w650 wind generator protection system

27
W650 Wind Generator Protection System System Protection & Improved Operational Uptime

Upload: andrew-gillespie

Post on 30-Dec-2015

79 views

Category:

Documents


2 download

DESCRIPTION

W650 Wind Generator Protection System. System Protection & Improved Operational Uptime. Why W650?. Protection to Provide Backup to Wind Turbine Controls & Excitation Better Wind Farm Economics by Improving System Uptime & Time to Restoration - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: W650 Wind  Generator  Protection System

W650 Wind Generator Protection System

System Protection & Improved Operational

Uptime

Page 2: W650 Wind  Generator  Protection System

2 /GE Multilin

2005

Why W650?Protection to Provide Backup to Wind Turbine Controls & Excitation

Better Wind Farm Economics by Improving System Uptime & Time to Restoration• Address Lack of Wind Turbine &

System Event DiagnosticsDiagnostic in W650 can tell what happened, why, and when … to the mSec

Page 3: W650 Wind  Generator  Protection System

3 /GE Multilin

2005

What is the W650?

Part of an Overall Protection System … but can be used as a stand alone protective device

Overlay to Existing Wind Turbine & Farm Control by Providing Unit Protection, Wind Farm System Protection, Unit, & System Diagnostics Substation

Protection Controller

W650 1 in Wind Turbine

W650 2 in Wind Turbine

W650 n in Wind Turbine

Windfarm Substation Protection Controller sends Trip and Block Commands to and From W650’s

W650’s can also send trip and block commands to each other

Page 4: W650 Wind  Generator  Protection System

4 /GE Multilin

2005

Some Definitions …

Page 5: W650 Wind  Generator  Protection System

5 /GE Multilin

2005

Definition of Larger Wind Farm System (Units > 1MW on a Coordinated Farm)

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

Utility (e.g. 33kV)Tie Breaker

Step Up TransformerBus Breaker

Windfarm Substation

Bus

Collector Feeder Breakers

Collector Bus

Transformer Breaker

Line

Page 6: W650 Wind  Generator  Protection System

6 /GE Multilin

2005

Definitions with Wind Turbine

WTG

GeneratorExcitation

Transformer

Wind Tower Breaker

Generator Output Voltage (e.g. - 575V or 3kV … depends on MW size of Generator)

Collector System Voltage (e.g. - 3kV or 13.8 … depends on MW size of Generator & Presence Transformer)

Wind Tower

Page 7: W650 Wind  Generator  Protection System

7 /GE Multilin

2005

Sources of Faults

Inside the Wind Turbine• Tower Cable• Transformer Faults• Wiring Inside the

Electrical Distribution Panel

• Wind Turbine Generator• Excitation System Fault

On the Wind Farm• Collector Bus Cable Fault• Step Up Transformer• Substation Bus Structure

Fault• Feeder Fault Impact on

Stability

External to the Wind Farm• Voltage Stability• Reverse Power Flow

Page 8: W650 Wind  Generator  Protection System

8 /GE Multilin

2005

How Faults Manifest Themselves

Inside the Wind Turbine• IOC, TOC, Ground Fault

On the Wind Farm• Voltage/Current Unbalance

External to the Wind Farm

•IOC, TOC, Voltage Stability

Page 9: W650 Wind  Generator  Protection System

9 /GE Multilin

2005

Subjects for Discussion … Gaps Today1. No backup Protection in Wind

Turbines/Towers … Need for a System Wide Protective Application apart from Control

2. Lack of Coordinated Event Record & Oscillography make it Difficult to Determine What Happened & When, resulting in Prolonged Time to Return to Service

3. Lack of Overall Coordinated Wind Farm System Protection can result in Lack of Operational Selectivity and Reduced System Uptime

Page 10: W650 Wind  Generator  Protection System

10 /GE Multilin

2005

What does the W650 do ?

Page 11: W650 Wind  Generator  Protection System

11 /GE Multilin

2005

W650 Wind Turbine Protection CapabilitiesW650 for Protection,

Metering, and Coordination to Upstream Substation Protection

Communications to GE Wind Turbine Controller via CANopen protocol

•Available Protection – Under/overvoltage, Under/overfrequency, voltage unbalance, directional over-current, zero sequence overvoltage, aux voltage, and breaker failure

Configurable Display & LED’s

Keypad & ShuttleFront Port Upload & Download

Page 12: W650 Wind  Generator  Protection System

12 /GE Multilin

2005

W650 Hardware Construction

The W650 features advantage such as:• Modular hardware architecture:

Main CPU board with two plug and play comm boards

Universal magnetic (CTs & VTs) module

Programmable I/O module Single or redundant power

supply Front board: HMI ( Graphical or

alphanumerical display, LEDs, RS232)

• Modern and open communication protocols for easy integration

Page 13: W650 Wind  Generator  Protection System

13 /GE Multilin

2005

W650 Wind Turbine Protection (con’t)• Metering – current (+/- 0.5%),

voltage (+/- 1%), power(+/-1%), energy (1%), power factor (0.02)

• Event capture – up to 479 events time stamped to 1mSec

• Oscillography – Up to 20 oscillography files programmable from 4-64 samples/cycle, 1MB of data, analog and digital signals. Retrievable via front panel or system communications.

• Monitoring – 4x20 character display … optional graphic display …

Page 14: W650 Wind  Generator  Protection System

14 /GE Multilin

2005

W650 Wind Turbine Protection (con’t)•Control – programmable unit control

•Communications – IEC61850 communications to peer W650’s and Substation Protection Relays

Substation Protection Controller

W650 1 in Wind Turbine

W650 2 in Wind Turbine

W650 n in Wind Turbine

IEC61850 Communications Protocol Uses Ethernet to Send Block and Trip Commands from WTG Relays to Substation Controller as well as via Peer to Peer

Page 15: W650 Wind  Generator  Protection System

15 /GE Multilin

2005

W650 Wiring

Page 16: W650 Wind  Generator  Protection System

16 /GE Multilin

2005

How does the W650 Integrate into the Entire Wind Farm?

Page 17: W650 Wind  Generator  Protection System

17 /GE Multilin

2005

Examples of Wind Farm Protection Requirements1. Open Collector Breakers Upon Fault in Cable to

Host Utility– All Wind Turbines, Selective, or Entire Collector

2. Open Collector Breakers Upon Transformer Fault– All Wind Turbines, Selective, or Entire Collector

3. Collector Bus Cable fault Requires Selective Trip Wind Turbine Breakers

4. Issues in a Specific Wind Turbine to Prompt Block Command to Other Wind Turbines

Page 18: W650 Wind  Generator  Protection System

18 /GE Multilin

2005

Electrical Protection TopologyInterconnect Protection

GSU Protection

Bus Protection

Feeder Protection

Feeder Protection

Feeder Protection

Feeder Protection

Turb. Prot.

Turb. Prot.

Turb. Prot.

Turb. Prot.

Turb. Prot.

Turb. Prot.

Turb. Prot.

Turb. Prot.

Turb. Prot.

Turb. Prot.

Turb. Prot.

Turb. Prot.

Page 19: W650 Wind  Generator  Protection System

19 /GE Multilin

2005

Network TopologyInterconnect Protection

GSU Protection

Bus Protection

Feeder Protection

Feeder Protection

Feeder Protection

Feeder Protection

Turb. Prot.

Turb. Prot.

Turb. Prot.

EnetSwitch

EnetSwitch

EnetSwitch

Ethernet Switch

Feeder 2 Feeder 3 Feeder 4

•Fault Tolerant Ring

•Support WTG outside a break in the ring

•Requires 2 Fiber Strands

•Worst case 1 micro Sec Delay by Switch

•Unmanaged Switch in WTG

•Managed Switch w/VLAN in Substation

Protection System Overlays Parallel Control System

Page 20: W650 Wind  Generator  Protection System

20 /GE Multilin

2005

Alternate Network Topology (if 3rd Party Wind Farm Protection is Used)

Sub controller

Turb. Prot.

Turb. Prot.

Turb. Prot.

EnetSwitch

EnetSwitch

EnetSwitch

Ethernet Switch

Feeder 2 Feeder 3 Feeder 4

Other Supplier’s Protection

Hardwired IO

Page 21: W650 Wind  Generator  Protection System

21 /GE Multilin

2005

Transfer Trip Capabilities of W650

1. send a “block” or “transfer trip” from the protection offering in the Wind Farm substation protection (GE or other) to entire collector bus or individual wind turbine

2. “block” or “transfer trip” command from individual wind turbine to substation protection

Page 22: W650 Wind  Generator  Protection System

22 /GE Multilin

2005

Transfer Trip Example

1. Transformer Protection detects Differential Fault and Initiates Transfer Trip Command– Transformer Breaker Opens

2. Collector Bus W650’s Receive Transfer Trip Command and Issue Command to Trip Breaker

3. Collector Bus and WTG’s Isolated

Page 23: W650 Wind  Generator  Protection System

23 /GE Multilin

2005

Economics

• Yellow Items Represent Customer Specific Variables

• Payback Calculated on Improved System Operations

• Equipment/Personnel Damage Avoidance Not Included

Wind Farm Energy Sell Price ($/kWH) 0.08$

Size of Individual WTG (MW) 1.5

Size in kW 1500

Downtime of 1 WTG (hours) 48

Lost Revenue of 1 WTG 5,760.00$

% Improvement of W650 Diagnostics 50%

$ to Operating Bottom Line for 1 occurance 2,880.00$

Number of Windturbines in Windfarm 16

Cost of W650 system 24,660.00$ Estimated # of WTG Outages/Year 24

Savings to W650 System 69,120.00$

Payback Period (years) 0.36

Page 24: W650 Wind  Generator  Protection System

24 /GE Multilin

2005

How do I get more information?

Page 25: W650 Wind  Generator  Protection System

25 /GE Multilin

2005

Support Resources Available from GE Multilin• Available On-line at www.gemultilin.com

• Product Cut Sheet

• Product Presentation

• Whitepaper on Transfer Trip Technologies and Benefits

• Guideform Specification to Assist Consultants and EPC’s

• Wiring/Installation Information

• Pricing and Ordering Information Available On-Line

Page 26: W650 Wind  Generator  Protection System

26 /GE Multilin

2005

Ordering Information

Greenfield Installations•Specify to Wind Turbine OEM & Wind Farm EPC•Request to Include with Wind Farm Substation and Wind Turbine’s•Field Integration Services Available

Retrofit Bill of Material•1 W650 per Wind Turbine•1 Ethernet Switch per Wind Turbine (GE Multilin model ML600)•1 Ethernet Switch in Wind Farm Substation (GE Multilin model ML2400)•Substation Protection Controller (GE Multilin C30)

Page 27: W650 Wind  Generator  Protection System

27 /GE Multilin

2005

Who to Contact for Questions

•GE Multilin – John Garrity, 518.877.8860, [email protected]

•GE PSEC – tbd

•GE Wind - tbd