2015 2030 2600 5200 2750 2030 2015 ø 920 Main facts at a glance LUBING Maschinenfabrik GmbH & Co. KG Lubingstraße 6 · 49406 Barnstorf (Germany) Tel.: +49 (0) 54 42 - 98 79-0 · Fax: +49 (0) 54 42 - 98 79-33 www.lubing.com · info@lubing.com Drinking-Systems Climate-Systems House equipment Waste air purification For further information: www.lubing.com Technical modifications reserved. 0868-1 / 11-18 / 500 Waste air purification for pig houses Multi-stage waste air purification with the CleaningCubes Technical Data Dimensions (in mm) Required components • TechnicCube • ChemCubes middle as required up to max. 7 pieces (with or without BioCube) • ChemCube End (with or without BioCube) • Sulphuric acid • Root wood chips Technical requirements • Fresh water supply line • Power supply 400 V / 50 Hz • Blowdown water tank • Solid and level ground Note: Regular cleaning intervals of at least 3 months are recommended. Cleaning should be carried out more frequently if necessary. We will be pleased to help you with your planning and design and provide you with a non-binding offer. DLG Certification already in preparation. Power: max. 25.000 m³/h per ChemCube 1 TechnicCube can supply 8 ChemCubes, thus max. power: 200.000 m³/h per unit TechnicCube ChemCube without BioCube ChemCube with BioCube EndCube with or without BioCube

Upload: others

Post on 07-Apr-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Waste air purification - Lubing · 2018-11-07 · Waste air purification for pig houses TechnicCube A TechnicCube supplies up to eight CleaningCubes. The demand of con-nected CleaningCubes

2015

20302600

5200

2750

2030

2015

ø 920

Main facts at a glance

LUBING Maschinenfabrik GmbH & Co. KG

Lubingstraße 6 · 49406 Barnstorf (Germany)Tel.: +49 (0) 54 42 - 98 79-0 · Fax: +49 (0) 54 42 - 98 79-33www.lubing.com · [email protected]

Drinking-SystemsClimate-SystemsHouse equipmentWaste air purification

For further information: www.lubing.comTechnical modifications reserved.

0868

-1 /

11-

18 /

500

Waste air purification for pig houses

Multi-stage waste air purification with the CleaningCubes

Technical Data

Dimensions (in mm)

Required components

• TechnicCube

• ChemCubesmiddleasrequireduptomax.7pieces(withorwithoutBioCube)

• ChemCubeEnd(withorwithoutBioCube)

• Sulphuricacid

• Rootwoodchips

Technical requirements

• Freshwatersupplyline

• Powersupply400V/50Hz

• Blowdownwatertank

• Solidandlevelground

Note:

Regular cleaning intervals of at least 3 months are recommended. Cleaning should be carried out more frequently if necessary.

Wewillbepleasedtohelpyouwithyourplanninganddesignandprovideyouwithanon-bindingoffer.

DLGCertificationalreadyinpreparation.

Power: max. 25.000 m³/h per ChemCube1 TechnicCube can supply 8 ChemCubes, thusmax. power: 200.000 m³/h per unit

TechnicCubeChemCube

without BioCubeChemCube

with BioCube

EndCube with

or without

BioCube

Page 2: Waste air purification - Lubing · 2018-11-07 · Waste air purification for pig houses TechnicCube A TechnicCube supplies up to eight CleaningCubes. The demand of con-nected CleaningCubes

Waste air purification for pig houses

TechnicCubeA TechnicCube supplies up to eightCleaningCubes. The demand of con-nected CleaningCubes is adjusted tothefanoutputinuptofourlevels.

ChemCubeA ChemCube can clean up to 25,000m³/h exhaust air of ammonia anddust.WashingwaterissprayedintheChemCubeforcleaning.

The principleLUBING CleaningCubes are a modu-lar two-level system for waste air pu-rification of pig houses, where the chemical stage adjusts to the current air rate. The optional downstream biological stage is responsible for re-duction of smell, and is always fully in operation in order to permit even growth of the biology. The methodLUBING CleaningCubes switch a de-dicated ChemCube downstream of every exhaust fan, in order to wash dust and ammonia from the exhaust air. For this, acidic washing water (pH 3.5) is sprayed when the air en-ters the ChemCube already, in order to use the entire available space with the accordingly long contact times. Subsequently, a washing is applied across a 20 cm strong plastic pad. A droplet separator is then used to re-move drops carried from the air. The ChemCube is only in operation if the associated fan is in operation as well. Adjustment of the size of the chemi-cal stage to the air rate is possible, so that only very little water needs to be recirculated in small air rates and the operating costs will reduce according-ly. The optional subsequent BioCube ensures efficient and operating-costs-reducing smell reduction with root wood. In order to permit even growth of biology, all BioCubes are coupled with each other, so that the entire root-wood wall is charged with air.

ApplicationThe waste air purification is intended for use in pig houses. This can be used easily both in new buildings and in existing stables.

The system is supplied in prefabri-cated parts. This achieves a very low transport volume so that no heavy transport is required. All necessary welds are already placed so that the CleaningCubes can be set up by sim-ple connection and screwing on site. A major part of the work can also be done by the customer himself. Pad and droplet separator

Foreffectivecleaning inaverysmallspace, the exhaust air in the Chem-Cubeisroutedthroughpads(left)andthenthroughdropletseparators.

ControlThecontroloptimallyadjuststhede-mandinwasteairpurificationoutputto the fan output, and performs allcontrolsautomatically.

Root woodFurthersmellreductionisachievedbyuse of root wood on which culturescansettle.

Blow-down waterUsed washing water is pumped intoa collection tank via a submersionpumpandcanbeusedasfertilizer.

BioCubeOptionally,wasteairpurificationcanachieve even better odour reductionwiththeBioCubes.

Washing waterTheacidicwashingwaterisproducedbyadditionofsulphuricacid.PracticaldeliveryintheIBC.

The advantages at a glance:• Adjustmentofthechemical

stagetothecurrentairrate.

• Twoexitsurfacespermitsmallestbuilds.

• ThenumberofCubesusedcanbeadjustedtothestablesizeneeds.

• Thankstothechemicalstage,onlyverylittleblow-downwaterisproduced.

• Deliveryinprefabricatedparts.

• Alsosuitableforpartialexhaustairtreatment