wakerley quarry revised phasing sequence mineral ... · short wood ward bdy cd def drain wood...
TRANSCRIPT
N
300m 150m 0 300m
SCALE: 20mm = 150m (1:7,500 @ A3)
A3
AP
W4/16/601
Project
Title
Drawn:JG
Approved:
19/02/2016Date: 1:7,500 @ A3Scale:
Drawing number Paper size Rev.
-
REVISED PHASING SEQUENCE
WAKERLEY QUARRY
© Crown Copyright 2015. All rights reserved. Licence number 0100031673
6 LANCASTER WAY
ERMINE BUSINESS PARK
HUNTINGDON
CAMBS
PE29 6XU
TEL: 01480 498099 FAX: 01480 498077
WWW.MICKGEORGE.CO.UK
R
Mineral extraction
exclusion zone
71.3m
Def
Drain
Def
Track
Drain
Greenwood Sale
Short Wood
Ward BdyCD
Def
Drain
Wood Hollow
Path (um
)
Drain
Drain
Drain
Track
CD
CDDef
Wakerley Great Wood
Drain
Drain
Track
Track
Track
Trac
k
78.3m
77.4m
Laxton Wood
Long Wood
Track
Dra
in
Pat
h (u
m)
Dra
in
Track
Drain
86.0m
Track
78.6m
Trac
k
Pat
h (u
m)
Path (um)
Path (um)
Wakerley Great Wood
Track
Pat
h (u
m)
67.4m
68.9m
Drain
Pond
Track
Pond
Issues
75.0m
68.6m
61.3m
Baptist'sChurch
St John the
Path (um)
71.0m
73.5m
Track
72.8m
72.8m
Drain
49
40
00
E4
94
00
0E
49
45
00
E4
94
50
0E
49
50
00
E4
95
00
0E
49
55
00
E4
95
50
0E
297500N 297500N
298000N 298000N
298500N 298500N
299000N 299000N
0 250m 500m 750m100m
Phase A
Pear Tree House Dovaston Oswestry Shropshire SY10 8DP01691 682 773 www.bright-associates.co.uk
bright & associateslandscape and environmental consultants
Key
Application Consent Boundary
Operational areas
Sub-soil bund
Unworked areas
Restored land
Topsoil storage bund
Phase boundary
General movements of restorationmineral
General direction of quarryworking
Principal areas of existingwoodland
Advanced woodland planting
Access track
Existing mining consent
NORTH
Bright and Associates permission of the controller of Her Majesty's Stationery Office, ©Crown Copyright reserved. Licence number AR100019096 January 2016)
OS data provided by Mick George, Crown Copyright 2015,License Number0100316732016)
Bund 5 - topsoilscreening bund
Bund 4 - sub-soilstorage bund 1:4
outer slopes
Internal accesstrack
Advance plantedhedgerow
Existing youngwoodland
Sunken (1.5m) access track with crushedlimestone surface and new hedgerow on woodland
side to provide physical and visual barrier
Advance planted hedgerows on 2m high bundwith 1:5 outer slope and on woodland side 4mtarmac access road (sunk 1.5m) with 2 no. 7m
wide passing places before quarry extraction limit.
New 2m bund withhedge and 1:5
outer slopes foragricultural use
New tarmac haulroad sunk c.1.5m
Newhedge
Existingwoodland
Existing ground level
Illustrative cross-section of haulroad near entrance (Scale 1:400)
Bund 4a - sub-soilscreening bund 1:2
outer slopes
Plan 3a
Title:
WAKERLEY QUARRY
Client:
Project:
PHASE A
Plan 1:7,5005WK1050-D1v5
Drawn by: Scale:@A3CAD Ref: Version:
FS
Date:
January 2016
Drawing:
71.3m
Def
Drain
Def
Track
Drain
Greenwood Sale
Short Wood
Ward BdyCD
Def
Drain
Wood Hollow
Path (um
)
Drain
Drain
Drain
Track
CD
CDDef
Wakerley Great Wood
Drain
Drain
Track
Track
Track
Trac
k
78.3m
77.4m
Laxton Wood
Long Wood
Track
Dra
in
Pat
h (u
m)
Dra
in
Track
Drain
86.0m
Track
78.6m
Trac
k
Pat
h (u
m)
Path (um)
Path (um)
Wakerley Great Wood
Track
Pat
h (u
m)
67.4m
68.9m
Drain
Pond
Track
Pond
Issues
75.0m
68.6m
61.3m
Baptist'sChurch
St John the
Path (um)
71.0m
73.5m
Track
72.8m
72.8m
49
40
00
E4
94
00
0E
49
45
00
E4
94
50
0E
49
50
00
E4
95
00
0E
49
55
00
E4
95
50
0E
297500N 297500N
298000N 298000N
298500N 298500N
299000N 299000N
0 250m 500m 750m100m
Phase B
Pear Tree House Dovaston Oswestry Shropshire SY10 8DP01691 682 773 www.bright-associates.co.uk
bright & associateslandscape and environmental consultants
NORTH
Bright and Associates permission of the controller of Her Majesty's Stationery Office, ©Crown Copyright reserved. Licence number AR100019096 January 2016)
OS data provided by Mick George, Crown Copyright 2015,License Number0100316732016)
Bund 5 - topsoilscreening bund
Bund 4 -sub-soilstorage bund 1:4
outer slopes
Site accesstrack
Internal accesstrack
Key
Application Consent Boundary
Operational areas
Sub-soil bund
Unworked areas
Restored land
Topsoil storage bund
Phase boundary
General movements of restorationmineral
General direction of quarryworking
Principal areas of existingwoodland
Advanced woodland planting
Access track
Existing mining consent
Bund 4a - sub-soilscreening bund 1:2
outer slopes
Plan 4a
Title:
WAKERLEY QUARRY
Client:
Project:
PHASE B
Plan 1:7,5005WK1050-D1v5
Drawn by: Scale:@A3CAD Ref: Version:
FS
Date:
January 2016
Drawing:
71.3m
Def
CD
Drain
Def
Track
Drain
Greenwood Sale
Short Wood
Ward BdyCD
Def
Drain
Wood Hollow
Path (um
)
Drain
Drain
Track
CD
CDDef
Wakerley Great Wood
Drain
Drain
Track
Track
Track
Trac
k
78.3m
77.4m
Laxton Wood
Long Wood
Track
Dra
in
Pat
h (u
m)
Dra
in
Track
Drain
86.0m
Track
78.6m
Trac
k
Pat
h (u
m)
Path (um)
Path (um)
Wakerley Great Wood
Track
Pat
h (u
m)
67.4m
68.9m
Drain
Pond
Track
Pond
Issues
75.0m
68.6m
61.3m
Baptist'sChurch
St John the
Path (um)
71.0m
73.5m
Track
72.8m
72.8m
49
40
00
E4
94
00
0E
49
45
00
E4
94
50
0E
49
50
00
E4
95
00
0E
49
55
00
E4
95
50
0E
297500N 297500N
298000N 298000N
298500N 298500N
299000N 299000N
0 250m 500m 750m100m
Phase C
Pear Tree House Dovaston Oswestry Shropshire SY10 8DP01691 682 773 www.bright-associates.co.uk
bright & associateslandscape and environmental consultants
NORTH
Bright and Associates permission of the controller of Her Majesty's Stationery Office, ©Crown Copyright reserved. Licence number AR100019096 January 2016)
OS data provided by Mick George, Crown Copyright 2015,License Number0100316732016)
Bund 5 - topsoil screening bund -removed following the completion
of Phase B
Bund 7 - sub-soil storage bund - soil andoverburden used to form screening bund (5m
ht.) -1:4 inner slopes and 1:8 outer slopes
Site accesstrack
Bund 4 - sub-soil bund- removed following thecompletion of Phase B
Internal accesstrack
Key
Application Consent Boundary
Operational areas
Sub-soil bund
Unworked areas
Restored land
Topsoil storage bund
Phase boundary
General movements of restorationmineral
General direction of quarryworking
Principal areas of existingwoodland
Advanced woodland planting
Access track
Existing mining consent
Bund 4a - sub-soilscreening bund -
removed followingthe completion of
Phase B
Plan 5a
Title:
WAKERLEY QUARRY
Client:
Project:
PHASE C
Plan 1:7,5005WK1050-D1v5
Drawn by: Scale:@A3CAD Ref: Version:
FS
Date:
January 2016
Drawing:
71.3m
Def
Def
Track
Drain
Greenwood Sale
Short Wood
Ward BdyCD
Def
Drain
Wood Hollow
Path (um
)
Drain
Drain
Track
CD
CDDef
Wakerley Great Wood
Drain
Drain
Track
Track
Track
Trac
k
78.3m
77.4m
Laxton Wood
Long Wood
Track
Dra
in
Pat
h (u
m)
Dra
in
Track
Drain
86.0m
Track
78.6m
Trac
k
Pat
h (u
m)
Path (um)
Path (um)
Wakerley Great Wood
Track
Pat
h (u
m)
67.4m
68.9m
Drain
Pond
Track
Pond
Issues
75.0m
68.6m
61.3m
Baptist'sChurch
St John the
Path (um)
71.0m
73.5m
Track
72.8m
72.8m
49
40
00
E4
94
00
0E
49
45
00
E4
94
50
0E
49
50
00
E4
95
00
0E
49
55
00
E4
95
50
0E
297500N 297500N
298000N 298000N
298500N 298500N
299000N 299000N
0 250m 500m 750m100m
Phase D
Pear Tree House Dovaston Oswestry Shropshire SY10 8DP01691 682 773 www.bright-associates.co.uk
bright & associateslandscape and environmental consultants
NORTH
Bright and Associates permission of the controller of Her Majesty's Stationery Office, ©Crown Copyright reserved. Licence number AR100019096 January 2016)
OS data provided by Mick George, Crown Copyright 2015,License Number0100316732016)
Bund 8, constructed and joined into bund7 (5m ht.) with 1:4 internal slopes and 1:8
outer slopes -sub-soil storage bund
Site accesstrack
Bund 4, restored
Key
Application Consent Boundary
Operational areas
Sub-soil bund
Unworked areas
Restored land
Topsoil storage bund
Phase boundary
General movements of restorationmineral
General direction of quarryworking
Principal areas of existingwoodland
Advanced woodland planting
Access track
Existing mining consent
Bund 4a - restored
Plan 6a
Title:
WAKERLEY QUARRY
Client:
Project:
PHASE D
Plan 1:7,5005WK1050-D1v5
Drawn by: Scale:@A3CAD Ref: Version:
FS
Date:
January 2016
Drawing:
71.3m
Def
Def
Track
Drain
Greenwood Sale
Short Wood
Ward BdyCD
Def
Drain
Wood Hollow
Path (um
)
Drain
Drain
Track
CD
CDDef
Wakerley Great Wood
Drain
Drain
Track
Track
Track
Trac
k
78.3m
77.4m
Laxton Wood
Long Wood
Track
Dra
in
Pat
h (u
m)
Dra
in
Track
Drain
86.0m
Track
78.6m
Trac
k
Pat
h (u
m)
Path (um)
Path (um)
Wakerley Great Wood
Track
Pat
h (u
m)
67.4m
68.9m
Drain
Pond
Track
Pond
Issues
75.0m
68.6m
61.3m
Baptist'sChurch
St John the
Path (um)
71.0m
73.5m
Track
72.8m
72.8m
49
40
00
E4
94
00
0E
49
45
00
E4
94
50
0E
49
50
00
E4
95
00
0E
49
55
00
E4
95
50
0E
297500N 297500N
298000N 298000N
298500N 298500N
299000N 299000N
0 250m 500m 750m100m
Phase E
Pear Tree House Dovaston Oswestry Shropshire SY10 8DP01691 682 773 www.bright-associates.co.uk
bright & associateslandscape and environmental consultants
NORTH
Bright and Associates permission of the controller of Her Majesty's Stationery Office, ©Crown Copyright reserved. Licence number AR100019096 January 2016)
OS data provided by Mick George, Crown Copyright 2015,License Number0100316732016)
Bund 9, constructed and linked to bund8- with 1:2 inner slopes and 1:5 outer
slopes - sub-soil storage bund
Site accesstrack
Bund 7 - progressively removedand used for restoration andformation of bund 9 - sub-soil
storage bund
Bund 4, restored
Key
Application Consent Boundary
Operational areas
Sub-soil bund
Unworked areas
Restored land
Topsoil storage bund
Phase boundary
General movements of restorationmineral
General direction of quarryworking
Principal areas of existingwoodland
Advanced woodland planting
Access track
Existing mining consent
Remaining material in bunds 7,8 and 9used for final restoration of Phases D
and E
Bund 4a - restored
Plan 7a
Title:
WAKERLEY QUARRY
Client:
Project:
PHASE E
Plan 1:7,5005WK1050-D1v5
Drawn by: Scale:@A3CAD Ref: Version:
FS
Date:
January 2016
Drawing: