    PROJEKMASSRAPIDTRANSITLEMBAHKELANG

    JAJARANSUNGAIBULOH KAJANG

    GENERALSPECIFICATION

    FORCIVILENGINEERINGWORKS

    DocumentReferenceNo. : KVMRT/PDP/SBK/GEN/OP/GS/CS/0001

    Revision : 00

    DateIssued : 22nd

    August2011

  • 8/10/2019 Vol III of IV - Section 11 - 01 General Specification

    2/224

    PageNotUsed

  • 8/10/2019 Vol III of IV - Section 11 - 01 General Specification

    3/224

    PROJEKMASSRAPIDTRANSITLEMBAHKELANG

    JajaranSungaiBuloh Kajang

    GeneralSpecificationforCivilEngineeringWorks

    KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 i Revision:00

    AMENDMENTHISTORY

    REVISIONNO. DETAILSOFAMENDMENT

    00

    First

    issue.

  • 8/10/2019 Vol III of IV - Section 11 - 01 General Specification

    4/224

    PROJEKMASSRAPIDTRANSITLEMBAHKELANG

    JajaranSungaiBuloh Kajang

    GeneralSpecificationforCivilEngineeringWorks

    KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 ii Revision:00

    Page

    Not

    Used

  • 8/10/2019 Vol III of IV - Section 11 - 01 General Specification

    5/224

    PROJEKMASSRAPIDTRANSITLEMBAHKELANG

    JajaranSungaiBuloh Kajang

    GeneralSpecificationforCivilEngineeringWorks

    KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 TOC1of8 Revision:00

    TABLEOFCONTENTSPage

    SECTIONG1 GENERAL

    G1.1

    Applicationof

    the

    General

    Specification

    ......................................................................................

    G1

    1

    G1.2 Abbreviationsanddefinitions.......................................................................................................G11

    G1.3 Glossaryofterms..........................................................................................................................G15

    G1.4 Trials..............................................................................................................................................G16

    G1.5 StandardsandCodesofPractice..................................................................................................G16

    G1.6 Drawings........................................................................................................................................G17

    G1.7 ContractorsDrawings...................................................................................................................G17

    G1.8 MetricandImperialunits..............................................................................................................G18

    G1.9 DimensionsfromDrawings...........................................................................................................G18

    G1.10 Investigationdata.........................................................................................................................G18

    G1.11 SurveyoftheSite..........................................................................................................................G19

    AppendixAG1.1 RequirementsForAsBuiltSurveys................................................................G117

    SECTIONG2THESITE

    G2.1 AccesstotheSite..........................................................................................................................G21

    G2.2 Siterestrictions.............................................................................................................................G21

    G2.3 Siteservices...................................................................................................................................G22

    G2.4 Sitecleanliness..............................................................................................................................G24

    G2.5 ParkingFacilities............................................................................................................................G25

    G2.6 SitePestControl............................................................................................................................G26

    G2.7 Conditionsfortemporarylandallocation.....................................................................................G26

    G2.8 SiteSecurity...................................................................................................................................G26

    G2.9 GeneralWorksTrains....................................................................................................................G26

    G2.10

    ContractorsOwn

    Rolling

    Stock.....................................................................................................

    G2

    7

    G2.11 DefinedAreaandRestrictedAreaWorkingandWorksTrainOperations...................................G28

    AppendixAG2.1 RequirementsofWorksPackageContractorsOwnRollingStock................G211

    SECTION3 SITEESTABLISHMENT

    G3.1 UseoftheSite...............................................................................................................................G31

    G3.2 Submissionofparticulars..............................................................................................................G31

    G3.3 SurveyoftheSite..........................................................................................................................G32

    G3.4

    Fencesand

    Signs

    on

    the

    Site

    .........................................................................................................

    G3

    2

    G3.5 SiteOfficeAccommodationforthePDP,PDPRandtheSupervisingConsultant.........................G33

  • 8/10/2019 Vol III of IV - Section 11 - 01 General Specification

    6/224

    PROJEKMASSRAPIDTRANSITLEMBAHKELANG

    JajaranSungaiBuloh Kajang

    GeneralSpecificationforCivilEngineeringWorks

    KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 TOC2of8 Revision:00

    Page

    G3.6 TheWorksPackageContractor'sSiteAccommodation................................................................G36

    G3.7 VehiclesforthePDPandSupervisingConsultant.........................................................................G36

    G3.8 ClearanceoftheSite.....................................................................................................................G38

    G3.9 Attendance....................................................................................................................................G38

    G3.10 MaterialTestingLaboratory..........................................................................................................G39

    G3.11 ProvisionForSurveyInstrumentsandChainmen.......................................................................G310

    G3.12 PhotographicRecords.................................................................................................................G310

    G3.13 ProhibitionofAdvertising...........................................................................................................G312

    SECTIONG4 THEWORKS

    G4.1 ProjectExecutionPlan..................................................................................................................G41

    G4.2 MethodStatements,andInspectionandTestingPlans...............................................................G42

    G4.3 NormalworkinghoursatSite.......................................................................................................G42

    G4.4 Drawingsandschedulesforplantandequipment.......................................................................G43

    G4.5 StagenotificationandinspectionofWorks..................................................................................G43

    G4.6 Demolitionworks..........................................................................................................................G44

    G4.7 Constructionrestraints.................................................................................................................G44

    G4.8 TemporaryWorks.........................................................................................................................G45

    G4.9

    OffSite

    Fabrication

    Works

    ............................................................................................................

    G4

    8

    G4.10 Constructionequipmentandplant...............................................................................................G48

    G4.11 ProtectionoftheWorks................................................................................................................G49

    G4.12 ApprovalsfromRelevantAuthorities..........................................................................................G410

    G4.13 TechnologyTransfer....................................................................................................................G411

    SECTIONG5WORKINROADS

    G5.1 MaintenanceofExistingRoads,Bridges,Culverts,etc.................................................................G51

    G5.2

    Temporarydiversions

    and

    traffic

    management

    ...........................................................................

    G5

    2

    G5.3 HalfwidthConstructionandTrafficControl.................................................................................G58

    G5.4 TemporaryTrafficSigns................................................................................................................G58

    G5.5 TemporaryRoutes.........................................................................................................................G59

    G5.6 Useofroadsandfootways............................................................................................................G59

    G5.7 Pedestrianrequirements..............................................................................................................G59

    G5.8 Temporarystreetlighting...........................................................................................................G510

    G5.9 Reinstatementofroadsandfootways........................................................................................G511

    G5.10

    TrafficManagement

    Implementation

    Team

    ...............................................................................

    G5

    11

  • 8/10/2019 Vol III of IV - Section 11 - 01 General Specification

    7/224

    PROJEKMASSRAPIDTRANSITLEMBAHKELANG

    JajaranSungaiBuloh Kajang

    GeneralSpecificationforCivilEngineeringWorks

    KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 TOC3of8 Revision:00

    Page

    SECTIONG6DAMAGEANDINTERFERENCE

    G6.1 Damageandinterference.............................................................................................................G61

    G6.2 Watercoursesanddrainagesystems............................................................................................G62

    G6.3 Utilitiesandotherservices............................................................................................................G63

    G6.4 Conditionsurveyofexistingbuildingsandstructures..................................................................G66

    G6.5 Structures,roadsandotherproperty...........................................................................................G66

    G6.6 Treesandothersimilarobstructions............................................................................................G66

    G6.7 Avoidanceofnuisance..................................................................................................................G66

    G6.8 ProtectionofExistingRailways.....................................................................................................G67

    G6.9 ElectromagneticCompatibility......................................................................................................G68

    AppendixAG6.1

    Reference

    List

    Of

    Standards

    Relating

    To

    EMC

    ...............................................

    G6

    14

    SECTIONG7TEMPORARYELECTRICITYSUPPLY

    G7.1 WorkonSite..................................................................................................................................G71

    G7.2 Electrical general.........................................................................................................................G71

    G7.3 Scope.............................................................................................................................................G72

    G7.4 Materials,appliancesandcomponents........................................................................................G72

    G7.5 Designconsiderations...................................................................................................................G72

    G7.6

    Mainsvoltage

    ................................................................................................................................

    G7

    2

    G7.7 Typesofdistributionsupply..........................................................................................................G72

    G7.8 Protectionofcircuits.....................................................................................................................G73

    G7.9 Earthing.........................................................................................................................................G73

    G7.10 Plugs,socketoutletsandcouplers................................................................................................G73

    G7.11 Cables............................................................................................................................................G73

    G7.12 Transformersandswitchgearintunnels......................................................................................G74

    G7.13 Lightinginstallation.......................................................................................................................G74

    G7.14

    Electricalmotors

    ...........................................................................................................................

    G7

    4

    G7.15 Inspectionandtesting...................................................................................................................G75

    G7.16 Identification.................................................................................................................................G75

    G7.17 Maintenance.................................................................................................................................G75

    G7.18 Maintenancerecord......................................................................................................................G75

    G7.19 ElectricitysupplyforOtherWorksContractorsandtrialoperations...........................................G75

    G7.20 Metering........................................................................................................................................G77

    G7.21 Paymentofelectricitycharge.......................................................................................................G77

  • 8/10/2019 Vol III of IV - Section 11 - 01 General Specification

    8/224

    PROJEKMASSRAPIDTRANSITLEMBAHKELANG

    JajaranSungaiBuloh Kajang

    GeneralSpecificationforCivilEngineeringWorks

    KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 TOC4of8 Revision:00

    Page

    SECTIONG8MATERIALS,EQUIPMENT,ANDSPAREPARTS

    G8.1 Materials.......................................................................................................................................G81

    G8.2 MaterialsandequipmentprovidedbyOtherWorksContractors................................................G82

    G8.3 SupplyofSparePartsandSpecialTools........................................................................................G83

    G8.4 PackingandStorage......................................................................................................................G84

    G8.5 ShippingandDelivery....................................................................................................................G87

    SECTIONG9SAFETY&HEALTH

    G9.1 WorksPackageContractor'sSafety&HealthObligations............................................................G91

    G9.2 LawsandRegulations....................................................................................................................G92

    G9.3 Contractor'sSafetyandHealthPersonnel....................................................................................G92

    G9.4 Safety&HealthPlan.....................................................................................................................G94

    G9.5 Safety&HealthRiskAssessment..................................................................................................G95

    G9.6 Emergencypreparednessandresponse.......................................................................................G96

    G9.7 Incidentnotificationandreporting...............................................................................................G97

    G9.8 ControlofSafety&HealthNonCompliance................................................................................G97

    G9.9 TrafficManagementandPublicSafety.........................................................................................G98

    G9.10 GeneralSafetyandHealthRequirements....................................................................................G98

    G9.11

    Safetyand

    Health

    Meetings

    ........................................................................................................

    G9

    15

    G9.12 Safety&HealthDocumentation.................................................................................................G915

    G9.13 Monthlyprogressreport.............................................................................................................G915

    G9.14 Training.......................................................................................................................................G916

    G9.15 SafetyandHealthInspectionandAuditing.................................................................................G916

    SECTIONG10QUALITYASSURANCEANDQUALITYCONTROL

    G10.1 Introduction................................................................................................................................G101

    G10.2

    MinimumQA/QC

    Requirements

    .................................................................................................

    G10

    1

    G10.3 QualityManagementResponsibility...........................................................................................G104

    G10.4 QA/QCProgramandPlan............................................................................................................G104

    G10.5 DocumentControl.......................................................................................................................G106

    G10.6 ProductIdentificationandTraceability.......................................................................................G107

    G10.7 InspectionandTesting................................................................................................................G107

    G10.8 NonComplianceandDispositionofNonConformingMaterials.............................................G1010

    andConstructedWorks

    G10.9

    Correctiveand

    Preventive

    Actions

    ............................................................................................

    G10

    11

    G10.10 QualityAuditsandTraining.......................................................................................................G1011

  • 8/10/2019 Vol III of IV - Section 11 - 01 General Specification

    9/224

    PROJEKMASSRAPIDTRANSITLEMBAHKELANG

    JajaranSungaiBuloh Kajang

    GeneralSpecificationforCivilEngineeringWorks

    KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 TOC5of8 Revision:00

    Page

    SECTIONG11ENVIRONMENTALMANAGEMENT

    G11.1 GeneralEnvironmentalManagement........................................................................................G111

    G11.2 LegalRequirements.....................................................................................................................G111

    G11.3 Environmentalpersonnel............................................................................................................G112

    G11.4 DetailedEnvironmentalImpactAssessment(DEIA).................................................................G112

    G11.5 EnvironmentalManagementPlan(EMP)..................................................................................G112

    G11.6 ErosionandSedimentControlPlan(ESCP)...............................................................................G114

    G11.7 Deliverables.................................................................................................................................G114

    G11.8 EnvironmentalProtectionWorks................................................................................................G115

    G11.9 StormwaterManagement...........................................................................................................G118

    G11.10Environmental

    Incidents

    .............................................................................................................

    G11

    8

    G11.11 EnvironmentalMonitoring,SiteInspectionandauditing...........................................................G118

    G11.12 Training,Promotionandawareness...........................................................................................G119

    G11.13 Meetings...................................................................................................................................G1110

    G11.14 NonCompliance........................................................................................................................G1110

    SECTIONG12PLANNING,PROGRAMMINGANDPROGRESSMONITORINGOFTHEWORKS

    G12.1 PlanningandProgramming.........................................................................................................G121

    G12.2

    Planningand

    Programming

    Organization

    ...................................................................................

    G12

    1

    G12.3 ProgrammeSubmissions.............................................................................................................G121

    G12.4 ProgressMonitoring....................................................................................................................G121

    G12.5 ProgrammeRequirements..........................................................................................................G122

    G12.6 BaselineProgramme...................................................................................................................G124

    G12.7 Design,ProcurementandManufacturingProgramme...............................................................G126

    G12.8 ArchitecturalBuildersWorksandFinishes(ABWF)and............................................................G128

    BuildingServicesProgramme

    G12.9

    Testingand

    Commissioning

    Programme

    ....................................................................................

    G12

    9

    G12.10 CoordinatedInstallationProgramme........................................................................................G129

    G12.11 ThreeMonthRollingProgramme.............................................................................................G1210

    G12.12 ScheduleofDesign....................................................................................................................G1211

    G12.13 TimeChainageProgramme.......................................................................................................G1213

    G12.14 TrackRelatedInstallationProgramme(TRIP)...........................................................................G1213

    G12.15 ConstructionEquipment&LabourReturns..............................................................................G1215

    G12.16 MonthlyProgressMeetingandReport.....................................................................................G1215

    G12.17 ProgrammeAnalysisReport......................................................................................................G1218

  • 8/10/2019 Vol III of IV - Section 11 - 01 General Specification

    10/224

    PROJEKMASSRAPIDTRANSITLEMBAHKELANG

    JajaranSungaiBuloh Kajang

    GeneralSpecificationforCivilEngineeringWorks

    KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 TOC6of8 Revision:00

    Page

    SECTIONG13LIAISONWITHOTHERS

    G13.1 Liaisonwithothers......................................................................................................................G131

    G13.2 WorkbyOtherWorksContractors.............................................................................................G131

    G13.3 Coordinationandcooperation....................................................................................................G132

    G13.4 OtherProjectContractsandCoordination................................................................................G132

    G13.5 InterfaceManagementPlansandInterfaceControlDocuments...............................................G134

    G13.6 CoordinationwithOtherWorksContractorsinpreparingCSDsandSEMs................................G136

    G13.7 CoordinationMeetings...............................................................................................................G138

    AppendixAG13.1 TableofContentsforInterfaceManagementPlan.....................................G139

    AndInterfaceControlDocument

    SECTIONG14DOCUMENTMANAGEMENT

    G14.1 Documents,submissionsandcorrespondence..........................................................................G141

    G14.2 ElectronicFileFormats................................................................................................................G142

    G14.3 Submissionsprogramme.............................................................................................................G143

    G14.4 Submissionandreviewprocedure..............................................................................................G144

    G14.5 Projectrecords............................................................................................................................G145

    SECTIONG15GENERALREQUIREMENTSFORBUILDINGSERVICESANDARCHITECTURAL

    BUILDERSWORKS

    AND

    FINISHES

    G15.1 General........................................................................................................................................G151

    G15.2 Submissions.................................................................................................................................G151

    G15.3 Coordination...............................................................................................................................G151

    G15.4 SubmissionsforBuildingServicesWorks....................................................................................G151

    G15.5 SubmissionsforArchitecturalBuildersWorksandFinishes.......................................................G156

    SECTIONG16SOFTWAREMANAGEMENTANDCONTROL

    G16.1

    General........................................................................................................................................

    G16

    1

    G16.2 SoftwareQualityAssurancePlan................................................................................................G161

    G16.3 SoftwareReleaseControl............................................................................................................G163

    G16.4 SoftwareProgressTracking.........................................................................................................G164

    G16.5 SoftwareAudit............................................................................................................................G165

    G16.6 SoftwareDocumentation............................................................................................................G166

    G16.7 SafetyIntegrityLevel...................................................................................................................G166

    G16.8 SoftwareDeliverablesandLicenses............................................................................................G167

    G16.9 Backup.........................................................................................................................................G168

    AppendixAG16.1 TypicalTableofContentsforSoftwareQualityAssurancePlan...................G169

  • 8/10/2019 Vol III of IV - Section 11 - 01 General Specification

    11/224

    PROJEKMASSRAPIDTRANSITLEMBAHKELANG

    JajaranSungaiBuloh Kajang

    GeneralSpecificationforCivilEngineeringWorks

    KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 TOC7of8 Revision:00

    Page

    SECTIONG17SYSTEMSAFETY

    G17.1 ConstructionRiskManagement..................................................................................................G171

    G17.2 SystemAssurance.......................................................................................................................G171

    SECTIONG18TESTINGANDCOMMISSIONING

    G18.1 General........................................................................................................................................G181

    G18.2 TestingandCommissioning........................................................................................................G181

    G18.3 OperationsManuals....................................................................................................................G182

    G18.4 AsBuiltDrawings........................................................................................................................G182

    G18.5 Training.......................................................................................................................................G183

    G18.6 TrainingMethods........................................................................................................................G185

    ENDOFTABLEOFCONTENTS

  • 8/10/2019 Vol III of IV - Section 11 - 01 General Specification

    12/224

    PROJEKMASSRAPIDTRANSITLEMBAHKELANG

    JajaranSungaiBuloh Kajang

    GeneralSpecificationforCivilEngineeringWorks

    KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 TOC8of8 Revision:00

    PageNot

    Used

  • 8/10/2019 Vol III of IV - Section 11 - 01 General Specification

    13/224

    PROJEKMASSRAPIDTRANSITLEMBAHKELANG

    JajaranSungaiBuloh Kajang

    GeneralSpecificationforCivilEngineeringWorks

    SectionG1 General

    KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 G11of18 Revision:00

    SECTIONG1

    GENERAL

    Applicationof

    theGeneral

    Specification

    G1.1

    (1)

    Theprovisions

    contained

    in

    the

    Particular

    Specification

    and

    the Drawings shall in the event of any inconsistency or

    discrepancy prevail over the provisions contained in this

    General Specification (GS) and the Materials and

    WorkmanshipSpecification.

    (2) The provisions contained in the GS shall prevail over the

    provisionscontainedintheStandards,CodesofPracticeand

    similarstandarddocumentsstatedintheContract.

    (3) This GS shall be read in conjunction with other documents

    includedin

    the

    Contract.

    (4) Allclauseandsectionreferences intheGSshallrefertothe

    Sections, SubSections, clauses and subclauses within this

    documentunlessspecificallydescribedotherwise.

    (5) References in the Contract to "General Specification" shall

    meanthisdocumentandtotheprovisionscontainedherein.

    (6) Further to the requirements of the Conditions of Contract

    concerning the sufficiency of the Contract Documents, the

    WorksPackage

    Contractor

    shall

    promptly

    notify

    the

    PDP

    of

    any error, omission, fault or other defect in the Drawings

    and/orSpecificationswhichhediscoverswhenreviewingthe

    ContractorExecutingtheWorks.

    Abbreviations

    and

    definitions

    G1.2 (1) Abbreviations used in the GS shall have the following

    meanings:

    ABWF : ArchitecturalBuilders'WorksandFinishes

    AC : AlternatingCurrent

    ALARP : AsLowAsReasonablyPossible

    ASTM : AmericanSocietyforTestingandMaterials

    BMS : BuildingManagementSystem

    BS : BritishStandard

    CAD : ComputerAidedDrafting

    CAR : CorrectiveActionRequest

    CICE : ContractorsIndependentCheckingEngineer

    CIDB : ConstructionIndustryDevelopmentBoard

  • 8/10/2019 Vol III of IV - Section 11 - 01 General Specification

    14/224

    PROJEKMASSRAPIDTRANSITLEMBAHKELANG

    JajaranSungaiBuloh Kajang

    GeneralSpecificationforCivilEngineeringWorks

    SectionG1 General

    KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 G12of18 Revision:00

    CPM : CriticalPathMethod

    CSD : CombinedServicesDrawings

    DEIA : DetailedEnvironmentalImpactAssessment

    DID

    :

    Departmentof

    Irrigation

    and

    Drainage

    DOSH : DepartmentofOccupationalSafety&Health

    DSM : DeterministicSafetyAnalysis

    E&M : ElectricalandMechanical

    EMP : EnvironmentalManagementPlan

    EN : EuropeanStandards

    ERP

    :

    EmergencyPreparedness

    and

    Response

    Plan

    ESCP : ErosionandSedimentControlPlan

    GS : GeneralSpecification(thisdocument)

    ICD : InterfaceControlDocument

    IEC : InternationalElectrotechnicalCommission

    IEE : InstitutionofElectricalEngineers

    IEEE

    :

    Institutionof

    Electrical

    and

    Electronic

    Engineers

    IMP : InterfaceManagementPlan

    IP : IndustrialProtection

    ISO : InternationalOrganisationforStandardization

    ITP : InspectionandTestingPlan

    LBS

    :

    LocationBreakdown

    Structure

    M&WS: MaterialsandWorkmanshipSpecification

    MSDS : MaterialSafetyDataSheet

    NCR : NonComplianceReport

    OBS : OrganisationBreakdownStructure

    PAT : PartialAcceptanceTests

    PCMM:

    ProjectCodes

    and

    Method

    of

    Measurement

    PDM : PrecedenceDiagrammingMethod

  • 8/10/2019 Vol III of IV - Section 11 - 01 General Specification

    15/224

  • 8/10/2019 Vol III of IV - Section 11 - 01 General Specification

    16/224

    PROJEKMASSRAPIDTRANSITLEMBAHKELANG

    JajaranSungaiBuloh Kajang

    GeneralSpecificationforCivilEngineeringWorks

    SectionG1 General

    KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 G14of18 Revision:00

    (3) Further to Clause 1.1 of the Conditions of Contract, the

    following words or phrases used in the GS shall have the

    meaningsgiventothembelow:

    Baseline Programme means the Works Package

    Contractorscoordinated

    detailed

    programme

    for

    the

    Works

    prepared in accordance with Clause G12.6, and which is

    referred to in the Conditions of Contract as the baseline

    programme, Approved Programme or Approved Revised

    Programme,dependingonthestatusoftheprogramme.

    Commissioning means all activities and operations to be

    performedbytheWorksPackageContractor toensurethat

    allmachinery,apparatusandsystems, insofaras ispossible,

    is capable of being fully operated by the Works Package

    Contractor to satisfy all Integrated Test functions and tests

    tobeperformedduringtheTestRunningperiod.

    Completion Testsmeans tests including InstallationTests,

    PAT, SAT, TOC and PRO to be executed after the supply,

    deliveryandinstallationofthePermanentWorksbutpriorto

    practical completion of the Works or after any part of the

    Permanent Works contained in any section of the Works is

    installed but prior to practical completion of the section of

    theWorksinwhichthepartiscomprised.

    Contractors

    Independent

    Checking

    Engineer

    means

    the

    Registered Professional Engineer appointed by the Works

    Package Contractor to independently check and certify the

    designofTemporaryWorks.

    "DefinedArea"meansanareaoftrackasdescribedinClause

    G2.11.

    DesignDocumentsmeansalldrawings,designcalculations,

    software, specifications, samples, patterns, models, written

    procedures and all other documents and things relating to

    the

    design

    of

    the

    Permanent

    Works

    and/or

    the

    Temporary

    Works which are prepared by or on behalf of the Works

    PackageContractor.

    "General Works Train" or Works Train means any rolling

    stockprovidedbythePDPortheWorksPackageContractor

    respectively for thepurposeofcarryingout installationand

    testingworkswithintheDefinedAreaorRestrictedArea.

    IntegratedTestmeansthosesystemwideoperabilitytests

    tobeundertakenbytheWorksPackageContractorwhereby

    the

    Works

    Package

    Contractor

    shall

    demonstrate

    the

    compatibility between his plant and the plant of Other

    WorksContractors.

  • 8/10/2019 Vol III of IV - Section 11 - 01 General Specification

    17/224

    PROJEKMASSRAPIDTRANSITLEMBAHKELANG

    JajaranSungaiBuloh Kajang

    GeneralSpecificationforCivilEngineeringWorks

    SectionG1 General

    KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 G15of18 Revision:00

    Monthly Progress Report means a report which shall be

    preparedandsubmittedbytheWorksPackageContractorto

    the PDP on a monthly basis, detailing the progress of the

    ContractandothermattersasspecifiedinSectionG12.

    "Operating

    Railway"

    means

    the

    existing

    railway

    tracks

    currentlyinrevenueoperationorinTrialOperationsandany

    ancillaryareassuchasthedepots,sidings,stations,terminus

    and traction power feeder stations which form part of the

    operatingsystem.

    "RailwayOperator"meansPrasarana(oroneof itsgroupof

    companies),orKTM,orothersuchcompanywhichoperates

    or will operate the particular railway or transit system

    referredtointheclauseinwhichthetermhasbeenapplied.

    "RelevantAuthority"

    means

    any

    Government

    department

    or

    publicbodyhavingjurisdictioninrelationtotheWorks.

    "Restricted Area" means the location in the railway under

    construction which houses electrical or mechanical

    equipmentthathasbecomeenergisedandhencepotentially

    dangeroustopeopleworkinginthearea. Whenthetermis

    usedfortrackareaitsassociatedpowerrailisenergisedand

    it isbarricadedfromunauthorisedaccessandtrainsmaybe

    runningathighspeedfortesting.

    S

    curve

    means

    the

    graphical

    relationship

    between

    the

    planned (and actual where appropriate) quantity of

    completed work (or resources) and time. The curve

    producedistobeillustratedonanaccumulativebasiswhere

    the slope of the line indicates the rate of undertaking the

    workorrateofexpenditureoftheresources.

    TestRunningmeansthatperiodofPAT,SAT,andTOCprior

    toTrialRunningwhentheOtherWorksContractorsshallbe

    testing their plant and equipment and run the same in

    conjunction

    with

    the

    Railway

    Operator.

    In

    addition

    during

    thisperiodsystemwidetestsshallbeundertakenthatshall

    requiretheattendanceofrelevantOtherWorksContractors.

    TrialRunningmeansthatperiodimmediatelyfollowingthe

    completion of a section of railway under construction, but

    prior to opening, when the Railway Operator shall be

    operating the rolling stock and all other systems and

    generally using the railway as though a scheduled service

    was operating, except for the absence of farepaying

    passengers.

    Glossaryof

    terms

    G1.3 (1) Words and expressions to which meanings are assigned in

    anySectionoftheGSshallhavethesamemeaningsinother

  • 8/10/2019 Vol III of IV - Section 11 - 01 General Specification

    18/224

    PROJEKMASSRAPIDTRANSITLEMBAHKELANG

    JajaranSungaiBuloh Kajang

    GeneralSpecificationforCivilEngineeringWorks

    SectionG1 General

    KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 G16of18 Revision:00

    Sections of the GS except when the context otherwise

    requires.

    (2) Utilitiesareelectricity,lighting,trafficcontrol,telephoneand

    other communication cables, gas, water supply, sewerage

    and drainage, including all associated protection, supports,

    ancillarystructures,

    fittings

    and

    equipment.

    (3) Survey Datum Levels refers to the prevailing datum system

    applicabletotheKlangValley.

    (4) The survey projection and the coordinates used on the

    Drawings refers to theprevailing surveysystemapplicable to

    theKlangValley.

    Trials G1.4 (1) Trials shall be carried out as stated in the Materials and

    Workmanship Specification to demonstrate that proposed

    materials

    and

    methods

    of

    construction

    will

    produce

    work

    whichcomplieswiththespecifiedrequirements.

    (2) Trials shall be carried out before the construction of the

    relevant Permanent Works commences so as to allow the

    PDPasufficientperiodtodetermineifthetrialcomplieswith

    thespecifiedrequirements.

    (3) Trials shall be carried out using materials and methods of

    constructionofthetypesandlocationsapprovedbythePDP.

    (4)

    If,in

    the

    opinion

    of

    the

    PDP,

    work

    which

    complies

    with

    the

    requirementsoftheContracthasnotbeenproduced inthe

    trial, particulars of proposed changes to the materials or

    methodsofconstructionshallbesubmitted forapprovalby

    thePDP,andfurthertrialsshallbecarriedoutuntilrelevant

    work which complies with the specified requirements has

    been produced in the trial, unless otherwise agreed by the

    PDP.Worksforwhichtrialsarerequiredshallnotcommence

    until, in the opinion of the PDP, work which complies with

    thespecifiedrequirementshasbeenproducedinthetrial.

    (5) UnlesspermittedbythePDP,thematerialsandmethodsof

    constructionusedtoproduceworkwhichcomplieswiththe

    specifiedrequirementsinatrialshallnotbechangedunless

    furthertrialshavebeencarriedouttodemonstratethatthe

    proposedchangesaresatisfactory.

    Standardsand

    Codesof

    Practice

    G1.5 (1) The particular edition of any Standard or Code of Practice

    applicable to the Works, shall be the edition stated in the

    Specifications. If no edition is specified, the Standard or

    CodeofPracticeshallbedeemedtobetheeditioncurrentat

    thetime

    of

    Tender,

    unless

    otherwise

    approved

    by

    the

    PDP.

    If

    theMalaysianStandardexists,whichthePDPdeterminesto

    beequivalenttotheBritishorotherStandardspecified,then

  • 8/10/2019 Vol III of IV - Section 11 - 01 General Specification

    19/224

    PROJEKMASSRAPIDTRANSITLEMBAHKELANG

    JajaranSungaiBuloh Kajang

    GeneralSpecificationforCivilEngineeringWorks

    SectionG1 General

    KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 G17of18 Revision:00

    theMalaysianStandardshallbefollowed.

    (2) In the event of any discrepancy between the provisions of

    the Specifications and the provisions within the relevant

    Standards or Codes of Practice as mentioned in this

    Specification, then the provisions of the Specifications shall

    takeprecedence.

    (3) The Works Package Contractor shall provide for the use of

    the PDP such Standards and Codes of Practice as may be

    required intheexecutionoftheWorks. Theseshallremain

    thepropertyoftheWorksPackageContractor.

    (4) The Permanent Works, and, where appropriate, materials

    andworkmanship,shallbe inaccordancewiththeMaterials

    andWorkmanshipSpecificationandtherequirementsofthe

    Contract, or where no standard is identified, the Works

    Package Contractor shall make a proposal which shall be

    subjecttoapprovalbythePDP.

    Drawings G1.6 (1) A list of those drawings forming part of the Contract

    (Drawings)isincludedintheSpecificationsifapplicable.

    (2) All references to drawing numbers shall refer to the latest

    amendmentofthatdrawing.

    (3) On completion of each section of the Works the Works

    Package Contractor shall be responsible for modifying the

    Drawingsto

    reflect

    the

    as

    built

    condition.

    This

    exercise

    shall

    include for all amendments to dimensions, removal or

    amendment to notes, changes from future tense to past

    tenseandmaterialsused.

    (4) For build only contracts, the asbuilt drawings shall be

    carried out on soft copies of the Drawings which shall be

    providedtotheWorksPackageContractorforthispurpose.

    (5) For design and build contracts, the asbuilt drawings shall

    be

    endorsed

    by

    the

    Works

    Package

    Contractors

    Design

    Consultant.

    Contractors

    Drawings

    G1.7 (1) The preparation and submission of drawings, sketches,

    figures, diagrams, illustrations and the like by the Works

    PackageContractorintheexecutionoftheWorks,shallbein

    accordance with the PDPs CAD requirements or other

    standardapprovedbythePDP. Anysoftcopiesofdrawings

    provided for theuseof theWorksPackageContractorshall

    be modified by him if necessary to ensure that his

    submissionscomplywiththeapprovedCADrequirements.

    (2) The Works Package Contractor shall be responsible for the

    production of AsBuilt drawings. These shall include, but

  • 8/10/2019 Vol III of IV - Section 11 - 01 General Specification

    20/224

    PROJEKMASSRAPIDTRANSITLEMBAHKELANG

    JajaranSungaiBuloh Kajang

    GeneralSpecificationforCivilEngineeringWorks

    SectionG1 General

    KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 G18of18 Revision:00

    are not limited to: structural design drawings; architectural

    drawingsincludingdetaildrawings,framingplans,fixingsetc;

    E&M drawings including details of components, fixing,

    conduit locations; drawings of all services. These shall be

    preparedandsubmittedinaccordancewithSectionG14.

    (3)

    TheWorks

    Package

    Contractor

    shall

    submit

    the

    following

    no.

    ofcopiesofAsbuiltdrawings:

    a) Four sets of A1 size drawings comprising 1 set of

    originalreproducibledrawingsand3setsofnonfade

    prints.

    b) SixsetsofA3sizeprintsreducedfromtheoriginalA1

    sizedrawings.

    c) FoursetsofelectroniccopiesstoredonCDROM.

    (4) The Works Package Contractor shall be responsible for the

    production of all drawings required for submission to

    statutorybodies,otherGovernmentDepartments,andutility

    undertakingsinordertoprogresstheWorks.

    Metricand

    Imperialunits

    G1.8 Specifications in imperial units shall not be substituted for

    Specifications in metric units stated in the Contract without the

    priorapprovalofthePDP.

    Dimensions

    fromDrawings

    G1.9 Dimensions shall not be obtained by scaling from the Drawings.

    Dimensions

    which

    are

    not

    shown

    on

    such

    drawings

    or

    calculable

    from dimensions shown on such drawings shall be obtained from

    thePDP.

    Investigation

    data

    G1.10 (1) Utility investigation data, ground investigation, laboratory

    investigation, laboratory testing data, rock cores and soil

    samples taken from ground investigation commissioned or

    obtained by the PDP in connection with the Project, are

    availableforinspectiononapplicationtothePDP.

    (2) Theutility investigationdata,ground investigationdataand

    laboratory

    testing

    data

    are

    made

    available

    to

    the

    Works

    Package Contractor solely for the purpose of assisting the

    WorksPackageContractortomakehisowninterpretationof

    thegroundconditionsandutilitylocations. Theaccuracyor

    reliability of the information given in the information

    supplied,preparedorcommissionedatanytimebythePDP

    in connection with the Works and adjacent or interfacing

    worksisnotwarrantedandthePDPshallhavenoliabilityto

    theWorksPackageContractorinanymannerwhatsoeverfor

    suchinformation.

    (3) Allotheradditionalutilityinvestigation,groundinvestigation

    and laboratory testing required for the execution of the

  • 8/10/2019 Vol III of IV - Section 11 - 01 General Specification

    21/224

    PROJEKMASSRAPIDTRANSITLEMBAHKELANG

    JajaranSungaiBuloh Kajang

    GeneralSpecificationforCivilEngineeringWorks

    SectionG1 General

    KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 G19of18 Revision:00

    WorksshallbecarriedoutbytheWorksPackageContractor

    inaccordancewiththeContract.

    G1.11 SurveyoftheSite

    SurveyWorks G1.11.1 (1) The PDP has established a Primary Control Survey Network

    for

    the

    Project.

    The

    Works

    Package

    Contractor

    shall

    reference this network and undertake all survey works

    necessary to establish, maintain control of and record the

    locations, alignments and levels of the Works. The survey

    worksshall,withoutlimitation,include:

    a) ASurveyControlNetworkfortheWorks. TheWorks

    Package Contractor shall within two (2) calendar

    months from the date of the Letter of Acceptance

    complete and submit for the PDPs approval his

    SurveyControlNetwork.

    b) An Initial Land Record Survey or surveys of parts of

    the Site, which shall be completed together with

    drawingrecordspriortocommencementofworkon

    thatpartoftheSite.

    c) AllsurveysrequiredduringtheprogressoftheWorks

    to control and record the location, alignment and

    leveloftheWorks.

    d) TheasbuiltsurveysofthePermanentWorksandthe

    preparation

    of

    Survey

    Records

    Drawings

    in

    accordance with the requirements of this Section

    G1.11.

    e) Whereapplicable,thedeformationmonitoringofany

    Permanent Works which are constructed on

    reclaimedland.

    f) Precondition surveys of buildings, structures and

    otherfacilitiespotentiallyaffectedbytheworks.

    g)

    Videosurveys

    of

    all

    existing

    drains

    and

    sewers

    within

    the Site and to the nearest manhole or catchpit

    outsidetheSiteboundary.

    (2) For the Survey Control Network, the Works Package

    Contractor is required to establish a first order Horizontal

    Survey Control Network that consists of Primary Control

    StationsplusaVerticalSurveyControlNetworkatgradelevel

    to be established that consists of Bench Marks. The

    requirements and standards of accuracy for the networks

    shallbe

    :

  • 8/10/2019 Vol III of IV - Section 11 - 01 General Specification

    22/224

    PROJEKMASSRAPIDTRANSITLEMBAHKELANG

    JajaranSungaiBuloh Kajang

    GeneralSpecificationforCivilEngineeringWorks

    SectionG1 General

    KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 G110of18 Revision:00

    HorizontalNetwork Requirements

    Accuracy 1:100,000forundergroundworkssections.

    1:60,000forelevatedworkssections

    Origin MajorTrigonometrical Stations.

    Distancesbetween

    adjacent

    stations

    established

    tobebetween500mand1000m.

    VerticalNetwork Requirements

    Accuracy Levellingrouteshorterthan1km:

    +/ 1mm N(whereNisnumberofsetup) Levellingrouteover1km:

    +/ 4mm K(whereKisinkilometres)forundergroundworkssections

    +/ 6mm K(whereKisinkilometres)forelevatedworkssections

    Origin Atleast2agreedpermanentbenchmarksat

    bothendsofthelevellingrouteshouldbe

    selected.

    (3) The location of control stations and benchmarks must be

    safe, stable and easily accessible. The Works Package

    Contractor is responsible for site clearance to ensure inter

    visibility between horizontal control stations and to obtain

    allrelevantpermitsforperformingthesurvey.

    (4) SurveyStationMarkerstobeinstalledforthenewHorizontal

    ControlNetwork

    Stations

    and

    Benchmarks

    shall

    be

    in

    one

    of

    thefollowingtypes:

    SurveyMarker GroundConditions

    TriangulationMonument(Concrete

    pillar)

    Hilltop

    PicketBox Openground

    SurveyNail Kerbstones,pavement,concrete

    sumps,concreterooforstructures

    StainlessSteelRodBenchMark Concretewall/structuresornatural

    rock

    (5) Priortothecommencementoffieldobservations,theWorks

    Package Contractor must submit for approval a Survey

    Method Statement that includes the following information

    to demonstrate that the survey is capable of achieving the

    accuraciesandstandardsofthisGS:

    a) TheroutingandconfigurationsoftheNetworks,

    b) Thepreanalysisreports,

    c) The use of techniques, instruments, equipment,

    materials and data processing and computing

  • 8/10/2019 Vol III of IV - Section 11 - 01 General Specification

    23/224

    PROJEKMASSRAPIDTRANSITLEMBAHKELANG

    JajaranSungaiBuloh Kajang

    GeneralSpecificationforCivilEngineeringWorks

    SectionG1 General

    KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 G111of18 Revision:00

    softwarepackages,

    d) Surveyoperationschemeandqualityprocedures,

    e) Staffingqualificationsandexperience,and

    f)

    Data

    handling

    procedures

    and

    data

    format

    for

    final

    resultsubmissions.

    (6) Oncompletionofthesurvey,theWorksPackageContractor

    shallsubmitthefollowingdeliverables:

    a) A survey report summarizing instruments used,

    survey procedures, approach to adjustment

    computationandanalysisresult.

    b) Hard and softcopy of a Survey Album that includes

    network diagrams and location sketches, Station

    SummarysheetforeachStationandBenchMarkwith

    acoordinatelistofalltheStationsandBenchMarks.

    c) Original field notes, data disks, field sketches,

    computation sheets for all reduction computation

    andadjustmentresults.

    d) Avalidcalibrationcertificateforeachinstrumentand

    valid license for each software package used in the

    survey.

    (7) The Initial Land Record Survey shall be undertaken prior tothecommencementofworksonSiteandnoworksmaybe

    carriedoutonanypartoftheSiteuntilithasbeensurveyed

    andthesurveyrecordsapprovedbythePDP. Itshall:

    a) Recordalloriginallandforms,features,levelsandthe

    like.

    b) Establish the lines, levels and boundaries of the

    Works.

    c)

    Locate

    or

    confirm

    the

    details

    and

    location

    of

    all

    utilitiesandservicesonorintheSite.

    d) Check where relevant adjacent roads, buildings,

    structuresandanyconstructionworknotassociated

    withtheContractarelocated.

    (8) The Initial Land Record Survey shall be undertaken with a

    view to providing sufficient detailed information of major

    existing features which are to be demolished or altered

    duringthecourseoftheWorksandformthebasisforfuture

    Site reinstatement and as a record for details/standards

    requiredforsuchreinstatement.

  • 8/10/2019 Vol III of IV - Section 11 - 01 General Specification

    24/224

    PROJEKMASSRAPIDTRANSITLEMBAHKELANG

    JajaranSungaiBuloh Kajang

    GeneralSpecificationforCivilEngineeringWorks

    SectionG1 General

    KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 G112of18 Revision:00

    (9) Precondition surveys of buildings and structures shall be

    carried out by a suitably qualified engineer or qualified

    building surveyor, as necessary for the nature of the

    structure concerned and which shall produce an accurate

    record (together with photographic records) of the existing

    stateof

    the

    structure

    prior

    to

    the

    commencement

    of

    work

    in

    theconcernedarea. Inadditiontoanyreportsissuedtothe

    Relevant Authorities, the Works Package Contractor shall

    submitthree(3)copiesofthepreconditionsurveyreportsto

    the PDP not less than twentyeight (28) days prior to the

    commencementofworkinthatarea.

    (10) The Works Package Contractor shall conduct video record

    surveysofallexistingdrainageandseweragesystemswithin

    anddirectlyadjacenttotheSiteandsubmittothePDPtwo

    copies

    of

    all

    survey

    records

    and

    video

    footage

    prior

    tocommencement of any works within the relevant parts of

    the Site. The surveys shall extend to the first manhole

    outsidetheSiteboundary.

    (11) The Works Package Contractor shall conduct video record

    surveys of all existing and new drainage and sewerage

    systemswithintheSiteandsubmittothePDPtwocopiesof

    allsurveyrecordsandvideofootagewithintwentyeight(28)

    days of the issue of the Certificate of Practical Completion

    fortheWorks.

    SurveyQuality

    Plan

    G1.11.2 TheWorksPackageContractorshallsubmitforapprovalbythePDP

    withinone (1)month fromthedateoftheLetterofAcceptance,a

    SurveyQualityPlanorplansforthecontrolofallsurveywork. The

    SurveyQualityPlanshalldefine:

    a) The organization, responsibilities and authorities given to

    identifiedpersonnel.

    b) The methods and procedures for establishing, maintaining

    controlofandrecordingallsurveyactivitiesrequiredbythe

    Contract.

    c) The proposed method of recording the data arising from

    these surveys and the electronic digital format for such

    records.

    e) TheSurveyPlaninaccordancewiththisSection.

    f) The method and procedure for notifying the PDP of all

    surveyactivities.

    g)

    The

    methods

    and

    procedures

    for

    the

    calibration

    of

    thesurveyequipment.

  • 8/10/2019 Vol III of IV - Section 11 - 01 General Specification

    25/224

    PROJEKMASSRAPIDTRANSITLEMBAHKELANG

    JajaranSungaiBuloh Kajang

    GeneralSpecificationforCivilEngineeringWorks

    SectionG1 General

    KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 G113of18 Revision:00

    h) Thefrequencyofmonitoring forallSurveyControlNetwork

    Points.

    TheSurvey

    Manager

    G1.11.3 TheWorksPackageContractorshallappointasuitablyqualifiedand

    competentpersonastheSurveyManager,toberesponsibleforthe

    task

    of

    ensuring

    that

    the

    requirements

    of

    the

    Survey

    Quality

    Plan

    are implemented and maintained. The Works Package Contractor

    shallatthetimeofsubmissionoftheSurveyQualityPlan,submitfor

    approval by the PDP details of the qualifications, experience,

    authorityandresponsibilitiesoftheproposedSurveyManager.

    SurveyPlan G1.11.4 Each survey undertaken by the Works Package Contractor shall be

    deemed to be a quality control activity. A Survey Plan or plans

    suitablystructuredtocomplywiththerelevantrequirementsofthis

    sectionshallbesubmittedforapprovalbythePDP.TheSurveyPlan

    shalldefinetheprogrammeandfrequencyrequiredfor:

    a) Theestablishmentofsurveycontrolorreferencepoints.

    b) Constructionsurveys,whicharetobeundertakentocontrol

    theworkduringeachconstructionprocess.

    c) Progresssurveys,whicharetobeundertakentorecordthe

    statusoftheworkforpurposessuchastheachievementof

    KeyDatesandMilestones.

    d) Asbuilt surveys, which are to be undertaken to record the

    location,

    alignment

    and

    level

    of

    all

    completed

    elements

    of

    thePermanentWorks.

    e) Whereapplicable,themonitoringofthelevelsofPermanent

    Workswhichareconstructedonreclaimedland.

    f) Ascheduleformonitoringofdeformationandsettlementof

    existingstructuresandbuildingswithinthezoneofinfluence

    ofconstructionshallbemaintainedwhereapplicable.

    Monitoringof

    SurveyWorks

    G1.11.5 TheWorksPackageContractorshallprovideallreasonablefacilities

    tothe

    Supervising

    Consultant,

    and

    others

    authorised

    by

    the

    PDP

    to

    witness any survey activity and to check the accuracy of the

    measurementsandtherecordsofsuchactivities. Thisshallinclude

    without limitation, the provision of all survey measurements in

    electronicdigitalformatandotherrecordsuponrequest.

    AsBuilt

    Surveys

    G1.11.6 Unless otherwise agreed with the PDP, the Works Package

    Contractor shall ensure that the asbuilt surveys are undertaken

    withintwo(2)daysofthecompletionofeachstageorsectionofthe

    PermanentWorksandthesurveyrecordsubmittedforapprovalby

    thePDPwithinseven(7)daysthereafterandshallbesuchthat:

    (1) the determinationof frequencyof the location and level of

    eachelementofthePermanentWorksshallcomplywiththe

  • 8/10/2019 Vol III of IV - Section 11 - 01 General Specification

    26/224

    PROJEKMASSRAPIDTRANSITLEMBAHKELANG

    JajaranSungaiBuloh Kajang

    GeneralSpecificationforCivilEngineeringWorks

    SectionG1 General

    KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 G114of18 Revision:00

    requirementsofAppendixAG1.1;

    (2) the determination of accuracy for the location and level of

    the Permanent Works shall be commensurate with the

    constructiontolerancesthatareapplicabletothePermanent

    Works;and

    (3) if a concession has been permitted by the PDP for a

    deviation from the required level and or alignment, then

    sufficient additional points shall be provided to define the

    fullextentofeachdeviation.

    Measurement

    Units

    G1.11.7 The units of measurement for recording the asbuilt location and

    levelofthePermanentWorksshallbeasfollows:

    LinearMeasurements: Metres

    VerticalMeasurements

    :

    Metres

    AngularMeasurements: Clockwisefrom0to360Degrees.

    Azimuth: LocalPlaneRectangularSystem

    Deformation

    Monitoring

    G1.11.8 WhereapartorasectionofthePermanentWorksisconstructedon

    reclaimedland,theWorksPackageContractorshallsubmit,atleast

    twentyeight (28)days prior to thecompletion ofany part ofsuch

    work, details of the surveys required for the monitoring of both

    vertical and horizontal movement of the completed works. These

    detailsshall,

    without

    limitation,

    define:

    a) Theextentofeachsurvey.

    b) ThetimebetweenthecompletionoftheworkandtheInitial

    Survey.

    c) Thefrequencyofthesubsequentsurveys.

    d) Theformatinwhichthedatawillberecorded.

    e) Theformatand frequency forreportingtheresultsofthese

    surveysto

    the

    PDP.

    MainSurvey

    ControlPoints

    forOther

    Works

    Contractors

    G1.11.9 The Works Package Contractor shall provide and protect until

    handed over a series of Main Survey Control Points for the Other

    Works Contractors. They shall be ready one month prior to the

    access of the Other Works Contractor. The maximum spacing

    between the Main Survey Control Points shall be no more than

    250mandshallbeintervisible. Thematerialsforthesurveymarker

    shall be proposed by the Works PackageContractor and approved

    by the PDP. Main Survey Control Points shall be placed such that

    theyremain

    accessible

    before,

    during

    and

    after

    track

    construction.

    Detailed requirements for the Main Survey Control Points for

    differentstructuresarespecifiedbelow.

  • 8/10/2019 Vol III of IV - Section 11 - 01 General Specification

    27/224

    PROJEKMASSRAPIDTRANSITLEMBAHKELANG

    JajaranSungaiBuloh Kajang

    GeneralSpecificationforCivilEngineeringWorks

    SectionG1 General

    KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 G115of18 Revision:00

    a) TunnelandStationStructure

    Main Survey Control Points shall be established for each

    tunnel bore on each track inside the Stations. The Survey

    Control Points shall be located on the tunnel roof or walls

    clearof

    the

    track

    and

    walkway

    concrete.

    Additional

    points

    shallbe installedateach levelwithinthestationtosuitthe

    OtherWorksContractorsrequirements.

    b) ViaductStructure

    MainSurveyControlPointsshallbeestablishedfortheDown

    Trackonly iftheyarevisible forboth trackson theviaduct.

    Otherwise additional Main Survey Control Points along the

    Up Track will be required. The Main Survey Control Points

    shall be located on the upper surface of the viaduct deck

    within1m

    distance

    from

    the

    column

    pier

    at

    the

    fixed

    end

    of

    theviaductdeck.

    c) AtGrade

    MainSurveyControlPointsshallbeestablishedwithin20m

    of the mainline tracks. Otherwise additional Main Survey

    Control Points will be required for other tracks. The Main

    Survey Control Points shall be located offset from track

    centrelineandclearoftheballastonfixedstructures.

    AsBuilt

    Survey

    Record

    Drawings

    G1.11.10

    TheWorks

    Package

    Contractor

    shall

    prepare

    and

    maintain

    aset

    of

    drawings of the Permanent Works to show the asbuilt survey

    records in accordance with Appendix AG1.1 and to identify all

    deviations thereto, whether due to the PDPs instructions, the

    WorksPackageContractorsmethodofconstruction,siteconditions

    or any other reason. Unless otherwise permitted by the PDP, the

    Works Package Contractor shall ensure that the data from the as

    built surveys is incorporated into the As Built Survey Record

    Drawings and submitted for approval within fourteen (14) days of

    the dateof theasbuiltsurvey.Thepreparationand submissionof

    AsBuilt

    Survey

    Record

    Drawings

    shall

    comply

    with

    the

    requirements

    ofthePDPsCADstandards.

    Deliverables G1.11.11 (1) One complete set of As Built Survey Record Drawings, in a

    form acceptable to the PDP, shall be signed by the Works

    PackageContractorsSurveyManagerasbeingatruerecord

    ofthePermanentWorksasbuilt. TheAsBuiltSurveyRecord

    DrawingsshallbesubmittedtothePDPandapprovalpriorto

    applying for a Certificate of Practical Completion for the

    relevantSectionorforthewholeoftheWorks.

    (2)

    Onecomplete

    set

    of

    As

    Built

    Survey

    Record

    Drawings

    shall

    comprisethefollowing:

  • 8/10/2019 Vol III of IV - Section 11 - 01 General Specification

    28/224

    PROJEKMASSRAPIDTRANSITLEMBAHKELANG

    JajaranSungaiBuloh Kajang

    GeneralSpecificationforCivilEngineeringWorks

    SectionG1 General

    KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 G116of18 Revision:00

    (a) Three(3)A1sizepaperprintsofeachdrawing.

    (b) One(1)A1sizenegativecopyofeachdrawing.

    (c) Two(2)setsofelectronicCADfiles.

    (3)

    Further

    to

    ClauseG1.7(2),

    As

    Built

    Survey

    Record

    Drawings

    mayalsoformpartoftheAsbuiltdrawings, ifacceptable

    tothePDP,andprovidedinthequantitiesspecifiedinClause

    G1.7(3).

    Monthly

    Report

    G1.11.12 TheWorksPackageContractorshallinclude inhismonthlyreporta

    section covering the Survey Works. This section of the monthly

    report shall comment on the Survey Works undertaken and the

    Survey Records completed. The report shall also show planned

    SurveyProgrammesforthefollowingmonth.

  • 8/10/2019 Vol III of IV - Section 11 - 01 General Specification

    29/224

    PROJEKMASSRAPIDTRANSITLEMBAHKELANG

    JajaranSungaiBuloh Kajang

    GeneralSpecificationforCivilEngineeringWorks

    SectionG1 General

    KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 G117of18 Revision:00

    APPENDIXAG1.1

    REQUIREMENTSFORASBUILTSURVEYS

    ITEM REQUIREMENTSFORASBUILTSURVEYSASBUILTSURVEY

    RECORDDRAWINGS

    EARTHWORKANDPAVEMENTS

    1) Earthworksand

    landscaping

    Locationandlevelsatagridof20mcentres LocationPlan

    2) Roads&Footpaths Crosssectionsatmaximumof20mintervalsforeachlayer.

    Levelpointsoneachcrosssectionnottoexceed10mintervals

    andtoincludeeachchangeofhorizontalandvertical

    alignment,thecentrelineandtheedgesofeachlayer. All

    streetfurnitureandmanholes

    LocationPlanand

    crosssections

    showingalllayers

    3) Carparks Asforitem1 LocationPlanand

    crosssections

    showingalllayers

    STRUCTURES

    4) PilesandPileCaps Foundinglevel,cutofflevel&locations. LocationPlan

    5) Foundations,

    footings

    Foundinglevelsat5mcentres;location&leveloftop

    foundationconcrete

    LocationPlan

    6) Floorslabs Location&levelsofunderside&finishedfloorsurfaceat5m

    centres

    LocationPlan

    7) Columns Locationofcentrepointatcolumnhead&foot LocationPlan

    8) Walls Locationofinner&outerfacesateachendofwall,atvertical

    constructionjointsandatanychangesofalignment. Where

    topofwallisexposedthefinishedlevelsat5mcentresandat

    anychangesofalignment.

    LocationPlan

    9) Beams Locationofcentrelineandsoffitlevelateachendofbeamor

    atmaximum10mcentre

    LocationPlan

    10) Elevatedslabs Location&leveltotopsurfaceat5mcentres LocationPlan

    11) Tunnelsand

    StationPlatforms

    Eightpointswrigglesurvey(asbuilt)at2mcentres LocationPlan

    12)

    Viaduct

    Cross

    Sections

    not

    to

    exceed

    5m

    intervals

    plus

    at

    all

    MovementJoints Location

    Plan

    DRAINAGEWORKS

    13) Stormwaterdrains

    sewerdrains,orany

    gradedpipeworks

    Location&levelofstormwaterdrains invert,sewerdrains

    invert,andpipeinvertevery50m&ateachchangeof

    horizontalorverticalpipealignment,type&sizeofstorm

    waterdrain,sewerdrain,andpipe.

    Planandlong

    sectionshowing

    changesofgrade,

    invertlevels,drain

    typesandsizes,pipe

    types&sizesandthe

    depthbelowthe

    designedtopof

    earthworksorlayerwork

  • 8/10/2019 Vol III of IV - Section 11 - 01 General Specification

    30/224

    PROJEKMASSRAPIDTRANSITLEMBAHKELANG

    JajaranSungaiBuloh Kajang

    GeneralSpecificationforCivilEngineeringWorks

    SectionG1 General

    KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 G118of18 Revision:00

    ITEM REQUIREMENTSFORASBUILTSURVEYSASBUILTSURVEY

    RECORDDRAWINGS

    14) Manholes,Septic

    Tanks&Soakaways

    Location,size&typeofmanhole,&manholecover&invert

    level. Incoming&outgoingpipelines,sizeandinvertlevel

    Includeinabove

    plans

    15) Outfalls Locationandinvertlevel Includeinabove

    plans

    16) Headwalls Locationandlevel Includeinabove

    plans

    17) Gullies Location,leveldepthandsize Includeinabove

    plans

    18) Sumps,pumps

    roddingeyes,etc

    Locations,sizeandtype Includeinabove

    plans

    19) Pipework Location,leveloftopofearthworksorlayerworks&levelof

    pipecentrelineevery10mandateachchangeofhorizontalor

    verticalpipealignment,pipetypeandpipesize.

    LocationPlan

    20)

    Valves,Unions

    Location,

    size

    and

    type

    Expansion

    Joints,

    Pump,

    etc. Location

    Plan

    ENDOFSECTION

  • 8/10/2019 Vol III of IV - Section 11 - 01 General Specification

    31/224

    PROJEKMASSRAPIDTRANSITLEMBAHKELANG

    JajaranSungaiBuloh Kajang

    GeneralSpecificationforCivilEngineeringWorks

    SectionG2TheSite

    KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 G21of12 Revision:00

    SECTIONG2

    THESITE

    Accessto

    the

    SiteG2.1

    (1)

    The

    Works

    Package

    Contractor

    will

    be

    given

    access

    to

    the

    Site

    inaccordancewiththeConditionsofContract.

    (2) TheWorksPackageContractor shall at all timespermit and

    facilitateaccesstotheSiteandtheWorksbythestaffofthe

    PDP, Supervising Consultant, and all other personnel

    authorisedbythePDP.

    (3) TheWorksPackageContractor shall at all timespermit and

    facilitateaccesstotheSitebyGovernmentdepartmentsand

    utility undertakers, and other Relevant Authorities for the

    inspectionand

    maintenance

    of

    their

    facilities

    located

    within

    theSite.

    (4) The Works Package Contractor shall permit and facilitate

    accesstotheSiteandtheWorksbyOtherWorksContractors

    during the times specified in the Contract or as otherwise

    instructedbythePDP.

    (5) Unless otherwise permitted by the Contract, the Works

    Package Contractor shall maintain ingresses and egresses

    (including designated emergency access routes) to all

    properties and facilities within and around the Site. Any

    alternative access arrangements proposed by the Works

    PackageContractor shallbe safeand free fromhazardsand

    shall be subject to the approval of the RelevantAuthorities

    andofthePDP.

    (6) TheWorksPackageContractorshallberesponsibleforliaising

    withandobtainingpermissionfromallowners/occupiersof

    private land and properties in order to gain access to such

    properties for the purpose of carrying out survey works,

    monitoringworks,

    investigation

    works

    and

    the

    like.

    Siterestrictions G2.2 (1) TheparticularusetowhichtheSite isputshallbesubmitted

    for approval by the PDP and theWorks PackageContractor

    shall:

    a) confine his use of the areas of the Site to purposes

    having been approved by the PDPwho reserves the

    right to extend, amend or restrict the uses towhich

    areasof theSitewillbeput,which rightshallnotbe

    unreasonablyapplied;

    b) refrainfromdepositingrubbishorcausingnuisanceor

    permittingnuisance to be caused and, exceptwhere

  • 8/10/2019 Vol III of IV - Section 11 - 01 General Specification

    32/224

    PROJEKMASSRAPIDTRANSITLEMBAHKELANG

    JajaranSungaiBuloh Kajang

    GeneralSpecificationforCivilEngineeringWorks

    SectionG2TheSite

    KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 G22of12 Revision:00

    approvedbythePDP,depositingearthonorremoving

    earthfromareasoftheSite;

    c) refrain from obstructing manholes, utility access

    pointsandthelike.

    (2)

    Workother

    than

    that

    necessary

    for

    completion

    of

    the

    Works

    shallnotbecarriedoutonSite.

    (3) AtalltimeswhilsttheWorksPackageContractorhasaccessto

    theSite,heshallprovidemeansofdistributingloadsimposed

    by Works Package Contractors Equipment and traffic and

    preventdamagetoutilitiesandservices.

    (4) Except where otherwise provided, the Works Package

    ContractorshallnotpermitanypersontoresideontheSite.

    (5)

    Unlessotherwise

    stated,

    the

    Works

    Package

    Contractor

    shall

    payallratesandchargesofanynaturewhatsoeverarisingout

    of his use of the Site and all other works areas provided

    thereinundertheContract.

    (6) The location and size of stockpile material, including

    excavated material within the Site, shall be submitted for

    approvalbythePDP.Allstockpilesshallbemaintainedatall

    timesinastablecondition.

    (7) TheWorksPackageContractor shallnotallowanimals tobe

    broughtonto

    the

    Site.

    Siteservices G2.3 (1) TheWorksPackageContractorshallprovideallsiteservicesas

    necessaryandappropriatefortheconstructionoftheWorks,

    whichshallinclude,butnotnecessarilybelimitedto:

    a) electricity;

    b) water;

    c) compressedair;

    d)

    sitecommunication

    facilities;

    e) temporarydrainageandsewagedisposal;

    f) temporaryfireprotectionsystems;

    g) temporarylightningprotection;

    h) dangerousgoodsstores;and

    i) temporarylightingfacilities.

    (2)

    Suchservices

    shall

    be

    provided

    by

    the

    Works

    Package

    Contractor for use solely in connection with the proper

    executionof theWorks.TheWorksPackageContractorshall

  • 8/10/2019 Vol III of IV - Section 11 - 01 General Specification

    33/224

    PROJEKMASSRAPIDTRANSITLEMBAHKELANG

    JajaranSungaiBuloh Kajang

    GeneralSpecificationforCivilEngineeringWorks

    SectionG2TheSite

    KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 G23of12 Revision:00

    comply with all regulations of the utility undertakers and

    Government Departments concerned. The Works Package

    Contractor shall provide and maintain all installations

    associatedwithsuchservicesandinrelationtheretoshalltake

    allreasonableprecautionstosafeguardthesafetyandhealth

    of all persons and the security of the Site. The PDP may

    require the immediate disconnection or alteration of such

    installations or portions thereof as he considers to be

    prejudicialtosafety,healthorsecurity.Assoonasanyorall

    oftheWorksPackageContractor's installationsareno longer

    requiredfortheexecutionoftheWorks,theyshallbeentirely

    removedtothesatisfactionofthePDP.

    (3) All installations shall comply fully with all appropriate

    statutoryrequirements.Pipes,tubes,ductsorcablescrossing

    highways,footpaths,orrightsofwayshallberampedoveror

    recessedbelow

    the

    surface.

    Specific

    services

    shall

    comply

    withthefollowing:

    a) Electricity

    The electricity supply shall comply with the

    requirementsofSectionG7herein.

    b) Water

    Anadequatesupplyofpotablewatershallbeprovided

    at

    the

    Site,

    including

    provision

    to

    the

    satisfaction

    ofthewatersupplyauthorityofanystoragetankssothat

    sufficient potable water is always available for the

    executionoftheWorks.

    c) CompressedAir

    Except in pressurised workings, the compressed air

    supply forpneumatictoolsandequipmentshallbeat

    apressureofnotmorethan0.9MN/m2orothersuch

    pressureasmaybe limitedbyprevailing regulations.

    Detailsof

    proposed

    air

    supply

    for

    use

    in

    pressurised

    workings shall be submitted by the Works Package

    ContractorforapprovalbythePDP.

    d) SiteCommunicationFacilities

    The Works Package Contractor shall install efficient

    means of site communications including messenger,

    telephone and,where appropriate, twoway radio to

    thesatisfactionofthePDP.Intunnelwork,theWorks

    Package Contractor shall install telephone

    communicationbetween

    tunnel

    faces,

    bottoms

    and

    tops of shafts and the Works Package Contractor's

    officeandPDP'soffice. Temporary telephonepoints

  • 8/10/2019 Vol III of IV - Section 11 - 01 General Specification

    34/224

    PROJEKMASSRAPIDTRANSITLEMBAHKELANG

    JajaranSungaiBuloh Kajang

    GeneralSpecificationforCivilEngineeringWorks

    SectionG2TheSite

    KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 G24of12 Revision:00

    alongtunnelsshallbeprovidedatevery500metres.

    e) TemporaryTunnelandSubwayVentilation

    The temporary ventilation system for tunnels and

    subways shall achieve aminimum air velocity of 0.3

    m/secand

    shall

    prevent

    still

    air

    in

    equipment

    rooms,

    cross passages and niches. The Works Package

    Contractor shallensure thatallemissions,discharges

    oroperations shall include localventilation toensure

    suitableemissiondilution. Ifadditional ventilation is

    required to support the activities of the Works

    PackageContractor inaccordancewiththeairquality

    guidelines of BS6164, this shall be provided by the

    Works Package Contractor. All practical measures

    shallbetaken,includingtheuseofcatalyticconverters

    toensure

    that

    diesel

    operating

    plant

    is

    maintained

    and

    operated to a high standard in order to minimize

    emissionsandensuremaximumdilution.

    (4) ThePDPwill instructtheWorksPackageContractorastothe

    requirements for site services tobe connected to thePDP's

    portable site accommodation at any given location and the

    Works PackageContractor shall provide andmaintain these

    servicesduringhisuseoftheSite.

    Sitecleanliness G2.4 (1) The Site shall bemaintained in a clean and tidy condition.

    Materials,including

    materials

    required

    for

    Temporary

    Works

    shallbestoredinanorderlymanner. Rubbish,debris,cement

    bags,disused formwork,disusedpackagingandthe likeshall

    be disposed of at least once a day and the works areas

    cleanedbyflushingwithwaterifnecessarysothattheSiteis

    kept constantly cleanand tidy. Notwithstanding the above,

    theWorksPackageContractorshallalsoplacerubbishbinsat

    strategiclocationsthroughouttheSite.

    (2) TheWorksPackageContractorshallthroughouttheperiodof

    theContractprovideacentraldebriscollectionpointonSite,

    as approvedby thePDP. OtherWorksContractors shallbe

    required todeposit theirdebris in this collectionpointona

    dailybasisandtheWorksPackageContractorshallathisown

    expenseprocure the regular collection and removalof such

    debris from the Site.Aftereveryworks shift, allwork areas

    shallbecleanedandmadetidytothesatisfactionofthePDP.

    (3) As part of the Works Package Contractors general

    housekeeping, the removal of all unused materials,

    construction detritus, general waste, redundant packaging

    andthe

    like,

    shall

    be

    planned

    and

    carried

    out

    on

    aregular

    basis,andwhichshallalsobepartofhisfirecontrolstrategy

    for the Site. In addition, the Works Package Contractors

  • 8/10/2019 Vol III of IV - Section 11 - 01 General Specification

    35/224

    PROJEKMASSRAPIDTRANSITLEMBAHKELANG

    JajaranSungaiBuloh Kajang

    GeneralSpecificationforCivilEngineeringWorks

    SectionG2TheSite

    KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 G25of12 Revision:00

    housekeepingproceduresshallalsoincludethemonitoringof

    waste and detritus produced and left on the Site byOther

    Works Contractors to ensure that the Other Works

    Contractors are also removing suchmaterials from the Site

    expeditiously, and to alert the PDP in cases of non

    cooperationinsuchmatters.

    (4) The Works Package Contractor shall ensure that no earth,

    debris,orrock isdepositedonpublicorprivaterightsofway

    asa resultof theWorks, includinganydepositsarising from

    themovementofWorksPackageContractorsEquipment.All

    roads, both within and external to the Site which are

    impactedonbytheWorksshallbekeptincleanconditionby

    theWorksPackageContractor.Allhaulroadswillberegularly

    gradedandwatered,asnecessarytominimisedustnuisance.

    (5)

    The

    Works

    Package

    Contractor

    shall

    provide

    and

    maintain

    apatrol unit for the duration of theContract. The unit shall

    compriseone(1)foremanandtwo(2)labourerswhoshallall

    be delegated fulltime to the unit. Themain duties of the

    patrol unit shall include the up keeping of proper lighting,

    signingandguardingprovisionsaswellasotherrelatedduties

    asdirectedfromtimetotimebythePDP.

    (6) Thepatrolunit shallbe required toworkoutside theWorks

    PackageContractor'snormalworkinghours ifsorequiredby

    thePDP.

    (7) The Works Package Contractor shall provide all necessary

    protective clothing, safety equipment, hand tools, ladders,

    trestles,power supply, replacement equipment and the like

    fortheexclusiveuseofthepatrolunit.

    Parking

    Facilities

    G2.5 (1) The Works Package Contractor shall provide adequate

    parking facilities formobile equipment and vehicles on or

    closetotheSite.

    (2) The parking facilities shall provide adequate space for

    parkingall

    mobile

    equipment,

    works

    vehicles,

    delivery

    vehicles,stafftransportationvehiclesandvisitorsvehicles.

    (3) WheretheparkingfacilitiesarelocatedontheSite,covered

    walkwaysshallbeprovidedbetweentheparkingareasand

    Site facilities such as offices, storage, and accommodation

    areas.

    (4) WheretheparkingfacilitiesarelocatedawayfromtheSite,

    shuttle bus services and covered waiting areas shall be

    providedtofacilitatethemovementofpeoplebetweenthe

    parkingfacilityandtheSite.

    (5) TheWorksPackageContractorshallatno timepermitany

  • 8/10/2019 Vol III of IV - Section 11 - 01 General Specification

    36/224

    PROJEKMASSRAPIDTRANSITLEMBAHKELANG

    JajaranSungaiBuloh Kajang

    GeneralSpecificationforCivilEngineeringWorks

    SectionG2TheSite

    KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 G26of12 Revision:00

    mobileequipmentorvehicletobeparked inareasthatare

    notdesignatedparkingfacilities.

    (6) TheWorksPackageContractorshallatalltimesensurethat

    public nuisance is not caused by the parking of mobile

    equipmentandvehiclesassociatedwiththeWorks.

    G2.6 SitePestControl

    RodentControl G2.6.1 The Works Package Contractor shall at all times take effective

    measures to prevent damage by rodents to the PermanentWorks

    andconstituentparts thereof,suchascables,electroniccards,etc.,

    during theexecutionof theWorksandshalladvise thePDPofsuch

    measurestakenaccordingly.

    Preventionof

    mosquito

    breeding

    G2.6.2 Measuresshallbe taken topreventmosquitobreedingon theSite.

    Themeasurestobetakenshallincludethefollowing:

    a) Emptycans,oildrums,packingsandotherreceptacleswhich

    may retainwater shall be deposited at a central collection

    pointandthosenotrequiredforfutureuseshallberemoved

    fromtheSiteregularly.

    b) Standing water shall be removed or, where this is not

    practicable treated at least once every week with an

    environmentally acceptable product which will prevent

    mosquitobreeding.

    c)

    WorksPackage

    Contractors

    Equipment

    and

    other

    items

    on

    theSitewhichmay retainwater shallbe stored, coveredor

    treatedinsuchamannerthatwaterwillnotberetained.

    Conditionsfor

    temporaryland

    allocation

    G2.7 The Works Package Contractor shall comply with the obligations,

    requirements and restrictions applicable to any land allocation for

    theWorksPackageContractor'suse.

    SiteSecurity G2.8 (1) TheWorks Package Contractor shall establish, operate, and

    maintainasecuritysystemfortheSiteinaccordancewiththe

    requirementsoftheParticularSpecification.

    (2) The Works Package Contractor shall provide adequate

    training forhis securitystaff toensure that theyareable to

    dischargetheirsecuritydutiesproperly.

    (3) ThePDPssecuritystaffshallconductinspectionsandsecurity

    auditsontheSitefromtimetotime,andthePDPshallnotify

    the Works Package Contractor of any required remedial

    measures or recommended improvements to the Works

    Package Contractors security system arising from such

    inspectionsandaudits.

    GeneralWorks

    Trains

    G2.9 (1) ThePDPwillarrange forGeneralWorksTrainstobeusedby

    theWorksP