wappingers central school district 2016 capital project · 2016-10-04 · september 23, 2013 2016...
TRANSCRIPT
Wappingers Central School District
2016 Capital Project
Schematic Design Report Summary
September 7, 2016
September 23, 2013
2016 Capital Project Schematic Design ReportWappingers Central School District September 7, 2016R H I N E B E C K A R C H I T E C T U R E 1
Schematic Design Report
Project Budget
Project ScopeSite Improvements Accessibility ImprovementsSports ImprovementsMusic, Drama and Arts ImprovementsFacilities Improvements
Project Schedule
Other Project Initiatives
Next Steps
September 23, 2013
2016 Capital Project Schematic Design ReportWappingers Central School District September 7, 2016R H I N E B E C K A R C H I T E C T U R E
Scope Construction Budget Incidental Costs Total
Facility Improvements $12,140,800 $3,035,200 $15,176,000
Accessibility Improvements $1,529,600 $382,400 $1,912,000
Sports Improvements $4,930,000 $986,000 $5,916,000
Arts Improvements $3,100,000 $619,000 $3,719,000
Total $21,700,400 $5,022,600 $26,723,000
Project Budgets
September 23, 2013
2016 Capital Project Schematic Design ReportWappingers Central School District September 7, 2016R H I N E B E C K A R C H I T E C T U R E 3
District Wide Scope of WorkBuilding RCK JJ VW WJ BE FE FP GH JE KR MC OG SR VR BG1BCS Building Rating S S S U S U U U U S U S U U UProposed ImprovementsFacilitiesPavement - Roads and Lots
Sidewalks
BasketBall Courts
Site Drainage
Exterior Steps, Stairs, Ramps
Windows
Resilient Flooring
Ceilings
Stage Curtains
Lockers
Interior Doors
Interior Stair Rails
Interior Electrical Distribution
Cooling/Air Cond. Systems
Ventilation Equipment
Unit Ventilators
HVAC Controls
AccessibilityElevators
Toilet Rooms
Signage
Stage Access
Program ImprovementsArts Program Improvements
Sports Program Improvements
September 23, 2013
2016 Capital Project Schematic Design ReportWappingers Central School District September 7, 2016R H I N E B E C K A R C H I T E C T U R E 4
Roy C Ketcham High School Site Plan
Feature Field and Track
Soccer
Soft Ball
Baseball
New Concession Stand and Toilet Rooms (Separate Project)
Practice
Scope of Work• Sports Improvements
Feature Field Improvements: New Artificial Turf, Lighting, Portable Bleachers Improve Soccer and Baseball Fields Re-sod Practice Football Field Add storage building for equipment
• Paving, Walks, and Drainage Improvements
New Paving
September 23, 2013
2016 Capital Project Schematic Design ReportWappingers Central School District September 7, 2016R H I N E B E C K A R C H I T E C T U R E 5
Roy C Ketcham High School
First FloorAuditorium
Band
Chorus
Scope of WorkArts Program Improvements Auditorium Upgrades, New Stage lighting, Acoustic Shell for Stage Band Room Improvements New Sound and Video Recording Systems and Production Labs Video monitors for Green Rooms Renovate Ceramic Classroom, Replace Art Room Sinks
Air Conditioning Upgrades:Main Office and Music Rooms
Second Floor
Video RecordingClassroom 227
Ceramics236
Video Production and Darkroom241
Main Office
September 23, 2013
2016 Capital Project Schematic Design ReportWappingers Central School District September 7, 2016R H I N E B E C K A R C H I T E C T U R E
Feature Field
Soccer/Soft Ball
To Baseball Field
Toilet Rooms Field House
Basketball
6
John Jay High School Site Plan
Sports Improvements Feature Field Improvements: New Artificial Turf, Upgrade lighting New
Scoreboard Regrade Baseball Field, new Sod at
Soccer and Baseball Fields
Re-sod Practice Football Field New Fencing Renovate Toilet Rooms, Field House Improvements Add Storage Building for Equipment Outside Basketball Court Upgrade
Paving, Walks, and Site Improvements
`
New Paving
New Paving
September 23, 2013
2016 Capital Project Schematic Design ReportWappingers Central School District September 7, 2016R H I N E B E C K A R C H I T E C T U R E 7
John Jay Senior High School
Scope of WorkArts Program Improvements Auditorium Upgrades New Stage Lighting Acoustic Shell for Stage Band and Chorus Room Improvements New Practice Rooms New Sound and Video Recording Systems and Production Labs Video monitors for Green Rooms Renovate 3D Classroom, Replace Art Room Sinks
Replace Ceiling Tiles in Corridors
Auditorium
Band
Chorus
3D CRVideo RecordingCR
Partial First Floor Plan
First Floor PlanNew Art CR Sinks
September 23, 2013
2016 Capital Project Schematic Design ReportWappingers Central School District September 7, 2016R H I N E B E C K A R C H I T E C T U R E 8
Van Wyck Junior High School
Replace Boys Gym Lockers
Accessible Toilet Rooms - 2nd floor
Replace Selected Corridor Lockers
First Floor
Second Floor
September 23, 2013
2016 Capital Project Schematic Design ReportWappingers Central School District September 7, 2016R H I N E B E C K A R C H I T E C T U R E 9
Wappingers Junior High School
Scope of Work• Elevator and Accessible Toilet Rooms• Wheelchair Lift• Replace Windows• Exterior Stair Repairs• Electrical Panel Replacements• Ventilation System Upgrades• Heating Upgrades• Stage Curtains
First Floor
New Elevator
Office
Second Floor
Second Floor Elevator PlanFirst Floor Similar
Accessible Toilet Rooms
Wheel Chair Lift
September 23, 2013
2016 Capital Project Schematic Design ReportWappingers Central School District September 7, 2016R H I N E B E C K A R C H I T E C T U R E 10
Brinckerhoff Elementary School
First Floor Plan
Fishkill Elementary School Scope of Work• Accessible Toilet Rooms• Exterior Stair Rails• Stage Curtains
Scope of Work• Exterior Caulking
at Ramps• Repoint Chimney• Replace Library and Office
Rooftop Units
First Floor PlanNew Roof Top AC units
September 23, 2013
2016 Capital Project Schematic Design ReportWappingers Central School District September 7, 2016R H I N E B E C K A R C H I T E C T U R E 11
Fishkill Plains Elementary School
First Floor Plan
Faculty Room and New Toilet Rooms
New Stage Curtains
New Accessible Toilet RoomsReconfigure Faculty Room
New Hand Rails
Accessible Toilet Rooms
Faculty Room280 SF
September 23, 2013
2016 Capital Project Schematic Design ReportWappingers Central School District September 7, 2016R H I N E B E C K A R C H I T E C T U R E 12
Gayhead Elementary School Site Plan
Scope of Site Work• Paving and Drainage Improvements• Exterior Stair Repairs• Reconstruct Damaged Sidewalks• Outside Basketball Court
Improvements• Remove Modulars
September 23, 2013
2016 Capital Project Schematic Design ReportWappingers Central School District September 7, 2016R H I N E B E C K A R C H I T E C T U R E 13
Gayhead Elementary School Scope of Interior Work• Elevator• Accessible Toilet Rooms
First Floor Plan
Lower Level Floor Plan
Lower Level Elevator
First FloorElevator
New Ramp
September 23, 2013
2016 Capital Project Schematic Design ReportWappingers Central School District September 7, 2016R H I N E B E C K A R C H I T E C T U R E 14
James Evans Elementary School Site Improvements
Scope of Site Work• Paving and Drainage Improvements• Sidewalk Replacement
New Paving
September 23, 2013
2016 Capital Project Schematic Design ReportWappingers Central School District September 7, 2016R H I N E B E C K A R C H I T E C T U R E 15
James Evans Elementary SchoolScope of Interior Work• Elevator and Accessible Toilet Rooms• Stair Rails• Access to Stage• New VCT in 1st Floor Corridors and Stairs
First Floor Plan
Lower Level Floor Plan
Partial First Floor Plan at Elevator
New ElevatorReconfigure Classroom, Office and OT/PT
New ElevatorReconfigure Art Classroom and Faculty Room
New Classroom
OT/PT
Office
Elevator
Accessible Toilet Rooms
Cafeteria
Gym
Office
Nurse
New VCT
September 23, 2013
2016 Capital Project Schematic Design ReportWappingers Central School District September 7, 2016R H I N E B E C K A R C H I T E C T U R E 16
Kinry Road Elementary School
Scope of Work• Paving, Walks, and Drainage
Improvements• Provide ADA Access to Stage• New Stage Curtains
New Paving
September 23, 2013
2016 Capital Project Schematic Design ReportWappingers Central School District September 7, 2016R H I N E B E C K A R C H I T E C T U R E 17
Myers Corners Elementary School Site Plan
Scope of Work• Paving and Walks Improvements• Outside Basketball Court
Improvements
September 23, 2013
2016 Capital Project Schematic Design ReportWappingers Central School District September 7, 2016R H I N E B E C K A R C H I T E C T U R E 18
Myers Corners Elementary School
Partial Second Floor Plan
AccessibleToilets and
Elevator
New Handrails at Interior Stairs
First Floor Plan
New Stage Curtains and
Access to Stage
Exterior Handrails
Partial First Floor Plan at Elevator
EntranceLobbyMain
Office
ElevatorAccessibleToilets
September 23, 2013
2016 Capital Project Schematic Design ReportWappingers Central School District September 7, 2016R H I N E B E C K A R C H I T E C T U R E 19
Oak Grove Elementary School
Drainage Improvements
Exterior Stair Replacement
Access to Stage andNew Stage Curtains
First Floor Plan
September 23, 2013
2016 Capital Project Schematic Design ReportWappingers Central School District September 7, 2016R H I N E B E C K A R C H I T E C T U R E 20
Sheafe Road Elementary School
Access to Stage
Accessible Toilet Rooms
Entrance Walk Replacement
First Floor Plan
New VCT
September 23, 2013
2016 Capital Project Schematic Design ReportWappingers Central School District September 7, 2016R H I N E B E C K A R C H I T E C T U R E 21
Vassar Road Elementary School
New Stage
Curtains
Exterior Ramp Replacement
Accessible Toilet Rooms
Paving and Side Walk Replacements
First Floor Plan
Paving Plan
September 23, 2013
2016 Capital Project Schematic Design ReportWappingers Central School District September 7, 2016R H I N E B E C K A R C H I T E C T U R E 22
Transportation Office at Wappingers Jr. HS
Scope of Work• Accessible Toilet Room• Exterior Stair Repairs• Window Replacement
September 23, 2013
2016 Capital Project Schematic Design ReportWappingers Central School District September 7, 2016R H I N E B E C K A R C H I T E C T U R E 23
Other Project Initiatives
Smart School Bond Act ProjectsDistrict Wide Hardware UpgradeDistrict Wide Security VestibulesDistrict Wide AC in Server Rooms
StudiesAir Conditioning for HS AuditoriumsAir Conditioning for John Jay HS CafeteriaSite Improvement Study for Myers Corners ESSite Improvement Study for John Jay HS
September 23, 2013
2016 Capital Project Schematic Design ReportWappingers Central School District September 7, 2016R H I N E B E C K A R C H I T E C T U R E 24
Project Schedule
Schematic Design 9/7/16Design Development 10/24/16Construction Documents Phase 1 11/15/16Phase 1 SED Review Complete 3/17Bid & Award Phase 1 4/17Construction Starts Phase 1 6/17
Construction Documents Phase 2 12/20/16Phase 2 SED Review Complete 6/17Bid & Award Phase 2 7/17Construction Starts Phase 2 TBD
(dependent on scope and school schedule)
September 23, 2013
2016 Capital Project Schematic Design ReportWappingers Central School District September 7, 2016R H I N E B E C K A R C H I T E C T U R E 25
Next Steps
Continue with the Design Development Phase
Establish Phase 1 Scope
Complete Phase 1 Construction Document Packages for Early Submission to SED
Confirm Construction Schedules
Questions or Comments?