warning safety caution manual - framers council...• first violation will result in a written...

250
SAFETY MANUAL A %LOLQJXDO Guide for Safety on the Jobsite Jointly produced with the Structural Building Components Association WARNING CAUTION DANGER framerscouncil.org Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION Your Company Name HERE

Upload: others

Post on 22-Sep-2020

2 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

SAFETYMANUAL

A Guide for Safety on the Jobsite

Jointly produced with the Structural Building

Components Association

WARNING

CAUTION

DANGER

framerscouncil.orgCopyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

Your Company Name HERE

Page 2: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

Page 3: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

SAFETYMANUAL

A Bilingual Guide for Safety on the Jobsite

Version 4.0Published July 2018

Copyright © 2014-18

National Framers Council and Structural Building Components Association

All rights reserved. This manual or any part thereof may not be reproduced in any form without the written permission of the publisher. Printed in the United States of America.

The Structural Building Components Association (SBCA) and the National Fram-

techniques and recommendations discussed in this manual. THE INFORMATION IS INTENDED AS A GENERAL GUIDE TO SAFETY PRACTICES ONLY AND IS NOT INTENDED TO PROVIDE SPECIFIC GUIDANCE OR OPINION, LEGAL OR OTHERWISE. The publication of these materials furthermore does not constitute an explicit or implicit endorsement by SBCA or the NFC.

Jointly produced with the Structural Building

Components Association

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEY

UAL

ngual Guide for Safetngual Guide fo

Version 4.0Version 4.0Published July 2Published July 2

Copyright © 20Copyright © 20

National FNational

All rfo

Page 4: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

Company InformationIf a section does not apply, simply leave it blank.

Company Name:

President/CEO/Owner:

Company Safety Coordinator:

Street Address:City, State, Zip Code:Phone: Fax:General Email:Website:

Name:Phone: Email:

Name:Phone: Email:

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEFax:

ne: EmaE

Name:Name:Phone:Phone:

Expires__________

SubCOID#_________

Page 5: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

Company PoliciesIf a section does not apply, simply leave it blank.

DisciplinaryAction Policy:

Additional Policies:

Attach an additional page if necessary. See Employee Handbook, if applicable, for complete details.

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLElicies:licies:

Safety rules and procedures have been established by the Company for theprotection of all Employees engaged in jobsite activity. All Employees are requiredto adhere to these rules and procedures on the Company’s jobsites.

An Employee’s disregard for adhering to the safety policies, rules and procedurescan result in serious injury to the Employee and his/her co-workers. Themanagement of the Company cannot tolerate this type of behavior. Employeedisciplinary action will be considered for any Employee who is found to be inviolation of the Company’s safety policies, rules and procedures in accordance withthe following schedule.

• First violation will result in a written warning to the Employee.• Second violation within a one-year period may result in the Employee beingsuspended for a three-day period.• Third violation within a one-year period may result in the Employee beingterminated from employment for cause.

In the case where an Employee intentionally disregards a safety rule or procedure,management may waive the above disciplinary procedure and immediately dismissthe Employee. A copy of all Employee disciplinary actions must be sent to theHuman Resource office for placement in the Employee’s personnel file.

Page 6: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

This table of contents is a form used to verify the sections of the safety manual in which an Employee receives training. By initialing and dating next to a given section, you are certifying that you have read the material in that section of the Safety Manual and have no questions. You understand that if you have questions regarding the Safety Manual or your personal safety, it is your responsibility to contact your supervisor for an explanation and additional information.

Section 1: General Jobsite Safety1.1 Introduction Initial: _____ Date: _____1.2 Jobsite & Emergency Contact Information Initial: _____ Date: _____1.3 General Safety Rules Initial: _____ Date: _____1.4 Drug & Alcohol Policy Initial: _____ Date: _____1.5 First Aid Procedures Initial: _____ Date: _____1.6 Hazardous Communication (HAZCOM) Training Guidelines Initial: _____ Date: _____1.7 Preventing Heat Illnesses Initial: _____ Date: _____1.8 Preventing Hypothermia & Frostbite Initial: _____ Date: _____1.9 Fire Prevention & Protection Initial: _____ Date: _____1.10 Weather/Storm Procedures Initial: _____ Date: _____1.11 Automobile Driving Procedures Initial: _____ Date: _____1.12 Proper Use of Extension Cords Initial: _____ Date: _____1.13 Avoiding Electrical Shock Initial: _____ Date: _____1.14 Working in High Wind Initial: _____ Date: _____1.15 Trench Awareness Initial: _____ Date: _____

1.17 Reinforcing Steel Impalement Hazards Initial: _____ Date: _____1.18 Respirable Silica Exposure Control Guidelines Initial: _____ Date: _____

Section 2: Accident Investigation & Reporting2.1 Introduction Initial: _____ Date: _____2.2 Automobile Accident Investigation & Reporting Procedures Initial: _____ Date: _____2.3 Automobile Accident Report Initial: _____ Date: _____2.4 Jobsite Injury Investigation & Reporting Procedures Initial: _____ Date: _____2.5 Employer’s First Report of Injury Initial: _____ Date: _____2.6 Property Damage Investigation & Reporting Procedures Initial: _____ Date: _____2.7 Employer’s First Report of Property Damage Initial: _____ Date: _____2.8 Witness Statement Initial: _____ Date: _____

Section 3: Personal Safety3.1 Personal Protective Equipment (PPE) Initial: _____ Date: _____

• Head Protection Initial: _____ Date: _____

TABLE OF CONTENTS

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEareare

no quesno queyour personalour persona

additional informatadditional inform

Initial: __________ Date: ___Date: ___Initial: _______ Date: Date:Initial: __________ DaDInitial: _____Initial: _____Initial: ___Initial: ___

aining Guidelinesaining Guidelines Initial: Initial:Init

e

scedurescedures

nsion Cordsn Cordscal Shockal

High Windigh Windwarenesseness

einforcing Steel Impalement Heinforcing Steel Impalem8 Respirable Silica Exposure 8 Respirable Silica Exposu

Section 2: Accident ection 2: Accident1 IntroductionIntroductio

utomobile Accidemobile Accidmobile Acmobile Ac

nju

Page 7: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

Usted entiende que si tiene preguntas con respeto al Manual de Seguridad o su seguridad personal,

Sección 1: Seguridad general en el trabajo

1.2 Iniciales: _____ Fecha: _____1.3 Reglas generales de seguridad Iniciales: _____ Fecha: _____

1.5 Procedimientos de primeros auxilios Iniciales: _____ Fecha: _____1.6 Iniciales: _____ Fecha: _____

1.10 Procedimientos del clima/tormentas Iniciales: _____ Fecha: _____

1.13 Evitando choques eléctricos Iniciales: _____ Fecha: _____1.14 Trabajando con viento fuerte Iniciales: _____ Fecha: _____1.15 Conciencia de la zanja Iniciales: _____ Fecha: _____

1.17 Riesgo de empalmiento de las barillas de refuerzo Iniciales: _____ Fecha: _____

Sección 2: Investigación e informe de accidentes

2.3 Informe de accidente de auto Iniciales: _____ Fecha: _____2.4 Iniciales: _____ Fecha: _____

2.6 Iniciales: _____ Fecha: _____

Sección 3: Seguridad personal

ÍNDICE

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEo su segurido su seguri

Iniciales: _____les: ____ Iniciales: __ciales: __

IniciaIniciII

ormentasrmentas

es eléctricoses eléctricoscon viento fuerteon viento fue

cia de la zanjae la zanja

esgo de empalmiento de las besgo de empalmiento de

Sección 2: Investigaección 2: Investiga

me de acme de ac

Page 8: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

• Eye Protection Initial: _____ Date: _____• Gloves Initial: _____ Date: _____• Clothing Initial: _____ Date: _____• Ear Protection Initial: _____ Date: _____• Dust Protection Initial: _____ Date: _____

3.2 Proper Body Mechanics Initial: _____ Date: _____

Section 4: Fall Protection4.1 Introduction Initial: _____ Date: _____4.2 Ladders Initial: _____ Date: _____4.3 Protection from Falling Objects Initial: _____ Date: _____4.4 Guardrails Initial: _____ Date: _____

4.6 Personal Fall Arrest Systems (PFAS) Initial: _____ Date: _____4.7 Positioning Device Systems Initial: _____ Date: _____4.8 Horizontal Lifelines Initial: _____ Date: _____4.9 Rescue Plan Initial: _____ Date: _____

Section 5: Jobsite Equipment5.1 Aerial Lifts Initial: _____ Date: _____5.2 Forklifts Initial: _____ Date: _____5.3 Lockout/Tagout Initial: _____ Date: _____

Section 6: Power-Operated Hand Tools 6.1 Introduction Initial: _____ Date: _____6.2 Air Compressors Initial: _____ Date: _____6.3 Portable Generators Initial: _____ Date: _____6.4 Pneumatic Nail Guns Initial: _____ Date: _____6.5 Powder-Actuated Tools Initial: _____ Date: _____

Section 7: Addenda

Glossary & Appendices

-

Employee (Print Name) Signature Date

Supervisor (Print Name) Signature Date

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE_____ D

itial: _____tial: _____ Date: ___Date: ___Initial: _____tial: _____ Date: _____Date: _____Initial: __________ Date: ____Date: ___Initial: ________ Date: _Date:

Initial: _____Initial: _____Initial: ___Initial: ___Initial: _Initial: Initi

entent

er-Operated Hand Toerated Hand T

sorsorsGeneratorsrators

matic Nail GunsGunsowder-Actuated Toolsowder-Actuated Tools

Section 7: Addendaection 7: Addenda

ssary & Appry & App

Page 9: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

• Guantes Iniciales: _____ Fecha: _____• Ropa Iniciales: _____ Fecha: _____

Sección 4: Protección contra caídas

4.2 Escaleras Iniciales: _____ Fecha: _____

4.4 Barandillas Iniciales: _____ Fecha: _____4.5 Andamio Iniciales: _____ Fecha: _____

4.7 Sistemas de dispositivos de posicionarse/retractables Iniciales: _____ Fecha: _____4.8 Sistema de línea de vida horizontal Iniciales: _____ Fecha: _____

Sección 5: Equipos del lugar de trabajo 5.1 Elevador aéreo Iniciales: _____ Fecha: _____5.2 Montacargas Iniciales: _____ Fecha: _____5.3 Aislar/etiquetar Iniciales: _____ Fecha: _____

Sección 6: Herramientas de mano eléctricas

6.2 Compresores de aire Iniciales: _____ Fecha: _____

Sección 7: Adiciones

de trabajo (si es necesario) Iniciales: _____ Fecha: _____

Glosario y apéndices

Empleado ( Escriba su nombre) Firma Fecha

Supervisor (Escriba su nombre) Firma Fecha

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEiciales: _____ Fecha: _____es: _____ Fecha: _____

Iniciales: _____ Fecha: ____ Fecha: Iniciales: _____ FechIniciales: _____ Fec

actablesctables Iniciales: ____Iniciales: ___Iniciales: _ciales: _

gar de trabajo ar de trabajo

amientas de mano elntas de mano

s de airede aire

Sección 7: Adicionesección 7: Adiciones

de trabajo (si es nece trabajo (si es ne

rio y aprio y ap

Page 10: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

Page 11: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

SECTION 1

GENERAL JOBSITE SAFETY

SECCIÓN 1

SEGURIDAD GENERAL EN EL

LUGAR DE TRABAJO

Training Resources: Toolbox Talks1.3 Horseplay

HousekeepingWorkplace Violence

1.5 First Aid Procedures1.6 HAZCOM - How to Read an SDS

HAZCOM Standard Labels & PictogramsHAZCOM Standard Pictograms

Examples of Corrosion Examples of Exclamation Mark Examples of Exploding Bomb Examples of Flame Over Circle Examples of Flame Examples of Gas Cylinder Examples of Health Hazard Examples of Skull & Crossbones1.7 Preventing Heat Illnesses1.8 Preventing Hypothermia & Frostbite1.9 Fire Protection & Prevention1.12 Proper Use of Extension Cords1.13 Avoiding Electric Shock1.14 High Wind – Securing the Jobsite

Working in High Wind1.15 Trench Awareness1.161.17 Reinforcing Steel Impalement Hazards1.18 What Is Silica? Silica Exposure Control: Cutting of Autoclaved Aerated Concrete Wall Panels

Silica Exposure Control: Cutting Gypsum/Fiber Cementitious Products

Silica Exposure Control: Drilling Concrete

Safety Awareness Resources: Posters1.3 DANGER Construction Area

No HorseplaySafety FirstHousekeeping

1.6 Hazard Communication Standard Pictograms1.7 Working in Hot Conditions1.9 No Smoking1.18 Silica Dust Hazard

Recursos de Formación: Toolbox Talks1.3 Las bromas

LimpiezaViolencia en el trabajo

1.5 Procedimiento de los primeros auxilios1.6 Comunicación de peligros (HAZCOM) - Como leer el SDS

Etiquetas y pictogramas para la norma sobre la HAZCOMPictograma para la norma sobre la HAZCOM

Ejemplos de corrosión Ejemplos de signo de exclamación Ejemplos de explosión de bomba Ejemplos de llama sobre círculo Ejemplos de llama Ejemplos de cilindro de gas Ejemplos de riesgos para la salud Ejemplos de calavera y huesos cruzados1.7 Prevención de enfermedades del calor1.8 Prevención de la hipotermia y de la congelación1.9 Prevención y protección del fuego1.12 Uso apropiado de cables eléctricos de estensión1.13 Evitando choques eléctricos1.14 Vientos Fuertes – Asegurando el lugar de trabajo

Trabajando con viento fuerte1.15 Conciencia de la zanja1.161.17 Riesgo de empalmiento de las barillas de refuerzo1.18 ¿Qué es sílice? Control de exposición a la sílice: Corte de paneles de pared de concreto aireado en autoclave

Control de exposición a la sílice: Corte de productos

Control de exposición a la sílice: Perforación de concreto

Recursos de Conciencia de Seguridad: Carteles1.3 PELIGRO Área de construcción

No correr o bromasSeguridad ante todoLimpieza

1.6 Pictograma para la norma sobre la comunicación de peligros1.7 Trabajar en situaciones calurosas 1.9 No fumar1.18 Peligros del polvo de silica

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEAL EAL E

E TRABAE TRABA

stbiten

n Cordsn Cordshockock

curing the Jobsite the JobsiteHigh Wind

wareness

Reinforcing Steel Impalement Hazardseinforcing Steel Impalement Hazards8 What Is Silica?What Is Silica?

Silica Exposure Control: Cutting of AuSilica Exposure Control: Cutting of A Concrete Wall PanelsConcrete Wall PanelsSilica Exposure Control: Cuttiilica Exposure Control: Cut

Productsductsxposure Controxposure Contro

Formación: Toolbox Talksación: Toolbox Talks

cia en el trabajocia en el traocedimiento de los primeros auxiliosdimiento de los primeros auxilios

Comunicación de peligros (HAZCOM) - Comunicación de peligros (HAZCOM) - CEtiquetas y pictogramas para la normaEtiquetas y pictogramas para la normPictograma para la norma sobre laPictograma para la norma sobre la

Ejemplos de corrosiónEjemplos de corrosión Ejemplos de signo deEjemplos de signo de Ejemplos de exploEje Ejemplos de llEj Ejemplos dEjemp EjemplEjemp EjeEje 1.71.7 PP1.8

Page 12: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

SECTION 1: GENERAL JOBSITE SAFETYIntroduction

-

-

-

-

-

GENERAL JOBSITE SAFETY 1.1 Introduction

1.1

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

Page 13: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

SECCIÓN 1: SEGURIDAD GENERAL EN EL LUGAR DE TRABAJOIntroducción

-

--

-

-

-

SEGURIDAD GENERAL EN EL LUGAR DE TRABAJO 1.1 Introducción

1.1

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

Page 14: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

GENERAL JOBSITE SAFETY 1.1 Introduction

GLOSSARY APPENDIX A

bold, blue-green text

Competent Person-

Employee 1

-

--

CAUTION:

DANGER:

WARNING:

1

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SSSSAMPLE

NING:

SSSSSSSS

Page 15: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

SEGURIDAD GENERAL EN EL LUGAR DE TRABAJO 1.1 Introducción

GLOSARIO APENDICE A-

texto oscuro y azul-verde

Persona competente:

Empleado: ---

-

PRECAUCIÓN:

PELIGRO: -

ADVERTENCIA:

1

-

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEO:

ADVERTENCIAADVERTENCIA:

Page 16: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

GENERAL JOBSITE SAFETY 1.1 Introduction

Orientation

--

Competent Person -

Competent Person

Jobsite Personnel

-

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

Page 17: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

SEGURIDAD GENERAL EN EL LUGAR DE TRABAJO 1.1 Introducción

Orientación

-

-Persona Competente

Persona Competente

-

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

Page 18: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

GENERAL JOBSITE SAFETY

Phone Location

Services for emergency)

for emergency)

Services

Jobsite PersonnelPhone

Number

Safe

tyC

oord

inat

or

Pers

on

Oth

er:

Oth

er:

Oth

er:

Oth

er:

Oth

er:

1.2

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

SASASASASSSSSMPMPPPPMPMPMPMPMPPPPPMPMMPMPMPMPPPMMAMMMMMAMAMAMMMMMAMAMAMMMAMAMAMAAASAA

PLLLELELEEPPPPPPSafe

Coo

rdi

on

her: er:

Page 19: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

SEGURIDAD GENERAL EN EL LUGAR DE TRABAJO

Teléfono

Servicios de

Servicios

Personal del Lugar de Trabajo Liste nombres y chequee todos Número de

Teléfono

Coo

rdin

ador

de

Segu

ridad

Pers

ona

Ger

ente

de

Proy

ecto

Otr

o:

Otr

o:

Otr

o:

Otr

o:

Otr

o:

1.2

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

SASASASASASSSSrvicios de

MPMPPPPMPMPMPMPMPPPPPMPMMPMPMPMPPPMMAMMMMMAMAMAMMMMMAMAMAMMMAMAMAMSAAASAA

LLLELELEEPPPPPPCoo

rSe

gurid

a

Pers

ona o

:

Page 20: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

GENERAL JOBSITE SAFETY

Employees

Employees

Employee

of other Employees Employee

competent personaccident -

Employees

SECTION 3: PERSONAL SAFETY

Employees

-

to the

-

1.3

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEEmployeeEmployee

sonson

EmployeeEmploye

SAFETYSAFETY

EmployeesmployeS

E

S

Page 21: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

SEGURIDAD GENERAL EN EL LUGAR DE TRABAJO

Empleados -

Empleados-

Empleado

EmpleadosEmpleado

persona competente

accidente

Empleados-

SECCIÓN 3: SEGURIDAD PERSONAL

Empleados -

-

-

1.3

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE-

EmpleadosEmpleado

mpetentempetente

denteden

Empleadospleados

3: SEGURIDAD3: SEGURIDAD

EmpleaEmp

SSS

Page 22: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

GENERAL JOBSITE SAFETY

EmployeesSECTION 5: JOBSITE EQUIPMENT

signsEmployees

walkways

DANGER Employee

lower level

SECTION 4: FALL PROTECTION

holes

SECTION 4: FALL PROTECTION

Power-operated hand tools

SECTION 6: POWER-OPERATED HAND TOOLS

ground fault circuit interrupters (GFCIs)

Employee is

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLECTION 4: FALL TION 4: FALL

N 4: FALL PROTECTIONN 4: FALL PROTECT

wer-operated hand toolsoperated hand tools

SECTIONSECTION

LELE

Page 23: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

SEGURIDAD GENERAL EN EL LUGAR DE TRABAJO

EmpleadosSECCIÓN 5: EQUIPO DEL LUGAR DE TRA-

BAJO

advertencia -Empleados

pasillos

-

PELIGRO-

SECCIÓN 4: PROTECCIÓN CONTRA CAÍDAS

huecos

SECCIÓN 4: PROTECCIÓN CONTRA CAÍDAS

Herramientas eléctricas de manoSECCIÓN

6: HERRAMIENTAS ELÉCTRICAS DE MANO

Limpieza:

Empleado es

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

--

-

ECCIÓN 4: PROTECCIÓNCIÓN 4: PROTASS

cosos

N 4: PROTECCIÓN CONTN 4: PROTECCIÓN CONT

ramientas eléctricas de mientas eléctricas de

6: HERRAMIENTAS ELÉC6: HERRAMIENTAS ELÉ

Lim

LELE

Page 24: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

GENERAL JOBSITE SAFETY

Employees

accident

-

1.4

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

Page 25: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

SEGURIDAD GENERAL EN EL LUGAR DE TRABAJO

Empleados -

accidente

-

-

-

-

1.4

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

Page 26: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

GENERAL JOBSITE SAFETY

Employee

Employeeaccident

SECTION 2: ACCIDENT INVESTIGATION & REPORTING for

accident SECTION 2: ACCIDENT INVESTIGATION & REPORTING

1.5

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEEmployeemployeeac

CCIDENT INVESTIGATICCIDENT INVEST

INI

Page 27: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

SEGURIDAD GENERAL EN EL LUGAR DE TRABAJO

Empleado

que Empleado se ha estabilizado con tratamiento médico

SECCIÓN 2: INVESTIGACIÓN Y RE-PORTE DE ACCIDENTE

-accidente SECCIÓN 2: INVESTIGACIÓN Y

REPORTE DE ACCIDENTE

1.5

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

AMMPLEque Empleado se ha que Empleado se ha icoco

SECCIÓN 2: INVSECCIÓN ACCIDENTECIDENTE

Page 28: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

GENERAL JOBSITE SAFETY

accident

accidentSECTION 2: ACCIDENT INVESTI-

GATION & REPORTING

CAUTION

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEident

NVESTI-

Page 29: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

SEGURIDAD GENERAL EN EL LUGAR DE TRABAJO

accidente-

accidente SECCIÓN 2: INVESTI-GACIÓN Y REPORTE DE ACCIDENTE

PRECAUCIÓN

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

identee SECCIÓN 2: INSECCIÓN 2: ACCIDENTEACCIDENTE

Page 30: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

GENERAL JOBSITE SAFETY

Employees

hazardous substances

Employeeshazardous substances

hazardous substances

hazardous substances

The use of hazardous substances

hazardous substances

Employeesto hazardous substances

Employees

hazardous substances

Employees --

ing Acknowledgement APPENDIX A

1.6

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEp

stanceses

rdous substancesdous substances

s substancessubstances

hazardoushaza

hazardous substancesous substances

Page 31: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

SEGURIDAD GENERAL EN EL LUGAR DE TRABAJO

Empleados

sustancias peligrosas

-

Empleados

sustancias peligrosas

sustancias peligrosas

sustancias peligrosas

sustancias peligrosas

Empleados sustancias peligrosas

Empleados

sustancias peligrosas

Empleados

-edgement APPENDICE A

1.6

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEs peligrosass peligrosas

ustancias peligrosasustancias peligrosas

ias peligrosasas peligrosas

sustanciasu

Empleadosmpleados

Page 32: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

GENERAL JOBSITE SAFETY

-

-

Flame Corrosion Flame Over Circle

Gas CylinderCrossbones

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

SASSSSSSSSSSAMSAAFlamFlam

Page 33: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

SEGURIDAD GENERAL EN EL LUGAR DE TRABAJO

-

-

• Carcinógeno• Mutagenicidad• Toxicidad para la reproducción• Sensibilización respiratoria

órganos diana• Peligro por aspiración

Llama

• Pirofóricos

(autorreactivas)

Signo de exclamación• Irritante (piel y ojos)

• Toxicidad aguda (dañino)• Efecto narcótico• Irritante de vías

respiratorias• Peligros para la capa de ozono (no obligatorio)

Corrosión• Corrosión o

• Lesion ocular• Corrosivo para los

Llama sobre

• ExplosivosBotella de gas

• Gases a presiónCalavera y

• Toxicidad aguda

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

SASSSSSSSSS Carcinógenorcinógenoutagenicidadagenicidad

idad para la reproducciónad para la reproducciónización respiratorian respiratoria

ación

AMAA• Pirofó• P

Page 34: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

GENERAL JOBSITE SAFETY

DANGER

1.7

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

Page 35: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

SEGURIDAD GENERAL EN EL LUGAR DE TRABAJO

PELIGRO-

-

1.7

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

Page 36: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

GENERAL JOBSITE SAFETY

Employees

DANGER

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

Page 37: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

SEGURIDAD GENERAL EN EL LUGAR DE TRABAJO

-

Emplea-dos

-

PELIGRO

-

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

RO RO

Page 38: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

GENERAL JOBSITE SAFETY

DANGER

-

1.8

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

Page 39: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

SEGURIDAD GENERAL EN EL LUGAR DE TRABAJO

PELIGRO-

-

1.8

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

Page 40: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

GENERAL JOBSITE SAFETY

DANGER

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

Page 41: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

SEGURIDAD GENERAL EN EL LUGAR DE TRABAJO

PELIGRO

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

Page 42: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

GENERAL JOBSITE SAFETY

signs-

1.9

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE--PLPL

Page 43: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

SEGURIDAD GENERAL EN EL LUGAR DE TRABAJO

Letreros -

ables

1.9

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE--PLPL

Page 44: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

GENERAL JOBSITE SAFETY

-

of

-

CLASS OF FIRES SYMBOL

A

B

C

D

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

SASASAASASASASASSSSLASS OF RES

Page 45: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

SEGURIDAD GENERAL EN EL LUGAR DE TRABAJO

-

-

-

CLASE DE FUEGOS

A

B

C

D

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

SASASAASASASASASSSSASE DE EGOS

Page 46: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

GENERAL JOBSITE SAFETY

call 911

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

Page 47: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

SEGURIDAD GENERAL EN EL LUGAR DE TRABAJO

llame al 911

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

Page 48: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

GENERAL JOBSITE SAFETY

-

1.10

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEE

Page 49: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

SEGURIDAD GENERAL EN EL LUGAR DE TRABAJO

-

-

-

-

-

1.10

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEE

Page 50: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

GENERAL JOBSITE SAFETY

scaffolding

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

SASASA

Page 51: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

SEGURIDAD GENERAL EN EL LUGAR DE TRABAJO

-

-

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMSAMPLE

--

SS

Page 52: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

GENERAL JOBSITE SAFETY

-accidents

Employees

Employee

-

Employees

Employee’s

Employee

1.11

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

AMPLEEmployeesEmployees

EmpEm

Page 53: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

SEGURIDAD GENERAL EN EL LUGAR DE TRABAJO

accidentes

Empleados

Empleado

-Empleados -

Empleado

Empleado

-

-

1.11

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEdentesdentes

Page 54: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

GENERAL JOBSITE SAFETY

Employee

defects

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

Page 55: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

SEGURIDAD GENERAL EN EL LUGAR DE TRABAJO

-

Empleado -

defectos

-

-

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

Page 56: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

GENERAL JOBSITE SAFETY

-accidents

-

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

Page 57: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

SEGURIDAD GENERAL EN EL LUGAR DE TRABAJO

accidentes -

-

-

-

-

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

Page 58: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

GENERAL JOBSITE SAFETY

DANGER

1.12

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

AASASALELE

Page 59: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

SEGURIDAD GENERAL EN EL LUGAR DE TRABAJO

PELIGRO

-

1.12

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

AASASALELE

Page 60: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

GENERAL JOBSITE SAFETY

DANGER

1.13

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

AA

Page 61: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

SEGURIDAD GENERAL EN EL LUGAR DE TRABAJO

PELIGRO

-

1.13

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

SASA

Page 62: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

GENERAL JOBSITE SAFETY

-

-

Note:

-

1.14

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

--

--

SSSSPP

Page 63: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

SEGURIDAD GENERAL EN EL LUGAR DE TRABAJO

1.14

-

Notar: --

-

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

SP

Page 64: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

GENERAL JOBSITE SAFETY

-

1.15

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPL

Page 65: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

SEGURIDAD GENERAL EN EL LUGAR DE TRABAJO

1.15

-

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPL

Page 66: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

GENERAL JOBSITE SAFETY

1.16

-

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEPPAA

Page 67: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

SEGURIDAD GENERAL EN EL LUGAR DE TRABAJO

1.16

-

-

-

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE- PP

SASA

Page 68: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

GENERAL JOBSITE SAFETY

1.17

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPL

Page 69: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

SEGURIDAD GENERAL EN EL LUGAR DE TRABAJO

1.17

-

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPL--

Page 70: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

GENERAL JOBSITE SAFETY

crystalline silica

-

1.18

crystalline silica

crystalline silica

crystal-line silica

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE--

ilica

crystalline silicacrystalline silica

lineli

Page 71: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

SEGURIDAD GENERAL EN EL LUGAR DE TRABAJO

1.18

sílice cristalina

--

-

-

sílice cris-talina

-sílice cristalina

-

sílice cristalina

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE---

--

talinatal

sílicesílice

Page 72: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

GENERAL JOBSITE SAFETY

--

crystalline silica-

ING OPTION

-crystalline silica

crystalline silica

-

-

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEc

SASAc

Page 73: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

SEGURIDAD GENERAL EN EL LUGAR DE TRABAJO

-

-

sílice cristalina

sílice cristalina

--

-

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEsílice cristalinasílice cristalina

AA

Page 74: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

NO

GENERAL JOBSITE SAFETY

contractor an

contractor an

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEcont

Page 75: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

SEGURIDAD GENERAL EN EL LUGAR DE TRABAJO

S NO

monitoreo.

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

Page 76: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

GENERAL JOBSITE SAFETY

-

-

-

Note: -

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE-

Note:Note

Page 77: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

SEGURIDAD GENERAL EN EL LUGAR DE TRABAJO

-

-

-

Nota:-

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE--

--

Nota:Nota:

Page 78: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

GENERAL JOBSITE SAFETY

Note:

When used outdoors:

When used indoors:

Note: -

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

Page 79: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

SEGURIDAD GENERAL EN EL LUGAR DE TRABAJO

-

-

Nota: -

Cuando se usa al aire libre:

Cuando se usa en interiores:

Nota:-

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

Page 80: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

GENERAL JOBSITE SAFETY

-

Note:

Objective Data

• The crystalline silica

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEne silicasilica

Page 81: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

SEGURIDAD GENERAL EN EL LUGAR DE TRABAJO

Nota:

Datos objetivos

sílice cristalina

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLENN sílice cristalina sílice cristalin

Page 82: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

GENERAL JOBSITE SAFETY

Note

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SASSASSSSASSASSSSASSAMAMAMAMAMAMAMAMAMAMMPMMPMMPMPMPMPLPLPPL

SSSSSASASASAAAMAMAMAMMMPMPPPLPLEPPLPLPLLELELELEEEPLEEPLEEE

Page 83: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

SEGURIDAD GENERAL EN EL LUGAR DE TRABAJO

Nota

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SASASASASASASSSSASASASASSASASAMAAMAMMAMMAMMMPMSSSSSASASASASAAAMAMAMAMMMPMMPMMPMPLPLPLPLPLEPLELELELELELEEEEELEEE

MPMPMPPPLPLLEE

S

Page 84: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

ASSSASASAAMAAMMAMAMMMPMPPMPMPMPPPLPLPLPLPLPLPLEELELELEE

AAAAMAMPMPMPPPLPPLPLELELE

SSSSSASASASAAAMAMAMAMMMMPMPMPPPLPLPLPLLELELEEEE

Page 85: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SASAMSASASASAMAMAMSAAASAAMAMMSASASASAAAMAMAMAMMMPMMPMPMPMMPMPMPMPMPMPPPPLPPLPLPLPLELELELELEEEEEEEEE

MMMPMPMPMPPPPLPLPLPLLELELELELEEE

SASA

Page 86: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

Page 87: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

Training Resources: Toolbox Talks2.1 Types of Accidents2.2 Automobile Accident Reporting2.4 Jobsite Injury Reporting2.6 Property Damage Reporting2.8 Witness Statement

Recursos de Formación: Toolbox Talks2.1 Tipos de accidentes2.2 Informe del accidente de auto2.4 Informe de una lesión en el área de trabajo2.6 Informe de daños de propiedad2.8 Declaración del testigo

SECTION 2: ACCIDENT INVESTIGATION & REPORTING

SECCIÓN 2:

INVESTIGACIÓNY REPORTE DE

ACCIDENTES

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

Talksks

MPLRecursos dcursos 2.12.1 Tipos de ipos de2.22.2 InformInfo2.42.4 InIn

LE2.6

ECCIÓN 2ECCIÓN 2

VESTIGACIÓVESTIGACIÓY REPORTEY REPORT

ACCIDEACCID

Page 88: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

ACCIDENT INVESTIGATION & REPORTING 2.1 Introduction

SECTION 2: ACCIDENT INVESTIGATION & REPORTINGIntroduction

accident -

-

1

1 --

Accident Flow Chart

2.1

Accident Occurs

Call 911 if an emergency. Notify your supervisor.

Auto-Related

Auto AccidentInvestigation

Jobsite-Related

Auto Accident Report

Involves Personal Injury

Property Damage

Jobsite Injury Investigation

Property Damage Investigation

Employer’s First Report of Injury

1

Employer’s First Report of Property Damage

Share Lessons LearnedRetrain Employees if necessary.

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE--

obsite-Related

Involves ersonal Injur

JobsInves

Employer’s First R

Page 89: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

INVESTIGACIÓN Y REPORTE DE ACCIDENTES 2.1 Introducción

SECCIÓN 2: INVESTIGACIÓN Y REPORTE DE ACCIDENTESIntroducción

accidente

-

1

1

2.1

Los Accidentes Occurren

Llamar al 911 si es una emergencia.

Relacionados-Al Auto

Investigación del Accidente

de Auto

Relacionados-Al Área de Trabajo

Reporte del Accidente de

Auto

Involucran Lesión Personal

Daño de Propiedad

Investigación de la Lesión en el Área

de TrabajoInvestigación del

Daño de Propiedad

Primer Reporte del Empleador de la Lesión -

Primer Reporte del Empleador del Daño de la Propiedad

Compartir lecciones aprendidas

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEencia.

Relacionados-Al Área de Trabajo

dente deAuto

Involucran Lesión Personal

Investigación dla Lesión e

de

imer Reporte del Emplea

Page 90: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

ACCIDENT INVESTIGATION & REPORTING 2.2 Automobile Accident Investigation & Reporting Procedures

Automobile Accident Investigation & Reporting Procedures

Call 911

Automobile Accident Report 2.3 AUTOMOBILE ACCIDENT REPORT

Witness Statement 2.8 WITNESS STATEMENT

Automobile Accident Report

2.2

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

2.3 AUTOMOBILE ACCI2.3 AUTOMOBILE ACCI

WitnesWitnes

Automobile Accident Repoomobile Accident Repo

Page 91: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

INVESTIGACIÓN Y REPORTE DE ACCIDENTES 2.2 Procedimientos de investigación y reporte del accidente de auto

Procedimientos de investigación y reporte del accidente de auto

Llame 911

-

Reporte del Accidente de Auto 2.3 REPORTE DEL ACCIDENTE DE AUTO

Declaración de Testigo2.8 DECLARACIÓN DE TESTIGO

Reporte del Accidente de Auto

2.2

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE2.3 REPORTE DEL ACC2.3 REPORTE DEL ACC

ÓN DE TESTIGOÓN DE TESTIGO

e del Accidente de Autoidente de Auto

Page 92: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

ACCIDENT INVESTIGATION & REPORTING 2.3 Automobile Accident ReportINVESTIGACIÓN Y REPORTE DE ACCIDENTES 2.3 Reporte del Accidente de Auto

Automobile Accident ReportReporte del accidente de auto

(Co pleta i ediata ente y presentarlo dentro de horas del accidente )

BASIC INFORMATION (INFORMACIÓN BÁSICO)( o bre de la persona involucrada en accidente)

________________________________________________ (Conductor) (Pasajero)Street (Calle)

(Cuidad) (Estado) (Código Postal)( ero de Tel fono)

( irección de Correo Electrónico)( o bre de la persona co pletando este infor e)

____________________________________________________________________________________( ero de Tel fono)

( irección de Correo Electrónico)

ACCIDENT DETAILS (DETALLES DEL ACCIDENTE)( echa del ccidente)

Street (Calle)(Cuidad) (Estado) (Código Postal)

( Co o occurió el accidente )________________________________________________________________________________________________________________________________________________________________________

( otos to adas ) (Sí)(Incluye fotos con la sub issión del infor e )

( az interca biado infor ación de aseguranza ) (Sí)(Incluye infor ación de aseguranza con la sub issión del infor e )

( az obtenido una copia del infor ación de la Policía ) (Sí)( eparta ento de la Policía): _________________________________________________

( ero de la Placa del Policía Presente)( ero del infor e de la Policía)

EMPLOYEE’S VEHICLE (AUTOMÓVIL DEL EMPLEADO)( uto óvil de la co pañía) ( uto óvil de propiedad privada)

( ño) (Tipo) ( I lti os n eros (Placa)

( o bre de Guiante segurado)(Co pañía del Seguro)

( ero de seguranza)( Se dañó el auto óvil ) (Sí)

( ónde ) _______________________________________________________________

2.3

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SSSAMPLEidente)idente)

ductor)ductor) (Pasaje(Pasaje

(Código Postal)ódigo Postal)

pletando este infor e)do este infor e)_________________________________________________

CCIDENTE)E

(Estado)(Estado)( Co o occurió el accidente )( Co o occurió el accidente )

______________________________________________________________________________________

otos to adas )otos to adas ) (Sí)(Sí)((IncluyeIncluye(Incluye(Incluye

SAMPLE( fotos con l fotos con luyeluye

( a( a

( eparta ento de la ( eparta ento de la

EE’S VEHIC

Page 93: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

OTHER DRIVER’S VEHICLE (AUTOMÓVIL DEL OTRO CONDUCTOR)( ño): (Tipo): __________________________________________

(Placa)(Co pañía del Seguro)

( ero de seguranza)( Se dañó el auto óvil ) (Sí)

( ónde ) _______________________________________________________________( o bre del Propietario)

Street (Calle)(Cuidad) (Estado) (Código Postal)

( ero de Tel fono)( irección de Correo Electrónico)

( o bre y n ero de tel fono del guiante si es diferente del propietario)____________________________________________________________________________________

INJURY INFORMATION (INFORMACIÓN DE LA LESIÓN)( lguien fue lesionado ) (Sí)

( o bres)____________________________________________________________________________________

( Extensión de la lesión )____________________________________________________________________________________

( Transportado al hospital ) (Sí)( o bre y lugar del hospital)

___________________________________________________________________________________

WITNESS INFORMATION (INFORMACIÓN DEL TESTIGO)Witness Statement -

( se la declaración de testigo ó en una hoja separada recoge el no bre n ero de tel fono y correo

SIGNATURES (FIRMAS)

___________________________________ ______________________________ _______________(E pleado) ( ir a) ( echa)

___________________________________ ______________________________ _______________

___________________________________ ______________________________ _______________

ACCIDENT INVESTIGATION & REPORTING 2.3 Automobile Accident ReportINVESTIGACIÓN Y REPORTE DE ACCIDENTES 2.3 Reporte del accidente de auto

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SASAMPLE___________

(Código Postal)(Código Postal)

del guiante si es diferente del propietario del guiante si es diferente del propietari____________________________________________

ÓN)(Sí)(Sí)

_________________________________________

_______________________________________________portado al hospital ) portado al hospital ) (Sí)

( o bre y lugar del hospital)( o bre y lugar del hospital)__________________________________________

O MACIÓN DEL TESmentment

( se la declaración de testigo ó en una hclaración de testigo ó en una

NATURES (FIRMAS)

________________________________________(E pleado)(E pleado)

___________________

Page 94: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

ACCIDENT INVESTIGATION & REPORTING 2.4 Jobsite Injury Investigation & Reporting Procedures

Jobsite Injury Investigation & Reporting Procedures

competent personEmployer’s

First Report of Injury

2.6 PROPERTY DAMAGE INVESTIGATION & REPORTING PROCEDURES

Jobsite Injury Investigation:

accident-

Employee

-

Employer’s First Report of Injury

competent person5.3 LOCKOUT/TAGOUT

-

2.4

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEEmEm

AGE INVESTIGATIOAGE INVESTIGATIO

n:

EmployeeEmployee

EmployerEmployer

SSSSSSSSSSSSSSSSSS

Page 95: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

INVESTIGACIÓN Y REPORTE DE ACCIDENTES 2.4 Procedimientos de investigación y reporte de lesiones en el lugar de trabajo

Procedimientos de investigación y reporte de lesiones en el lugar de trabajo

persona competente

Reporte de Accidente-

2.6 PROCEDIMIENTOS DE INVESTIGACIÓN Y REPORTE DE DAÑO A LA PROPIEDAD

Investigación de lesiones en el lugar de trabajo:

accidente-

-

Empleado

Primer Reporte de Empleador de la Lesión

persona competente 5.3AISLAR/ETIQUETAR

2.4

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEACIÓN Y REPORTE DE IÓN Y REPORTE DE

en el lugar de trab

EmpleadoEmplead

la Lesión esión

SS

Page 96: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

ACCIDENT INVESTIGATION & REPORTING 2.4 Jobsite Injury Investigation & Reporting Procedures

Employer’s First Report of Injury

Jobsite Injury Reporting:

Call 911

Employer’s First Report of Injury 2.5 EMPLOYER’S FIRST REPORT OF INJURY

Witness Statement2.8 WITNESS STATEMENT

Employer’s First Report of Injury

Employer’s First Report of Injury -

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEEmployeEmploye

FIRST REPORT OFFIRST REPORT O

2.8 W2.

Page 97: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

INVESTIGACIÓN Y REPORTE DE ACCIDENTES 2.4 Procedimientos de investigación y reporte de lesiones en el lugar de trabajo

-

--

Reporte de daño en el lugar de trabajo:

-

Llame al 911

-

Primer Reporte de Empleador de la Lesión 2.5 PRIM-ER REPORTE DE EMPLEADOR DE LA LESIÓN

2.8 DECLARACIÓN DE TESTIGO

Primer Reporte de Empleador de la Lesión -

-

Primer Reporte de Empleador de la Lesión

-

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE--

--

ar de trabajo:

PrimePrimER REPORTE R REPOR

Page 98: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

Employer’s First Report of InjuryPrimer reporte de empleador de la lesión

(Co pleta i ediata ente y presentarlo dentro de horas del accidente )

PROJECT INFORMATION (INFORMACIÓN DEL PROYECTO)( echa del Infor e)

(Infor e Preparado por)( o bre del Trabajo)

Street (Calle)(Cuidad) (Estado) (Código Postal

INJURED EMPLOYEE INFORMATION (EMPLEADO LESIONADO INFORMACIÓN)( o bre del E pleado)

Street (Calle)(Cuidad) (Estado) (Código Postal

( ero de Tel fono)( irección de Correo Electrónico)

( echa de Contratado) (Tarifa de pago) (hora)( cupación) ( ero de ños en la cupación)

( o bre del subcontratista)( ctividad y Localidad Exacta del Incidente)

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

INJURY/ILLNESS INFORMATION (INFORMACIÓN DEL LESIÓN/ENFERMEDAD)( echa del ccidente)

( ía de la Se ana) ( ora del ía)( echa eportado) ( ora eportado)

Reported to ( eportado a)(Supervisor del E pleado)

(Cu l fue la lesión)____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

2.5

ACCIDENT INVESTIGATION & REPORTING 2.5 Employer’s First Report of InjuryINVESTIGACIÓN Y REPORTE DE ACCIDENTES 2.5 Primer reporte de empleador de la lesión

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE(Código Postal Postalstalstalstal

DO INFORMACIÓN)

(Estado)Estado) (Código Po(Código P

nico)ico)(Tari

del subcontratista)del subcontratista)( ctividad y Localidad Exacta( ctividad y Localidad Exact

______________________________________________________________________________________

___________________________________________________________________

____________________________________________________________________________________

JURY/ILLNESS INFORMATIONURY/ILLNESS INFORMATIO( echa del ccid( echa del ccid

( ía de la Se a( ía de la Se( echa ep( echa ep

to to ( eportado( eportado

Page 99: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

( ueron dados Pri eros uxilios ) (Sí)( Transportado al hospital ) (Sí)

( o bre y lugar del hospital)____________________________________________________________________________________

( Prueba de alcohol drogas ad inistrada ) (Sí)

DESCRIPTION OF THE INCIDENT (DESCRIPCIÓN DEL INCIDENTE)________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

( otos to adas ) (Sí)(Incluye fotos con la su isión del infor e )

ADDITIONAL INFORMATION (INFORMACIÓN ADICIONAL)(E uipo y cosas ue estaban i plicadas en el incidente)

____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

(lista del PPE usado cuardo el accidente occurrió)____________________________________________________________________________________

( ueron seguidos los procedi ientos est ndar del trabago )(Sí) ( Si no por u ) _________________________________________

( ueron violadas las reglas de seguridad ) (Sí)( Si una regla fue violada cu l regla ) __________________________________________

( a sido entrenado el lesionado ) (Sí) ( Si no por u )

ACTIONS TO PREVENT RECURRENCE (ACCIONES PARA PREVENIR LA RECURRENCIA)(Medidas de corrección para ue no suceda ja s):

____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

( E pleado necesita ser entrenado de nuevo ) (Sí)( En u reglas ) _______________________________________________

___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

ACCIDENT INVESTIGATION & REPORTING 2.5 Employer’s First Report of InjuryINVESTIGACIÓN Y REPORTE DE ACCIDENTES 2.5 Primer reporte de empleador de la lesión

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE____________________________

____________________________________________________________________________________

_______________________________________________________________________________________

_______________________________________________

isión del infor e )sión del infor e )

DICIONAL)(E uipo y cosas ue estaban i plic(E uipo y cosas ue estaban i pli

_______________________________________________________________________________________

_____________________________________________(lista del PPE usado cuardo el accid(lista del PPE usado cuardo el acci

________________________________________________( ueron seguidos( ueron segu

( Si no por u )( Si no por u )( u

( Si una regla fue violada cu l regl( Si una regla fue violada cu l reg

( Si no por u ) ( Si no por u )

TIONS TO PREVENT RECU

_____________________________________________________________

_________________

Page 100: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

INJURED EMPLOYEE’S STATEMENT (DECLARACIÓN DEL EMPLEADO LESIÓNADO)____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

In addition to his/her statement, the injured Employee shall answer the following questions :( ónde estaba usted cuando ocurrió el incidente )

____________________________________________________________________________________ ( u actividad estaba realizando usted antes del inci

dente ) ______________________________________________________________________________( abian otros trabajadores en las areas cercanas ) (Sí)

( ui nes eran ) __________________________________________________________( u hizo usted in ediata ente despu s del incidente )

____________________________________________________________________________________( a sufrido alguna vez antes una lesión en esta parte del cuerpo )

(Sí)

WITNESS INFORMATION (INFORMACIÓN DEL TESTIGO)Witness Statement -

( se la declaración de testigo ó en una hoja separada recoge el no bre n ero de tel fono y correo

SIGNATURES (FIRMAS)

___________________________________ ______________________________ _______________(E pleado) ( ir a) ( echa)

___________________________________ ______________________________ _______________

___________________________________ ______________________________ _______________

ACCIDENT INVESTIGATION & REPORTING 2.5 Employer’s First Report of InjuryINVESTIGACIÓN Y REPORTE DE ACCIDENTES 2.5 Primer reporte de empleador de la lesión

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SSAMPLE__________

________________________________________________

following questions ng question ::d cuando ocurrió el incidente )ó el incidente )

_________________________________________________u actividad estaba realizando usted antactividad estaba realizando usted an_________________________________________________

bajadores en las areas cercanas )bajadores en las areas cercanas )_________________________________________________

( u hizo usted in ediata e( u hizo usted_________________________________________( a sufrido alguna vez antes un( a sufrido alguna vez ante

ORMACIÓN DEL TESTIGO)

eclaración de testigo ó en una hoja separclaración de testigo ó en una hoja sepa

MAS)

______________________________________________(E pleado)(E pleado)

____________________________________________

Page 101: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

Page 102: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

ACCIDENT INVESTIGATION & REPORTING 2.6 Property Damage Investigation & Reporting Procedures

Property Damage Investigation & Reporting Procedures

competent person -Employer’s First

Report of Property Damage

2.4 JOBSITE INJURY INVESTIGATION & REPORTING PROCEDURES

Property Damage Investigation:

accident

Employee

-

Employer’s First Report of Property Damage

competent person5.3 LOCKOUT/TAGOUT

-

2.6

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEEmploymplo

JURY INVESTIGATIJURY INVESTIGATI

ti

mployeeloyee

SSSSSS

Page 103: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

INVESTIGACIÓN Y REPORTE DE ACCIDENTES 2.6 Procedimientos de investigación y reporte para daños a la propiedad

Procedimientos de investigación y reporte para daños a la propiedad

persona competente -

Reporte de Accidente del Empleador

PROCEDIMIENTOS DE INVESTIGACIÓN Y REPORTE PARA LESIONES EN EL LUGAR DE TRABAJO

Investigación de daños a la propiedad:

accidente

Empleado

Primer Reporte del Em-pleador del Daño de la Propriedad

-

persona competenteAISLAR/

ETIQUETAR

2.6

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEp

STIGACIÓN Y REPORTETIGACIÓN Y REPORTE

a propiedad:

EmpleadoEmplead

pleador del Daño dor del D

S

Page 104: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

ACCIDENT INVESTIGATION & REPORTING 2.6 Property Damage Investigation & Reporting Procedures

Employer’s First Report of Property Damage

Property Damage Accident Reporting:

Call 911

Employer’s First Report of Property Damage2.7 EMPLOYER’S FIRST REPORT OF PROPERTY DAMAGE

Witness Statement2.8 WITNESS STATEMENT

Employer’s First Report of Property Damage to

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLERepo

Employer’s First REmployer’s First R2.7 EMPLOYER’S FIRSTMPLOYER’S FIRS

2.8 WITNESS 2.8 WITNESS

Page 105: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

INVESTIGACIÓN Y REPORTE DE ACCIDENTES 2.6 Procedimientos de investigación y reporte para daños a la propiedad

-

Primer Reporte del Empleador del Daño de la Propriedad

--

Reporte de daño a la propiedad por accidente:

Llame al 911

Primer Reporte del Empleador del Daño de la PropriedadPRIMER REPORTE DEL EMPLEADOR DEL DAÑO DE LA PRO-

PRIEDAD

DECLARACIÓN DE TESTIGO

Primer Reporte del Empleador del Daño de la Propriedad

-

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEla

----

ropiedad por accide

Primer RepoPrimer RepPRIMER REPOPRIMER REPO

PRIEDADPRIEDAD

Page 106: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

Employer’s First Report of Property DamagePrimer reporte del empleador del daño de la propriedad

(Co pleta i ediata ente y presentarlo dentro de horas del accidente )

PROJECT INFORMATION (INFORMACIÓN DEL PROYECTO)( echa del Infor e)

(Infor e Preparado por)( o bre del Trabajo)

Street (Calle)(Cuidad) (Estado) (Código Postal

CLAIMANT INFORMATION (INFORMACIÓN DEL DEMANDANTE)(Co pañía)

( o bre)Street (Calle)

(Cuidad) (Estado) (Código Postal ( ero de Tel fono)( irección de Correo Electrónico)

DESCRIPTION OF THE INCIDENT (DESCRIPCIÓN DEL INCIDENTE)

____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

(Si incidente ha cuasado dañó a propiedad del de andante describe el dañó)___________________________________________________________________________________

( otos to adas ) (Sí)(Incluye fotos con la su isión del infor e )

Employees involved (if any) (E pleados e plicados si hay ):( o bre) ( ero de Tel fono)( o bre) ( ero de Tel fono)( o bre) ( ero de Tel fono)( o bre) ( ero de Tel fono)

( tilice p ginas adicionales para e pleados adicionales )

2.7

ACCIDENT INVESTIGATION & REPORTING 2.7 Employer’s First Report of Property DamageINVESTIGACIÓN Y REPORTE DE ACCIDENTES 2.7 Primer reporte del empleador del daño de la propriedad

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE(Código Postal Postalstalstalstal

NTE)

(Estado)(Estado) (Códig(Códi

lectrónico)ctrónico)

(DESCRIPCIÓN DEL INCIDEN

_____________________________________________________________________________________

_______________________________________________

de andante describe el dañó)de andante describe el dañ_______________________

( otos t( otos t

Page 107: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

ACTIONS TO PREVENT RECURRENCE (ACCIÓNES PARA PREVENIR LA RECURRENCIA)(Medidas de corrección para ue no suceda ja s )

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

( E pleado necesita ser entrenado de nuevo ) (Sí)( En u reglas ) _______________________________________________

_________________________________________________________________________________

EMPLOYEE’S STATEMENT (DECLARACIÓN DEL EMPLEADO)____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

In addition to his/her statement, the Employee shall answer the following questions :( ónde estaba usted cuando ocurrió el incidente )

____________________________________________________________________________________ ( u actividad estaba realizando usted antes del inci

dente ) ______________________________________________________________________________( abian otros trabajadores en las reas cercanas ) (Sí)

( ui nes eran ) __________________________________________________________( u hizo usted in ediata ente despu s del incidente )

____________________________________________________________________________________

WITNESS INFORMATION (INFORMACIÓN DEL TESTIGO)Witness Statement -

( se la declaración de testigo ó en una hoja separada recoge el no bre n ero de tel fono y correo

SIGNATURES (FIRMAS)

___________________________________ ______________________________ _______________(E pleado) ( ir a) ( echa)

___________________________________ ______________________________ _______________

___________________________________ ______________________________ _______________

ACCIDENT INVESTIGATION & REPORTING 2.7 Employer’s First Report of Property DamageINVESTIGACIÓN Y REPORTE DE ACCIDENTES 2.7 Primer reporte del empleador del daño de la propriedad

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SSAMPLE_

_____________(Sí)(Sí)

_____________________________________________________________________________

____________________________________________________________________________________________

________________________________________________________________________________________________

_________________________________________________

e shall answer the following quee shall answer the fo( ónde estaba usted cuando o( ónde estaba usted

_______________________________________________ ( u actividad ( u actividad

_________________________________________________( abian otros trabajadores e( abian otros trabajadores e

nes eran ) _________________________________

_______________________________________________

ATION INFORMACIÓNess Statementss Statement

( se la declaración de testigo( se la declaración de testig

NATURES FIRMAS

______(E plea

Page 108: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

Witness StatementDeclaración de testigo

(Co pleta i ediata ente y presentarlo dentro de horas del accidente )

WITNESS INFORMATION (INFORMACIÓN DE TESTIGOS)( o bre)

Street (Calle)(Cuidad) (Estado) (Código Postal

( ero de Tel fono)( irección de Correo Electrónico)

( E pleado ) (Sí)

DESCRIPTION OF THE INCIDENT/INJURY (DESCRIPCIÓN DEL INCIDENTE/LESIÓN)____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Photos taken? ( otos to adas ) (Sí)Include photos with Witness Statement. (Incluye fotos con la su isión del infor e )

SIGNATURES (FIRMAS)

___________________________________ ______________________________ _______________(Testigos) ( ir a) ( echa)

___________________________________ ______________________________ _______________

2.8

ACCIDENT INVESTIGATION & REPORTING 2.8 Witness StatementINVESTIGACIÓN Y REPORTE DE ACCIDENTES 2.8 Declaración de testigo

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SSAMPLE(Código Postal(Código Postalstalstalstal

N DEL INCIDENTE/LESIÓN)________________________________________________

_______________________________________________________________________________________

_______________________________________________________________________________________

___________________________________________________________________________________________

________________________________________________________________________________________

_________________________________________________________________________________________________

? ( otos to adas )otos to adas ) (Sí)(Sí)photos with Witness Statemeth Witness Stateme

ATURES (FIRMAS)

_____________________________________________(Testigos)(Testigo

Page 109: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

SECTION 3: PERSONALSAFETY

SECCIÓN 3:

SEGURIDAD PERSONAL

Training Resources: Toolbox Talks3.1 Personal Protective Equipment (PPE) Required

Proper Personal Protective Equipment (PPE) Use3.2 Proper Body Mechanics – Lifting, Carrying & Pushing

Proper Body Mechanics – Pulling, Reaching & Stooping

Safety Awareness Resources: Posters3.1 Hard Hat Area

Eye Protection RequiredHigh Visibility Clothing Must Be Worn in this Area

Recursos de Formación: Toolbox Talks3.1 Requerido equipo de protección personal (PPE)

Uso apropiado del equipo de protección personal (PPE)3.2 Mecánica adecuada del cuerpo – Levantando, cargando y empujando

Mecánica adecuada del cuerpo – Jalando, alcanzando y agachándose

Recursos de Conciencia de Seguridad: Carteles1.3 Área de cascos

Protección para los ojos se requiereRopa de alta visibilidad debe usarse en esta zona

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEECCIÓN 3ECCIÓN 3

SEGURIDASEGURIDAPERSOPERSO

TalksksRequiredequired

ent (PPE) Useent (PPE) Useg, Carrying & PushingCarrying & Pushing

ulling, Reaching & Stoopingaching & Stooping

reness Resources: Posterss Resources: Poste Area

Protection Requiredrotection Righ Visibility Clothing Must Be Worn in this Areigh Visibility Clothing Must Be Worn in t

Recursos dcursos 3.13.1 Requeridoequerid

Uso aUso3.23.2 MM

Page 110: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

All Employees are required to wear personal protective equipment (PPE) while on the jobsite. When non-typical workplaces or tasks are encountered, the new situation should be assessed by a competent person from the Company to determine what PPE is required.

SECTION 3: PERSONAL SAFETYPersonal Protective Equipment (PPE)

PERSONAL SAFETY 3.1 Personal Protective Equipment (PPE)

3.1

Head Protection:

Hard hats must always be worn on the jobsite. This is especially important where overhead work is taking place. All hard hats are required to conform to ANSI Z89.1-1969.

WARNING Always use and wear a hard hat according to manufacturer’s recommendations. Do not drill holes in the hat.

Eye Protection:

Safety glasses must always be worn on the jobsite pursuant to OSHA guide-lines. All safety glasses are required to conform to ANSI Z87.1-1968. Eye-glasses can be worn as safety glasses if they meet the ANSI standard. If not, then safety glasses must be worn over the eyeglasses.

Gloves:

Work gloves must be worn when engaged in work activity that could cause a laceration or puncture wound of the wrists or hands on the jobsite.

Clothing:

Proper work attire must be worn to protect the body and limbs from lacerations and puncture wounds. Clothing must also be worn to protect the body given jobsite climate conditions. Loose and/or ripped clothing should not be worn to minimize the risk of accident or injury caused by clothing getting caught on

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMSSSSSSSSSAMPLE

ould be ald be a

quired.quired.

site. This is especially importasite. This is especially importll hard hats are required to cohard hats are required to co

d wear a hard hat according tod wear a hard hat according tt drill holes in the hat. drill holes in the

on:

s must always be worn on thes must always be worn on thefety glasses are required to cfety glasses are required to

can be worn as safety glassesn be worn as safety glassesafety glasses must be worn oasses must be worn

Gloves:

Work gloves must berk gloves must belaceration or puncation or

Clot

ProPro

Page 111: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

A todos los Empleados se les requiere usar equipo de protección personal (PPE) mientras están en el lugar de trabajo. Cuando está en áreas de trabajo que no son típicas o con tareas imprevistas, estas situaciones nuevas deben ser evaluadas por una persona competentede la Compañía para determinar cuál PPE se necesita.

SECCIÓN 3: SEGURIDAD PERSONALEquipo de protección personal

SEGURIDAD PERSONAL 3.1 Equipo de protección personal

3.1

Protección para la cabeza:

Cascos deben usarse todo el tiempo en el lugar de trabajo. Esto es especial-mente importante cuando están trabajando arriba de usted. Se requiere que todos los cascos cumplan con ANSI Z89.1-1969.

ADVERTENCIA Siempre póngase y use el casco según las recomenda-ciones del fabricante. No perforar huecos en el casco.

Protección de los ojos:

Lentes de seguridad deben ser usados todo el tiempo en el lugar de trabajo según las normas de OSHA. Se requiere que todos los lentes cumplan con ANSI Z87.1-1968. Lentes correctivos o de visión se pueden usar como lentes de seguridad si cumplen con las regulaciones de ANSI. Si no, entonces lentes de seguridad deben usarse sobre los lentes correctivos o de visión.

Guantes:

Guantes de trabajo deben usarse cuando se participa en actividades laborales que puedan causar cortaduras graves o perforaciones en las muñecas o en las manos en el lugar de trabajo.

Ropa:

Ropa de trabajo adecuada debe usarse para proteger el cuerpo y las extremidades de cortaduras graves o perforaciones. La ropa debe usarse para proteger el cuerpo según las condiciones de clima del lugar de trabajo. La ropa suelta y/o rasgada no se debe usar para disminuir el riesgo de un accidente o lesión causada por la ropa que puede quedar atrapada en el

largos y camisas con mangas.

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SASSSSSSSAMSSAMPLE

PEas o coas o co

na competna compe

el lugar de trabajo. Esto es esl lugar de trabajo. Esto es esando arriba de usted. Se requdo arriba de usted. Se requ

I Z89.1-1969.Z89.1-1969.

e póngase y use el casco segúpóngase y use el casco sego perforar huecos en el cascoperforar huecos en el casco

e los ojos:

guridad deben ser usados todguridad deben ser usados tonormas de OSHA. Se requiernormas de OSHA. Se requie

87.1-1968. Lentes correctivos-1968. Lentes correctivoseguridad si cumplen con las resi cumplen con las

e seguridad deben usarse sob seguridad deben usarse sob

uantes:

Guantes de trabates de tque puedan caque puedan cmanos en emanos en e

Ro

Page 112: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

HeadProtection

Eye Protection

Ear Protection

Dust Protection

Gloves

Clothing

Footwear

Puncture-resistant soles

PERSONAL SAFETY 3.1 Personal Protective Equipment (PPE)

This is a summary depiction, please see complete rules in this section.

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SASSSSSSSSSSSSSAMPLELELELELEPPLELLELEELLLLLLLELELLMPLMMMPMPMP

EELLLELELELEMMMMMionionioioon

GlovesGloves

ClothingClothin

Page 113: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

Protección para la cabeza

Protección de los ojos

Protección de los oídos

Protección contra polvo

Guantes

Ropa

Calzado

Suelas resistentes a la Perforación

SEGURIDAD PERSONAL 3.1 Equipo de protección personal

Esta es usa descripción sumaria. Por favor consulte las reglas completas en esta sección.

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SASSSSSSSSSSSSSAMPLELELELELEPPLELELELEELLLLLLLELELLMPLMMPMPMPMPMP

EELLLELELELEMGuantesGuantes

RopaRopa

Page 114: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

PERSONAL SAFETY 3.1 Personal Protective Equipment (PPE)

Ear Protection:

Ear plugs must be worn on the jobsite when an Employee’s decibel exposure exceeds 85 decibels. Typical symptoms of exposure to sounds over 85 deci-bels include:

• Shouting above noise to make one’s voice heard.• Ringing in the ears.

activity.

CAUTION

For proper ear protection, ear plugs should be worn in the following manner:1. Roll ear plug until it is compressed.2. Insert the compressed ear plug well into the ear canal.

Footwear: Work shoes with slip-resistant and puncture-resistant soles must be worn on the jobsite at all times. Keep shoes free of oil, mud and other slippery substances.

Exception: Tennis/sneaker-type shoes can be worn while working on roofs.

WARNING Be aware of ice, dirt and other slip hazards on the jobsite.

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMAMAMAMAMAAAAMAAASAMAMMMPLEPPLPLPPPPPPPPPLLLPLPPPPLPPPLEPLELELEEEELELLEPLELELELELE

AMMAMSS

ection, ear plugs should be wection, ear plugs should g until it is compressed.ntil it is compressed.

e compressed ear plug well ine compressed ear plug well in

F

Page 115: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

SEGURIDAD PERSONAL 3.1 Equipo de protección personal

Protección de los oídos:

Tapones para los oídos deben usarse en el lugar de trabajo cuando la ex-posición de decibeles de un Empleado supera los 85 decibeles. Síntomas típicos de exposición a sonidos de más de 85 decibeles incluyen:

• Gritando sobre ruidos para poder ser escuchados.• Zumbido en los oídos.

actividad ruidosa.

PRECAUCIÓN Tapones para los oídos deben usarse correctamente para ser efectivos.

Para protección adecuada de los oídos, tapones para los oídos deben usarse de la siguiente manera:

1. Rodar los tapones para los oídos hasta que queden comprimidos.2. Meter los tapones comprimidos bien en el canal auditivo.3. Suavemente

dejar el tapón en su lugar con la punta del dedo hasta quese expanda com-pletamente y el tapón para los oídos quede a su medida.

Calzado: Zapatos de trabajo con suelas antideslizante y resistente a las perforaciones deben usarse todo el tiempo en el lugar de trabajo. Mantenga los zapatos libre de aceite, lodo y otras sustancias resbaladizas.

Excepción: Zapatos de tipo deportivo pueden usarse mientras trabaja en los techos.

ADVERTENCIA Estar alerta del hielo, basura y otros peligros de resbalo en el lugar de trabajo.

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMMMPLEMMPMPLMPLMPPPPPPPMPPPPLPLPLPLLPLPPPPMPLPPPLEPLELELEELELPLEELELELE

SS

en usarse correctamente paraarse correctamente par

adecuada de los oídos, taponcuada de los oídos, tapoe manera: manera:

los tapones para los oídos halos tapones para los oídos er los tapones comprimidos br los tapones comprimidos b

uavementementedejar el tapón en dejar el tapón en su lugar con la su lugar con la punta del dedo punta del dedhasta quese hasta quese expanda comexpanda com--pletamente y epletamente y tapón para tapón poídos quoídos qsu meu me

Cal

Page 116: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

PERSONAL SAFETY 3.1 Personal Protective Equipment (PPE)

Dust Protection:

(NISOH) approved dust mask must be worn on the jobsite according to the

from the manufacturer. Employees are responsible for checking the condition of the dust mask before each use. If deemed damaged, ask the supervisor for a replacement. Cut materials in a well-ventilated area or outdoors whenever possible.

CAUTION

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEng tg t

k the supthe suoutdoors wheoutdoors wh

Page 117: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

SEGURIDAD PERSONAL 3.1 Equipo de protección personal

Protección contra polvo:

Una máscara para polvo apropiadamente ajustada y aprobada por el Nation-al Institute for Occupational Safety and Health (NISOH) debe usarse en el

Sheets (SDS) de los materiales del fabricante. Empleados son responsables de chequear la condición de la máscara para polvo antes de cada uso. Si se considera dañada, pídale a su supervisor un reemplazo. Cortar los materiales en un área bien ventilada o al aire libre cuando sea posible.

PRECAUCIÓN Máscaras para polvo deben usarse correctamente para ser efectivas.

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLELEn rere

e cada ue cada Cortar los maCortar los m

osible.sible.

usarse correctamente para se correctamente para

Page 118: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

Proper Body Mechanics

-tenance of a person’s body balance and control. Proper use of body mechanics will conserve energy, reduce stress and strain on body structures, reduce the possibility of personal injury, and produce movements that are safe.

Employees are not required to lift heavy or bulky objects that overtax their physical condi-

whenever practical and the devices must be appropriate for the lifting or moving task. Employ-ees operating equipment designed to lift or move objects must be appropriately trained and

tasks, the following guidelines should be observed.

3.2

PERSONAL SAFETY 3.2 Proper Body Mechanics

Lifting:

Get set for lifting load, demonstrating good timing.

Lift by pushing with the legs; straighten the ankles, knees and hips to an upright position.

Do not use your back.

Keep the load as close to the body as possible while lifting.

Do not twist the body.

Change direction when lifting by moving the feet.

Carrying:

Keep the back as straight as possible.

Keep weight load close to the body and centered over the pelvis.

Counterbalance the load by shifting part of the body in the oppo-site direction from the load.

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

SASASAASASA

nics will consnics will cony of personal injuryy of personal inju

vertax their physical condiir physical condi--

the lifting or moving task. Emthe lifting or moving task. Emmust be appropriately trainedmust be appropriately trained

SSSSSSSASSSSSSS

et for lifting load, demonstratinor lifting load, demonstrat

Lift by pushing with the legs; sLift by pushing with the legsto an upright position. to an upright position.

AAADo not use your backnot use your back

Keep the load asKeep the load aAADo not twisDo not twis

ChanC

C

Page 119: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

Mecánicas apropiadas del cuerpo

-

El uso apropiado de la mecánica corporal será conservar energía, reducir el estrés y la tensión en las estructuras del cuerpo, reducir la posibilidad de lesiones personales, y producir los movi-mientos que son seguros.

Los empleados no están obligados a levantar objetos pesados o demasiado grandes que so-brecargan su condición o capacidad física. Dispositivos mecánicos deben reemplazar el levan-tar y mover objetos mediante esfuerzo manual donde sea práctico, y los dispositivos deben ser apropiados para la tarea de levantar o mover. Empleados operando equipos diseñados para levantar o mover objetos deben ser entrenados correctamente y autorizados para operar tales equipos. Cuando esfuerzo manual es apropiado para el levantamiento y las tareas de movi-miento, las siguientes normas deben ser observadas:

3.2

SEGURIDAD PERSONAL 3.2 Mecánicas apropiadas del cuerpo

Levantar:

posible.

Prepararse para levantar la carga, demostrando un buen momento.

Levante empujando con las piernas, enderezando los tobillos, rodillas y caderas a una posición vertical.

No usar su espalda.

Mantener la carga lo más cerca al cuerpo como sea posible mien-tras levantando.

No torcer el cuerpo.

Cambiar de dirección mientras esté levantando moviendo los pies.

Cargando:

Mantener la espalda tan derecha como sea posible.

Mantener la carga lo más cerca del cuerpo y hacia el centro sobre la pelvis.

Balancear la carga cambiando parte del cuerpo en la dirección opuesta de la carga.

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPSASSSASSASASASASASASASSSAMPLE

cir el estrés y la tenr el estrés y la tnales, y producir los moales, y producir los mo

dos o demasiado grandes quedos o demasiado grandes quecánicos deben reemplazar elcánicos deben reemplazar e

ea práctico, y los dispositivos dpráctico, y los dispositivos ados operando equipos diseñaos operando equipos diseñ

rrectamente y autorizados parrectamente y autorizados papara el levantamiento y las tapara el levantamiento y las t

ervadas:ervadas:

:

sible.sible

Prepararse para levantar laPrepararse para levantar l

Levante empujando cvante empujando rodillas y caderas s y caderas

AMANo usar su eNo usar su e

MantenMantenAtras lAA

Page 120: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

PERSONAL SAFETY 3.2 Proper Body Mechanics

Put down the load by bending the hips and knees with the back straight and the load close to the body.

If the load is too heavy, get help.

When the load is carried by more than one person, identify a leader to ensure good timing and coordination.

Pushing:

Stand close to the object to be moved.

Crouch down with feet apart.

Bend the elbows and put the hands on the load at chest level.

Lean forward with the chest or shoulder against the object.

Do not push with arms or shoulders.

Keep the back straight. Crouch and push with the legs.

Pulling:

Place the feet apart, one foot in the back of the other, keeping close to the object to be moved.

Pull by straightening the legs. Keep the back straight.

Walk backward with crouching strides, so the legs do all the work.

Reaching:

Stand close to the object. Keep center of gravity over the base of support.

Place the feet wide apart, one in front of the other, to ensurefreedom of movement—forward and backward—as arms are raised and lowered.

Maintain good body alignment. Move close to object.

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPSASSASASASSSSSSSSSSSSS

MPLEsonson

on. on.

ved.

ut the hands on the load at chut the hands on the load at ch

the chest or shoulder againstthe chest or shoulder agains

with arms or shoulders. with arms or should

he back straight. Crouch and pe back straight. Crouch an

ulling:

Place the feet apart, onace the feet apart, oclose to the object toe to the object to

Pull by strPull by st

WalkW

Page 121: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

SEGURIDAD PERSONAL 3.2 Mecánicas apropiadas del cuerpo

Bajar la carga doblando las caderas y las rodillas con la espalda derecha y la carga cerca del cuerpo.

Si la carga es demasiada pesada, pida ayuda.

líder para asegurar buena sincronización y coordinación.

Empujando:

Pararse cerca del objeto a ser movido.

Agacharse con los pies separados.

Doblar los codos y poner las manos en la carga al nivel del pecho.

Inclinarse hacia adelante con el pecho o los hombros contra el objeto.

No empujar con los brazos o los hombros.

Mantener la espalda derecha. Agacharse y empujar con las piernas.

Jalando:

Colocar los pies separados, un pie detrás del otro, manteniéndose cerca del objeto para mover.

como sea posible.

Jalar enderezando las piernas. Mantener la espalda derecha.

Caminar hacia atrás con pasos grandes en cuclillas, para que las piernas hagan todo el trabajo.

Alcanzando:

Pararse cerca del objeto. Mantener el centro de gravedad sobre la base de apoyo.

Poner los pies bien separados, con un pie enfrente del otro, para asegurar libertad de movimiento—hacia adelante y detrás—mien-tras los brazos suben y bajan.

Mantener buena alineación del cuerpo. Acercarse al objeto.

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

SASASASASSSSSSS

inaciónnación

ido.

ados.ados.

r las manos en la carga al nivlas manos en la carga al niv

lante con el pecho o los hombrante con el pecho o los hombr

on los brazos o los hombros.os brazos o los

r la espalda derecha. Agacharr la espalda derecha. Aga

ando:

Colocar los pies separadColocar los pies sepacerca del objeto para ca del objeto para

como sea poscomo sea pos

Jalar endJalar en

CaC

Page 122: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

PERSONAL SAFETY 3.2 Proper Body Mechanics

Do not reach outward to the point of straightening.

When reaching for an object above the head, grip it with palms up and lower it. Keep it close to the body on the way down.

Stooping:

Stand close to the object.

footing for the task to be done.

Bend the hips and knees, lower the body, keep the back in good alignment, and bring the hands down to the object.

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEer the body, keep the back in er the body, keep the back inands down to the object. s down to the object.

Page 123: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

SEGURIDAD PERSONAL 3.2 Mecánicas apropiadas del cuerpo

No alcanzar hacia fuera hasta el punto de estar derecho.

Cuando alcanzando un objeto por arriba de la cabeza, agarrarlo con palmas hacia arriba y bajarlo. Mantenerlo cerca del cuerpo al bajarlo.

Agachándose:

Pararse cerca del objeto.

Poner los pies separados, con un pie en frente del otro, para tener

Doblar las caderas y rodillas, bajar el cuerpo, mantener la espalda con buena alineación, y bajar las manos hacia el objeto.

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEen frente del otro, para tenernte del otro, para tener

bajar el cuerpo, mantener la ebajar el cuerpo, mantener la ear las manos hacia el objeto.las manos hacia el objeto.

Page 124: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

Page 125: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

SECTION 4: FALLPROTECTION

SECCIÓN 4:

PROTECCIÓN CONTRA CAÍDAS

Training Resources: Toolbox Talks.1 eneral uidelines for Ris Assessment.2 Step Ladders

E tension LaddersConstructing a Safe Job Made Wooden LadderSafe Use of Job Made Wooden Ladders

.3 Protection from alling bjectsCovering Holes

. uardrails – System Requirementsuardrails – E amples

. Pumpjac Scaffolding

. Personal all Arrest Systems (P AS) Proper it & nspectionPersonal all Arrest Systems (P AS) Anchorage Point &

ree all istance. Putting on a Body Harness. Horizontal Lifeline (HLL) System. Rescue Plan

Safety Awareness Resources: Posters.1 A ER Controlled Access one.3 A ER Men Wor ing Above

o Par ing alling bjects. o ot Remove Handrails. o ot Enter ithout Proper all Protection

Recursos de Formación: Toolbox Talks.1 Pautas generales para evaluación de riesgos.2 Escaleras de mano

Escaleras de e tensiónConstruyendo una escalera de madera en el lugar de trabajo

de forma seguraUso seguro de escaleras de madera hechas en el trabajo

.3 Protección contra la ca da de objetosapando los Hoyos

. Barandillas – Requisitos del sistemaBarandillas – Ejemplos

. atos de pompa Andamios

. Ajuste e inspección adecuada del sistema de detención de ca das (P AS)

Sistema personal de detención de ca das (P AS) punto de anclaje y distancia de ca da. Poni ndose un arn s de cuerpo. Sistema de l nea de vida horizontal.

Recursos de Conciencia de Seguridad: Carteles.1 PEL R ona de acceso controlado.3 PEL R Hombres trabajando arriba

o estacionarse objetos cayendo. o quiten las barandillas. o entre sin la proteccion apropiada de ca da

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEECCIÓN 4ECCIÓN 4

PROTECCIÓPROTECCIÓCONTRA CAÍDONTRA CAÍ

Ladderadderers

uirements

ingrrest Systems (P AS) Proper it & nspectionst Systems (P AS) Proper it & nspection

all Arrest Systems (P AS) Systems (P AS) Anchorage Point & Anchorage Point &ee all istance

ting on a Body Harnessing on a Body HarnessHorizontal Lifeline (HLL) SystemHorizontal Lifeline (HLL) SystemRescue PlanRescue Plan

AwarenesAwarenesR Controlled

en W

Recursos de FormRecursos.1.1 Pautas generales paraPautas.2.2 Escaleras de manoEscaleras

Escaleras de eEscaleras deConstruyenConstruyen

deUsoUso

.3.3

Page 126: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

SECTION 4: FALL PROTECTIONIntroduction

All fall protection systems, whether fabricated on site, purchased, or rented, must conform to the

FALL PROTECTION 4.1 Introduction

General Guidelines for Risk Assessment:

DANGER Use fall protection when on a

lower level to pre-

Each Employee

the use of a guardrail system, personal fall arrest system or other

Exception: When the employer can demonstrate that it is infeasible or

-

4.2 LADDERS4.3 PROTECTION FROM FALLING OBJECTS 4.4 GUARDRAILS4.5 SCAFFOLDING4.6 PERSONAL FALL ARREST SYSTEMS (PFAS)4.7 POSITIONING DEVICE SYSTEMS4.8 HORIZONTAL LIFELINES4.9 RESCUE PLAN

4.1

ELIMINATE

PREVENT

systems or other

fall protection

RESTRAINUse personal fall arrest systems

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE:

fall all other other

on:: When the When the yer can demonstrate n demonstrate

it is infeasible or ble or

4.2 LADD4.2 LAD4.3 PR4.3 P4.44.

NATE

LEMPLMP

PREVENT

systems or other

fall

Use per

Page 127: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

SECCIÓN 4: PROTECCIÓN CONTRA CAÍDASIntroducción

PROTECCIÓN CONTRA CAÍDAS 4.1 Introducción

Reglas generales para evaluación de riesgos:

PELIGRO Use protección contra caídas

nivel inferior

pudiera resultar en una lesión

Empleado en una

lado o borde sin protección

caerse con el uso de una barandilla, sistemade protección contra caídasciones recomendadas para la protección contra

Excepción: -

-

4.2 ESCALERAS4.3 PROTECCIÓN CONTRA OBJETOS QUE CAEN4.4 BARANDILLAS4.5 ANDAMIO4.6 SISTEMA PERSONAL DE PROTECCIÓN CONTRA CAÍDAS (PFAS)4.7 SISTEMAS DE DISPOSITIVOS DE POSICIONARSE/RETRACTABLES4.8 SISTEMA DE LÍNEA DE VIDA HORIZONTAL4.9 PLANIFICACIÓN DE RESCATE

4.1

ELIMINAR

PROTEGERUsar el sistema de

barandillas ó usar otro medio de protección contra caídas reco-

RESTRINGIRUsar el sistema de protección

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEesg

de una e una stemama

ción contra ción contra

recomendadas mendadas la protección contra ción contra

Excepción:Excepción:

4.4

INAR

LEMPLMP

PROTEGERUsar el sistema de arandillas ó usar otro medio de protección contr

ESUsar e

Page 128: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

FALL PROTECTION 4.2 Ladders

Ladders

Use:

Do not exceed the maximum intended load

WARNING

-

CAUTION

platform

4.2

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

AA

ad

--

AAAAAASAAMCAUTIONCAUTIONCACAUAUTIONNN

SASAPP

Page 129: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

PROTECCIÓN CONTRA CAÍDAS 4.2 Escaleras

Escaleras

-

Uso:

No exceder la carga máxima prevista

ADVERTENCIAeléctricas encima antes de manipular

-cos que pueden causar electrocución o

líneas eléctricas o expuestos equipos

PRECAUCIÓN Nunca colocar una escalera por encima o recostada sobre

Nunca usar una escalera en frente de

plataforma

4.2

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

AAantes de manipular ntes de manipular

--en causar electrocución o en causar electrocución o

eas eléctricas o expuestos eqas eléctricas o expuestos eq

AAAAAAAAAAMSAAMPRECAUCIÓNPRECAUCIÓNPRECAAAUCIÓNNN Nunca Nunca

escalera por encima oscalera por encima

SASA Nunca uNunca u

PP

Page 130: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

FALL PROTECTION 4.2 Ladders

Ladder must extend a

Maintain

Extension ladders

Place ladder on

secure the bottom

4:1Rule

3 ft.

4 ft.

32

1

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

Place ladder on e ladder on

he bottombottom

PLE3 ft.3 ft.

S

LEELEMPLMPLLLLLPLPLPLPLPLPLPPMPMPMPMPMMPLPLLPLPLLPLPPPPP3333333

2

111111

Page 131: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

PROTECCIÓN CONTRA CAÍDAS 4.2 Escaleras

La escalera debeextenderse a un

Amarrar la escalera al borde de la parte

de contacto al

Escaleras de extensión deben

sobremontar por lo

4:1Rule

3 ft.

4 ft.

32

1

de alturas que se extienda la escalera, la base debe

de donde la escalera se

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLlo

SMPLMPLLLLLPLPLPLPLPLPLPPMPMPPLEPLE

3 ft.3 ft.

LEELEMPMPMMPLPLLPLPLLPLPPPPP3333333

22

111111

Page 132: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

FALL PROTECTION 4.2 Ladders

Always maintain a three-point contact (two hands and a foot, or two feet

Extension Ladders:

Four-to-One Rule:

Step Ladders:

Do not use a step ladder

Ensure the spreader of a step ladder is locked before

top or top step of a step

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEFour-to-One Rule:Four-to-One Rule

pStep L

Page 133: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

PROTECCIÓN CONTRA CAÍDAS 4.2 Escaleras

-

Escaleras de extensión: Regla de cuatro-a-uno: Por cada cuatro pies de altura que una es-calera se extiende, su base debe ser colocada a un pie de donde la

-

base debe colocarse a

Escaleras de extensión se deben sobremontar un mínimo de tres

peldaños de una escalera dere-

Escaleras de tijera: No usar una escalera de tijera como una sola escalera o en una posición

parador de una escalera de

Nunca sentarse o pararse en la parte superior o en

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

MPLERegla de cuatro-a-unRegla de cuatro-a-ucuatro pies de alturuatro pies de altucalera se extiendcalera se extienser colocada aser colocada

basb

Escale

Page 134: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

FALL PROTECTION 4.2 Ladders

Job-made Wooden Ladders:

Inspect job-made ladders for defects periodically and after any

at the top of the ladder to protect from

Do not use job-made ladders as a work platform or for any purpose other than

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAAMPLEtop of the ladder to protect froder to protect fr

PPDo not use job-made laddenot use job-made laddplatform or for any purpoplatform or for any purpo

Page 135: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

PROTECCIÓN CONTRA CAÍDAS 4.2 Escaleras

Escaleras de madera hechas en el trabajo:

Inspeccione Escalera Hecha en el Lugar de Trabajo por defectos periodicamente y despues de cualqui-er incidente que pueda afectar su uso

-

-

parte superior de la escalera para

No use las escaleras hechas en el trabajo como una plataforma de trabajo o para cualquier otro Proposito que no

Un escalera de escalones escalera de madera construida

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE--

parte superior de la escalere superior de la escale

PPNo use las escaleraNo use las escaleratrabajo como unatrabajo como uno para cualquo pa

Page 136: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

FALL PROTECTION 4.2 Ladders

Inspection:

The capacity safety stickers on step ladders and extension ladders must

• Metal Ladders

- Dents

• Wood Job-made Ladders

• Fiberglass Ladders & Fiberglass Step Ladders - Loose components

- No-slip resistant rubber or plastic feet

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEon ladden ladd

ddersders

ass Ladders & Fiberglass Sass Ladders & Fiberglass Sse components se components

- No-slip resistant rub- No-slip resistant rub

SSSSSSSSSSSSSSSSSS

Page 137: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

PROTECCIÓN CONTRA CAÍDAS 4.2 Escaleras

Inspección:

-

-

• Escaleras de metal

- Abolladuras - Escalones doblados - Peldaños o rieles doblados

• Base de antideslizamiento de hule resistente o plástico Escaleras de Madera Hechas en el Lugar de Trabajo

- Grietas - Astillas - Peldaños o escalones sueltos

• - Partes sueltas - Partes que faltan - Grietas - Astillas

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEento de hule resistente o plánto de hule resistente o plás en el Lugar de Trabajoen el Lugar de Trabajo

o escalones sueltosalones sueltos

artes sueltass sueltas Partes que faltanue faltan

- Grietas- Gr - Astillas- Astillas

SSSSSSSSSSSSSSSSSS

Page 138: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

FALL PROTECTION 4.3 Protection from Falling Objects

Protection from Falling Objects

Use:

WARNING

Holesa guardrail system

leading edge

WARNING -

reduces jobsite accidents

Protection Systems:

Toe Boards (as a part of a guardrail system)

4.4 GUARDRAILS

4.3

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

leading edgeleading edge

NGNG

reduces jobsite educes jobsite accidentsaccidents

otecti

Toe BoardsToe Board

P

Page 139: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

PROTECCIÓN CONTRA CAÍDAS 4.3 Protección de objetos que caen

Protección de objetos que caen

Uso:

ADVERTENCIA

Los hoyos -sistema de barandillas

-

Mantener los materiales y el equipo por lo borde princi-

pal a menos que un sistema de barandi-

ADVERTENCIA Estar alerta de su alrededor y de los Empleados trabajando

con su ambiente de trabajo reduce acci-dentes

Sistemas de protección:

Antideslizador (Como parte de un sistema de barandillas)

Ver 4.4 BARANDILLAS -

4.3

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEasas

teriales y el equipo por lo teriales y el equipo por loborde princiborde princi-

os que un sistema de barandi-s que un sistema de barandi

VERTENCIATENCIA Estar alerta de Estar alertaAAalrededor y de los Empleadoslrededor y de los Empleados

con su ambiente de trabacon su ambiente de trabdentesdentes

Sistem

AntAnt

Page 140: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

FALL PROTECTION 4.3 Protection from Falling Objects

-

or protect them with a

6 ft.

6 ft.

Top View Side View

6 ft.66

6 ft.

Hole

Hole

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMAMMAMPAMMPPPMMMMMMMMMPMPMPLMPLPLPLPLPMPMPMPLPLMPPLPLPMPLEPLELELLLPLPLPLPLPPLP

Side ViewSide ViewEEEEEEE

Page 141: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

PROTECCIÓN CONTRA CAÍDAS 4.3 Protección de objetos que caen

(a menos que el sistema de barandillas

con el sistema de

Este conciente de sus alrededores y de los

Empleados que traba-

6 ft.

6 ft.

Vista de Arriba Vista de Lado

6 ft.66

6 ft.

Hoyo

Hoyo

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMAMMAMPAMMPPPMMMMMMMMMPMPMPLMPLPLPLPLPMPMPMPLPLMPPLPLPMPLEPLELELLLPLPLPLPLPPLP

Vista de LadoVista de LadoEEEEEEE

Page 142: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

FALL PROTECTION 4.3 Protection from Falling Objects

Canopy

Barricade

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

Page 143: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

PROTECCIÓN CONTRA CAÍDAS 4.3 Protección de objetos que caen

Toldo

Barricada

control u otro sistema que controla acce-

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

Page 144: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

FALL PROTECTION 4.4 Guardrails

Guardrails

DANGER Use fall protection when on a

lower level

Use:

Holes/Openings Install guardrail systems across holes -

roofs when the

CAUTION-

Stairs

Leading Edge leading edge

and ends of platforms, unless alternate fall

Ramps

4.4

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEeses -

roofsroofs when the when t

Leading Edge eading Edge

and an

LE

Page 145: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

PROTECCIÓN CONTRA CAÍDAS 4.4 Barandillas

Barandillas

-

PELIGROnivel bajo

Uso:

Hoyos/Aberturas Instalar sistemas de barandillaslos hoyos

Instalar una cubierta o sistema de barandillas

PRECAUCIÓN

-dilla al lado opuesto del acceso para que una persona no pueda caminar directamente en el

EscalerasInstalar un sistema de barandillas en las esca-leras hasta que las escaleras se necesiten para

Borde Principal Instalar un sistema de barandillas en el borde

Andamio

de todos los lados y extremos abiertos de las

Rampas

4.4

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEo

e barandillas e barandillas

o opuesto del acceso para quo opuesto del acceso para qua no pueda caminar directamea no pueda caminar directam

alerasaleInstalar un sistema de barInstalar un sistema de baleras hasta que las escaleras hasta que las esc

Borde Principal de PrincipInstalar un sistalar un

AndamiAnda

LELE

Page 146: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

FALL PROTECTION 4.4 Guardrails

to withstand at least a

Mesh

Verticals

Guardrail Systems:

WARNING Guardrail systems -

A guardrail system shall be comprised of the following:

Top Rail:

Mid Rail/Screen/Mesh: -

Toe Board: lower level

Verticals:

Additional Members:

failure, a

42 in.

21 in.

8 ft.

3.5 in.

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

EEPLEPLEPPLELEEELEEEELLPL

ystems:

NGNG Guardrail systemsGuardrail systems

guardrail system shall be couardrail system shall be co

Top Rail:Top Rail:

Mid Rail/ScreenMid Rail/Scree

Toe BTo

3.5 in

Page 147: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

PROTECCIÓN CONTRA CAÍDAS 4.4 Barandillas

estar capacitado para

Verticales

Sistemas de barandillas:

ADVERTENCIA Sistemas de barandillas deben ser construídos

Un sistema de barandillas debe componerse de lo siguiente:

Riel de Arriba: -

Riel del Medio/Pantalla/Malla:

Antideslizador:nivel de abajo

Verticales:

Miembros adicionales: Deben instalarse para que no haya abertura en el

falla, una

del borde principal en cualquier dirección hacia afuera o abajo, a cualquier

42 in.

21 in.

8 ft.

3.5 in.

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMAMPLEEEPLEPLEPPLELEPEELEEEELLPL

barandillas:

RTENCIATENCIA Sistemas de baSistemas de b

Un sistema de barandillas dUn sistema de barandillas

Riel de Arriba:Riel de Arriba:

Riel del MedioRiel del M

AA

3.5 in

Page 148: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

Scaffolding

--

Use:

Scaffoldscompetent person

CAUTION

WARNING

WARNING Always wear a hard hat and

FALL PROTECTION 4.5 Scaffolding

4.5

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMAMPLEent personon

NGNG Always wear a hard hat a Always wear a hard ha

Page 149: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

Andamio

Uso:

Andamiospersona competente

PRECAUCIÓN-

-

ADVERTENCIA

-

ADVERTENCIA-

la caída de objetos y potenciales lesiones

PROTECCIÓN CONTRA CAÍDAS 4.5 Andamio

4.5

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMAAMPAA

MPLEpersona competena competen

AA

ADVERTENCIAADVERTENCIAAA

la caída de objetosla caída de objetos

Page 150: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

FALL PROTECTION 4.5 Scaffolding

dismantled or altered in any way except

Each Employee on a

systems on all open sides and ends on all

work platforms free of

that has been secured

-

Pumpjack poles must be

Pumpjack/Scaffolding

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMAAMAME

PLMPPMMPMAMAAMMMMAM

EEPLPMPMPPPPPMPPPLE

MPLMPLPLMPLPPPPPPPPLPLPPMP

AMAMMPMMMPMPMPPMPPMPMMMMPMPAMAMAMAMAM

LLLLPLPLPLPLLLPPPLPLPLPLPPMMMM open open

ds on all ds on all

ee of ee of

Page 151: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

PROTECCIÓN CONTRA CAÍDAS 4.5 Andamio

Andamios sólo de-ben ser colocados,

alterados de cualquier manera bajo la super-

-

a un miembro estruc-

tener protección

Instalar el sistema de barandillas en todos los lados y extremos abiertos de los anda-

mios donde la caída es

Mantener los andamios y las plataformas de

trabajo libres de

Instalar andamios en

estable que se ha

y con los requisitos de

Los postes de los andamios de subir manuales deben sujetarse

-

Gatos de pompa/andamio

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAAAMAME

PLMPPMMPMAMAAMMMAMAM

EEPLPMPMPPPPPMPPPLE

MPLMPLPLMPLPPPPPPPPLPLPMP

AMAMMPMMMPMPMPPMPPMPMMMMPMPAMAMAMAMAM

LLLLPLPLPLPLLLLLPPPLPLPLPLPPMMMMma de ma de

en todos en todos s y extremos y extremos

s de los anda-e los anda-de la caída es la caída es

mios mios e

y con los re

Page 152: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

Fall Protection:

DANGER Each Employee on a scaffold

incident that could lead to serious

guardrail systemstoe boards, are installed at all open

4.4 GUARD-RAILS -

Each walkway

Personal fall arrest systemsattached by lanyard lifeline

anchorage point that is

4.6 PERSONAL FALL ARREST SYSTEMS

Inspection:

Scaffoldsdefects by a competent person before each work shift, and after any

platforms

FALL PROTECTION 4.5 Scaffolding

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLErest systemsrest systems

yardyard

AAARREST SYSTEMARREST SYSTEM

Inspecti

ScafScafdedSSSS

Page 153: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

Protección contra caídas:

PELIGROandamiodebe tener protección contra caí-

puede resultar en una lesión seria

No usar andamios donde la caída es

que un sistema de barandillas,

instalados en todos los lados y los 4.4 Barandillas

pasillo

Sistemas personales de protección contra caídas usados en desacelerador a una línea

de vida

anclaje

No atar un sistema personal de protección contra caídas al sistema de 4.6 Sistemas Personales de Protección Contra Caídas

Inspección:

Andamios y los componentes de los andamios deben ser inspeccio-nados para defectos persona competente antes de cada turno de trabajo, y después de cualquier ocurrencia que puede

Mantener los andamios y las plataformas

-

PROTECCIÓN CONTRA CAÍDAS 4.5 Andamio

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

ass

nales de protección connales de protecdesa

AANo atar un sistema persNo atar un sistema pers4.6 S4.6 S

Inspecc

AndaAndanadnaddSSS

Page 154: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

FALL PROTECTION 4.6 Personal Fall Arrest Systems

Personal Fall Arrest Systems (PFAS)

Use:

WARNINGbody harness, a lanyard with shock

-snap hook for connection to suitable

meet these material requirements may

Do not use a body belt

WARNING Guardrail systems adequate anchor-age points

nor contact any lower leveldeceleration

distance

4.6

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEdrail systems drail systems

nor contact any nor contact any lower levlower lev

distancedistance

Page 155: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

PROTECCIÓN CONTRA CAÍDAS 4.6 Sistema personal de protección contra caídas

Sistema personal de protección contra caídas (PFAS)

-

Uso:

ADVERTENCIAde un arnés del cuerpo, cuerda de seguridad con el paquete de absorción,

gancho de cierre para conectarse a ciertos objetos

cumplir con estos requerimientos de los materiales puede resultar en una lesión

No usar una correa de cuerpo como

usar solo para posicionarse y no como

ADVERTENCIA Los sistemas de barandillasadecuado de anclaje

-

nivel de abajodistancia

de desaceleración-

Una persona de rescate y una escalera deben estar disponibles durante el

4.6

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLs sión n

uerpouerpo como como

cionarse y no como ionarse y no como

NCIAN Los sistemas de bLos sistemas de bdo de anclajedo de anclaje

de desace desa

Page 156: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

FALL PROTECTION 4.6 Personal Fall Arrest Systems

Adequate

attached by lanyard to an adequate

Before Fall

After Fall

6 ft. (1.8 m)Length of Lanyard

3.5 ft. (1.1 m)Deceleration Distance

Anchorage

6 ft. (1.8 m)Height of Worker

TOTAL 15.5 ft.

(4.7 m) FROM

ANCHORAGE

Front View Back View

Lanyard with shock-absorbing pack

D-Ring Connected to Snap Hook

Lanyard deceleration example

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEMPMPPPPPMPMPMPMPPPPP

AMPLPPPLMPPPLPLPLPLPLPLPLPLPLPLPPLLEPLPLEELLEPLLEPLPLPLLEL

6 ft.6 ft. (1.8 m) (1.8 m)Length of Lanyardength of Lanyar

3.5 ft.5 ft. (1.1 (1Deceleration eceleration

A

AAAA

Page 157: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

PROTECCIÓN CONTRA CAÍDAS 4.6 Sistema personal de protección contra caídas

Usar un punto adecuado de anclaje

amarrado por un de-sacelerador a un punto

de anclaje adecuado

Antes De La Caída

Después De La Caída

6 ft. (1.8 m)

Desacelerador

3.5 ft. (1.1 m)Distancia de la Desaceleración

El Anclaje

6 ft. (1.8 m)Altura del trabajador

TOTAL

15.5 ft. (4.7 m)

DESDE EL ANCLAJE

Vista de frente

Vista de espaldas

Desacelerador con paquete para absorber

los choques

Anillo D Conectado al Mosquetón

Ejemplo del desacelerador

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEMPMPPPPPMPMPMPMPPPPP

AMPLPPPLMPPPLPLPLPLPLPLPLPLPLPLPPLPLPLEELLEPLLEPL

D

PLPLLEL6 ft.6 ft. (1.8 m) (1.8 m)

DesaceleradorDesacelerado

3.5 ft.ft. E (1.1 m (1.1 Distancia dDistancia dDesaceleDesacel

El AnEl An

AAAAA

Page 158: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

Inspection:

All equipment must be tested by the

-

by a competent person

Equipment Requirements:

Body Harness

Adequate Anchorage Point -

used to support or suspend platforms

• As part of a complete personal fall arrest system which maintains a safety factor of at least two and

Self-retracting Lifeline/Lanyard A deceleration device contain-

Lanyardconnector decelera-tion device, lifeline

Snap Hook A connector comprised of a hook-shaped member with a

WARNING -failure of the

FALL PROTECTION 4.6 Personal Fall Arrest SystemsCopyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEments:

ate Anchorage Pointte Anchorage Poi

d to support or suspend to support or suspend platfplat

•• As part of a complete As part of a complet pea safety factor of at lea safety factor of at le

Self-retractiSelf-retracti

La

Page 159: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

Inspección:

Todo equipo debe ser probado por el fabri-

deterioridad, y componentes defectuosos

debe ser usado para la protección del Em-pleado hasta que haya sido inspeccionado y determinado por una persona competente

Requerimientos del equipo:

Arnés del Cuerpo

para atarlo a otros componentes del sistema personal de protección contra

Punto Adecuado de Anclajeequipos de protección personal contra caídas deben ser independientes de cualquier anclaje que es usado para apoyar o suspender plataformas y

-

• sistema personal de protección contra caídas

Línea de vida auto retractable/Desaceleradordesaceleración que contiene una cuerda enrollada en un cilindro que puede ser extraída lentamente de, o retraída en, el cilindro bajo poca tensión du-

Desacelerador

arnés del cuerpo a un dispositivo de desacelerador, línea de vida

Mosquetón conectador compuesto de un miembro de forma de

ADVERTENCIA de que se desconecten accidentalmente que puede resultar en la falla del

PROTECCIÓN CONTRA CAÍDAS 4.6 Sistema personal de protección contra caídas

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEo y determinado por una o y determinado por una perspers

quipo:

componentes del sistema percomponentes del sis

ecuado de Anclajeecuado de Anclajde protección personal contra e protección personal contra

ier anclaje que es usado paraer anclaje que es usado para

•• sistemasistema

Línea de vida auLínea de vida audesaceleración qdesaceleración qser extraída leser extraíd

DesaD

Page 160: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

Positioning Device Systems

Use:

A positioning device system shall consist of a body harnessto allow an Employee to be supported on an

2

WARNINGshall not be attached to guardrail sys-tems because they are not adequate anchorage pointsare not able to resist the necessary force

that an Employee can be secured to a suitable anchorage point and cannot free

Equipment Requirements:

Body Beltlanyard, lifeline or deceleration device

cannot be used as a personal fall arrest system; it can only be used

Body Harness

FALL PROTECTION 4.7 Positioning Device Systems

2

4.7

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEyss--uate

essary force essary force

loyee can be secured to a oyee can be secured to a anchoragenchorage point and cannot point and cannot

quipment Requirem

Body BeltBody Beltlanylan

cannot be used ascannot be used as

Body HaBody Ha

PLPL

Page 161: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

Sistemas de dispositivos de posicionarse/retractables

Uso:

Un sistema de dispositivos de posi-cionarse arnés del cuerpo equipado para permitir que un

2

ADVERTENCIAde posicionarse no deben ser atados a los sistemas de barandillas porque no son puntos adecuados de anclaje -mas de barandillas no son capaces de resistir

conectados para que un Empleado pueda anclaje y que la

Requerimientos del equipo:

Cinturón del Cuerpola cintura y atada a un desacelerador, línea de vida o dispositivo de desaceleraciónsistema personal de protección contra caídas; solo se puede

Arnés del Cuerpo -

con medios de unir a otros componentes del sistema personal de protec-

PROTECCIÓN CONTRA CAÍDAS 4.7 Sistemas de dispositivos de posicionarse/retractables

2

4.7

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE2

os a los los orque no son rque no son

nclajeclaje -capaces de resistir capaces de res

dos para que un Empleado puos para que un Empleado panclajeanclaje

Requerimientos d

Cinturón del CueCinturón del Cuela cintura y atadaa cintura y atadade desacelee desasistema psistema

ArnAr

EELL

Page 162: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

FALL PROTECTION 4.7 Positioning Device Systems

Always attach lanyard to an adequate

Lanyard

Front View Back View

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEMP

AMAMMMMMLPLEPLPLLELELLLLPPLPLPPLEPLLELELE

Front ViewFront View

LL

Page 163: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

PROTECCIÓN CONTRA CAÍDAS 4.7 Sistemas de dispositivos de posicionarse/retractables

desacelerador a un punto adecuado de

anclaje

Desacelerador

Anillo D y Mosquetón

Vista de frente

Vista de espaldas

Anillo D conectado al Mosquetón

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEMP

AMAMMMMMLPLEPLPLLELELLLLPPLPLPPLEPLLELELE

Vista de Vista de frentefrente

LL

Page 164: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

Adequate Anchorage Point -

used to support or suspend platforms

• As part of a complete personal fall arrest system which maintains a safety factor of at least two and

Self-retracting Lifeline/Lanyard deceleration device contain-

Lanyarda connector

Snap Hook connector comprised of a hook-shaped member with

WARNING -failure

Inspection:

Positioning device systems shall be inspected prior to each use for

FALL PROTECTION 4.7 Positioning Device Systems

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEhicic

eration deviceration device contanta

okok connectoronnector comprised comprisedrr

WARNINGWARN

specti

PoPSAASSSSSSSSS

Page 165: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

Punto de Anclaje Adecuadopersonal de protección contra caídas deben ser independiente de cual-quier anclaje que es usado para soportar o suspender las plataformas

• sistema personal de protección contra caídas

Línea de vida auto retractable/Desacelerador dispositivo de desaceleración que contiene una cuerda enrollada en un cilindro que puede ser extraída lentamente de, o retraída en, el cilindro bajo poca

Desaceleradorenlace en cada extremo para conec-

Mosquetón conectador compuesto de un miembro de forma de

ADVERTENCIAde que se desconecte accidentalmente que puede resultar en la falla del

Inspección:

Los sistemas dispositivos de posicionarse deben ser inspeccio-

PROTECCIÓN CONTRA CAÍDAS 4.7 Sistemas de dispositivos de posicionarse/retractables

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEconon

eradorrador dispositivdispositivrda enrollada en un cilindro nrollada en un cilindro

etraída en, el cilindro bajo pocel cilindro bajo poc

enlaceenlac en cada extren cada extr

conectadorconectador compuest compuesr

ADVERTENCIAENCIAAAde que se desconecte accide que se desconecte acc

specci

SLoLSSSSSSSSS

Page 166: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

Horizontal Lifeline (HLL) System

Use:

A Horizontal Lifeline System (HLLshall consist of a suitable anchor point, a body harness, a self-retracting life-line snap hook for connec-tion to the Horizontal Lifeline System

WARNING

Employee can

contact any lower level

limit maximum deceleration distance

Inspection:

-spected and determined by a competent person

FALL PROTECTION 4.8 Horizontal Lifeline (HLL) System

4.8

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEEmployeeEmployee can can

ny ny lower levellower level

maximum ximum deceleration disdeceleration di

Insp

PLPL

S

Page 167: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

Sistema de línea de vida horizontal

Uso:

Un sistema de linea de vida hori-zontal (HLL)anclaje adecuado, un arnés de cuerpo,una linea de vida auto-retactable y un gancho de seguridad con bloqueo

-tos de estos materiales puede resultar en

ADVERTENCIAinstalado de acuerdo a las recomendaciones

• Debe estar conectado de tal manera que un empleado

-er nivel inferior

Un recatista y la escalera deben estar disponibles durante el uso de un

Inspección:

-

los empleados hasta que sea inspeccionado y sea determinado por una per-sona competente

PROTECCIÓN CONTRA CAÍDAS 4.8 Sistema de línea de vida horizontal

4.8

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE--en n

ecomendaciones comendaciones

star conectado de tal manera qtar conectado de tal manerampleadopleado

er nivel inferiorferior

Un recatisUn recatis

Insp

PLPL

S

Page 168: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

Equipment Requirements:

Horizontal Lifeline

or suspend platforms

• As part of a complete personal fall arrest system which maintains a safety factor of at least two, and

Body Harness Employee in

Do not use a body belt

Self-retracting Lifeline deceleration devicedrum-wound line that can be slowly extracted from, or retracted onto, the

Do not use a lanyard

Snap Hook connector comprised of a hook-shaped member with

WARNING -failure

FALL PROTECTION 4.8 Horizontal Lifeline (HLL) System

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEwhich mwhich

EmployeeEmployee in in

LifelineLifeline deceleration ddecele that can be slowly extracted that can be slowly extra

t use a use a lanyardlanyard

Snap HookSnap H connectconne

WARNINGWARNIN

SASA

Page 169: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

Requerimientos del equipo:

Line de vida horizontal-

je que se utilice para apoyar o suspender plataformas y capaces de

detención de caídas que

-

No utilice un cinturón de cuerpo

Line de vida auto-retractable dispositivo de desacel-eración que contiene una línea de tambor que se puede extraer lentam-

-

No utilice una cuerda de seguridad-

Ganchos de seguridad conector compuesto por un miembro

ADVERTENCIA la posibilidad de desconexión accidental que podría resultar en el fallo de

PROTECCIÓN CONTRA CAÍDAS 4.8 Sistema de línea de vida horizontal

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEde caídasde caídas q

e cuerpoe cuerpo

a auto-retractableauto-retractable ddque contiene una línea de tamue contiene una línea de tam

AANo utilice una No utilice cuerda decuerda

Ganchos de sGanchos de

ADASS

Page 170: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

Rescue Planning

beforeto an Employee

Important Considerations:

-

-tim from a ladder, platform or aerial lift 5.1 AERIAL LIFTS

Determine the proximity of a professional rescue team and under what

Post Fall Recovery:

-

1.5 FIRST AID PROCEDURES

FALL PROTECTION 4.9 Rescue Planning

4.9

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMAMPLErmm or or aerial liftaerial lif 5

Determine the proximity Determine the proximity

Post Fa

Page 171: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

-

Consideraciones importantes:

plataforma o elevador aéreo

Determinar la proximidad de un equipo de rescate profesional y en qué

Determinar el tiempo de respuesta aproximado de los recatistas de

Rescate después de la caída:

1.5PROCEDIMIENTOS DE PRIMEROS AUXILIOS

PROTECCIÓN CONTRA CAÍDAS

4.9

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEs:

plataformaplataf o o elel

Determinar la proximDeterminar la proxi

DeterminarDetermina

Res

Page 172: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

FALL PROTECTION 4.9 Rescue Planning

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

Page 173: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

-

-

PROTECCIÓN CONTRA CAÍDAS

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

Page 174: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

Page 175: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

SECTION 5: JOBSITEEQUIPMENT

SECCIÓN 5:

EQUIPOS DEL LUGAR DE TRABAJO

Training Resources: Toolbox Talks.1 Aerial Lifts – Manufacturer Recommendations & nspection

Aerial Lifts – all Protection.2 or lifts.3 Loc out agout

Safety Awareness Resources: Posters.2 or lifts – no our Limitations

or lifts –Requirements to perateor lifts – ield to Pedestriansor lift Area – ot Responsible for amageor lift Area – Par at our n Ris

.3 Loc out agout

Recursos de Formación: Toolbox Talks.1 Recomendaciones e inpección de fábrica para

el elevador a reo Elevador a reo – Protección de ca das

.2 Montacargas

.3 Aislar Etiquetar

Recursos de Conciencia de Seguridad: Carteles.2 Montacargas – Sepa sus limitaciones

Montacargas – Requisitos para operarMontacargas – Ceda a los peatonesÁrea de montacargas – o nos hacemos

responsables por da osÁrea de montacargas – Estacionarse a su propio riesgo

.3 Aislar Etiquetar

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEECCIÓN 5ECCIÓN 5

EQUIPOS DEEQUIPOS DLUGARLUGATRATRA

Talksksdations & nspectionations & nspection

wareness Resources: Posts Resources: Posifts – no our Limitationsimitations

or lifts –Requirements to perateor lifts –Requirements to perateor lifts – ield to Pedestriansor lifts – ield to Pedestriansor lift Area – ot Responsible for amaor lift Area – ot Responsible for amor lift Area – Par at our n Risor lift Area – Par at our n Ris

Loc out agoutLoc out agout

Recursos dcursos .1.1 Recomenecomen

El

.2

Page 176: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

JOBSITE EQUIPMENT 5.1 Aerial Lifts

SECTION 5: JOBSITE EQUIPMENTAerial Lifts

Use:

Employeesaerial lift.

signs

CAUTION scaffold

accident

WARNINGpersonal fall

arrest system

5.1

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEscaffoldscaff

AAWARNINGWARNIN

arrest sarrest sSASALELE

Page 177: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

EQUIPOS DEL LUGAR DE TRABAJO 5.1 Elevador aéreo

SECCIÓN 5: EQUIPOS DEL LUGAR DE TRABAJOElevador aéreo

Uso:

Empleadoselevador aéreo

símbolos de

PRECAUCIÓNandamio

accidente

ADVERTENCIA

sistema personal de protección contra caídas

5.1

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

MN

accidenteaccidente

AASASASAADVADSS

LELE

Page 178: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

JOBSITE EQUIPMENT 5.1 Aerial Lifts

Inspection:

Aerial Lift Checklist

Guidelines:

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

Page 179: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

EQUIPOS DEL LUGAR DE TRABAJO 5.1 Elevador aéreo

Inspección:

Reglas:

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

Page 180: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

JOBSITE EQUIPMENT 5.1 Aerial Lifts

Aerial Lift Checklist

INSPECTION OK REQUIRES REPAIR

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SSAMAMPLEEELELELLLEPLPLPPLPLPPPLPLPPLPLPLPPMPPPMPMPMPPPMMMAMAMAMASASASSSS

IRES REPA

Page 181: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

EQUIPOS DEL LUGAR DE TRABAJO 5.1 Elevador aéreo

INSPECCIÓN OK REQUIERE REPARACIÓN

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SSAMAMPLELELLLEPLPLPLPPLPLPLPPLPPLPLPPMPPPMPMPMPPPMMMAMAMAMASA

EE

SASSSSS

IERE REPARACIÓN

Page 182: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

JOBSITE EQUIPMENT 5.2 Forklifts

Forklifts

Use:

Employees

signs

CAUTION

WARNING

CAUTION

5.2

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

AA

nsns

WARNINGWARNING

SASASAAAA

E

ACAUTIONAUTIOAUAUTION

SASA

Page 183: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

EQUIPOS DEL LUGAR DE TRABAJO 5.2 Montacargas

Montacargas

Uso:

Empleados

símbolos de

PRECAUCIÓN

ADVERTENCIA

PRECAUCIÓN

5.2

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

SASA

s de de

MMMIÓN ÓÓN

ADVERTENCIAADVERTENCI

SSPREPRPRRRSS

EEE

Page 184: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

JOBSITE EQUIPMENT 5.2 Forklifts

Inspection:

Forklift Checklist

Guidelines:

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

Page 185: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

EQUIPOS DEL LUGAR DE TRABAJO 5.2 Montacargas

Inspección:

Reglas:

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

Page 186: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

JOBSITE EQUIPMENT 5.2 Forklifts

Forklift Checklist

INSPECTION OK REQUIRES REPAIR

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SASSAMAMPLEEELELELLLEPLPLPPLPLPPPLPLPPLPLPLPPMPPPMPMPMPPPMMMAMAMAMASASASSSS

QUIRES REPAIR

Page 187: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

EQUIPOS DEL LUGAR DE TRABAJO 5.2 Montacargas

INSPECCIÓN OK REQUIERE REPARACIÓN

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SSSASSAMAMPLEEELELLLLELEPLPLPPLPLPPLPPLPLPPMPPPMPMPMPPPMMMMMAMAMASASASASSS

IERE REPARACIÓN

Page 188: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

Lockout/Tagout

Use:

Employees Lockout/Tagout

WARNING

JOBSITE EQUIPMENT 5.3 Lockout/Tagout

5.3

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

Page 189: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

Aislar/Etiquetar

Uso:

ADVERTENCIA

EQUIPOS DEL LUGAR DE TRABAJO 5.3 Aislar/etiquetar

5.3

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMAMPLE

Page 190: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

Page 191: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

SECTION 6: POWER-OPERATEDHAND TOOLS

SECCIÓN 6:

HERRAMIENTAS DE MANO

ELÉCTRICAS

Training Resources: Toolbox Talks.1 eneral – Manufacturer Recommendations and nspection

eneral – Proper UseLoc out agout

.2 Air Compressor – nspection & Use

. Pneumatic ail un – nspection & Use

. Po der Actuated ools – nspection & UsePo der Actuated ools – Cartridge Storage & isposal

Safety Awareness Resources: Posters.1 Hand ool Safety

Recursos de Formación: Toolbox Talks.1 Recomendaciones enerales del fabricante e inspección

En eneral – Uso apropiadoAislar Etiquetar

.2 Compresor de aire – nspección y uso

. Pistola de clavos neumática – nspección y uso

. Herramientas activadas de polvo – nspección y usoHerramientas activadas de polvo – Almacenamiento y

eliminación de los cartuchos

Recursos de Conciencia de Seguridad: Carteles.1 Seguridad herramienta de mano

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEECCIÓN 6ECCIÓN 6

RRAMIENTARRAMIENTADE MADE M

ELÉCTELÉCT

Talkskstions and nspectionions and nspection

n & Usespection & Usespec

ols – nspection & Usels – nspection &d ools – Cartridge Storage & isposalools – Cartridge Storage & isposal

y Awareness Resources: y Awareness ResourcHand ool SafetyHand ool Safety

Recursos dcursos .1.1 Recomenecomen

En eEn AiA

.2

Page 192: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

SECTION 6: POWER-OPERATED HAND TOOLSIntroduction

-

POWER-OPERATED HAND TOOLS 6.1 Introduction

General Guidelines:

Employees power-operated hand tools

-

accident

SECTION 3: PERSONAL SAFETY

6.2 AIR COMPRESSORS6.3 PORTABLE GENERATORS6.4 PNEUMATIC NAIL GUNS6.5 POWDER-ACTUATED TOOLS

6.1

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMSSSSSSSSSSSSSSSSSSSSSSAMPLE

wer-operateer-operat

SECTSECT

AASASA

Page 193: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

SECCIÓN 6: HERRAMIENTAS DE MANO ELÉCTRICASIntroducción

-

HERRAMIENTAS DE MANO ELÉCTRICAS 6.1 Introducción

Reglas generales:

Empleados herramien-tas de mano eléctricas

accidente

-SECCIÓN 3: SEGURI-

DAD PERSONAL

eléctricas:

6.2 COMPRESORES DE AIRE6.3 GENERADORES PORTÁTILES6.4 PISTOLAS DE CLAVOS NEUMÁTICAS6.5 HERRAMIENTAS ACTIVADAS CON PÓLVORA

6.1

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

SSSSSSSSSSSSSSSSSSSSS

herramher

DAD PERSONALDAD PERSONAL

SAAASASAelé

Page 194: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

POWER-OPERATED HAND TOOLS

Use:

Employees

SECTION 3: PERSONAL SAFETY

CAUTION-

Maintenance:

accident

6.2

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE3: PERSONAL SAFETYRSONAL SAFETY

--

Maintenance:

Page 195: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

HERRAMIENTAS DE MANO ELÉCTRICAS

Uso:

Empleados

-SECCIÓN 3: SEGURI-

DAD PERSONAL

PRECAUCIÓN

-

6.2

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLESECCIÓN 3CCIÓN

SSSS

Page 196: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

POWER-OPERATED HAND TOOLS

-

ground-fault circuit interrupters (GFCI) -

WARNING -

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLErcuit interrupters (GFCI)cuit interrupters (GFCI

INGNG

AA

Page 197: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

HERRAMIENTAS DE MANO ELÉCTRICAS

-

interruptores de circuito de falla a tierra (GFCI)

ADVERTENCIA -

-

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEores de circuito de falla res de circuito de

ADVERTENCIAADVERTENCIAAA

SASA A

Page 198: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

POWER-OPERATED HAND TOOLS 6.3 Portable Generators

Portable Generators

Use:

Employees

SECTION 3: PERSONAL SAFETY

-

ground-fault circuit interrupt-ers (GFCI) -

-

WARNING

6.3

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEPERSONAL SAFETYPERSONAL SAFETY

-

rcuit interruptcuit interrupt---

WARNINGWARN

SASAAAPLPL

Page 199: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

HERRAMIENTAS DE MANO ELÉCTRICAS 6.3 Generadores portátiles

Generadores portátiles

-

Uso:

Empleados

-SECCIÓN 3: SEGURI-

DAD PERSONAL

interruptores de circuito de falla a tierra

-

-

ADVERTENCIA

6.3

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SECCIÓN 3: SIÓN 3: S

ores de circuito de ores de circuito de a

ADVERTENCIAADVERTENCIAAA

SASAAAPLPL

Page 200: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

POWER-OPERATED HAND TOOLS 6.3 Portable Generators

Maintenance:

accident

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

Page 201: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

HERRAMIENTAS DE MANO ELÉCTRICAS 6.3 Generadores portátiles

-

-

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEE

Page 202: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

POWER-OPERATED HAND TOOLS

Use:

Employees

WARNING

--

SECTION 3: PERSONAL SAFETY

CAUTION

WARNING

WARNING

6.4

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

---

PERSONAL SAFETYERSONAL SAFETY

MNNN

WARNINGWARNING

WARNINWARNINAASASALELELE

Page 203: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

HERRAMIENTAS DE MANO ELÉCTRICAS

-

Uso:

Empleados

ADVERTENCIA No alterar la pistola de

-

SECCIÓN 3: SEGURIDAD PERSONAL

PRECAUCIÓN

ADVERTENCIA

ADVERTENCIA

-

6.4

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMAMPLE--

CIÓN 3: SEGURIDAD PERCIÓN 3: SEGURIDAD PER

AAAMAMAMAMAMAMECAUCIÓN AUCIÓN UCIÓIÓIÓNNN

ADVERTENCIAADVERTENCIAAA

ADVADSASASS

LELE

Page 204: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

POWER-OPERATED HAND TOOLS

Maintenance:

accident

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

Page 205: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

HERRAMIENTAS DE MANO ELÉCTRICAS

-

accidente

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

Page 206: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

Use:

Powder-actuated tool operators-

-

-

SECTION 3: PERSONAL SAFETY

CAUTION

CAUTION -

WARNING --

POWER-OPERATED HAND TOOLS

6.5

TRAINED OPERATOR

-SAMPLE

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLESECTION 3: PERSOSECTION 3: PERS

MNNN

SASASAAAALE

ACAUTIONCAUTIONCACAUAU ONNN

WARNINGWARNINSASA

EEE

SASA

EENED OPERA

SAMPLESAMPLE

Page 207: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

con pólvora

-

-

Uso:

Los operadores de las herramientas activadas con pólvora

-

-SECCIÓN3: SEGURI-

DAD PERSONAL

PRECAUCIÓN

PRECAUCIÓN

ADVERTENCIA-

HERRAMIENTAS DE MANO ELÉCTRICAS

6.5

TRAINED OPERATOR

-SAMPLE

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

RSONALRSONA

AAAMAMAMAMAMAMCAUCIÓNAUCIÓNAUCIÓIÓIÓNNN

SASASASAAAAAAAPRECAUCIÓRECAURECAECAECACAAU IÓ

ADVADSASALEEEE

SS

EENED OPERA

SAMPLESAMPLE

Page 208: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

Cartridge Storage:

Maintenance:

accident

POWER-OPERATED HAND TOOLS

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEaccidentaccident

LELE

Page 209: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

-

-

--

-

-

-

HERRAMIENTAS DE MANO ELÉCTRICAS

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

----

SAASSSSSSSSSSSSSSSSSSSSSSSSS

LELE

Page 210: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

Page 211: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

SECTION 7: ADDENDA

SECCIÓN 7: ADICIONES

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLELECIÓN 7:CIÓN 7:

ADICIONESADICIONES

Page 212: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

Page 213: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

7.1

FrameSAFE Site-Specific Fall Protection Plan Template

Instructions for UseDO NOT INCLUDE THIS PAGE IN YOUR MANUAL

Step 1: Complete Site-Specific Form Enter the site-specific information in the form on the first page of the plan template either using the form fields in the pdf file or by hand.

Step 2: Choose Options for Installation Procedures*In addition to the first two pages of the plan template, the options for installation procedures that follow are intended for use as part of a site-specific fall protection plan. Your Company shall choose one (1) option for each category of work to include in your safety manual as your site-specific plan.

The categories of work include:

1. Installation of floor trusses/joists2. Installation of floor sheathing3. Installation of roof trusses/rafters

Include ONLY the option your Company uses for each work category. DO NOT include pages in your safety manual for categories of work your Company will not perform on this jobsite or that reflect installation procedures your Company does not perform.

Step 3: Finalize the Site-Specific Plan The final site-specific plan for your Company can be compiled in one of two ways:

1. PRINT the first two pages plus the pages that represent your installation procedures and insert them as section 7.1 of your FrameSAFE Manual.

2. DELETE the pages for the installation options your company does not use and SAVE the pdf as a new file name. (This option allows for ease in electronic communication.)

* If the installation procedures used by your COMPANY are not included as a current option, please contact the National Framers Council (608-310-6777, [email protected])to submit your procedures for review by the NFC Safety Committee. Please follow the template of the existing options to submit your plan.

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEte either using te either using thet

nstallation procedures that follcedures that folCompany shall ompa choose one (1ose one (

tee--specific plan. specific

es for each work category.s for each work category. DOpany will not perform on this jowill not perform on this j

erform.erform.

ic Plan Plan your Company can be compilempany can be comp

st two pages plus the pages tht two pages plus the pagesction 7.1 of your FrameSAFE on 7.1 of your FrameSAFE

the pages for the installation ages for the installatiole name. (This option allows fThis option allows f

stallation procedureallation procedutact the Natioct the Natio

r procedr procedptio

Page 214: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

7.1

FrameSAFE Site-Specific Fall Protection Plan

This fall protection plan is specific for the following project:Company Name: Project Name: Location of Project: Plan Prepared By: Date Plan Prepared/Modified: Plan Approved By: Plan Supervised By: Type of Construction: Single Family ______ Townhouse ______ Apartment ______ Condo ______ Duplex ______ Other ____________________

1. Statement of Company PolicyThe Company is dedicated to the protection of its Employees from on-the-job injuries. All Employees of the Company have the responsibility to work safely on the Project. The purpose of this plan is to supplement our existing safety and health program and to ensure that every Employee who works for the Company recognizes workplace fall hazards and takes the appropriate measures to address those hazards.

This Fall Protection Plan addresses the use of conventional fall protection at a number of areas on the Projectand identifies specific activities that require non-conventional means of fall protection. During the construction of residential buildings, it is sometimes infeasible or it creates a greater hazard to use conventional fall protection systems at specific areas or for specific tasks. These areas or tasks may include:

1. Installation of floor trusses/joists2. Installation of floor sheathing3. Installation of roof trusses/rafters

In these cases, conventional fall protection systems may not be the safest choice. This plan is designed to enable the Company and its Employees to recognize the fall hazards associated with this Project and to establish the safest procedures that are to be followed in order to prevent falls to lower levels or through holes and openings in walking/working surfaces.

Each Employee will be trained in these procedures and will strictly adhere to them except when doing so would expose the Employee to a greater hazard. If, in the Employee's opinion, this is the case, the Employee is to notify the Competent Person of their concern and have the concern addressed before proceeding.

It is the responsibility of the Company to implement this Fall Protection Plan. Continual observational safety checks of work operations and the enforcement of the safety policy and procedures shall be regularly enforced. The crew supervisor or foreman is responsible for correcting any unsafe practices or conditions immediately.

It is the responsibility of the Company to ensure that all Employees understand and adhere to the procedures of this plan and to follow the instructions of the crew supervisor. It is also the responsibility of the Employee to bring to the Company’s management's attention any unsafe or hazardous conditions or practices that may cause injury to either themselves or any other Employees. Any changes to the Fall Protection Plan must be approved by a Qualified Person within the Company.

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE______ Apartment ______Apartment ______

Other _____O _____________________

s from ons from o -thethe--job injuries. All job injuries. All--oject. The purpose of this planoject. The purpose of this pla

every Employee who works foevery Employee who works foeasures to address those hazaasures to address those haz

conventional fall protection atconventional fall protnonon--conventional means of faconventional means o

feasibble or it creates a greaterle or it creates a greatefor specific tasks. These areafor specific tasks. These area

es/joistss/joistseathingng

russes/rafteersrs

ional fall protection systems monal fall protection systems and itsits Employees to recogniEmployees to recogn

st procedures that are to be foures that are to be fowalking/working surfaces.walking/working surfaces.

loyee will be trained in these oyee will be trained in thesthe Employee to a greater hae Employee to a greater hae Competent Person of theCompetent Person of the

onsibility of the Cbility of the Coperations operations

or or f

Page 215: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

7.1

2. Fall Protection Systems to Be Used on This ProjectInstallation of floor trusses/joists, truss/joist bracing, floor sheathing, roof trusses/rafters, and roof truss/rafter bracing will be conducted by Employees who are specifically trained to do this type of work and are trained to recognize the fall hazards. The nature of such work normally exposes the Employee to a fall hazard for a short period of time. This plan details how the Company will minimize hazards associated with the installation of the aforementioned products.

On this Project, safety nets will not provide adequate fall protection because the nets may cause the walls to collapse.

Similarly, requiring Employees to use a ladder for the entire installation process can cause a greater hazard because the Employee must stand on the ladder with his back or side to the front of the ladder. When installing the joists and/or trusses and/or bracing, an Employee will need both hands to maneuver the truss and therefore cannot hold onto the ladder. In addition, ladders cannot be adequately protected from movement while installing floor trusses/joists and bracing, floor sheathing, and roof trusses/rafters and bracing. Furthermore, many Employees may experience additional fatigue because of the increase in overhead work with heavy materials, which can also lead to a greater hazard.

Exterior scaffolds cannot be utilized on this Project because the ground cannot support the scaffolding. In most cases the erection and dismantling of the scaffold would expose an Employee to a greater fall hazard.

3. Enforcement

Constant awareness of and respect for fall hazards, and compliance with all safety rules are considered conditions of employment. The employer, foreman/supervisor, or other individuals in the safety and personnel department, reserves the right to issue disciplinary warnings to Employees, up to and including termination, for failure to follow the Company safety rules and the requirements of this plan

4. Accident Investigations

All accidents that result in injury to any Employee, regardless of their nature, will be investigated and reported. It is an integral part of any safety program to document the incident and events surrounding the incident, as soon as possible so that the cause and means of the prevention can be identified to prevent a reoccurrence. In the event that an Employee falls or there is some other related, serious incident occurring, this plan will be reviewed to determine if additional practices, procedures, or training need to be implemented to prevent similar types of falls or incidents from occurring.

5. Changes to Plan

Any changes to the Fall Protection Plan must be approved by a Qualified Person within the Company.This plan will be reviewed as the job progresses to determine if additional practices, procedures or trainingneeds to be implemented by the Competent Person to improve or provide additional fall protection. Employees will be notified and trained, if necessary, in the new procedures. A copy of this plan and all approved changes will be maintained at the Project site.

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEan cause a gren cause a gr

nt of the ladder. Whnt of the ladder. Wo maneuver the truss andmaneuver the truss and

uately protected from movemy protected from movemtrusses/rafters and bracing. fters and bracing.

cause of the increase in overhcause of the increase in overh

he ground cannot support thehe ground cannot support thexpose an Employee to a greaxpose an Employee to a grea

ards, and compliance with all srds, and complianceman/supervisor, or other indeman/supervisor, or othe

ciplinary warnings to Employeinary warnings to Employes and the requirements of thies and the requirements of th

ury to any Employee, regardleury to any Employee, regardlsafety program to document safety program to docum

at the cause and means of thethe cause and means of theployee falls or there is some oee falls or there is some

mine if additional practices, prditional practices, princidents from occurring. incidents from occurring

es to Plans to Plan

anges to the Fall Protectges to the Fall Protwill be reviewed as thll be reviewed as t

mplemented by emented bynd trainednd trained

at the

Page 216: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

7.1

FrameSAFE Site-Specific Fall Protection Plan

1A. Installation of floor trusses/joists:

During the installation of floor trusses/joists, the Company will take the following step-by-step approach to protect its Employees who are exposed to fall hazards:

Only Employees trained in the following procedures will be allowed to install floor trusses or joists.The Company will be responsible for training each Employee on the outlined procedures below so that each Employee:

(1) Understands and follows stated procedures; and(2) Is able to recognize unsafe conditions.

It is the Employee’s responsibility to:(1) Notify the Company’s crew supervisor with questions or concerns regarding any aspect

of the training; and(2) Refrain from engaging in unsafe practices.

ProcedureTo minimize exposure to fall hazards, materials will be staged so that the Employees have quick and safe access to the material. All walls are to be properly braced prior to starting the floor truss/joist installation process. Employees installing floor trusses/joists will install the first two (2) trusses/joists by using a ladder or scaffold. After the first three trusses/joists are properly braced and secured, Employees will be required to use a Self-retracting Lifeline to install the balance of floor trusses/joists. Employees will access the top plates via a secured ladder to the secured interior top plate or truss top chord.

Employees will anchor to the existing trusses/joists that have been secured to the top plate and braced and proceed to set the following trusses/joists.

Employees will repeat this process to continue setting the balance of the trusses/joists.Employees will be required to use a Self-Retracting Lifeline to anchor to the existing floor trusses/joists that have been secured and proceed to install bracing.Employees working 6 ft. (1.8 m) above the surrounding grade or floor level below and are within 6 ft. (1.8 m) of the leading edge, will use conventional fall protection (e.g., guardrail system) along with their Self-Retracting Lifeline.

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEll floor l floor

ined procedned proce

stions or concerns regarding aerns regarding a

will be staged so that the will be staged so that the EmpEm

starting the floorstarting the floor truss/joist/joist insinswill install the first ill install the first two (2)t trusus

re properly braced and securee properly braced andnstall the balance of floor trustall the balance of floor tr

p plates via a p plates via a secured secur ladder ladder

or toor to the existing trusses/joistthe existing trusses/joised to set the following trusseso set the following trusses

eat this process to conrocess to continue stinue be required to use a Selfbe required to use a Sel -RetrRet

that have been secured and that have been secured ands working orking 6 ft. (1.8 m)6 ft. (1.8 m) above tabove

m) of the leading edge, e leading edge, will usewill usheir Self-Retracting Lifelineetracting Lifeline.

Page 217: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

7.1

FrameSAFE Site-Specific Fall Protection Plan

1B. Installation of floor trusses/joists:

During the installation of floor trusses/joists, the Company will take the following step-by-step approach to protect its Employees who are exposed to fall hazards:

Only Employees trained in the following procedures will be allowed to install floor trusses or joists.The Company will be responsible for training each Employee on the outlined procedures below so that each Employee:

(1) Understands and follows stated procedures; and(2) Is able to recognize unsafe conditions.

It is the Employee’s responsibility to:(1) Notify the Company’s crew supervisor with questions or concerns regarding any aspect

of the training; and(2) Refrain from engaging in unsafe practices.

Procedure* To minimize exposure to fall hazards, materials will be staged so that the Employees have quick and safe access to them.All walls are to be properly braced prior to starting the floor truss/joist installation process. Employees will access the interior top plates via a secured ladder.Employees may work from the interior top plates to roll the floor trusses/joists into position and secure them in place. Employees on the interior top plates shall have no duties other than truss/joistinstallation. Once floor truss installation begins, Employees not involved in that activity shall not stand or walk below the operation where they might be struck by falling objects.Employees shall not work from or walk on top plates, joists, floor trusses, beams or other structural members until they are securely braced and supported.Employees working 6 ft. (1.8 m) above the surrounding grade or floor level below and within 6 ft. (1.8 m) of the outside building edge, will use conventional fall protection (e.g., guardrail system). Employees working 15 ft. (4.6 m) or more above any floor level below will use conventional fall protection.

* Interior scaffolds cannot be utilized on this job because the interior bracing used to hold walls plumb and lined straight reduces movement and access along scaffold planks. Furthermore, random brace locations make scaffold placement difficult or impossible since Employees must use both hands maneuvering trusses and joists and direct their attention up. Employees will be unable to watch their steps to avoid serious injury from tripping over braces that cross the scaffold. A trip hazard on scaffolding presents a greater hazard to Employees than safe working procedures while on top plates. Finally, the standing on ladders or scaffolds would require the Employees to nail the trusses at eye and chest level creating a greater hazard.

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEtall floor trall floor

utlined procedurtlined procedu

estions or concerns regardingestions or concerns regarding

s.

s will be staged so that the Ems will be staged so that the Em

o starting the floorstarting the floor truss/joistoist iniplates via a secured ladder.plates via a secured

ior top plates to roll the floor tror top plates to roll ton the interior top plates shaon the interior top plates

begins, begin Employees Employees not involvnot involvre they might be struck by fallie they might be struck by fa

work from or walk on top platesk from or walk on top plateare securely braced and suppcurely braced and su

ng 6 ft. (1.8 m) above the surng 6 ft. (1.8 m) above the surthe the outside buildingoutside building edge, wiledge,

es working 1rking 15 5 ftft. (. (44.6 m) .6 m) or mor mtion.

affolds cannot be utilized on thaffolds cannot be utilized educes movement and accessduces movement and acces

d placement difficult or impossacement difficult or imposd direct their attention up.direct their attention

er braces that cross tr braces that crossan safe workingsafe workin

ee EEmployemploye

Page 218: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

7.1

FrameSAFE Site-Specific Fall Protection Plan

2A. Installation of floor sheathing:

During the installation of floor sheathing, the Company will take the following step-by-step approach to protect its Employees who are exposed to fall hazards:

Only Employees trained in the following procedures will be allowed to install floor sheathing.The Company will be responsible for training each Employee on the outlined procedures below so that each Employee:

(1) Understands and follows stated procedures; and(2) Is able to recognize unsafe conditions.

It is the Employee’s responsibility to:(1) Notify the Company’s crew supervisor with questions or concerns regarding any aspect

of the training; and(2) Refrain from engaging in unsafe practices.

ProcedureTo minimize exposure to fall hazards, materials will be staged so that the Employees have quick and safe access to the material. Employee installing floor sheathing will install the first sheet of floor sheathing by using a secured ladder/scaffold or by standing on the bottom chord of the truss. Each employee will access the first sheet of sheathing via a secured ladder to the secured floor truss.

Each employee will anchor to the truss/joist with an OSHA approved strap/anchor using a Self-Retracting Lifeline to install the balance of the floor sheathing.

Employees working 6 ft. (1.8 m) above the surrounding grade or floor level below and are within 6 ft. (1.8 m) of the leading edge, will use conventional fall protection (e.g., guardrail system) along with their Self-Retracting Lifeline.

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEll floor l floor

ined procedned proce

stions or concerns regarding aerns regarding a

will be staged so that the Empwill be staged so that the Em

all the first sheet of floor sheaall the first sheet of floor sheatom chord of the trusom chord of the tr s.

heet of sheathing via eet of sheathing vi a secure

o the the truss/joist truss/jois with an OSHAwith an OSinstall the balance of the floorl the balance of the floo

.8 m) above the surrounding g8 m) above the surrounding edge, will use conventional faedge, will use conventional f

ing LifelineLifeline. .

Page 219: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

7.1

FrameSAFE Site-Specific Fall Protection Plan

2B. Installation of floor sheathing:

During the installation of floor sheathing, the Company will take the following step-by-step approach to protect its Employees who are exposed to fall hazards:

Only Employees trained in the following procedures will be allowed to install floor sheathing.The Company will be responsible for training each Employee on the outlined procedures below so that each Employee:

(1) Understands and follows stated procedures; and(2) Is able to recognize unsafe conditions.

It is the Employee’s responsibility to:(1) Notify the Company’s crew supervisor with questions or concerns regarding any aspect

of the training; and(2) Refrain from engaging in unsafe practices.

ProcedureTo minimize exposure to fall hazards, materials will be staged so that the Employees have quick and safe access to them.All walls are to be properly braced prior to starting the floor sheathing installation process. Except for the first row of sheathing, which will be installed by Employees using a secured ladder/scaffold or by standing on the bottom chord of the floor truss, employees will work from anestablished deck. Each employee will access the first sheet of sheathing via a secured ladder to the secured floor truss.When exterior guardrails are complete, Employees will be considered protected and will work from an established deck.Employees working 6 ft. (1.8 m) above the surrounding grade or floor level below and are within 6 ft. (1.8 m) of the outside building edge, will use conventional fall protection (e.g., guardrail system). Employees working 15 ft. (4.6 m) or more above any floor level below will use conventional fall protection.

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEstall floor shestall floor s

outlined procedureoutlined procedu

uestions or concerns regardinuestions or concerns regardin

es.

als will be staged so that the Els will be staged so that the E

to starting the floor starting the floor sheathing ngwhich will be installed by which will be installe Emp

he bottom chord of the e bottom chord of the floor tr

e first sheet of ssheet of sheathing via heathing via

s are complete, are complete, EEmployees wmployees w

g 6 ft. (1.8 m) above the surro8 m) above the surroutside building edgeoutside building edge, will us, will us

working 1orking 15 5 ft. (ft. (44.6. m) or more aor more

Page 220: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

7.1

FrameSAFE Site-Specific Fall Protection Plan

3A. Installation of roof trusses/rafters:

During the installation of roof trusses/rafters, the Company will take the following step-by-step approach to protect its Employees who are exposed to fall hazards:

Only Employees trained in the following procedures will be allowed to install roof trusses/rafters.The Company will be responsible for training each Employee on the outlined procedures below so that each Employee:

(1) Understands and follows stated procedures; and(2) Is able to recognize unsafe conditions.

It is the Employee’s responsibility to:(1) Notify the Company’s crew supervisor with questions or concerns regarding any aspect

of the training; and(2) Refrain from engaging in unsafe practices.

ProcedureTo minimize exposure to fall hazards, materials will be staged so that the Employees have quick and safe access to the material. All walls are to be properly braced prior to starting the roof truss/rafter installation process.Employees installing roof trusses/rafters will install the first three (3) trusses/rafters by using asecured ladder/scaffold.After the first three trusses/rafters are properly braced and secured, Employees will be required to use Self-Retracting Lifeline to install the balance of roof trusses/rafters.Employees will access the top plates via a secured ladder to the secured interior top plate or truss bottom chord/ceiling joist-rafter tail. Employees will anchor to the existing trusses/rafters that have been secured and proceed to set the following two trusses/rafters.Employees will continue this process to set the balance of the trusses/rafters and will also continue to install required bracing to ensure the trusses/rafters are properly braced.

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEstall roof trutall roof

outlined procedureoutlined procedu

uestions or concerns regardinuestions or concerns regardin

es.

als will be staged so that the Els will be staged so that the E

to starting starting the roof trussthe roof /rafterteersrs will install the first three (3will install the fir

rs are properly braced and seare properly braced and o install the balance of roof truinstall the balance of roof tru

top plates via a secured laddtop plates via a secured laddst--rafter tailrafter tail. .

or to the existing trussesthe existing trusses/rafte/raftees/rafters.

continue this process to set thcontinue this process to set thuired bracing to ensure the trured bracing to ensure the tr

Page 221: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

7.1

FrameSAFE Site-Specific Fall Protection Plan

3B. Installation of roof trusses/rafters:

During the installation of roof trusses/rafters, the Company will take the following step-by-step approach to protect its Employees who are exposed to fall hazards:

Only Employees trained in the following procedures will be allowed to install roof trusses/rafters. The Company will be responsible for training each Employee on the outlined procedures below so that each Employee:

(1) Understands and follows stated procedures; and(2) Is able to recognize unsafe conditions.

It is the Employee’s responsibility to:(1) Notify the Company’s crew supervisor with questions or concerns regarding any aspect

of the training; and(2) Refrain from engaging in unsafe practices.

Procedure* To minimize exposure to fall hazards, materials will be staged so that the Employees have quick and safe access to them.All walls are to be properly braced prior to starting the roof truss/rafter installation.Employee installing roof trusses/rafters will access the top plate/bottom chord of trusses via a secured ladder.Employees may work from the interior top plates to install the roof trusses/rafters into position and secure them in place. Employees on the interior top plates shall have no duties other than truss/rafter installation.Once truss/rafter installation begins, Employees not involved in that activity shall not stand or walk below the operation where they might be struck by falling objects.Employees shall not work from or walk on top plates, joists, floor trusses, beams or other structural members until they are securely braced and supported.When Employees are walking/working on top plates, joists, floor trusses, beams, or similar structural members over 6 ft. (1.8 m) above the surrounding grade or floor level below and are within 6 ft. (1.8 m) of the outside building edge, fall protection shall be provided by a personal fall arrest protection system.Employees working 15 ft. (4.6 m) or more above any floor level below will use conventional fall protection.Employees will not remain on or in the peak or ridge any longer than necessary to safely complete the task.

* Interior scaffolds cannot be utilized on this job because the interior bracing used to hold walls plumb and lined straight reduces movement and access along scaffold planks. Furthermore, random brace locations make scaffold placement difficult or impossible since employees must use both hands maneuvering trusses and joists and direct their attention up. They will be unable to watch their steps to avoid serious injury from tripping over braces that cross the scaffold. A trip hazard on scaffolding presents a greater hazard to employees than safe working procedures while on top plates. Finally, the standing on ladders or scaffolds would require the employees to nail the trusses at eye and chest level creating a greater hazard.

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEo

ed procd proc

ons or concerns regarding anyncerns regarding any

be staged so that the Employaged so that the Empl

rting the rting the roof trussroof truss/rafter/rafter instainstaaccess the top plate/bottom caccess the top plate/bottom

r top plates to install the roof tr top plates to instaon the interior top plates shall n the interior top plate

begins, Employees not involvebegins, Employees not involvthey might be struck by fallingthey might be struck by fallin

rk from or walk on top plates, k from or walk on top platesre securely braced and suppoecurely braced and suppo

are walking/working on top plang/working on top pers over 6 ft. (1.8 m) above thers over 6 ft. (1.8 m) above t

88 m) of the m) of the outside buildingoutside building eection system.on system.

ees working 1king 15 5 ft. (ft. (44.6.6 m) m) or mor ction.

mployees will not remain on ormployees will not remain ohe task.he task.

SAscaffolds cannot be utilizcaffolds cannot be u

uces movement andces movement anment difficult oent difficult o

their attentheir attenoss

Page 222: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

7.1

FrameSAFE Site-Specific Fall Protection PlanAlternate Method*

The NFC acknowledges the primary methods for fall protection as described above may not be feasible in every jobsite situation. In those cases a secondary method, which is approved by OSHA in accordance with 1926 Subpart M, Appendix E, II Fall Protection Systems to be used on this Project, may be used. The NFCrecognizes this method in isolated situations but recommends a more stringent application as outlined below.

Safety Monitoring System

Where conventional fall protection is infeasible or creates a greater hazard at the leading edge and during initial connecting activity, we plan to do this work using a safety monitoring system and expose only a minimum number of employees for the time necessary to actually accomplish the job. The maximum number of workers to be monitored by one safety monitor is three (3). We are designating the following trained employees as designated erectors and they are permitted to enter the controlled access zones and work without the use of conventional fall protection.

Safety monitor:

Designated erector:

Designated erector:

Designated erector:

The safety monitor shall be identified by wearing an orange hard hat. The designated erectors will be identified by wearing a blue hard hat.

Only individuals with the appropriate experience, skills, and training will be authorized as designated erectors. All employees that will be working as designated erectors under the safety monitoring system shall have been trained and instructed in the following areas:

1. Recognition of the fall hazards in the work area (at the leading edge and when making initial connections-point of erection).

2. Avoidance of fall hazards using established work practices which have been made known to the employees.

3. Recognition of unsafe practices or working conditions that could lead to a fall, such as windy conditions.4. The function, use, and operation of safety monitoring systems, guardrail systems, body belt/harness

systems, control zones and other protection to be used.5. The correct procedure for erecting, maintaining, disassembling and inspecting the system(s) to be

used.6. Knowledge of construction sequence or the erection plan.

A conference will take place prior to starting work involving all members of the erection crew and supervisors of any other concerned contractors. This conference will be conducted by the framing supervisor in charge of the project. During the pre-work conference, framing procedures and sequences pertinent to this job will be thoroughly discussed and safety practices to be used throughout the specific work activity will be outlined. Further, all personnel will be informed that the controlled access zones are off limits to all personnel other than those designated erectors specifically trained to work in that area.

The duties of the safety monitor are to:

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEon

EELEhe leading edge and dur

LEand expose only

LEhe job. The maximum numbe

LEating the following trained em

PLEaccess zones and work w

PLPLMPLMPMPMPby wearing an orange hard

AMAMperience, skills, an

AMworking as designated erecto

AMthe following area

of the fall hazards in the workfall hazards in the wons-point of erection).erection).

ance of fall hazards using estaance of fall hazards usingployees.ployees.

Recognition of unsafe practicecognition of unsafe practicThe function, use, and opee function, use, and

ems, control zones ms, control zonesrrect proceduect procedu

f

Page 223: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

7.1

1. Warn by voice when approaching the open edge in an unsafe manner.2. Warn by voice if there is a dangerous situation developing which cannot be seen by another person

involved with product placement, such as a member getting out of control.3. Make the designated erectors aware they are in a dangerous area.4. Be competent in recognizing fall hazards.5. Warn employees when they appear to be unaware of a fall hazard or are acting in an unsafe manner.6. Be on the same walking/working surface as the monitored employees and within visual sighting

distance of the monitored employees.7. Be close enough to communicate orally with the employees.8. Not allow other responsibilities to encumber monitoring. If the safety monitor becomes too encumbered

with other responsibilities, the monitor shall (1) stop the erection process; and (2) turn over other responsibilities to a designated erector; or (3) turn over the safety monitoring function to another designated, competent person. The safety monitoring system shall not be used when the wind is strong enough to cause loads with large surface areas to swing out of radius, or result in loss of control of the load, or when weather conditions cause the walking-working surfaces to become icy or slippery.

Controlled Access Zone

A controlled access zone means an area designated and clearly marked with signage at all entrances to the work area, in which leading edge work may take place without the use of guardrail, safety net or personal fall arrest systems to protect the employees in the area. Control zone systems shall comply with the following provisions:

1. When used to control access to areas where leading edge and other operations are taking place the controlled access zone shall be defined by a control line or by any other means that restricts access.When control lines are used, they shall be erected or clearly marked not less than 6 ft. (1.8 m) nor more than 60 feet (18 m) or half the length of the member being erected, whichever is less, from the leading edge.

2. The control line shall extend along the entire length of the unprotected or leading edge and shall be approximately parallel to the unprotected or leading edge.

3. The control line shall be connected on each side to a guardrail system or wall.4. Control lines shall consist of ropes, wires, tapes, or equivalent materials, and supporting stanchions as

follows:a. Each line shall be flagged or otherwise clearly marked at not more than 6-foot (1.8 m) intervals

with high-visibility material.b. Each line shall be rigged and supported in such a way that its lowest point (including sag) is not

less than 39 inches (1 m) from the walking/working surface and its highest point is not more than 45 inches (1.3 m) from the walking/working surface.

c. Each line shall have a minimum breaking strength of 200 pounds (.88 kN).

* Interior scaffolds cannot be utilized on this job because the interior bracing used to hold walls plumb and lined straight reduces movement and access along scaffold planks. Furthermore, random brace locations make scaffold placement difficult or impossible since employees must use both hands maneuvering trusses and joists and direct their attention up. They will be unable to watch their steps to avoid serious injury from tripping over braces that cross the scaffold. A trip hazard on scaffolding presents a greater hazard to employees than safe working procedures while on top plates. Finally, the standing on ladders or scaffolds would require the employees to nail the trusses at eye and chest level creating a greater hazard.

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEr becomes tor becomes

; and (2) turn over and (2) turn ovenitoring function to anothtoring function to anoth

not be used when the wind ie used when the wind iradius, or result in loss of consult in loss of con

surfaces to become icy or slipsurfaces to become icy or sli

PLPLclearly mark with signage

PLwithout the use of guardrail, PLControl zone systems shall

MPs where leading edge and oths where leading edge andefined by a control line or by ad by a control line or by a

ey shall be erected or clearlyey shall be erected or clearlyhe length of the member beinghe length of the member bein

extend along the entire lengthng the entire lengthallel to the unprotected or leadllel to the unprotected or lead

shall be connected on each shall be connected on each sshall consist of ropes, wires, consist of ropes, wires,

Each line shall be flagged or Each line shall be flaggewith highwith high-visibility materiavisibility mate

b.b. Each line shall be riggeEach line shall be riggless than 39 inches less than 39 inchesthan 45 inches (1than 45 inches Each line shaach line sha

can

Page 224: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

7.1

FrameSAFE Site-Specific Fall Protection Plan Acknowledgment

My signature below certifies that I understand the material presented and have no questions. I fully understand and am aware that if I have any questions regarding this training or my personal safety, I mayask my Supervisor and/or Employer for additional information and explanation.

____________________________________________________________________________________Employee (Print Name) Signature Date

____________________________________________________________________________________Employee (Print Name) Signature Date

____________________________________________________________________________________Employee (Print Name) Signature Date

____________________________________________________________________________________Employee (Print Name) Signature Date

____________________________________________________________________________________Employee (Print Name) Signature Date

____________________________________________________________________________________Employee (Print Name) Signature Date

____________________________________________________________________________________Employee (Print Name) Signature Date

____________________________________________________________________________________Employee (Print Name) Signature Date

____________________________________________________________________________________Employee (Print Name) Signature Date

____________________________________________________________________________________Employee (Print Name) Signature Date

____________________________________________________________________________________Employee (Print Name) Signature Date

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE______________

DateDate

_______________________________________ DateDate

________________________________________ DateDate

____________________________________________ure

__________________________________________Signaturenature

______________________________________SignatureSignature

_______________________________________ame) SignSign

____________________________________________ee (Print Name)(Print Name)

___________________nt Name)Name)

Page 225: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

7.1

FrameSAFE Modelo del Plan de Protección Contra Caídas Específico Del Lugar de Trabajo

Instrucciones de UsoNO INCLUYA ESTA PÁGINA EN SU MANUAL

Paso 1: Completar el Formulario Específico del Lugar de Trabajo Poner la información en el formulario específico del lugar en la primera página del modelo del plan ya sea llenando las áreas con el formato pdf o a mano.

Paso 2: Escoger las Opciones para el Proceso de la Instalación* En adición a las dos primeras páginas del modelo del plan, las opciones para los procesos de instalaciones a continuación estan destinados para usarse como parte del plan de protección contra caídas específico dellugar de trabajo. Su Compañía debe escoger una (1) opción para cada categoría de trabajo para incluir en su manual de seguridad como su plan específico del lugar de trabajo.

Las categorías de trabajo incluyen:

1. Instalación de trosas/viga de piso2. Instalación de forrado del piso3. Instalación de las trosas/vigas del techo

SOLAMENTE incluir la opción que su Compañía usa para cada categoría del trabajo. NO incluir las páginas en su manual de seguridad para las categorías de trabajo que su Compañía no realizará en este lugar de trabajo o que reflejen los procedimientos de instalación que su Compañía no hace.

Paso 3: Finalizar el Plan Específico del Lugar de Trabajo El plan específico del lugar de trabajo final/terminado para su Compañía puede ser copilado en una de estas dos formas:

1. IMPRIMIR las dos primeras páginas más las páginas que representan su proceso de instalación y colocarlas en la sección 7.1 de su Manual de FrameSAFE.

2. QUITAR las páginas de opciones de instalación que su Compañía no usa y GUARDAR el pdf como un nombre nuevo de archivo. (Esta opción permite la facilidad en la comunicación electrónica.)

* FrameSAFE’s el Plan de Protección Contra Caídas Específico del Lugar de Trabajo se encuentra en su face de desarrollo. Si los procesos de instalación usados por su COMPAÑÍA no estan incluídos como una opción actual, por favor de contactar al National Framers Council (608-310-6777,) para enviar sus procedimientos que serán revisados por el Comité de Seguridad del NFC. Por favor de seguir el modelo de las opciones existentes para presentar con su plan.

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEa del modelo del modelo del plan yadel plan ya

ciones para los procesos de iniones para los procesos de inde protección contra e protección contra caídascaídas e

n para cada categoría de trabcada categoría de trade trabajode trabajo.

el techo techo

u Compañía usa para cada caCompañía usa para cada cas categorías de trabajo que ss categorías de trabajo que s

imientosntos de ide instalación que snstalación que s

EspecíficoEspecíf del Lugar de TraLugar de Tragar dear de trabajotrabajo final/terminadofinal/terminado

IMIR las dos primeras páginaos primeras páginaocarlas en la secciónocarlas en la sección 7.1 7.1 de s

QUITAR QUITAR las páginas de opciolas páginas de opcocomo un nombre nuevo demo un nombre nuevo deelectrónicaelectrónica.).)

an

Page 226: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

7.1

FrameSAFE Plan de Protección Contra Caídas Específico Del Lugar de Trabajo

Este plan de protección contra caídas es específico para el siguiente proyecto: Nombre de la Compañía:Nombre del Proyecto:Localidad del Proyecto:Plan Preparado Por:Fecha del Plan Preparado/Modificado:Plan Aprovado Por:Plan Supervisado Por:Tipo de Construcción: Single Family ______ Townhouse ______ Apartmento ______ Condominio ______ Duplex ______ Otro ____________________

1. Términos de la Póliza de la CompañíaLa Compañía está dedicada a la protección de sus Empleados de lesiones en el trabajo. Todos los Empleados de la Compañía tienen la responsabilidad de trabajar con Seguridad en el Proyecto. El propósito de este plan es de suplementar el programa de salud y seguridad existente y para asegurar que cada Empleado que trabaja para la Compañía reconozca los peligros de las caídas y tome las precauciones necesarias para solucionar esos peligros.

Este Plan de Protección Contra Caídas habla del uso de protección convencional contra caídas en varias áreas del Proyecto e identifica actividades específicas que requiere medios no convencionales de protección contra caídas. Durante la construcción de edificios residenciales, a veces no es la mejor solución o crea un peligro más grande el uso de los sistemas de protección contra caídas convencionales en ciertas áreas o tareas específicas. Estas áreas o tareas pueden incluir:

1. Instalación de trosas/viga de piso2. Instalación de forrado del piso3. Instalación de las trosas/vigas del techo

En estos casos, los sistemas convencionales de protección contra caídas no serían la solución más segura. Este plan está diseñado para ayudar que la Compañía y sus Empleados reconozcan los peligros de las caídas asociados con este Proyecto y establecer los procedimientos más seguros que se deben seguir para prevenir las caídas a niveles bajos o por los hoyos y aberturas en las áreas de caminar/trabajar.

Cada Empleado será entrenado en estos procedimientos y los seguirá estrictamente excepto cuando al hacerlo podría exponer al Empleado a un peligro mayor. Si, en la opinión del Empleado, este es el caso, el Empleado debe notificar a la Persona Competente de su preocupación y solucionar la preocupación antes de seguir/continuar.

Es la responsabilidad de la Compañía de implementar este Plan de Protección Contra Caídas. Observaciones constantes como control de seguridad de las operaciones de trabajo y la aplicación de la póliza y procedimientos de seguridad deben ser enforzados regularmente. El supervisor del grupo o capataz tiene la responsabilidad de corregir cualquier práctica o condiciones inseguras inmediatamente.

Es la responsabilidad de la Compañía de asegurarse que todos los Empleados entiendan y que se adhieran alos procesos de este plan y que sigan las instrucciones del supervisor del grupo. Es también la responsabilidad de los Empleados de dejarle saber al gerente de la Compañía de cualquier condición insegura o peligrosa o cualquier práctica que pueda causar lesiones a sí mismo o a cualquier otro Empleado.

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

______ ApartmentApartmento ________________ Otro__ _______________________

dos de lesiondos de lesionees en el trabajo.s en el trabajo. Seguridad en el Proyecto. ESeguridad en el Proyecto. E

xistentexistente y para asegurar que y para asegurar quelas caídas y tome las precauas caídas y tome las precau

a dela del uso de protección convuso de protección cos específicas que requiere mepecíficas que requiere m

n de edificios residenciales, a de edificios residenciales, atemas de protección temas de protección contracontra c

o tareas pueden incluirareas pueden incluir: :s/viga de pisopiso

rrado del pisorrado de las trosasas trosas//vigasvigas del techoecho

s sistemas as convencionales convencionales dedediseñado para ayudarseñado para ayudar que la Cque la C

n este Proyecto y establecer n este Proyecto y establea niveles bajos o por los hoyoa niveles bajos o por los ho

mpleado será entrenado enpleado será entrenado eodría exponer aldría exponer al EmpleEmp

ebe notificar a la otificar a la r

Page 227: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

7.1

Cualquier cambio al Plan de Protección Contra Caídas debe ser aprovado por la Persona Qualificada de la Compañía.

2. Sistema para Protección Contra las Caídas para ser Usado en Este ProyectoInstalación de las trosas/vigas de piso, los soportes de la trosa/viga, forrado del piso, trosas/vigas del techo,los soportes de la trosa/viga del techo se llevará a cabo por aquellos Empleados que han sido específicamente entrenados para hacer este tipo de trabajo y estan entrenados para reconocer los peligros de las caídas. La naturaleza de este tipo de trabajo normalmente expone al Empleado a peligros de caídas por un período corto. Este plan detalla como la Compañía puede reducir los peligros asociados con la instalación de los productos mencionados anteriormente.

En este Proyecto, redes de seguridad no proveerán protección apropiada contra las caídas porque las redes pueden causar que las paredes colapsen.

Del mismo modo, requerir a los Empleados que usen una escalera para todo el proceso de la instalación puede causar un peligro más grande porque el Empleado debe pararse en la escalera de espaldas o de lado ala parte frontal de la escalera. Cuando se instalan las vigas y/o los soportes de la trosa, el Empleado va a necesitar las dos manos para mover la trosa por lo cual no podrá agarrarse a la escalera. Además, las escaleras no pueden protegerse apropiadamente de movimiento mientras se instalan las trosas/vigas de piso y los soportes, forrado del piso, y los soportes de la trosa/viga del techo. Además, muchos Empleados pueden experimentar fatiga adicional debido a el aumento del trabajo por encima con materiales pesados, lo cual también puede crear un mayor riesgo.

Andamios del exterior no pueden ser utilizados en este Proyecto porque el terreno no puede soportar el andamio. En la mayoría de los casos la construcción y el desmantelamiento de los andamios pueden exponer al Empleado a un peligro más grande de las caídas.

3. Enforzamiento

Atención constante y respeto a los peligros de las caídas, y cumplimiento de todas las reglas de seguridad se consideran como condiciones de empleo. El empleador, capataz/supervisor, o cualquier otro individuo del departamento de seguridad y del personal, reserva el derecho de dar advertencias disciplinarias a los Empleados, que pueden incluir la terminación de empleo, por la falla de seguir las reglas de seguridad de la Compañía y los requerimientos de este plan.

4. Investigaciones de Accidentes

Todos los accidentes que resultan en una lesión al Empleado, sin importar como sucedió, seran investigados y reportados. Es una parte integral de cualquier programa de seguridad de documentar el incidente y los acontecimientos ocurridos alrededor del incidente, cuanto antes sea possible para que las causas y medidas de prevención puedan ser identificadas para prevenir que ocurra de nuevo. En el caso de que un Empleado se caiga o que algún otro incidente serio relacionado ocurra, este plan será revisado para determinar si prácticas adicionales, procesos, o el entrenamiento que tiene que ser implementado para prevenir que ocurran tipos similares de caídas o incidentes.

5. Cambios al Plan

Cualquier cambio al Plan de Protección Contra las Caídas debe ser aprovado por la Persona Qualificada de la Compañía. Este plan será revisado a medida que el trabajo avanza para determinar si prácticas, procedimientos o entrenamiento adicionales necesitan ser implementados por la Persona Competente para mejorar o proveer protección de las caídas adicional. Los Empleados serán notificados y entrenados, si es necesario, en los procesos nuevos. Una copia de este plan y todos los cambios aprobadosserá mantenido en el lugar del Proyecto.

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEadosdo

a las caídas porquea las caídas porq

a todo el proceso deoceso de la la instalainstalarse en la escalera rse en la escalera dede espaldaespalda

soportes de la soporte trosa, elel EmpEmprá agarrarse a la escaleraagarrarse a la escalera. AdA

ento mientras se instalanto mientras se instalann lalas tsvigaviga del techodel techo. AdemásAdemás,, mucmuc

nto del trabajo por encima connto del trabajo por encima co

en esteen es Proyecto porque el teProyecto pstrucción y el desmantelamientrucción y el desmantel

as caídascaídas. .

los peligros de las caídas, y celigros de las caídas,s de empleo. El empleadors de empleo. El empleador,

d y del personald y del pe , reserva el dreserva el dn incluir la terminación de emincluir la terminación de em

erimientos de este plan.entos de este plan.

nes de Accidentesnes de Accidentes

accidentes que resultan en uaccidentes que resultan en tadosos.. Es una parte integral dEs una parte integral dimientos ientos ocurridos alrededocurridos alreded

ción puedan ser identón puedan ser idealgún otro inciden otro incide

cecesosos, s, oo ees o in

Page 228: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

7.1

FrameSAFE Plan de Protección Contra Caídas Específico Del Lugar de Trabajo

1A. Instalación de las trosas/vigas del piso:

Durante la instalación de las trosas/vigas del piso, la Compañía tomará el siguiente método paso-a-paso para proteger a sus Empleados que estan expuestos a peligros de las caídas:

Solo Empleados entrenados en los siguientes procedimientos estarán permitidos de instalar las trosas o vigasLa Compañía será responsable de entrenar a cada Empleado en los procesos a continuación para que cada Empleado:

(1) Entienda y siga los procedimientos establecidos; y (2) Sea capaz de reconocer condiciones inseguras.

Es la responsabilidad del Empleado de: (1) Notificarle al supervisor del grupo de la Compañía con preguntas o preocupaciones

relacionadas a cualquier aspecto del entrenamiento; y(2) Evitar hacer prácticas inseguras.

ProcesoPara disminuir la exposición a los peligros de las caídas, los materiales deben estar almacenados para que el Empleado pueda tener acceso seguro y rápido al material. Todas las paredes deben estar apropiadamente con soportes antes de comenzar el proceso de lainstalación de la trosa/joist del piso. Empleados instalando las trosas/vigas del piso instalarán las dos (2) primeras trosas/vigas usando una escalera o andamio.Después de que las tres primeras trosas/vigas esten con sus soportes apropiados yapropiadamente seguras, a los Empleados se les requerirá usar retractor/yo-yo para instalar el resto de las trosas/vigas del piso. Los Empleados tendrán acceso a la parte superior de las paredes por medio de una escalera asegurada a la parte superior de la pared en el interior o a la parte superior de las trosas que han sido aseguradas.

o Los Empleados se anclarán a las trosas/vigas existentes que han sido aseguradas y procederán a colocar las siguientes trosas/vigas.

Los empleados se les requerira que usen un retractor (yoyo),que sera anclado a las trosas/vigas del piso existentes que han sido aseguradas y continuar con la instalacion de los refuersos del piso.Los Empleados trabajando a 6 pies (1.8 m) encima del suelo o del nivel del piso de abajo y estan a menos de 6 pies (1.8 m) del borde, usarán protección contra las caídas convencionales (ejemplo: sistema de barandillas) junto con su Retractor/Yo-Yo.

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEétodo étodo

án permitidos de insn permitidos de

en los procesos a continuaciós procesos a continuaci

s;; y rasras. .

a Compañía con preguntas o pCompañía con preguntas o l entrenamiento; yentrenamiento; y

ros de s de las las caídascaídas,, los materialos materiacceso cces seguro y rápido al mateseguro y ráp

propiadamente ropiadamente con soportescon sopo apisoo. .

osas/sa vigagass dedel l piso instalarán piso instalarán

s primeras trosas/primeras trosas/vigasvigas estenestenuras, a los Empleados se les a los Empleados se les

/vigas del piso.piso. s tendrán acceso a la parte sutendrán acceso a la parte su

la parte superior de la pared a parte superior de la pareduradasas. .

Los Emplpleados eados se anclarán ase anclarán aprocederánprocederán a colocar las sa colocar las s

os empleados se les requeriraos empleados se les requdel piso existentes que han sdel piso existentes que hanpiso.piso.LosLos EmplEmpleados trabajaneados trabajamenos menos de de 6 pies (1.8pies (1

stema de baranda de barand

Page 229: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

7.1

FrameSAFE Plan de Protección Contra Caídas Específico Del Lugar de Trabajo

1B. Instalación de las trosas/vigas del piso:

Durante la instalación de las trosas/vigas del piso, la Compañía tomará el siguiente método paso-a-paso para proteger a sus Empleados que estan expuestos a los peligros de las caídas:

Solo Empleados entrenados en los siguientes procedimientos estarán permitidos de instalar las trosas del piso o vigas.La Compañía será responsable de entrenar a cada Empleado en los procesos a continuación para que cada Empleado:

(1) Entienda y siga los procedimientos establecidos; y (2) Sea capaz de reconocer condiciones inseguras.

Es la responsabilidad del Empleado de: (1) Notificarle al supervisor del grupo de la Compañía con preguntas o preocupaciones

relacionadas a cualquier aspecto del entrenamiento; y (2) Evitar hacer prácticas inseguras.

Proceso* Para disminuir la exposición a los peligros de las caídas, los materiales deben estar almacenados para que el Empleado pueda tener acceso seguro y rápido al material. Todas las paredes deben estar apropiadamente con soportes antes de comenzar el proceso de lainstalación de las trosas/vigas del piso. Los Empleados tendrán acceso a la parte superior de la pared en el interior por medio de una escalera asegurada. Los Empleados pueden trabajar desde la parte superior de la pared en el interior para poner las trosas/vigas del piso en posición y asegurarlas en su lugar. Los Empleados en la parte superior de la pared en el interior tendrán la sola tarea de instalar las trosas/vigas. Una vez que la instalación de las trosas de los pisos se ha comenzado, Los Empleados que no estan involucrados en esa actividad no deben pararse o caminar bajo la operación donde pueden ser golpeados por objetos que caigan. Los Empleados no deben trabajar o caminar en la parte superior de las paredes, vigas, trosas del piso, vigas de hierro o cualquier otro miembro de la estructura hasta que hayan sido reforzados ysoportados con seguridad.Los Empleados trabajando a 6 pies (1.8 m) encima del suelo o del nivel del piso de abajo y estan a menos de 6 pies (1.8 m) del borde exterior del edificio, usarán protección contra las caídas convencionales (ejemplo: sistema de barandillas). Los Empleados trabajando a 15 pies (4.6 m) o más por encima de cualquier nivel del piso de abajo usarán protección contra caídas convencional.

* Los andamios internos no pueden ser utilizados en este trabajo porque los soportes en el interior usado para sostener las paredes las paredes a plomo y aliniadas reducen el movimiento y acceso a lo largo de los tablones de andamios. Además, localidades dispersas de los soportes hacen difícil la colocación del andamio o imposible ya que los Empleados deben usar ambas manos para mover las trosas y las vigas y poner atención hacia arriba. Los Empleados no podrán ver sus pasos para evitar lesiones serias al tropezar con los soportes que cruzan el andamio. Un peligro de tropiezo en un andamio presenta un peligro mayor a los Empleados que usando los procedimientos seguros de trabajar encima de la parte superior de la pared. Finalmente, al pararse en las escaleras o andamios requiere que los Empleados claven las trosas al nivel de la vista y del pecho creando un peligro mayor.

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLErmitidos drmitidos

s procesos a continus procesos a cont

mpañía con preguntas o preocmpañía con preguntas o preorenamientoamiento;; y y

e e las las caídascaídas,, los materiales dlos materiales do o seguro y rápido al materialseguro y rápido al material

adamente adamente con soportes antescon sopososo. .

a la parte superior de la paredla parte superior de la pa

bajar desde la parte superior dajar desde la parte superior dposición y asegurarlas en su luosición y asegurarlas en su

endrán la sola tarea de instalandrán la sola tarea de instalalación de de las trosas de las trosas de los pislos

os en esa actividad no deben s en esa actividad no deben por objetos que caiganpor objetos que caigan. .

dos no deben trabajar o camios no deben trabajar o camas de hierrohierro o cualquiero cualquier otro motro m

ados con seguridad.seguridad.Empleados trabajando aEmpleados trabajando a 6 pip

enos enos de de 6 pies6 (1.8 m) 1.8 m) ddel boconvencionales convencionales (e(ejemplo: sismplo: seLos Empleados trabajandLos Empleados trabajandusarán protección contusarán protección c

os internosnternos no pno pedesedes las plas p

mios

Page 230: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

7.1

FrameSAFE Plan de Protección Contra Caídas Específico Del Lugar de Trabajo

2A. Instalación de Forrado del Piso:

Durante la Instalación del forrado del piso, la Compañía tomará el siguiente método paso-a-paso para proteger a sus Empleados que estan expuestos a los peligros de las caídas:

Solo Empleados entrenados en los siguientes procedimientos estarán permitidos de instalar el forrado del piso.La Compañía será responsable de entrenar a cada Empleado en los procesos a continuación para que cada Empleado:

(1) Entienda y siga los procedimientos establecidos; y (2) Sea capaz de reconocer condiciones inseguras.

Es la responsabilidad del Empleado: (1) Notificarle al supervisor del grupo de la Compañía con preguntas o preocupaciones

relacionadas a cualquier aspecto del entrenamiento; y(2) Evitar hacer prácticas inseguras.

ProcesoPara disminuir la exposición a los peligros de las caídas, los materiales deben estar almacenados para que los Empleados puedan tener acceso seguro y rápido al material. Los Empleados instalando el forrado del piso instalarán la primera hoja del forrado del piso usando una escalera/andamio seguro o parándose en la parte inferior de la trosa. Cada Empleado tendrá acceso a la primera hoja del forro por medio de una escalera asegurada ala trosa del piso que tiene todos los soportes.

o Cada uno de los empleados se anclarán a las trosas/vigas con una correa/ancla aprobada por OSHA utilizando un retractor (yoyo) para instalar el resto de el forrado.

Los Empleados trabajando a 6 pies (1.8 m) encima del suelo o del nivel del piso de abajo y estan a menos de 6 pies (1.8 m) del borde principal, usarán protección contra las caídas convencionales(ejemplo: sistema de barandillas) junto con su Retractor/Yo-Yo.

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

mitidosmitidos

procesos a continprocesos a cont

pañíapañía con preguntas o preocus o preocunamiento; yamiento;

las caídaslas caídas,, los materiales deblos materiales deeso seguro y rápido al materiaeso seguro y rápido al materi

pisopiso instalarán la primera hojinstalarán la primera hondose en ladose en la parte inferiorparte in de la

a primeraprimera hojaoja del forro por medel forrolos soportesos soportes. .

eados se anclarán a las trosas se anclarán a las trosao un retractor (yoyo) para insto un retractor (yoyo) para inst

do a 6 pies (1.8 m) encima dedo a 6 pies (1.8 m) encima dm) del bordedel borde principalprincipal, usarán, usará

de barandillas) junto con su dillas) junto con su R

Page 231: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

7.1

FrameSAFE Plan de Protección Contra Caídas Específico Del Lugar de Trabajo

2B. Instalación del Forrado del Piso:

Durante la Instalación del forrado del piso, la Compañía tomará el siguiente método paso-a-paso para proteger a sus Empleados que estan expuestos a los peligros de las caídas:

Solo Empleados entrenados en los siguientes procedimientos estarán permitidos de instalar el forrado del piso.La Compañía será responsable de entrenar a cada Empleado en los procesos a continuación para que cada Empleado:

(1) Entienda y siga los procedimientos establecidos; y (2) Sea capaz de reconocer condiciones inseguras.

Es la responsabilidad del Empleado: (1) Notificarle al supervisor del grupo de la Compañía con preguntas o preocupaciones

relacionadas a cualquier aspecto del entrenamiento; y(2) Evitar hacer prácticas inseguras.

ProcesoPara disminuir la exposición a los peligros de las caídas, los materiales deben estar almacenados para que los Empleados puedan tener acceso seguro y rápido al material. Todas las paredes deben estar apropiadamente con soportes antes de comenzar el proceso de la instalación del forrado del piso.Con la excepción de la primera fila de forro, que será instalado por los Empleados usando una escalera/andamio seguro o parándose en la parte inferior de la trosa del piso, los Empleados trabajarán de la plataforma establecida.Cada Empleado tendrá acceso a la primera hoja del forro por medio de una escalera segura a la trosa del piso que ha sido asegurada. Cuando las barandillas del exterior se han completado, los Empleados se considerarán protegidos y trabajarán de la plataforma establecida.Los Empleados trabajando a 6 pies (1.8 m) encima del suelo o del nivel del piso de abajo y estan a menos de 6 pies (1.8 m) del borde exterior del edificio, usarán protección contra las caídas convencionales (ejemplo: sistema de barandillas). Los Empleados trabajando a 15 pies (4.6 m) o más por encima de cualquier nivel del piso de abajo usarán protección contra caídas convencional.

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEermitidos deermitidos d

os procesos a continuaos procesos a continua

y

ompañía con preguntas o preompañía con preguntas o prentrenamiento; ymiento; y

s de las caídass de las caídas,, los materialeslos materialeacceso seguro y rápido al maceso seguro y rá

opiadamentepiadamente con soportescon so ant

a fila de forro, que será instalaa de forro, que será instalparándose en laparándose en la parte inferiorparte inferio

a establecidaa establecida..á acceso a la primera acceso a la primera hojahoja delde

a sido aseguradaasegurada. . ndillas del exterior se han comdillas del exterior se han com

e la plataforma establecidala plataforma establecida.dos trabajando a 6 pies (1.os trabajando a 6 pies (1.8 m8 m

6 pies (1.8 m) es (1.8 m) ddel borde exteel borde extcionales ((ejemplo: sistema deejemplo: sistema d

Empleados trabajando a 1Empleados trabajando a 5 5 psarán protección contra caídasarán protección contra c

Page 232: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

7.1

FrameSAFE Plan de Protección Contra Caídas Específico Del Lugar de Trabajo

3A. Instalación de las trosas/vigas del techo:

Durante la Instalación de las trosas/vigas del techo, la Compañía tomará el siguiente método paso-a-paso para proteger a sus Empleados que estan expuestos a los peligros de las caídas:

Solo Empleados entrenados en los siguientes procedimientos estarán permitidos de instalar las trosas/vigas del techo.La Compañía será responsable de entrenar a cada Empleado en los procesos a continuación para que cada Empleado:

(1) Entienda y siga los procedimientos establecidos; y(2) Sea capaz de reconocer condiciones inseguras.

Es la responsabilidad del Empleado de:(1) Notificarle al supervisor del grupo de la Compañía con preguntas o preocupaciones relacionadas a cualquier aspecto del entrenamiento; y(2) Evitar hacer prácticas inseguras.

ProcesoPara disminuir la exposición a los peligros de las caídas, los materiales deben estar almacenados para que los Empleados puedan tener acceso seguro y rápido al material.Todas las paredes deben estar apropiadamente con soportes antes de comenzar el proceso de la instalación de las trosas/vigas del techo.Los Empleados instalando las trosas/vigas del techo instalarán las primeras tres (3) trosas/vigasusando una escalera/andamio seguro.Después de que las primeras tres trosas/vigas han sido apropiadamente soportadas y aseguradas,a los Empleados se les requerirá usar Retractor/Yo-Yo para instalar el resto de las trosas/vigas del techo.Los Empleados tendrán acceso a la parte superior de la pared por medio de una escalera segura que ha sido asegurada a la parte superior de la pared en el interior o a la parte inferior de la trosa/viga-cola de la viga. Los empleados se anclarán a las trosas/vigas del techo existentes que han sido aseguradas y procedera a instalar las dos siguientes trosas/vigas. Los Empleados continuarán el proceso de colocar el resto de las trosas/vigas y tambiéncontinuarán la instalación de los soportes requeridos para asegurarse de que las trosas/vigas esten apropiadamente con soportes.

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEermitidos deermitidos d

os procesos a continuaos procesos a continua

y

mpañía con preguntas o preompañía con preguntas o preonamiento; ynto; y

os de las caídas, los materiales de las caídas, los materialr acceso seguro y rápido al mr acceso seguro y r

ropiadamente con soportesopiadamente con sop anel techo.techo.

trosasas//vigavigass del techodel techo instalinstamio seguromio seguro..

meras tres trosasmeras tres trosas//vigavig ss han sihan ses requerirá usar equerirá usar Retractor/YoRetractor/Yo

tendrán acceso a la parte suptendrán acceso a la parte susegurada a la parte superior dsegurada a la parte superio

cola de laa de la vigaviga. . pleados se anclarán a las trosse anclarán a las tros

dera a instalar las dos siguienalar las dos siguies Empleados continuarán el ps Empleados continuarán

continuarán la instalación de continuarán la instalación apropiadamenteapropiadamente con soporcon sopo

Page 233: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

7.1

FrameSAFE Plan de Protección Contra Caídas Específico Del Lugar de Trabajo

3B. Instalación de las trosas /vigas del techo:

Durante la Instalación de las trosas/vigas del techo, la Compañía tomará el siguiente método paso-a-paso para proteger a sus Empleados que estan expuestos a los peligros de las caídas:

Solo Empleados entrenados en los siguientes procedimientos estarán permitidos de instalar las trosas/vigas del techo.La Compañía será responsable de entrenar a cada Empleado en los procesos a continuación para que cada Empleado:

(1) Entienda y siga los procedimientos establecidos; y(2) Sea capaz de reconocer condiciones inseguras.

Es la responsabilidad del Empleado de:(1) Notificarle al supervisor del grupo de la Compañía con preguntas o preocupaciones relacionadas a cualquier aspecto del entrenamiento; y (2) Evitar hacer prácticas inseguras.

Proceso*

Para disminuir la exposición a los peligros de las caídas, los materiales deben estar almacenados para que los Empleados puedan tener acceso seguro y rápido al material.Todas las paredes deben estar apropiadamente con soportes antes de comenzar el proceso de la instalación de las trosas/vigas del techo.Los Empleados instalando las trosas/vigas del techo tendrán acceso a la parte superior de la pared/parte inferior de las trosas por medio de una escalera segura. Los Empleados pueden trabajar desde la parte superior de la pared en el interior para instalar las trosas/vigas en posición y asegurarlas en su lugar. Los Empleados en la parte superior de la pared en el interior solo tendrán la tarea de instalar las trosa/viga. Una vez que la instalación de la trosa/viga ha comenzado, los Empleados no envueltos en esa actividad no deben pararse o caminar por la parte de abajo de la operación donde pueden ser golpeados por los objetos que caigan. Los Empleados no deben trabajar o caminar en la parte superior de las paredes, vigas, trosas del piso, vigas de hierro o cualquier otro miembro de la estructura hasta que hayan sido reforzados ysoportados con seguridad.Cuando los Empleados estan caminando/trabajando en la parte superior de la pared, vigas, trosas de piso, vigas de hierro, o estructuras similares de más de 6 pies (1.8 m) encima del suelo o del nivel del piso de abajo y estan a menos de 6 pies (1.8 m) del borde principal, protección contra las caídas será proveído por medio del sistema personal contra las caídas.Los Empleados trabajando a 12 pies (3.6 m) o más por encima de cualquier nivel del piso de abajo usarán protección contra caídas convencional.Los Empleados no permanecerán en o el la punta o en la cresta no más que lo necesario para completar la tarea con seguridad.

* Los andamios internos no pueden ser utilizados en este trabajo porque los soportes en el interior usado para aguantar las paredes a plomo o aliniadas reducen el movimiento y acceso a lo largo de los tablones del andamio. Además, localidades dispersas de los soportes hacen difícil la colocación del andamio o imposible ya que el Empleado debe usar ambas manos para mover las trosas y las vigas y dirigir su atención hacia arriba. No podrán ver sus pasos para evitar lesiones serias al tropezar con los soportes que cruzan el andamio. Un peligro de tropiezo en un andamio presenta un peligro mayor a los Empleados que usando los procedimientos seguros de trabajar en la parte superior de la pared. Finalmente, al pararse en las escaleras o en los andamios requerirá que los Empleados claven las trosas al nivel de la vista y del pecho creando un peligro mayor.

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEd

ocesos a conocesos a co

ñía con preguntas o preocupatas o preocupanto;nto; y y

e las caídas, los materiales dee las caídas, los materiales dceso seguro y rápido al materceso seguro y rápido al mate

adamente con soportes antes mente con sopocho.ho.

sassas//vigas del techo tendrán avigas del techo tendas por medio de una escalera por medio de una escalera

ajar desde la parte superior dajar desde la parte superior dy asegurarlas en su lugar. Losasegurarlas en su lugar. L

án la tarea de instalar las trosn la tarea de instalar las troslación de la trosade la trosa//vigaviga ha comha

n pararse o caminar por la pan pararse o caminar por la palos objos objetos que caiganetos que caigan. .

dos noos no deben trabajar o camindeben trabajar o camis de hierrohierro o cualquier otro mo cualquier otro m

ados con seguridad.seguridad.ndo los do lo Empleados eeados estan camstan cam

e pisoe piso,, vigas de hierro, o estruvigas de hierro, o nivel del piso de abajo y nivel del piso de abajo y estaescaídas será proveído por caídas será proveído por Los Empleados trabajaLos Empleados trabajausarán protección cousarán protección cos Empleados nompleados n

pletar la tarletar la taS

Page 234: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

7.1

FrameSAFE Plan de Protección Contra Caídas Específico Del Lugar de TrabajoMétodo Alternativo*

El NFC reconoce que los métodos principales para la protección contra las caídas como se han descrito anteriormente pueden no ser factibles en cada una de las situaciones del trabajo. En esos casos un método secundario, que es aprovado por la OSHA de acuerdo con 1926 Subpart M, Appendix E, II Sistema de Protección Contra las Caídas sea usado en este Proyecto, puede ser usado. El NFC reconoce este método en situaciones aisladas, pero recomienda una aplicación más estricta como se describe a continuación.

Sistema de Monitoreo de Seguridad

Cuando el uso de las protecciones de las caídas convencional no es factible o crea un riesgo mayor en el borde principal y durante la conección inicial de una actividad, planeamos hacer este trabajo usando un sistema de monitoreo de seguridad y exponer solo a un mínimo número de empleados por el tiempo necesario para actualmente completar el trabajo. El número máximo de trabajadores que van a ser supervisados por unmonitor de seguridad seran tres (3). Estamos designando a los siguientes empleados entrenados como constructores designados y estan permitidos a entrar a las zonas de acceso controlado y trabajar sin el uso deprotección contra las caídas convencional.

Monitor de seguridad:

Constructor designado:

Constructor designado:

Constructor designado:

El monitor de seguridad se identificará usando un casco anaranjado. Los constructores designados se identificarán usando un casco azul.

Solo individuales con experiencia apropiada, habilidades, y entrenamiento serán autorizados como constructores designados. Todos los Empleados que van a trabajar como constructores designados bajo el sistema de monitoreo de seguridad tienen que haber sido entrenados e instruídos en las siguientes áreas:

1. Reconocimiento de los riesgos de las caídas en el lugar de trabajo (en el borde principal y cuando se hace la conección inicial al punto de montar).

2. Evitando los peligros de las caídas usando las prácticas de trabajo establecidas que se les ha indicado a los Empleados.

3. Reconocimiento de prácticas inseguras o condiciones de trabajo que pueden terminar en una caída, tales como las condiciones del viento.

4. La función, el uso, y la operación del sistema de monitoreo de seguridad, sistemas de barandillas, sistemas del cinturón/arnes, zonas controladas y otra protección que se va a usar.

5. El proceso correcto para construir, mantener, desmontar e inspeccionar el (los) sistema(s) que se va a usar.

6. Conocimiento de la secuencia de la construcción o del plan de construcción.

Una reunión se hará antes de comenzar el trabajo involucrando a todos los miembros de la construcción y los supervisores de cualquier otro contratista interesado. Esta reunión se conducirá por el supervisor del framinga cargo del proyecto. Durante la reunión antes de trabajar, los procesos de construir y la secuencia

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAAAMPLE,

Erecono

Ebe a continu

ELELEfactible o crea un riesgo may

LEneamos hacer este trabajo u

PLEmero de empleados por

PLe trabajadores que van a se

PLo a los siguientes empleados

PLa las zonas de acceso controPLMPMPMP

AMAMdentificará usando un casco

AMasco azul.

AMeriencia apropiada, habi

SATodos los Emplead

SAnitoreo de seguridad tienen q

conocimiento de los riesgosconocimiento de los riesgos dhacece la conección inicial al pula conección inicial al puEvitando los peligros de latando los peligros d

s EmpleadosEmpleados. . ocimiento de pimiento de p

o las coo las col

Page 235: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

7.1

relacionada a este trabajo serán discutidas detalladamente y prácticas de seguridad que serán usadas durante actividades específicas del trabajo serán detalladas. Adicionalmente, a todo el personal se le informará que las zonas de acceso controlado están fuera de límite a todo el personal menos los constructores designados que han sido específicamente entrenados para trabajar en esa área.

Las tareas del monitor de seguridad son:

1. Advertir con la voz cuando se acerque al borde abierto de una manera insegura. 2. Advertir con la voz si se está desarollando alguna situación peligrosa que no se puede ver por otra

persona involucrada el la colocación del producto, tales como un miembro fuera de control.3. Advertirle a los constructores designados que están en una área peligrosa. 4. Ser competente en reconocer los peligros de las caídas. 5. Advertirle a los empleados cuando no se den cuenta de un peligro de las caídas o estan actuando de

una manera insegura. 6. Estar en la misma superficie de caminar/trabajar que los empleados monitoreados y dentro de la

distancia de la visión de los empleados monitoreados. 7. Estar lo suficientemente cerca para comunicarse oralmente con los empleados. 8. No permitir que otras responsabilidades impidan el monitoreo. Si al monitor de seguridad le dan

demasiadas responsabilidades, el monitor debe (1) parar el proceso de construcción; y (2) darle otras responsabilidades al constructor designado; o (3) darle la función de monitor de seguridad a otro designado, persona competente. El sistema de monitoreo de seguridad no debe ser usado cuando el viento es muy fuerte que puede causar que las cargas que tienen las áreas de superficie largas quepuedan balancearse fuera de alcance, o que resulte en la pérdida del control de la carga, o cuando las condiciones del clima causen que las superficies de caminar/trabajo se congelen o se vuelvan resbalozas.

Zona de Acceso Controlado

Una zona de acceso controlado significa un área designada y marcada claramente con letreros en todas las entradas del área de trabajo, en la cual el trabajo del borde principal se puede hacer sin el uso de barandillas,red de seguridad o sistema de protección personal contra las caídas para proteger a los empleados en el área. Los sistemas de la zona controlada deben cumplir con las siguientes provisiones:

1. Cuando se use el acceso controlado a las áreas donde el borde principal y donde se hacen otras operaciones la zona de acceso controlado deben ser definidas por una línea de control o por cualquier otro método que restringe el acceso. Cuando se usan las líneas de control, deben ser colocadas o marcadas claramente a no menos de 6 pies (1.8 m) no más de 60 pies (18 m) o la mitad de la medida de la estructura que se construye, cualquiera que sea menor, desde el borde principal.

2. La línea de control se debe extender a lo largo de lo que no está protegido o del borde principal y debe estar aproximadamente paralela a lo que no está protegido o al borde principal.

3. La línea de control debe estar conectada a cada lado del sistema de la barandilla o de la pared. 4. Las líneas de control deben ser de cuerda, alambres, cintas, o materiales parecidos, y los pilares de

soporte como a continuación: a. Cada línea debe estar identificada o marcada claramente de otra manera a no más de 6 pies

(1.8 m) intervalos con material de alta visibilidad. b. Cada línea debe estar asegurada y soportada de tal manera que en su parte más baja

(incluyendo si cae) que no sea a menos de 39 pulgadas (1 m) de la superficie de caminar/trabajar y su punto más alto que no sea a más de 45 pulgadas (1.3 m) de la superficie de caminar/trabajar.

c. Cada línea debe tener un mínimo de resistencia a la rotura de 200 libras (.88 kN).

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEa de a de c

las caídas o estan actuaas caídas o estan actua

ados monitoreados oreados y dentro dy dentro d

te con lose con los empleados. s.nitoreoeo. Si al. Si al monitor de segumonitor de se

parar el proceso de construccparar el proceso de construc) darle la función de monitor d) darle la función de monitor

de monitoreo de seguridadde monitoreo de seguridad nonoe las cargas que tienen las áras cargas que tie

o que resulte en la pérdida deo que resulte en la ps superficies de caminar/trabasuperficies de caminar/t

AMAMca un área designad

AM, en la cual el trabajo del bor

AMma de protección personal c

AMzona controlada deben c

e use el acceso controlado a cceso controlado a iones la zona de acceso contiones la zona de acceso

método que restringe el accemétodo que restringe el amarcadas claramente a no mercadas claramente a no mede la estructura que se conla estructura que se con

línea de control se deínea de control se daproximadamenoximadamen

de controde controe c

Page 236: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

7.1

* Los andamios internos no pueden ser utilizados en este trabajo porque los soportes en el interior usadospara aguantar las paredes a plomo y aliniadas reducen el movimiento y acceso a lo largo de los tablones delandamio. Además, localidades dispersas de los soportes hacen difícil la colocación del andamio o imposible ya que el Empleado debe usar ambas manos para mover las trosas y las vigas y dirigir su atención hacia arriba. No podrán ver sus pasos para evitar lesiones serias al tropezar con los soportes que cruzan el andamio. Un peligro de tropiezo en un andamio presenta un peligro mayor a los Empleados que usando los procedimientos seguros de trabajar en la parte superior de la pared. Finalmente, al pararse en las escaleras o en los andamios requerirá que los Empleados claven las trosas al nivel de la vista y del pecho creando un peligro mayor.

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

p

E

Page 237: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

7.1

FrameSAFE Reconocimiento del Plan de Protección Contra Caídas Específico Del Lugar de Trabajo

Mi firma a continuación certifica que entiendo el material presentado y no tengo preguntas. Yo completamente entiendo y estoy consciente que si tengo algunas preguntas relacionadas con este entrenamiento o mi seguridad personal, yo le puedo preguntar a mi Supervisor y/o Empleador por información y explicación adicional.

____________________________________________________________________________________Empleado (Nombre Impreso) Firma Fecha

____________________________________________________________________________________Empleado (Nombre Impreso) Firma Fecha

____________________________________________________________________________________Empleado (Nombre Impreso) Firma Fecha

____________________________________________________________________________________Empleado (Nombre Impreso) Firma Fecha

____________________________________________________________________________________Empleado (Nombre Impreso) Firma Fecha

____________________________________________________________________________________Empleado (Nombre Impreso) Firma Fecha

____________________________________________________________________________________Empleado (Nombre Impreso) Firma Fecha

____________________________________________________________________________________Empleado (Nombre Impreso) Firma Fecha

____________________________________________________________________________________Empleado (Nombre Impreso) Firma Fecha

____________________________________________________________________________________Empleado (Nombre Impreso) Firma Fecha

____________________________________________________________________________________Empleado (Nombre Impreso) Firma Fecha

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE_____________________________________

FechaFec

____________________________________________ FechFech

_____________________________________________rmama

_________________________________________ FirmaFirma

____________________________________________ FirmaFirm

_____________________________________________mpreso)eso)

__________________________________________Nombre Impreso)Nombre Impre

________________________________Nombre ImpreNombre Impreso)so)

Page 238: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLE

Page 239: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

GLOSSARY &APPENDIX A

GLOSARIO YAPÉNDICE A

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEGLOSARGLOSARAPÉNDICEAPÉNDICE

Page 240: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

Accidente: Un evento inesperado que resulta en una lesión personal o daño a la propiedad.

Elevador aéreo: Cualquier dispositivo mon-tado en un vehículo usado para elevar a los Empleados.

Anclajelíneas de vida, desaceleradores o dispositivos de desaceleración.

Punto adecuado de anclajeusados para amarrar los equipos de protec-ción personal contra caídas deben ser inde-

para apoyar o suspender las plataformas y capaces de soportar un mínimo de 5,000 libras (22.2 kN) por Empleado amarrado, o debe ser diseñado, instalado y usado:• Como parte de un sistema personal de pro-

tección contra caídas completo lo cual man-tiene un factor de seguridad de un mínimo de dos y

-da.

Persona autorizada: Una persona aproba-

Gérmenes transmitidos por la san-gre: Microrganismos patógenos que estan presentes en la sangre de los humanos que pueden causar enfermedad en los humanos. Estos patógenos incluyen, pero no son limita-dos a, el virus de la hepatitis B (HBV) y el virus

Correa para el cuerpo (cinturón de seguridad): Una correa con medios para

-

leración. Los cinturones no pueden ser usados como un sistema personal de protección contra caídas; solamente pueden ser usados como un sistema de dispositivos de posicionamiento.

Accident: An undesired event that results in

Aerial Lift: Any vehicle-mounted device used to elevate Employees.

Anchorage: A secure point of attachment for lifelines, lanyards or deceleration devices.

Adequate Anchorage Point: Anchor-ages used for attachment of personal fall arrest equipment shall be independent of any anchorage being used to support or suspend platforms and capable of supporting at least 5,000 pounds (22.2 kN) per employee at-tached, or shall be designed, installed and used:• As part of a complete personal fall arrest

system which maintains a safety factor of at least two and

Authorized Person: A person approved or assigned by the employer to perform a specif-

Bloodborne Pathogens: Pathogenicmicroorganisms that are present in human blood and can cause disease in humans. These pathogens include, but are not limited to, hepatitis B virus (HBV) and human immu-

Body Belt (Safety Belt): A strap with means both for securing it about the waist and for attaching it to a lanyard, lifeline or deceler-ation device. Body belts cannot be used as a personal fall arrest system; they can only be used as a positioning device system.

GLOSSARY GLOSARIO

GLOSSARY GLOSARIO

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEa la

ier dispositier disposdo para elevar a do para elevar a

desaceleradores o dispositivoadores o dispositivoración.ra

adecuado de anclajeadecuado de anclajedos para amarrar los equipos dra amarrar los equipos

ón personal contra caídas debón personal contra caídas deb

para apoyar o suspender lapara apoyar o suspender lcapaces de soportar un capaces de soportar un(22.2 kN) por Emplea(22.2 kN) pdiseñado, instaladodiseñado, in• Como parte dComo parte

tección contección cotiene untiene undos ydos y

arrest rrest factor of ctor of

A person approved or son approved or oyer to perform a specifform a specif--ff

ne Pathogenshogen :: PathogenicPathogenicanisms that are present in huanisms that are present in hu

and can cause disease in humand can cause disease iese pathogens include, but arse pathogens include, but

o, hepatitis B virus (HBV) andhepatitis B virus (HBV) and

y Belt (Safety lt (Safety oth for secoth for sec

g it to

Page 241: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

GLOSSARY GLOSARIO

Arnés del cuerpo: Un diseño de correas que puede asegurarse sobre el empleado de

-tención de caída sobre al menos los muslos, la pelvis, la cintura, el pecho y los hombros, con medios para conectarlos a otros componentes de un sistema personal de protección contra caídas.

Abrazadera: Una conexión rígida que man-

Hebillacinturón o el arnés del cuerpo cerrado alrede-dor del cuerpo del empleado.

PRECAUCIÓNpeligrosa lo cual, si no se evita, puede resultar en lesiones menores o moderados.

Cortacircuitos: Un dispositivo diseñado para abrir y cerrar un circuito de manera no au-tomática y abrir el circuito automáticamente en una sobrecorriente predeterminada sin dañarse cuando se aplica apropiadamente dentro de su capacidad.

Contenedores cerrados: Un contene-dor así sellado por medio de una tapa u otro dispositivo que ni el líquido ni el vapor se escapará del contenedor en temperaturas normales.

Persona competente

antihigiénicas, con riesgos o peligrosas para los empleados, y quien tiene la autoridad de tomar medidas de corrección inmediatas para eliminarlas.

Conector: Un dispositivo que se usa para -

sonal de protección contra caídas o sistema de dispositivos de posicionarse. Puede ser un componente independiente del sistema (como un mosquetón) o un componente integral del sistema (como una hebilla o anillo-D cosido en una correa para el cuerpo o arnés para el cuerpo, o un mosquetón empalmado o cosido a un desacelerador o un desacelerador de auto retracción).

Body Harness: A design of straps that may be secured about the employee in a manner to distribute the fall arrest forces over at least the thighs, pelvis, waist, chest and shoulders, with means for attaching it to other compo-nents of a personal fall arrest system.

Brace: A rigid connection that holds one scaf-

another member, or to a building or structure.

Buckle: Any device for holding the body belt or body harness closed around the employ-ee’s body.

CAUTION: -tion which, if not avoided, could result in minor

Circuit Breaker: A device designed to open and close a circuit by nonautomatic means and to open the circuit automatically on a prede-termined overcurrent without damage to itself when properly applied within its rating.

Closed Container: A container so sealed by means of a lid or other device that neither liquid nor vapor will escape from it at ordinary temperatures.

Competent Person: One who is capable

in the surroundings or working conditions that

prompt corrective measures to eliminate them.

Connector: A device that is used to couple (connect) parts of a personal fall arrest sys-tem or positioning device system together.

system (such as a carabineer) or an integral component of the system (such as a buckle or D-ring sewn into a body belt or body harness, or a snap-hook spliced or sewn to a lanyard or self-retracting lanyard).

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLExión rígida queión rígida qu

arnés del cuerpo cerrado alredrpo cerrado alrederpo del empleado.rpo d LLLLLLLRECAUCIÓNCAUCIÓNCACAUAUCUCICIÓIÓNÓN

grosa lo cual, si no se evita, pugrosa lo cual, si no se evita, pn lesiones menores o moderan lesiones menores o modera

CortacircuitosCortacircu : Un dispUn disppara abrir y cerrar un cirpara abrir y cerrar un citomática y abrir el cirtomática y una sobrecorrienteuna sobreccuando se apliccuando se apcapacidad.capacidad.

ContenContedor asdor adisd

d d

itself tself

er so sealed er so sealed vice that neither vice that neither

e from it at ordinary rom it at ordinary

sonson:: One who is capable One who is capable

ndings or working conditions tor working conditions

pt corrective measures to elimpt corrective measures to

Connectornnector:: A device that is A device that ionnect) parts of a personnnect) parts of a per

or positioning devicr positioning devi

uch as auch as aof th

Page 242: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

Método de control: Acciones y/o activi-dades que se tomen para prevenir, eliminar o reducir la ocurrencia de un peligro que usted

Zona de acceso controlado (CAZ): Una

sin el uso de un sistema de barandillas, siste-mas personales de protección contra caídas, o sistemas de redes de seguridad, y en las

CAZ debería ser usada únicamente si métodos convencionales de protección contra caídas son imposibles o causan más peligro.

Sílice cristalina: La sílice cristalina es un material industrial importante que se encuen-

componente de arena, piedra, roca, hormigón, ladrillo, bloque y mortero. Los materiales que

a la sílice respirable puede causar silicosis (un deterioro progresivo de la función pulmonar), cáncer de pulmón, otras enfermedades respira-torias y enfermedad renal.

PELIGRO -sa lo cual, si no se evita, se debe asumir que resultará en la muerte o lesiones graves. Esta palabra de advertencia se debe limitar a las situaciones más extremas.

Dispositivo de desaceleración: Cual-quier mecanismo, como una cuerda de agarre, un cordón de costura desgarrable, un acollador

o deformaciones, acollador de auto retracción, etc., que sirve a disipar una cantidad sustancial de energía durante la detención de caídas, o de otra manera que limite la energía impuesta en un empleado durante la detención de caída.

Distancia de desaceleración: La distancia

al caer, excluyendo el alargamiento de una línea de vidas y distancia de caída libre, del punto al

a operar. Se mide como la distancia entre la

arnés de cuerpo del empleado al momento de

GLOSSARY GLOSARIO

Control Method: Actions and/or activities that are taken to prevent, eliminate or reduce

Controlled Access Zone (CAZ): An area in which certain work may take place without the use of guardrail systems, personal fall arrest systems, or safety net systems, and in which

only be used if a conventional fall protection

Crystalline Silica: An important industrial material found abundantly in the earth’s crust.

a component of sand, stone, rock, concrete, brick, block and mortar. Materials containing

-places. Exposure to respirable silica can cause silicosis (a progressive impairment of lung function), lung cancer, other respiratory diseases and kidney disease.

DANGER: -tion which, if not avoided, should be assumed

-nal word is to be limited to the most extreme situations.

Deceleration Device: Any mechanism, such as a rope grab, rip-stitch lanyard, specially-woven lanyard, tearing or deform-ing lanyard, automatic self-retracting lifeline/lanyard, etc., that serves to dissipate a sub-stantial amount of energy during a fall arrest, or otherwise limit the energy imposed on an employee during fall arrest.

Deceleration Distance: The additional vertical distance a falling employee travels, excluding lifeline elongation and free fall distance, before stopping, from the point at which the deceleration device begins to oper-

the location of an employee’s body belt or body harness attachment point at the moment

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEarandran

ión contraón contrseguridad, y en eguridad, y en

ada únicamente si métodda únicamente si métodde protección contra caídas tección contra caídas

es o causan más peligro.más peligro.

cristalinaristalin : La sílice cristalina stalina rial industrial importante que sendustrial importante que s

componente de arena, piedcomponente de arena, piedladrillo, bloque y morteroladrillo, bloque y mortero

a la sílice respirala sílice redeterioro progdeterioro progcáncer de pcáncer de torias y etorias y

s

ry y

--d be assumed d be assumed

--the most extreme e most extreme

eviceevice:: Any mechanism, Any mechanism, grab, rip-stitch lanyard, ab, rip-stitch lanyar

ven lanyard, tearing or deformnyard, tearing or deformd, automatic self-retracting lifetic self-retracting life

, etc., that serves to dissipate etc., that serves to dissipateial amount of energy during aial amount of energy duri

otherwise limit the energy imotherwise limit the energy imemployee during fall arrest.ployee during fall arrest.

celeration Distaneleration Dista distance a fastance a fa

lifeline elifeline efore

Page 243: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

GLOSSARY GLOSARIO

de la caída) del dispositivo de desaceleración, y

el empleado pare completamente.

Defecto: Cualquier característica o condición

es parte.

Empleado:el Decreto1 sin tener en cuenta la relación contractual que puede ser presunta a existir

tista o subcontratista quien lo ha contratado.

Decreto, pero los términos idénticos se usan en el Decreto Davis-Bacon (4 U.S.C. 276ª), lo cual provee la protección del salario mínimo en los contratos de construcciones federales o con asistencia federal. El uso del mismo término en un estatuto el cual frecuentemente se aplica a la

considerable valor presidencial en determinando

Equivalente: Diseños, materiales o métodos alternativos para proteger contra un peligro que el empleador puede demostrar proveerá un grado igual o mayor de seguridad para los em-pleados que los métodos, materiales o diseños

Falla: No sostiene la carga, rotura o sepa-ración de las partes de los componentes. No

máxima se excede.

Zona de caída: El área (incluyendo pero

que los materiales parcialmente o completa-mente suspendidos pueden caer en el evento de un accidente.

of activation (at the onset of fall arrest forces) of the deceleration device during a fall, and the location of that attachment point after the employee comes to a full stop.

Defect: Any characteristic or condition that tends to weaken or reduce the strength of the

Employee: Every laborer or mechanic under the Act1 regardless of the contractual relation-ship which may be alleged to exist between the laborer and mechanic and the contractor or subcontractor who engaged him. “Laborer

the identical terms are used in the Davis-Ba-con Act (40 U.S.C. 276a), which provides for minimum wage protection on Federal and federally assisted construction contracts. The use of the same term in a statute which often applies concurrently with section 107 of the Act has considerable presidential value in ascertaining the meaning of “laborer and me-

means one who performs manual labor or who labors at an occupation requiring phys-

worker skilled with tools.

Equivalent: Alternative designs, materials

the employer can demonstrate will provide an equal or greater degree of safety for employ-ees than the methods, materials or designs

Failure: Load refusal, breakage or separa-tion of component parts. Load refusal is the point where the ultimate strength is exceeded.

Fall Zone: The area (including but not lim-ited to the area directly beneath the load) in which it is reasonably foreseeable that partial-ly or completely suspended materials could fall in the event of an accident.

1

Safety Standards Act, commonly known as the Construction Safety Act (86 Stat. 96; 40 U.S.C. 333).

1

Safety Standards Act, comúnmente conocido como el Con-struction Safety Act (86 Stat 96; 40 U.S.C. 333)

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEen cuenta la relación en cuenta la relació

uede ser presunta a existir e ser presunta a existir

ontratista quien lo ha contratadontratista quien lo ha contratado

o, pero los términos idénticos spero los términos idénticos sel Decreto Davis-Bacon (4 U.S.Ceto Davis-Bacon (4 U.S

ual provee la protección del saual provee la protección del salos contratos de construccionlos contratos de construccionasistencia federal. El uso dasistencia federal. El uso un estatuto el cual frecuun estatuto el cual frecu

considerable valorconsiderabd med me--

labor or or or quiring physquiring phys--

ative designs, materials ative designs, materials

an demonstrate will provide ademonstrate will provide aater degree of safety for emplegree of safety for emp

the methods, materials or desds, materials or des

ailureilure: Load refusal, breakag Load refusal, breakation of component parts. Loan of component parts. Loaoint where the ultimate snt where the ultimat

Zonene:: The are The aree area die area di

eas

Page 244: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

-dido, quemando intensamente, o teniendo una velocidad rápida de propagación de llamas.

Hoyo en el suelo: Una abertura midiendo menos de 12 pulgadas (30.5 cm) pero más de 1 pulgada (2.54 cm) en su menor dimensión, en cualquier suelo, plataforma, pavimento, o patio, a través del cual los materiales pero no una persona podría caer; como hoyo continuo, abertura de una tubería o espacios abiertos.

Circuito interruptor de falla a tierra (GFCI): Un interruptor de circuito de acción rápida diseñado para apagar el poder eléctrico en caso de una falla a tierra en menos de 1/40 de un segundo.

Sistema de barandillas: Una barrera verti-cal que consiste de, pero no está limitada a, rieles superiores, rieles intermedios, postes y rodapiés, construídos para prevenir que los empleados y

Pasamanos: Una barra o tubo apoyado en soportes de una pared o partición, como una escalera o una rampa, para proporcionar a las personas con un agarradero en caso de

Sustancia peligrosa: Un material que, por

corrosivo, oxidante, irritante o de otra manera

lesión o la muerte.

Hoyo: Un espacio o vacío de 2 pulgadas (5.1 cm) o más en su menor dimensión, en un sue-

Escalera hecha en el lugar de trabajo:Una escalera fabricada por los empleados, típicamente en el lugar de construcción, y no es fabricada comercialmente.

Plataforma en escaleras: Una plataforma

Desacelerador -da, cuerda de alambre o una correa que gene-ralmente tiene un conector en cada extremo para conectarlo a un cinturón del cuerpo o arnés del cuerpo de un dispositivo de desace-

GLOSSARY GLOSARIO

Flammable: Capable of being easily ignit-ed, burning intensely, or having a rapid rate of

Floor Hole: An opening measuring less than 12 in. (30.5 cm) but more than 1 in. (2.54 cm)

pavement, or yard, through which materials but not persons may fall; such as a belt hole, pipe opening or slot opening.

Ground-Fault Circuit Interrupter (GFCI): A fast-acting circuit breaker designed

ground-fault within as little as 1/40 of a second.

Guardrail System: A vertical barrier con-sisting of, but not limited to, toprails, midrails, posts and toe boards, erected to prevent em-

Handrail: A single bar or pipe supported on brackets from a wall or partition, as on a stairway or ramp, to furnish persons with a handhold in case of tripping.

Hazardous Substance: A material which, --

Hole: A gap or void 2 in. (5.1 cm) or more

walking/working surface.

Job-made Ladder: A ladder that is fabricat-ed by employees, typically on the construction site, and is not commercially manufactured.

Landing:stairs.

Lanyard:or strap that generally has a connector at each end for connecting the body belt or body harness to a deceleration device, lifeline or anchorage.

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEterialeerial

omo hoyo cmo hoyoo espacios abierespacios abie

ptor de falla a tierra tor de falla a tierra ruptor de circuito de acción de circuito de acción

do para apagar el poder eléctricgar el poder eléctriuna falla a tierra en menos de una falla a tierra en menos de

gundo.gundo.

ema de barandillasde barandillas:: Una bUnaal que consiste de, pero no está l que consiste de, pero no está

superiores, rieles intermedios, superiores, rieles intermedios, construídos para prevenir quconstruídos para prevenir q

PasamanosPasama : Unasoportes de una oportes de uescalera o unaescalera o unlas personalas persona

SusSus

on a on a with a with a

A material which, A material which, ----

r void 2 in. (5.1 cm) or more oid 2 in. (5.1 cm) or more

orking surface. ace.

-made Laddermade La : A ladder thaA ladded by employees, typically on thby employees, typically on t

site, and is not commerciallye, and is not commercially

dingi :

Page 245: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

GLOSSARY GLOSARIO

Borde principal: El borde de un piso, techo

cambia su ubicación a la adición de más piso, techo, cobertura o secciones de encofrado que se ubican, se forman o se construyen. Un bor-de principal de ataque es considerado como un

cuando no está activamente y continuamente

Línea de vida: Un componente de un siste-ma personal de protección contra caídas que

-mente (línea de vida vertical), o para conectar

--

tal), y que sirve como un medio de conectar otros componentes de un sistema personal de

Aislar/Etiquetar: Un procedimiento com-pletado para asegurarse de que las máquinas peligrosas están apropiadamente apagadas y no se enciendan antes de terminar el mante-nimiento o reparación.

Niveles más bajos: Esas áreas o super-

limitadas a, nivel del suelo, pisos, plataformas,

materiales, agua, equipos, estructuras o partes de las mismas.

Carga máxima prevista: La carga total de todos los empleados, equipos, herramientas, materiales, cargas transmitidas y otras cargas anticipadas que se aplican al componente de una escalera en cualquier momento.

Punto de acceso: Todas las áreas usadas por los empleados para pasar relacionado al

aberturas de escaleras, paredes sin forrar y otras aberturas permanentes o temporales usadas para tal recorrido.

Leading Edge:-

ing surface (such as the deck) that changes

formwork sections are placed, formed or con-structed. A leading edge is considered to be

-ods when it is not actively and continuously under construction.

Lifeline: A component of a personal fall ar--

nection to an anchorage at one end to hang vertically (vertical lifeline), or for connection to

-

means for connecting other components of a personal fall arrest system to the anchorage.

Lockout/Tagout: A procedure completed to ensure that dangerous machines are properly

completion of maintenance or servicing work.

Lower Levels: Those areas or surfaces to which an employee can fall. Such areas or surfaces include, but are not limited to,

-ways, excavations, pits, tanks, material, wa-ter, equipment, structures or portions thereof.

Maximum Intended Load: The total load of all employees, equipment, tools, materials, transmitted loads and other loads anticipated to be applied to a ladder component at any one time.

Point of Access: All areas used by employ-ees for work-related passage from one area or level to another. Such open areas include doorways, passageways, stairway openings, studded walls and various other permanent or temporary openings used for such travel.

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEe y continue y conti

Un componente de un sistecomponente de un sisteprotección contra caídas que ción contra caídas que

ínea de vida vertical), o para cínea de vida vertical), o para c

tal), y que sirve como un medital), y que sirve como un medotros componentes de un sotros componentes de un s

Aislar/EtiquetarAislar/Etpletado para asegpletado parpeligrosas estápeligrosas esno se encienno se encienimiento nimien

NiveNive

y y

work.work.

urfaces aces Such areas Such areas

ot limited to, ot limited to--

tanks, material, wamaterial, wa--tures or portions thereof.ures or portions thereof.

ended Loadnded Load:: The total load The total loaees, equipment, tools, materiaquipment, tools, materi

d loads and other loads anticind other loads anticpplied to a ladder component pplied to a ladder component

me. me.

Point of Accessint of Access:: All areas All areaes for work-related passas for work-related pas

evel to another. Suchvel to another. Sucays, passagews, passagew

walls and walls andpen

Page 246: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

Sistema personal de protección contra caídas (PFAS): Un sistema usado para detener la caída de un empleado. Con-

arnés del cuerpo, y debería incluir un desace-lerador, dispositivo de desaceleración, línea de vida o una combinación de estos.

Plataforma --

formas pueden ser construídas usando tablas de madera individuales, tablas fabricadas, cubiertas fabricadas y plataformas fabricadas.

Sistema de dispositivos de posicio-narse: Un cinturón o arnés de cuerpo equi-pado para permitir que un empleado que se

mientras se inclina.

Herramientas de mano eléctricas:Cualquier herramienta de mano que requiere una fuente de poder adicional y/o un mecanis-

Herramientas activadas con pólvora:Una pistola de clavos usada en construcción

-

explosión controlada creada por una carga pequeña de propulsión química, parecido al proceso que dispara un arma de fuego.

: Aquel que, por pose--

tigio profesional, o quien por su extenso cono-cimiento, ha demostrado con éxito su habilidad de solucionar o resolver problemas relaciona-

Techo

ha completado, se convierte temporalmente la

Sistema de monitoreo de seguridad:Un sistema de seguridad en el cual una perso-na competente es responsable por reconocer y advertir a los empleados de peligros de caer.

GLOSSARY GLOSARIO

Personal Fall Arrest System (PFAS):A system used to arrest an employee’s fall.

belt or body harness, and may include a lanyard, deceleration device, lifeline or combinations of these.

Platform: A work surface elevated above lower levels. Platforms can be constructed us-ing individual wood planks, fabricated planks, fabricated decks and fabricated platforms.

Positioning Device System: A body belt or body harness system rigged to allow an employee to be supported on an elevated vertical surface, such as a wall, and work with both hands free while leaning.

Power-operated Hand Tool: Any hand-held tool that requires an additional power source and/or mechanism other than manual labor.

Powder-actuated Tool: A nail gun used in -

als to hard substrates such as steel and con--

nology relies on a controlled explosion created by small chemical propellant charge, similar to

: One who, by posses-

professional standing, or who by extensive knowledge, training and experience, has suc-cessfully demonstrated his/her ability to solve

Roof: The exterior surface on the top of

formwork that, because a building has not been completed, temporarily become the top surface of a building.

Safety-monitoring System: A safety sys-tem in which a competent person is responsi-

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEstruídas usando tabtruídas usando t

es, tablas fabricadas, es, tablas fabricadaas y plataformas fabricadas.plataformas fabricadas.

dispositivos de posicioos de posicio-cinturón o arnés de cuerpo eqcinturón o arnés de cuerpo eq

ra permitir que un empleado qua permitir que un empleado q

mientras se inclina.mientras se inclina.

Herramientas de manHerramientas de maCualquier herramienta dCualquier heuna fuente de poder una fuente

HerramienHerramienUna pistolaUna pistol

n used in used in --

eel and coneel and con----

d explosion created explosion created ellant charge, similar to harge, similar to

:: One who, by posses One who, by posses--

nal standing, or who by extensg, or who by extensdge, training and experience, dge, training and experie

fully demonstrated his/her abifully demonstrated his/he

f: The exterior surf The exterior sur

that, becthat beeted

Page 247: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

GLOSSARY GLOSARIO

Andamio: Cualquier plataforma elevada temporal (apoyada o suspendida) y su estruc-

materiales o los dos.

Línea de vida auto retractable/Desacelerador: Un dispositivo de desace-leración que contiene una cuerda enrollada en un cilindro que puede ser extraída lentamente

durante un movimiento normal del Empleado,

automáticamente bloquea el cilindro y detiene la caída. Líneas de vida auto retractables/desaceleradores que limitan automáticamente la distancia de caída libre a 2 pies (.61 m) o menos deben ser capaces de sostener una carga de tensión mínima de 3000 lbs. (13.3 kN) aplicada a la línea de vida o al desacelerador en la posición totalmente extendida.

Señales: Las advertencias de peligro publica--

das o ubicadas, en lugares donde los peligros existen.

Mosquetón: Un conectador compuesto de un miembro de forma de gancho con un protector normalmente cerrado, o con partes parecidas, que se puede abrir para permitir que el gancho

-

Objetos inestables

no pueden apoyar apropiadamente las car-

constituyen un soporte de base segura para los andamios, las plataformas o los empleados.

concreto.

Pasillo: Una porción de la plataforma de andamio usada solamente para acceso y no

Scaffold: Any temporary elevated platform (supported or suspended) and its supporting structure (including points of anchorage), used for supporting employees or materials or both.

Self-retracting Lifeline/Lanyard: A deceleration device containing a drum-wound line that can be slowly extracted from, or retracted onto, the drum under slight tension during normal employee movement, and which, after onset of a fall, automatically locks the drum and arrests the fall. Self-retracting lifelines and lanyards that automatically limit free fall distance to 2 ft. (.61 m) or less shall be capable of sustaining a minimum tensile load of 3,000 pounds (13.3 kN) applied to the device with the lifeline or lanyard in the fully extended position.

Signs: -

Snap Hook: A connector comprised of a hook-shaped member with a normally closed keeper, or similar arrangement, which may be opened to permit the hook to receive an ob-

hooks together.

Unstable Objects:

them to become dislocated and shift and, therefore, may not properly support the loads

platforms or employees. Examples include, but are not limited to, barrels, boxes, loose bricks and concrete blocks.

Walkway:used only for access and not as a work level.

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEvo

erda enerda enextraída lentaextraída lent

nto normal del Empleadoto normal del Empleado

te bloquea el cilindro y detienea el cilindro y detieneeas de vida auto retractables/o retractables/

adores que limitan automáticaadores que limitan automáticancia de caída libre a 2 pies (.6cia de caída libre a 2 pies (.6

os deben ser capaces de sostdeben ser capaces de sosarga de tensión mínima de 300arga de tensión mínima de 300

aplicada a la línea de vida o aaplicada a la línea de vida o en la posición totalmente een la posición totalmente e

SeñalesSeñales: Las adverte: L

das o ubicadas, s o ubicadaexisten.existen.

MosqueMosqumiembmiembnormnq

sed of a of a rmally closed mally closed

nt, which may be t, which may be to receive an obreceive an ob--

Objectsts::

become dislocated and shift abecome dislocated and shift fore, may not properly supporfore, may not properly su

atforms or employees. Exforms or employeesare not limited to, bare not limited to, b

and concrete bconcrete b

Page 248: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

GLOSSARY GLOSARIO

Abertura en la pared: Una abertura que es por lo menos 30 pulgadas (76.2 cm) de altura y 18 pulgadas (45.7 cm) de ancho, en cual-quier pared o partición, a través de la cual una persona puede caer; tal como unas aberturas pequeñas o abertura de descarga.

ADVERTENCIApeligrosa en la cual, si no se evita, puede re-sultar en la muerte o en lesión grave.

Wall Opening: An opening at least 30 in. (76.2 cm) high and 18 in. (45.7 cm) wide, in any wall or partition, through which persons may fall; such as a yard-arm doorway or chute opening.

WARNING: -ation in which, if not avoided, could result in

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEevita, puevita, p

sión grave.sión grav

Page 249: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

be used in their work. Each employee is required to read company-provided training materials on the following topics, initial each line to indicate that each module is fully understood and sign the acknowledgement at the bottom. This acknowledgement must be returned to a Supervisor

Overview of Hazard Communication

Protecting Yourself from Hazardous Materials

Additional Topics

-

may be periodically revised, it is my responsibility to keep my copy up to date with any revi-

nothing in this training is to be construed as a contract and that disciplinary procedures may be

Employee (Print Name) Signature Date

Trainer (Print Name) Signature Date

APPENDIX A: HAZCOM TRAINING ACKNOWLEDGEMENT FORM

APPENDIX A HAZCOM Training Acknowledgement Form

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEded training materied training mate

fully understood and sigfully understood and sigbe returned to a Supervisor turned to a Supervisor

us Materialss Materials

y be periodically revibe periodically rev

n this trainn this train

Page 250: WARNING SAFETY CAUTION MANUAL - Framers Council...• First violation will result in a written warning to the Employee. • Second violation within a one-year period may result in

-vo de reducir la posibilidad de enfermedad o lesiones causadas por químicos proporcionando a los empleados con la mayor cantidad de información como sea necesaria para entender

obligado a leer los materiales de entrenamiento proporcionados por la compañía en los siguien-tes temas, poner sus iniciales en cada línea para indicar que cada módulo se entiende com-

devuelto a un Supervisor para incluirlo en el archivo del personal del empleado.

Resumen de Comunicación de Peligros

Métodos para Detectar la Presencia de Materiales Peligrosos

Protegiéndose contra Materiales Peligrosos

Temas Adicionales

-tos. Entiendo que esta información puede ser revisada periódicamente, es mi responsabilidad de mantener mi copia al día con cualquier revisión que se me proporcione, y que puedo consul-tar con mi supervisor si tengo algunas preguntas. Entiendo que nada en este entrenamiento se

APÉNDICE A: ENTRENAMIENTO DE COMUNICACIÓN DE PELIGROS (HAZCOM)

APÉNDICE A Entrenamiento de Comunicación de Peligros (HAZCOM)

Copyright © National Framers Council & Structural Building Components Association for exclusive use by the Purchaser. All rights reserved. SAMPLE - NOT FOR DISTRIBUTION

SAMPLEproporcpropor

para entendpara enten

compañía en los siguiecompañía en los siguiemódulo se entiende comulo se entiende com--

nal del empleado.nal del empleado.

es Peligrosos es Peligrosos

es Peligrososes Peligrosos

aleses

tiendo que esendo que esner mi coner mi c

upe