Page 1: War-winning Capabilities…On Time, On Cost 1 Air Armament Center Mr. Deryl Israel AAC/EN Integrated Program Assessment Status 28 February 2008 DISTRIBUTION

1

War-winning Capabilities…On Time, On Cost

Air Armament CenterAir Armament Center

Mr. Deryl IsraelAAC/EN

Integrated Program Integrated Program

Assessment StatusAssessment Status

28 February 2008 28 February 2008

DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.

Page 2: War-winning Capabilities…On Time, On Cost 1 Air Armament Center Mr. Deryl Israel AAC/EN Integrated Program Assessment Status 28 February 2008 DISTRIBUTION

2

War-winning Capabilities…On Time, On Cost

Outline

• Integrated Assessment (IA) Update IA purpose & backgroundProgress since 2007 Industry Day

• Program Sufficiency Review (PSR) summaryFY06-07 activity & resultsLessons learned: How to do better SRsLessons learned: How to build better programs

• Way Ahead: Plans for 2008

Page 3: War-winning Capabilities…On Time, On Cost 1 Air Armament Center Mr. Deryl Israel AAC/EN Integrated Program Assessment Status 28 February 2008 DISTRIBUTION

3

War-winning Capabilities…On Time, On Cost

Assessment Purpose & Background

• Historically, Eglin programs haveCost overruns of 15%-30% Schedule slips of 6-12 months

• Since FY06, deployed and integrated a suite of assessments to execute AAC’s vision--War-winning capabilities… on time, on cost

• Intent is to create and maintain a high-confidence portfolio

Page 4: War-winning Capabilities…On Time, On Cost 1 Air Armament Center Mr. Deryl Israel AAC/EN Integrated Program Assessment Status 28 February 2008 DISTRIBUTION

4

War-winning Capabilities…On Time, On Cost

High-Confidence ProgramsKey Characteristics*

* As Defined by D&SWS design teams

• Good “Should-Cost” Estimate

• Budget/Cost Estimate alignment

• Approved time-phased CDD requirements

• Program office resourcing

• Requirements stability

• Budget stability mechanism

• Incremental program plan

• Short-duration capability release/production schedules

• SDD phase no greater than 6 years

• Tech / manufacturing maturity assessment thresholds met

• Integrated sustainment and depot strategy

• Realistic test planning, Approved IOT&E plan

• Life-cycle acquisition strategy—time certain success incentive

• Executing according to “plan”

• Probability of Program Success (PoPS) measures

Page 5: War-winning Capabilities…On Time, On Cost 1 Air Armament Center Mr. Deryl Israel AAC/EN Integrated Program Assessment Status 28 February 2008 DISTRIBUTION

5

War-winning Capabilities…On Time, On Cost

AFPEO/WP Policy, 23 May 07AAC Integrated Assessments

• These assessments will help us collaborate with our government stakeholders and industry to improve our acquisition processes and align expectations.

• AAC acquisition commanders/directors must effectively employ the assessments during program planning and execution

• Assessment leaders will provide results to the PEO/Deputy PEO, Weapons; commanders or directors of appropriate AAC line units; and the AAC Center Senior Functional owning the assessment being reported.

Page 6: War-winning Capabilities…On Time, On Cost 1 Air Armament Center Mr. Deryl Israel AAC/EN Integrated Program Assessment Status 28 February 2008 DISTRIBUTION

6

War-winning Capabilities…On Time, On Cost

LogisticsHealth

Assessment(LHA)

CostSufficiency

Review(CSR)

Systems Engineering Assessment

(SEA)

ProgramSufficiency

Review(PSR)

TechnologyReadiness & IntegrationAssessment

(TRA)

Probability of Program

Success(PoPS)

Spiral 2 Assessment Engine I

NP

UT

S (

FR

OM

ST

D A

AC

PR

OD

UC

TS

)

Rollout Spring

‘08

ManufacturingReadiness

Assessment(MRA)

Probability of Program

Success(PoPS)

LogisticsHealth

Assessment(LHA)

Page 7: War-winning Capabilities…On Time, On Cost 1 Air Armament Center Mr. Deryl Israel AAC/EN Integrated Program Assessment Status 28 February 2008 DISTRIBUTION

7

War-winning Capabilities…On Time, On Cost

AAC Assessment Life Cycle

CSR

PSR

POM Input MS A MS B MS C Sustainment

PSR(As Required)

MonthlyUpdated

QuarterlyUpdated

TRA’/MRA’

PSR

TRA/MRA’

CSR

SEA

PoPS

PSR

TRA/MRA’

CSR

PoPS

LHA

PoPS

MRA/TRA’(As Required)

CSR(As Required)

SEA

MonthlyUpdated

PoPS

SEA

LHA

PSR

LHA

MRA/TRA’

CSR

SEA

PoPS

Page 8: War-winning Capabilities…On Time, On Cost 1 Air Armament Center Mr. Deryl Israel AAC/EN Integrated Program Assessment Status 28 February 2008 DISTRIBUTION

8

War-winning Capabilities…On Time, On Cost

Progress Since 2007 Industry Day

• Probability of Program Success (PoPS) Consistent monthly updates in SMART Internal audits drive process compliance

• Cost Sufficiency Review Earlier collaboration between staff & programs

• Manufacturing Readiness Assessment Updated guide published 30 Nov 07

• Logistics Health Assessment Increment 1 design complete; approved by AFMC/A4 Increment 2 design to include Pre MS B coverage

• Sufficiency Reviews Co-chaired by AAC/EN, 308th ARSW/CL PoPS-based template; promotes standard work Action item status reported at program reviews

Page 9: War-winning Capabilities…On Time, On Cost 1 Air Armament Center Mr. Deryl Israel AAC/EN Integrated Program Assessment Status 28 February 2008 DISTRIBUTION

9

War-winning Capabilities…On Time, On CostO N D J F M A M J J A S

AIR-TO-AIR PROGRAMS

AIR-TO-GROUND PROGRAMS

Realistic Realistic, Carries Risk

FY06 AAC Sufficiency ReviewsFY06 AAC Sufficiency Reviews

COMBAT SUPPORT PROGRAMS

NEW CONCEPT PROGRAMS

AAC Totals 20 (13 7 )

G / None

1 2 1 1 3 1 5 1 1 0 2 3

Canceled- major redesign req’d

Contract award: FY10Plan presented at EWSR

AAC/CA Approved Prod

Y / None

User did not include in POM

PDRR on track; JCTD starts FY08

Current MAR/Rebaselines since SR/Notes

G / NoneUser requirement withdrawn

Canceled- producibility issues

R / None / FY08 funding issue

Concept provided to SECAFConcept provided to AFSOCConcept provided to ACCConcept provided to ACCAssessment sent to AFMC/CCConcept provided to SOCOMConcept provided to AFSOC

Focused Lethality MunitionWind-Correct Mun Disp-Ext RangeLaser JDAMCovert Resupply (COVERS)BLU-122 Rebaseline

AMRAAM FY08 POMMALD SDD RebaselineAMRAAM RebaselineAir Superiority Target FY08 POMMALD Universal Armament Interface

Munition Assy Conveyor II MS C

ALM MK82 DIMEVery Small MunitionTactical Laser for Airfield DefenseI-500 PenetratorSmall Concept Weapon on PredatorAdaptive Carriage EnterpriseClose Air Support WeaponsHd Tgt Void Sens Fuze Risk Reduct

Page 10: War-winning Capabilities…On Time, On Cost 1 Air Armament Center Mr. Deryl Israel AAC/EN Integrated Program Assessment Status 28 February 2008 DISTRIBUTION

10

War-winning Capabilities…On Time, On CostO N D J F M A M J J A S

AIR-TO-AIR PROGRAMS

AIR-TO-GROUND PROGRAMS Current MAR/Rebaselines since SR/Notes

Realistic Realistic, Carries Risk

FY07 AAC Sufficiency ReviewsFY07 AAC Sufficiency Reviews

COMBAT SUPPORT PROGRAMS

NEW CONCEPT PROGRAMS

AAC Totals 22 (6 16 )

G / None

3 1 4 3 2 3 1 1 1 0 1 2

R / None – Awaiting N-M decisionR / None – Awaiting N-M decision

User requirement withdrawn

G / None

Contract award: FY08

Contract award: FY10

AoA eliminated concept

PDRR Contract award: FY10G / None

G / None

G / NoneG / None

G / NoneG / None

Prototype effort: on track

Extended User EvalJCTDUser requirement withdrawnFY08 JCTD; SDD start: FY10

AMSTE-JDAMJASSM-ER RestructureJASSM Maritime InterdictionJDAM ProductionLaser JDAMSDB II Cost (prior to DoD CAIG rvw)SFW Production FY10 POM

AST Business Jet AoAMALD-J SDDAST QF-16 Update

CRIIS Rapid PrototypeJoint Threat EmitterCRIIS Risk Reduction & SDDP5 Combat Training SystemAutomated Remote Transport SysCRIIS Test & Training

Adv Tactical Laser Ext User EvalHard Tgt Void Sensing Fuze JCTDMassive Ordnance Penetrator QRCHard Tgt Void Sensing Fuze

Page 11: War-winning Capabilities…On Time, On Cost 1 Air Armament Center Mr. Deryl Israel AAC/EN Integrated Program Assessment Status 28 February 2008 DISTRIBUTION

11

War-winning Capabilities…On Time, On Cost

AAC Portfolio Performance

2006 Overall Program Health

13

11

89

1112 12

14

1211 11

12

6

7

98

87

6

5

67

87

01

2 21 1

32

3 32 2

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Months Red ProgramsYellow ProgramsGreen ProgramsProgram Rebaselines: 3

Page 12: War-winning Capabilities…On Time, On Cost 1 Air Armament Center Mr. Deryl Israel AAC/EN Integrated Program Assessment Status 28 February 2008 DISTRIBUTION

12

War-winning Capabilities…On Time, On Cost

2007 Overall Program Health

1011 11 11 11 11 11 11 11

12 12 12

54 4

34 4 4 4 4 2 2 2

1 1 12

1 1 1 1 12 2 2

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

MonthsRed ProgramsYellow ProgramsGreen Programs

AAC Portfolio Performance

Program Rebaselines: 2

Page 13: War-winning Capabilities…On Time, On Cost 1 Air Armament Center Mr. Deryl Israel AAC/EN Integrated Program Assessment Status 28 February 2008 DISTRIBUTION

13

War-winning Capabilities…On Time, On Cost

Lessons LearnedHow to do better Sufficiency Reviews

Do:• Employ cross-functional approach when completing assessments• Use proper versions of process guides/tools (e.g. PoPS spreadsheet)• Conduct sufficient “deep dives” into appropriate individual assessments• Address weaponeering & mission planning across entire life cycle• Present efficient and effective test plans built with CTA & RTO inputs• Incentivize supplier decision processes when transitioning to production • Identify opportunities to validate manufacturing processes• Carefully select cost/schedule benchmarks• Conduct thorough Cost SRs prior to Program SRs• Use PoPS results in Program SRs to identify, communicate risks

Don’t:• Assume all AAC programs will be low-risk efforts • Over-optimistically evaluate programs• View Cost and Program SRs as the IG; they are home team help

Page 14: War-winning Capabilities…On Time, On Cost 1 Air Armament Center Mr. Deryl Israel AAC/EN Integrated Program Assessment Status 28 February 2008 DISTRIBUTION

14

War-winning Capabilities…On Time, On Cost

Assessments Becoming AF Tools

• AAC leaders assigned to AFSO21 Develop & Sustain Warfighting Systems (D&SWS) teams

Ms Stokley, AAC/CA, co-sponsored Life Cycle Management; Oversight/Command & Control teams

Ms Rutledge, 708ARSG/CL; Mr Mistretta, AAC/EN; Tech Development team Mr Walley, 918ARSG/DD; Life Cycle Management team

• Assessments endorsed by AFMC/CC; SAF/AQ to create & maintain high-confidence programs

PoPS: key risk management tool & metric TRAs/MRAs: enable “stage gating” milestones SEA: moving toward AFMC-wide application LHA: Sponsored by AFMC/A4 Sufficiency Reviews: req’d at key decision points AF-level Implementation planning now underway

Page 15: War-winning Capabilities…On Time, On Cost 1 Air Armament Center Mr. Deryl Israel AAC/EN Integrated Program Assessment Status 28 February 2008 DISTRIBUTION

15

War-winning Capabilities…On Time, On Cost

Building Better ProgramsAttaining High Confidence

* Proposed by D&SWS design teams

• Better transition planning, decisions via technology and manufacturing assessments, PoPS, Pre-MS B risk reduction phase*

• Iterative requirements that evolve, provide trade space prior to MS B*

• Stable requirements for a given increment*• Realistic resourcing ($$ and people)*• Risk-based source selections*• Strong, consistent Systems Engineering processes*• Incremental development w/ discrete offramps*• Incentivize sustainment (affordability/availability)*• Proactive risk management*• Early, active test community involvement in test planning• Up-front weaponeering & mission planning—and resources

Page 16: War-winning Capabilities…On Time, On Cost 1 Air Armament Center Mr. Deryl Israel AAC/EN Integrated Program Assessment Status 28 February 2008 DISTRIBUTION

16

War-winning Capabilities…On Time, On Cost

Way Ahead: 2008 Plans

• Share AAC processes/lessons learned via D&SWS Enable running start at other centers Facilitate PoPS training at other Centers Personnel from other Centers attend AAC IA events

• Design LHA Increment 2 (supports pre-MS B efforts)• Align AAC IA improvements with D&SWS

Integrate near-term AFMC; SAF/AQ decisions Minimize scrap & rework as AF standards adopted Continue process standardization

• Leverage assessments to streamline doc prep Summarize key results in AAC Expectation Mgt Agreements Use assessment products to streamline Life Cycle Mgt Plan