vrf system presentation !

Click here to load reader

Post on 14-May-2015

3.148 views

Category:

Education

28 download

Embed Size (px)

DESCRIPTION

Any one would like to know about VRF/VRV system concept, just view the document and drop in your comments as a feedback...

TRANSCRIPT

  • 1.Lets Go Green Lifes Good When its Green

2. LG Green Building Jebel Ali - Dubai 21.5% Savings on Energy Use 31.8% Savings on Potable Water Use 30 KW on-grid Solar PV system 3.91% Offset by On-Site Renewable Energy 91.7% Diversion from Landfill of Construction Waste 30.6% Use of Materials with Recycled Content 45.2% Use of Materials Regionally Available3/60 3. Global Sales LGE Consolidated Basis, IFRS Unit : USD Billion Total does not equal 100 percent as divisional sales pertain solely to LG Electronics Korea and overseas subsidiaries and include internal transactions, other subsidiaries earnings, etc.USD 48.97 USD 48.2 USD 45 USD 44USD 43.4HE 41%USD 39 MC 22%HA 20%AE 8%200620072008200920102011 4. AE Company (Air Conditioning & Energy Solution) Residential1st company to sell 100 million unitsManufactured Koreas1st air conditioner Air Conditioning & Energy SolutionWorlds Top selling air conditioning manufacture for 8years 5. AE Company (Air Conditioning & Energy Solution) HVAC SolutionLG VRFFull line-up of comprehensive air conditioning solutionsMulti V Systems (VRF)Heating(Residential)Heating(Commercial)Indoor UnitsSingle SystemsMulti Split SystemsRooftop 6. AE Company (Air Conditioning & Energy Solution) HVAC SolutionLG ChillerFull line-up of comprehensive air conditioning solutionsChiller SystemAHUCTHUNPP(Nuclear Power Plant)Control SystemsVentilation SystemsBuilding Management Systems 7. AE Company (Air Conditioning & Energy Solution) Vertical SolutionOffice Buildings Multi V IIIHotelsHigh-Rise BuildingsMulti V Water IIDX AHUMulti V Space III eco VLow Static Duct Low Static Duct DX AHU Art-1 Way Chiller LED PLS eco V Multi V Water BMSHotel Solutions Multi V Geo ChillerART COOL Home Energy Management System 8. AE Company (Air Conditioning & Energy Solution) Vertical Solution HospitalsShopping Malls4-Way Cassette 1-Way CassetteMulti V Geo Multi V WaterChiller BMS DX AHUBMS 9. LG Multi V System 10. ContentsWhat is VRF System ?Variable Refrigerant Flow The Variable Refrigerant Flow System has the ability to control the amount of refrigerant flowing through the system Simply, each FCU/AHU unit receives only the required amount of refrigerant in order to meet the cooling load of the conditioned space The Inverter Unit will Gradually Increases or Decreases its Capacity based on the load by increasing or decreasing the rotation speed of the motor. 11. World Best COP Tech. V Scroll Inverter compressorVentilation with AHU Convectional AHUCyclone sub-cooling circuitHigh static propeller fanFeatures - No individual controlLow energy consumption (Inverter compressor)- Freeze & burst (chilled & hot water type)BLDC Inverter Fan Motor Uniform (refrigerant) distributor Wide Louver fin in Heat ExchangerSine wave inverter controlVRF Indoor Unit- Low air volume, staticBig air volume, high static pressure- No ventilation & humidification- Low installation space - Big energy consumption (pump & fan) Ventilation & humidification Inverter compressorIAQ control Easy Installation 12. ContentsHow it works? Control of the refrigerant flow by inverter compressor100%LoadIndoor UnitsINVST1PINV INV14% 10% Comp. capacity control14/60100%ST1 13. ContentsTechnical Innovation Innovation 1 V scroll V Scroll inverter compressor is LG Compressor Brand name. The compressor is manufactured by LG Korean factory using state of the art techniques. The adoption of the BLDC motor makes the system more efficient and powerful. V Scroll inverter compressor Steel PlatesScroll typeReluctance torqueBigger performanceNBLDC motoriMore efficientT SRotorMagnetic torque Inverter driverND Magnetic Multi V is made in Korean factory as well major components like compressor.15/60 14. ContentsTechnical Innovation Innovation 2 Cyclone SCC Sub-cooling is one of the most important technologies in VRF system. LG Multi V use more efficient cyclone type. By cyclone sub-cooling circuit, Best effect can be achieved.More efficient Less pressure lossCyclone Larger heatexchange areaSub-cooling ExpansionSub-cooling circuitTheory and Effects PressureCyclone sub-cooling circuitCondenserEvaporatorEnthalpy1st effect : Refrigerant pressure loss reduce Long and high rising piping 2nd effect : Cooling capacity gets improved In a thermodynamic point of view16/60 15. ContentsInverter Technology of Multi V III Inverter Technology Controls the Refrigerant Flow by Varying the Compressor Revolution as per the Cooling load.Ambient Temp : 46 All rooms coolingMicro processor & Inverter logicInverter Scroll compressor EEV 120Hz HighFull load Sensor less ControlRevolutionPWMCooling loadUFull load Variable Refrigerant FlowCooling CapacityV WPartial load50Hz20HzLowPartial capacity EEVAmbient Temp : 35 Only 1 room cooling17/60 16. ContentsHow it works? Control by remote controller of usersP INVST1CPU18/60CPUCPUCPU18 17. ContentsHow it works? Control of the refrigerant Flow by Electronic Expansion ValveT1 = Set temperature from Remote controller air temperature T2 = Suction air temperature sensor T3 = Inlet refrigerant temperature sensor (liquid) T4 = Outlet refrigerant temperature sensor (gas)Blower speedControl BoxGas T4SuctionDischargeBlowerT3 EEVT2LiquidT1 Electronic expansion valve (0~1350 pulses)19/60 18. ContentsHow it works? Multi V control low pressure of system in case of cooling operationComponent CompressorCoolingCooling Mode Low Pressure SC EEVFan Indoor EEVSuperheat controlSC EEVFanHigh PressureSuperheat of Sub Coolingcomp Indoor EEVPressureFan control ( speed up by inverter )Target high pressureCompressor control ( speed up by inverter ) Target low pressureStart 20/60Time 19. ContentsWhat is LG Multi V? Owing to VRF Technology, Multi V is the Brand Name of LG.Multi V is the LG VRF system: Compared to the Common On-Off Controlled Compressor,the Inverter Controlled Compressor is able to run the proper revolution (Hz) in order to provide the best efficiency (power Consumption), Exceptional dehumidification& Temp Control. On-Off system21/60Inverter system 20. ContentsMulti V System Layout Combination of Maximum 64 Indoor Units Multi V III Tropical ModelIDU combination Rate Multi V III : 130 %Max. 48HP1Way CST2Way CST Refrigerant PipesY BranchLow static duct High static duct4Way CSTARTCOOL MirrorARTCOOL GalleryConsole22/60 21. ContentsProduct Roadmap Multi V Outdoor Single unit max 16Hp, 3 Unit combination is possible (Max 48Hp)Single unit max 16HpMedium 8 &10HP23/60Large 12 , 14 & 16HPCombination 48HpMax 48HP 22. Product Roadmap Multi V Indoor kW1.62.22.83.64.25.67.18.210.612.314.123.930.2Btu/h5k7k9k12k15k18k24k28k36k42k48k76k96kART COOL SeriesGallerySRACWall MountedMirror1Way (Art) Ceiling Cassette2Way 4WayCeiling & Floor Ceiling Suspended Ceiling Concealed DuctHigh Static Low Static Built-inFloor StandingWith CaseWithout CaseConsoleFresh air Intake 23. Multi V & AHU Large capacity with No BMS) Temp. Senor / RA, SA(essential), OA, Mix(optional) Humid. Senor / RA, SA, OA(optional)RAEAOASAOutdoor UnitExpansion KitDamper Actuator / EA, OA, Mix(optional) Differential Pressure switch(optional) Valve for Humidifier(optional) CO2 Sensor(optional) Smoke Detector(optional)AHUExpansion KitControl Kit Wired remote controller OptionalConnection Pipe Communication wireThermistor Signal (On/Off)Signal (DC0~10V) 24. Multi V & AHU Large capacity with Communication Kit & BMSRAEAOASAExpansion KitAHU Room air Temp Sensor (should be installed into the return air part)Outdoor UnitExpansion KitComm. KitWired remote controllerOptionalConnection Pipe Communication wire Thermistor Signal(On/Off) 25. ContentsIntroduction of Multi V III Tropical Outstanding Performance LG Multi V is the most strong VRF system. TUV certification for continuous operation under 54 during 24 hours.27/60 26. ContentsIntroduction of Multi V III Tropical Outstanding Performance LG Multi V is the most efficient VRF system. COP Max 4.3 at rated condition COP comparison Heat pump model (8HP), T1 condition4.326%BLDC Inverter Fan MotorHigh static propeller fan[ Average value]3.4-. kW / Ton = 0.87 @ T1 -. kW / Ton = 1.10 @ T3Cyclone sub-cool circuitWide Louver fin in Heat Exchanger Sine wave inverter controlNew refrigerant distributorBLDC inverter compressorconventional Cooling capability Coefficient of Performance (COP) = Energy consumption28/60COP data 27. ContentsIntroduction of Multi V III Tropical Outstanding Performance Extending pipe length and elevationTotal piping length Actual longest Piping length (Eqvlnt)Level Difference Between ODU and IDUMax110m1000m200m (225m)Longest piping length after 1st branch (Conditional application)40m (90m)Level difference between ODU and IDU 110m Level difference between IDU and IDULongest piping lengthMax 225mLevel difference between ODU and ODU Test building Project R&D Center Building Location Seoul. Korea Const.TTL Dim. 84,307.09 mType31/60Dim 5,619.14 m R&D BuildingScale5F ~ 20F15m 5m 28. ContentsIntroduction of Multi V III Tropical Outstanding Performance Design & installation degree of freedom increase ( Fan External static pressure - Max 8mmAq)Conventional32/60 29. ContentsIntroduction of Multi V III Tropical Smart Functions8 Stages of night silence operation are possible during the night time. It can give comfort to owner and a neighbor. Night silence operationCapacity100Ambient temp Load Sound leveldaynightdayMode start Mode end 8:0033/6012:004:008:0012:004:008:00 Time (am) 30. ContentsIntroduction of Multi V III Tropical Smart FunctionsMinimizing any inconvenience that may occur in an emergency situation Back-up operation _CompressorBack-up operation _UnitMalfunctionMalfunctionBack-up operationAll single unit of Multi V III tropical has more 2 compressors. 35/60Back-up operation 31. ContentsIntroduction of Multi V III Tropical Smart FunctionsTo make life span of compressor even, alternative operation is possible. Alternative operationON36/60OFF 32. ContentsIntroduction of Multi V III Tropical Smart FunctionsAutomatic test run, refrigerant amount check, real-time inspection and back-up operation for parts and sensors, maximizing reliability of the product & minimizing installation and maintenance time. Fault Detection and Diagnosis (FDD)01Automatic test run02Refrigerant amount check03Real time diagnosis (refrigerant and parts)04Real time back-up (compressor and sensors) Refrigerant recovery function0537/60 33. ContentsIntroduction of Multi V III Tropical Smart FunctionsEasy and fast test run. Auto test run function help you to save the checking time during the final stage of installation Automatic test run _ FDDConventional test run SettingLGMVPC100% operationTime Save Auto Test Run Start1Unit operationReport60%ReportReport by HTLM Auto test run check list Sensors Operating cycle Electric status Refrigerant amount38/60 34. ContentsIntroduction of Multi V III Tropical Smart FunctionsThis kind of mistake can happen in site. However problem is that it is very hard to find the reason because it is not commonsense mistake. But Multi V can check it automatically for the best installation. Incorrect piping notice _ FDDIncorrect communication line notice _ FDDIncorrect piping (liquid line + gas line) Refrigerant pipingcommunication lineIncorrect communication line39/60 35. ContentsIntroduction of Multi V III Tropical Smart Functions Real-time automatic fault prediction functionMulti V III allows you to check the current status for the sensors and the EEV, which are the major components for system control, through a test runSensorSensorEEVOutdoor unitIndoor unitTemperature sensor3Pressure sensor 40/608 20 36. ContentsIntroduction of Multi V III Tropical Smart Functions Pump down and out function can reduce the refrigerant discharge.Pump downWhen an indoor unit malfunctions, this function collects the refrigerant remaining in the piping line or that unit to an outdoor unit Transfers refrigerantMalfunctionPump outWhen an outdoor unit malfunctions, this function collects the refrigerant in another indoor unit or a piping line Transfers refrigerantMalfunction41/60 37. ContentsIntroduction of Multi V III Tropical Smart Functions4way piping provides a different installation method. So It can reduce installation cost. 4way pipingPiping cover needed Not good lookingRightLeft Front Installation of bottom piping is available. LG provide accessory for easy installation. BottomBottom direction 42/60 38. ContentsIntroduction of Multi V III Tropical Smart Functions Easy to install refrigerant pipe & Easy maintenance (Standing SVC) Service area reduction and Easy standing service and maintenanceConventional50% Front SVC Area900 C/Box Open area 43/60500 SVC Area Standing service available 39. ContentsIntroduction of Multi V III Tropical Smart Functions Quick and right service is necessary. Black Box built in Multi V records operation data for 3 minutes. SVC engineer can analysis the problem and take quick and right action owing to operation history. Black Box for data acquisition Record operation data Ambient temp. High pressure Low pressure Sensor status Operation data etc. Error occurred SVC -. Analysis with recorded data & -. Quick and right service SD memory module : 3 months data recording 44/60 3 minutes 40. Green Building InitiativeLEED RegulationsThe LEED green building certification program is an initiative by The U.S. Green Building Council, Inc. (USGBC) to positively impact our natural environment, economy, health, and productivity through well designed buildings, energy efficient equipment, and high quality material. Today, there are many breakthroughs in building science, technology, and operations that are available for designers and building owners to maximize both economic and environmental performance of their buildings. The green building movement offers an unprecedented opportunity to respond to the most important challenges of our time, including global climate change, dependence on non sustainable and expensive sources of energy. LEED 2009 for New Construction and Major Renovations 100 base points; 6 possible Innovation in Design and 4 Regional Priority points Certified 4049 points Silver 5059 points Gold 6079 points Platinum 80 points and above 41. Green Building InitiativeLEED Regulations1.Sustainable site (26 Pts)2.Water Efficiency (10 Pts)3.Energy & Atmosphere (35 Pts) 31 Pts LG can address4.Material & Resources (14 Pts)5.Indoor Environmental Quality (15 Pts) 4 Pts LG can address6.Innovation in Design (6 Pts) 5 Pts LG can address 42. Land Mark Multi V Project Project NameBrighton CollegeBuilding TypeSchoolProject ownerBloom PropertiesConsultant NameImplement ConsultantContractor NameEmirates Link MaltauroPlace/ CityUAE Abu DhabiCompletion DateSeptember 2011Type Of UnitsMulti V& AHU UnitsTotal Capacity1,200_TonTotal Project Value1,100,000_$Important requirement of the client BMS compatible AC system The minimum Operating cost Higher emphasis on Indoor air quality (IAQ) Reliable operation, at 54 deg C Ambient49Educational 43. Land Mark Multi V Project Project NameGEMS American AcademyBuilding TypeSchoolProject ownerGEMS EducationConsultant NameNational Engineering BearuContractor NameTrinity Engineering ServicesPlace/ CityUAE Abu DhabiCompletion DateSeptember 2011Type Of UnitsMulti V& AHU Units.Total Capacity1,112_Ton.Total PJT Value1,136,000_$.Important requirement of the client BMS compatible AC system. The minimum Operating cost. Higher emphasis on Indoor air quality (IAQ). Reliable operation, at 54 deg C Ambient. Note: LG award extended to other Products.50Educational 44. Land Mark Multi V Project Project NameRefurbishment of 8 SchoolsBuilding TypeSchoolProject ownerAbu Dhabi Education CouncilConsultant NameConseco InternationalContractor NameDifferent ContractorsPlace/ CityUAE Abu DhabiCompletion DateSeptember 2010Type Of UnitsMulti VTotal Capacity2,105_TonTotal Project Value2,000,000_$Notes 3 Schools Awarded to LG out of 8. Electricity Bill is a Major Concern of Government, as such they remove old units and adopt the VRF systemEducational 45. Land Mark Multi V Project Project NameRefurbishment of 10 SchoolsBuilding TypeSchoolProject ownerAbu Dhabi Education CouncilConsultant NameIan Banham and AssociatesContractor NameDifferent ContractorsPlace/ CityUAE Abu DhabiCompletion DateSeptember 2011Type Of UnitsMulti V & FAHU/ AHU UnitsTotal Capacity2,500_TonTotal Project Value2,500,000_$Notes LG for the 2nd Year in a row awarded a part of these Schools ( Five Schools Awarded to LG out of 10) LG delivered 26 FAHU/ AHU along with the Multi V Electricity Bill is a Major Concern of Government, as such they remove old units and adopt the VRF systemEducational 46. Land Mark Multi V Project Project NameKhaitan Police HQBuilding TypeGovernmentProject ownerMinistry of Public WorksNo Of FloorsG+M+2 BuildingConsultant NameMinistry of Public WorksContractor Name Place/ CityKuwaitCompletion DateNovember 2011Type Of UnitsMulti VTotal Capacity200_TonTotal Project Value240,000_$Client requirements Centrally control the AC units from one location, MEW (Ministry of Electricity & Water) Approval Capability of Working in ambient temperature of 54 C without tripping.53Government 47. Land Mark Multi V Project Project NameKorean EmbassyBuilding TypeGovernmentProject ownerSouth KoreaNo Of FloorsG+6 BuildingConsultant NameMinistry Of InteriorContractor NameM/s ImtiyazPlace/ CityKuwaitCompletion DateOctober 2011Type Of UnitsMulti VTotal Capacity250_TonTotal Project Value375,000_$Client requirements Centrally control the AC units from one location, Group control multiple units serving the same zone. Capability of Working in ambient temperature of 54 C without tripping.54Government 48. Land Mark Multi V Project Project NameOman Botanic GardenBuilding TypeCommercial BuildingProject ownerOBGNo Of FloorsG+1 BuildingConsultant NameALATACContractor NameMercuryPlace/ CityOman MuscatCompletion DateJune, 2012Type Of UnitsMulti VTotal Capacity520_TonTotal Project Value550,000_$Notes Project for cultivating rare plants. Client insisted for eco friendly and energy saving techn ology.Government 49. Land Mark Multi V Project Project NameArabian Horse StudBuilding TypeLab & Care Center - 10 Horse Stable to His HighnessProject ownerSheikh Mohammed Bin Rashid Al MaktoumConsultant NameEngineers OfficePlace/ CityUAE DubaiCompletion DateDecember 2009Type Of UnitsMulti V, (40 ODU, 400 FCU)Total Capacity800_TonTotal Project Value1,120,000_$Client requirements Sustainable design with green Refrigerant. The lesser the better power consumption. Capability of Monitoring& Controlling the AC units, and auto back up operation.56Government 50. Land Mark Multi V Project Project NameAl Gurum ResortBuilding TypeResidential DevelopmentProject ownerAl Dar PropertiesNo Of Villas70 Villas Phase IContractor NameSix ConstructPlace/ CityUAE Abu DhabiCompletion DateOctober 2008Type Of UnitsMulti VTotal Capacity1,750_TonTotal Project Value2,400,000_$Notes: Super Premium Villas, the Selling price of each villa is around 25 Million AED BMS compatible AC system. Compatible to Home Net. Reliable operation, at 54 deg C AmbientResidential 51. Land Mark Multi V Project Project NameAbu Dhabi International Shooting ClubBuilding TypeResidential DevelopmentProject ownerIMCCNo Of Villas385 VillasContractor NameFibrex, ThermoPlace/ CityUAE Abu DhabiCompletion DateJune 2011Type Of UnitsMulti V, (385 ODU/ 4,000 FCU)Total Capacity5,361_TonTotal PJT Value6,800,000_$Notes Estidama Compliance Pearl 1 Electricity Bill for the owners/ Tenants of the Villa Reliable operation, at 54 deg C Ambient.Residential 52. Land Mark Multi V Project Project NameAdearest Owners VillaBuilding TypeResidentialProject ownerAdearestNo Of Villas3 Big Premium VillaContractor NameAdearestPlace/ CityUAE SharjahCompletion DateAug 2008Type Of UnitsMulti VTotal Capacity173_TonTotal PJT Value250,000_$Notes Project originally designed with Daikin VRV Fast delivery & Commissioning support , help LG to win the PJTResidential 53. Land Mark Multi V Project Project NameLaya Orchid HotelBuilding TypeHospitalityProject ownerLaya hospitalityNo Of FloorsG+7 BuildingContractor NameEnvicon EmiratesPlace/ CityUAE DubaiCompletion DateJanuary 2012Type Of UnitsMulti VTotal Capacity400_TonTotal Project Value400,000_$Notes Compatibility with BMS system. Project originally designed with Air Cooled Chillers andthen converted to VRF to reduce the Electric power consumption. LG solution extended to include HA& Hotel TV.60Hospitality 54. Land Mark Multi V Project Project NameDhalak ResortBuilding TypeResort for Qatar Emirs FamilyProject ownerQatar DairConsultant NameW S AtkinsContractor NameQDVCPlace/ CityDhalak, EritreaCompletion DateSept 2010Type Of UnitsMulti VTotal Capacity275_Ton.Total PJT Value370,000_$.Notes Less Outdoor space available LG provided full support from design, installation, SVCHospitality 55. Land Mark Multi V Project Project NameSavanah Flamingo ResortBuilding TypeHospitalityProject ownerTDIC (Tourism Development & Invest. Co) (Abu Dhabi Gov)Consultant NameW.S. AtkinsContractor NameAl Shafar ContractingPlace/ CityUAE Abu DhabiCompletion DateJune 2011Type Of UnitsMulti V & AHUTotal Capacity800_TonTotal Project Value1,600,000_$Notes Estidama Pearl 2 Compliance. Electric Power source is Diesel Generator, so its a mus t to reduce the power consumption ASAP. Capability of working up to 54 of ambient temperature62Hospitality 56. Land Mark Multi V Project Project NameZUMA RestaurantBuilding TypeRestaurantProject ownerZUMA/DIFCConsultant NameDesign & Build - PenguinContractor NamePenguin EngineeringPlace/ CityUAE DubaiCompletion DateJuly 2008Type Of UnitsMulti VTotal Capacity150_TonTotal Project Value200,000_$Notes District cooling connection was not enough Operating cost was also a concern. Limited condensing unit space at the parking area63Hospitality 57. Land Mark Multi V Project Project NameBelhoul HospitalBuilding TypeHospitalProject ownerBelhoul Life careNo Of FloorsG+5 BuildingConsultant NameNutekContractor NameARJPlace/ CityUAE DubaiCompletion DateJanuary 2010Type Of UnitsMulti VTotal Capacity250_TonTotal Project Value300,000_$Notes Project originally designed with Air Cooled Chillers and then converted to VRF to reduce the cost of Electric Connection and Electric power consumption, Offered with Central Controller.64Hospital 58. Land Mark Multi V Project Project NameAl Jazi TowerBuilding TypeCommercial OfficesProject ownerAl Khaliji HQ BankNo Of FloorsG+18 Building, 2nd, 3rd7 4th Floor OnlyPlace/ CityQatarCompletion DateDecember 2008Type Of UnitsMulti VTotal Capacity162_TonTotal Project Value200,000_$Notes Project originally designed with Air Cooled Chillers and then converted to VRF to reduce the connecting load Client required individual billing for the offices Premium AC which is capable of handling high elevation building65Commercial 59. Land Mark Multi V Project Project NameAjman BankBuilding TypeBankProject ownerEDARANo Of FloorsG+2 BuildingConsultant NameMac Nally ConsultantContractor Name Place/ CityUAE AjmanCompletion DateDecember 2008Type Of UnitsMulti VTotal Capacity220_TonTotal Project Value250,000_$Notes Project originally designed with Air Cooled Chillers andthen converted to VRF to reduce the power consumption, Client required individual billing for offices.66Commercial 60. Land Mark Multi V Project Project NameDubai BankBuilding TypeBankProject ownerDubai BankNo Of FloorsG+2 BuildingConsultant NameEngineers OfficeContractor NameSS. Lootha ConstructionsPlace/ CityUAE DubaiCompletion DateJuly 2009Type Of UnitsMulti VTotal Capacity159_TonTotal Project Value200,000_$Notes Project originally designed with Air Cooled Chillers and then converted to VRF to reduce the cost of Electric Connection and Electric power consumption, Offered with Central Controller.67Commercial 61. Land Mark Multi V Project Project NameAl Meraas Sales CenterBuilding TypeOffice BldgProject ownerAl MERAASNo Of FloorsG+M BuildingConsultant NameSPW ConsultantContractor Name Place/ CityUAE DubaiCompletion DateNov 2009Type Of UnitsMulti VTotal Capacity120_TonTotal Project Value150,000_$Notes Project Demands for less operational cost, as client need to pay the electricity bill Offered with Central Controller.68Commercial 62. Land Mark Multi V Project Project NameAirport Heights ECGABuilding TypeCommercial BuildingProject ownerCommercialECGANo Of FloorsConsultant NameIBN KhaldounContractor NameHJBPlace/ CityOman MuscatCompletion DateUnder CommissioningType Of UnitsMulti VTotal Capacity200_TonTotal Project Value225,000_$Notes Its a Ministry of Finance PJT Green Technology Installation Flexibility and Network solutionPROJECT UNDER COMMISSIONING 63. Land Mark Multi V Project Project NameYahya Group Holding BuildingBuilding TypeOffice BuildingProject ownerYahya Group HoldingNo Of FloorsG+1 BuildingConsultant NameAl AbrajContractor NameOGEPlace/ CityOman - SOHARCompletion DateDecember 2011Type Of UnitsMulti VTotal Capacity135_TonTotal Project Value160,000_$Notes Project owner looking for energy saving technology in o rder to reduce annual electrical cost.LG proposed Multi V and highlighted annual savingsCommercial 64. Land Mark Multi V Project Project NameBritish Council BuildingBuilding TypeOffice BuildingProject ownerBritish CouncilNo Of FloorsG+1 BuildingConsultant NameMajaanContractor NameCemecPlace/ CityOman - MuscatCompletion DateJanuary 2012Type Of UnitsMulti VTotal Capacity20_TonTotal Project Value30,000_$Notes Project originally designed with Air Cooled Chillers and then converted to VRF to reduce the cost of Electric Connection and Electric power consumption, Offered with Central Controller.Commercial 65. Land Mark Multi V Project Project NameHubara Bird CultureBuilding TypeLaboratory CenterProject ownerAbu Dhabi Authority For Culture& Heritage (ADACH)Consultant NameLab DesignContractor NameAdearestPlace/ CityUAE Al AinCompletion DateAugust 2008Type Of UnitsMulti VTotal Capacity527_TonTotal Project Value685,000_$Client Requirements Sustainable design with green Refrigerant The lesser the better power consumption Capability of Monitoring& Controlling the AC units72Miscellaneous