wakerley quarry revised phasing sequence mineral ... · short wood ward bdy cd def drain wood...

6
N 300m 150m 0 300m SCALE: 20mm = 150m (1:7,500 @ A3) A3 AP W4/16/601 Project Title Drawn: JG Approved: 19/02/2016 Date: 1:7,500 @ A3 Scale: Drawing number Paper size Rev. - REVISED PHASING SEQUENCE WAKERLEY QUARRY &URZQ Copyright 2015. All rights reserved. Licence number 0100031673 6 LANCASTER WAY ERMINE BUSINESS PARK HUNTINGDON CAMBS PE29 6XU TEL: 01480 498099 FAX: 01480 498077 WWW.MICKGEORGE.CO.UK R Mineral extraction exclusion zone

Upload: others

Post on 05-Aug-2020

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: WAKERLEY QUARRY REVISED PHASING SEQUENCE Mineral ... · Short Wood Ward Bdy CD Def Drain Wood Hollow Path (um) Drain Drain Track CD CD Def Wakerley Great Wood Drain Drain Track Track

N

300m 150m 0 300m

SCALE: 20mm = 150m (1:7,500 @ A3)

A3

AP

W4/16/601

Project

Title

Drawn:JG

Approved:

19/02/2016Date: 1:7,500 @ A3Scale:

Drawing number Paper size Rev.

-

REVISED PHASING SEQUENCE

WAKERLEY QUARRY

© Crown Copyright 2015. All rights reserved. Licence number 0100031673

6 LANCASTER WAY

ERMINE BUSINESS PARK

HUNTINGDON

CAMBS

PE29 6XU

TEL: 01480 498099 FAX: 01480 498077

WWW.MICKGEORGE.CO.UK

R

Mineral extraction

exclusion zone

Page 2: WAKERLEY QUARRY REVISED PHASING SEQUENCE Mineral ... · Short Wood Ward Bdy CD Def Drain Wood Hollow Path (um) Drain Drain Track CD CD Def Wakerley Great Wood Drain Drain Track Track

71.3m

Def

Drain

Def

Track

Drain

Greenwood Sale

Short Wood

Ward BdyCD

Def

Drain

Wood Hollow

Path (um

)

Drain

Drain

Drain

Track

CD

CDDef

Wakerley Great Wood

Drain

Drain

Track

Track

Track

Trac

k

78.3m

77.4m

Laxton Wood

Long Wood

Track

Dra

in

Pat

h (u

m)

Dra

in

Track

Drain

86.0m

Track

78.6m

Trac

k

Pat

h (u

m)

Path (um)

Path (um)

Wakerley Great Wood

Track

Pat

h (u

m)

67.4m

68.9m

Drain

Pond

Track

Pond

Issues

75.0m

68.6m

61.3m

Baptist'sChurch

St John the

Path (um)

71.0m

73.5m

Track

72.8m

72.8m

Drain

49

40

00

E4

94

00

0E

49

45

00

E4

94

50

0E

49

50

00

E4

95

00

0E

49

55

00

E4

95

50

0E

297500N 297500N

298000N 298000N

298500N 298500N

299000N 299000N

0 250m 500m 750m100m

Phase A

Pear Tree House Dovaston Oswestry Shropshire SY10 8DP01691 682 773 www.bright-associates.co.uk

bright & associateslandscape and environmental consultants

Key

Application Consent Boundary

Operational areas

Sub-soil bund

Unworked areas

Restored land

Topsoil storage bund

Phase boundary

General movements of restorationmineral

General direction of quarryworking

Principal areas of existingwoodland

Advanced woodland planting

Access track

Existing mining consent

NORTH

Bright and Associates permission of the controller of Her Majesty's Stationery Office, ©Crown Copyright reserved. Licence number AR100019096 January 2016)

OS data provided by Mick George, Crown Copyright 2015,License Number0100316732016)

Bund 5 - topsoilscreening bund

Bund 4 - sub-soilstorage bund 1:4

outer slopes

Internal accesstrack

Advance plantedhedgerow

Existing youngwoodland

Sunken (1.5m) access track with crushedlimestone surface and new hedgerow on woodland

side to provide physical and visual barrier

Advance planted hedgerows on 2m high bundwith 1:5 outer slope and on woodland side 4mtarmac access road (sunk 1.5m) with 2 no. 7m

wide passing places before quarry extraction limit.

New 2m bund withhedge and 1:5

outer slopes foragricultural use

New tarmac haulroad sunk c.1.5m

Newhedge

Existingwoodland

Existing ground level

Illustrative cross-section of haulroad near entrance (Scale 1:400)

Bund 4a - sub-soilscreening bund 1:2

outer slopes

Plan 3a

Title:

WAKERLEY QUARRY

Client:

Project:

PHASE A

Plan 1:7,5005WK1050-D1v5

Drawn by: Scale:@A3CAD Ref: Version:

FS

Date:

January 2016

Drawing:

Page 3: WAKERLEY QUARRY REVISED PHASING SEQUENCE Mineral ... · Short Wood Ward Bdy CD Def Drain Wood Hollow Path (um) Drain Drain Track CD CD Def Wakerley Great Wood Drain Drain Track Track

71.3m

Def

Drain

Def

Track

Drain

Greenwood Sale

Short Wood

Ward BdyCD

Def

Drain

Wood Hollow

Path (um

)

Drain

Drain

Drain

Track

CD

CDDef

Wakerley Great Wood

Drain

Drain

Track

Track

Track

Trac

k

78.3m

77.4m

Laxton Wood

Long Wood

Track

Dra

in

Pat

h (u

m)

Dra

in

Track

Drain

86.0m

Track

78.6m

Trac

k

Pat

h (u

m)

Path (um)

Path (um)

Wakerley Great Wood

Track

Pat

h (u

m)

67.4m

68.9m

Drain

Pond

Track

Pond

Issues

75.0m

68.6m

61.3m

Baptist'sChurch

St John the

Path (um)

71.0m

73.5m

Track

72.8m

72.8m

49

40

00

E4

94

00

0E

49

45

00

E4

94

50

0E

49

50

00

E4

95

00

0E

49

55

00

E4

95

50

0E

297500N 297500N

298000N 298000N

298500N 298500N

299000N 299000N

0 250m 500m 750m100m

Phase B

Pear Tree House Dovaston Oswestry Shropshire SY10 8DP01691 682 773 www.bright-associates.co.uk

bright & associateslandscape and environmental consultants

NORTH

Bright and Associates permission of the controller of Her Majesty's Stationery Office, ©Crown Copyright reserved. Licence number AR100019096 January 2016)

OS data provided by Mick George, Crown Copyright 2015,License Number0100316732016)

Bund 5 - topsoilscreening bund

Bund 4 -sub-soilstorage bund 1:4

outer slopes

Site accesstrack

Internal accesstrack

Key

Application Consent Boundary

Operational areas

Sub-soil bund

Unworked areas

Restored land

Topsoil storage bund

Phase boundary

General movements of restorationmineral

General direction of quarryworking

Principal areas of existingwoodland

Advanced woodland planting

Access track

Existing mining consent

Bund 4a - sub-soilscreening bund 1:2

outer slopes

Plan 4a

Title:

WAKERLEY QUARRY

Client:

Project:

PHASE B

Plan 1:7,5005WK1050-D1v5

Drawn by: Scale:@A3CAD Ref: Version:

FS

Date:

January 2016

Drawing:

Page 4: WAKERLEY QUARRY REVISED PHASING SEQUENCE Mineral ... · Short Wood Ward Bdy CD Def Drain Wood Hollow Path (um) Drain Drain Track CD CD Def Wakerley Great Wood Drain Drain Track Track

71.3m

Def

CD

Drain

Def

Track

Drain

Greenwood Sale

Short Wood

Ward BdyCD

Def

Drain

Wood Hollow

Path (um

)

Drain

Drain

Track

CD

CDDef

Wakerley Great Wood

Drain

Drain

Track

Track

Track

Trac

k

78.3m

77.4m

Laxton Wood

Long Wood

Track

Dra

in

Pat

h (u

m)

Dra

in

Track

Drain

86.0m

Track

78.6m

Trac

k

Pat

h (u

m)

Path (um)

Path (um)

Wakerley Great Wood

Track

Pat

h (u

m)

67.4m

68.9m

Drain

Pond

Track

Pond

Issues

75.0m

68.6m

61.3m

Baptist'sChurch

St John the

Path (um)

71.0m

73.5m

Track

72.8m

72.8m

49

40

00

E4

94

00

0E

49

45

00

E4

94

50

0E

49

50

00

E4

95

00

0E

49

55

00

E4

95

50

0E

297500N 297500N

298000N 298000N

298500N 298500N

299000N 299000N

0 250m 500m 750m100m

Phase C

Pear Tree House Dovaston Oswestry Shropshire SY10 8DP01691 682 773 www.bright-associates.co.uk

bright & associateslandscape and environmental consultants

NORTH

Bright and Associates permission of the controller of Her Majesty's Stationery Office, ©Crown Copyright reserved. Licence number AR100019096 January 2016)

OS data provided by Mick George, Crown Copyright 2015,License Number0100316732016)

Bund 5 - topsoil screening bund -removed following the completion

of Phase B

Bund 7 - sub-soil storage bund - soil andoverburden used to form screening bund (5m

ht.) -1:4 inner slopes and 1:8 outer slopes

Site accesstrack

Bund 4 - sub-soil bund- removed following thecompletion of Phase B

Internal accesstrack

Key

Application Consent Boundary

Operational areas

Sub-soil bund

Unworked areas

Restored land

Topsoil storage bund

Phase boundary

General movements of restorationmineral

General direction of quarryworking

Principal areas of existingwoodland

Advanced woodland planting

Access track

Existing mining consent

Bund 4a - sub-soilscreening bund -

removed followingthe completion of

Phase B

Plan 5a

Title:

WAKERLEY QUARRY

Client:

Project:

PHASE C

Plan 1:7,5005WK1050-D1v5

Drawn by: Scale:@A3CAD Ref: Version:

FS

Date:

January 2016

Drawing:

Page 5: WAKERLEY QUARRY REVISED PHASING SEQUENCE Mineral ... · Short Wood Ward Bdy CD Def Drain Wood Hollow Path (um) Drain Drain Track CD CD Def Wakerley Great Wood Drain Drain Track Track

71.3m

Def

Def

Track

Drain

Greenwood Sale

Short Wood

Ward BdyCD

Def

Drain

Wood Hollow

Path (um

)

Drain

Drain

Track

CD

CDDef

Wakerley Great Wood

Drain

Drain

Track

Track

Track

Trac

k

78.3m

77.4m

Laxton Wood

Long Wood

Track

Dra

in

Pat

h (u

m)

Dra

in

Track

Drain

86.0m

Track

78.6m

Trac

k

Pat

h (u

m)

Path (um)

Path (um)

Wakerley Great Wood

Track

Pat

h (u

m)

67.4m

68.9m

Drain

Pond

Track

Pond

Issues

75.0m

68.6m

61.3m

Baptist'sChurch

St John the

Path (um)

71.0m

73.5m

Track

72.8m

72.8m

49

40

00

E4

94

00

0E

49

45

00

E4

94

50

0E

49

50

00

E4

95

00

0E

49

55

00

E4

95

50

0E

297500N 297500N

298000N 298000N

298500N 298500N

299000N 299000N

0 250m 500m 750m100m

Phase D

Pear Tree House Dovaston Oswestry Shropshire SY10 8DP01691 682 773 www.bright-associates.co.uk

bright & associateslandscape and environmental consultants

NORTH

Bright and Associates permission of the controller of Her Majesty's Stationery Office, ©Crown Copyright reserved. Licence number AR100019096 January 2016)

OS data provided by Mick George, Crown Copyright 2015,License Number0100316732016)

Bund 8, constructed and joined into bund7 (5m ht.) with 1:4 internal slopes and 1:8

outer slopes -sub-soil storage bund

Site accesstrack

Bund 4, restored

Key

Application Consent Boundary

Operational areas

Sub-soil bund

Unworked areas

Restored land

Topsoil storage bund

Phase boundary

General movements of restorationmineral

General direction of quarryworking

Principal areas of existingwoodland

Advanced woodland planting

Access track

Existing mining consent

Bund 4a - restored

Plan 6a

Title:

WAKERLEY QUARRY

Client:

Project:

PHASE D

Plan 1:7,5005WK1050-D1v5

Drawn by: Scale:@A3CAD Ref: Version:

FS

Date:

January 2016

Drawing:

Page 6: WAKERLEY QUARRY REVISED PHASING SEQUENCE Mineral ... · Short Wood Ward Bdy CD Def Drain Wood Hollow Path (um) Drain Drain Track CD CD Def Wakerley Great Wood Drain Drain Track Track

71.3m

Def

Def

Track

Drain

Greenwood Sale

Short Wood

Ward BdyCD

Def

Drain

Wood Hollow

Path (um

)

Drain

Drain

Track

CD

CDDef

Wakerley Great Wood

Drain

Drain

Track

Track

Track

Trac

k

78.3m

77.4m

Laxton Wood

Long Wood

Track

Dra

in

Pat

h (u

m)

Dra

in

Track

Drain

86.0m

Track

78.6m

Trac

k

Pat

h (u

m)

Path (um)

Path (um)

Wakerley Great Wood

Track

Pat

h (u

m)

67.4m

68.9m

Drain

Pond

Track

Pond

Issues

75.0m

68.6m

61.3m

Baptist'sChurch

St John the

Path (um)

71.0m

73.5m

Track

72.8m

72.8m

49

40

00

E4

94

00

0E

49

45

00

E4

94

50

0E

49

50

00

E4

95

00

0E

49

55

00

E4

95

50

0E

297500N 297500N

298000N 298000N

298500N 298500N

299000N 299000N

0 250m 500m 750m100m

Phase E

Pear Tree House Dovaston Oswestry Shropshire SY10 8DP01691 682 773 www.bright-associates.co.uk

bright & associateslandscape and environmental consultants

NORTH

Bright and Associates permission of the controller of Her Majesty's Stationery Office, ©Crown Copyright reserved. Licence number AR100019096 January 2016)

OS data provided by Mick George, Crown Copyright 2015,License Number0100316732016)

Bund 9, constructed and linked to bund8- with 1:2 inner slopes and 1:5 outer

slopes - sub-soil storage bund

Site accesstrack

Bund 7 - progressively removedand used for restoration andformation of bund 9 - sub-soil

storage bund

Bund 4, restored

Key

Application Consent Boundary

Operational areas

Sub-soil bund

Unworked areas

Restored land

Topsoil storage bund

Phase boundary

General movements of restorationmineral

General direction of quarryworking

Principal areas of existingwoodland

Advanced woodland planting

Access track

Existing mining consent

Remaining material in bunds 7,8 and 9used for final restoration of Phases D

and E

Bund 4a - restored

Plan 7a

Title:

WAKERLEY QUARRY

Client:

Project:

PHASE E

Plan 1:7,5005WK1050-D1v5

Drawn by: Scale:@A3CAD Ref: Version:

FS

Date:

January 2016

Drawing: