VTRANS RAIL BRIDGE MANAGEMENT PROGRAM prepared for the HOUSE TRANSPORTATION COMMITTEE on WEDNESDAY JANUARY 10 TH , 2018 BY Dan Delabruere Erin Charbonneau Rail & Aviation Bureau Director Rail Bridge Management Engineer CONTENTS p. 1 ...............................................................Program Overview p. 2 .................................................................Subdivision Map p. 3 ...................................................................VTR Northern p. 4 ..................................................................VTR “Southern” p. 5 ................................................................. Green Mountain p. 6 ................................................................Connecticut River p. 7 ...............................................................Montpelier & Barre p. 8 ................................................... Load Capacity & Looking Ahead p. 9 .............................................................. Load Capacity Map

Upload: duongkien

Post on 12-Jun-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: VTRANS RAIL BRIDGE MANAGEMENT PROGRAM - … AREMA code has changed, an updated analysis may be required as prescribed by a railroad bridge engineer. 19 bridges are scheduled to have

 

 

VTRANS RAIL BRIDGE 

MANAGEMENT PROGRAM  prepared for the 

HOUSE TRANSPORTATION COMMITTEE 

on 

WEDNESDAY JANUARY 10TH, 2018 

BY 

Dan Delabruere  Erin Charbonneau 

Rail & Aviation Bureau Director  Rail Bridge Management Engineer 

 

CONTENTS p. 1   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Program Overview 

p. 2   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Subdivision Map 

p. 3   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .VTR Northern 

p. 4  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .VTR “Southern” 

p. 5   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Green Mountain 

p. 6   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Connecticut River 

p. 7   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Montpelier & Barre 

p. 8  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Load Capacity & Looking Ahead 

p. 9   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Load Capacity Map 

Page 2: VTRANS RAIL BRIDGE MANAGEMENT PROGRAM - … AREMA code has changed, an updated analysis may be required as prescribed by a railroad bridge engineer. 19 bridges are scheduled to have

 

 

RAIL  BRIDGE  MANAGEMENT  PROGRAM  

The FRA established Federal safety requirements for railroad bridges in 2010 under 49 CFR Part 237.  VTrans 

established a Rail Bridge Management Program in September 2012 in accordance with these regulations.  The 

program is responsible for collecting and maintaining an inventory of rail bridges, their condition, and making 

recommendations on repairs, strengthening or replacement of components or entire structures.  These 

regulations also mandate that annual safety inspections are performed for each bridge, and that all bridges 

have an initial determination of load capacity completed by September 2017, which has been completed. 

There are 216 rail bridges on State‐owned property. The State is responsible for 174 of those bridges, with the 

railroad operator responsible for the remaining 42 bridges through existing lease agreements.  

STATEWIDE BRIDGE INVENTORY & LOAD CAPACITY 

Summary: # Spans  1  2  3  4  5  6  7  8  9  10  11  Total 

# Bridges  172  26  9  3  1  2  1  1  0  0  1  216 

 

STATEWIDE INSPECTION CONDITION RATING 

 

Key: 1 2 3 4 5 6 7 8 9 N H

Failure Imminent Critical Serious Poor Fair Satisfactory Good Very Good Excellent Not Applicable Hidden

30 39 3561

9

1311 9

9

VTRNorthern

VTRSouthern

GreenMountain

Conn.River

Montpelier& Barre

Bridge Responsibility

STATE - 174 RAILROAD - 42

<286K40

>286K134

State Bridge Load Capacity

1022

50

74

2020 0 8

22

52

72

222 0 013 16

47

77

17 1 3

1 2 3 4 5 6 7 8 9 N H

Target: 4+2015 - 178 Bridges

2016 - 178 Bridges

2017 - 174 Bridges

Based on 174 state‐responsible bridges 

Page 1

Page 3: VTRANS RAIL BRIDGE MANAGEMENT PROGRAM - … AREMA code has changed, an updated analysis may be required as prescribed by a railroad bridge engineer. 19 bridges are scheduled to have

!!

!!

!!

!!

!!

!!

""

!!

!!

""

!!

!!

""

!!

!!

""

!!

!!

""

!!

!!

!!

""

""

!!

!!

!!

""

""

!!

!!

!!

""

!!

!!

!!

!!

!!

""

!!

!!

!!

""

""

!!

!!

!!

!!

!!

!!

""

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

""

!!!!

!!

!!

!!

""

!!

!!

""

""

!!

!!

!!

!!

!!

!!

""

!!

""

!!

!!

""

!!

""

!!

""

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

""

!!

!!

!!

""

!!

!!

""

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

""

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

""

!!

!!

!!

!!

!!

""

""

!!

!!

""

""

!!

!!

!!

!!

""

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

""

!!

!!

!!

!!

!!

!!

!!

!!

""

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

""

""

!!

!!

!!

!!

""

!!

!!

!!

!!

""

!!

!!

""

""

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

""

!!

!!

!!

VTR NorthernSubdivision43 Bridges

GMRC BellowsFalls Subdivision44 Bridges

WACR Conn.River Line

70 Bridges

VTR SouthernSubdivision50 Bridges

WACR M&BSubdivision9 Bridges

0 10 20 305

Scale in Miles

State OwnedRailroad Bridges

Service Layer Credits: Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong),

Overview

""!! State Responsible Bridge (174)

Railroad Responsible Bridge (42)

Page 2

Page 4: VTRANS RAIL BRIDGE MANAGEMENT PROGRAM - … AREMA code has changed, an updated analysis may be required as prescribed by a railroad bridge engineer. 19 bridges are scheduled to have

 

 

VERMONT  RAILWAY  –  NORTHERN  

INSPECTION CONDITION RATING 

Summary: # Spans  1  2  3  4  Total 

# Bridges  19  7  3  1  30 

 

LOAD CAPACITY 

   

0

2

4

6

8

10

12

14

1 2 3 4 5 6 7 8 9 N H

Coun

t of B

ridge

s

Inspection Condition Rating

Inspection History

2015

2016

2017

0

1

2

3

4

5

6

7

8

9In

spec

tion

Cond

ition

Rat

ing

Rutland - - - - - - - - - - - - - - - - - - - - - - - - Burlington

Rating by Bridge

Target: 4+

<286K1

>286K29

Load Capacity Summary

100

150

200

250

300

350

Capa

city

@ 1

0m

ph (k

ips)

Rutland - - - - - - - - - - - - - - - - - - - - - - - - Burlington

Capacity by Bridge(based on 286K load configuration)

There are 43 Bridges on this line, 30 of which are the responsibility of the State.   

All 30 State Responsibility bridges had an Annual Inspection during 2017.  

All 30 State Responsibility bridges have a known Safe Load Capacity as of September 2017. 

o BR220 has a safe load capacity of less than 286K. 

o 3 bridges are scheduled to have an in‐depth inspection and the load capacity verified/updated 

in 2018. 

Target: >286K

Page 3

Page 5: VTRANS RAIL BRIDGE MANAGEMENT PROGRAM - … AREMA code has changed, an updated analysis may be required as prescribed by a railroad bridge engineer. 19 bridges are scheduled to have

 

 

VERMONT  RAILWAY  –  SOUTHERN    

The VTR “Southern” is a combination of the B&R and Hoosick Subdivisions and the Bennington Branch.  

There are 50 Bridges on this line, 39 of which are the responsibility of the State.  

All 39 State Responsibility bridges had an Annual Inspection during 2017. 

All 39 State Responsibility bridges have a known Safe Load Capacity as of September 2017. 

o 3 bridges are scheduled to have an in‐depth inspection and the load capacity verified/updated 

in 2018. 

INSPECTION CONDITION RATING 

Summary: # Spans  1  2  3  4  5  6  Total 

# Bridges  31  5  1  0  0  2  39 

   

LOAD CAPACITY 

   

0

2

4

6

8

10

12

14

1 2 3 4 5 6 7 8 9 N H

Coun

t of B

ridge

s

Inspection Condition Rating

Inspection History

2015

2016

2017

0

1

2

3

4

5

6

7

8

9In

spec

tion

Cond

ition

Rat

ing

Hoosick, NY - - - - - - - - - - - - - - - - - - - - - - - Rutland

Rating by Bridge

Target: 4+

<286K11

>286K28

Load Capacity Summary

100

150

200

250

300

350

Capa

city

@ 1

0m

ph (k

ips)

Hoosick, NY - - - - - - - - - - - - - - - - - - - - - - - Rutland

Capacity by Bridge(based on 286K load configuration)

Target: >286K

Page 4

Page 6: VTRANS RAIL BRIDGE MANAGEMENT PROGRAM - … AREMA code has changed, an updated analysis may be required as prescribed by a railroad bridge engineer. 19 bridges are scheduled to have

 

 

GREEN  MOUNTAIN  

There are 44 Bridges on this line, 35 of which are the responsibility of the State.   

All 35 State Responsibility bridges had an Annual Inspection during 2017. 

All 35 State Responsibility bridges have a known Safe Load Capacity as of September 2017. 

o 1 bridge is scheduled to have an in‐depth inspection and the load capacity verified/updated in 

2018. 

INSPECTION CONDITION RATING 

Summary: # Spans  1  2  3  4  Total 

# Bridges  29  5  0  1  35 

 

LOAD CAPACITY 

 

0

2

4

6

8

10

12

14

1 2 3 4 5 6 7 8 9 N H

Coun

t of B

ridge

s

Inspection Condition Rating

Inspection History

2015

2016

2017

0

1

2

3

4

5

6

7

8

9In

spec

tion

Cond

ition

Rat

ing

Bellows Falls - - - - - - - - - - - - - - - - - - - - - - Rutland

Rating by Bridge

Target: 4+

<286K4

>286K31

Load Capacity Summary

100

150

200

250

300

350

Capa

city

@ 1

0m

ph (k

ips)

Bellows Falls - - - - - - - - - - - - - - - - - - - - - - Rutland

Capacity by Bridge(based on 286K load configuration)

Target: >286K

Page 5

Page 7: VTRANS RAIL BRIDGE MANAGEMENT PROGRAM - … AREMA code has changed, an updated analysis may be required as prescribed by a railroad bridge engineer. 19 bridges are scheduled to have

 

 

WACR  –  CONNECTICUT  RIVER  

There are 70 Bridges on this line, 61 of which are the responsibility of the State.   

All 61 State Responsibility bridges had an Annual Inspection during 2017. 

All 61 State Responsibility bridges have a known Safe Load Capacity as of September 2017. 

o 12 bridges are scheduled to have an in‐depth inspection and the load capacity verified/updated 

in 2018. 

INSPECTION CONDITION RATING 

Summary: # Spans  1  2  3  4  5  6  7  8  9  10  11  Total 

# Bridges  49  6  1  1  1  0  1  1  0  0  1  61 

 

LOAD CAPACITY 

 

0

2

4

6

8

10

12

14

1 2 3 4 5 6 7 8 9 N H

Coun

t of B

ridge

s

Inspection Condition Rating

Inspection History

2015

2016

2017

0

1

2

3

4

5

6

7

8

9In

spec

tion

Cond

ition

Rat

ing

White River Junction - - - - - - - - - - - - - - - -Newport

Rating by Bridge

Target: 4+

<286K21

>286K40

Load Capacity Summary

100

150

200

250

300

350

Capa

city

@ 1

0m

ph (k

ips)

White River Junction - - - - - - - - - - - - - - - -Newport

Capacity by Bridge(based on 286K load configuration)

Target: >286K

Page 6

Page 8: VTRANS RAIL BRIDGE MANAGEMENT PROGRAM - … AREMA code has changed, an updated analysis may be required as prescribed by a railroad bridge engineer. 19 bridges are scheduled to have

 

 

WACR  –  MONTPELIER  &  BARRE  

There are 9 Bridges on the WACR – Montpelier & Barre Line, all of which are the responsibility of the State.   

All 9 State Responsibility bridges had an Annual Inspection completed during 2017. 

o BR304, BR305 & BR306 all have an inspection condition rating = 3 (Serious).  These bridges are 

seeing particularly rapid rates of deterioration and critical repairs are necessary. 

All 9 State Responsibility bridges have a known Safe Load Capacity as of September 2017. 

o BR304 has a safe load capacity <263K. BR308 & BR310 have a safe load capacity <286K. 

INSPECTION CONDITION RATING 

Summary: # Spans  1  2  3  Total 

# Bridges  6  1  2  9 

   

LOAD CAPACITY 

   

0

2

4

6

1 2 3 4 5 6 7 8 9 N H

Coun

t of B

ridge

s

Inspection Condition Rating

Inspection History

2015

2016

2017

0

1

2

3

4

5

6

7

8

9In

spec

tion

Cond

ition

Rat

ing

Montplier- - - - - - - - - - - - - - - - - - - - - - - - - - - -Barre

Rating by Bridge

Target: 4+

<286K3

>286K6

Load Capacity Summary

100

150

200

250

300

350

Capa

city

@ 1

0m

ph (k

ips)

Montpelier- - - - - - - - - - - - - - - - - - - - - - - - - - -Barre

Capacity by Bridge(based on 286K load configuration)

Target: >286K

Page 7

Page 9: VTRANS RAIL BRIDGE MANAGEMENT PROGRAM - … AREMA code has changed, an updated analysis may be required as prescribed by a railroad bridge engineer. 19 bridges are scheduled to have

 

 

STATEWIDE  LOAD  CAPACITY  

Load Capacity Analyses have been performed on all 174 State Responsible Bridges.  

134 (77%) have a load capacity equal to or greater than 286 kips*. 

  40 (23%) have a load capacity less than 286 kips*. 

 

The VTrans Rail Bridge Management Program requires that all bridges have the load capacity verified once 

every ten years.  Generally, this includes performing an in‐depth inspection of the bridge which is compared 

to the conditions found during the previous load capacity analysis.  If member conditions have changed, or if 

the AREMA code has changed, an updated analysis may be required as prescribed by a railroad bridge 

engineer. 

19 bridges are scheduled to have an in‐depth inspection and have the load rating verified/updated in 

2018.   

The goal is to have the backlog of older capacity analyses cleared and to get on the 10yr cycle during 

FY19. 

 

* A kip is a US customary unit of force, and is labeled with either “kip(s)” or “K” throughout this report. 

  1 kip equals 1,000 pounds‐force.  

 

 

LOOKING AHEAD 

Estimated yearly activities: 

Task  Historic  FY18  FY19  FY20  FY21  FY22  FY23  FY24 ‐ 29 

Initial Load Capacity Analysis  174  0  0  0  0  0  0  0 

Updated Load Capacity Analysis    19  15  15  15  15  15  15 

Annual Inspection    174  174  174  174  174  174  174 

Detailed Inspection*    19  18  18  18  18  18  18 

Underwater Inspection*    5  5  5  5  5  5  5 

Bridge Maintenance    Yes  Yes  Yes  Yes  Yes  Yes  Yes 

Data Maintenance    Yes  Yes  Yes  Yes  Yes  Yes  Yes 

*Estimated 10‐year cycle               

 

 

 

 

 

 

Page 8

Page 10: VTRANS RAIL BRIDGE MANAGEMENT PROGRAM - … AREMA code has changed, an updated analysis may be required as prescribed by a railroad bridge engineer. 19 bridges are scheduled to have

!

!!

!

!!!!!!!

!!!!

!!!!

!! !!!!!!!!!

! !!!!

!!!!!

!!

!!!!!!!!

!! !!!!

!!!!

!!!

!!!! !!

!!!

!

!

!!!!

!!!!

!! !!!

! !!!!!! !! ! !!

!!!!!

! !

!

!

!!!!!

!!!

!!!

!

!

!!

!

!

!

!

!

!

!

!

!!

!

!

!

!

!!

!

!

!!!!!!

! !!!

!

!!!!! !

!!!

!!!!!!

!!

!!

!!!!!

!!

!!

!! !!!!!! !!!!!

!!!!!!

!!!! !!

!!!

!

!

!!!!

!!!!

!!

!!

!

! !!!

!!! !! ! !!

!!

!!!

! !

!

!

!!!

!!

!!!

!!

!

!

!

!!

!

!

!

!

!

!

!

!

!!

!

!

!

X

X

XX

XXXX

XXXX

XX

XX

XXX

X

X

XXX

XX

XXX

X

XXXXXXX

X

X

X

XX

XXXX

X

XXX X

X

XX

XX

XX

X

X

XXX

XX

XX

X

XXX

XXX

X

X

VTR NorthernSubdivision

GMRC BellowsFallsSubdivision

VTR 'Southern'Subdivision

WACR M&BSubdivision

WACR Conn.River Line

Service Layer Credits: Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance

0 10 205

Scale in Miles

State ResponsibleRailroad Bridges

Load Capacity

!! Capacity > 286k

XX Capacity < 286k