vol-iia-scope details package lapanga _68-01
TRANSCRIPT
-
ODISHAPOWERTRANSMISSIONCORPORATIONLIMITED
CONSTRUCTIONOF
400KVSUBSTATIONATLAPANGAWITHASSOCIATEDLILOLINES(LILOOF IBMERAMANDALIBOTHCIRCUIT)
VOLIIA
SCOPEOFWORKS
NOTICEINVITINGTENDERNITNO.58/201112BIDDOCUMENTNO.:SR.G.MCPCTENDER400KVLAPANGA68/201112
NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA1/2
-
IMPORTANTNOTE
THEBIDDERSAREADVISEDTOVISITTHESITEBEFOREQUOTINGTHEBID.THEYSHALLASCERTAINALLTHE DATAFORTURNKEYCOMPLETION OF THE SUBSTATION AND ASSOCIATEDTRANSMISSIONLINESSUCHAS;
1. SOILBEARINGCAPABILITY.
2. BENCHINGANDFILLINGFORSITELEVELLING.
3. TYPEOFSTRUCTURESFORBOTHLINE&SUBSTATION.
4. QUANTITYOFMATERIALS/STRUCTURES/EQUIPMENT.
5. TYPEOFFOUNDATIONSFOR LINETOWERS&SUBSTATIONEQUIPMENT/STRUCTURES.
6. THELENGTHOFTHEBOUNDARYWALL,FENCINGANDROADS.
7. ANYOTHERDATAREQUIREDFORDESIGNINGTHELINE& SUBSTATION.
NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA2/2
-
1.0)GENERALThe Employer (M/S ODISHA POWER TRANSMISSION CORPOTATION
LIMITED.)is strengthening their Transmission and Distribution systems by way ofconstructing 2X315MVA, 400/220KVSubstationat Lapangawith construction ofassociated LILO lines ( LILO of IBMeramandali Both circuit) on turnkey basis atLAPANGA inthestateofODISHAasoutlinedinthedetailedscopeofwork.TheworksaretobecarriedoutonTurnkeyBasistillfinalcommissioningofsubstation&associatedtransmissionline,itstesting,commissioningandhandingoverthesametotheowner.
OPTCL is implementingaprojectnamedGridStrengthening forODISHA.Thefollowingtransmissionsystemisenvisagedunderthisproject.(a)LILOOFIBMeramandaliline6.0Km.(appox) (b)Establishmentofnew400/220KV,2X315MVAS/S atLapanga in theStateofODISHA
SCOPE:SubStation:Thescopeofthisspecificationcoversthefollowing:
Constructionoffollowing400KVBaysatLapangaandinstallationofequipments(includingallcivilworks).
(i) 400KVbay08Nosfeederbays.(ii) 400KVbay2NosforICT(iii) 220KVbay2NosforICT220KVSide.
Thedetailedscopeofworkisbroughtoutinsubsequentclausesofthissection.(I)ElectricalWork:
Design,engineering,manufacture,testing,supplyonFORdestinationsitebasisincludingtransportationandinsurance,storage,erection,testingandcommissioningoffollowing(420KV&245KV)equipment/itemsatLAPANGAcompleteinallrespect:
(a)420KV&245KVcircuitbreakers,isolators,currenttransformers,capacitor voltagetransformers,surgeArrestorsandotherequipment.(b)2Nos33/.415KV,1000KVAAuxiliary transformeralongwithassociated equipment.(c)Completesubstationautomationincludinghardwareandsoftwarealongwithassociated equipment and kiosks for following bays (bays as defined in technical specification, sec. S/S automation). Adequate training to OPTCL officialsarerequiredtobeorganisedforfamiliarisationoftheSAS.400KV10nos.(presentscope)&infuture4Nosfeederbaywillbeadded.220KV2nos.(presentscope).
NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA1/36
-
*Theexistingongoing220/132KVsystemhasbeenprovidedwithSCADAprovisioncompatible to IEC 61850. Hence the proposed Substation automation shouldaccommodate the present system. Details of the SLDof the existing substation isenclosedunderTSIIfordesignofthesubstationautomationsystem(SCADA).(d)Completerelayandprotectionsystem.(e)Fireprotectionsystem.(HighPressurewatersprayMulsifire&Hydrantsystemalsotobeconsidered)*Designandperformancerequirementsofthefollowingtypesoffireprotectionsystems;
(i) HydrantSystem(ii) HighVelocityWater(H.V.W)SpraySystem.(iii) FireDetectionandalarmSystem.(iv) PortableFireExtinguishers.(v) Wheel/TrolleymountedFireExtinguishers
(f)LTSwitchgear(AC&DCdistributionboards).(g)DGSets.(250KVA,SilentGenereator)(h)BatteriesandBatterychargers.(i)1.1KVgradepower&controlcablealongwithcompleteaccessories.(j)Latticetypestructures(galvanized)for420KV/220KVsidecolumnandbeam&Pipetypestructure(galvanised)for420KV/220KVequipmentsupportstructureshallbeprovidedasperOPTCLrequirement,exceptCBsupportstructure,whichshallbeasperCBmanufacturer'sdesign.(k)Buspostinsulators,insulatorsstrings(160KN,Antifogtype)andhardware,clamps&connectors,conductors,aluminumtubes,Busbarandearthing materials.Baymarshalingboxes,spacers,cablesupporting angles/channels,cabletraysandcovers,junctionboxburiedcabletrenchesetc.(j)Earthmat.(LayingintheearthG.IFlat 75X12mm&RaiserfromtheearthmattodifferentequipmentandStructureG.IFlat75X10mm)(k) Complete lightingand illuminationof theswitchyard,Roads,DGbuilding, FireFighting&Pumphouseshall beprovidedby thecontractor asperdrawings/BOQenclosed by the purchaser. The lighting fixtures for switch yard lighting shall bemounted on Gantry structures. G.I tubular Lighting poles to be provided by thecontractor.(l) Controlandrelaypanel(BayPanel)arerequiredtobeinstalledintheswitcyardinAirConditionedKioskaspertechnicalspecunderE21Control&protectionpanel,SASandAirConditionedKiosk.(m)Oneno.ofbaymarshallingkioskshallbeprovidedforeachbay(excludingtiebreakerbayincaseofoneandhalfbreakerscheme).Inadditiontotherequirementsspecifiedelsewhere in thespecification, thebaymarshallingkioskshallhave two
NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA2/36
-
distinct compartments for the followingpurpose:To receive two incoming415V,3phase,63Amps.ACsupplywithautochangeoverandMCBunits.DetailsoftheBMKareasperTechnicalspecification.(II)CivilWorks: The scope of work shall include but shall not be limited to the
following:Design,Engineeringandcivilworksfor:a) Soilinvestigationfordesignpurposeduringtender.b) Foundationof2X315MVAAutoTransformers(ICT)andReactor(2X50
MVAR,400KV)alongwith rail cum road track, jackingpadsandpylonsupports,fireresistantwalls.
c) Foundationforlatticeandpipestructuresandequipments.d) Foundation for lightingpoles, baymarshallingboxes, baycontrol units,
panelsandcontrolcubiclesofequipment.e) Cabletrenchesalongwithcoversandsumppits.f) Cabletrenchcrossingswithroads,railtracks,culvertsetc.g) Roads&Railtracksinsidesubstation.Allroadsinsideswitchyardfencing,
thequantityforwhichistobeestimatedbythebidder,shallbewithblacktopping.AllremainingroadsfromS/Smaingateandapproachroadshallbeconcrete roads.Quantities for concrete roadsareasgiven in thepriceschedule.ReferTechnicalspecificationforsectionCivilworksofTechnicalspecification.
h) Metalspreadingandantiweedtreatmentofswitchyardarea.i) StormWaterDrainagesystemintheS/S.j) PermanentwatersupplytowatertankprovidedforFireFightingsystem,
Firefightingpumphousebuilding,bayskioskandfirefightingsystem.k) Substationfencingandgate.l) Buildingforfirefightingpumphouse(asperPurchasersupplieddrawing).m) Foundationfor2Nos33/.415KV,1000KVAauxiliarytransformer.n) Rainwaterharvestingsystem.
(III)Beforeproceedingwiththeconstructionworkofthenewsubstationandexisting substations.Thecontractorshallfullyfamiliarizehimselfwiththesiteconditionsandgeneralarrangementsandschemeetc.Thoughthepurchasershallendeavortoprovidetheinformation,itshallnotbebindingforthepurchasertoprovidethesame. The bidders are advised to visit the substation sites and acquaint themselveswith thetopography, infrastructureandalsothedesignphilosophy beforeparticipatinginthetender.Thebiddershallbefullyresponsibleforprovidingallequipment,materials,systemandservicesspecifiedorotherwisewhichare requiredtocompletetheconstructionandsuccessfulcommissioningoperationand
NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA3/36
-
maintenanceofthe substationinallrespects.Allmaterialsrequiredforthecivil (cement,sandand steel etc) and construction/installation works shall be suppliedbythecontractor.Thecompletedesign(unlessspecifiedotherwiseinspecificationelsewhere)anddetailedengineeringshallbedonebythecontractorbasedonthedetailscopeofworkas indicated.Refer thedrawingsas includedunder theTSII fordesign purpose.
(a)Anyotheritemsnotspecificallymentionedinthespecificationbutwhicharerequiredforsupply,erection,testingandcommissioningandsatisfactoryoperationofthesubstationaredeemedtobeincludedinthescopeofthespecificationunlessspecificallyexcluded.(b)The contractor shall also be responsible for the overall coordination withinternal/externalagencies,projectmanagement,trainingofpurchaser'smanpower,loading, unloading, handling, moving to final destination for successful erection,testingandcommissioningofthesubstation/switchyard.(c)Baywidthfor400KVshallbe27mtrs.(minimum)andfor220KVshall be18mtrs.(minimum)subjecttomaintainingrequiredstatutoryclearance.Theshortcircuitforces(with63KAShortCktCurrent),applicablefor supportstructuresshallbecalculatedby the contractor. Designof substation and its associatedauxiliariessystemsincludespreparationofsinglelinediagramsandelectricallayouts,erectionkeydiagrams,electricalandphysicalclearancediagrams,designcalculationsforEarthmat,DirectstrokeLightingProtection(DSLP)BusBarandSpacers,controland protection schematics, wiring and termination schedules, civil designs (asapplicable) and drawings, design of the fire fighting system , outdoor& indoorlighting/illumination and other relevant drawings and documents required forengineeringofallfacilitieswithinthefencingtobeprovidedunderthiscontractarecoveredunderthescopeofthecontractor.
(IV)PHYSICALANDOTHERPARAMETERS:Locationofthesubstation:Thelocationofsubstationisindicatedbelow:Sl.No. NameoftheSubstation. Name of
theState.DistrictHeadQtr
NearestRailwayStation.
1. 400KV/220KVGridSubStationatLapangainthedistrictofODISHA.
ODISHA Sambalpur Jharsuguda
NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA4/36
-
(V)Meteorologicaldata:ThemeteorologicaldataofthesubstationsisenclosedunderTSII.However,for designpurposes,ambienttemperatureshouldbeconsideredas50deg.Cand relativehumidityas100%.Atmosphereatallsubstationsisheavilyindustrially pollutedzone.(VI)SoilData:ThebiddershallberesponsibleforcarryingouttherequiredtestsatsiteandshouldfullysatisfyhimselfaboutthenatureofsoilexpectedtobeencounteredpriortothesubmissionofBid.AnyvariationofsoildataduringdetailedengineeringorconstructionstageshallnotconstituteavalidreasoninaffectingthetermsandconditionsoftheBid.(VII)SCHEDULEOFQUANTITIES.The requirement of various items/equipments and civil works are indicated in BidProposal Sheet schedules (BPSVol. 1Bof the bidding documents as Shedule2A,2B,2C&3).
Allequipment/itemsandcivilworksforwhichbillofquantityhasbeenindicatedinBPS(BidProposalSheetSchedulesVol1B)shallbepayableonunitratebasis.Duringactualexecution,anyvariationinsuchquantitiesshallbepaidbasedontheunitrateundereachitemincorporatedinNotificationofaward.
Wherethequantitiesofitems/worksarenotindicatedbutindicatedasLOT/LS,thebidderisrequiredtoestimatethequantityrequiredforentireexecutionandcompletionofworksandincorporatetheirpriceinrespectiveBidpriceschedule(BPSVol1B)oftheBidding documents. For erection hardware items, bidders shall estimate the totalrequirementoftheworksandindicateLOTwiselumpsumprice.Anymaterial/worksfortheLOTnotspecificallymentionedinthedescriptioninBPSasmayberequiredshallbedeemedtobeincludedintheLOTitself.
Besides the mandatory spares ,which are mentioned in the in the bid priceschedules(BPSVo.1BSchedule3oftheBiddingdocuments),optionalsparesrequiredmaybeseparatelyquotedbytheBidder.ThiswillnotbeconsideredforBidEvaluation.Thepurchaserreservetherighttopurchasethethesameoptionalspares.
The bidder is clarified that no mandatory spares shall be used during thecommissioningoftheequipment.Anysparesrequiredforcommissioningpurposeshallbearrangedbythecontractor.Theunutilizedsparesifanybroughtforcommissioningpurposeshallbetakenbythecontractor.(VIII)BASICREFERENCEDRAWINGS:
400/220KV LAPANGA S/S will be a extended substtaion of the ongoing220/132/33KVSubstationatLapanga.Forthe400KVvoltagelevel,breakerandhalfswitchingschemewith type layoutarrangementshallbeused.For220KVVoltagelevel,doublemainandtransferbusschemelayoutarrangementshallbeused.
NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA5/36
-
Single line diagram, structural layout drawings of proposed S/s(indicative only) isenclosedwiththebiddocumentsforreference,whichcanberefereedduringdetailedengineeringbythebidder. The reference drawings for earthing and others, which form a part of thespecifications, are given in Tech SpecVolII. The bidder shall maintain the overalldimensionsof the substations, buildings, phase to earth clearance, phase to phaseclearanceandsectionalclearance,clearancesbetweenbuses,busheightsbutmayalterthelocationsofequipmenttoobtainthestatutoryelectricalclearancesrequiredforthesubstation.
The enclosed drawings(indicative) in the TSVOLII give the basic scheme,structurallayoutofsubstation,substationbuildings,associatedservicesetc.Incaseofanydiscrepancybetweenthedrawingsandtextofspecification,therequirementsoftextshall prevail in general. However, the Bidder is advised to get these clarified fromPURCHASER.(IX)Theauxiliarytransformersofrating1000KVAshallbeusedtofeedthesubstationauxiliaries.The1000KVA,33/0.415KVauxiliarytransformer shallbeconnectedto33KV system of the substation. This auxiliary transformers should not be used forconstructionpurpose.Thedetailedschemeisshowninthesinglelinediagram.(X)SPECIALTOOLSANDTACKLES:
Thebiddershall includeinhisproposalthedeploymentofallspecialtoolsandtackles required for erection, testing, commissioningandmaintenanceof equipment.However,alistofallsuchdevicesshouldbeindicatedintherelevantscheduleprovidedintheBPS.InadditiontothisthecontractorshallalsofurnishalistofspecialtoolsandtacklesforthevariousequipmentinamannertoberefereedbythePURCHASEduringtheoperationoftheseequipment.(XI)FACILITIESTOBEPROVIDEDBYTHEBIDDER:(a)Biddershallmakearrangementfortheauxiliarypowersuppliesforconstructionpurpose.ThecostoftheuseofthepowershallbebornebytheBidder. (b)Biddershallmakeavailableconstructionwatersupply forconstructionofsubstation.Allnecessaryarrangementsforwatersupplyathisowncost,
AndpurchasershallinnocaseberesponsibleforanydelayinworksbecauseofnonavailabilityorinadequateavailabilityofElectricalPower&water.(XII)SPECIFICREQUIREMENT:
Thebiddershallberesponsibleforsafetyofhumanandequipmentduringtheworking.ItwillbetheresponsibilityofthecontractortocoordinateandobtainElectricalInspector's clearance before commissioning, any addition items, modification due toobservationofsuchstatutoryauthoritiesshallbeprovidedbythecontractatnoextracosttothepurchaser.
NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA6/36
-
(XIII)Thetechnicalspecificationshallbefollowedforthefollowings.
a)FinalizationofthesubstationstructurallayoutinconsultationwithOPTCL.b) Execution of all civil works as per schedule for erection of all substationequipment, structuresand foundationof transformers, roads,culverts, rainwaterharvestingarrangements,constructionofearthmat,cabletrench,drainagesystem,Fencingetc.c) Erection, testing, commissioning of all equipment and handing over of thesubstation bays complete in all respect as per approved scheme and to thesatisfactionoftheEmployerincludingstatutoryinspection.d)Themakesoftheequipment/components/materialsshallbefromOPTCLapprovevendor list indicated in this tender and to beapprovedby theemployer beforeplacementoftheorderonthevendor/manufacturer.e)Thecontractor(s)shallarrangepowersupplyforconstructionoftheproject.Theexpenditure for such arrangement till completion of the project shall be to thecontractor(s)account.f)Thecontractor(s)shallarrangecleanwaterforconstructionandcuringtothecivilworks.Theexpenditureforsucharrangementtillcompletionoftheprojectshallbetothecontractor(s)account.g) The work as mentioned in the price schedule shall be considered for theevaluationofthebid.h) Thecontractor shall arrange for security of all thematerials includingownersupplymaterials(handedovertohim)thatarerequiredforsuccessfulcompletionoftheprojecttillfinalhandingoveroftheentireworktoOPTCL.i) Contractor has to obtain Project License in respect of the projects from theSecretary, Electrical Licensing Board of ODISHA at his own cost, prior tocommencementofworks.j) The contractor shall supply one official copy of each Standard listed in theappropriateschedule.
Thecontractorshallbefullyresponsibleforprovidingallequipment,material,systemsandserviceswhicharerequiredtocompletetheconstructionandsuccessfulcommissioning of the works in all respects. The Contractor shall also refer to theTechnicalSpecification(Vol.II),forproperunderstandingoftheworksinvolvedinrespectofeachsubstation.
ThescopeofworkonTurnkeybasisincludesdesign,engineering,manufacture,type testing, (factory testing) supply on FOR destination site basis, transportation,handling,storageatsite,erection,sitetesting,commissioningcompleteinallrespectsandmaintenanceofplantandequipmentuntilhandingoverofworksinaccordancewith
NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA7/36
-
ConditionsofContractandthestipulationsundervariouschaptersofthisspecificationatthepricesstatedinthePriceScheduleforthefollowing.2.0)BRIEFSCOPEOFWORK:PACKAGE6801/2011.i) Supplyofequipmentandmaterialsexcludingpowertransformers/ICT/Reactor.ii) Detaileddesignoftheproposedsubstation,bayextensionworkand400KVDC
Transmissionline.iii) Providingengineeringdataanddrawings,asperspecifiedformat,foremployers
review,approvalandrecords.iv) Complete Manufacturing including Type, Acceptance & Routine testing, as
specified.v) Packingandtransportation fromthemanufacturersworks to thesite including
transitinsurance&customsclearance/portclearance(ifrequired),porthandling,forimportedgoodsandfurtherloading(ifapplicable)Asdeliveredatsitebasis
vi) Receipt, Unloading, Storage, Insurance and Preservation of Sub station &TransmissionLinematerial&accessoriesatsite.
vii) Constructionof2x315MVA400/220KVS/SatLapanga&Associated400KVDCTransmission Line (LILO) on Turnkey Basis. LILO of both circuit IBMeramandalilineto400KVsubstationatLapanga,LineLength6.0Kmsappox,onTurnkeybasisintheStateofODISHA(includingallcivilworks).
vii) Construction of 400 KV Double Circuit LILO (LILO of both circuit IBMeramandalilineto400KVsubstationofLapanga.LengthoflineApproximateLinelengthis6.0Kms.* OPGWcable tobeusedfor communicationpurpose. Accordingly thecontractor to consider the equipment andmaterials tobeused for thesame.(1)Supplyof towerstructuralmaterials,conductor ,insulatoretc includingCivilworksforthetransmissionline.(2)TransmissionLineroutesurveyofentirestretch,SettlementofallissuesrelatedtorightofWayandconstructionofline(includingallcivilworks).(3)TestingandcommissioningofSubstation,TransmissionLine&associatedsystem.(4)HandingoverofthecompletedsystemtotheOwner.(5)SatisfactoryconclusionoftheContract.(6)InstallationofPLCC/Communicationindoorequipment(ownersupplyitem)atboththeendofthesubstation.
NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA8/36
-
Theaforesaidscopeofworkisonlyindicative.Thedetailedscopeisdescribedinthe Bidding Documents, which are available for inspection & sale, at the addressmentionedatpara18.0,asperdetailsschedulegivenbelow:
2.1.Substation2.1.1.ElectricalThescopeincludesbutisnotlimitedtoi)Supplyerection,testing&commissioningofthefollowingequipments:
I. Circuitbreakers
II. Isolators
III. Currenttransformers.
IV. Voltagetransformers(capacitiveandinductive)
V. CT,CVT,IVTconsoleboxeswithaluminiumalloyhavingminimumthreemm thickness.
VI. Alloutdoorkiosks/boxes,shallbeGIsheetofminimum2mmthickness with aluminiumalloycanopy(rainhood)of3mmthickness.
VII. Surgearresters
VIII. Postinsulators
IX. Protection, control, and metering systemswith Substation automation (SCADA).
X. Insulatorstringswithhardware
XI. Busbar,circuitconductorandallconductoraccessories.
XII. Powerandcontrolcables,cablingaccessories,cabletraysetc.Propersealingofthecableentry(control&Power)atControlRoombuilding,topreventwaterenteringfromswitchyard/outsidetoCRBuilding,preventingentryofratsandreptiles,Fireproofetc.
XIII. AC/DCsystemsincludingalldistributionboards,batteryandchargersystems,auxiliarytransformers.
XIV. Airconditioningplantandsystemsforcontrolroom.(ifrequired)
XV. Firefightingsystemsandequipment.(Mulsifier&HydrantSystemalsotobeconsidered)
*Designandperformancerequirementsofthe
NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA9/36
-
followingtypesoffireprotectionsystems;
a.HydrantSystemb.HighVelocityWater(H.V.W)SpraySystemc.FireDetectionandalarmSystemd.PortableFireExtinguisherse. Wheel/TrolleymountedFireExtinguishers
XVI. Steel structures for switchyard gantries and portals (lattice type); and equipment(pipeorlatticetype)includingthoseforlightningprotection.
XVII. Earthingsystemandearthingconductors.
XVIII. Testingandmaintenanceequipment.
XIX. Lightingofsubstationareaandsubstationbuildings.Illuminationandemergencylightingsystematdifferentlocations.
1. Controlandrelaypanelsasproposed.(BayModuletobeinstalledinthe switchyardinAirConditionedKioskasperTS)
XX. PresentEventloggerpanelprovidedfor220/132/33KVSubstationcanbeconsideredfor400KVsystemalso.NecessarymodulestobearrangedtomatchwiththeexistingpanelforEventlogger.
XXI. ACandDCdistributionboardsasperrequirementandasproposed.
XXII. Busbarprotectionscheme(forproposed400KVsystemandnecessarybaymodule&othersystemtobeprovidedtomatchwiththeexistingoneforthe220kVbayextensionfor220KVsideoftheICT).
XXIII. DisturbancerecorderwithTimesynchronization.(GPS)
XXIV. SubstationlevelPC/LaptopprovisionforRelayconfigurationwiththeir software.
XXV. Anyotheritemsrequiredforcompletionoftheprojectarealsointhescopeofthiscontractinordertocompletethesubstationinallrespect.
XXVI. Supplyofallclamps,connectorsandhardwarerequiredforcommissioningofthesubstation.Thequantityandratingoftheconnectorsandclampsaredependentonthelayoutandrequirementofthesubstation.
NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA10/36
-
XXVII. Supplyandputtingofsubstationilluminationsystem.AllthelightfittingsshallbeLEDtype&thesefittingsshallbemountedonswitchyardportalstructuressuchascolumns&beams.Noseparatelightingmastisrequired.Entiresubstationlightingsystemintheswitchyard&colonyshallbede signedusingundergroundcablesonly.Nooverheadconductorsarepermittedforthispurpose.Forstreetlightingoneoutdoor lightingkioskwithtwoincomersof200Aratingswitchfuseunits(SFU)&withsixfeedersof32AratingfittedwithMCBshallbeconsidered.Similartypeofoutdoorkioskshallbeconsideredforcolonypowersupplywith200ASFU&tenoutgoing feederof 32A rating fittedwith MCB shall beconsidered
XXVIII. OPGWlinkbetweenthetwolinksasproposedtheindoorequipmentlikeFOTE(FibreOpticTerminalEquipment)aretobesuppliedandtobeerectedandtestedbythecontractor.
ii)Supplyofthefollowingequipmentsalso:
.1 MandatorysparesforsubstationequipmentbeingsuppliedunderthiscontractasperBidproposalSheet(BPS)schedule3.
.2 Maintenance&testingequipmentetcasperthelistprovidedinrelevantchapteroftechnicalspecifications.
2.1.2.Civilworks
Thedesign,engineering,supplyofallmaterialsincludingcementandsteel,consumables,asperspecificationandapproveddrawingsforcivilworksofthesubstationincludingbutnotlimitedtothefollowing:
1. Designing, fabrication, galvanizing and erection of structures on respectivefoundationsdetailedinspecificationforcivilworks.Supplyofallstructuralmaterials(columns&beams,hardware&fastenersetc)asperrequirement.Thecontractorshall preferably adopt OPTCLdesignedstandard structures for use in varioussubstation,thedetailsofwhicharegivenatClauseno12ofthischapter.
2. Soiltestingforsoilresistivityandsoilbearingcapacitybeforedesigning.
3. Sitedevelopmentincludingleveling,filling&compactingofthesubstationareatothedesiredheight.
4. Wherever pile foundations(if required after soil investigation) are required forControl room building, switch yard tower columns, Equipment foundation andtransmission line towersetc., theseare tobeconstructedasper theguideline
NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA11/36
-
indicated in the specification elsewhere. The type of pile foundations can beascertainedonlyaftersoilinvestigationandapprovalofthesamebyOPTCL.
5. ConstructionofsubstationretainingwallwithbrickmasonryandfencingbyGIheavydutygoatmeshfencingaspersiterequirement.
6. ConstructionofboundarywallalongthepropertylineofthesubstationwithMaingate,securityshedandtwonos.switchyardgatesinthesubstation.Provisionsofasecurityshednearthemaingate.ThestructureshallbeRCCframedstructure.Thereshallbeprovisionofelectricalilluminationfacilities.
7. Fencingofswitchyardareaandotherareaslikestationtransformerarea.
8. There shall be provision of plantations of fruit bearing plants and water tapprovisionforwateringtheplantsinthesubstations.
9. Construction of all foundations for columns, all switchgear such as circuitbreakers,isolators,CTs,CVTsandothersubstationequipmentsuchaslinetraps,postinsulator,etc.
10.Constructionof foundationof ICT /Reactor/Power transformer/AutoTransformerincludingsupplyandputtingofrailfromtheservicebaytothetransformerplinth,allfoundations of columns, equipment structures. Separate foundations for themarshalingboxesoftheisolatorsaretobeconsidered.
11.Antitermitetreatmentofswitchyardandcolonybuildings.
12.Switchyardbuildingssuchascontrol room,DGset roomand.Thereshall beprovisionofawatercoolerincludingwaterpurifierinsidethecontrolroombuilding.Provisionofsplit typeairconditionersinsidethecontrolroom&PLCCroomofControlRoombuildingandconferencearea.
13.Thereshallbeprovisionofstoreshed,oneRampwithwinchforliftingthematerialsandloweringthematerialsupto5MTandopenyardplatformtostorethematerialsliketransformerbushing,CT,CVTandotherequipment.
14.Supplyandspreadingofuniform20mmnominalsizeHGmetalof160mmthickinsidetheswitchyardareaoftheSubStations.Thespreadingwillbedoneaboveafinishedlevelofswitchyardlandbyplaincementconcreteofthickness75mm(ratio 1:4:8). Anti weed treatment of the switch yard area to be madeas perprevailingpracticebeforespreadingofPCC.
NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA12/36
-
15.Constructionofdrainagesystemof thesubstationsand thenewlyconstructedquarters&floodwaterdischargesystems.Miscellaneousworkslikemanholessoakpits,RCCtrench,fencing,etc.intheswitchyard.
16.Constructionofrainwaterharvestingarrangementsinthesubstation.
17.Constructionofcabletrencheswithtrays&covers&sumppitwithpump,asperrequirement.
18.Construction of approach road to the new substation as per requirement.Constructionofperipheryroadsinsidethefencing.Theroadsinsidetheswitchyard&attheperipheryshallbeof3.75mtr.wide&theroadinsideswitchyardshallbeofconcreteroadaspertechnicalspecification.Theotherroadsmainandapproachroadshallbe7mtrswideandshallbebitumengrading.TheroadinfrontoftheICT/PowerTransformer/AutoTransformerconnectingtothemainroadshallbeof7mtrswideconcreteroad.
19. Designingandproviding the earth matandearthingof the substation lightingprotection,equipmentearthingetc.Earthmatshallbedesignedusing75X12mmGIflat&theearthraiserfromtheearthmattotheequipment&allstructuresshallbe 75X10mm GIFlat.For lighteningprotection individualspikenot less than2.5mtrsshallbeprovidedoneachcolumnoftheswitchyard.Watertapprovisionshallbeprovidedforpouringwaterintotheearthpitsconstructedinside&aroundtheperipheryfencetheswitchyard.Theearthingshallbeextendedbeyond2mtrsfromthefencingandthefencingearthingarealsotobetakencare.
20.A water tank for the fire fighting system to be designed ,considering therequirementofwaterformeetingtheworstconditionsandtobeprovidedwithitsconnectionfromaborewell,whichistobeprovidedneartothewatertank.
21.A250KVADGsettobeprovidedneartheexistingcontrolroombuildingtomeettherequirementduringemergencycondition.TheD.GshallbeofsilenttypeandcanbeplacedinaDGroom.
22.Civicamenitiesforthetownshipincludingdrainageandseweragesystems.
23.Allothermaterials,whichthecontractorfeelstoberequiredforcompletionofthesubstation.
24.Plantationoffruitbearingandflowerbearingplantsandgardensinandaroundthesubstation.
NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA13/36
-
25. ModularMultidiameter flexibleCablesealingsystemconsistingof frames,blocksandaccessoriestobeinstalledwherevertheelectrical/control/communicationcablesoverground enteror leavefromcontrolroombuilding.CablesealingtobedonewithMultidiametertypeflexiblemodularbasedsealingblocksofdifferentsizes(size20:4mmto14.5mm,size30:10mmto25mm,size40:21.5mmto34.5mm,size60:28mmto54mm,size90:48mmto71mm,size120:67.5mmto99mmoranyconvenientsize)tobeprovidedforsimple,easyandquicktoassemble&reassemble.somespareblocksontheframetobeprovidedwithusableMultidiameterblockswithcenterplug,sothatthesespareblockscanbeusedforexpansioninfutureforwiderangeofcables,solidblocksshouldnotbeusedonframe.Cablesealingsystemshouldhavebeentypetestedforfire/water/smoketightnessandsuppliershallhavelocalpresencebywayoffullinfrastructurehavingservicesupport,trainingsupportandstockssupportandalsohavenecessarysalessupport for anychange / extension in future. Frames&stayplatematerial shouldbegalvanized steel and for compression single piece wedgewith galvanized steel boltsshouldbeused.
2.2.Transmissionlines.
i)Survey&ROWissues
1. DetailedlineSurveyworksasperspecification.
2. Thecontractorshallhavetosolvetheentirerightofwayproblemathisowncost.Contractorshallalsoresolvetheissuesrelatedtothetreecuttinginthetransmissionlineandsubstationathisowncost.HoweverthedetailsofROWissueshavebeenindicatedinSpecialConditionofContract(SCC)Vol.1A.
ii) Design & Manufacturing (as applicable), supply, storage, erection, testing &commissioningoffollowingmaterials
1. GalvanizedStructural materials of towersas per requirement. OPTCLadoptedstandardtowersshallpreferablybeusedforthetransmissionline,thedetailsofwhichisgivenatClauseno.13inthischapter.
2. Insulators,hardwares.
3. ACSRMooseconductors,GIearthwire/OPGWwirewithaccessoriesetcandtheirstringing.In400KVDClineTwinACSRMooseconductortobeadopted.OPGWwiretobeusedfortheproposedline.
NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA14/36
-
4. Antifog type Disc insulators are required to be supplied and erected inTransmissionline.
5. Commissioningoftransmissionlines.
6. Anyotheritemsrequiredarealsointhescopeofthiscontractinordertocompletetheproposedtransmissionlinesinallrespect.
3.ElectricalSystemDataof400/220/132/33
1. NominalSystemVoltage(KV) 400/220/132/33
2. HighestSystemVoltage(kV) 420/245/145/36
3. SystemNeutralEarthing. Effectivelyearthed
4.BasicInsulationLevel(kVP)
i) Bus 1425/1050/650/170
ii) EquipmentotherthanTransformer 1425/1050/650/170
iii) Transformer 1425/1050/650/170
5. PowerFrequencywithstandvoltage(KVrms) 630/460/275/80
6. SystemfaultlevelKA 63/40/40/25
7. Creepagedistanceforinsulators(mm) 10500/6125/3625/900
8.Min.recommendedclearanceinair(mm)asperCBIP
i) Phasetophase 4200/2400/1300/530
ii) Phasetoearth 3500/2160/1300/480
iii) Sectionalclearance 6500/5000/4000/4000
9. Min.groundclearance(asperIERules) 8000/5500/5000/4000
10.Busconfigurationfor400/220/132/33kV
NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA15/36
-
SelectionofACSRconductorshallbeChosenfromMoose,Zebraandpantherasperrequirementanddecisionofemployer.AluminiumtubularPipefor400KVBusandequipmenttoequipmentconnectionfor400&220KVside.
11.Phasetophasedistance:
i) Alongthebay(mm) 7000/4500/3000/1500
ii) Strungbus(mm) 7000/4500/3000/1500
12.Referencedesigntemperature 50Deg.Centigrade.
Detailedtechnicalparticularsofdifferentequipmenthavebeenspecifiedintherespectivespecificationsinthesubsequentsection.Ifanytechnicalparticularsaremissed from this volume the samemaypleasebe referred from relevant IS:specificationforbiddingpurpose.
4.Designwork
TheBiddershallfurnishdetaileddesignofthesubstation&transmissionlines.Thedesignworkshallincludebutnotlimitedtotechnicalcalculations,preparationofdrawings and bill of materials and specifying equipment not specified in thespecificationbutnecessaryforthecompletionofthesubstation &transmissionlinesontheturnkeybasis.Thetechnicalcalculationdesigndrawings,etc.shallbesubmittedtotheEmployerforapproval.HoweverthelayoutdrawingfurnishedbyOPTCLshallbetakenasaguideline.
5.Standards
Allmaterialsandequipmentsshallgenerallycomplyinallrespectswiththelatestedition of the relevant Indian Standards. International ElectroTechnicalCommission(IEC)oranyother internationallyacceptedStandardequivalentorbetter than relevant Indian Standard. Equipment complying with all otherauthoritativestandardssuchasBritish,ASA,VDE,etc.willalsobeconsideredifperformanceequivalentorsuperiortoIndianStandardisensured.
In the event of supply of equipment confirming to any International orinternationally recognized Standard other than the Standard listed in the
NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA16/36
-
Specification. The salient features of comparison shall be brought out andfurnishedalongwiththebid.
IncaseofadoptinganystandardotherthanthatISorIEC,acompletesetofadoptedstandardshallbesuppliedbythebidder.However it isdesirableandpreferred that the equipment offered shall comply with one consistent set ofstandardunlessotherthanexceptionalcases.
TheequipmentshallalsocomplywiththelatestrevisionofIndianElectricityActandIndianElectricityRulesandanyotherElectricalStatutoryProvision,RulesandRegulations.
6.ReferenceDrawings
Drawings showing indicating scope of work are enclosed. Drawings arecomplementarytospecificationsandshallbereferredtoforbetterunderstandingaswellasforestimationofquantitiesandbillofmaterialsforarisingatlumpsumbidpriceonturnkeybasis.
Thebiddershallsubmitwiththetender,planofthesubstationshowingbroadlythescopeofworkincorporatedaspertechnicalspecification.Allthedrawingsshallbesubmitted in quadruplicate, enumerated in conformity with relevant clausestipulatedintheTechnicalSection.
Thesedrawingsshallshowproposedlayoutplanwithsection.Drawingsshowingoverall dimension,clearanceetc. required for assemblinganddismantlingandspacerequirementsofalltheapparatusaretobesuppliedtoenabletheEmployertoexaminethedesignandlayoutattheinstallation.
7.PackingandMarking
Thebiddershallincludeandprovideforsecurelyprotectingandpackingtheplantsoastoavoiddamageintransitunderproperconditionandshallberesponsibleforalllossordamagecausedbyanydefectinpacking.
Largeandheavy itemssuchas 220kV, 132 kVand33KVequipment andstructuralsteelshallbepackedandshippedasperstandardinternationalpractice.
NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA17/36
-
Container/Cartoons,boxes,trunksandotherpackagesshallbestrongandsturdyinconstructiontowithstandOceanshipping,loadingandunloading,transportonroughroads,andstorageintropicalareaandhaulingandhandlingduringerectionetc.Boxesandpackagesshallalsobeprotectedbysuitablepackingwiththehelpofwoodenplanks/MSframeorgalvanizedsteelstrips.Alayerofwaterproofmaterialshallbeprovidedinsidethecartoon/boxes/packagestoprotecttheequipmentfromwaterseepageandtoavoidrust.Thefollowinginformationshallbemarkedonthecontainer/boxes/packagesetc.
a. Contractors/manufacturersname,projecttitleandcontractreference.
b. Plant/accessoryidentificationNo.andtitle.
c. Net/grossweight.
d. Employersnamewithotherdispatchparticularssuchasdestination.
Theemployershall takenoresponsibilityforanydamagedonetotheplantonroutetothesiteofworkorplaceofdeliverywhicheverisapplicable.
8.Tests
i)Unlessotherwisespecifiedinrespectivesection,allequipmentshallbesubjectedroutine,acceptancetestascoveredandspecifiedinanystandardinpresenceoftheauthorized representativeof theemployer. If theequipment/materials is not typetestedduringlastfiveyearsonthedateofBidOpening,thesamehastobetypetestedagainbeforeusingofmaterialsinthisproposedproject.
ii)Biddershallsubmittypetestreportfromarecognizedlaboratoryalongwiththebid.
iii)Atleast15daysadvancenoticeshallbegivenbythecontractortotheemployerforwitnessthetests.
9.CompliancetoIErule1956
i)TheconstructionagencyshallpossesasafetymanualdulyapprovedbycompetentauthorityintheGovt.ofhisStateGoverningthesafetyinworkbythepersonnelandstaff.
NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA18/36
-
ii) The agency shall possess valid contractors license issued by the ElectricalLicensingBoardofODISHA(ELBO)failingwhichhewillnotbeallowedtostartthework.
iii) Supervisors of works shall posses appropriate valid supervisory certificate ofcompetencyissuedELBO,ODISHA.
iv)At least50%ofelectricalworkmenemployed in theprojectshallpossesvalidworkmenpermitbyELBO.
10. TheContractor has to followsubmissionof drawings, data,documentaspertheformatgivenbelow.
Sl.No. Description WithBids
PostOrder FinalDocumentForReview
ForRecords
Transparency
Prints(Photostat)
Electronic
1. Switchyard single linediagrami
2. Switchyardlayout,plan, section &placement ofvariousequipment
3. Switchyardearthingand lightning protectioncalculations.
4. Battery,batterycharger,DCDBsizingcalculations.
5. Switchyard lightingcalculations
6. Switchyardearthingandlightninglayout.
7. Switchyardlightinglayout.
8. Switchyard,controlroomequipmentandcablelayout.
9. Switchyardclampsandconnectordetails.
10. Relay,meteringandcontrol panel block logicdiagram.
NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA19/36
-
Sl.No. Description WithBids
PostOrder FinalDocumentForReview
ForRecords
Transparency
Prints(Photostat)
Electronic
11. Control panel schematicdrawings.
12. Logicforcastlekeyinterlockbetweenbreakerandisolator.
13. Relay,metering&ControlpanelandACDB,DCDBGAdrawings.
14. SwitchyardequipmentGAdrawingsandcontrolschematics.
15. Cableschedule.16. Interconnection
diagrams.17. Relaysetting
calculationsandCoordinationdrawings.
18. SLDsofACDBandDCDB.
19. Soakpitandwasteoilpitlayoutandsizingcalculation.
20. Structuraldesigncalculationssuperstructures.
21. Civildrawingsforfoundationandcabletrenches.
22. Structuralfabricationdrawingsofequipmentsgantriesetc.
23. Filledinequipmentdatasheetsasperenclosedformat.
24. Completeliterature,leafletsforallequipments.
25. Operational/maintenancemanual.
NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA20/36
-
Sl.No. Description WithBids
PostOrder FinalDocumentForReview
ForRecords
Transparency
Prints(Photostat)
Electronic
26. Deviationschedulew.r.t.a)Specificationb)Document/attachments.
27. Listofsparepartsforeachmajorequipment.
28. Listofspecialtoolsandtackles.
29. Listofsubvendors.30. QAplanofvendor31. Installationoperating
andmaintenanceinstruction.
32. InspectionPlanandTestingProcedure.
33. TestRecords.34. Listofcommissioning/
maintenancespares.
35. DataBook/Manuala)InstallationManualb)Operating/Maintenance.c)Catalogues/Brochures.
NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA21/36
-
11.Minimumclearanceforsubstationdesignshallbeasperdetailsgiveninthetablebelow.Highestsystemvoltage(kV)
Insulationlevel(kVP)
SwitchingImpulseVoltage(KVP)
SectionalClearance(mm)
Minimumclearance GroundClearance(mm)
Betweenphase&ground
Betweenphases
36KV 170 4000 480 530 4000145KV 650 4000 1300 1300 5000245KV 1050 5000 2160 2400 5500420KV 1425 1050 6500 3500 4200 8000
NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA22/36
-
12.OPTCLadoptedstandardswitchyardstructure:Thebiddersmayadopt their own type testeddesign for switchyard structureswithapprovalfromOPTCL.HoweverthestandardswitchyardstructuresadoptedinOPTCLswitchyardssystemindifferentvoltagelevelsaregivenbelow.A 400KVSIDE:
1COLUMN:4TA,4TB,4TC,4TDTYPE,HEIGHT29(AdditionalPeak5Mtrs)MTRS,WEIGHT10MT
2 BEAM:4GA,4GBTYPE,LENGTH27MTRS,WEIGHT4MTB 220KVSIDE:1. COLUMN:P1STYPE,HEIGHT21.5MTRS,WEIGHT4.464MT2. BEAM:Q1TYPE,LENGTH18MTRS,WEIGHT1.473MTC 132KVSIDE:1. COLUMN:T1STYPE,HEIGHT15MTRS,WEIGHT1.193MT
2. COLUMN:T4STYPE,HEIGHT11MTRS,WEIGHT0.924MT
3. BEAM:G1TYPE,LENGTH10.4MTRS,WEIGHT0.613MT
4. BEAM:G2TYPE,LENGTH14.9875MTRS,WEIGHT0.906MT
5. BEAM:G1XTYPE,LENGTH10.4MTRS,WEIGHT1.370MT
6. BEAM:G1,2TYPE,LENGTH10.4MTRS,WEIGHT1.25MTD 33KVSIDE:
1. COLUMN:T8STYPE,HEIGHT10.5MTRS,WEIGHT0.777MT
2. COLUMN:T9STYPE,HEIGHT7.5MTRS,WEIGHT0.592MT
3. BEAM:G4TYPE,LENGTH5.5MTRS,WEIGHT0.306MT
4. BEAM:G4XTYPE,LENGTH5.5MTRS,WEIGHT0.306MT5. BEAM:G6TYPE,LENGTHMTRS,WEIGHT7.25MT
ETHEBAYWIDTHOFDIFFERENTVOLTAGELEVELAREASBELOW
1. 400KVSYSTEMSHALLBE27MTRS.2. 220KVSYSTEMSHALLBE18MTRS3. 132KVSYSTEMSHALLBE10.4/13.1MTRS.4. 33KVSYSTEMSHALLBE5.5MTRS
NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA23/36
-
13.OPTCLadoptedstandardTowerstructurefortransmissionline:The contractor may adopt their own type tested design for transmission linestructures/towers with approval from OPTCL. However the standard towerstructuresadoptedinOPTCLfordifferentvoltagelevelsaregivenbelow.
A. 132KVTransmissionline.(Height29Mtrs)(MSGalvanised)
(i) PAtype:Unitweight:3.430MT.
(ii) +3mtrs:Unitweight:0.537MT.
(iii) +6mtrs:Unitweight:1.349MT.
(iv) PBtype:Unitweight:4.973MT.
(v) +3mtrs:Unitweight:1.018MT.
(vi) +6mtrs:Unitweight:2.104MT.
(vii) PCtype:Unitweight:6.214MT.
(viii) +3mtrs:Unitweight:1.119MT.
(ix) +6mtrs:Unitweight:2.342MT.
(x) TemplatesforPAUnitweight:0.665MT
(xi) TemplatesforPBUnitweight:0.602MT
(xii) TemplatesforPCUnitweight:1.904MT
B. 220KVTransmissionline.(Height35.5Mtrs)(MSGalvanised)
(i) OAtype:Unitweight:4.351MT.
(ii) +3mtrs:Unitweight:0.727MT.
(iii) +6mtrs:Unitweight:1.448MT.
(iv) OBtype:Unitweight:7.574MT.
(v) +3mtrs:Unitweight:1.305MT.
(vi) +6mtrs:Unitweight:2.242MT.
(vii) OCtype:Unitweight:9.839MT.
(viii) +3mtrs:Unitweight:1.436MT.
(ix) +6mtrs:Unitweight:2.599MT.
(x) +15mtrs:Unitweight:6.670MT
NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA24/36
-
(xi) UR:Unitweight:13.585MT.
(xii) UR+3mtrstype:Unitweight:17.316MT.
(xiii) UR+6mtrstype:Unitweight:4.249MT.
(xiv) TemplatesforOAUnitweight:0.597MT
(xv) TemplatesforOBUnitweight:0.815MT
(xvi) TemplatesforOCUnitweight:1.172MT
(xvii) TemplatesforURUnitweight:1.509MT
C.400KVTransmissionlineTower.(Height46Mtrs)(HTSteelinLegSection,CrossArm&MainBracingandotherSectionMS)
(I)DA(Normal)Type:(0to2deg):7.54869MT
DA(+3Mtrextn):+1.93856MT
DA(+6MtrExtn):+2.74532MT
DA(+9MtrExtn):+4.62562MT
(ii)DBType:(2to15deg):13.96342MT
DB(+3Mtrextn):+2.44864MT
DB(+6MtrExtn):+4.82572MT
DB(+9MtrExtn):+9.34636MT
(iii)DCType:(15to30deg):15.78074MT
DC(+3Mtrextn):+2.90732MT
DC(+6MtrExtn):+5.4436MT
DC(+9MtrExtn):+9.94816MT
(iv)DDType:(30to60deg):22.29494MT.
DD(+3Mtrextn):+4.11758MT
DD(+6MtrExtn):+5.25294MT
DD(+9MtrExtn):+7.2021MT
NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA25/36
-
D.No.ofBolts&NutsusedineachoftheTower
TypeofTower Normal +3mtrs +6mtrs +9mtrsPA 1602 142 276PB 1097 273 542PC 1654 313 592OA 1147 180 228OB 1299 236 372OC 1877 254 402UR 2283 357 588DA 1980 524 722 1214DB 3668 656 1284 2464DC 4140 786 1442 2608DD 5844 1080 1388 1912
NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA26/36
-
14.ApprovedMakeOf Equipment&MaterialstobeusedintheSubstationandTransmissionlines.Thefollowingmakeoftheequipments&materialsshallbesuppliedasperapprovedvendorlist.
VENDORLISTFORSUBSTATIONANDLINEWORKSOFOPTCL
SlNo DescriptionofEquipmentormaterial NameoftheVendor
1 BREAKER
1.1 400KVSpringSpring,SF6,3150A,50KA
Siemens/ABB/CGL/AREVA/BHEL
1.2 220KVSpringSpring,SF6,3150A,40KA
Siemens/ABB/CGL/AREVA
1.3 132KVSpringSpring,SF6,3150A,40KA
Siemens/ABB/CGL/AREVA
1.4 33KVSpringVacuum,1600A,25KA Siemens/ABB/CGL/AREVA/BHEL
2 CT
2.1 400KV&220KV(Dead/LiveTank) AREVA/ABB/CGL/BHEL/SIEMENS
2.2 132KV,Dead/LiveTank AREVA/ABB/CGL/BHEL/Vishal/Transfield/IndianTransformer/Victrans/VijayaElectricals
2.3 33KV,Dead/LiveTank AREVA/ABB/CGL/Pragati/Vishal/Transfield/IndianTransformer/Victrans/VijayaElectricals
3 CVT
400KV,220KV&132KV AREVA/ABB/CGL/BHEL/SIEMENS
4 PT/IVT
4.1 400KV&220KV AREVA/ABB/CGL/BHEL/SIEMENS
4.2 132KV&33KV AREVA/ABB/CGL/BHEL/IndianTransformers/VijayaElectricals/Victrans
5 SURGEARRESTOR
400KV,220KV,132KV&33KV CGL/OBLUM/AREVA/LAMCO/ELPROInternational
NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA27/36
-
6 CRPANEL
400KV,220KV,132KV&33KV ABB/SIEMENS/AREVA/OtherManufacturersusingRelaysofSIEMENS/AREVA/ABB/SEL/GE
7 ISOLATORS(I)400KV ABB/SIEMENS/SWITHGEAR&STRUCTURALS/GRPOWER/AREVA/CGL
(II)220KV,132KV&33KV ABB/SIEMENS/SWITHGEAR&STRUCTURALS/GRPOWER/AREVA/CGL,M/sJ.DElectricalsLtd,Howrah.
8 HARDWAREFITTINGS
8.1 400KV RASTRIYAUDHYOG/ERITECH/IAC/EMI,KrsnaTransmissionHardwareMfgPvtLtd.IndustrialSpareProducts.
8.2 220KV,132KV&33KV RASTRIYAUDHYOG/ERITECH/IAC/EMI/ELECTROTECHANDTRANSTECH,KrsnaTransmissionHardwareMfgPvtLtd.JaincoTransmissionLtd,A.K.PowerIndustriesPvtLtd,IndustrialSpareProducts.
9 CONDUCTOR APAR,GPIL,ERITECH,STERLITE,VIJAYA/LUMINO/CABCON/TIRUPATI
10 EARTHWIRE BHARATWIREROPES/UICWIRES/USHAMARTIN/GKWIRE,M/SBEDMUTHAINDUSTRIESLTD.
11 DISCINSULATORS/SOLIDCOREPOSTINSULATORS
BHEL/WS/MODERNINSULATOR/ADITYABIRLAINSULATORS/SRAVANA,M/sInsulators&Electricalscompany,Mandeep,M.P.
12 LONGRODINSULATOR MODERNINSULATORS
13 TOWER&STRUCTURESFORLINEANDSUBSTATIONANDFOUNDATIONBOLT(SAIL/TATA/RINLSTEELTOBEUSED)
KEC/RPG/Jyoti/L&T/EMC/Kalpataru/NEXO/UTKALGALVANIZER/IVRCLINFRASTRUCTURES&PROJECTSLTD,NAGPUR/UNIQUESTRUCTURES&TOWERSLTDBHILAI/TECHNOENGINEERING&COLTDNEWDELHI/UNISTARGALVANISERS&FABRICATORS(P)LTDJAMSEDPUR/NEWMODERNTECHNOMECHPVT.LTDBARIPADA/GLOBALGALVANISER,
NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA28/36
-
Khurdha/AGARWALSTEELSTRUCTURES(INDIA)PVTLTD,HYDERABAD,Hyderabad/SriAshutosEngineering,Raipur/AsterPvtLimited,Hyderabad/ShreemElectricalsPvtLimited,Bangalore.
14 PVCINSULATEDPOWERANDCONTRALCABLES
NICCO/GLOSTER/CCI/KEI/CRYSTAL/POLYCAB/GPIL/FINOLEX/Universal,M/sHavellsIndiaLtd,M/sKECInternationalLtd.
15 HFCOAXIALCABLES ALPHACOMMUNICATION,DELHI/DELTONCables,NewDelhi
16 STATIONTRANSFORMER(BEESTANDARD)
AREVA/ALFA/TESLA/OTPL
17 FIREFIGHTINGEQUIPMENT MINIMAX/CEASEFIRE,M/sKanadiaFyrFyterPvtLtd.
18 LIGHTINGFIXTURES PHILPS/CGL/BAJAJ/HAVELS,M/sAvanisolutionsPvtLtd.OthermakeLEDLIGHTINGASPERBEESTANDARD
19 CEMENTOPCGRADE43 ACC/ULTRATECH/KONARK/LAFARGE
20 STEEL SAIL/TATA/RINL&steelsofothermaketobeapprovedbyOPTCLas&whenrequired.
21 GIPIPE TATA/JINDAL
22 AIRCONDITIONER HITACHI/CARRIER/BLUESTAR/VOLTAS/LG
23 PVCWIRES L&T/FINOLEX/ANCHOR/KDK/HAVELLS
24 SWITCHES ANCHOR/ABB/CONA/INDOASIAN/HAVELS
25 MCB L&T/ABB/SIEMENS/MDS/HAVELLS/INDOASIAN
26 ACB/MCCB L&T/SIEMENS/MERLINGERIN
27 ACDB/DCDB/BMK/CONSOLEBOX MAKTELSYSTEM(Vadodara)/SARVANA(Chenai)/Technocrat(Cuttack),M/sUnitedEngineersPvtLtd.
28 CLAMPSANDCONNECTORS ElectromechTranstech/Rastraudyog/Tyco/IAC/AswiniKumar&Co.,Cuttack
NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA29/36
-
29 GIBOLTS&NUTS NEXO/GKW/ASP
30 BATTERY&BATTERYCHARGER EXIDEforBattery&CALDYNEforBatteryCharger.
31 WAVETRAP AREVA,ABB,BPL
32 Meters,Transducers,Indicator. M/sSecureMetersPvtLtd
33 AuxillaryRelays. M/sEausun&ReyorleeLtd.
NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA30/36
-
15.PortableFireExtinguisher: (ANNEXUREI)
Portablefireextinguishersofthefollowingtypesshallbesuppliedtoeach
substation.
SlNo
DescriptionofItems
Unit capacity QuantityRequiredAt each132/33 kVS/S
At each220/132/33kV S/S &400/220 KVS/S
At each220/33kVS/S
1 FoamType Nos 9ltrs 2 4 42 Dry chemical
PowderType(Trolleymounted)
Nos 22.5Kgs 2 4 2
3 Dry PowderType
Nos 5Kgs 2 4 2
4 Carbondioxide(CO2
Nos 9Kgs 5 10 5
5 CarbonDioxide(CO2)
Nos 4.5Kgs 5 10 5
6 Carbondioxide(CO2)Trolleymounted
Nos 22.5Kgs 2 4 2
7 Fire bucketwith (a setcomprises ofsixnosBucketin each stand&onestand)
Set 3 5 3
The quantities are indicative. Bidders are advised to design as per therequirement.
NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA31/36
-
16.Maintenance&TestingEquipment:(ANNEXUREII)Maintenance&testingequipmentshallbesupplied&installedforeachsubstationasperthelistgivenbelow.Sl.No
DescriptionofItems Unit QuantityRequiredAteach132/33KVS/S
Ateach220/132/33KVS/S&400/220KVS/S.
Ateach220/33KVS/S
1. 160 kv transformer oil breakdownvoltagetestset
Nos 1 1 1
2. Insulationresistancetester(megger) Nos 1 1 13. Oilsamplingbottle Nos 4 4 44. SF6gasleakdetector Nos 1 1 15. LCD,digitalmultimeter Nos 2 2 26. Analogue Multimeter(features same as
digitalmultimeter)Nos 1 2 1
7. LCD,clamponmeter Nos 2 2 28. Digitalearthtester Nos 1 1 1
9. Discharge rod as per standard forcarryingouttheswitchyardmaintenancework
Nos 6 6 6
10. Rubberglovesofoperationof isolatorsandearthswitch
Pairs 2 2 2
11. Relaytoolskit Sets 1 1 112. Portableemergencylight Nos 4 4 413. Latest version desktop PC of reputed
make withall itsaccessoriesincludingCPU,Monitor,UPSandhavingalllatestloadedsoftwareandalsoitsbackupinshapeof CDandseparatependrive .Suitable for loading of software asrecommended by the relaymanufacturer. It includessupplyofoneno portable laser printer of reputedmake.MakeofPCandprinter:HP/DELL
Set 1 1 1
**Themultimeters(bothdigitalandanalogue),clamponmeters,earthtestershallofMotwanemake.PriorapprovalsofOPTCLforallthetestingequipmentsaretobetaken.
NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA32/36
-
17.OtherToolsandPlants(T&Ps)Requirement: (ANNEXUREIII)FollowingT&Psofreputedmakeshallbesupplied&installedateachsubstation.SlNo
DescriptionofItems unit QuantityRequired
Ateach132/33KVS/S
Ateach220/132/33KVS/S&400/220KVS/S.
Ateach220/33KVS/S
1 SetofDspanner(6mm42mm) Set 1 1 12 SetofRingspanner(6mm
42mm)Set 1 1 1
3 Socketwrenchwithsockets,handles,andotherattachment(6mm42mm)
Set 1 1 1
4 Insulatedcuttingplier Nos 2 2 25 Insulatednoseplier Nos 2 2 26 Monkeyplier Nos 1 1 17 Circlipplier Nos 1 1 18 Pipewrench
a)12inch1nob)18inch1no
Set1 1 1
9 Slywrencha)12inch2nosb)18inch1no
Set1 1 1
Insulatedhandlescrewdriversofdifferentsizesasperrequireda)12inchplainhead2nosb)8inchplainhead2nosc)12inchstarhead1nod)smallsize6inchplainandstarhead2eache)Completesetofdifferentheadinonebox/set1set
Set 1 1 1
11 LNkeyssetofdifferentsizesinonebox/set
Set 1 1 1
12 M.SFiles(12inchand6inchsizes)Roundfilesandflatfilesoneeachofdifferentsizes)
set 1 1 1
13 Hammarwithhandlea)1lb2nosb)1/2lb2nosc)2lb1no
Set 1 1 1
14 Crowbara)5ft2nosb)3ft2nos
set 1 1 1
NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA33/36
-
SlNo
DescriptionofItems unit QuantityRequired
Ateach132/33KVS/S
Ateach220/132/33KVS/S&400/220KVS/S.
Ateach220/33KVS/S
15 Steelscale(12inch) Nos 2 2 216 Steeltape
a)5mtrs2nosb)30mtrs1no
Set 1 1 1
17 Oilcane Nos 2 2 218 Spiritlevel(8inch) No 2 2 219 Plumbheadwithstringand
attachmentNo 1 1 1
20 Maintenancesafetybeltwithallattachmentandhelmets(completeoneset)
Set 3 4 3
21 Handdrillmachinewithdifferentbitsandkey.(Wolfmake)
No 1 1 1
22 Vacuumcleanerhavinghotblowerprovisionwithallattachments(EurekaForbesmake)
No 1 1 1
23 230250VAC,80W,450mmsweep,1400rpmstand(rugged)FANMake:Almonard,CGL
No 2 4 2
**T&PsshallbeofTaparia/Geodremake.ThehanddrillandvacuumcleanershallbewolfandEurekaForbesmake.
NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA34/36
-
18.OfficeFurniture:(ANNEXUREIV)Officefurnitureshallbesupplied&installedateachsubstationasperthelistgivenbelow.AllthefurnitureshallbeofGodrejmake.Beforesupplyofthefurnituretothesubstation,approvalfromOPTCLisrequired.Detailsofthescopeofsupplyareasindicatedbelow.
SlNo DescriptionofItems unit QuantityRequiredAteach132/33KVS/S
Ateach220/132/33KVS/S&400/220KVS/S.
Ateach220/33KVS/S
1 5ftX3ftexecutivetablewithdrawerbothsides
Nos 5 6 5
2 3ftX2&1/2ftTablewithonesidedrawer
Nos 7 8 7
3 Computertablesuitablekeepingmonitor,CPU,UPSandprinterwithtwonosrevolvingarmchairsuitableforcomputeruse.
Set 1 1 1
4 Executiverevolving,adjustable(height)chairswitharm
Nos 5 6 5
5 CushionfixedStypesteelchairswitharm
Nos 18 24 18
6 6ftX3ftconferencetable Nos 1 1 17 Cushionarmsteelchairsfor
conferencetablepurposeNos 6 8 6
8 6ftheightsteelalmirah(onlywithselves)forkeepingrecordsandothervaluableitems
Nos 4 6 4
9 6ftheightsteelalmirahwithglassdoorsforlibrarypurpose
Nos 2 2 2
10 6ftheight(havingminimum6lockersfacility)steelcupboardwithlockingarrangement
Nos 2 2 2
11 4ftsteelrack(minimumthreeselves)forkeepingthefilesandotheritems
Nos 8 10 8
NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA35/36
-
19.PORTABLEALUMINIUMLADDEREXTENDABLETYPEOF3m+3mTOBEUSEDFORMAINTENANCEOFEQUIPMENTINSIDESWITCHYARD.HeavydutyTwofoldwithslidingfeaturealuminiumladdertobeusedforthemaintenanceworkequipmentintheswitchyard(400KV,220KV,132KV&33KV:Breaker,CT,CVT,Isolatorsetc)&alsostreetlightingmaintenance.Eachfoldwillbeofminimumheightof3Mtrsandshouldhavebetterlockingarrangementbetweeneachfoldsforbetterrigidity.
20.PEDESTALMOUNTEDWHEELFITTEDDERRICKFORLIFTING/LOWERINGOFMATERIALSUPTO1.5TONCAPACITY.
HeavydutyPedestalmountedwheelfittedderrickforlifting/loweringofmaterialsupto1.5toncapacitytobeusedforthemaintenanceworkequipmentintheswitchyard(400KV,220KV,132KV&33KV:Breaker,CT,CVT,Isolatorsetc)&alsoothermaintenanceworks.Theheightofthederrickwillbesuitableforloweringofthetoppoleofthecircuitbreakerupto400KVandotherequipmentsupto400KV.
ENDOFVOLUMEIIA(SCOPEOFWORK)
NITNO.58/201112(PACKAGE6801/2011_LAPANGA400KV)SCOPEDETAILSVOLIIA36/36