waste discharge requirements what's coming down the pipe

12
WASTE DISCHARGE REQUIREMENTS WHAT'S COMING DOWN THE PIPE Mona Dougherty, PE Senior Water Resource Control Engineer Wastewater and Storm Water Programs North Coast Regional Water Quality Control Board September 12, 2014

Upload: solada

Post on 04-Jan-2016

31 views

Category:

Documents


2 download

DESCRIPTION

Mona Dougherty, PE Senior Water Resource Control Engineer Wastewater and Storm Water Programs North Coast Regional Water Quality Control Board September 12, 2014. Waste Discharge Requirements What's Coming Down The Pipe. It’s All About Disposal. Regulatory Background. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Waste Discharge Requirements  What's  Coming Down The Pipe

WASTE DISCHARGE REQUIREMENTS

WHAT'S COMING DOWN THE PIPE

Mona Dougherty, PE

Senior Water Resource Control Engineer

Wastewater and Storm Water Programs

North Coast Regional Water Quality Control Board

September 12, 2014

Page 2: Waste Discharge Requirements  What's  Coming Down The Pipe

It’s All About Disposal

Page 3: Waste Discharge Requirements  What's  Coming Down The Pipe

Regulatory Background California Water Code Clean Water Act Antidegradation Policy (Res. No. 68-16)

North Coast Water Quality Control Plan (Basin Plan) Sources of Drinking Water Policy (Res. No. 88-63)

Policies and Procedures for Cleanup (Res. No. 92-49)

State Implementation Policy for NTR and CTR (2005)

Recycled Water Policy (Res. No. 09-11) and amendment

Onsite Waste Treatment System Policy(Res. No. 12-32)

Page 4: Waste Discharge Requirements  What's  Coming Down The Pipe

Destination Dictates

Ocean Discharges Surface Water Discharges Groundwater Discharges Recycled Water

CropsToiletsLandscapeWater Supply Augmentation

Page 5: Waste Discharge Requirements  What's  Coming Down The Pipe

Ocean Plan

No Changes Since 2012 Statewide Trash Policy

Page 6: Waste Discharge Requirements  What's  Coming Down The Pipe

Inland Surface Waters

NutrientsNitrogenPhosphorus

Page 7: Waste Discharge Requirements  What's  Coming Down The Pipe

The Recycled Water Policy The Policy anticipated stakeholder groups would lead

efforts for the development of Salt and Nutrient Management Plans in the region

North Coast Regional Board requested designing a regional framework as an alternative approach

Develop risk based approach to basin prioritization

Establish policy framework within the implementation plan for discharges of waste to land

7

Page 8: Waste Discharge Requirements  What's  Coming Down The Pipe

Chemicals of Emerging Concern (CECs)

Pharmaceuticals

Caffeine

Nicotine

Acetaminophen

Personal Care Products (PPCPs)

Page 9: Waste Discharge Requirements  What's  Coming Down The Pipe

Basin Plan Amendments In Progress

Groundwater Toxicity & Chemical Constituents

Groundwater Protection Policy Requested for Triennial Review Consideration

Mixing Zone PolicyException to Seasonal Discharge

Prohibition

Page 10: Waste Discharge Requirements  What's  Coming Down The Pipe

Onsite Waste Treatment System Policy Ensure properly functioning OWTS for protection of health

and the environment and statewide consistency Adopted June 2012 / Effective May 2013 / Amend May 2014

Page 11: Waste Discharge Requirements  What's  Coming Down The Pipe

Partnerships

Other agencies

Municipalities

Interested parties

Page 12: Waste Discharge Requirements  What's  Coming Down The Pipe

Contact Information

Mona Dougherty

[email protected]

(707) 570-3761

Lisa Bernard

[email protected]

(707) 576-2677