washington state s. t. i. p. 2018 to 2021 (project funds ...€¦ · (project funds to nearest...

56
(Project Funds to Nearest Dollar) Report Date - May 30, 2018 totals for years 2018 thru 2021 Selection Criteria (from SEARCH panel - if any) Washington State S. T. I. P. Agency County MPO Region Envrionmental Classification Priority Number Title PIN STIP ID Amendment Number 18-05 Agency Project ID Secured Y Planned Is New Current Action Future Action Amended Approved as of Date Federal Fund Code State Fund Code Inside MPO MPO Project ID 2018 to 2021 Page 1

Upload: phungdang

Post on 22-Apr-2018

213 views

Category:

Documents


1 download

TRANSCRIPT

(Project Funds to Nearest Dollar)

Report Date - May 30, 2018

totals for years 2018 thru 2021

Selection Criteria (from SEARCH panel - if any)

Washington State S. T. I. P.

Agency

County

MPO

Region

Envrionmental Classification

Priority Number

Title

PIN

STIP ID

Amendment Number 18-05

Agency Project ID

Secured Y

Planned

Is New

Current Action

Future Action

Amended

Approved as of Date

Federal Fund Code

State Fund Code

Inside MPO

MPO Project ID

2018 to 2021

Page 1

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: CDTC Y Inside N Outside May 30, 2018

County: Chelan

Agency: LINK Transit

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

00 WA-09616 23 CE No N/A N/A 4,347,216 18-05

Battery Electric Buses and Charger

Purchase up to five (5) Battery Electric Buses from BYD Heavy Industries, including a fast-charger and its installation.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

ALL 2018 5339(c) 3,768,489 0 578,727 4,347,216

Project Totals 3,768,489 0 578,727 4,347,216

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 4,347,216 0 0 0 0

Totals 4,347,216 0 0 0 0

Page 2

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: CDTC Y Inside N Outside May 30, 2018

County: Chelan

Agency: LINK Transit

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

00 WA-11088 23 0.000 CE No NA NA 521,760 18-05

Replace up to Seven (7) Cutaway Buses

Purchase up to seven (7) cutaway buses.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

ALL 2018 5339 376,747 0 145,013 521,760

Project Totals 376,747 0 145,013 521,760

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 521,760 0 0 0 0

Totals 521,760 0 0 0 0

Federal FundsState Funds Local Funds Total

Agency Totals for LINK Transit 4,145,236 0 723,740 4,868,976

Page 3

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: CDTC Y Inside N Outside May 30, 2018

County:

Agency: WSDOT - NC

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

02 200208C 200208CDTC 28 0.530 CE No 119.16 119.69 488,005 18-05

US 2/Easy Street E - Pedestrian Trail

This project will design and construct a shared use path.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

PE 2018 STP(US) 77,850 0 22,150 100,000

CN 2019 STP(US) 186,840 0 201,165 388,005

Project Totals 264,690 0 223,315 488,005

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 100,000 0 0 0 0

CN 0 388,005 0 0 0

Totals 100,000 388,005 0 0 0

Federal FundsState Funds Local Funds Total

Agency Totals for WSDOT - NC 264,690 0 223,315 488,005

Page 4

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: CWCG Y Inside N Outside May 30, 2018

County: Cowlitz

Agency: Longview

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

14 WA-09220 21 0.100 CE Yes California Way Industrial/SR432 Intersection 5,300,000 18-05

CALIFORNIA WAY/SR 432 INTERSECTION

Realigning California Way to create a single intersection at SR 432/Industrial Way, resulting in more efficient signal operation & turning movements. Realignment of California Way intersection will require right-of-way acquisition of parcels and relocation of existing businesses. Two existing railroad crossing will require widening to accommodate the new alignment.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

PE 2018 NHFP 920,000 0 0 920,000

RW 2019 NHFP 2,076,000 0 0 2,076,000

CN 2019 NHFP 2,304,000 0 0 2,304,000

Project Totals 5,300,000 0 0 5,300,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 920,000 0 0 0 0

RW 0 2,076,000 0 0 0

CN 0 2,304,000 0 0 0

Totals 920,000 4,380,000 0 0 0

Federal FundsState Funds Local Funds Total

Agency Totals for Longview 5,300,000 0 0 5,300,000

Page 5

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: CWCG Y Inside N Outside May 30, 2018

County:

Agency: WSDOT - SW

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

11 400520A 400520A08 21 50.970 CE No 27.40 78.37 367,290 18-05

I-5/Cowlitz and Lewis County Ramps - ADA Upgrades

Update ADA to meet current guidelines. See also SWW RTPO record 400520A21.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

PE 2019 NHPP 26,910 0 1,121 28,031

PE 2020 NHPP 53,269 0 2,219 55,488

CN 2020 NHPP 278,095 0 5,675 283,770

Project Totals 358,274 0 9,015 367,289

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 28,031 55,488 0 0

CN 0 0 283,770 0 0

Totals 0 28,031 339,258 0 0

Federal FundsState Funds Local Funds Total

Agency Totals for WSDOT - SW 358,274 0 9,015 367,289

Page 6

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: Headquarters N Inside Y Outside May 30, 2018

County:

Agency: WS Parks & Recreation

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

00 WA05(002) WA-07767 30 CE No Various Various 212,850 18-05

Coulee Corridor - Phase 2

Construction and installation of community kiosks, trailblazer signs,story panel displays and interpretive panels.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

CN 2018 Discretionary - SB 88,200 0 0 88,200

Project Totals 88,200 0 0 88,200

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

CN 88,200 0 0 0 0

Totals 88,200 0 0 0 0

Federal FundsState Funds Local Funds Total

Agency Totals for WS Parks & Recreation

88,200 0 0 88,200

Page 7

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: NEW RTPO N Inside Y Outside May 30, 2018

County: Stevens

Agency: Colville

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

02 WA-10993 28 0.030 CE No Astor Ave Main 1,400,000 18-05

Heritage Court

Heritage Court pedestrian safety and connectivity at the intersection of Astor and Main.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

PE 2018 TAP(R) 54,000 0 0 54,000

Project Totals 54,000 0 0 54,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 54,000 0 0 0 0

Totals 54,000 0 0 0 0

Federal FundsState Funds Local Funds Total

Agency Totals for Colville 54,000 0 0 54,000

Page 8

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: Okanogan Co. N Inside Y Outside May 30, 2018

County: Okanogan

Agency: Okanogan Co.

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

07 9155(1) 06 2.250 CE Yes MP 1.91 MP 4.16 3,182,660 18-05

Old 97 (Driskel Rd to Verestar Rd)

Minor realignment, widening, grading, drainage, ballast, top course and HMA or BST. Guardrail may be necessary on short grade section.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

PE 2018 STP(R) 25,000 0 3,902 28,902

PE 2019 0 CRAB 270,000 30,000 300,000

RW 2019 STP(R) 10,000 0 1,561 11,561

RW 2021 0 CRAB 180,000 20,000 200,000

CN 2021 STP(R) 988,000 CRAB 1,350,000 304,197 2,642,197

Project Totals 1,023,000 1,800,000 359,660 3,182,660

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 28,902 0 0 0 0

RW 0 311,561 0 0 0

CN 0 0 0 2,842,197 0

Totals 28,902 311,561 0 2,842,197 0

Federal FundsState Funds Local Funds Total

Agency Totals for Okanogan Co. 1,023,000 1,800,000 359,660 3,182,660

Page 9

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: Peninsula RTPO N Inside Y Outside May 30, 2018

County:

Agency: WSDOT - OLY

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

14 0101(387) 310153E 310153E-05 21 34.200 CE No 249.65 283.85 99,211 18-05

US 101/Golf Course Rd to N of W Uncas Rd - Rumble Strips

Collision data indicates run off the road incidents occur along higher speed highways. By installing shoulder rumble strips or profiled plastic line, the frequency of run off the road incidents may be reduced.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

PE 2018 HSIP 12,927 0 539 13,466

Project Totals 12,927 0 539 13,466

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 13,466 0 0 0 0

CN 0 0 0 0 85,745

Totals 13,466 0 0 0 85,745

Page 10

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: Peninsula RTPO N Inside Y Outside May 30, 2018

County:

Agency: WSDOT - OLY

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

14 0101(387) 310153G 310153G-05 14 0.220 CE No 282.41 282.63 106,381 18-05

US 101/Golf Course Rd to N of W Uncas Rd - Special Repair

The strip seal expansion joints on these structures have reached their usable service life and need replacement. The bridge deck grading needs to be addressed. This project will replace the strip seals expansion joints and fixed the grading on the deck to extend the service life of structures 101/250 and 101/251.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

PE 2018 NHPP 14,054 0 585 14,639

Project Totals 14,054 0 585 14,639

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 14,639 0 0 0 0

CN 0 0 0 0 91,742

Totals 14,639 0 0 0 91,742

Federal FundsState Funds Local Funds Total

Agency Totals for WSDOT - OLY 26,981 0 1,124 28,105

Page 11

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: PSRC Y Inside N Outside May 30, 2018

County: Snohomish

Agency: Everett

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

00 EVT-71 21 0.000 CE No 112th Street SE 18th Street 711,300 18-05

Everett Citywide Innovative Safety

For traffic signals throughout the city, design for and install flashing yellow arrows, retroreflective tape on existing backplates, leading pedestrian intervals, and accessible pedestrian pushbuttons

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

PE 2018 HSIP 70,110 0 7,790 77,900

CN 2018 HSIP 570,060 0 63,340 633,400

Project Totals 640,170 0 71,130 711,300

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 711,300 0 0 0 0

Totals 711,300 0 0 0 0

Federal FundsState Funds Local Funds Total

Agency Totals for Everett 640,170 0 71,130 711,300

Page 12

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: PSRC Y Inside N Outside May 30, 2018

County: King

Agency: Kirkland

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

17 KIRK-44 28 0.200 CE No NE 132nd Street and 84th Ave

NE 132nd Street and 87th Ave

500,00018-05

NE 132nd Street Sidewalk

Design and construction of curb, gutter, sidewalk, and planter strip along NE 132nd Street between 84th Ave NE and 87th Avenue NE in the Finn Hill neighborhood.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

PE 2018 0 OTHER 150,000 0 150,000

CN 2019 0 OTHER 350,000 0 350,000

Project Totals 0 500,000 0 500,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 150,000 350,000 0 0 0

Totals 150,000 350,000 0 0 0

Federal FundsState Funds Local Funds Total

Agency Totals for Kirkland 0 500,000 0 500,000

Page 13

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: PSRC Y Inside N Outside May 30, 2018

County: Snohomish

Agency: Snohomish Co.

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

00 SNOCO-143 04 0.000 DCE No 240th St SE Snohomish-WoodinvilleRoad

655,28118-05

240th Street SE FFY 2017 Railway/Highway Crossing

Install safety improvements and reconstruct the crossing including concrete panels, new sidewalk, widen shoulders, upgrade to LED signal and upgrade the signal interconnection.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

PE 2018 0 0 94,000 94,000

CN 2018 HSIP 417,620 OTHER 143,661 0 561,281

Project Totals 417,620 143,661 94,000 655,281

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 655,281 0 0 0 0

Totals 655,281 0 0 0 0

Federal FundsState Funds Local Funds Total

Agency Totals for Snohomish Co. 417,620 143,661 94,000 655,281

Page 14

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: PSRC Y Inside N Outside May 30, 2018

County:

Agency: WSDOT - NW

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

11 140567E WDNW-1180 14 18.900 CE No MP 1.14 MP 20.04 16,998,580 18-05

I-405/Burlington Northern Railroad Bridge to Pedestrian Trail Bridge - Seismic Retrofit

Provide seismic retrofit on thirteen I-405 bridges located within Washington's Seismic Lifeline Route. NHS Bridges are 2017 priorities - 405/045E (priority #19), 405/045W (priority #20), 405/046E (priority #21), 405/046W (priority #22), 405/047E (priority #23), 405/047W (priority #24), 405/048E (priority #25), 405/048W (priority #26), 405/052E (priority #27), 405/052W (priority #28), 405/056E (priority #29), 405/056W (priority #30), and 405/012 (priority #13).

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

PE 2019 NHPP 2,473,404 0 103,058 2,576,462

Project Totals 2,473,404 0 103,058 2,576,462

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 2,576,462 0 0 0

Totals 0 2,576,462 0 0 0

Page 15

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: PSRC Y Inside N Outside May 30, 2018

County:

Agency: WSDOT - NW

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

11 100527U WDNW-1181 21 2.780 CE No MP 173.59 MP 176.37 376,068 18-05

I-5/NE 130th St to NE 175th St - ADA Compliance

This project will evaluate and improve pedestrian safety by upgrading ADA sidewalk ramps within the project limits.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

PE 2019 NHPP 32,256 0 1,344 33,600

CN 2020 NHPP 335,619 0 6,849 342,468

Project Totals 367,875 0 8,193 376,068

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 33,600 342,468 0 0

Totals 0 33,600 342,468 0 0

Page 16

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: PSRC Y Inside N Outside May 30, 2018

County:

Agency: WSDOT - NW

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

11 100516H WDNW-1178 14 1.730 CE No MP 162.82 MP 164.55 22,997,260 18-05

I-5/Southbound S Spokane St to I-90 Vicinity - Deck Overlay & Expansion Joint

The existing sliding plate expansion joints on Bridge 5/536W, 5/538S-W, 5/539W, 5/539SCD, 5/538S-E on I-5 southbound need replacement. Bridge deck rehabilitation is to grind and place polyester concrete overlay.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

PE 2019 NHPP 1,973,664 0 82,236 2,055,900

Project Totals 1,973,664 0 82,236 2,055,900

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 2,055,900 0 0 0

Totals 0 2,055,900 0 0 0

Page 17

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: PSRC Y Inside N Outside May 30, 2018

County:

Agency: WSDOT - NW

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

11 109024T WDNW-1182 14 1.610 DCE No MP 4.28 MP 5.89 2,986,209 18-05

I-90/Homer M Hadley Bridge - Anchor Cable Replacement

Replace eleven selected anchor cables on the I-90 Homer M Hadley Bridge.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

PE 2019 NHPP 99,708 0 4,155 103,863

Project Totals 99,708 0 4,155 103,863

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 103,863 0 0 0

Totals 0 103,863 0 0 0

Page 18

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: PSRC Y Inside N Outside May 30, 2018

County:

Agency: WSDOT - NW

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

11 109024S WDNW-1183 14 1.610 DCE No MP 4.28 MP 5.89 4,795,270 18-05

I-90/Lacey V Murrow Bridge - Anchor Cable Replacement

Replace fifteen selected anchor cables on the I-90 Lacey V Murrow Floating Bridge.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

PE 2019 NHPP 147,882 0 6,162 154,044

Project Totals 147,882 0 6,162 154,044

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 154,044 0 0 0

Totals 0 154,044 0 0 0

Page 19

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: PSRC Y Inside N Outside May 30, 2018

County:

Agency: WSDOT - NW

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

11 109004W WDNW-1179 14 0.010 CE No MP 2.40 MP 2.41 377,050 18-05

I-90/Westbound I-5 Overcrossing, W-S Ramp - Expansion Joint Replacement

Replace the expansion joints on the I-90 westbound structure which over-crosses mainline I-5 and on-ramps to southbound I-5. (Bridge No. 90/10W-S)

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

PE 2019 NHPP 31,248 0 1,302 32,550

Project Totals 31,248 0 1,302 32,550

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 32,550 0 0 0

Totals 0 32,550 0 0 0

Page 20

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: PSRC Y Inside N Outside May 30, 2018

County:

Agency: WSDOT - NW

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

14 0104(056) 110401D WDNW-1041 21 0.060 CE No Railroad Ave (MP 24.48) Sunset Ave Vic (MP 24.54) 745,658 18-05

SR 104/Sunset Ave - Railroad Crossing Improvements

This project will install advance preemption with gate down circuitry and associated hardware and software in Edmonds at the intersection with Sunset Ave.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

CN 2018 HSIP 639,605 0 13,053 652,658

Project Totals 639,605 0 13,053 652,658

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 652,658 0 0 0 0

Totals 652,658 0 0 0 0

Page 21

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: PSRC Y Inside N Outside May 30, 2018

County:

Agency: WSDOT - NW

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

02 116900B WDNW-1191 21 1.370 CE Yes MP 0.03 MP 1.40 1,093,572 18-05

SR 169/SR 164 to SE 400th St - ADA Compliance

This project will evaluate and improve pedestrian safety by upgrading ADA sidewalk ramps within the project limits.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

PE 2018 NHPP 158,888 0 6,620 165,508

RW 2019 NHPP 72,104 0 1,472 73,576

CN 2019 NHPP 837,398 0 17,090 854,488

Project Totals 1,068,390 0 25,182 1,093,572

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 165,508 928,064 0 0 0

Totals 165,508 928,064 0 0 0

Page 22

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: PSRC Y Inside N Outside May 30, 2018

County:

Agency: WSDOT - NW

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

14 101808D WDNW-1186 14 0.620 CE No MP 3.62 MP 4.24 1,559,224 18-05

SR 18/Northern Pacific (BNSF) Railroad Overcrossing - Expansion Joint Replacement

Replace the expansion joints and paint the bearings on the SR 18 Northern Pacific (BNSF) Railroad Overcrossing (Bridge No. 18/9).

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

PE 2018 NHPP 260,460 0 10,852 271,312

CN 2020 NHPP 1,262,154 0 25,758 1,287,912

Project Totals 1,522,614 0 36,610 1,559,224

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 271,312 0 1,287,912 0 0

Totals 271,312 0 1,287,912 0 0

Page 23

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: PSRC Y Inside N Outside May 30, 2018

County:

Agency: WSDOT - NW

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

12 101801C WDNW-1189 21 3.260 CE No MP 0.86 MP 4.12 1,646,246 18-05

SR 18/Weyerhauser Way Vicinity to SR 164 Vicinity - Barrier Replacement

This segment of concrete barrier, located in the median on SR 18, is nearing the end of its service life and needs to be replaced.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

PE 2018 STP 102,924 0 4,288 107,212

CN 2020 STP 1,508,253 0 30,781 1,539,034

Project Totals 1,611,177 0 35,069 1,646,246

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 107,212 0 1,539,034 0 0

Totals 107,212 0 1,539,034 0 0

Page 24

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: PSRC Y Inside N Outside May 30, 2018

County:

Agency: WSDOT - NW

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

14 150920D WDNW-1187 21 1.380 CE No MP 20.41 MP 21.79 13,680 18-05

SR 509/Des Moines Memorial Drive to SW 200th St - ADA Compliance

This project will evaluate and improve pedestrian safety by upgrading ADA sidewalk ramps within the project limits.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

PE 2019 NHPP 2,160 0 90 2,250

CN 2020 NHPP 11,201 0 229 11,430

Project Totals 13,361 0 319 13,680

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 2,250 11,430 0 0

Totals 0 2,250 11,430 0 0

Page 25

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: PSRC Y Inside N Outside May 30, 2018

County:

Agency: WSDOT - NW

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

16 151612B WDNW-1190 21 4.050 CE No MP 12.17 MP 16.22 95,820 18-05

SR 516/SE Wax Rd Vicinity to SR 169 - ADA Compliance

This project will evaluate and improve pedestrian safety by upgrading ADA sidewalk ramps within the project limits.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

PE 2018 STP 8,594 0 358 8,952

CN 2020 STP 85,131 0 1,737 86,868

Project Totals 93,725 0 2,095 95,820

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 8,952 0 86,868 0 0

Totals 8,952 0 86,868 0 0

Page 26

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: PSRC Y Inside N Outside May 30, 2018

County:

Agency: WSDOT - NW

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

12 152604L WDNW-1192 14 2.350 CE No MP 1.43 MP 3.78 7,140,674 18-05

SR 526/Airport Rd to E Casino Rd - Seismic Retrofit

Provide seismic retrofit on four SR 526 bridges located within Washington's Seismic Lifeline Route. NHS Bridges and 2017 priorities - 526/010 (priority #8), 526/012S-E (priority #58), 526/014 (priority #7), and 526/020 (priority #6).

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

PE 2018 0 CWA 800,274 0 800,274

Project Totals 0 800,274 0 800,274

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 800,274 0 0 0 0

Totals 800,274 0 0 0 0

Page 27

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: PSRC Y Inside N Outside May 30, 2018

County:

Agency: WSDOT - NW

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

06 153035F WDNW-1188 21 0.360 CE Yes MP 48.73 MP 49.09 307,781 18-05

SR 530/Seeman St to Mountain Loop Rd - ADA Compliance

This project will evaluate and improve pedestrian safety by upgrading ADA sidewalk ramps within the project limits.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

PE 2018 NHPP 39,484 0 1,645 41,129

RW 2019 NHPP 25,970 0 530 26,500

CN 2019 NHPP 235,349 0 4,803 240,152

Project Totals 300,803 0 6,978 307,781

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 41,129 266,652 0 0 0

Totals 41,129 266,652 0 0 0

Page 28

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: PSRC Y Inside N Outside May 30, 2018

County:

Agency: WSDOT - NW

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

02 100251A WDNW-1185 14 0.080 CE Yes MP 34.24 MP 34.32 1,092,080 18-05

US 2/Anderson Creek Bridge - Scour Repair

This project on US 2 Anderson Creek Bridge No. 2/39 will place heavy loose riprap around southeast retaining wall and Pier 3 to cover the exposed footing and prevent the bridge footing from scouring. In addition, this project will re-vegetate work access road area with native plants.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

PE 2018 NHPP 240,106 0 10,004 250,110

RW 2019 NHPP 25,382 0 518 25,900

CN 2020 NHPP 799,749 0 16,321 816,070

Project Totals 1,065,237 0 26,843 1,092,080

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 250,110 25,900 816,070 0 0

Totals 250,110 25,900 816,070 0 0

Page 29

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: PSRC Y Inside N Outside May 30, 2018

County:

Agency: WSDOT - NW

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

14 100201K WDNW-1184 21 0.200 CE No MP 21.37 MP 21.57 2,206,926 18-05

US 2/Sultan Westbound Weigh Station - Weigh Station Preservation

Washington State Patrol has identified a need to repave the parking lot and replace the building at the Sultan weigh station on westbound US 2. Replacing the building and rehabilitating the pavement will address these needs identified by WSP. WSP will be able to police freight traffic on US 2 more effectively as a result of this project.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

PE 2018 NHPP 302,185 0 12,591 314,776

CN 2019 NHPP 1,854,307 0 37,843 1,892,150

Project Totals 2,156,492 0 50,434 2,206,926

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 314,776 1,892,150 0 0 0

Totals 314,776 1,892,150 0 0 0

Federal FundsState Funds Local Funds Total

Agency Totals for WSDOT - NW 13,565,185 800,274 401,689 14,767,148

Page 30

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: PSRC Y Inside N Outside May 30, 2018

County:

Agency: WSDOT - OLY

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

12 0003(129) 300394A WDO-415 20 0.380 DCE Yes Begin SRMP 040.71 End SRMP 041.09 49,199,784 18-05

SR 3/Chico Creek - Remove Fish Barrier

The existing drainage structure at this location has been identified as a fish passage barrier. By replacing the existing structure with a fish passable structure, the restriction to fish passage will be eliminated. Remove fish passage barrier (15.0229 0.10).

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

PE 2019 NHPP 2,654,363 0 110,598 2,764,961

RW 2020 NHPP 271,972 0 11,332 283,304

Project Totals 2,926,335 0 121,930 3,048,265

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 2,764,961 283,304 0 0

Totals 0 2,764,961 283,304 0 0

Page 31

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: PSRC Y Inside N Outside May 30, 2018

County:

Agency: WSDOT - OLY

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

12 351253W WDO-469 21 1.000 DCE No BMP 001.00 EMP 002.00 458,826 18-05

SR 512/Parkland Weigh in Motion - Weigh Station Improvement

This project is to convert the permanent traffic recorder on SR 512 to a virtual weigh in motion.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

PE 2019 NHPP 121,920 0 5,080 127,000

CN 2019 NHPP 325,189 0 6,637 331,826

Project Totals 447,109 0 11,717 458,826

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 458,826 0 0 0

Totals 0 458,826 0 0 0

Page 32

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: PSRC Y Inside N Outside May 30, 2018

County:

Agency: WSDOT - OLY

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

14 300716W WDO-470 21 0.260 DCE No BMP 044.16 EMP 044.42 153,621 18-05

SR 7/Spanaway Weigh Station - Weigh Station Improvement

This project is to remove the building to improve safety and limit potential liability. Remove non-functional overhead detector. Remove scales. Disconnect unnecessary utilities. Rehabilitate the pavement and start using the facility as an F-12 station.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

PE 2019 NHPP 107,290 0 4,470 111,760

CN 2019 NHPP 41,024 0 837 41,861

Project Totals 148,314 0 5,307 153,621

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 153,621 0 0 0

Totals 0 153,621 0 0 0

Federal FundsState Funds Local Funds Total

Agency Totals for WSDOT - OLY 3,521,758 0 138,954 3,660,712

Page 33

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: Quad-Co RTPO N Inside Y Outside May 30, 2018

County: Adams

Agency: Adams Co.

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

00 WA-11080 18 CE No Multiple Multiple 100,000 18-05

Odessa - County Bridge Replacement

Planning, Design, and cost estimated for 10 Adams and Grant County Bridge Replacement required by the Odessa Ground Water Replacement Project

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

PE 2018 0 OTHER 100,000 0 100,000

Project Totals 0 100,000 0 100,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 100,000 0 0 0 0

Totals 100,000 0 0 0 0

Federal FundsState Funds Local Funds Total

Agency Totals for Adams Co. 0 100,000 0 100,000

Page 34

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: Quad-Co RTPO N Inside Y Outside May 30, 2018

County: Kittitas

Agency: Ellensburg

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

16 WA-05646 03 0.600 CE No Mtn. View Ave. Capitol Ave. 1,270,000 18-05

Willow Street Improvements

Project will widen and rehabilitate Willow Street from Mtn. View Ave. to Capitol Ave. Project will also include the installation of curb, missing sidewalk segments, and utilities.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

PE 2018 STP(US) 80,000 0 20,000 100,000

CN 2019 STP(US) 936,000 0 234,000 1,170,000

Project Totals 1,016,000 0 254,000 1,270,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 100,000 0 0 0 0

CN 0 1,170,000 0 0 0

Totals 100,000 1,170,000 0 0 0

Federal FundsState Funds Local Funds Total

Agency Totals for Ellensburg 1,016,000 0 254,000 1,270,000

Page 35

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: RTC Y Inside N Outside May 30, 2018

County:

Agency: WSDOT - SW

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

11 400523I 400523I06 15 0.640 CE Yes 9.00 9.64 50,500,000 18-05

I-5/179th Street Interchange - Interchange Improvements

Interchange improvements to allow for commercial development in the area.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

PE 2018 0 0 500,000 500,000

Project Totals 0 0 500,000 500,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 269,231 230,769 0 0 0

Totals 269,231 230,769 0 0 0

Page 36

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: RTC Y Inside N Outside May 30, 2018

County:

Agency: WSDOT - SW

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

11 400518L 400518L06 18 0.270 CE No 0.0 0.27 350,000 18-05

I-5/Interstate Bridge - Implementation of Senate Bill 5806

Preliminary work to develop a process for planning for a new bridge.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

PE 2018 0 0 350,000 350,000

Project Totals 0 0 350,000 350,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 185,711 164,289 0 0 0

Totals 185,711 164,289 0 0 0

Federal FundsState Funds Local Funds Total

Agency Totals for WSDOT - SW 0 0 850,000 850,000

Page 37

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: RTC N Inside Y Outside May 30, 2018

County:

Agency: WSDOT - SW

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

07 414214A 414214A20 28 33.770 CE Yes 0.00 33.77 1,189,460 18-05

SR 142/Lyle to Little Klickitat River Br - ADA

Upgrade ADA facilities

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

PE 2018 STP 70,677 0 2,945 73,622

PE 2019 STP 177,243 0 7,385 184,628

RW 2019 STP 123,656 0 2,524 126,180

RW 2020 STP 145,599 0 2,971 148,570

CN 2020 STP 643,331 0 13,129 656,460

Project Totals 1,160,506 0 28,954 1,189,460

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 73,622 184,628 0 0 0

RW 0 126,180 148,570 0 0

CN 0 0 656,460 0 0

Totals 73,622 310,808 805,030 0 0

Federal FundsState Funds Local Funds Total

Agency Totals for WSDOT - SW 1,160,506 0 28,954 1,189,460

Page 38

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: SCOG Y Inside N Outside May 30, 2018

County: Skagit

Agency: SCOG

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

00 WA-11060 18 CE No SCOG MPA SCOG MPA 231,214 18-05

Household Travel Survey

The household travel survey will study regional travel behavior and public sentiment for what transportation investments should be made. The project will inform the update to the regional travel demand model and provide statistically valid representation of public preference on regional travel issues.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

PE 2018 STP(US) 200,000 0 31,214 231,214

Project Totals 200,000 0 31,214 231,214

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 231,314 0 0 0

Totals 0 231,314 0 0 0

Federal FundsState Funds Local Funds Total

Agency Totals for SCOG 200,000 0 31,214 231,214

Page 39

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: SCOG Y Inside N Outside May 30, 2018

County: Skagit

Agency: Sedro Woolley

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

17 SW53 15 1.910 CE No Cook Road SR9/Township Street 200,000 18-05

Jones/John Liner/Trail Road Corridor Scoping Study

Planning level project to define the scope of the Jones/John Liner/Trail Road Corridor in order to establish an alternative east-west corridor to relieve congestion on SR20 between SR9 South and SR9 North.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

PE 2018 STP(US) 100,000 0 100,000 200,000

Project Totals 100,000 0 100,000 200,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 150,000 50,000 0 0 0

Totals 150,000 50,000 0 0 0

Federal FundsState Funds Local Funds Total

Agency Totals for Sedro Woolley 100,000 0 100,000 200,000

Page 40

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: SCOG Y Inside N Outside May 30, 2018

County: Skagit

Agency: Skagit Transit

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

00 WA-09857 23 CE No Skagit Transit PTBA Skagit Transit PTBA 62,500 18-05

Bus Stop Design Standards

Planning activity to evaluate current bus stop system and provide a planning document that will include design standards, ROW surveys and engineer drawings for upgrades to various sites.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

ALL 2018 STP(US) 50,000 0 12,500 62,500

Project Totals 50,000 0 12,500 62,500

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 31,250 31,250 0 0 0

Totals 31,250 31,250 0 0 0

Page 41

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: SCOG Y Inside N Outside May 30, 2018

County: Skagit

Agency: Skagit Transit

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

00 WA-09859 23 CE No Mount Vernon UZA Mount Vernon UZA 23,121 18-05

Skagit Transit Bus Shelters Purchase

Purchase and installation of up to 6 bus shelters place on highly used transit routes in the Mount Vernon UZA.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

ALL 2018 STP(US) 20,000 0 3,121 23,121

Project Totals 20,000 0 3,121 23,121

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 23,121 0 0 0 0

Totals 23,121 0 0 0 0

Page 42

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: SCOG Y Inside N Outside May 30, 2018

County: Skagit

Agency: Skagit Transit

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

00 WA-09860 23 CE No Varies Varies 37,500 18-05

Skagit Transit Bus Stop Re-Construction

Construction project to upgrade various bus stops to ADA guidelines.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

ALL 2018 STP(US) 30,000 0 7,500 37,500

Project Totals 30,000 0 7,500 37,500

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 37,500 0 0 0

Totals 0 37,500 0 0 0

Federal FundsState Funds Local Funds Total

Agency Totals for Skagit Transit 100,000 0 23,121 123,121

Page 43

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: SCOG Y Inside N Outside May 30, 2018

County:

Agency: WSDOT - NW

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

01 100501H WA-11043 21 0.930 CE No I-5 MP 234.65 I-5 MP 235.58 1,159,885 18-05

I-5/Bow Hill SB Weigh Station - Weigh Station Preservation

Installation of jersey barriers, rehabilitation of the parking area pavement, and re-striping the lanes to address the needs identified by Washington State Patrol (WSP). WSP will be able to police freight traffic more effectively on this area.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

PE 2018 NHPP 156,058 0 6,502 162,560

CN 2019 NHPP 977,379 0 19,946 997,325

Project Totals 1,133,437 0 26,448 1,159,885

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 63,213 99,347 0 0 0

CN 0 699,424 297,901 0 0

Totals 63,213 798,771 297,901 0 0

Page 44

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: SCOG Y Inside N Outside May 30, 2018

County:

Agency: WSDOT - NW

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

06 100901D WA-11044 21 0.500 CE No SR 9 MP 58.50 SR 9 MP 59.00 546,100 18-05

SR 9/Sedro-Woolley Weigh in Motion - Weigh Station Preservation

The project will construct a Vehicle Weigh-in-Motion facility as this location has high priority identified by Washington State Patrol (WSP). WSP will be able to police freight traffic on SR 9 more effectively as a result of this project.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

PE 2018 STP 73,584 0 3,066 76,650

CN 2019 STP 460,061 0 9,389 469,450

Project Totals 533,645 0 12,455 546,100

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 29,806 46,844 0 0 0

CN 0 329,225 140,225 0 0

Totals 29,806 376,069 140,225 0 0

Federal FundsState Funds Local Funds Total

Agency Totals for WSDOT - NW 1,667,082 0 38,903 1,705,985

Page 45

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: SRTC Y Inside N Outside May 30, 2018

County: Spokane

Agency: Airway Heights

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

14 WA-08553 28 0.370 CE No Hayford Rd Deer Heights Road 346,773 18-05

Highway 2 Shared Use Path Gap Project

Construct new pedestrian pathway along south edge of US 2 between Hayford Rd and Deer Heights Rd (1360 ft) and complete shared use pathway on north edge of US 2 to Deer Heights Rd (620 ft).

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

PE 2018 TAP(UL) 20,641 0 6,221 26,862

CN 2019 TAP(UL) 177,830 0 142,081 319,911

Project Totals 198,471 0 148,302 346,773

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 23,862 0 0 0 0

CN 0 322,911 0 0 0

Totals 23,862 322,911 0 0 0

Federal FundsState Funds Local Funds Total

Agency Totals for Airway Heights 198,471 0 148,302 346,773

Page 46

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: SRTC Y Inside N Outside May 30, 2018

County: Spokane

Agency: Spokane Co.

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

16 3917(005) WA-07003 04 1.350 CE Yes MP 0.54 MP 1.89 2,795,693 18-05

Mill Road

This project will construct an ACP grind and removal with HMA repave over the entire roadway. The new road will be striped with bike lanes where no bike lanes currently exist. Safety improvements at the intersection with Hastings road will be constructed, including pedestrian countdowns, and a curb realignment to reduce confusion with an existing dedicated right turn lane. ADA ramps will be reconstructed to current standards for the length of the project. Stormwater improvements will be made for the length of the project to ensure proper drainage to current standards.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

PE 2018 0 0 84,473 84,473

RW 2018 0 0 217,644 217,644

CN 2018 STP(UL) 697,142 0 1,723,530 2,420,672

Project Totals 697,142 0 2,025,647 2,722,789

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 94,315 0 0 0 0

RW 217,644 0 0 0 0

CN 911,296 1,509,376 0 0 0

Totals 1,223,255 1,509,376 0 0 0

Federal FundsState Funds Local Funds Total

Agency Totals for Spokane Co. 697,142 0 2,025,647 2,722,789

Page 47

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: SRTC Y Inside N Outside May 30, 2018

County: Spokane

Agency: SRTC

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

00 WA-11040 18 0.000 CE No NA NA 173,411 18-05

SRTC Data Acquisition

SRTC will acquire data to support the update of the travel demand model and other regional planning efforts.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

PE 2018 STP(UL) 150,000 0 23,411 173,411

Project Totals 150,000 0 23,411 173,411

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 173,411 0 0 0 0

Totals 173,411 0 0 0 0

Federal FundsState Funds Local Funds Total

Agency Totals for SRTC 150,000 0 23,411 173,411

Page 48

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: SWW RTPO N Inside Y Outside May 30, 2018

County:

Agency: WSDOT - SW

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

06 450722B 450722B21 11 0.040 CE Yes 2.36 2.40 12,717,600 18-05

SR 507/Skookumchuck River Bridge - Replace Bridge

Replace structurally deficient bridge #507/8

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

PE 2018 STP 44,899 0 1,871 46,770

PE 2019 STP 483,930 0 20,164 504,094

PE 2020 STP 489,107 0 20,379 509,486

PE 2021 STP 393,264 0 16,386 409,650

RW 2020 STP 1,505,868 0 30,732 1,536,600

Project Totals 2,917,068 0 89,532 3,006,600

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 46,770 504,094 509,486 409,650 0

RW 0 0 1,536,600 0 0

CN 0 0 0 0 7,576,558

Totals 46,770 504,094 2,046,086 409,650 7,576,558

Federal FundsState Funds Local Funds Total

Agency Totals for WSDOT - SW 2,917,068 0 89,532 3,006,600

Page 49

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: TRPC Y Inside N Outside May 30, 2018

County: Thurston

Agency: Thurston Co.

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

00 WA-10898 18 CE No County Wide County Wide 300,000 18-05

Thurston County Mobility Strategy

To address future transportation needs on the County's road system. The study will result in a strategy to address transportation mobility in urban/rural transition areas and strategy corridors throughout the County.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

PE 2018 STP(R) 259,500 0 40,500 300,000

Project Totals 259,500 0 40,500 300,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 300,000 0 0 0 0

Totals 300,000 0 0 0 0

Federal FundsState Funds Local Funds Total

Agency Totals for Thurston Co. 259,500 0 40,500 300,000

Page 50

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: TRPC Y Inside N Outside May 30, 2018

County: Thurston

Agency: TRPC

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

00 WA-10943 44 CE No NA NA 250,000 18-05

Olympia Capitol Campus - Taming the Dragons

An intense Travel Demand Management outreach/education effort targeting top/mid-level managers at state agency worksites on the Olympia Capitol Campus to increase adoption of mobile/flexible/telework options and am/pm schedule shifts for state employees.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

PE 2018 CMAQ 216,250 0 33,750 250,000

Project Totals 216,250 0 33,750 250,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 250,000 0 0 0 0

Totals 250,000 0 0 0 0

Federal FundsState Funds Local Funds Total

Agency Totals for TRPC 216,250 0 33,750 250,000

Page 51

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: WCoG Y Inside N Outside May 30, 2018

County: Whatcom

Agency: Bellingham

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

16 5559(001) BHAM 26 01 0.250 CE No Pacific Rim Ln Aldrich Rd 5,412,000 18-05

West Horton Road, Phase 1

Construct new minor arterial to connect a developing urban growth area to SR539. Including bike lanes, separated boardwalk path, and illumination.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

CN 2019 STP(US) 1,400,000 0 2,933,000 4,333,000

Project Totals 1,400,000 0 2,933,000 4,333,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

CN 0 4,333,000 0 0 0

Totals 0 4,333,000 0 0 0

Federal FundsState Funds Local Funds Total

Agency Totals for Bellingham 1,400,000 0 2,933,000 4,333,000

Page 52

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: WCoG N Inside Y Outside May 30, 2018

County: Whatcom

Agency: Lummi Nation

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

08 LUMMI 7 28 0.750 CE No Kwina Road Scott Road 1,070,000 18-05

Lummi Shore Drive Sidewalk

Construct a side path for pedestrians and bicyclists. Project includes illumination, swale, and signs.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

PE 2018 0 0 75,000 75,000

CN 2018 0 Ped/Bike Program 615,000 380,000 995,000

Project Totals 0 615,000 455,000 1,070,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 75,000 0 0 0 0

CN 995,000 0 0 0 0

Totals 1,070,000 0 0 0 0

Federal FundsState Funds Local Funds Total

Agency Totals for Lummi Nation 0 615,000 455,000 1,070,000

Page 53

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: WWV Y Inside N Outside May 30, 2018

County: Walla Walla

Agency: Valley Transit

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

00 1808 23 CE No N/A N/A 26,000 18-05

Real-Time Passenger Information Display System for Market Station (FFY 2015)

Purchase and installation of two electronic passenger information displays providing real-time bus location and schedules. One larger display will be installed on the Market Station customer service building, and one smaller display will be installed near the Main Street multi-modal shelter.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

ALL 2018 5339 20,490 0 5,510 26,000

Project Totals 20,490 0 5,510 26,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 26,000 0 0 0 0

Totals 26,000 0 0 0 0

Federal FundsState Funds Local Funds Total

Agency Totals for Valley Transit 20,490 0 5,510 26,000

Page 54

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: YVCOG Y Inside N Outside May 30, 2018

County: Yakima

Agency: Yakima Transit

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

00 YT-IT17-19 23 CE No N/A N/A 571,230 18-05

IT/Equipment Updates - Fixed Route Buses

IT and Equipment Upgrades for Yakima Transit's Fixed Route Services. Funds are expected for years 2016 (Fed funds: $59,194, Match: $14798.50), 2017 (Fed funds: $196,399, Match: $49,099.75), and 2018 (Fed funds: $201,391, Match: $50,347.75).

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

ALL 2018 5339 456,984 0 114,246 571,230

Project Totals 456,984 0 114,246 571,230

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 280,000 291,230 0 0 0

Totals 280,000 291,230 0 0 0

Federal FundsState Funds Local Funds Total

Agency Totals for Yakima Transit 456,984 0 114,246 571,230

Page 55

Washington State S. T. I. P.

2018 to 2021

(Project Funds to Nearest Dollar)

MPO/RTPO: YVCOG N Inside Y Outside May 30, 2018

County: Yakima

Agency: Yakima Co.

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

07 S390(004) YkCo50000C 11 0.200 CE No 12.96 13.16 1,603,360 18-05

Fort Road Bridge #1353 Replacement Project

Replace existing bridge structure with new 2 lane bridge.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds Total

CN 2018 STP(BR) 1,093,360 CRAB 305,000 0 1,398,360

Project Totals 1,093,360 305,000 0 1,398,360

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

CN 1,398,360 0 0 0 0

Totals 1,398,360 0 0 0 0

Federal FundsState Funds Local Funds Total

Agency Totals for Yakima Co. 1,093,360 305,000 0 1,398,360

Page 56