.0 4,838,307 63 189.1 793,876

35 415.5 3,924,300 64 353.2 3,011,513

36 343.2 3,277,604 65 402.0 2,761,117

37 427.4 3,992,608 66 400.4 2,741,471

38 430.6 5,009,986 67 384.3 2,498,813

39 400.8 5,016,204 68 369.3 2,302,259

40 399.7 3,497,804

Plant Production

Location Gallons

Raw Water In 219,951,129

Filter Water 223,044,424

Finished High Lift 203,618,853

High Lift Return 7,291,852

I-35 Pump Station 199,727,603

Combined Production

Plant Production 203,618,853

Well Production 190,896,345

Total Combined

Production 394,515,198

2012 June

Page 39: Water Resources 2012 Annual Report

Production Ratio

Plant

Well

Volume Comparison

Raw Water In

Filter Water

I-35 Pump Station

Plant Production

Well Production

Well Production

Well Number

Well Hours

Well Gallons

Well Number

Well Hours

Well Gallons

8 706.4 5,647,067 41 638.2 5,857,889

9 670.7 6,465,382 42 667.0 5,054,400

10 438.6 2,877,687 43 686.6 4,324,850

11 578.4 2,492,817 44 663.0 11,494,346

14 563.5 3,188,278 45 363.4 4,273,115

15 687.3 6,210,116 46 656.2 5,157,756

18 499.7 4,704,024 47 514.7 4,522,415

19 538.5 3,299,452 48 644.8 4,875,629

20 638.2 4,766,769 49 574.0 3,086,881

21 708.4 4,524,079 50 696.1 6,516,678

22 629.0 4,754,044 51 670.8 5,622,187

23 656.5 3,994,330 52 621.8 3,095,479

24 698.3 5,523,388 53 0.0 0

25 718.3 6,829,150 54 671.3 8,248,000

26 599.9 5,005,230 55 148.3 1,061,929

27 658.0 6,519,957 56 661.3 5,790,250

28 695.4 6,057,563 57 705.3 12,727,258

29 675.3 5,870,942 58 613.1 4,178,243

30 0.0 0 59 645.0 3,902,701

31 481.3 3,449,225 60 602.6 4,788,894

32 667.5 9,904,852 61 599.0 6,066,404

33 683.4 7,397,653 62 508.1 2,835,725

34 652.1 6,412,838 63 428.7 1,444,753

35 625.5 4,418,282 64 656.6 5,017,783

36 657.8 5,059,534 65 411.0 2,441,865

37 637.9 6,038,281 66 411.7 2,132,678

38 699.4 7,265,221 67 414.4 2,036,923

39 704.6 8,432,268 68 400.0 2,066,266

40 693.6 5,260,268

Plant Production

Location Gallons

Raw Water In 329,191,460

Filter Water 333,756,210

Finished High Lift 308,230,155

High Lift Return 7,850,777

I-35 Pump Station 300,482,303

Combined Production

Plant Production 308,230,155

Well Production 280,989,993

Total Combined

Production 589,220,148

2012 July

Page 40: Water Resources 2012 Annual Report

Production Ratio

Plant

Well

Volume Comparison

Raw Water In

Filter Water

I-35 Pump Station

Plant Production

Well Production

Well Production

Well Number

Well Hours

Well Gallons

Well Number

Well Hours

Well Gallons

8 520.4 3,704,800 41 523.2 4,441,741

9 551.5 4,757,338 42 499.4 3,643,795

10 337.2 1,922,492 43 425.0 1,760,838

11 368.4 1,153,998 44 505.8 7,235,243

14 403.5 2,070,977 45 372.7 4,252,873

15 554.9 4,908,064 46 566.9 4,084,799

18 414.6 3,321,458 47 520.4 4,396,256

19 443.9 2,770,463 48 522.9 3,227,662

20 448.2 2,095,980 49 438.8 2,883,277

21 587.4 3,474,319 50 502.3 4,507,580

22 480.1 3,185,176 51 597.3 4,420,693

23 415.5 2,142,330 52 438.2 2,497,195

24 388.5 2,733,075 53 0.0 0

25 564.8 5,192,390 54 484.0 5,720,987

26 451.7 2,972,036 55 32.7 163,171

27 547.4 4,907,718 56 574.0 4,475,977

28 570.8 4,587,568 57 563.6 9,301,640

29 490.1 3,718,693 58 439.8 2,667,333

30 0.0 0 59 435.4 2,746,996

31 451.0 2,395,792 60 466.2 3,241,941

32 525.1 7,502,782 61 513.8 4,447,685

33 497.4 4,815,572 62 405.5 1,968,358

34 534.4 4,817,572 63 231.4 682,494

35 491.6 2,664,481 64 412.1 3,033,862

36 556.9 3,520,436 65 285.6 1,461,942

37 520.5 4,823,776 66 274.1 1,248,832

38 616.7 6,066,118 67 277.1 1,187,144

39 571.0 6,631,974 68 267.7 1,242,662

40 506.2 3,653,984

Plant Production

Location Gallons

Raw Water In 340,977,740

Filter Water 348,944,763

Finished High Lift 316,233,680

High Lift Return 7,822,521

I-35 Pump Station 285,930,263

Combined Production

Plant Production 316,233,680

Well Production 191,541,319

Total Combined

Production 507,774,999

2012 August

Page 41: Water Resources 2012 Annual Report

Production Ratio

Plant

Well

Volume Comparison

Raw Water In

Filter Water

I-35 Pump Station

Plant Production

Well Production

Well Production

Well Number

Well Hours

Well Gallons

Well Number

Well Hours

Well Gallons

8 441.0 3,601,407 41 390.2 3,877,033

9 337.6 3,507,720 42 265.4 2,015,061

10 167.6 1,256,068 43 333.0 2,332,802

11 290.6 1,563,122 44 471.4 6,334,222

14 264.4 1,656,299 45 110.8 1,362,891

15 395.7 3,607,731 46 380.2 3,081,801

18 217.8 2,345,822 47 208.8 2,065,566

19 290.9 1,803,828 48 461.6 3,631,925

20 216.9 1,239,730 49 242.1 1,570,766

21 431.1 2,682,835 50 498.3 4,638,601

22 316.6 2,538,579 51 537.8 4,788,500

23 288.2 1,822,163 52 252.2 1,102,147

24 411.3 3,639,302 53 0.0 0

25 387.6 3,754,213 54 343.8 4,305,670

26 237.6 1,685,005 55 0.0 0

27 265.0 2,747,012 56 409.8 3,735,066

28 451.0 3,736,962 57 470.9 7,564,768

29 292.8 2,502,661 58 294.9 2,058,341

30 0.0 0 59 396.1 2,561,798

31 511.3 3,601,440 60 303.6 2,670,797

32 519.0 7,569,326 61 240.2 2,467,210

33 392.0 4,263,430 62 133.8 934,143

34 415.8 4,077,790 63 78.9 320,631

35 422.8 2,859,943 64 362.1 2,741,006

36 462.8 3,667,178 65 244.3 1,561,370

37 493.9 4,922,039 66 241.1 1,512,504

38 487.3 4,869,859 67 205.0 1,180,837

39 249.7 2,944,346 68 219.9 1,310,774

40 331.5 2,728,675

Plant Production

Location Gallons

Raw Water In 290,635,776

Filter Water 296,928,684

Finished High Lift 272,416,264

High Lift Return 7,553,354

I-35 Pump Station 263,267,452

Combined Production

Plant Production 272,416,264

Well Production 158,920,712

Total Combined

Production 431,336,976

2012 September

Page 42: Water Resources 2012 Annual Report

Production Ratio

Plant

Well

Volume Comparison

Raw Water In

Filter Water

I-35 Pump Station

Plant Production

Well Production

Well Production

Well Number

Well Hours

Well Gallons

Well Number

Well Hours

Well Gallons

8 260.5 2,589,237 41 273.4 3,194,000

9 321.8 3,866,268 42 259.5 2,248,086

10 212.2 1,682,038 43 287.6 2,869,801

11 124.9 484,827 44 247.0 3,745,938

14 287.3 1,902,751 45 172.1 2,179,717

15 225.7 2,184,947 46 262.6 2,387,752

18 215.0 2,663,334 47 272.6 3,239,278

19 220.3 1,597,970 48 301.3 3,112,865

20 264.2 1,439,448 49 211.7 2,434,249

21 275.5 1,946,538 50 255.5 2,608,167

22 224.6 2,305,347 51 298.2 2,965,582

23 207.1 1,612,861 52 239.8 1,112,048

24 307.0 3,064,937 53 0.0 0

25 267.2 2,678,777 54 296.3 3,930,223

26 259.3 1,862,917 55 0.0 0

27 227.2 2,451,903 56 288.4 2,750,098

28 290.9 2,521,201 57 357.6 6,201,393

29 291.0 2,815,955 58 252.7 1,873,982

30 0.0 0 59 262.1 1,874,087

31 89.8 787,709 60 253.8 2,499,239

32 305.1 4,687,704 61 272.0 3,045,076

33 247.4 3,166,969 62 254.9 1,964,553

34 268.8 3,085,572 63 256.6 870,126

35 161.4 1,594,238 64 278.2 2,335,230

36 264.4 2,482,671 65 325.0 2,253,909

37 323.3 3,317,393 66 320.0 2,219,265

38 317.0 3,463,716 67 310.6 2,027,511

39 288.2 3,431,080 68 280.2 1,854,631

40 281.1 2,801,028

Plant Production

Location Gallons

Raw Water In 221,008,469

Filter Water 224,241,328

Finished High Lift 206,526,621

High Lift Return 6,579,235

I-35 Pump Station 201,669,714

Combined Production

Plant Production 206,526,621

Well Production 136,286,141

Total Combined

Production 342,812,762

2012 October

Page 43: Water Resources 2012 Annual Report

Production Ratio

Plant

Well

Volume Comparison

Raw Water In

Filter Water

I-35 Pump Station

Plant Production

Well Production

Well Production

Well Number

Well Hours

Well Gallons

Well Number

Well Hours

Well Gallons

8 308.4 3,175,010 41 327.7 3,866,147

9 377.3 4,561,711 42 311.9 2,568,783

10 270.9 2,087,224 43 291.2 2,681,651

11 10.3 9,780 44 360.2 5,310,620

14 331.2 2,220,768 45 197.0 2,316,812

15 352.3 3,168,188 46 291.9 2,628,900

18 275.3 3,362,056 47 363.3 4,352,200

19 424.4 2,631,342 48 349.1 3,408,910

20 326.5 1,874,195 49 0.0 0

21 351.8 2,386,748 50 336.4 3,585,945

22 364.3 3,348,981 51 320.6 3,318,462

23 326.2 2,416,705 52 296.5 1,469,590

24 49.4 514,027 53 0.0 0

25 354.0 3,299,824 54 357.2 4,779,966

26 326.1 2,312,179 55 0.0 0

27 282.7 3,120,261 56 264.0 2,373,146

28 364.7 3,375,275 57 413.2 7,345,684

29 333.3 3,305,881 58 192.4 1,444,633

30 0.0 0 59 264.5 1,945,843

31 321.8 2,914,779 60 310.9 2,984,413

32 275.4 4,045,803 61 282.6 3,387,838

33 303.4 3,902,917 62 244.2 1,737,265

34 268.9 3,194,175 63 234.0 834,485

35 302.8 2,617,496 64 248.0 2,059,700

36 302.1 2,822,701 65 444.6 2,943,033

37 0.3 2,784 66 424.9 2,894,216

38 337.1 3,858,579 67 429.2 2,649,407

39 318.5 4,027,671 68 378.0 2,366,816

40 250.3 2,512,640

Plant Production

Location Gallons

Raw Water In 153,999,325

Filter Water 157,926,360

Finished High Lift 146,740,200

High Lift Return 7,370,976

I-35 Pump Station 146,644,875

Combined Production

Plant Production 146,740,200

Well Production 152,324,161

Total Combined

Production 299,064,361

2012 November

Page 44: Water Resources 2012 Annual Report

Production Ratio

Plant

Well

Volume Comparison

Raw Water In

Filter Water

I-35 Pump Station

Plant Production

Well Production

Well Production

Well Number

Well Hours

Well Gallons

Well Number

Well Hours

Well Gallons

8 212.7 2,329,237 41 223.8 2,763,513

9 229.8 2,860,867 42 210.5 1,787,338

10 141.8 1,187,296 43 213.6 2,261,124

11 246.2 2,812,835 44 275.7 4,133,566

14 224.4 1,540,847 45 76.5 899,099

15 212.7 1,911,969 46 205.1 1,879,846

18 227.7 2,724,393 47 191.5 2,393,808

19 200.0 1,240,062 48 194.7 2,216,933

20 257.3 1,549,540 49 191.5 1,773,438

21 206.7 1,505,912 50 269.6 2,952,162

22 211.1 2,048,589 51 300.8 3,222,608

23 0.0 0 52 165.4 851,285

24 0.0 0 53 136.5 1,352,527

25 248.6 2,317,010 54 246.7 3,414,327

26 171.0 1,236,455 55 0.0 0

27 171.2 2,001,511 56 205.6 1,848,561

28 273.6 2,587,939 57 354.1 6,335,885

29 259.7 2,806,327 58 212.8 1,664,566

30 0.0 0 59 265.8 2,045,558

31 234.0 2,214,696 60 188.5 1,903,138

32 432.0 1,908,222 61 267.4 3,450,988

33 157.1 2,261,789 62 224.8 1,930,887

34 245.2 2,941,713 63 218.1 872,895

35 254.7 2,269,455 64 164.5 1,451,428

36 318.8 3,252,102 65 281.5 1,818,901

37 395.7 4,836,298 66 279.7 1,938,238

38 407.4 4,736,217 67 303.6 2,016,217

39 216.4 2,791,538 68 266.4 1,731,134

40 278.0 3,082,182

Plant Production

Location Gallons

Raw Water In 137,084,561

Filter Water 140,446,643

Finished High Lift 132,912,783

High Lift Return 7,785,737

I-35 Pump Station 126,114,328

Combined Production

Plant Production 132,912,783

Well Production 123,864,967

Total Combined

Production 256,777,750

2012 December

Page 45: Water Resources 2012 Annual Report

0

10

20

30

2008

2009

2010

2011

2012

(In Million Gallons) 2008 2009 2010 2011 2012

January 8.6 9.4 8.8 10.7 8.7

February 8.8 9.3 8 8.5 8.1

March 9.4 13.1 8.7 12.9 11.4

April 11.5 12.1 11.3 17 14.6

May 17.9 15.3 14.3 15.3 14.8

June 16 21.9 15.6 20.8 18.2

July 20 22.1 18.7 21.4 22.1

August 19.3 14.8 21.2 18.7 20.0

September 14.6 13.6 16.8 19 18.5

October 13.8 12.3 14.3 15.2 12.4

November 11.5 9.9 11.6 10.7 11.6

December 8.5 8.3 8.3 8.1 10.9

Maximum for Year 20 22.1 21.2 21.4 22.1

Page 46: Water Resources 2012 Annual Report

Gallons

2008

2009

2010

2011

2012

Year Gallons

2008 9,615,269

2009 10,222,949

2010 10,037,612

2011 10,640,288

2012 11,220,194

Page 47: Water Resources 2012 Annual Report

2008

2009

2010

2011

2012

2008 2009 2010 2011 2012

January 227,818,326 247,099,203 231,379,703 238,467,052 227,125,859

February 206,858,841 220,702,093 196,704,229 213,280,325 199,393,891

March 234,995,338 271,659,510 224,823,016 289,504,682 256,773,352

April 270,402,451 268,114,401 268,084,414 395,199,013 282,334,297

May 337,769,620 298,728,904 320,241,559 350,232,135 371,983,004

June 369,250,886 464,588,571 378,065,627 490,588,502 387,360,346

July 490,027,084 519,372,452 426,087,931 616,258,331 581,463,371

August 411,209,086 341,873,465 589,010,114 566,350,001 521,219,478

September 342,338,248 292,817,152 381,986,152 453,838,469 457,337,622

October 328,675,500 265,614,868 368,567,360 354,923,923 336,315,527

November 267,666,192 247,705,860 270,525,873 246,860,056 291,773,385

December 236,087,915 225,451,749 228,426,212 212,704,213 249,064,013

Page 48: Water Resources 2012 Annual Report

35

35

ArcadiaLake

Covell Rd

Danforth Rd

Edmond Rd

15th St

33rd St

Memorial Rd

Coffee Creek Rd

Sorghum Mill Rd

Ande

rson R

d

Weste

rn Av

e

Santa

Fe Av

e

Kelly

Ave

Broa

dway

Brya

nt Av

e

Coltra

ne R

d

Soon

er Rd

Air D

epot

Blvd

Midw

est B

lvd

Doug

las Bl

vd

Post

Rd

Westm

inster

Rd

PS

PS

PS

PS

PS

PS

PS

PS

NW Complex

Danforth Complex

33rd StreetComplex

BF

College Complex

I-35 Complex

Post RoadComplex

Arcadia LakeWTP

2nd StreetBooster

Arcadia

0 1 20.5 Miles

City of Edmond Water System

January 14, 2009

The City of Edmond disclaims any warranty or merchantability or warranty for fitness of use for a particular purpose, expressed or implied, with respect to this data. Furthermore, the City of Edmond disclaims any responsibility for the accuracy or completeness of this data.

Transmission Line (Edmond Water)Distribution Lines

Transmission Line (OKC Water)Transmission Line (OKC Owned)

Elevated Storage Tank

Ground Storage Tank Water Well

BF Breakpoint FacilityPS Pumping Station

Page 49: Water Resources 2012 Annual Report

DANFORTHWATER TOWER COMPLEX COLLEGE TOWER COMPLEX

CLEARWELL CAPACITY 2.0 MG CLEARWELL CAPACITY 2.0 MG

CLEARWELL DIAMETER 146'-0" CLEARWELL DIAMETER 88' 10" Inside Dia.

CLEARWELL DEPTH 17'-0" CLEARWELL DEPTH 42' 7.5" Liquid Depth

TOWER CAPACITY 0.5 MG TOWER CAPACITY 0.5 MG

OVERFLOW 1340 OVERFLOW 1340

GPM 1500 each GPM 650 each

HORSEPOWER 2 each at 75 HORSEPOWER 2 each at 60

Chlorination provided to ground storage. Chlorination provided to ground storage.

Notes: Continuous monitoring provided. Notes: Continuous monitoring provided.

PLANT HIGH LIFT PUMP STATION NORTHWEST COMPLEX

CLEARWELL CAPACITY 2 each at 4.0 MG CLEARWELL CAPACITY 2.0 MG

CLEARWELL DIAMETER 180' CLEARWELL DIAMETER 125' Inside Diameter

CLEARWELL DEPTH 20' CLEARWELL DEPTH 22' 6" Liquid Depth

POST RD TOWER CAPACITY 0.5 MG NUM. OF PUMP UNITS 4

OVERFLOW 1240 GPM 2 at 3,000; 2 at 5,000

NUMBER OF UNITS 4 HORSEPOWER 2 at 300; 2 at 450

GPM 2 at 2,800; 2 at 5,560 I-35 BOOSTER PUMP STATION

HORSEPOWER 2 at 250; 2 at 500 CLEARWELL CAPACITY 1.0 MG

Notes: Continuous monitoring provided and required. CLEARWELL DIAMETER 94" Inside Diameter

33RD STREET WATER TOWER COMPLEX CLEARWELL DEPTH 19' Liquid Depth

CLEARWELL CAPACITY 2.0 MG SHORT TOWER CAPACITY 0.5 MG

CLEARWELL DIAMETER 146' 0" OVERFLOW 1240

CLEARWELL DEPTH 17' 0" TALL TOWER CAPACITY 0.5 MG

TOWER CAPACITY 0.5 MG OVERFLOW 1336

OVERFLOW 1340 GPM 2 at 1,530; 2 at 2,800; 2 at 6,000

GPM 2 at 1800 each HORSEPOWER 2 at 125; 2 at 250; 2 at 400

HORSEPOWER 2 each at 100 15TH STREET BOOSTER PUMP STATION

Chlorination provided to ground storage. NUMBER OF UNITS 3

Notes: Continuous monitoring provided. GPM DESIGN CAPACITY 300 GPM

2ND STREET BOOSTER PUMP STATION HORSEPOWER 7.5 HP

NUMBER OF UNITS 3 PLANT LOW LIFT PUMP STATION

GPM DESIGN CAPACITY 2,000 GPM each GPM 1 at 2,800; 4 at 2,080

HORSEPOWER 3 each at 125 HORSEPOWER 50 each

Page 50: Water Resources 2012 Annual Report

Water Tower Heights

Location Feet PSI

College 115 50.945

Danforth 155 68.665

33rd St 155 68.665

I-35 Tall 218 96.574

I-35 Short 124 54.932

Post Rd 159 70.437

Page 51: Water Resources 2012 Annual Report
Page 52: Water Resources 2012 Annual Report

35

35

ArcadiaLake

Water Treatment Plant

Covell Rd

Danforth Rd

Edmond Rd

15th St

33rd St

Memorial Rd

Coffee Creek Rd

Sorghum Mill Rd

Waterloo Rd

Weste

rn Av

e

Santa

Fe Av

e

Kelly

Ave

Broa

dway

Brya

nt Av

e

Coltra

ne R

d

Soon

er Rd

Air D

epot

Blvd

Midw

est B

lvd

Doug

las Bl

vd

Post

Rd

Westm

inster

Rd

646362

606159

58

57

44

0904

35

3332

2356

54

47

3031

22 36

16 17

2829

1410

46

18

48

5551

42

43

19

15

371221

38

26

40

39

3450

45

41 20

52 4953

0327

25

24 11

0608

6665

6867

Water Well Locations

0 1 20.5 Miles LegendWater Treatment PlantWater WellCity LimitsRailroadStreets

January 14, 2009

City of Edmond

The City of Edmond disclaims any warranty or merchantability or warranty for fitness of use for a particular purpose, expressed or implied, with respect to this data. Furthermore, the City of Edmond disclaims any responsibility for the accuracy or completeness of this data.

Page 53: Water Resources 2012 Annual Report

35

35

ArcadiaLake

Covell Rd

Danforth Rd

Edmond Rd

15th St

33rd St

Memorial Rd

Coffee Creek Rd

Sorghum Mill Rd

Waterloo Rd

Weste

rn Av

e

Santa

Fe Av

e

Kelly

Ave

Broa

dway

Brya

nt Av

e

Coltra

ne R

d

Soon

er Rd

Air D

epot

Blvd

Midw

est B

lvd

Doug

las Bl

vd

Post

Rd

Westm

inster

Rd

A

B

C

DE

Water Well Zones

0 1 20.5 MilesLegend

City LimitsRailroadStreets

January 14, 2009

City of Edmond

The City of Edmond disclaims any warranty or merchantability or warranty for fitness of use for a particular purpose, expressed or implied, with respect to this data. Furthermore, the City of Edmond disclaims any responsibility for the accuracy or completeness of this data.

Water Well Zone AWater Well Zone BWater Well Zone CWater Well Zone DWater Well Zone E

Page 54: Water Resources 2012 Annual Report

109 E 5th St WELL STATISTICS

Date Drilled 1952

Flow (GPM) 120

Latitude/Longitude 35.65 / -97.48

Elevation 1190'

Total Depth 650'

Top Perforations 252'

Lower Perforations 442'

Pump Set 540'

Method of Drilling Cable Tool

Driller Rouner

Number of Joints

Size of Casing 10.75"

Size of Pump Columns 4"

PVC/Steel Pump 140'steel, 400'certilock

General Condition Good

EQUIPMENT

Electrical Controls ABB Variable

Pump Christiansen

Stages 6 inch 8 stage

Motor Franklin

Horsepower 50 HP

Pump Install Date 1992

Work Performed 2012: Pulled pump and motor, video, did down hole cleaning of the casing and performed 48 hour pump test. Ordered new equipment.

Recommendations for 2013: Installed new pump and motor and rehabilitated well head. Performed routine maintenance

MONTH GALLONS

January 2,124,017

February 743,446

March 1,381,545

April 2,250,779

May 1,052,876

June 2,972,845

July 4,028,457

August 2,986,247

September 2,807,298

October 1,613,018

November 1,494,880

December 1,110,866

Page 55: Water Resources 2012 Annual Report

37 W 8th St WELL STATISTICS

Date Drilled 1954

Flow (GPM) 170

Latitude/Longitude 35.65 / -97.48

Elevation 1188'

Total Depth 554'

Top Perforations 228'

Lower Perforations 425'

Pump Set 527'

Method of Drilling Cable Tool

Driller Statts

Number of Joints

Size of Casing 10.75"

Size of Pump Columns 4"

PVC/Steel Pump 126' Steel, 400' PVC

General Condition Good

EQUIPMENT

Electrical Controls ABB/VFD

Pump Christiansen

Stages 8 stage

Motor Franklin

Horsepower 50 HP

Pump Install Date 2008

Work Performed 2012: Performed routine maintenance

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 3,398,111

February 1,798,604

March 0

April 236,875

May 3,352,978

June 5,413,485

July 6,277,420

August 5,598,304

September 5,276,452

October 2,873,284

November 1,602,426

December 3,301,691

Page 56: Water Resources 2012 Annual Report

326 N Baumann Ave WELL STATISTICS

Date Drilled 1957

Flow (GPM) 171

Latitude/Longitude 35.66 / -97.47

Elevation 1224'

Total Depth 719'

Top Perforations 317'

Lower Perforations 713'

Pump Set 580'

Method of Drilling Cable Tool

Driller Rouner

Number of Joints 27

Size of Casing 10.75"

Size of Pump Columns 5.5"

PVC/Steel Pump

General Condition Good

EQUIPMENT

Electrical Controls ABB/VFD

Pump Christiansen

Stages 7walc/6 stage

Motor Centripro

Horsepower 40 HP

Pump Install Date 2009

Work Performed 2012: Performed routine maintenance

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 1,573,424

February 1,484,530

March 3,122,182

April 2,409,014

May 974,877

June 2,190,196

July 3,403,603

August 2,429,443

September 1,978,504

October 811,930

November 582,743

December 1,219,730

Page 57: Water Resources 2012 Annual Report

1335 S Broadway WELL STATISTICS

Date Drilled 1964

Flow (GPM) 190

Latitude/Longitude 35.64 / -97.48

Elevation 1183'

Total Depth 724'

Top Perforations 355'

Lower Perforations 722'

Pump Set 622.4

Method of Drilling Cable Tool

Driller Rouner

Number of Joints 36

Size of Casing 10.75"

Size of Pump Columns 5.5"

PVC/Steel Pump 29joints pvc 2joints steel

General Condition Good

EQUIPMENT

Electrical Controls ABB

Pump Christiansen

Stages 6CHC 10stage

Motor Franklin

Horsepower 40 HP

Pump Install Date 2012

Work Performed 2012: Motor failed, pulled well and replaced pump and motor, returned to service and performed routine maintenance

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 2,789,357

February 1,643,268

March 4,766,269

April 4,340,380

May 2,703,097

June 3,945,889

July 6,815,952

August 1,048,944

September 0

October 0

November 947,365

December 1,153,412

Page 58: Water Resources 2012 Annual Report

17 N Bryant Ave WELL STATISTICS

Date Drilled 1969

Flow (GPM) 119

Latitude/Longitude 35.65 / -97.46

Elevation 1188'

Total Depth 747'

Top Perforations 355'

Lower Perforations 694'

Pump Set 619.5

Method of Drilling Cable Tool

Driller Statts

Number of Joints

Size of Casing 10.75"

Size of Pump Columns 4"

PVC/Steel Pump 21joints pvc 10 steel

General Condition Fair

EQUIPMENT

Electrical Controls ABB/VFD

Pump Christiansen

Stages 7 stage

Motor Franklin

Horsepower 40 HP

Pump Install Date 2011

Work Performed 2012: Replaced variable Frequency drive, performed routine maintenance

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 216,137

February 0

March 0

April 181,000

May 1,564,283

June 2,473,801

July 3,404,604

August 2,956,999

September 1,113,539

October 1,459,580

November 1,080,972

December 1,279,653

Page 59: Water Resources 2012 Annual Report

2335 S Rankin St WELL STATISTICS

Date Drilled 1967

Flow (GPM) 170

Latitude/Longitude 35.63 / -97.47

Elevation 1187'

Total Depth 775'

Top Perforations 281'

Lower Perforations 766'

Pump Set 660'

Method of Drilling Cable Tool

Driller Statts

Number of Joints 33

Size of Casing 10.75"

Size of Pump Columns 5.5"

PVC/Steel Pump

General Condition Good

EQUIPMENT

Electrical Controls ABB/VFD

Pump Centrilift

Stages 7 stage

Motor PSM

Horsepower 60 HP

Pump Install Date

Work Performed 2012: Rehabilitated the well head, painted interior walls, painted the floor and performed routine maintenance

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 2,104,829

February 2,592,730

March 3,422,620

April 3,349,623

May 2,552,748

June 4,660,384

July 6,236,640

August 3,494,878

September 740,212

October 2,922,631

November 1,241,531

December 1,241,597

Page 60: Water Resources 2012 Annual Report

817 E 2nd St WELL STATISTICS

Date Drilled 1979

Flow (GPM) 173

Latitude/Longitude 35.65 / -97.47

Elevation 1180'

Total Depth 684'

Top Perforations 291'

Lower Perforations 662'

Pump Set 614'

Method of Drilling Cable Tool

Driller Statts

Number of Joints

Size of Casing 10.75"

Size of Pump Columns 4"

PVC/Steel Pump 25joints pvc 10 steel

General Condition Good

EQUIPMENT

Electrical Controls Benshaw Softstart

Pump Christiansen

Stages 8 stage

Motor Franklin

Horsepower 50/3450

Pump Install Date 2011

Work Performed 2012: Performed routine maintenance

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 1,980,117

February 1,792,202

March 1,188,829

April 1,522,563

May 1,909,741

June 3,610,369

July 4,903,467

August 3,856,120

September 2,649,108

October 1,352,976

November 980,298

December 1,749,890

Page 61: Water Resources 2012 Annual Report

916 E 15th St WELL STATISTICS

Date Drilled 1971

Flow (GPM) 120

Latitude/Longitude 35.64 / -97.47

Elevation 1150'

Total Depth 689'

Top Perforations 230'

Lower Perforations 669'

Pump Set 620'

Method of Drilling Cable Tool

Driller Statts

Number of Joints 30

Size of Casing 10.75"

Size of Pump Columns 5.5"

PVC/Steel Pump

General Condition Good

EQUIPMENT

Electrical Controls ABB

Pump Christensen/6CLC

Stages 16st/4.19 impellar

Motor Franklin

Horsepower 60 HP/3450

Pump Install Date 2010

Work Performed 2012: Performed routine maintenance

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 1,590,266

February 1,996,483

March 2,516,622

April 2,599,660

May 1,660,789

June 3,752,868

July 4,903,723

August 4,471,759

September 3,464,714

October 1,650,849

November 1,316,792

December 1,347,725

Page 62: Water Resources 2012 Annual Report

580 N Kelly Ave WELL STATISTICS

Date Drilled 1972

Flow (GPM) 135

Latitude/Longitude 35.66 / -97.49

Elevation 1170'

Total Depth 635'

Top Perforations 109'

Lower Perforations 630'

Pump Set 550'

Method of Drilling Cable Tool

Driller Statts

Number of Joints 27

Size of Casing 10.75"

Size of Pump Columns 5.5"

PVC/Steel Pump

General Condition Good

EQUIPMENT

Electrical Controls ABB VFD

Pump Centrilift

Stages 14 stage

Motor Centrilift

Horsepower 40 HP

Pump Install Date

Work Performed 2012: Performed routine maintenance

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 1,570,712

February 679,575

March 2,596,632

April 2,597,175

May 1,735,699

June 2,084,963

July 3,849,900

August 2,953,388

September 2,024,079

October 709,801

November 629,348

December 968,458

Page 63: Water Resources 2012 Annual Report

3308 S Kelly Ave WELL STATISTICS

Date Drilled 1972

Flow (GPM) 160

Latitude/Longitude 35.62 / -97.49

Elevation 1165'

Total Depth 705'

Top Perforations 240'

Lower Perforations

Pump Set 567'

Method of Drilling Cable Tool

Driller Statts

Number of Joints 29

Size of Casing 10.75"

Size of Pump Columns 5.5"

PVC/Steel Pump

General Condition Good

EQUIPMENT

Electrical Controls ABB/DRIVE

Pump Christenson

Stages 8 stage

Motor Centripro

Horsepower 30 HP

Pump Install Date 2008

Work Performed 2012: Performed routine maintenance

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 1,777,384

February 2,520,850

March 2,918,553

April 2,719,115

May 2,248,063

June 3,536,969

July 4,300,721

August 3,822,808

September 2,560,253

October 2,216,209

November 1,581,843

December 2,089,310

Page 64: Water Resources 2012 Annual Report

840 S Bryant Ave WELL STATISTICS

Date Drilled 1972

Flow (GPM) 175

Latitude/Longitude 35.64 / -97.46

Elevation 1100'

Total Depth 650'

Top Perforations 130'

Lower Perforations 585'

Pump Set 602'

Method of Drilling Cable Tool

Driller Statts

Number of Joints 28

Size of Casing 10.75"

Size of Pump Columns 5.5"

PVC/Steel Pump

General Condition Good

EQUIPMENT

Electrical Controls ABB/VFD

Pump PSM

Stages 13 stage

Motor PSM

Horsepower 45 HP

Pump Install Date

Work Performed 2012: Performed routine maintenance

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 2,738,553

February 1,510,418

March 3,970,290

April 3,558,568

May 1,192,510

June 1,985,941

July 2,466,949

August 1,206,568

September 69,398

October 0

November 0

December 0

Page 65: Water Resources 2012 Annual Report

2016 E 33rd St WELL STATISTICS

Date Drilled 1973

Flow (GPM) 210

Latitude/Longitude 35.62 / -97.45

Elevation 1145'

Total Depth 698'

Top Perforations 114'

Lower Perforations 690'

Pump Set 623'

Method of Drilling Cable Tool

Driller Statts

Number of Joints 27

Size of Casing 10.75"

Size of Pump Columns 5.5"

PVC/Steel Pump

General Condition Good

EQUIPMENT

Electrical Controls ABB/VFD

Pump Centrilift

Stages 13 stage

Motor Centrilift

Horsepower 46 HP

Pump Install Date

Work Performed 2012: Pulled pump and motor and replaced, painted interior walls and rehabilitated the well head

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 2,065,396

February 2,585,191

March 2,048,240

April 3,289,274

May 1,691,975

June 3,694,488

July 3,987,368

August 3,103,745

September 2,088,886

October 1,080,698

November 1,429,851

December 2,782,034

Page 66: Water Resources 2012 Annual Report

1309 S Kelly Ave WELL STATISTICS

Date Drilled 1973

Flow (GPM) 210

Latitude/Longitude 35.64 / -97.49

Elevation 1150'

Total Depth 604'

Top Perforations 114'

Lower Perforations 604'

Pump Set 540'

Method of Drilling Cable Tool

Driller Statts

Number of Joints

Size of Casing 10.75"

Size of Pump Columns 5.5"

PVC/Steel Pump

General Condition Good

EQUIPMENT

Electrical Controls ABB/VFD

Pump PSM

Stages 22 stage

Motor PSM

Horsepower 60 HP

Pump Install Date

Work Performed 2012: Pulled pump and motor for repair, repaired damaged surface casing, replaced well head, painted interior of well house

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 3,011,693

February 2,807,644

March 3,775,508

April 3,901,510

May 2,213,980

June 5,546,053

July 5,369,808

August 4,567,811

September 3,079,309

October 2,499,303

November 3,354,310

December 2,600,840

Page 67: Water Resources 2012 Annual Report

2400 S Kelly Ave WELL STATISTICS

Date Drilled 1975

Flow (GPM) 230

Latitude/Longitude 35.63 / -97.49

Elevation 1150'

Total Depth 705'

Top Perforations 356'

Lower Perforations 680'

Pump Set 483'

Method of Drilling Cable Tool

Driller Statts

Number of Joints

Size of Casing 10.75"

Size of Pump Columns 5.5"

PVC/Steel Pump

General Condition Good

EQUIPMENT

Electrical Controls ABB/VFD

Pump Centrilift

Stages 6 stage

Motor Centrilift

Horsepower 57 HP/3600

Pump Install Date

Work Performed 2012: Painted interior walls and Performed routine maintenance

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 3,246,226

February 3,283,219

March 4,011,070

April 4,497,968

May 2,479,328

June 5,015,240

July 6,504,242

August 6,186,987

September 5,206,716

October 3,320,602

November 3,174,849

December 2,146,941

Page 68: Water Resources 2012 Annual Report

4116 N Santa Fe Ave WELL STATISTICS

Date Drilled 1977

Flow (GPM) 150

Latitude/Longitude 35.69 / -97.51

Elevation 1055'

Total Depth 475'

Top Perforations 154'

Lower Perforations 398'

Pump Set 361'

Method of Drilling Cable Tool

Driller Statts

Number of Joints 17

Size of Casing 10.75"

Size of Pump Columns 5.5"

PVC/Steel Pump

General Condition Good

EQUIPMENT

Electrical Controls ABB

Pump Centrilift

Stages 19 stage

Motor Centrilift

Horsepower 50 HP

Pump Install Date

Work Performed 2012: Performed routine maintenance

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 801,450

February 438,432

March 2,363,940

April 2,252,205

May 674,932

June 764,871

July 4,392,146

August 691,901

September 0

October 0

November 0

December 0

Page 69: Water Resources 2012 Annual Report

216 S Fretz Ave WELL STATISTICS

Date Drilled 1978

Flow (GPM) 210

Latitude/Longitude 35.65 / -97.49

Elevation 1190'

Total Depth 710'

Top Perforations 200'

Lower Perforations 585'

Pump Set 550'

Method of Drilling Cable Tool

Driller Statts

Number of Joints 27

Size of Casing 10.75"

Size of Pump Columns 5.5"

PVC/Steel Pump

General Condition Good

EQUIPMENT

Electrical Controls ABB/VFD

Pump PSM

Stages 8 stage

Motor PSM

Horsepower 60 HP

Pump Install Date

Work Performed 2012: Performed routine maintenance

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 1,067,447

February 1,549,067

March 4,068,907

April 4,794,932

May 2,905,001

June 4,516,244

July 6,540,993

August 6,070,814

September 4,676,681

October 2,005,685

November 2,048,637

December 2,874,518

Page 70: Water Resources 2012 Annual Report

1932 N Boulevard WELL STATISTICS

Date Drilled 1977

Flow (GPM) 180

Latitude/Longitude 35.67 / -97.48

Elevation 1150'

Total Depth 478'

Top Perforations 235'

Lower Perforations 406'

Pump Set 391

Method of Drilling Cable Tool

Driller Sequoyah

Number of Joints

Size of Casing 10.75"

Size of Pump Columns 4"

PVC/Steel Pump 19joints pvc

General Condition Good

EQUIPMENT

Electrical Controls ABB

Pump Christiansen

Stages 7stage

Motor Franklin

Horsepower 40 hp

Pump Install Date 2011

Work Performed 2012: Performed routine maintenance

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 3,449,801

February 1,642,397

March 3,829,094

April 879,280

May 0

June 0

July 0

August 0

September 2,008,705

October 2,081,962

November 1,643,243

December 1,320,775

Page 71: Water Resources 2012 Annual Report

2301 N Bryant Ave WELL STATISTICS

Date Drilled 1978

Flow (GPM) 210

Latitude/Longitude 35.68 / -97.46

Elevation 1140'

Total Depth 532'

Top Perforations 186'

Lower Perforations 464'

Pump Set 420'

Method of Drilling Cable Tool

Driller Statts

Number of Joints 20

Size of Casing 10.75"

Size of Pump Columns 5.5"

PVC/Steel Pump

General Condition Good

EQUIPMENT

Electrical Controls ABB/VFD

Pump Christensen

Stages 9st/6CHC

Motor Franklin

Horsepower 50 HP/3450

Pump Install Date 2009

Work Performed 2012: Performed routine maintenance

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 4,572,601

February 2,165,956

March 6,086,573

April 5,070,024

May 2,668,149

June 5,000,332

July 6,563,898

August 4,203,973

September 3,858,659

October 2,547,388

November 1,959,435

December 3,990,322

Page 72: Water Resources 2012 Annual Report

2201 E 15th St WELL STATISTICS

Date Drilled 1978

Flow (GPM) 166

Latitude/Longitude 35.64 / -97.45

Elevation 1100'

Total Depth 715'

Top Perforations 250'

Lower Perforations 695'

Pump Set 525'

Method of Drilling Cable Tool

Driller Statts

Number of Joints

Size of Casing 10.75"

Size of Pump Columns 5.5"

PVC/Steel Pump

General Condition Good

EQUIPMENT

Electrical Controls ABB/VFD

Pump PSM

Stages 7 stage

Motor PSM

Horsepower 60 HP

Pump Install Date

Work Performed 2012: Rehabilitated the well head, painted interior walls, and performed routine maintenance

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 2,530,261

February 1,424,670

March 2,622,677

April 3,196,001

May 2,717,120

June 3,530,688

July 4,620,718

August 2,834,892

September 1,536,544

October 2,147,880

November 1,821,387

December 1,842,297

Page 73: Water Resources 2012 Annual Report

3740 E 40th St WELL STATISTICS

Date Drilled 1978

Flow (GPM) 285

Latitude/Longitude 35.62 / -97.43

Elevation 1120'

Total Depth 705'

Top Perforations 193'

Lower Perforations 632'

Pump Set 588'

Method of Drilling Cable Tool

Driller Statts

Number of Joints

Size of Casing 10.75"

Size of Pump Columns 5.5"

PVC/Steel Pump

General Condition Good

EQUIPMENT

Electrical Controls ABB/VFD

Pump Centrilift

Stages

Motor Centrilift

Horsepower 100 HP

Pump Install Date

Work Performed 2012: Pulled pump and motor, video, did down hole cleaning of the casing and performed 48 hour pump test. Ordered new equipment.

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 4,118,518

February 3,781,949

March 5,951,983

April 5,572,141

May 4,314,520

June 7,715,281

July 10,705,672

August 10,163,806

September 8,155,361

October 5,684,927

November 2,857,395

December 3,099,325

Page 74: Water Resources 2012 Annual Report

3650 S Coltrane Rd WELL STATISTICS

Date Drilled 1978

Flow (GPM) 160

Latitude/Longitude 35.62 / -97.44

Elevation 1140'

Total Depth 700'

Top Perforations 212'

Lower Perforations 560'

Pump Set 462'

Method of Drilling Cable Tool

Driller Statts

Number of Joints

Size of Casing 10.75"

Size of Pump Columns 5.5"

PVC/Steel Pump

General Condition Good

EQUIPMENT

Electrical Controls ABB/VFD

Pump Christiansen

Stages 5 stage

Motor Franklin

Horsepower 50hp

Pump Install Date 2011

Work Performed 2012: Performed routine maintenance

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 0

February 0

March 0

April 1,138,139

May 3,869,391

June 4,700,944

July 7,491,992

August 6,127,097

September 4,168,220

October 2,957,483

November 2,563,661

December 3,910,962

Page 75: Water Resources 2012 Annual Report

941 S Santa Fe Ave WELL STATISTICS

Date Drilled 1978

Flow (GPM) 300

Latitude/Longitude 35.64 / -97.51

Elevation 1125'

Total Depth 527'

Top Perforations 110'

Lower Perforations 472'

Pump Set 407'

Method of Drilling Cable Tool

Driller Statts

Number of Joints

Size of Casing 10.75"

Size of Pump Columns 5.5"

PVC/Steel Pump 407' 4" PVC

General Condition Good

EQUIPMENT

Electrical Controls ABB/VFD

Pump Christensen

Stages 5st/7WAHC

Motor Franklin

Horsepower 50 HP/3450

Pump Install Date 2009

Work Performed 2012: Performed routine maintenance

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 3,633,518

February 2,131,679

March 5,346,840

April 4,810,517

May 3,296,860

June 7,791,024

July 8,040,577

August 5,814,596

September 4,778,630

October 2,381,549

November 2,985,604

December 1,320,156

Page 76: Water Resources 2012 Annual Report

3809 E 15th St WELL STATISTICS

Date Drilled 1978

Flow (GPM) 185

Latitude/Longitude 35.64 / -97.43

Elevation 1100'

Total Depth 625'

Top Perforations 198'

Lower Perforations 518'

Pump Set 475'

Method of Drilling Cable Tool

Driller Statts

Number of Joints 19

Size of Casing 10.75"

Size of Pump Columns 5.5"

PVC/Steel Pump

General Condition Good

EQUIPMENT

Electrical Controls VFD

Pump Christensen

Stages 7 stage

Motor Centripro

Horsepower 50 HP

Pump Install Date 2008

Work Performed 2012: Rehabilitated well head, painted interior walls and performed routine maintenance

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 3,415,285

February 1,473,649

March 3,800,924

April 3,301,217

May 2,947,705

June 3,921,200

July 4,462,726

August 2,736,764

September 2,278,996

October 1,667,797

November 1,680,362

December 1,888,052

Page 77: Water Resources 2012 Annual Report

906 S Bryant Ave WELL STATISTICS

Date Drilled 1979

Flow (GPM) 200

Latitude/Longitude 35.64 / -97.45

Elevation 1100'

Total Depth 599'

Top Perforations 132'

Lower Perforations 595'

Pump Set 446'

Method of Drilling Cable Tool

Driller Statts

Number of Joints 24

Size of Casing 10.75"

Size of Pump Columns 5.5"

PVC/Steel Pump

General Condition Good

EQUIPMENT

Electrical Controls ABB/DRIVE

Pump 7WAHC

Stages 6 stage

Motor Franklin

Horsepower 60 HP

Pump Install Date 2007

Work Performed 2012: Performed routine maintenance

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 3,650,691

February 470,750

March 4,083,385

April 4,369,188

May 2,875,545

June 4,209,400

July 5,592,311

August 4,668,265

September 3,504,837

October 2,330,527

November 384,454

December 2,132,683

Page 78: Water Resources 2012 Annual Report

3840 S Broadway WELL STATISTICS

Date Drilled 1979

Flow (GPM) 200

Latitude/Longitude 35.62 / -97.49

Elevation 1160'

Total Depth 700'

Top Perforations 192'

Lower Perforations 694'

Pump Set 599'

Method of Drilling Cable Tool

Driller Statts

Number of Joints 29

Size of Casing 10.75"

Size of Pump Columns 5.5"

PVC/Steel Pump

General Condition Excellent

EQUIPMENT

Electrical Controls ABB/VFD

Pump Christensen

Stages 14st/6CLC

Motor Franklin

Horsepower 50 HP/3450

Pump Install Date 2010

Work Performed 2012: Rehabilitated well head, painted interior walls and performed routine maintenance

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 3,327,061

February 4,339,502

March 3,956,886

April 4,818,797

May 2,879,325

June 6,098,456

July 7,641,820

August 7,044,597

September 6,738,347

October 4,999,879

November 3,961,308

December 4,125,386

Page 79: Water Resources 2012 Annual Report

4016 S Kelly Ave WELL STATISTICS

Date Drilled 1980

Flow (GPM) 175

Latitude/Longitude 35.62 / -97.49

Elevation 1160'

Total Depth 797'

Top Perforations 116'

Lower Perforations 772'

Pump Set 636'

Method of Drilling Cable Tool

Driller Statts

Number of Joints 30

Size of Casing 10.75"

Size of Pump Columns 5.5"

PVC/Steel Pump

General Condition Good

EQUIPMENT

Electrical Controls ABB/VFD

Pump 7WAHC

Stages 6 stage

Motor Franklin

Horsepower 60 HP

Pump Install Date 2009

Work Performed 2012: Painted interior walls and Performed routine maintenance

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 4,405,127

February 5,310,473

March 5,427,010

April 5,572,441

May 3,313,111

June 7,490,397

July 7,625,716

August 6,904,520

September 6,222,072

October 4,950,667

November 4,835,795

December 4,289,197

Page 80: Water Resources 2012 Annual Report

2337 W 15th St WELL STATISTICS

Date Drilled 1980

Flow (GPM) 200

Latitude/Longitude 35.64 / -97.51

Elevation 1125'

Total Depth 515'

Top Perforations 182'

Lower Perforations 460'

Pump Set 404'

Method of Drilling Cable Tool

Driller Statts

Number of Joints 18

Size of Casing 10.75"

Size of Pump Columns 5.5"

PVC/Steel Pump 420' PVC

General Condition Good

EQUIPMENT

Electrical Controls Square D

Pump Christensen

Stages 6 stage

Motor Centripro

Horsepower 40 HP

Pump Install Date 2010

Work Performed 2012: Rehabilitated well head, painted interior walls and painted floor. performed routine maintenance

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 2,087,912

February 1,281,058

March 4,425,189

April 4,738,699

May 2,971,764

June 4,360,991

July 8,779,210

August 7,992,884

September 3,693,602

October 2,346,239

November 1,133,983

December 1,455,246

Page 81: Water Resources 2012 Annual Report

1045 W Waterloo Rd WELL STATISTICS

Date Drilled 1980

Flow (GPM) 185

Latitude/Longitude 34.72 / -97.5

Elevation 1080'

Total Depth 465'

Top Perforations 160'

Lower Perforations 437'

Pump Set 340'

Method of Drilling Cable Tool

Driller Statts

Number of Joints 16

Size of Casing 10.75"

Size of Pump Columns 5.5"

PVC/Steel Pump

General Condition Good

EQUIPMENT

Electrical Controls ABB/VFD

Pump PSM

Stages 5 stage

Motor PSM

Horsepower 40 HP

Pump Install Date

Work Performed 2012: Rehabilitated well head, painted interior walls and performed routine maintenance

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 2,462,356

February 1,494,007

March 2,421,565

April 3,067,864

May 1,760,725

June 4,019,253

July 5,062,530

August 2,566,689

September 20,164

October 17,445

November 1,433,849

December 341,865

Page 82: Water Resources 2012 Annual Report

1516 W Danforth Rd WELL STATISTICS

Date Drilled 1981

Flow (GPM) 225

Latitude/Longitude 35.66 / -97.5

Elevation 1150'

Total Depth 583'

Top Perforations 200'

Lower Perforations 490'

Pump Set 508'

Method of Drilling Cable Tool

Driller Statts

Number of Joints

Size of Casing 10.75"

Size of Pump Columns 5.5"

PVC/Steel Pump Certiloc

General Condition Good

EQUIPMENT

Electrical Controls ABB/DRIVE

Pump Christensen

Stages 8 stage

Motor Franklin

Horsepower 50 HP

Pump Install Date 2009

Work Performed 2012: Painted interior walls and Performed routine maintenance

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 2,682,787

February 1,653,831

March 945,548

April 987,447

May 3,254,136

June 5,717,549

July 7,167,682

August 5,478,489

September 4,687,512

October 3,523,720

November 1,941,615

December 1,667,737

Page 83: Water Resources 2012 Annual Report

3721 S Bryant Ave WELL STATISTICS

Date Drilled 1981

Flow (GPM) 175

Latitude/Longitude 35.62 / -97.46

Elevation 1160'

Total Depth 690'

Top Perforations 294'

Lower Perforations 676'

Pump Set 600'

Method of Drilling Cable Tool

Driller Statts

Number of Joints 29

Size of Casing 10.75"

Size of Pump Columns 5.5"

PVC/Steel Pump

General Condition Good

EQUIPMENT

Electrical Controls ABB/VFD

Pump Centrilift

Stages 13 stage

Motor Centrilift

Horsepower 46 HP

Pump Install Date

Work Performed 2012: painted interior walls and Performed routine maintenance

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 1,680,734

February 2,232,356

March 3,338,910

April 4,184,153

May 1,701,744

June 3,385,096

July 5,448,402

August 4,525,269

September 3,968,661

October 2,716,125

November 2,173,087

December 2,207,026

Page 84: Water Resources 2012 Annual Report

2524 Hidden Valley Rd WELL STATISTICS

Date Drilled 1981

Flow (GPM) 225

Latitude/Longitude 35.63 / -97.47

Elevation 1130'

Total Depth 700'

Top Perforations 210'

Lower Perforations 632'

Pump Set 560'

Method of Drilling Cable Tool

Driller Statts

Number of Joints 29

Size of Casing 10.75"

Size of Pump Columns 5.5"

PVC/Steel Pump

General Condition Good

EQUIPMENT

Electrical Controls Toshiba

Pump Christensen

Stages 6 stage

Motor Centripro

Horsepower 40 HP

Pump Install Date 2008

Work Performed 2012: Performed routine maintenance

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 3,187,072

February 4,073,789

March 4,782,429

April 5,002,427

May 2,960,347

June 4,787,723

July 2,097,991

August 2,748,887

September 3,003,489

October 2,068,990

November 2,332,930

December 3,658,222

Page 85: Water Resources 2012 Annual Report

2008 W Edmond Rd WELL STATISTICS

Date Drilled 1981

Flow (GPM) 270

Latitude/Longitude 35.65 / -97.51

Elevation 1105'

Total Depth 510'

Top Perforations 202'

Lower Perforations 466'

Pump Set 438

Method of Drilling Cable Tool

Driller Statts

Number of Joints 20

Size of Casing 10.75"

Size of Pump Columns 5.5"

PVC/Steel Pump

General Condition Good

EQUIPMENT

Electrical Controls ABB/VFD

Pump Christiansen

Stages 6 stage

Motor Franklin

Horsepower 75 hp

Pump Install Date 2011

Work Performed 2012: Painted interior walls and Performed routine maintenance

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 4,555,836

February 3,300,034

March 7,059,734

April 6,325,964

May 0

June 819

July 5,432,651

August 6,662,127

September 0

October 0

November 57,819

December 3,827,305

Page 86: Water Resources 2012 Annual Report

1508 W Danforth Rd WELL STATISTICS

Date Drilled 1982

Flow (GPM) 133

Latitude/Longitude 35.67 / -97.5

Elevation 1160'

Total Depth 570'

Top Perforations 265'

Lower Perforations 542'

Pump Set 509'

Method of Drilling Cable Tool

Driller Statts

Number of Joints 24

Size of Casing 10.75"

Size of Pump Columns 5.5"

PVC/Steel Pump

General Condition Good

EQUIPMENT

Electrical Controls ABB/VFD

Pump Christensen

Stages 8 stage

Motor Centripro

Horsepower 30 HP

Pump Install Date 2010

Work Performed 2012: Painted interior walls and Performed routine maintenance

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 597,107

February 1,071,084

March 2,874,339

April 3,525,482

May 1,318,596

June 2,616,916

July 6,137,557

August 3,527,413

September 2,060,705

October 533,551

November 57,036

December 676,552

Page 87: Water Resources 2012 Annual Report

709 N University Dr WELL STATISTICS

Date Drilled 1982

Flow (GPM) 150

Latitude/Longitude 35.66 / -97.47

Elevation 1180'

Total Depth 590'

Top Perforations 200'

Lower Perforations 585'

Pump Set 525'

Method of Drilling Cable Tool

Driller Statts

Number of Joints 36

Size of Casing 10.75"

Size of Pump Columns 5.5"

PVC/Steel Pump

General Condition Good

EQUIPMENT

Electrical Controls ABB/VFD

Pump Christensen

Stages 11st/6CLC

Motor Centrapro

Horsepower 40 HP

Pump Install Date 2008

Work Performed 2012: Performed routine maintenance

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 3,066,684

February 2,152,794

March 2,566

April 3,082,864

May 2,828,003

June 3,515,839

July 5,597,587

August 4,909,693

September 3,465,926

October 2,784,910

November 2,051,255

December 2,630,948

Page 88: Water Resources 2012 Annual Report

1601 Ridgecrest Rd WELL STATISTICS

Date Drilled 1984

Flow (GPM) 150

Latitude/Longitude 35.63 / -97.6

Elevation 1125'

Total Depth 720'

Top Perforations 180'

Lower Perforations 620'

Pump Set 540

Method of Drilling Rotary

Driller Hemphill

Number of Joints 27

Size of Casing 10.75"

Size of Pump Columns 5.5"

PVC/Steel Pump

General Condition Good

EQUIPMENT

Electrical Controls ABB/VFD

Pump Christensen

Stages 6CHC9stage

Motor Franklin

Horsepower 50H/3450

Pump Install Date 2012

Work Performed 2012: Pulled pump and motor and did a downhole video cleaned the casing, 48 hour pump test installed new equipment and rehabilitated the well head and painted the interior walls, performed routine maintenance

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 2,766,861

February 3,159,402

March 4,286,602

April 4,877,611

May 2,047,577

June 4,696,825

July 5,337,289

August 4,676,125

September 4,005,270

October 2,640,161

November 2,329,692

December 2,336,107

Page 89: Water Resources 2012 Annual Report

520 E 9th St WELL STATISTICS

Date Drilled 1984

Flow (GPM) 175

Latitude/Longitude 35.64 / -97.47

Elevation 1130'

Total Depth 720'

Top Perforations 180'

Lower Perforations 620'

Pump Set 605.2'

Method of Drilling Rotary

Driller Hemphill

Number of Joints 28

Size of Casing 12.75"

Size of Pump Columns 5.5"

PVC/Steel Pump

General Condition Good

EQUIPMENT

Electrical Controls ABB/DRIVE

Pump Christensen

Stages 6st/7WAHC

Motor Franklin

Horsepower 60 HP/3450

Pump Install Date 2010

Work Performed 2012: Performed routine maintenance

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 0

February 236,052

March 5,588,099

April 5,010,123

May 4,051,043

June 7,575,527

July 7,637,513

August 5,990,955

September 5,976,910

October 5,496,993

November 1,500,837

December 0

Page 90: Water Resources 2012 Annual Report

1122 N Boulevard WELL STATISTICS

Date Drilled 1985

Flow (GPM) 185

Latitude/Longitude 35.67 / -97.48

Elevation 1205'

Total Depth 600'

Top Perforations 210'

Lower Perforations 534'

Pump Set 529'

Method of Drilling Air Rotary

Driller Henkle

Number of Joints 22

Size of Casing 12.75"

Size of Pump Columns 5.5"

PVC/Steel Pump

General Condition Good

EQUIPMENT

Electrical Controls ABB/VFD

Pump Christiansen

Stages 10stage

Motor Franklin

Horsepower 40 HP/3600

Pump Install Date

Work Performed 2012: Painted interior walls and Performed routine maintenance

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 0

February 0

March 0

April 3,378,399

May 3,119,033

June 615,382

July 0

August 0

September 0

October 1,680,850

November 1,486,894

December 2,511,597

Page 91: Water Resources 2012 Annual Report

720 W Edmond Rd WELL STATISTICS

Date Drilled 1985

Flow (GPM) 150

Latitude/Longitude 35.65 / -97.49

Elevation 1160'

Total Depth 600'

Top Perforations 200'

Lower Perforations 500'

Pump Set 515'

Method of Drilling Air Rotary

Driller Henkle

Number of Joints 25

Size of Casing 12.75"

Size of Pump Columns 5.5"

PVC/Steel Pump

General Condition Good

EQUIPMENT

Electrical Controls ABB/VFD

Pump Christensen

Stages 10st/6CLC

Motor Centripro

Horsepower 40 HP/3450

Pump Install Date 2008

Work Performed 2012: Painted interior walls and Performed routine maintenance

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 2,230,552

February 2,292,775

March 47,551

April 3,843,432

May 2,597,200

June 6,449,248

July 7,558,511

August 6,171,729

September 5,652,708

October 1,377,188

November 2,138,754

December 2,336,437

Page 92: Water Resources 2012 Annual Report

3308 S Boulevard WELL STATISTICS

Date Drilled 1985

Flow (GPM) 225

Latitude/Longitude 35.62 / -97.48

Elevation 1170'

Total Depth 670'

Top Perforations 200'

Lower Perforations 670'

Pump Set 610'

Method of Drilling Air Rotary

Driller Henkle

Number of Joints 29

Size of Casing 12.75"

Size of Pump Columns 5.5"

PVC/Steel Pump

General Condition Good

EQUIPMENT

Electrical Controls ABB/VFD

Pump PSM

Stages 22 stage

Motor PSM

Horsepower 60 HP

Pump Install Date

Work Performed 2012: Performed routine maintenance

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 3,251,754

February 3,644,648

March 4,187,468

April 4,114,024

May 3,191,701

June 6,802,916

July 5,711,443

August 5,065,857

September 5,195,743

October 4,547,364

November 3,290,678

December 3,240,214

Page 93: Water Resources 2012 Annual Report

850 W Danforth Rd WELL STATISTICS

Date Drilled 1986

Flow (GPM) 140

Latitude/Longitude 35.67 / -97.49

Elevation 1180'

Total Depth 590'

Top Perforations 210'

Lower Perforations 486'

Pump Set 491'

Method of Drilling Air Rotary

Driller Henkle

Number of Joints 24

Size of Casing 12.75"

Size of Pump Columns 5.5"

PVC/Steel Pump

General Condition Good

EQUIPMENT

Electrical Controls ABB/VFD

Pump Christensen

Stages 9 stage

Motor Centripro

Horsepower 30 HP/3450

Pump Install Date 2008

Work Performed 2012: Painted interior walls and Performed routine maintenance, installed a variable frequency drive

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 945,391

February 374,454

March 1,994,973

April 1,775,266

May 1,375,979

June 1,958,863

July 3,071,384

August 1,906,794

September 821,985

October 455,494

November 690,995

December 1,098,237

Page 94: Water Resources 2012 Annual Report

326 W Danforth Rd WELL STATISTICS

Date Drilled 1986

Flow (GPM) 250

Latitude/Longitude 35.67 / -97.49

Elevation 1190'

Total Depth 535'

Top Perforations 210'

Lower Perforations 520'

Pump Set 490'

Method of Drilling Air Rotary

Driller Henkle

Number of Joints 20

Size of Casing 12.75"

Size of Pump Columns 5.5"

PVC/Steel Pump

General Condition Good

EQUIPMENT

Electrical Controls ABB/VFD

Pump Christensen

Stages 6CHC 7 stage

Motor Franklin

Horsepower 40 HP/3450

Pump Install Date 2012

Work Performed 2012: Removed old equipment, down hole video, 48 hour pump test, Installed new equipment, rehabilitated well head and painted interior walls. Performed routine maintenance

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 2,069,755

February 2,292,466

March 3,410,221

April 4,281,627

May 2,285,799

June 5,524,547

July 5,706,258

August 4,829,170

September 4,551,618

October 2,283,622

November 1,772,392

December 2,651,917

Page 95: Water Resources 2012 Annual Report

1640 E 33rd St WELL STATISTICS

Date Drilled 1986

Flow (GPM) 215

Latitude/Longitude 35.62 / -97.46

Elevation 1160'

Total Depth 652'

Top Perforations 210'

Lower Perforations 638'

Pump Set 557'

Method of Drilling Air Rotary

Driller Henkle

Number of Joints 24

Size of Casing 12.75"

Size of Pump Columns 5.5"

PVC/Steel Pump

General Condition Good

EQUIPMENT

Electrical Controls ABB/VFD

Pump Christensen

Stages 14 stage

Motor Centripro

Horsepower 50 HP

Pump Install Date 2008

Work Performed 2012: Rehabilitated well head, painted interior walls, performed routine maintenance

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 4,213,614

February 4,435,224

March 6,288,640

April 6,084,261

May 3,448,159

June 6,869,155

July 8,776,742

August 8,257,444

September 6,987,210

October 5,380,295

November 2,863,113

December 3,133,879

Page 96: Water Resources 2012 Annual Report

501 Pepperdine Ave WELL STATISTICS

Date Drilled 1992

Flow (GPM) 225

Latitude/Longitude 35.62 / -97.47

Elevation 1162'

Total Depth 675'

Top Perforations 248'

Lower Perforations 590'

Pump Set 650'

Method of Drilling Rotary

Driller Henkle

Number of Joints 65

Size of Casing 12.75"

Size of Pump Columns 4"

PVC/Steel Pump

General Condition Good

EQUIPMENT

Electrical Controls ABB

Pump Christiansen

Stages 10 stage

Motor Franklin

Horsepower 60 HP

Pump Install Date

Work Performed 2012: Pulled pump and motor, video, did down hole cleaning of the casing and performed 48 hour pump test. Ordered new equipment.

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 3,790,568

February 5,630,512

March 5,827,209

April 5,978,650

May 3,705,835

June 5,885,994

July 8,067,930

August 2,034,086

September 0

October 0

November 0

December 0

Page 97: Water Resources 2012 Annual Report

3831 Marked Tree Dr WELL STATISTICS

Date Drilled 1992

Flow (GPM) 175

Latitude/Longitude 35.62 / -97.45

Elevation 1130'

Total Depth 640'

Top Perforations 226'

Lower Perforations 620'

Pump Set 567.7'

Method of Drilling Rotary

Driller Henkle

Number of Joints 63

Size of Casing 12.75"

Size of Pump Columns 5.5"

PVC/Steel Pump

General Condition Good

EQUIPMENT

Electrical Controls ABB/DRIVE

Pump Christensen

Stages 9 stage

Motor Franklin

Horsepower 60 HP

Pump Install Date 2008

Work Performed 2012: Performed routine maintenance

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 2,230,886

February 2,077,430

March 3,532,778

April 4,301,364

May 2,228,032

June 3,152,237

July 5,436,433

August 6,154,604

September 3,494,426

October 193,508

November 864,313

December 1,896,084

Page 98: Water Resources 2012 Annual Report

2204 Aurora Rd WELL STATISTICS

Date Drilled 2001

Flow (GPM) 350

Latitude/Longitude 35.63 / -97.51

Elevation 1120'

Total Depth 525'

Top Perforations 220'

Lower Perforations 490'

Pump Set 475'

Method of Drilling Rotary

Driller Henkle

Number of Joints

Size of Casing 10.75"

Size of Pump Columns 4"

PVC/Steel Pump

General Condition Good

EQUIPMENT

Electrical Controls ABB/VFD

Pump Chirstensen

Stages 6st/7WAHC

Motor Franklin

Horsepower 60 HP/3450

Pump Install Date 2010

Work Performed 2012: Performed routine maintenance

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 1,630,239

February 6,454,393

March 7,232,548

April 8,582,669

May 5,339,902

June 9,947,074

July 10,987,228

August 10,181,077

September 8,084,537

October 7,641,261

November 6,148,792

December 5,238,910

Page 99: Water Resources 2012 Annual Report

2175 W Covell Rd WELL STATISTICS

Date Drilled 2001

Flow (GPM) 140

Latitude/Longitude 35.68 / -97.51

Elevation 1100'

Total Depth 425'

Top Perforations 256'

Lower Perforations 405'

Pump Set 340'

Method of Drilling Rotary

Driller Henkle

Number of Joints

Size of Casing 10.75"

Size of Pump Columns 4"

PVC/Steel Pump

General Condition Good

EQUIPMENT

Electrical Controls ABB/VFD

Pump Christensen

Stages 9 stage

Motor Centripro

Horsepower 30 HP

Pump Install Date 2008

Work Performed 2012: Performed routine maintenance

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 1,144,778

February 926,268

March 2,366,380

April 2,596,318

May 1,911,329

June 3,557,131

July 4,299,364

August 3,828,193

September 2,394,537

October 1,782,188

November 265,399

December 983,927

Page 100: Water Resources 2012 Annual Report

3336 N Santa Fe Ave WELL STATISTICS

Date Drilled 2001

Flow (GPM) 120

Latitude/Longitude 35.69 / -97.51

Elevation 1140'

Total Depth 425'

Top Perforations 254'

Lower Perforations 396'

Pump Set 387'

Method of Drilling Rotary

Driller Henkle

Number of Joints

Size of Casing 10.75"

Size of Pump Columns 4"

PVC/Steel Pump

General Condition Good

EQUIPMENT

Electrical Controls ABB/VFD

Pump Christensen

Stages 10 stage

Motor Franklin

Horsepower 50 HP

Pump Install Date 2005

Work Performed 2012: Performed routine maintenance

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 1,613,276

February 1,515,712

March 2,720,045

April 2,655,660

May 1,907,912

June 3,570,471

July 3,256,164

August 3,327,616

September 2,181,528

October 1,703,712

November 142,197

December 1,517,662

Page 101: Water Resources 2012 Annual Report

2932 Shortgrass Rd WELL STATISTICS

Date Drilled 2002

Flow (GPM) 171

Latitude/Longitude 35.68 / -97.48

Elevation 1167'

Total Depth 385'

Top Perforations 216'

Lower Perforations 360'

Pump Set 320'

Method of Drilling Rotary

Driller Henkle

Number of Joints

Size of Casing 10.75"

Size of Pump Columns 4"

PVC/Steel Pump

General Condition Good

EQUIPMENT

Electrical Controls ABB/VFD

Pump PSM

Stages

Motor PSM

Horsepower

Pump Install Date 2006

Work Performed 2012: Installed new ABB/VFD in its own room painted interior walls and floor performed routine maintenance

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 1,675,872

February 1,398,845

March 2,702,801

April 3,394,682

May 2,236,839

June 3,267,524

July 5,022,863

August 4,922,049

September 3,328,175

October 973,943

November 1,284,895

December 1,502,321

Page 102: Water Resources 2012 Annual Report

828 Ascot WELL STATISTICS

Date Drilled 2002

Flow (GPM) 200

Latitude/Longitude 35.69 / -97.47

Elevation 1193'

Total Depth 475'

Top Perforations 232'

Lower Perforations 460'

Pump Set 366'

Method of Drilling Rotary

Driller Henkle

Number of Joints

Size of Casing 10.75"

Size of Pump Columns 4"

PVC/Steel Pump

General Condition Good

EQUIPMENT

Electrical Controls ABB/VFD

Pump Christensen

Stages 5 stage

Motor Centripro

Horsepower 40 HP/3450

Pump Install Date 2008

Work Performed 2012: Pulled old equipment, video casing, clean casing, 48 hour pump test, installed new equipment and VFD

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 3,374,379

February 2,714,392

March 5,215,413

April 5,213,212

May 3,156,587

June 4,345,041

July 6,639,593

August 5,562,741

September 4,202,950

October 1,958,083

November 1,836,694

December 4,440,396

Page 103: Water Resources 2012 Annual Report

5001 E 15th St WELL STATISTICS

Date Drilled 2005

Flow (GPM) 100

Latitude/Longitude 35.64 / -97.42

Elevation 1083'

Total Depth 442'

Top Perforations 300'

Lower Perforations 412'

Pump Set 340.8'

Method of Drilling Air Rotary

Driller Layne

Number of Joints 16

Size of Casing 10.75"

Size of Pump Columns 4"

PVC/Steel Pump

General Condition Good

EQUIPMENT

Electrical Controls ABB/VFD

Pump Christensen

Stages 6st/7WALC

Motor Franklin

Horsepower 40 HP/3450

Pump Install Date 2010

Work Performed 2012: Performed routine maintenance

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 1,335,587

February 489,366

March 1,362,109

April 2,255,529

May 1,360,875

June 2,345,786

July 3,389,506

August 2,187,278

September 1,911,743

October 381,041

November 633,783

December 1,190,435

Page 104: Water Resources 2012 Annual Report

5655 E 15th St WELL STATISTICS

Date Drilled 2005

Flow (GPM) 90

Latitude/Longitude 35.64 / -97.41

Elevation 1075'

Total Depth 420'

Top Perforations 214'

Lower Perforations 392'

Pump Set 340.8'

Method of Drilling Air Rotary

Driller Layne

Number of Joints 16

Size of Casing 10.75"

Size of Pump Columns 4"

PVC/Steel Pump

General Condition Good

EQUIPMENT

Electrical Controls ABB/VFD

Pump Christensen

Stages 6st/7RAHC

Motor Franklin

Horsepower 25 HP/3450

Pump Install Date 2010

Work Performed 2012: Performed routine maintenance

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 628,343

February 176,873

March 623,746

April 790,795

May 631,834

June 613,190

July 1,075,606

August 920,565

September 56,042

October 215,509

November 270,712

December 637,796

Page 105: Water Resources 2012 Annual Report

6401 E 15th St WELL STATISTICS

Date Drilled 2005

Flow (GPM) 200

Latitude/Longitude 35.64 / -97.4

Elevation 1085'

Total Depth 420'

Top Perforations 214'

Lower Perforations 416'

Pump Set 362.1'

Method of Drilling Air Rotary

Driller Layne

Number of Joints 17

Size of Casing 10.75"

Size of Pump Columns 4"

PVC/Steel Pump

General Condition Good

EQUIPMENT

Electrical Controls ABB/VFD

Pump Christensen

Stages 6st/WALC

Motor Franklin

Horsepower 40 HP/3450

Pump Install Date 2010

Work Performed 2012: Performed routine maintenance

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 1,329,274

February 323,604

March 1,416,302

April 2,132,973

May 1,146,860

June 3,193,015

July 5,225,526

August 4,513,064

September 1,772,414

October 1,710,238

November 893,243

December 1,377,151

Page 106: Water Resources 2012 Annual Report

10570 E 15th St WELL STATISTICS

Date Drilled 2007

Flow (GPM) 130

Latitude/Longitude 35.64 / -97.34

Elevation 500'

Total Depth

Top Perforations 192'

Lower Perforations 470'

Pump Set 451'

Method of Drilling Air Rotary

Driller Layne

Number of Joints

Size of Casing 10.75"

Size of Pump Columns 4"

PVC/Steel Pump

General Condition Good

EQUIPMENT

Electrical Controls ABB

Pump Layne

Stages 9 stage

Motor Centripro

Horsepower 25 HP

Pump Install Date

Work Performed 2012: Performed routine maintenance

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 2,640,507

February 1,081,145

March 2,289,897

April 2,544,314

May 886,934

June 1,722,545

July 3,679,505

August 3,180,405

September 2,796,278

October 1,553,826

November 1,710,853

December 3,069,865

Page 107: Water Resources 2012 Annual Report

2200 S Post Rd WELL STATISTICS

Date Drilled 2007

Flow (GPM) 130

Latitude/Longitude 35.63 / -97.34

Elevation 500'

Total Depth

Top Perforations 200'

Lower Perforations 466'

Pump Set 451'

Method of Drilling Air Rotary

Driller Layne

Number of Joints

Size of Casing 10.75"

Size of Pump Columns 4"

PVC/Steel Pump

General Condition Good

EQUIPMENT

Electrical Controls ABB

Pump Layne

Stages 9 stage

Motor Centripro

Horsepower 25 HP

Pump Install Date

Work Performed 2012: Performed routine maintenance

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 2,309,869

February 1,026,372

March 2,310,378

April 2,527,500

May 972,645

June 1,621,435

July 3,109,035

August 2,775,925

September 1,819,355

October 1,525,589

November 1,269,138

December 2,708,251

Page 108: Water Resources 2012 Annual Report

2900 S Post Rd WELL STATISTICS

Date Drilled 2007

Flow (GPM) 130

Latitude/Longitude 35.63 / -97.35

Elevation 540'

Total Depth

Top Perforations 220'

Lower Perforations 510'

Pump Set 493'

Method of Drilling Air Rotary

Driller Layne

Number of Joints

Size of Casing 10.75"

Size of Pump Columns 4"

PVC/Steel Pump

General Condition Good

EQUIPMENT

Electrical Controls ABB

Pump Layne

Stages 9 stage

Motor Centripro

Horsepower 25 HP

Pump Install Date

Work Performed 2012: Performed routine maintenance

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 2,502,192

February 1,186,947

March 2,264,447

April 2,462,528

May 977,606

June 1,615,827

July 2,904,041

August 2,506,242

September 2,118,787

October 1,127,514

November 1,127,724

December 1,896,951

Page 109: Water Resources 2012 Annual Report

10539 E 33rd St WELL STATISTICS

Date Drilled 2007

Flow (GPM) 130

Latitude/Longitude 35.62 / -97.34

Elevation 540'

Total Depth

Top Perforations 222'

Lower Perforations 494'

Pump Set 493'

Method of Drilling Air Rotary

Driller Layne

Number of Joints

Size of Casing 10.75"

Size of Pump Columns 4"

PVC/Steel Pump

General Condition Good

EQUIPMENT

Electrical Controls ABB

Pump Layne

Stages 9 stage

Motor Centripro

Horsepower 25 HP

Pump Install Date

Work Performed 2012: Performed routine maintenance

Recommendations for 2013: Perform routine maintenance

MONTH GALLONS

January 2,416,493

February 1,005,441

March 2,137,410

April 2,208,580

May 969,402

June 1,864,105

July 3,043,503

August 2,673,834

September 1,845,674

October 1,586,626

November 1,590,597

December 2,503,953

Page 110: Water Resources 2012 Annual Report

0

1000

2000

3000

4000

5000

6000

Well 8

Well 37

Well 64

Page 111: Water Resources 2012 Annual Report

0

200

400

600

800

1000

1200

2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012

Zone A (North of Danforth Road)

Static

Pumping

0

200

400

600

800

1000

1200

2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012

Zone B (Danforth Road to Edmond Road)

Static

Pumping

Page 112: Water Resources 2012 Annual Report

0

200

400

600

800

1000

1200

2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012

Zone C (Edmond Road to Fifteenth Street)

Static

Pumping

0

200

400

600

800

1000

2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012

Zone D (Fifteenth Street to Thirty-Third Street)

Static

Pumping

Page 113: Water Resources 2012 Annual Report

0

200

400

600

800

1000

2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012

Zone E (Thirty-Third Street to Memorial Road)

Static

Pumping

Page 114: Water Resources 2012 Annual Report

Permit Statistics

OWRB Permit Number

Wells Under This Permit Acres Under

Permit Acre Feet per Year

Million Gallons per Year

19551287 8, 9 0* 638 208

19551288 2, 3, 4, 5, 6, 7 (All removed from service) 0* 1915 624

19740466 10, 11, 14, 15 (12, 16, 17 removed from service) 0* 2234 728

19740205 18, 19, 20, 21, 22, 23, 24, 39 0* 2553 832

19770789 26, 27, 28, 29, 32, 33, 42, 46, 47, 48, 49, 50, 51, 52, 53, 54, 55, 56

8290 5745 1872

19780508 40 144 319 104

19830664 25, 30, 31, 34, 35, 36, 37, 38, 41, 43, 44, 45 3850 3830 1248

20000514 57, 58 367 734 239

20010575 59 278 555 181

20010576 60, 61 131 261 85

20040566 62, 63, 64 447 894 291

20050573 65, 66, 67, 68 320 640 209

TOTALS: 13827 20318 6621

*Per OWRB Records These Permits Do Not Specify Acreage

Page 115: Water Resources 2012 Annual Report
Page 116: Water Resources 2012 Annual Report
Page 117: Water Resources 2012 Annual Report

Field Services is made up of four divisions; Water Line Maintenance, Wastewater Line Maintenance, Street Maintenance and Traffic. The department as a whole employs 66 individuals, with the Field Services Superintendent’s responsibilities being split between the divisions. The water, wastewater and street groups have been cross trained in the various job functions of each group. This has allowed the department to staff for normal demand, but be able to respond, in force, to peak demand. The Administrative staff, which has also been consolidated, functions much the same way as operations. Field Services is still responsible for the health and well-being of City of Edmond customers by providing quality water and removing wastewater in a safe, efficient manner. Field Services prides itself on its excellent customer service. It is never a pleasant experience to have a water leak in your front yard or have a blockage in the wastewater line, but through excellent customer service and positive attitude we strive to make these experiences as painless as possible.

Page 118: Water Resources 2012 Annual Report

WATER LINE MAINTENANCE History of the Water Line Maintenance Division goes back to 1889 when the first water well was hand dug in Edmond. The first tower was constructed in 1909 at 27 W. Third Street. Beginning with only a couple of people, the Water Line Maintenance Division grew to 28 employees in 1984. Since then the area of responsibility has continued to expand but manpower has been downsized through better management practices and technological advances. Water Line Maintenance Division is comprised of twenty (19) positions, which includes eighteen (18) public health professionals and one (1) supervisor. The Water Line Maintenance Division’s function is maintaining Edmond’s 498 miles of water distribution system, 4362 hydrants in the fire protection system and 27,702 residential and commercial meters. In the last year there were 3.28 miles of new water line added to the distribution system. The Division is responsible for the following main areas:

Page 119: Water Resources 2012 Annual Report

Emergency repair of water main breaks and service line leaks - Every call Water Line Maintenance receives is treated as an emergency, until crews are on site and make an informed decision of the severity of the leak. If the leak is an immediate threat to health or property, emergency locates will be called in and the repair will be made as quickly and safely as possible. If the leak is not an immediate threat to health or property, forty-eight (48) hour locates will be called in, and the leak scheduled as time permits. Water Line Maintenance repaired 55 main breaks in the last year. Installation of new residential meters - There are currently two options for new services to be installed in the City of Edmond. Contractors can choose to have Water Line Maintenance install the service line; setter and meter can or have a contractor install the service. All parts installed for new services must be purchased from and approved by Utility Line Maintenance. If the resident chooses to have a contractor install the service, Utility Line Maintenance inspects the quality of work and physically installs the meter after the inspection. Last year Water Line Maintenance installed 234 new meters and contractors installed 176 new residential and commercial meters.

Page 120: Water Resources 2012 Annual Report

Preventative maintenance of system valves and fire hydrants – Preventative maintenance is the backbone of any good water distribution system. Currently Water Line Maintenance has two employees performing preventative maintenance on valves and one employee performing preventative maintenance of fire hydrants. In the last year numerous valves have been found buried, missing or non-functional. Water Line Maintenance is working diligently to rectify the valve situation throughout the system. Throughout the previous year Water Line Maintenance has inspected and operated 9,551 valves and 2,386 fire hydrants. Perform utility line locates to minimize the damage to City of Edmond’s water and wastewater utilities due to excavation around the utilities. In the last year, Water Line Maintenance actually located 4,223 requests for utility line locates. Maintain fifteen (15) year meter change out program. In the last year 585 meters were changed out. Water Line Maintenance is currently conducting testing on the meters that are removed to ascertain what time frame would provide the lost/benefit ratio.

Page 121: Water Resources 2012 Annual Report

Street Maintenance continues to replace sod and concrete that is removed by the Water Line Maintenance crews. It was determined the department could perform the work more efficiently, productively and maintain a better-finished product than an outside contractor. Continue updating of all utility maps. Accurate mapping is one of the most useful tools at our disposal. When working with maps on a daily basis, the employees are constantly finding discrepancies between the maps and what is actually in the system. When these problems are found it requires a joint effort with Management Information System (MIS) to make the corrections to ensure that we have the best possible data that we can get. Leak detection is a large part of the preventative maintenance program conducted throughout Water Line Maintenance. Numerous leaks have been located while they are still small and repaired that would normally not have been found until they were large enough to be noticed. This also aids in tracking unaccounted water.

Page 122: Water Resources 2012 Annual Report

WASTEWATER LINE MAINTENANCE Wastewater Line Maintenance history started when the division was created in 1972. Before then, the Sanitation Department was responsible for taking care of problems in the collection system. The line maintenance division worked out of the old City Garage barn at 27 W. Third Street, which is now demolished. Over the years three buildings were constructed at 100 N. Kelly, which became the site for the Wastewater Line Maintenance Division. In 1994 the division was moved back to 27 W. Third. Wastewater Line Maintenance is comprised of (14) positions, which include thirteen (13) public health professionals and one (1) supervisor. The function of the Wastewater Line Maintenance Division is maintaining Edmond’s 424 miles of gravity mainline, 22 miles of force main, 3 siphon sewers, and 10,757 manholes. The surface area of the collection system is 36,591 acres. In the last year there were 1.98 miles of new wastewater lines added to the collection system. The division is responsible for the following main areas:

Page 123: Water Resources 2012 Annual Report

Wastewater Line Maintenance performs preventative maintenance of the collection system daily by four (4) basic methods, hydraulic cleaning, video inspection, mechanical root removal and chemical root control. Wastewater Line Maintenance strives to be proactive in its preventative maintenance program. In the last year Wastewater Line Maintenance hydraulically cleaned 427,444 feet of collection system, performed video inspection of 193,180 feet of collection system and performed mechanical root removal on 139,312 feet of wastewater lines. In addition, 121,087 feet of the collection system was chemically treated for roots. The chemical treatment was performed by an outside contractor. Collection system blockage removal is treated as an emergency on every call that is received. Wastewater Line Maintenance treats blockages as emergencies because crews need to be on site to determine what the problem is and what needs to be done to rectify the situation. There are a number of ways to remove blockages in the collection system, but the two most common are hydraulic cleaning and mechanical sawing. In the last year Wastewater Line Maintenance removed 105 blockages from the collection system, and had a total of 73 Sanitary Sewer Overflows or 16.37 per 100 miles of collection system.

Page 124: Water Resources 2012 Annual Report

Emergency and point repairs are also made throughout the collection system. Point repairs are sometimes as simple as a cracked joint of pipe to slight offsets in the bells of the pipes where they go together to emergency repairs which usually constitute a total failure in the system (collapsed line). In the last year Wastewater Line Maintenance made 42-point repairs. Manhole inspections are conducted to ensure the integrity, stability and cleanliness. Manholes should be free of any waste and grit that may accumulate in the opening. There were 2,689 manholes inspected during the year, and 25 manholes were either raised or repaired.

Page 125: Water Resources 2012 Annual Report

ADDRESS AND MANHOLE ID NUMBER DATE ESTIMATED GALLONS

REASONS DURATION (HOURS)

WET/DRY WEATHER

EVENT

REACHED "WATERS OF THE STATE"

1100 N. Broadway - Manhole # 22163 1/9/2012 10 Debris 1 No Ground 1010 E. Main St. - Junction box 1/12/2012 25 Debris 1 No Ground

3801 S. Broadway - Manhole # 20398 1/14/2012 3,000 Grease 5.5 No Drainage channel 210 E. Edwards - Manhole # 25423 1/17/2012 1,500 Grease and debris 1.75 No Ground 911 Crown Dr. - Cleanout 1/19/2012 75 Roots 1 No Ground 1909 Edgewood Dr. - Manhole # 26001 1/20/2012 750 Debris 1 No Drainage channel 217 E. Edwards - Manhole # 21592 1/27/2012 200 Grease 1.25 No Drainage channel 421 Clermont Dr. - Cleanout 1/29/2012 400 Roots 2.5 No Ground 30 E. 33rd St. - Manholes # 26448, 26449 & 26450 1/30/2012 500 Grease and debris 1.25 No Drainage channel 633 W. 7th St. - Manhole # 22054 2/7/2012 400 Roots 1 No Ground 912 Norma Lane - Manhole # 25306 & 25307 2/15/2012 300 Debris 0.5 No Ground W. Coffee Creek Rd & Little Timber 2/21/2012 30,200 Broken force main 0.75 No Drainage channel 225 Southern Place - Cleanout 2/21/2012 100 Roots and grease 0.5 No Ground 1801 Edgewood Dr. - Manhole # 79049 2/26/2012 2,000 Roots 2 No Drainage channel 805 Heatherstone Rd. - Manhole # 24898 2/26/2012 6,000 Roots and debris 2 No Drainage channel 2208 Lytal Lane - Cleanout 3/5/2012 10,000 Roots 3.5 No Ground and creek 2400 Santa Fe Ter. - Manhole # 18940 3/10/2012 1,500 Roots and debris 4 No Creek

501 Crestview - Manhole # 19199 3/12/2012 2,000 Debris 2.5 No Drainage channel &

street 2307 Ripple Creek Lane - Cleanout 3/15/2012 20 Roots and debris 1 No Ground

1521 Apollo Rd. - Cleanout 3/16/2012 3,000 Roots and grease 3.25 No Ground and

drainage channel 1100 Richmond Rd. - Cleanout 3/16/2012 30 Roots 1.25 No Floors

Page 126: Water Resources 2012 Annual Report

153 Brad St. - Manhole # 21888 4/3/2012 1,500 Grease and debris 1.5 No Drainage channel

613 Smiling Hills Blvd. Manhole # 27374 4/6/2012 2,500 Debris 4 No Ground

813 Elmwood Dr. - Cleanout 4/11/2012 300 Roots 1 No Ground

1713 Seminole Dr. - Cleanout 4/14/2012 200 Debris 2.75 No Ground

1703 Canary Dr. - Cleanout 4/23/2012 20 Debris 2.5 No Creek bed

532 East Oak Place - Manhole # 20981 4/23/2012 100 Debris 2.5 No Ground and

drainage channel

33rd & Richard Dr. 4/25/2012 50 Broken pressure main 0.75 No Ground

2801 Downing Ct. - Cleanout 5/6/2002 200 Roots and baby wipes 1.5 No Ground

1821 S. Rankin St. - Cleanout 5/7/2012 20 Roots 1.5 No Ground

810 Pine Oak Dr. - Manhole # 25664 5/16/2012 50 Roots 1.5 No Street

313 W. 10th St. - Manhole # 21963 6/2/2012 100 Roots and debris 2.5 No Drainage channel

2133 E. 2nd St. - Manhole # 24045 6/11/2012 2,000 Roots 1.5 No Drainage channel

145 Brad St. - Manhole # 21915 6/11/2012 2,000 Roots 1 No Drainage channel

1010 Locust Lane - Cleanout 6/11/2012 250 Roots and grease 2.5 No Ground

116 Ann Arbor - Cleanout 6/13/2012 100 Dirt in main 7.5 No Street

1419 Leo Dr. - Manhole # 18559 6/27/2012 50 Roots 1 No Ground

Page 127: Water Resources 2012 Annual Report

820 W. 15th St. - Cleanout 7/5/2012 960 Grease and debris 2 No Ground and

drainage channel

2620 Lost Trail Rd. - Manhole # 19019 7/8/2012 2,500 Roots and grease 2.5 No Drainage channel

1014 E. Main St. - Cleanout 7/15/2012 600 Roots, grease & baby

wipes 3 No Ground

10th St. & Fretz Ave. - Manhole # 21887 7/21/2012 5,000 Roots and grease 2 No Drainage channel

703 Sunset Dr - Cleanout 8/7/2012 50 Roots 1.25 No Ground

918 Crown Dr. - Cleanout 8/9/2012 50 Roots 0.5 No Ground

815 Sunset Dr. - Cleanout 8/27/2012 150 Roots 1.5 No Ground/yard

3905 143rd St. OKC 8/31/2012 5,000 Broken pipe 6.75 No Ground and drainage channel

600 Lilac Dr. - Damage main 9/5/2012 403,000 Damage main 8.25 No Drainage channel

166 Dennis St. - Manhole # 21922 9/16/2012 50 Grease 2 No Ground

1701 Pine Oak Dr. - Manhole # 78683 9/18/2012 200 Debris 1.25 No Ground

625 N. Broadway - lamp hole 9/18/2012 50 Grease 3.5 No Drainage channel

517 Candlewood Dr. 9/18/2012 1,000 Roots 2.5 No Drainage channel

and pond 517 Candlewood Dr. 4" drain tapped into main 9/26/2012 200 Roots 1.25 No Drainage channel

Page 128: Water Resources 2012 Annual Report

2413 Bent Trail Rd. - Manhole #19043 10/4/2012 1,200 Roots and grease 1.5 No Drainage channel

3805 Spring Hill Dr. Cleanout 10/6/2012 200 Roots 1 No Drainage channel

1301 E. 2nd St. - Manhole # 25451 10/7/2012 5,000 Grease line collapsed 25.5 No Ground

2nd & Coltrane - Manhole # 23926 10/11/2012 300 Roots and grease 3 No Ground

188 E. 33rd St. Cleanout 10/17/2012 200 Grease 0.5 No Drainage channel

1109 North Creek Dr. Cleanout 10/21/2012 50 Roots 2 No Ground

610 Timber Lane - Lamphole 10/30/2012 25 Grease and roots 0.75 No Ground

2200 Mark Rd. - Manhole 19829 11/3/2012 400 Roots 1.75 No Ground

1104 East Dr. - Inside of house 11/15/2012 150 Roots and debris 2 No Floor

801 Signal Ridge Dr. - Siphon 11/16/2012 500 Debris 1.25 No Drainage channel

2201 Marshall Dr. - Lamphole 11/21/2012 50 Grease 2.25 No Ground 232 & 233 Stonebrook Way - Manholes # 22336 & 22337 11/29/2012 500 Debris 0.75 No Drainage channel

3500 Smoky Hollow Rd. - Manhole # 24512 12/2/2012 6,000 Debris 2 No Drainage channel

1221 N. Kelly Ave. - Cleanout 12/4/2012 500 Grease and debris 1 No Parking lot

28 E. 6th St. - Manhole # 27098 12/11/2012 20 Roots 1 No Ground 2413 Bent Trail Rd. - Manholes # 19068 & 19043

12/12/2012 2,500 Debris 2 No Drainage channel

4009 Sheffield Ave. - Manhole # 22735 12/13/2012 800 Debris 1.5 No Pond

2513 Bent Trail Rd. - Manhole is not on GIS 12/13/2012 300 Debris 1 No Drainage channel

325 Meadow Lake Dr. - Manhole # 21659 12/14/2012 1,000 Grease 0.75 No Drainage channel

529 N. Blackwelder Ave. - Manhole # 22879 12/17/2012 150 Debris 1 No Street

1609 Mistletoe Ln. - Cleanout 12/28/2012 100 Grease 2 No Drainage channel

1704 Canary Cir. - Cleanout 12/30/2012 2,000 Debris 2 No Drainage channel

Page 129: Water Resources 2012 Annual Report

Date Stop Up Address Manholes Inspected 1/4/2012 59 Shirley Lane 59 Shirley Lane - Manholes # 21719 & 21718 1/9/2012 1100 N. Broadway 1100 N. Broadway - Manhole # 22163 1/12/2012 1010 E. Main St. 1010 E. Main St. - Manhole # 27106 1/12/2012 220 W. 4th St. 220 W. 4th St. - Manhole # 21595 1/14/2012 3801 S. Broadway 3801 S. Broadway - Manholes # 20397 & 20398 1/17/2012 210 E. Edwards 210 E. Edwards - Manhole # 25423 1/18/2012 1404 S. Gemini Rd 1404 S. Gemini Rd. - Manhole # 20664 1/19/2012 911 Crown Dr. 911 Crown Dr. - Manholes # 25143 & 25149 1/19/2012 2120 Marshall Dr. 2120 Marshall Dr. - Manhole # 20664 1/20/2012 1909 Edgewood Dr. 1909 Edgewood Dr. - Manhole - 26001 1/27/2012 217 E. Edwards 217 E. Edwards - Manhole # 21592 1/27/2012 28 E. Main St. 28 E Main St. - Manhole # 21791 1/29/2012 120 Barrett Place 120 Barrett Place Manhole #21770 1/29/2012 421 Clermont Dr. 421 Clermont Dr. - Manhole # 21177 1/30/2012 30 E. 33rd St. 30 E. 33rd St.- Manholes # 26448, 26449 & 26450 2/7/2012 920 E. 10th St. 920 E. 10th St. - Manholes # 25681 & 25682 2/7/2012 633 W. 7th St. 633 W. 7th St.- Manhole # 22054 2/9/2012 1004 E. 15th St. 1004 E. 15th St. - Manholes # 25704 & 25708 2/15/2012 713 S. Santa Fe Dr. 713 S. Santa Fe Dr. - Manholes #22042 & 22041 2/15/2012 912 Norma Lane 912 Norma Lane - Manholes # 25306 & 25307 2/21/2012 617 N. Broadway 617 N. Broadway - Manhole # 21561 2/22/2012 622 Timber Lane 622 Timber Lane - Manholes # 25790 & 25791 2/23/2012 2416 Windover 2416 Windover - Manhole - 24698 2/24/2012 2813 Lost Rock Trail 2813 Lost Rock Trail - Manhole # 18983 2/26/2012 1801 Edgewood Dr. 1801 Edgewood Dr. - Manhole # 79049 2/26/2012 805 Heatherstone Rd. 805 Heatherstone Rd. - Manhole # 24898 3/5/2012 2208 Lytal Lane 2208 Lytal Lane - Manholes # 24668 & 24671 3/6/2012 3412 Prairie Ave. 3412 Prairie Ave - Manhole # 26355 3/10/2012 2400 Santa Fe Ter. 2400 Santa Fe Ter. - Manhole # 18940 3/10/2012 1000 E. 13th St. 1000 E 13th St. - Manhole # 25704 3/12/2012 501 Crestview 501 Crestview - Manhole # 19199 3/13/2012 1201 Smiling Hill Blvd. 1201 Smiling Hill Blvd. - Manhole # 26219 3/14/2012 512 Lanes Turn 512 Lanes Turn - Manhole # 22384 3/15/2012 2307 Ripple Creek Lane 2307 Ripple Creek Lane # 19262 3/16/2012 1521 Apollo Rd. 1521 Apollo Rd. Manholes # 18612 & 18613 3/16/2012 1100 Richmond Rd. 1100 Richmond Rd. - Manhole # 25400 3/18/2012 621 Smiling Hill Blvd. 621 Smiling Hill Blvd. Manholes # 26316 & 26315 3/20/2012 921 E. 10th St. 921 E. 10th St. Manhole # 25692

Page 130: Water Resources 2012 Annual Report

Date Stop Up Address Manholes Inspected

4/3/2012 153 Brad St. 153 Brad St. Manhole # 2188

4/6/2012 2830 E. 2nd St. 2830 E. 2nd St. Manholes # 26686 & 24052

4/6/2012 613 Smiling Hills Blvd. 613 Smiling Hills Blvd. Manhole # 27374

4/6/2012 900 S. Bryant Ave. 900 S. Bryant Ave. Manhole # 27061

4/7/2012 2513 Julies Trail 2513 Julies Trail Manhole # 18951

4/11/2012 813 Elmwood Dr. 813 Elmwood Dr. Manholes # 26158 & 25157

4/14/2012 1713 Seminole Dr. 1713 Seminole Dr. Manhole # 24529

4/17/2012 120 Ann Arbor 120 Ann Arbor Manholes # 20532 & 20538

4/23/2012 1703 Canary Dr. 1703 Canary Dr. Manholes # 23481 & 23506

4/23/2012 532 East Oak Place 532 East Oak Place Manhole # 20981

4/24/2012 1609 Eagle Dr. 1609 Eagle Dr. Manhole # 23560

5/4/2012 234 Dennis St. 234 Dennis St. Manholes # 22114 & 21916

5/6/2012 2801 Downing Ct. 2801 Downing Ct. Manhole # 24097

5/7/2012 1812 S. Rankin St. 1812 S. Rankin St. Manhole # 26938

5/13/2012 809 Robin Hill Rd. 809 Robin Hill Rd. Manhole # 21678

5/16/2012 3312 Baird Dr. 3312 Baird Dr. Manholes # 26245 & 26246

5/16/2012 810 Pine Oak Dr. 810 Pine Oak Dr. Manhole # 25664

5/18/2012 624 Howard Ct. 624 Howard Ct. Manhole # 22068

5/21/2012 1016 Countrywood Lane 1016 Countrywood Lane Manhole # 19250

5/24/2012 1713 Seminole Dr. 1713 Seminole Dr. Manhole # 24529

5/31/2012 4617 Rhode Island Ave. 4617 Rhode Island Ave. Manhole # 20406 & 20401

6/2/2012 313 W. 10th St. 313 W. 10th St. Manhole # 21963

6/5/2012 226 E. 4th St. 226 E. 4th St. Manholes # 25805 & 21582

6/11/2012 2133 E. 2nd St. 2133 E. 2nd St. Manhole # 24045

6/11/2012 145 Brad St. 145 Brad St. Manhole # 21915

6/11/2012 1010 Locust Lane 1010 Locust Lane Manhole # 26202

6/12/2012 1302 W. Aries 1302 W. Aries Manhole # 18581

6/14/2012 612 W. Edmond Rd. 612 W. Edmond Rd. Manhole # 26794

6/18/2012 1017 Val Genes 1017 Val Genes Manhole # 18593

Page 131: Water Resources 2012 Annual Report

Date Stop Up Address Manholes Inspected 7/5/2012 108 E. 13th St. 108 E. 13th St. Manhole # 22094

7/5/2012 820 W. 15th St. 820 W. 15th St. - Siphon

7/8/2012 2620 Lost Trail Rd. 2620 Lost Trail Rd. Manhole # 19019

7/15/2012 1014 E. Main St. 1014 E. Main St. Manhole # 27106

7/21/2012 10th St. & Fretz Ave. 10th St. & Fretz Ave. Manhole # 21887

7/26/2012 301 E. 33rd St. 301 E. 3rd St. Manhole # 25813

7/27/2012 38 E. 14th St. 38 E. 14th St. Manhole # 22093

8/5/2012 101 Burton Place 101 Burton Place Manhole # 20533

8/7/2012 703 Sunset Dr. 703 Sunset Dr. Manhole # 22048

8/9/2012 918 Crown Dr. 918 Crown Dr. Manhole # 25156

8/27/2012 815 Sunset Dr. 815 Sunset Dr. Manhole # 21291

8/28/2012 1200 Pine Valley 1200 Pine Valley Manhole # 18894

8/30/2012 1505 Apollo Rd. 1505 Apollo Rd. Manholes # 18613 & 18611

8/31/2012 3701 Oak Hollow Dr. 3701 Oak Hollow Dr. Manholes 24684 & 24685

9/5/2012 600 Lilac Dr. 600 Lilac Dr. Creek Crossing

9/10/2012 504 Cinnamon Dr. 504 Cinnamon Dr. Manhole # 21746

9/13/2012 1628 Laurie Dr. 1628 Laurie Dr. Manhole # 20350

9/14/2012 1601 Pine Oak Dr. 1601 Pine Oak Dr. Manholes # 26164 & 77682

9/16/2012 166 Dennis St. 166 Dennis St. Manhole # 21922

9/18/2012 1701 Pine Oak Dr. 1701 Pine Oak Dr. Manhole # 78683

9/18/2012 625 N. Broadway 625 N. Broadway Manhole # 21554

9/18/2012 517 Candlewood Dr. 517 Candlewood Dr. Manhole # 24981

9/21/2012 1604 Pine Oak Dr. 1604 Pine Oak Dr. - Manhole # 26164

9/21/2012 2416 Windover Dr. 2416 Windover Dr. - Manhole # 24698

9/27/2012 1206 W. Gemini 1206 W. Gemini - Manholes # 18577 & 18576

Page 132: Water Resources 2012 Annual Report

Date Stop Up Address Manholes Inspected 10/4/2012 2413 Bent Trail Rd. 2413 Bent Trail Rd. - Manhole # 19043 10/6/2012 3805 Spring Hill Dr. 3805 Spring Hill Dr. - Manhole# 24693 10/7/2012 1301 E. 2nd St. 1301 E. 2nd St. - Manhole # 25451 10/11/2012 2200 Mark Rd. 2200 Mark Rd. - Manhole # 19829 10/11/2012 2nd & Coltrane 2nd & Coltrane - Manhole # 23926 10/13/2012 1301 N. Broadway 1301 N. Broadway - Manholes # 21563 & 21568 10/16/2012 708 Rockhollow Rd. 708 Rockhollow - Manholes 24987 10/17/2012 188 E. 33rd St. 188 E 33rd St. - Manhole # 20423 10/21/2012 608 Old English Rd. 608 Old English Rd. - Manhole # 21457 10/23/2012 1109 North Creek Dr. 1109 North Creek Dr. - Manhole # 23791 10/30/2012 610 Timber Lane 610 Timber Lane - Lamphole 11/3/2012 2200 Mark Rd. 2200 Mark Rd. - Manhole # 19829 11/13/2012 120 Barrett Place 120 Barrett Place - Manholes # 21770 & 21526 11/15/2012 1104 East Dr. 1104 East Dr. - Manhole # 25555 11/16/2012 801 Signal Ridge Dr. 801 Signal Ridge Dr. - Siphons 11/20/2012 9 N Smythe Ave. 9 N Smythe Ave. Manhole # 393 11/20/2012 2008 Hardy Dr. 2008 Hardy Dr. Manhole # 25926 11/21/2012 2201 Marshall Dr. 2201 Marshall Dr - Lamphole 11/27/2012 42 E. 2nd St. 42 E. 2nd St - Manholes # 20670 & 20671 11/29/2012 232 Stonebrook Way 232 Stonebrook Way - Manholes # 22336 & 22337 12/1/2012 512 Lanes Turn 512 Lanes Turn - Manhole # 21701 12/2/2012 3500 Smoky Hollow Rd. 3500 Smoky Hollow Rd. -Manhole # 224512 12/11/2012 28 E. 6th St. 28 E. 6th St. - Manhole # 27098 12/12/2012 2413 Bent Trail Rd. 2413 Bent Trail Rd. - Manholes # 19068 & 19043 12/13/2012 4009 Sheffield Ave. 4009 Sheffield Ave. - Manholes # 22735 12/13/2012 2513 Bent Trail Rd. 2513 Bent Trail Rd. - Manhole not on the map notify GIS/cam 12/14/2012 325 Meadow Lake Dr. 325 Meadow Lake Dr. - Manhole # 21659 12/15/2012 809 Robin Hill Rd. 809 Robin Hill Rd. - Manhole # 21678 12/17/2012 529 N. Blackwelder 529 N. Blackwelder - Manhole # 22879 12/18/2012 1229 S. Gemini Rd. 1229 S. Gemini Rd. - Manhole # 18551 12/20/2012 1604 Magnolia Ln. 1604 Magnolia Ln. - Manhole # 20296 12/20/2012 1002 Locust Ln. 1002 Locust Ln. - Manholes # 26202 & 25734 12/23/2012 1400 Cedar Ridge 1400 Cedar Ridge - Manhole # 26180

Page 133: Water Resources 2012 Annual Report

17,338 Total Linear Feet of Water Line, 10,438 Total Linear Feet of Sanitary Sewer

Water Line Sanitary Sewer

Name of Project Project Number 24” 12” 10” 8” 6” 24” 18” 15” 12” 10” 8” 6”

Arbor Creek 4 PR12-00008 1904 2378

Arbor Creek Retail West PR110003 10

Belmont Park 3 PR12-00003 3725 3288

Birnam Woods PR1100017 1063 3373 4255

EPS - Adminstration Building EP100023 338

EPS - Cross Timbers Elementary EP100006 390

Enterprise Warehouse - 2325 S Fretz Ave SP110013 197

Henderson Hills Baptist Church SP080023 3319 2138 142 670 1310 905

Hutton Place PR1100016 1600 928

Legend V Apartments SP100022 706 2410 125 406

Luke Corbett Residence EP12-00004 53

Mitch Park - WL for Aqua Center WC100004 2700 595 40

Original Townsite WL Impr, Phase 2 WC11-00001 40 50 110

Porches at Arbor Creek PR11-00015 1845 6 1607

RCB Bank SP110017 277 15

Redmond Trace 4 PR040038 550 30

Spring Creek SS Interceptor, Phase 2 CD030004 2337 1318 287 11 321

Subtotals 6765 10105 468 2337 1318 957 11 4910 905