washington state s. t. i. p. 2018 to 2021 (project funds ...€¦ · (project funds to nearest...
TRANSCRIPT
(Project Funds to Nearest Dollar)
Report Date - May 30, 2018
totals for years 2018 thru 2021
Selection Criteria (from SEARCH panel - if any)
Washington State S. T. I. P.
Agency
County
MPO
Region
Envrionmental Classification
Priority Number
Title
PIN
STIP ID
Amendment Number 18-05
Agency Project ID
Secured Y
Planned
Is New
Current Action
Future Action
Amended
Approved as of Date
Federal Fund Code
State Fund Code
Inside MPO
MPO Project ID
2018 to 2021
Page 1
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: CDTC Y Inside N Outside May 30, 2018
County: Chelan
Agency: LINK Transit
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
00 WA-09616 23 CE No N/A N/A 4,347,216 18-05
Battery Electric Buses and Charger
Purchase up to five (5) Battery Electric Buses from BYD Heavy Industries, including a fast-charger and its installation.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
ALL 2018 5339(c) 3,768,489 0 578,727 4,347,216
Project Totals 3,768,489 0 578,727 4,347,216
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 4,347,216 0 0 0 0
Totals 4,347,216 0 0 0 0
Page 2
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: CDTC Y Inside N Outside May 30, 2018
County: Chelan
Agency: LINK Transit
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
00 WA-11088 23 0.000 CE No NA NA 521,760 18-05
Replace up to Seven (7) Cutaway Buses
Purchase up to seven (7) cutaway buses.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
ALL 2018 5339 376,747 0 145,013 521,760
Project Totals 376,747 0 145,013 521,760
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 521,760 0 0 0 0
Totals 521,760 0 0 0 0
Federal FundsState Funds Local Funds Total
Agency Totals for LINK Transit 4,145,236 0 723,740 4,868,976
Page 3
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: CDTC Y Inside N Outside May 30, 2018
County:
Agency: WSDOT - NC
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
02 200208C 200208CDTC 28 0.530 CE No 119.16 119.69 488,005 18-05
US 2/Easy Street E - Pedestrian Trail
This project will design and construct a shared use path.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
PE 2018 STP(US) 77,850 0 22,150 100,000
CN 2019 STP(US) 186,840 0 201,165 388,005
Project Totals 264,690 0 223,315 488,005
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 100,000 0 0 0 0
CN 0 388,005 0 0 0
Totals 100,000 388,005 0 0 0
Federal FundsState Funds Local Funds Total
Agency Totals for WSDOT - NC 264,690 0 223,315 488,005
Page 4
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: CWCG Y Inside N Outside May 30, 2018
County: Cowlitz
Agency: Longview
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
14 WA-09220 21 0.100 CE Yes California Way Industrial/SR432 Intersection 5,300,000 18-05
CALIFORNIA WAY/SR 432 INTERSECTION
Realigning California Way to create a single intersection at SR 432/Industrial Way, resulting in more efficient signal operation & turning movements. Realignment of California Way intersection will require right-of-way acquisition of parcels and relocation of existing businesses. Two existing railroad crossing will require widening to accommodate the new alignment.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
PE 2018 NHFP 920,000 0 0 920,000
RW 2019 NHFP 2,076,000 0 0 2,076,000
CN 2019 NHFP 2,304,000 0 0 2,304,000
Project Totals 5,300,000 0 0 5,300,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 920,000 0 0 0 0
RW 0 2,076,000 0 0 0
CN 0 2,304,000 0 0 0
Totals 920,000 4,380,000 0 0 0
Federal FundsState Funds Local Funds Total
Agency Totals for Longview 5,300,000 0 0 5,300,000
Page 5
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: CWCG Y Inside N Outside May 30, 2018
County:
Agency: WSDOT - SW
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
11 400520A 400520A08 21 50.970 CE No 27.40 78.37 367,290 18-05
I-5/Cowlitz and Lewis County Ramps - ADA Upgrades
Update ADA to meet current guidelines. See also SWW RTPO record 400520A21.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
PE 2019 NHPP 26,910 0 1,121 28,031
PE 2020 NHPP 53,269 0 2,219 55,488
CN 2020 NHPP 278,095 0 5,675 283,770
Project Totals 358,274 0 9,015 367,289
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 28,031 55,488 0 0
CN 0 0 283,770 0 0
Totals 0 28,031 339,258 0 0
Federal FundsState Funds Local Funds Total
Agency Totals for WSDOT - SW 358,274 0 9,015 367,289
Page 6
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: Headquarters N Inside Y Outside May 30, 2018
County:
Agency: WS Parks & Recreation
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
00 WA05(002) WA-07767 30 CE No Various Various 212,850 18-05
Coulee Corridor - Phase 2
Construction and installation of community kiosks, trailblazer signs,story panel displays and interpretive panels.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
CN 2018 Discretionary - SB 88,200 0 0 88,200
Project Totals 88,200 0 0 88,200
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 88,200 0 0 0 0
Totals 88,200 0 0 0 0
Federal FundsState Funds Local Funds Total
Agency Totals for WS Parks & Recreation
88,200 0 0 88,200
Page 7
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: NEW RTPO N Inside Y Outside May 30, 2018
County: Stevens
Agency: Colville
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
02 WA-10993 28 0.030 CE No Astor Ave Main 1,400,000 18-05
Heritage Court
Heritage Court pedestrian safety and connectivity at the intersection of Astor and Main.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
PE 2018 TAP(R) 54,000 0 0 54,000
Project Totals 54,000 0 0 54,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 54,000 0 0 0 0
Totals 54,000 0 0 0 0
Federal FundsState Funds Local Funds Total
Agency Totals for Colville 54,000 0 0 54,000
Page 8
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: Okanogan Co. N Inside Y Outside May 30, 2018
County: Okanogan
Agency: Okanogan Co.
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
07 9155(1) 06 2.250 CE Yes MP 1.91 MP 4.16 3,182,660 18-05
Old 97 (Driskel Rd to Verestar Rd)
Minor realignment, widening, grading, drainage, ballast, top course and HMA or BST. Guardrail may be necessary on short grade section.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
PE 2018 STP(R) 25,000 0 3,902 28,902
PE 2019 0 CRAB 270,000 30,000 300,000
RW 2019 STP(R) 10,000 0 1,561 11,561
RW 2021 0 CRAB 180,000 20,000 200,000
CN 2021 STP(R) 988,000 CRAB 1,350,000 304,197 2,642,197
Project Totals 1,023,000 1,800,000 359,660 3,182,660
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 28,902 0 0 0 0
RW 0 311,561 0 0 0
CN 0 0 0 2,842,197 0
Totals 28,902 311,561 0 2,842,197 0
Federal FundsState Funds Local Funds Total
Agency Totals for Okanogan Co. 1,023,000 1,800,000 359,660 3,182,660
Page 9
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: Peninsula RTPO N Inside Y Outside May 30, 2018
County:
Agency: WSDOT - OLY
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
14 0101(387) 310153E 310153E-05 21 34.200 CE No 249.65 283.85 99,211 18-05
US 101/Golf Course Rd to N of W Uncas Rd - Rumble Strips
Collision data indicates run off the road incidents occur along higher speed highways. By installing shoulder rumble strips or profiled plastic line, the frequency of run off the road incidents may be reduced.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
PE 2018 HSIP 12,927 0 539 13,466
Project Totals 12,927 0 539 13,466
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 13,466 0 0 0 0
CN 0 0 0 0 85,745
Totals 13,466 0 0 0 85,745
Page 10
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: Peninsula RTPO N Inside Y Outside May 30, 2018
County:
Agency: WSDOT - OLY
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
14 0101(387) 310153G 310153G-05 14 0.220 CE No 282.41 282.63 106,381 18-05
US 101/Golf Course Rd to N of W Uncas Rd - Special Repair
The strip seal expansion joints on these structures have reached their usable service life and need replacement. The bridge deck grading needs to be addressed. This project will replace the strip seals expansion joints and fixed the grading on the deck to extend the service life of structures 101/250 and 101/251.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
PE 2018 NHPP 14,054 0 585 14,639
Project Totals 14,054 0 585 14,639
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 14,639 0 0 0 0
CN 0 0 0 0 91,742
Totals 14,639 0 0 0 91,742
Federal FundsState Funds Local Funds Total
Agency Totals for WSDOT - OLY 26,981 0 1,124 28,105
Page 11
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: PSRC Y Inside N Outside May 30, 2018
County: Snohomish
Agency: Everett
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
00 EVT-71 21 0.000 CE No 112th Street SE 18th Street 711,300 18-05
Everett Citywide Innovative Safety
For traffic signals throughout the city, design for and install flashing yellow arrows, retroreflective tape on existing backplates, leading pedestrian intervals, and accessible pedestrian pushbuttons
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
PE 2018 HSIP 70,110 0 7,790 77,900
CN 2018 HSIP 570,060 0 63,340 633,400
Project Totals 640,170 0 71,130 711,300
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 711,300 0 0 0 0
Totals 711,300 0 0 0 0
Federal FundsState Funds Local Funds Total
Agency Totals for Everett 640,170 0 71,130 711,300
Page 12
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: PSRC Y Inside N Outside May 30, 2018
County: King
Agency: Kirkland
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
17 KIRK-44 28 0.200 CE No NE 132nd Street and 84th Ave
NE 132nd Street and 87th Ave
500,00018-05
NE 132nd Street Sidewalk
Design and construction of curb, gutter, sidewalk, and planter strip along NE 132nd Street between 84th Ave NE and 87th Avenue NE in the Finn Hill neighborhood.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
PE 2018 0 OTHER 150,000 0 150,000
CN 2019 0 OTHER 350,000 0 350,000
Project Totals 0 500,000 0 500,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 150,000 350,000 0 0 0
Totals 150,000 350,000 0 0 0
Federal FundsState Funds Local Funds Total
Agency Totals for Kirkland 0 500,000 0 500,000
Page 13
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: PSRC Y Inside N Outside May 30, 2018
County: Snohomish
Agency: Snohomish Co.
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
00 SNOCO-143 04 0.000 DCE No 240th St SE Snohomish-WoodinvilleRoad
655,28118-05
240th Street SE FFY 2017 Railway/Highway Crossing
Install safety improvements and reconstruct the crossing including concrete panels, new sidewalk, widen shoulders, upgrade to LED signal and upgrade the signal interconnection.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
PE 2018 0 0 94,000 94,000
CN 2018 HSIP 417,620 OTHER 143,661 0 561,281
Project Totals 417,620 143,661 94,000 655,281
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 655,281 0 0 0 0
Totals 655,281 0 0 0 0
Federal FundsState Funds Local Funds Total
Agency Totals for Snohomish Co. 417,620 143,661 94,000 655,281
Page 14
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: PSRC Y Inside N Outside May 30, 2018
County:
Agency: WSDOT - NW
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
11 140567E WDNW-1180 14 18.900 CE No MP 1.14 MP 20.04 16,998,580 18-05
I-405/Burlington Northern Railroad Bridge to Pedestrian Trail Bridge - Seismic Retrofit
Provide seismic retrofit on thirteen I-405 bridges located within Washington's Seismic Lifeline Route. NHS Bridges are 2017 priorities - 405/045E (priority #19), 405/045W (priority #20), 405/046E (priority #21), 405/046W (priority #22), 405/047E (priority #23), 405/047W (priority #24), 405/048E (priority #25), 405/048W (priority #26), 405/052E (priority #27), 405/052W (priority #28), 405/056E (priority #29), 405/056W (priority #30), and 405/012 (priority #13).
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
PE 2019 NHPP 2,473,404 0 103,058 2,576,462
Project Totals 2,473,404 0 103,058 2,576,462
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 2,576,462 0 0 0
Totals 0 2,576,462 0 0 0
Page 15
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: PSRC Y Inside N Outside May 30, 2018
County:
Agency: WSDOT - NW
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
11 100527U WDNW-1181 21 2.780 CE No MP 173.59 MP 176.37 376,068 18-05
I-5/NE 130th St to NE 175th St - ADA Compliance
This project will evaluate and improve pedestrian safety by upgrading ADA sidewalk ramps within the project limits.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
PE 2019 NHPP 32,256 0 1,344 33,600
CN 2020 NHPP 335,619 0 6,849 342,468
Project Totals 367,875 0 8,193 376,068
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 33,600 342,468 0 0
Totals 0 33,600 342,468 0 0
Page 16
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: PSRC Y Inside N Outside May 30, 2018
County:
Agency: WSDOT - NW
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
11 100516H WDNW-1178 14 1.730 CE No MP 162.82 MP 164.55 22,997,260 18-05
I-5/Southbound S Spokane St to I-90 Vicinity - Deck Overlay & Expansion Joint
The existing sliding plate expansion joints on Bridge 5/536W, 5/538S-W, 5/539W, 5/539SCD, 5/538S-E on I-5 southbound need replacement. Bridge deck rehabilitation is to grind and place polyester concrete overlay.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
PE 2019 NHPP 1,973,664 0 82,236 2,055,900
Project Totals 1,973,664 0 82,236 2,055,900
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 2,055,900 0 0 0
Totals 0 2,055,900 0 0 0
Page 17
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: PSRC Y Inside N Outside May 30, 2018
County:
Agency: WSDOT - NW
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
11 109024T WDNW-1182 14 1.610 DCE No MP 4.28 MP 5.89 2,986,209 18-05
I-90/Homer M Hadley Bridge - Anchor Cable Replacement
Replace eleven selected anchor cables on the I-90 Homer M Hadley Bridge.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
PE 2019 NHPP 99,708 0 4,155 103,863
Project Totals 99,708 0 4,155 103,863
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 103,863 0 0 0
Totals 0 103,863 0 0 0
Page 18
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: PSRC Y Inside N Outside May 30, 2018
County:
Agency: WSDOT - NW
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
11 109024S WDNW-1183 14 1.610 DCE No MP 4.28 MP 5.89 4,795,270 18-05
I-90/Lacey V Murrow Bridge - Anchor Cable Replacement
Replace fifteen selected anchor cables on the I-90 Lacey V Murrow Floating Bridge.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
PE 2019 NHPP 147,882 0 6,162 154,044
Project Totals 147,882 0 6,162 154,044
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 154,044 0 0 0
Totals 0 154,044 0 0 0
Page 19
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: PSRC Y Inside N Outside May 30, 2018
County:
Agency: WSDOT - NW
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
11 109004W WDNW-1179 14 0.010 CE No MP 2.40 MP 2.41 377,050 18-05
I-90/Westbound I-5 Overcrossing, W-S Ramp - Expansion Joint Replacement
Replace the expansion joints on the I-90 westbound structure which over-crosses mainline I-5 and on-ramps to southbound I-5. (Bridge No. 90/10W-S)
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
PE 2019 NHPP 31,248 0 1,302 32,550
Project Totals 31,248 0 1,302 32,550
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 32,550 0 0 0
Totals 0 32,550 0 0 0
Page 20
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: PSRC Y Inside N Outside May 30, 2018
County:
Agency: WSDOT - NW
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
14 0104(056) 110401D WDNW-1041 21 0.060 CE No Railroad Ave (MP 24.48) Sunset Ave Vic (MP 24.54) 745,658 18-05
SR 104/Sunset Ave - Railroad Crossing Improvements
This project will install advance preemption with gate down circuitry and associated hardware and software in Edmonds at the intersection with Sunset Ave.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
CN 2018 HSIP 639,605 0 13,053 652,658
Project Totals 639,605 0 13,053 652,658
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 652,658 0 0 0 0
Totals 652,658 0 0 0 0
Page 21
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: PSRC Y Inside N Outside May 30, 2018
County:
Agency: WSDOT - NW
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
02 116900B WDNW-1191 21 1.370 CE Yes MP 0.03 MP 1.40 1,093,572 18-05
SR 169/SR 164 to SE 400th St - ADA Compliance
This project will evaluate and improve pedestrian safety by upgrading ADA sidewalk ramps within the project limits.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
PE 2018 NHPP 158,888 0 6,620 165,508
RW 2019 NHPP 72,104 0 1,472 73,576
CN 2019 NHPP 837,398 0 17,090 854,488
Project Totals 1,068,390 0 25,182 1,093,572
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 165,508 928,064 0 0 0
Totals 165,508 928,064 0 0 0
Page 22
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: PSRC Y Inside N Outside May 30, 2018
County:
Agency: WSDOT - NW
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
14 101808D WDNW-1186 14 0.620 CE No MP 3.62 MP 4.24 1,559,224 18-05
SR 18/Northern Pacific (BNSF) Railroad Overcrossing - Expansion Joint Replacement
Replace the expansion joints and paint the bearings on the SR 18 Northern Pacific (BNSF) Railroad Overcrossing (Bridge No. 18/9).
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
PE 2018 NHPP 260,460 0 10,852 271,312
CN 2020 NHPP 1,262,154 0 25,758 1,287,912
Project Totals 1,522,614 0 36,610 1,559,224
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 271,312 0 1,287,912 0 0
Totals 271,312 0 1,287,912 0 0
Page 23
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: PSRC Y Inside N Outside May 30, 2018
County:
Agency: WSDOT - NW
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
12 101801C WDNW-1189 21 3.260 CE No MP 0.86 MP 4.12 1,646,246 18-05
SR 18/Weyerhauser Way Vicinity to SR 164 Vicinity - Barrier Replacement
This segment of concrete barrier, located in the median on SR 18, is nearing the end of its service life and needs to be replaced.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
PE 2018 STP 102,924 0 4,288 107,212
CN 2020 STP 1,508,253 0 30,781 1,539,034
Project Totals 1,611,177 0 35,069 1,646,246
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 107,212 0 1,539,034 0 0
Totals 107,212 0 1,539,034 0 0
Page 24
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: PSRC Y Inside N Outside May 30, 2018
County:
Agency: WSDOT - NW
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
14 150920D WDNW-1187 21 1.380 CE No MP 20.41 MP 21.79 13,680 18-05
SR 509/Des Moines Memorial Drive to SW 200th St - ADA Compliance
This project will evaluate and improve pedestrian safety by upgrading ADA sidewalk ramps within the project limits.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
PE 2019 NHPP 2,160 0 90 2,250
CN 2020 NHPP 11,201 0 229 11,430
Project Totals 13,361 0 319 13,680
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 2,250 11,430 0 0
Totals 0 2,250 11,430 0 0
Page 25
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: PSRC Y Inside N Outside May 30, 2018
County:
Agency: WSDOT - NW
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
16 151612B WDNW-1190 21 4.050 CE No MP 12.17 MP 16.22 95,820 18-05
SR 516/SE Wax Rd Vicinity to SR 169 - ADA Compliance
This project will evaluate and improve pedestrian safety by upgrading ADA sidewalk ramps within the project limits.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
PE 2018 STP 8,594 0 358 8,952
CN 2020 STP 85,131 0 1,737 86,868
Project Totals 93,725 0 2,095 95,820
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 8,952 0 86,868 0 0
Totals 8,952 0 86,868 0 0
Page 26
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: PSRC Y Inside N Outside May 30, 2018
County:
Agency: WSDOT - NW
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
12 152604L WDNW-1192 14 2.350 CE No MP 1.43 MP 3.78 7,140,674 18-05
SR 526/Airport Rd to E Casino Rd - Seismic Retrofit
Provide seismic retrofit on four SR 526 bridges located within Washington's Seismic Lifeline Route. NHS Bridges and 2017 priorities - 526/010 (priority #8), 526/012S-E (priority #58), 526/014 (priority #7), and 526/020 (priority #6).
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
PE 2018 0 CWA 800,274 0 800,274
Project Totals 0 800,274 0 800,274
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 800,274 0 0 0 0
Totals 800,274 0 0 0 0
Page 27
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: PSRC Y Inside N Outside May 30, 2018
County:
Agency: WSDOT - NW
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
06 153035F WDNW-1188 21 0.360 CE Yes MP 48.73 MP 49.09 307,781 18-05
SR 530/Seeman St to Mountain Loop Rd - ADA Compliance
This project will evaluate and improve pedestrian safety by upgrading ADA sidewalk ramps within the project limits.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
PE 2018 NHPP 39,484 0 1,645 41,129
RW 2019 NHPP 25,970 0 530 26,500
CN 2019 NHPP 235,349 0 4,803 240,152
Project Totals 300,803 0 6,978 307,781
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 41,129 266,652 0 0 0
Totals 41,129 266,652 0 0 0
Page 28
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: PSRC Y Inside N Outside May 30, 2018
County:
Agency: WSDOT - NW
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
02 100251A WDNW-1185 14 0.080 CE Yes MP 34.24 MP 34.32 1,092,080 18-05
US 2/Anderson Creek Bridge - Scour Repair
This project on US 2 Anderson Creek Bridge No. 2/39 will place heavy loose riprap around southeast retaining wall and Pier 3 to cover the exposed footing and prevent the bridge footing from scouring. In addition, this project will re-vegetate work access road area with native plants.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
PE 2018 NHPP 240,106 0 10,004 250,110
RW 2019 NHPP 25,382 0 518 25,900
CN 2020 NHPP 799,749 0 16,321 816,070
Project Totals 1,065,237 0 26,843 1,092,080
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 250,110 25,900 816,070 0 0
Totals 250,110 25,900 816,070 0 0
Page 29
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: PSRC Y Inside N Outside May 30, 2018
County:
Agency: WSDOT - NW
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
14 100201K WDNW-1184 21 0.200 CE No MP 21.37 MP 21.57 2,206,926 18-05
US 2/Sultan Westbound Weigh Station - Weigh Station Preservation
Washington State Patrol has identified a need to repave the parking lot and replace the building at the Sultan weigh station on westbound US 2. Replacing the building and rehabilitating the pavement will address these needs identified by WSP. WSP will be able to police freight traffic on US 2 more effectively as a result of this project.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
PE 2018 NHPP 302,185 0 12,591 314,776
CN 2019 NHPP 1,854,307 0 37,843 1,892,150
Project Totals 2,156,492 0 50,434 2,206,926
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 314,776 1,892,150 0 0 0
Totals 314,776 1,892,150 0 0 0
Federal FundsState Funds Local Funds Total
Agency Totals for WSDOT - NW 13,565,185 800,274 401,689 14,767,148
Page 30
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: PSRC Y Inside N Outside May 30, 2018
County:
Agency: WSDOT - OLY
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
12 0003(129) 300394A WDO-415 20 0.380 DCE Yes Begin SRMP 040.71 End SRMP 041.09 49,199,784 18-05
SR 3/Chico Creek - Remove Fish Barrier
The existing drainage structure at this location has been identified as a fish passage barrier. By replacing the existing structure with a fish passable structure, the restriction to fish passage will be eliminated. Remove fish passage barrier (15.0229 0.10).
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
PE 2019 NHPP 2,654,363 0 110,598 2,764,961
RW 2020 NHPP 271,972 0 11,332 283,304
Project Totals 2,926,335 0 121,930 3,048,265
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 2,764,961 283,304 0 0
Totals 0 2,764,961 283,304 0 0
Page 31
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: PSRC Y Inside N Outside May 30, 2018
County:
Agency: WSDOT - OLY
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
12 351253W WDO-469 21 1.000 DCE No BMP 001.00 EMP 002.00 458,826 18-05
SR 512/Parkland Weigh in Motion - Weigh Station Improvement
This project is to convert the permanent traffic recorder on SR 512 to a virtual weigh in motion.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
PE 2019 NHPP 121,920 0 5,080 127,000
CN 2019 NHPP 325,189 0 6,637 331,826
Project Totals 447,109 0 11,717 458,826
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 458,826 0 0 0
Totals 0 458,826 0 0 0
Page 32
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: PSRC Y Inside N Outside May 30, 2018
County:
Agency: WSDOT - OLY
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
14 300716W WDO-470 21 0.260 DCE No BMP 044.16 EMP 044.42 153,621 18-05
SR 7/Spanaway Weigh Station - Weigh Station Improvement
This project is to remove the building to improve safety and limit potential liability. Remove non-functional overhead detector. Remove scales. Disconnect unnecessary utilities. Rehabilitate the pavement and start using the facility as an F-12 station.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
PE 2019 NHPP 107,290 0 4,470 111,760
CN 2019 NHPP 41,024 0 837 41,861
Project Totals 148,314 0 5,307 153,621
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 153,621 0 0 0
Totals 0 153,621 0 0 0
Federal FundsState Funds Local Funds Total
Agency Totals for WSDOT - OLY 3,521,758 0 138,954 3,660,712
Page 33
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: Quad-Co RTPO N Inside Y Outside May 30, 2018
County: Adams
Agency: Adams Co.
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
00 WA-11080 18 CE No Multiple Multiple 100,000 18-05
Odessa - County Bridge Replacement
Planning, Design, and cost estimated for 10 Adams and Grant County Bridge Replacement required by the Odessa Ground Water Replacement Project
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
PE 2018 0 OTHER 100,000 0 100,000
Project Totals 0 100,000 0 100,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 100,000 0 0 0 0
Totals 100,000 0 0 0 0
Federal FundsState Funds Local Funds Total
Agency Totals for Adams Co. 0 100,000 0 100,000
Page 34
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: Quad-Co RTPO N Inside Y Outside May 30, 2018
County: Kittitas
Agency: Ellensburg
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
16 WA-05646 03 0.600 CE No Mtn. View Ave. Capitol Ave. 1,270,000 18-05
Willow Street Improvements
Project will widen and rehabilitate Willow Street from Mtn. View Ave. to Capitol Ave. Project will also include the installation of curb, missing sidewalk segments, and utilities.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
PE 2018 STP(US) 80,000 0 20,000 100,000
CN 2019 STP(US) 936,000 0 234,000 1,170,000
Project Totals 1,016,000 0 254,000 1,270,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 100,000 0 0 0 0
CN 0 1,170,000 0 0 0
Totals 100,000 1,170,000 0 0 0
Federal FundsState Funds Local Funds Total
Agency Totals for Ellensburg 1,016,000 0 254,000 1,270,000
Page 35
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: RTC Y Inside N Outside May 30, 2018
County:
Agency: WSDOT - SW
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
11 400523I 400523I06 15 0.640 CE Yes 9.00 9.64 50,500,000 18-05
I-5/179th Street Interchange - Interchange Improvements
Interchange improvements to allow for commercial development in the area.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
PE 2018 0 0 500,000 500,000
Project Totals 0 0 500,000 500,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 269,231 230,769 0 0 0
Totals 269,231 230,769 0 0 0
Page 36
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: RTC Y Inside N Outside May 30, 2018
County:
Agency: WSDOT - SW
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
11 400518L 400518L06 18 0.270 CE No 0.0 0.27 350,000 18-05
I-5/Interstate Bridge - Implementation of Senate Bill 5806
Preliminary work to develop a process for planning for a new bridge.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
PE 2018 0 0 350,000 350,000
Project Totals 0 0 350,000 350,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 185,711 164,289 0 0 0
Totals 185,711 164,289 0 0 0
Federal FundsState Funds Local Funds Total
Agency Totals for WSDOT - SW 0 0 850,000 850,000
Page 37
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: RTC N Inside Y Outside May 30, 2018
County:
Agency: WSDOT - SW
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
07 414214A 414214A20 28 33.770 CE Yes 0.00 33.77 1,189,460 18-05
SR 142/Lyle to Little Klickitat River Br - ADA
Upgrade ADA facilities
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
PE 2018 STP 70,677 0 2,945 73,622
PE 2019 STP 177,243 0 7,385 184,628
RW 2019 STP 123,656 0 2,524 126,180
RW 2020 STP 145,599 0 2,971 148,570
CN 2020 STP 643,331 0 13,129 656,460
Project Totals 1,160,506 0 28,954 1,189,460
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 73,622 184,628 0 0 0
RW 0 126,180 148,570 0 0
CN 0 0 656,460 0 0
Totals 73,622 310,808 805,030 0 0
Federal FundsState Funds Local Funds Total
Agency Totals for WSDOT - SW 1,160,506 0 28,954 1,189,460
Page 38
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: SCOG Y Inside N Outside May 30, 2018
County: Skagit
Agency: SCOG
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
00 WA-11060 18 CE No SCOG MPA SCOG MPA 231,214 18-05
Household Travel Survey
The household travel survey will study regional travel behavior and public sentiment for what transportation investments should be made. The project will inform the update to the regional travel demand model and provide statistically valid representation of public preference on regional travel issues.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
PE 2018 STP(US) 200,000 0 31,214 231,214
Project Totals 200,000 0 31,214 231,214
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 231,314 0 0 0
Totals 0 231,314 0 0 0
Federal FundsState Funds Local Funds Total
Agency Totals for SCOG 200,000 0 31,214 231,214
Page 39
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: SCOG Y Inside N Outside May 30, 2018
County: Skagit
Agency: Sedro Woolley
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
17 SW53 15 1.910 CE No Cook Road SR9/Township Street 200,000 18-05
Jones/John Liner/Trail Road Corridor Scoping Study
Planning level project to define the scope of the Jones/John Liner/Trail Road Corridor in order to establish an alternative east-west corridor to relieve congestion on SR20 between SR9 South and SR9 North.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
PE 2018 STP(US) 100,000 0 100,000 200,000
Project Totals 100,000 0 100,000 200,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 150,000 50,000 0 0 0
Totals 150,000 50,000 0 0 0
Federal FundsState Funds Local Funds Total
Agency Totals for Sedro Woolley 100,000 0 100,000 200,000
Page 40
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: SCOG Y Inside N Outside May 30, 2018
County: Skagit
Agency: Skagit Transit
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
00 WA-09857 23 CE No Skagit Transit PTBA Skagit Transit PTBA 62,500 18-05
Bus Stop Design Standards
Planning activity to evaluate current bus stop system and provide a planning document that will include design standards, ROW surveys and engineer drawings for upgrades to various sites.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
ALL 2018 STP(US) 50,000 0 12,500 62,500
Project Totals 50,000 0 12,500 62,500
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 31,250 31,250 0 0 0
Totals 31,250 31,250 0 0 0
Page 41
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: SCOG Y Inside N Outside May 30, 2018
County: Skagit
Agency: Skagit Transit
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
00 WA-09859 23 CE No Mount Vernon UZA Mount Vernon UZA 23,121 18-05
Skagit Transit Bus Shelters Purchase
Purchase and installation of up to 6 bus shelters place on highly used transit routes in the Mount Vernon UZA.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
ALL 2018 STP(US) 20,000 0 3,121 23,121
Project Totals 20,000 0 3,121 23,121
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 23,121 0 0 0 0
Totals 23,121 0 0 0 0
Page 42
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: SCOG Y Inside N Outside May 30, 2018
County: Skagit
Agency: Skagit Transit
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
00 WA-09860 23 CE No Varies Varies 37,500 18-05
Skagit Transit Bus Stop Re-Construction
Construction project to upgrade various bus stops to ADA guidelines.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
ALL 2018 STP(US) 30,000 0 7,500 37,500
Project Totals 30,000 0 7,500 37,500
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 0 37,500 0 0 0
Totals 0 37,500 0 0 0
Federal FundsState Funds Local Funds Total
Agency Totals for Skagit Transit 100,000 0 23,121 123,121
Page 43
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: SCOG Y Inside N Outside May 30, 2018
County:
Agency: WSDOT - NW
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
01 100501H WA-11043 21 0.930 CE No I-5 MP 234.65 I-5 MP 235.58 1,159,885 18-05
I-5/Bow Hill SB Weigh Station - Weigh Station Preservation
Installation of jersey barriers, rehabilitation of the parking area pavement, and re-striping the lanes to address the needs identified by Washington State Patrol (WSP). WSP will be able to police freight traffic more effectively on this area.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
PE 2018 NHPP 156,058 0 6,502 162,560
CN 2019 NHPP 977,379 0 19,946 997,325
Project Totals 1,133,437 0 26,448 1,159,885
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 63,213 99,347 0 0 0
CN 0 699,424 297,901 0 0
Totals 63,213 798,771 297,901 0 0
Page 44
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: SCOG Y Inside N Outside May 30, 2018
County:
Agency: WSDOT - NW
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
06 100901D WA-11044 21 0.500 CE No SR 9 MP 58.50 SR 9 MP 59.00 546,100 18-05
SR 9/Sedro-Woolley Weigh in Motion - Weigh Station Preservation
The project will construct a Vehicle Weigh-in-Motion facility as this location has high priority identified by Washington State Patrol (WSP). WSP will be able to police freight traffic on SR 9 more effectively as a result of this project.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
PE 2018 STP 73,584 0 3,066 76,650
CN 2019 STP 460,061 0 9,389 469,450
Project Totals 533,645 0 12,455 546,100
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 29,806 46,844 0 0 0
CN 0 329,225 140,225 0 0
Totals 29,806 376,069 140,225 0 0
Federal FundsState Funds Local Funds Total
Agency Totals for WSDOT - NW 1,667,082 0 38,903 1,705,985
Page 45
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: SRTC Y Inside N Outside May 30, 2018
County: Spokane
Agency: Airway Heights
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
14 WA-08553 28 0.370 CE No Hayford Rd Deer Heights Road 346,773 18-05
Highway 2 Shared Use Path Gap Project
Construct new pedestrian pathway along south edge of US 2 between Hayford Rd and Deer Heights Rd (1360 ft) and complete shared use pathway on north edge of US 2 to Deer Heights Rd (620 ft).
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
PE 2018 TAP(UL) 20,641 0 6,221 26,862
CN 2019 TAP(UL) 177,830 0 142,081 319,911
Project Totals 198,471 0 148,302 346,773
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 23,862 0 0 0 0
CN 0 322,911 0 0 0
Totals 23,862 322,911 0 0 0
Federal FundsState Funds Local Funds Total
Agency Totals for Airway Heights 198,471 0 148,302 346,773
Page 46
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: SRTC Y Inside N Outside May 30, 2018
County: Spokane
Agency: Spokane Co.
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
16 3917(005) WA-07003 04 1.350 CE Yes MP 0.54 MP 1.89 2,795,693 18-05
Mill Road
This project will construct an ACP grind and removal with HMA repave over the entire roadway. The new road will be striped with bike lanes where no bike lanes currently exist. Safety improvements at the intersection with Hastings road will be constructed, including pedestrian countdowns, and a curb realignment to reduce confusion with an existing dedicated right turn lane. ADA ramps will be reconstructed to current standards for the length of the project. Stormwater improvements will be made for the length of the project to ensure proper drainage to current standards.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
PE 2018 0 0 84,473 84,473
RW 2018 0 0 217,644 217,644
CN 2018 STP(UL) 697,142 0 1,723,530 2,420,672
Project Totals 697,142 0 2,025,647 2,722,789
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 94,315 0 0 0 0
RW 217,644 0 0 0 0
CN 911,296 1,509,376 0 0 0
Totals 1,223,255 1,509,376 0 0 0
Federal FundsState Funds Local Funds Total
Agency Totals for Spokane Co. 697,142 0 2,025,647 2,722,789
Page 47
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: SRTC Y Inside N Outside May 30, 2018
County: Spokane
Agency: SRTC
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
00 WA-11040 18 0.000 CE No NA NA 173,411 18-05
SRTC Data Acquisition
SRTC will acquire data to support the update of the travel demand model and other regional planning efforts.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
PE 2018 STP(UL) 150,000 0 23,411 173,411
Project Totals 150,000 0 23,411 173,411
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 173,411 0 0 0 0
Totals 173,411 0 0 0 0
Federal FundsState Funds Local Funds Total
Agency Totals for SRTC 150,000 0 23,411 173,411
Page 48
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: SWW RTPO N Inside Y Outside May 30, 2018
County:
Agency: WSDOT - SW
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
06 450722B 450722B21 11 0.040 CE Yes 2.36 2.40 12,717,600 18-05
SR 507/Skookumchuck River Bridge - Replace Bridge
Replace structurally deficient bridge #507/8
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
PE 2018 STP 44,899 0 1,871 46,770
PE 2019 STP 483,930 0 20,164 504,094
PE 2020 STP 489,107 0 20,379 509,486
PE 2021 STP 393,264 0 16,386 409,650
RW 2020 STP 1,505,868 0 30,732 1,536,600
Project Totals 2,917,068 0 89,532 3,006,600
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 46,770 504,094 509,486 409,650 0
RW 0 0 1,536,600 0 0
CN 0 0 0 0 7,576,558
Totals 46,770 504,094 2,046,086 409,650 7,576,558
Federal FundsState Funds Local Funds Total
Agency Totals for WSDOT - SW 2,917,068 0 89,532 3,006,600
Page 49
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: TRPC Y Inside N Outside May 30, 2018
County: Thurston
Agency: Thurston Co.
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
00 WA-10898 18 CE No County Wide County Wide 300,000 18-05
Thurston County Mobility Strategy
To address future transportation needs on the County's road system. The study will result in a strategy to address transportation mobility in urban/rural transition areas and strategy corridors throughout the County.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
PE 2018 STP(R) 259,500 0 40,500 300,000
Project Totals 259,500 0 40,500 300,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 300,000 0 0 0 0
Totals 300,000 0 0 0 0
Federal FundsState Funds Local Funds Total
Agency Totals for Thurston Co. 259,500 0 40,500 300,000
Page 50
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: TRPC Y Inside N Outside May 30, 2018
County: Thurston
Agency: TRPC
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
00 WA-10943 44 CE No NA NA 250,000 18-05
Olympia Capitol Campus - Taming the Dragons
An intense Travel Demand Management outreach/education effort targeting top/mid-level managers at state agency worksites on the Olympia Capitol Campus to increase adoption of mobile/flexible/telework options and am/pm schedule shifts for state employees.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
PE 2018 CMAQ 216,250 0 33,750 250,000
Project Totals 216,250 0 33,750 250,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 250,000 0 0 0 0
Totals 250,000 0 0 0 0
Federal FundsState Funds Local Funds Total
Agency Totals for TRPC 216,250 0 33,750 250,000
Page 51
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: WCoG Y Inside N Outside May 30, 2018
County: Whatcom
Agency: Bellingham
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
16 5559(001) BHAM 26 01 0.250 CE No Pacific Rim Ln Aldrich Rd 5,412,000 18-05
West Horton Road, Phase 1
Construct new minor arterial to connect a developing urban growth area to SR539. Including bike lanes, separated boardwalk path, and illumination.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
CN 2019 STP(US) 1,400,000 0 2,933,000 4,333,000
Project Totals 1,400,000 0 2,933,000 4,333,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 0 4,333,000 0 0 0
Totals 0 4,333,000 0 0 0
Federal FundsState Funds Local Funds Total
Agency Totals for Bellingham 1,400,000 0 2,933,000 4,333,000
Page 52
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: WCoG N Inside Y Outside May 30, 2018
County: Whatcom
Agency: Lummi Nation
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
08 LUMMI 7 28 0.750 CE No Kwina Road Scott Road 1,070,000 18-05
Lummi Shore Drive Sidewalk
Construct a side path for pedestrians and bicyclists. Project includes illumination, swale, and signs.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
PE 2018 0 0 75,000 75,000
CN 2018 0 Ped/Bike Program 615,000 380,000 995,000
Project Totals 0 615,000 455,000 1,070,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 75,000 0 0 0 0
CN 995,000 0 0 0 0
Totals 1,070,000 0 0 0 0
Federal FundsState Funds Local Funds Total
Agency Totals for Lummi Nation 0 615,000 455,000 1,070,000
Page 53
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: WWV Y Inside N Outside May 30, 2018
County: Walla Walla
Agency: Valley Transit
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
00 1808 23 CE No N/A N/A 26,000 18-05
Real-Time Passenger Information Display System for Market Station (FFY 2015)
Purchase and installation of two electronic passenger information displays providing real-time bus location and schedules. One larger display will be installed on the Market Station customer service building, and one smaller display will be installed near the Main Street multi-modal shelter.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
ALL 2018 5339 20,490 0 5,510 26,000
Project Totals 20,490 0 5,510 26,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 26,000 0 0 0 0
Totals 26,000 0 0 0 0
Federal FundsState Funds Local Funds Total
Agency Totals for Valley Transit 20,490 0 5,510 26,000
Page 54
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: YVCOG Y Inside N Outside May 30, 2018
County: Yakima
Agency: Yakima Transit
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
00 YT-IT17-19 23 CE No N/A N/A 571,230 18-05
IT/Equipment Updates - Fixed Route Buses
IT and Equipment Upgrades for Yakima Transit's Fixed Route Services. Funds are expected for years 2016 (Fed funds: $59,194, Match: $14798.50), 2017 (Fed funds: $196,399, Match: $49,099.75), and 2018 (Fed funds: $201,391, Match: $50,347.75).
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
ALL 2018 5339 456,984 0 114,246 571,230
Project Totals 456,984 0 114,246 571,230
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
ALL 280,000 291,230 0 0 0
Totals 280,000 291,230 0 0 0
Federal FundsState Funds Local Funds Total
Agency Totals for Yakima Transit 456,984 0 114,246 571,230
Page 55
Washington State S. T. I. P.
2018 to 2021
(Project Funds to Nearest Dollar)
MPO/RTPO: YVCOG N Inside Y Outside May 30, 2018
County: Yakima
Agency: Yakima Co.
FuncCls
ProjectNumber PIN STIP ID
ImpType
TotalProjectLength Environmental
TypeRWRequired
BeginTermini
EndTermini
Total Est. Cost of Project
STIPAmend.No.
07 S390(004) YkCo50000C 11 0.200 CE No 12.96 13.16 1,603,360 18-05
Fort Road Bridge #1353 Replacement Project
Replace existing bridge structure with new 2 lane bridge.
Funding
Phase Start Date Federal Fund CodeFederal Funds
State Fund Code State Funds Local Funds Total
CN 2018 STP(BR) 1,093,360 CRAB 305,000 0 1,398,360
Project Totals 1,093,360 305,000 0 1,398,360
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 1,398,360 0 0 0 0
Totals 1,398,360 0 0 0 0
Federal FundsState Funds Local Funds Total
Agency Totals for Yakima Co. 1,093,360 305,000 0 1,398,360