I \ , S()( IAIS'I.N' RI KI'!Bl((I'' OF 11"~:'1' NANI
ELECTRICITY OF VIET NAM
PECC4 1P()0WE'R IEG(INEI'RING( (C)NSUIL'ING COMPANY 4
ISo 90012000
PROJECT: 19- 03
DUNG QUAT 220kV SUBSTATION
FEASIBILITY STUDY REPORT
RESETTLEMENT ACTION PLAN (RAP)(FINAL REVISION)
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
S(0('IAL1,I l It}L I'UlII 1( I O 0F il:I E NANI I
E11TI'RICITY OF IE'[ 11T NA NI
PECC4 POVE\R ENGINE'L"ING (C()NSUIL'ING ('()NIPANY 4
ISO 9001200
PROJECT: 19 - 03
DUNG QUAT 220kV SUBSTATION
FEASIBILITY STUDY REPORT
RESETTLEMENT ACTION PLAN (RAP)(FINAL REVISION)
Head of Department : Nguyen Kim Dong 4Head of Project Design: Nguyen Cuong
Khanlh Hoa Province, October 2005
FOR AND ON BEHALF OFPOWER ENGINEE ULTING COMPANY 4
|'* lPVANXY D'JNG M*
NGUYEN HUU TAPDEPIJTY DIREC?TOR
RcUsUtlllulcm n Actionll 1lzii (k' All)
PROJECT FORMIING C'ONTRIBlUTION
1. Tran Van Luvenl :Presiding RAP establishment
2. Doan Thi Thu Ha : Establishing RAP Report
FS on Dung Quat 22(kV substationI
Resct ltlccllt Action P lan (RA P)
ACIRONYNIS / ABBRENIATA10NS
- RAP Resettlemlenit Actioni Plan
- PAPs Project Affected Persons
- PAP Project Affected Person
- HHs Households
- WB \W'orld Bank
- PC People's Committee
- PPC Provincial People's Committee
- EVN Electricity of Vietnam
- LC Land clearance
- PRCs Provincial Resettlement Committees (Boards)
- DRCs District Resettlement Committees
- DMS Detailed measurement survey
- PMB Project Management Board
- PECC4 Power Engineering Consulting Company 4
- ACSR Aluminium steel reinforced conductor
- RIB Resettlement Information Booklet
- PAPs Displaced persons
- S/s Substation
- Trans. Transformer
- FS Feasibility Study
- TD Technical design
- BD Bidding documents
- ROW Right-Of-Way
- CPPMB Central Power Projects Management Board
- CLDC Central Regional Load Dispatch Centre
- NLDC National Load Dispatch Centre
FS on Diuig Qulat 22(kV substation 2
Resettlement Action I'lani (RAP)
9.3.5 Provisional sum 539.3.6 Total compensation cost for project 53
CHAPTER 10: CONCLUSIONAND PROPOSALS 5410.1 Conclusion 5410.2 Proposals 54
APPENDICES 55Annex 1: Entitlement matrix 56Annex 2: Inventory of project affected households for Dung Quat 220kV 58substationAnnex 3: Entitlements of project affected households 61Annex 4: Socio-economic household data sheet of PAPs 64Annex 5: Minutes of public consultation 66
FS on Dung Quat 220kV substation 7
Rcscttlemcnt Actioni 1Plnin ( RAl)
SUMMARY
Ii mpleimienitinig thc Vietnamese Communist Party's policy on the national
industrialization and modernization program, Electricity of Vietnam (EVN) has
established the project "System Efficiency, Improvement, Equitization and
Renewable Project (SEIER)" (3680-VN) financed by World Bank (WB). One of its
component is Dung Quat 220kV substation project with permanent land acquisition
is 27,749 mi2 . The substation is intended to construct on rice-field land nearby the
existing 110kV Dung Quat substation under Binh Thuan Commune, Binh Son
District, Quang Ngai Province
The Dung Quat 220kV substation is constructed for the purpose of supplying
power for Dung Quat industrial zone, mainly for Industrial Zone in the East and
Van Tuong city from the national power network and increasing the reliability in
power supply and power quality in the region.
1. Policy framework
The RAP project is established based on Decree 197/2004/ND-CP dated
December 3, 2004 of the Government regarding the compensation, resettlement
support when the State takes back the land; Decree 188/2004/ND-CP dated
November 16, 2004 of the Government regarding the method to determine the land
price and the price framework of land kinds; Decree 181/2004/ND-CP of the
Government regarding the implementation of Land Law, etc... and guideline on
RAP establishment of WB (the policy framework of unvoluntary resettlement OD
4.30). According to this policy, PAPs are people, households, entities with or
without juridical personality for their assets on project impacted land and
inventoried before the cut-off-date (September 25 h, 2004) are compensated
according to the Government's regulations.
2. Project impacts
The project causes impacts to the followings:
- P'ermanent land acquisition for construction of the substation and access
road to the substation : 27,749 miFS on Dnig Quat 220kV substation X
Resettlemejit Actioin Plan (RAP)
- Causing damage to paddy 24,998m2
- Results of project data collection show that there are 37 houselholds with
1 77 persons having impacted agricultural land
- No affect to cultural relics area, preservation area, pagoda and sensitive areas
- No ethnic minority household among impacted households.
- Dung Quat 220kV substation is expected to be constructed on rice-field
land, no impact to houses and land tenure, so no househould have to remove their
house.
- There are 5 impacted households over 25% area of agricultural land among
impacted households.
During public consultation process, project impacted households were agreed
to select the compensation procedure on land and assets in cash (impacted HHs over
25% land area included).
3. Compensation policy
The ending date of survey is September 2 51h, 2004. The price for making
compensation on land, assets and crops is based on the compensation unit price of
Quang Ngai Province.
All impacted households are entitled according to the policy framework and
Vietnam Decrees. Up till now, the survey result and damage inventory shows that
no remarkable impacts to people, the community and the public assets. As a result,
it is unnecessary to have economical recovery measures.
4. Public consultation
PAPs consultation to get feedback comments will restrict the contradictions and
delay when implementing the project. The resettlement plan will be implemented
following to the reference comments from the authorities and people in order to
maximize their participation in the resettlement plan and implementation as well as
socio-economical benefits. The authorities and people are consulted in substation
location, the resettlement policy, implementation of RAP and grievance mechanism.
5. Grievance
FS on Dung Quat 220kV substation 9
Rcscttleniictit Action Plan (RAP)
During project implemiientation. grievances of impacted people will be solves
based on Vietnam lawv. All grievances will be solved equitably and the grievances
procedures will be guided by related authorities. The griever will pay no cost for
this grievance.
CPPMB and the local authority are responsible for monitoring the RAP
implementation process. In addition, an independent consulting agency will be
assigned to supervise independently and appraise the compensation and resettlement
implementation process in accordance wvith the policy stated in this dossier. This
agency can be selected and awarded the contract by the PMB after the approved
resettlement plan or selected and awarded the contract by WB. The supervising
activities are implemented from the beginning of project implementation stage. This
independent supervising agency will report to PMB or W1B about its results of
supervising activities.
6. Management organization
CPPMB is the project coordinating unit and cooperates with other agencies such
as the People's Committee of Quang Ngai Province, Power Company of Quang
Ngai Province and WB in implementing detailed works of project, especially the
RAP implementation plan.
7. Project implementation schedule
Contents Time
Completing and submitting to the relevant authorities March, 2005for approval on cost estimate and technical design
The relevant authorities approve documents related to September, 2005the cost estimate and technical design
Preparation of bidding documents for goods and October, 2005construction
Approving the bidding documents for goods and November, 2005construction
Bid opening for construction and supply equipment & November, 2005materialsThe relevant authorities making an approved decision on February, 2006
FS on D)ung Quat 220kV substation 0
Resettlemeint Action Plan (RAP)
the results of construction bidding documents and supply
equipment & materials
Land clearance xvorks March 2006 . April 2006
Construction of civil part I May 2006 + April 2007
Construction of electrical part May 2007 + July 2007
Testing and completing August 2007 . October 2007
8. Cost estimate
Total project compensation cost is about VND 917,178,360 (or USD 58,049)
Total investment capital: VND 97,189,210,453 (or USD 6,151,216)
9. Information dissemination
The draft RAP will be disclosed in Quang Ngai Province and the Information
Development Center of WB (VDC) at premises of 63 Ly Thai To Street, Ha Noi
City. CPPMB will send copies of entitlement statement form to the authority's Binh
Son District. All feedbacks from the local authority and people are considered and
supplemented into the RAP.
FS on Dung Quat 220kV substation 1
Resetilenient Action Plan ( RAPI)
CHAPTER I
GENERAL INTRODUCTION
1.1 THE BASIS OF THE REPORT
The RAP report of Dung Quat 220kV substation project is set up with the
following basis:
+ The Master Plan of Viet Nam Power Network Development for the period
of 2001- 2010 taking into consideration the prospects till 2020 settled by Energy
Institute on January 2000, and revised project of the Master Plan of Viet Nam
Power Network Development in phase of 2001-2010 with considering up to 2020
prepared by Energy Institute on October, 2002.
+ Supplemental Report of Rehabilitation Planning and Power Network
Development of Dung Quat Industrial Park in the stage of 2002-2005 with
considering up to 2010 made by Institute of Energy on February, 2003.
+ Decision No.164/QD-EVN-TD dated January 1 9h, 2005 of EVN about the
aprroval of Feasibility Study Report of Dung Quat 220kV substation project.
+ Decision No.1752/QD-EVN-TD dated June 24h, 2004 of EVN about the
aprroval of Feasibility Study Report of Doc Soi - Dung Quat 220kV transmission
line project.
+ Decision No.554 EVN/DL3-8 dated January 315t, 2005 of Power Company
No.3 about the aprroval of technical design of the project Dung Quat Port 1 10kV
substation and transmission line connected to the substation.
+ Notice No.2328/UB dated November 27h, 2003 of People's Committee of
Quang Ngai Province about the agreement on the substation site for Dung Quat
220kV substation.
+ Economic Contract is signed between Central Power ProjectsManagement Board and PECC4.
FS on Dung Quat 220kV substation 12
Rcsettlimcnit Action Plan ( RAP)
1.2 PRINCIPLES AND OBJECTIVES
This report is set up with the purpose:
+ Study on policies of compensation, resettlement for households having land
acquisition for construction of the Dung Quast 220kV substation according to Viet
Nam laws and WB guidelines.
+Propose the alternatives of compensation, resettlement and the most efficient
way of implementation to the households having affected area. Ensuring that all
PAPs will be compensated for their losses and provided with rehabilitation measures
to assist them to improve, or at least maintain their pre-project living standards and
income earning capacity.
+ Help to choose the right design alternative, reduce the degree of damage at
the implementation of project and ensure the most economic and social advantages
of the project
+ Carry out to make livelihood-socio-economic damage survey of the project
area as well as working with the relevant authorities about compensation,
resettlement policies for affected households. The investigation work and collection
of data are mainly concentrated on the site of installation of substation.
The principle objective of the policy framework of unvoluntary resettlementOD 4.30) is:
All PAP's residing, working, doing business, at least maintain, their pre-
project living standards and income earning capacity as of the date of the baseline
surveys are entitled to be provided with rehabilitation measures sufficient to assist
them to improve. Lack of legal rights to the assets lost will not bar the PAP from
entitlement to such rehabilitation measures.
During RAP preparation, Decrees and Circulars of Vietnamese Government
such as Decree 197/2004/ND-CP, Decree 181/2004/ND-CP, Decree 188/2004/ND-
CP, etc..and Decisions about compensation unit price issued by The peoples'
committees of provinces are applied. The entitlement policy in this RAP are
suggested as follows:
FS on Dung Quat 220kV substation 13
Resetticmtint Action Plan (RAP)
+ Apply a compensation rate according to the market price or replacement
cost: Compensation of land and crops (short-day crops) at market price.
Compensation of house and trees (long-day tree) at conversion price
+ All affected properties are legible from the cut-off-date (September 25tIX
2004). The affected households who have been registered will be compensated.
This RAP will be valid after GOV's and WB's approval.
1.3 VALIDITY OF RAP IMPLEMENTATION
Resettlement and compensation program for PAPs, policy and provisions on
resettlement and compensation entitlement in RAP will be applied after approval of
WB and Vietnamese Government.
Before implementing resettlement and compensation program, the project
owner and local authorities should check and revise the applied compensation costs
in this report. If there is any compensation unit price non-conforming at the time of
program implementation, the local authorities and Resettlement and Compensation
Board (RCB) need to revise them to ensure sufficient compensation payment for
PAPs according to principles stated in RAP.
Survey data in this report base on investigation report in the phase of
feasibility study of the project and update them as per the approved alternative.
1.4 DESCRIPTION OF THE PROJECT
1.4.1 Project location
The 220kV Dung Quat substation is intended to construct on rice-field land
nearby the existing 110kV Dung Quat substation under Binh Thuan Commune,
Binh Son District, Quang Ngai Province with total area of 27,749m2. The
geographical situation is as follows:
- North adjacent to land area for planted rice
- South adjacent to existing 110kV Dung Quat substation
- East adjacent to wild hill land
- West adjacent to inter-district pathway and populated area
FS on Dung Quat 220kV substation 14
Resettlement Action Planl (RAP)
1.4.2 Project characteristics
* Voltage and capacity: The substation is dcsigned with tw o transformers
220/110/22kV-125MVA. One transformer 220/ l0/22kV-125MVA will he installed
in this phase. The 22kV voltage level is not use.
* Single line scheme:
- 220kV side: Apply the scheme "Double busbar system with transfer bus,
bus-section circuit breaker in combination with bus coupling breaker". The
configuration "two transmission lines - one transformer" will be applied in this
phase. The 220kV switchgear shall be outdoor.
- 110kV side: Apply the scheme"Double busbar system with transfer bus,
bus-section circuit breaker in combination with bus coupling breaker". The l lOkV
switchgear shall be outdoor.
* Main transformer:
- Type: 3-phases, outdoor - autotransformer
- Voltage level: 225 ± 8x1.25%/121/24kV
- Capacity: 125MVA
- Ratio of capacity: 125/125/30%.
* Main electrical equipments:
- 220kV circuit breaker
- 220kV disconnector switch
- 220kV current transformer.
- 220kV voltage transformer
- 11 OkV circuit breaker.
- 11 OkV disconnector switch.
- 11 OkV current transformer.
- 11 OkV voltage transformer.
- 110, 220kV surge arresters
* Control-protection and measuring system:
The control and supervisory system of Dung Quat 220kV substation is
controlled by computer according to 4 levels:
I-S on Dung Quat 220kV substation 15
Rescttlemeniit Action Plan (RAP)
* Level 1: Control centers (NLDC and CRLDC)
* Level 2: Station level
* Level 3: Bav lcvel
* Level 4: Equipment level
Protection relay uses digital type with outlet to connect to station computer
and SCADA/EMS system.
Control system at station level shall be of indoor; the protection and control
system at bay level will be outdoor. The protection and control equipments are
linked by the 1OOMbps Ethemet network.
* Service power supply:
- 380/220VAC power supply.
- 220VDC power supply.
* Communication and SCADA systems.
The optical communication equipment SDH/STM-4 is synchronously
equipped, supplement STM-4 card for existing optical transmission equipment at
Doc Soi 500kV substation to set up the optical communication route STM - 4
between Doc Soi 500kV substation and Dung Quat 220kV substation. The PCM
multiplexer and teleprotection equipment are newly equipped.
The SCADA system is controlled by computer; 01 connecting gateway is
equipped to link the National Load Dispatch Centre and Central Load Dispatch
Centre according to the standard IEC 60870-5-101.
* Earthing and lightning systems .
- Earthing system: Pile and bar types are used; and at the same link to the
earthing system of existing Dung Quat 11OkV substation. The earthing piles are
used copper galvanizing steel with 022 type, 3m length. The earthing bars are used
stranded copper conductor M95. The connection between the piles and conductors
or conductors and conductors are used CadWeld.
- Lightning system: Lightning arrester and lightning rod are installed on the
portal poles of 220kV and 11 OkV switchgears.
* Lighting system:
FS on Dung Quat 220kV substation 16
Rcsettlemcnt Actioni Plall (RZAT')
Control room's lighting system: The 40MW neon lamp is used for Nvorking
and 100W incandescent lamp, exploded- protection type is used for in fault.
Outdoor lighting system:
- Lighting system for 220kV, 110;kV switchgears are used 500W flood-light
installing on the independent lighting pole.
- Control room's lighting system used 250MW high-pressure mercury lamp
installing at control room.
- Lighting system around the substation used 75W sphere lamp installing on
the towers with height of 3.4m. The lamp towers is installed distant of Im from the
substation fence and about 25-35m putting one lamp tower.
* Water drainage - supply system and fire extinguishing:.
- Water supply system: including 01 drilling well, water pump, 02 water
tanks and water pipline made by galvanizing steel.
- Water drainage system: including one PVC pipeline and collecting wells.
- Fire extinguishing system: To observe the regulated requirements, the fire
extinguishing system shall be of floating system including 01 pumping station in
emergency case, 02 water tanks with 100m3 capacity, pipeline and foam fire
extinguishers. As for transformer used fixed spray water platform; The fire
extinguishers and fire-fighting tools are fully equipped in the substation such as
CO2 vessel, basin, hook, sand, oil gathering reservoir for break-down.
* Construction solutions:
- Total land acquisition area of the whole project: 27,749m2.
- Skeleton of substation's base leveling used skeleton base of the existing
Dung Quat 1 10kV substation; the average skeleton is 8.68m, the substation base is
mainly soil filling.
- Transformer's foundation, gantry tower, equipment supports: Reinforced
concrete
- Gantry tower, arms, equipment supports: Hot dip galvanizing figural steel
FS on Dung Quat 220kV substation 17
Reseti lciiem ii Actioni Plan (IRAP\)
- Control cable trenchies: UJsing ditch of burried cable. the walls and bottom
are made of concrete cast on site, the inside of suspension rack, the width of trench
is 0.4 - 0.6metres.
- Road inside the substation wvith width of 3m and 4m: Concrete
- Road ouside the substation with width of 4m: Concrete
- Control house: Structure of one storey, dimension 12m x 30m2, height of wall
to ceiling 4.2m. Main bearing force structure made of all-block reinforced concrete,
wall by brick, the tower's foundation by reinforced concrete, the wall foundation by
hewn stone.
- Shifting house for operation workers: including 07 rooms, the area of each
room is not over 30m2, total construction area is not over 370m2, total land
acquisition area of house and access road (including embankment slope) is 778m2.
- House with no upstairs, main bearing force structure made of all-block
reinforced concrete, wall by brick, the tower's foundation by reinforced concrete,
the wall foundation by hewn stone, house roof made by reinforced concrete with
colour-tin-roofed.
At present, there is one section of 22kV line locates on the proposed site of
Dung Quat 220kV substation. For this reason, this line section must be move out of
the substation location.
- Starting point of moved line section: Feeder bay 476 of 110/22kV Dung
Quat substation.
- Ending point: New construction tower on Binh Thuan line distant of 15m
from Binh Thuan 1 substation.
- Voltage level: 22kV.
- Number of circuit: 1 circuit
- Length of the line: 421m whereas there are 237m overhead line and 184m
underground line.
- Conductor: ACKr -120mm2 is used for O/H line and underground cable
used conductor LPE -24kV-3x240mm 2
FS on DnU1 Quat 22OkV substation 18
RcsettIeciett Actioni l'lan ( RAP)
1.5 PROJECT IMPACTS ON LAND AND ASSETS
- Permanent land acquisition land to construct the substation and access road to
the substation is 27,749m2.
- Dung Quat 220kV substation is expected to be constructed on on rice-field
land, so no impact to houses and land tenure, only affect to the agricultural land.
Whereas:
+ Land area for planting rice with 2 crops :24,998m2.
+ Land area of irrigation canal : 2,751 2 .
1.6 PROJECT IMPACTS MITIGATION MEASURES
Selection of substation location: For the investigation and design of
substation must conform to the followed requirements:
+ Conforming to Power Network Planning and socio-economic conditions of
Quang Ngai Province in the period of 2006-2010 with considering up to 2010.
+ Location: The substation is constructed on the area of headwork points for
important line routes.
+ Convenient for work-execution, transportation of equipments and operation
+ Smallest limitation for compensation works, volume of levelling and filling
for substation base is little.
+ Mitigating impacts on environment to surrounding areas caused by
construction of substation
The substation location completely avoid passing:
- Market areas, densely populated areas.
- Airport, military areas.
- Near or parallel with communication system
- Pagoda, protection forests, natural preserved areas, historic and cultural
asests etc.
Expected site for 220kV Dung Quat substation is the least effects to
environment and meeting to economic and technical aspects.
Technical solutions thorouahly exploited:
FS on Dung Quat 220kV substation 19
Resettlcmcnt Action Plant (RAP)
Design a rational work execution alternative, clhoose time for wvork executionat periods of harvest and complete work whlen next crop is not yet cultivated ( landis at resi). Organize work according to many shifts at high productivity, reducing thetime of land appropriation. Make definetely each item of work, each part of routeline to reduce the time of land appropriation. During investigation and workexecution process, the workers's camps are set up on vacant lot, on communaloffice area, not on private land or cultivated land.
Measures of cash indemnification are most rational.
During the stage of operation management, making repairs and overcomingincidents, safety measures are applied such as:
- Safety measures when making contact with electrical equipments
-Safety measures when making operation management works, repairs ofsubstation
1.7 TOTAL COST OF PROJECTItems Total (VND)
1. Cost for construction works 21,816,035,8662. Cost for equipment 57,828,391,3563. Other costs 8,541,026,4234. Contingency 8,815,845,3645. Cost for substation outside fence 214,911,444
Total 97,189,210,453In round: VND 97,189,210,000
CHAPTER 2
IMPLEMENTATION ORGANIZATION AND LEGAL FRAMEWORK FORCOMPENSATION AND RESETTLEMENT
Project Management Board and Local Authorities will be responsible forimplementing RAP. It should be on schedule, suitable with approved schedule forthe project. The coordination between the project owner and local authorities will bemade closely in order to implement RAP smoothly and effectively and to avoid thedelay of RAP implementation
2.1 INSTITUTIONAL ARRANGEMENTS
The lollowing institutions/agencies will be involved in implementing RAP:FS on Dung Quat 220kV substation 20
I~~ ~~~~ I I I I || , .. .
Rescttllemeit Actioil Plan (RAP)
- Electricity of Viet Naim (EVN)
- People's Committee of Quang Ngai Province
- Project Management Board - Central Power Projects Management Board
- Consultant Company - Power Engineering Consulting Company 4
- Price - Financing Departments of Quang Ngai Province
- Land Clearance Committee of Quang Ngai Province
- People's Committee of Binh Son District
- Land offices of Binh Son District
- Land clearance Board of Binh Son District
- People's Committee of Binh Thuan Commune
- Project affected persons (PAPs)
2.2 FUNCTIONS, TASKS FORCE AND RESPONSIBILITY
* Electricity of Viet Nam (EVN)
EVN is the owner of the project and is responsible for managing andorganizing of investment policy, investigation, design, construction as well assupervision for RAP implementation. EVN controls the project preparation andimplementation via professional agencies, approving decisions concerning
resettlement work submitted by PMB; assigning Central Power ProjectsManagement Board (CPPMB) to directly manage the whole process of projectimplementation.
* Project Management Board (PMB)
Central Power Projects Management Board is reponsible to EVN for directing
the whole project including the implementation of RAP from impact survey,inventory, making plans for RAP implementation. Main tasks of PMB will be:
+ Making Master Plan, management and supervision of land clearanceimplementation to ensure full determination of relating PAPs, set out satisfiedentitlements as per land clearance policy.
FS on Dung Quat 220kV substation 21
mmmml l l l l
Resettlenieti Actioni Plani (RAP)
+ To ensure that all PATIs arc announced of' applied policies for RAP
preparation. Entitlements of PAPs. project informationi and site clearanicc plan are
popularized under announcemcent torm. This is considered the proof' of' thcir
entitlement towards interests of RAP work.
+ Disseminate project information to PCs of all levels
+ Send RAP to Resettlement Committees, explaining applied models and
entitlements in the project.
+ Supervision/monitoring for compensation payment, coordinate to
implement land acquisition and site clearance.
+ Report the implementation process on land clearance work to EVN and
WB.
To meet this responsibility, PMB needs to establish a department or a group
including experienced officers to monitor RAP and environment implementation.
* Provincial People's Committee (PPC) of Quang Ngai
PPC is the agency approving and directing matters concerning the RAP
within the provincial area. The Project PPC are responsible for:
* Directing departments, branches and local areas in province related to RAP
preparation and implementation such as Land Department, Construction
Department, Department of Finance and Goods Price and People's Committee of
Phu Hoa District
* Approving the costs of compensation in provincial area.
* Approving dossiers of land delivery and recovery in provincial area.
* Establishing Provincial Resettlement and Compensation Committee and
directly manages the activities of this Board.
* Directing and managing the coordination between Branches and local
authorities in RAP implementation.
*: Departments of Finance and Goods Price of Quang Ngai Province
To be responsible for issuing detailed compensation unit prices applied in the
provincial area. During the implementation process, Department of Finance-Goods
FS on Dung Quat 220kV substation 22
Resetilenient Actionl P'lani (RAP)
Price needs to maake cooperation with other departments such as Construction
Department. Land Departmenit, Department of Agriculture and Rural Development
ancd l'eople's Committee of District wlhere the project constructed in order to
establish the compensation unit price for premises, land, trees and crops.
* Provincial Compensation Committee (PCC) of Quang Ngai Province
This Provincial Resettlement is established by the People's Committee of
Quang Ngai Province in order to implement the tasks of Provincial People's
Committee. During the implementation of compensation and resettlement support
(if any), it must have the participation of Owner, representatives of communal
people's committee and PAHs where land recovered
People's Committee of Binh Son District
Being responsible for guiding compensation and resettlement activities in
district, People's Committee of District is responsible for:
+ Creating good conditions and coordinate with relating agencies in survey,
inventory of project impact; organize community consultation activities,
information dissemination on the project implementation policy and land acquisition
plan to people of commune (ward) where project constructed.
+ Establishment of Resettlement Committees of District
+ Directing and monitoring RAP implementation in district
+Solving relating matters during RAP implementation together with
Resettlement Committees of district
* Resettlement Committee of Binh Son District
These are key institutions being mainly responsible for implementing RAP in
district area, District Resettlement Committee consists of experienced officers of the
data-gathering inventory. District Resettlement Committee is mainly responsible
for:
* Making models of compensation and resettlement support (if any) on the
area of District.
* Checking all survey documents concerning affected households and assets,
making Detailed Mcasurement Survey (DMS) for each household including ofFS on Dung Quat 220kV substation 23
Rescttlenient Action Plan (RAP)
aflected assets, total compensation cost based on entitlement policies regulated in
RAP.
* -Checking the unit prices of compensation stated in RAP, suggest
adjustment to comply with market prices at the plan implementation period.
* Co-ordinating with PMB, consultant agency to organize RAP meetings in
local section and organize public consultation together with project owner.
* Summarize and submit data affected in local section to Provincial
Resettlement Committee.
* Based on the policy and approved schedule in RAP, preparing the detailed
implementation plan and submit it to Provincial Resettlement Committee.
* Directly make payment on compensation and allowances to PAPs in a
timely manner.
* Settling the complaints and grievances of PAPs, solving any difficulties
during the implementation period, and suggest the solutions for the outstanding
issues to Provincial Resettlement Committees and Owner.
* Making monthly report and send them to PRCs, Owner and Chairmen of
DPCs.
Resettlement Committee of district will be headed by Chairman of district.
The Resettlement Committee of district will be consisted of the following
departments/ offices:
- Representative of Financial Office
- Representative of Owner: Permanent member
- Representative of Office of Environment and Natural Resources
- Representative of Statistic Office
- Representative of Industrial Office
- Representative of Binh Thuan Commune
- Representative of PAPs
FS on Dung Quat 220kV substation 24
Resettlcincit Action lPlani ( RAIP)
Staffis of District Rescttleicnt Committee will be concurrently having many
works during the project implemientation, enjoy allowances according to province's
decisions. Assistants work during the project implementation and get salary during
the work period.
*: People's Committee of Binh Thuan Commune
* Contributing to Overall Detailed Measurements Surveys.
* Co-ordinate with Resettlement Committees of districts for classifying
impacted assets, determine the legality and legibility of assets.
* Certify affected assets in general survey for compensation dossier of each
household (in the survey note).
* Making public information about the project and disseminating policies in
RAP.
*. Project Affected Persons (PAPs)
* Directly participate in the general survey, consider thoroughly their
entitlement and responsibility policy. After getting full entitlements, PAPs should
transfer the construction surface on time.
* Propose expectation, requirement for the above mentioned institutions and
monitor their implementation.
PMB and Quang Ngai Province will arrange adequate and experience staff to
make sure that RAP will be implemented smoothly as approved schedules.
2.3 STAFFING ORGANIZATION AND RESPONSIBLES
Table 2.1: Responsibilities of RAP implementing Institutions
No. Activities Institutions
Organizing meetings with PAPs to Compensation Committees of Binh1 disseminate information about Son District, Binh Thuan PC
RAP ________________
Monitoring and approving Project Management Board and2 impacted households and their Resettlement Committees of district
assets coordinate with People's Committee ofBinh Thuan Commune.
FS on Dung Quat 220kV substation 25
Resettleniclnt Action Plan ( RAP')
District Land Clearance Committee3 Detailed iileasurement suneN coordinate with People's Committce of
3 Detailed meas.4.1.)urementi~ survey Binh Tlhuan Commune and relevant Units
of local authority.
Project Management Board, Resettlement4 Informing for PAPs Committee of Binh Son District, Binh
Thuan Commune PC
S Decision on compensation Compensation Committee of Binh Sonproblems District
6 Compensation payment Compensation Committee of Binh SonDistrict and Project Management Board
7 Internal Monitoring CPPMB
Departnent of Natural Resources and
8 Independent Monitoring Environment or provincial socio-scienceUnits selected by Project ManagementBoard.
2.4 LEGAL FRAMEWORK
This is a project with loan from World Bank so the legal grounds applied will
be a combination of Vietnam and WB policies.
a. The Legal Documents of the Government of Vietnam
The Constitution of Vietnam, 1992 confirms the right of citizens to own a
house and to protect the ownership of the house.
According to Vietnam Law on land passed by National Assembly Term XI,
Session IV on November 26h, 2003 and come into force from July Ist, 2004.
* Decree No.197/2004/ND-CP issued by GOV on December 3rd, 2004
regulates compensation, resettlement support for recovered land by GOV.
* Circular No.1 16/2004/TT-BTC issued December 7h, 2004 by the Ministry of
Finance provides guidelines to implement Decree No.197/2004/ND-CP
issued by GOV on December 3rd, 2004 regulates compensation, resettlement
support for recovered land by GOV.
* Decree No 188/2004/Nd-CP of November 16th, 2004 on the stipulation of
method to determine the land price and the frame for the price of land types.
* Circular No.1 14/2004/TT-BTC issued November 16%', 2004 by the Ministry
of Finance provides guidelines to implement Decree No 188/2004/Nd-CP of
FS on Dunlg Quat 220kV substation 26
Rcscttlceiicnt Action Plani (RAP)
November 16"', 2004 on the stipulation of method to determine thle land price
and the frame for the price of land types.
* Decrec No. I 81/2004/ND-CP issued by the GOV concerning the
implementation of Land Law.
* Decree No.1 82/2004/ND-CP dated 29/10/2004 issued by the GOV
concerning the land price calculation method and the land price framework.
. Decree No.198/2004/ND-CP dated 03/12/2004 issued by the GOV
concerning the collection of land use charges.
* Decree No.17/2001/ND-CP issued by the GOV concerning the regulation on
management and using the ODA captital.
* Decree No.105/2005/ND-CP dated 17/8/2005 issued by the GOV concerning
the detailed regulations and guidelines on implementation of some articles in
the Electricity Law.
* Decree No.106/2005/ND-CP dated 17/8/2005 issued by the GOV concerning
the detailed regulations and guidelines on implementation of some articles in
* the Electricity Law pertaining to the safe protection of high voltage network.
b. World Bank Policy on Involuntary Resettlement (OD 4.30)
* The primary objective of this policy is to ensure that PAPs who have lost
assets are compensated at replacement cost and are provided with recovery
measures to help them improve better or at least maintain their standard of life and
their income capacity as in pre-project conditions.
* The policy framework is established based on the principles and objectives,
selection criteria for PAPs, entitlements, legal framework and institutions, mode of
rehabilitation and compensation, the participation of people. Furthermore,
procedures of grievance will be guided in the process of compensation, resettlement
and rehabilitation for PAPs.
c. Comparison between Government of Vietnam and World Bank
Approaches
* There are a number of ways in which the approaches of the Vietnam
Government - both in policy and practice - are compatible with World Bank
FS on Dung Quat 220kV substation 27
Rescttlemcint Actioni Plan (RAP)
guidelines so that PAPs can have legitimate entitlemencts. The most important
compatibilities are:
Vietna-n has a process wvhereby most people wvithout legal land rights may
meet conditions of legalization and receive compensation for losses.
* Permanent residents are provided with options that include relocation to an
improved site, or cash, or a combination of the two.
* Resettlement sites offer not only better-improved infrastructure and services
but also represent a higher standard of living.
* Allowances are provided to help the PAPs in the transition period and there
is an institutional structure through which people are informed, can negotiate
compensation, and can appeal.
Differences between the approaches and measures that need to be addressed
within the program also exist. However, in this context, procedures exist within
National and City governments that allow the granting of waivers of domestic law
on specific projects that may be in conflict with that of the funding agency.
d. Required Waivers
In order to meet the requirements of the World Bank OD4.30 on Involuntary
Resettlement a number of articles in various Vietnamese laws and regulations which
do not ensure compensation at replacement cost or set eligibility provisions which
do not extend the right to rehabilitation and or assistance to households without
proper land paper, will be waived.
* Price of Land for Calculation of Compensation
According to Vietnam regulations, the calculation of land price for
compensation will be based on Decree 188/2004/ND-CP, Decree 181/2004/ND-CP,
etc and Circulars No.1 16/2004/TT-BTC, No.1 14/2004/TT-BTC.
To ensure that the objectives of the project resettlement policy are met, unit
price for land compensation established by the People's Committee of Phu Yen
Province will be adjusted to meet at replacement costs.
The Item 4, Article 2 of Decree 17/2001/ND-CP dated May 04, 2001 to
guide on the ODA management stipulates that "in the case of the international
FS on Dung Quat 220kV substation 28
Rcsettlu icinet Actiol Plan (RAP)
aprecniients on ODA have becl signed between GOV and sponsor stipulates other
contents, thcn that intcrniationial agrecmients wvill be followved".
FS on Dung Quat 220kV substation 29
Resetltle:mnt Action Plan (RAPl)
CHAPTER 3
ENTITLEMENT POLICY
3.1 DEFINITION OF ELIGIBILITY AND LIMITATION TO ELIGIBILITY
Project Affected Persons (PAPs) including people confirmed by data collected
from the survey and investigation process as follows:
- PAPs have land or cultivalted land which are partially or totally affected
(temporarily or permanently) by the project.
- PAPs have crops (annual and perennial) and trees which are partially or
totally affected by the project.
- Encroachers who settled into the proposed affected area after the cut-off date
(September 25h, 2004) will have no entitlement to compensation and resettlement.
They will be required to demolish their structure and cut the trees or harvest their
crops for land clearance to the project. In the case necessary, they will be forced to
be removed out of the proposed project area. Nevertheless, they do not have to pay
any fine or sanction.
3.2 RESETTLEMENT AND COMPENSATION PRINCIPLES
The compensation and resettlement plan is established based on fundamental
principles, i.e conforming to laws, decrees, policies regulated by Vietnamese
Government and WB's guidelines consisting of:
1. Acquisition of land and other assets, and resettlement of people will be
minimized as much as possible.
2. All PAP's residing, working, doing business or cultivating land in right of
way (ROW) of transmission line, surrounding areas of tower foundation,
the substation areas, in the service roads under the project as of the date of
the baseline surveys are entitled to be provided with rehabilitation
measures sufficient to assist them to improve or at least maintain their pre-
project living standards, income earning capacity and production levels.
FS on Dung Quat 220kV substation 30
Resettlemeit Action llan (RAP)
Lack of leeal ri5zhts to thie assets lost should not bar the PAPs fronm
en7titlement to suC/7 rehabilitation measures.
3. The rehabilitation measures to be provided are: (i) compensation at
replacement cost, without deduction for depreciation or salvage materials for
houses and other structures; (ii) agricultural land for land of equal
productive capacity acceptable to the PAPs or in cash at replacement cost
according to PAP's choice ; (iii) replacement of residential/premise land of
equal size acceptable to the PAPs or in cash at replacement cost according to
PAP's choice ; and (iv) transfer and subsistence allowances.
4. Location of resettlement and relocation should be as close as possible to
existing residential area of PAPs.
5. The resettlement transition period will be minimized and the rehabilitation
means will be provided to the PAPs not over one month prior to the
expected start-up date of works in the respective Project site.
6. Plans for acquisition of land and other assets and provision of rehabilitation
measures will be carried out in consultation with the PAPs, to ensure
minimal disturbance. Entitlements will be provided to PAPs not over one
month prior to the expected start-up date of works in the respective Project
site.
7. The standard of life, the infrastructure of community must be maintained or
improved better than their prior place.
8. Financial and physical resources for resettlement and rehabilitation will be
made available and as where and when required.
9. Institutional arrangements will ensure effective and timely design, planning,
consultation and implementation of RAP.
10. Effective and timely supervision, monitoring and evaluation of the
implementation of RAP will be carried out.
3.3 ELIGIBILITY TO COMPENSATION ENTITLEMENT
Legitimate PAPs are all the affected households and institutions included in
the inventory with or without legal title included in the RAP inventory or able toFS on Dung Quat 220kv substation 3 1
Resettleiemenit Action Plain (RAP)
dcmonstratc with other means that prior to RAP cut-off date they owned, rented or
used land, and properties associated Nvith land as defined in 3.1 item
3.4 ENTITLEMENT POLICY
PAP's will be entitled to the following types of rehabilitation and assistance measures:
* PAP's losing agricultural land and crops
(i) The general mechanism for compensation of lost agricultural
land will be through provision of "land for land" arrangements of
equal productive capacity, satisfactory to the PAP.
However, if the PAP prefers to receive cash compensation then
the following applies:
- if the portion of the land to be lost represents 25% or less
than 25% of the total area of the landholding, and the
remaining land is still a viable economic holding, cash
compensation, at full replacement cost, may be provided to
the PAP; or
- if more than 25% of a villager's agricultural land is
acquired and the remaining holding is not viable then the
Project will acquire the entire landholding and provide
cash compensation at full replacement cost.
(ii) PAP's will be compensated for the loss of standing crops and fruit
or industrial trees at market price. Productive trees will be
compensated at replacement cost. Fruit trees will be compensated
for the remaining harvests.
(iii) PAP's whose land is temporarily taken by the works under the
each sub-Project will be compensated for their loss of income,
standing crops and for the cost of soil restoration and damaged
infrastructure. Land will be rehabilitated after the project
construction by PMB.
FS on Dung Quat 220kV substation 32
Resettleinlct Action Plan (RAP)
Pursuant to Decree 1 97/2004/ND-CP issued by the GOV concerning
compensation, resettlement support for recovered land by GOV, then PAPs will be
supported as follows:
- As per Article 28: Restoration allowance
Households, people directly make agricultural production, when being
recovered more than 30% area of assigned agricultural land, will be supported for
stabilizing the life within 3 months without relocation and within 6 months with
relocation; in case relocate in areas with difficult or especially difficult socio-
economical conditions then the support time is maximum of 12 months. The support
level in cash for one person per month equivalent to 30 kg of rice calculated as per
the average price in local region.
When the GOV recovers land of economical entities, registered business
households and causes business pausing, the maximum support level is 30% of an
annual income after tax, according to the average income of three subsequent years
before confirmed by the tax agency. The support level in details are regulated by
Provincial PC in accordance with the local reality.
- As per Article 29: Support for changing the career and creating employment
Households, people directly make agricultural production, when being
recovered more than 30% area of assigned agricultural land, will be supported for
changing the career for people in the age of labour. The support level in details areregulated by Provincial PC in accordance with the local reality.
- As per Article 31: Support level when recovering the public land ofcommunes, wards or towns
- Other support such as beside the support regulated in Articles 27, 28, 29,
30 and 31 of Decree 197/2004/ND-CP, pursuant to the local actual situation, the
Chairman of Provincial PC decides the other support measures to ensure the life andproduction stabilization for people who were recovered the land; in special cases,
this will be submitted to the Prime Minister for decision.
FS on Dung Quat 220kV substation 33
Kesettlenienti Action I'lani (RAP)
Forms of subsidy and bonus for PAPs
Type of subsidy Amount
- Subsid) for lifte and production 30 kg of rice/month/person within 3
stabilization. months if not displace; within 6 months
if displacing the accommodation and
within 12 months if displacing to the
difficult accommodation.
Supporting 30% of the income in one
year if affecting to the business.
- Support for changing the career and The impacted household losing over 30%
creating employment area of the agricultural production land
will be supported for changing career.
- Other subsidy levels Due to the decision of the Chairman of
Provincial PC.
3.5. IMPACTED CATEGORIES
By the nature of the project, so the households are impacted due to permanent
land acquisition for construction of substation and access road to the substation
(Details of impacted categories, see in Annex 1).
IS on Dung Quat 220kV substation 34
ResctlJtlement Actioll P'an ( RAPj)
CHAPTER 4
CENSUS AND SOCIO-ECONOMIC SURVEYS &
THE PROJECT IMPACTS
4.1 SOCIO-ECONOMIC CONDITIONS OF PROJECT AREA
The natural land surface of Quang Ngai Province is 51,352 km2 , the population
counted to December 31 th, 2002 is of 1,244,814 people. For administration
organization, there are 1 80 communes (wards, townlets), 13 districts and 01 town.
Quang Ngai town is the political economic and cultural center of the province.
The National Road IA of 98km length runs from North to South of Quang
Ngai Province together with traffic roads disposed evenly on the whole province,
connecting areas of materials, industrial zones, plain with the mountainous area,
serving the transport,. exchange goods between province with other regions in the
whole country. There is system of sea ports such as Dung Quat and Sa Ky,
especially Dung Quat deep water port, sooner and later, will be one of the important
gates to the sea of areas of Central, Western Highlands Provinces, Laos and
Cambodia via the National Road No.24. In the future, Quang Ngai Province will
have Van Tuong City, industrial zones such as Tinh Phong, Dung Quat contiguous
with Chu Lai open economical zone, etc...
Quang Ngai Province have famous historical monument such as tunnels of
Dam Toai, combat achievement of Van Tuong, etc... and many beauty spots as
huge foot, the cape of Ba Lang An,.. .. In recent years, Province has rehabilitated and
embellished these vestiges aming to attract the tourists inside and outside country.
* Project impacted area (Binh Son District)
- Total natural area of Binh Son District is 46,538.6 ha in which agricultural
land area is of 17,585.6 ha; forestry land area is of 9,107.2 ha; special use land area
is 4,574 ha; residential land area is of 854 ha; unused land is of 14,159.2 ha and rear
& grow land area of 258.6 ha.
- Total population of Binh Son District in 2002 is 176,286 people, the
population density is 378 persons per square kilometer
FS onl Dung Quat 220kV substation 35
Resettleienilt Action Plan (RAP)
Main characteristics of major economical sectors of Bin/h Soni District in 2002:
+ Agricultue, Forestry anid Auqaproduct: Life of people in these productive
sectors has much good change. agricultural production value increases compared
with the last year, and economical structure of agriculture and countryside has right
direction transfer (i.e decreasing agricultural rate, increasing rate of forestry, fish-
breeding and rear & grow).
Development direction of agriculture and countryside economical structure:
rapidly put technological science advances into agricultural and forestry production
(rehabilitation and upgrading the existing water reservancy system, apply
technological science in selecting breed for cropplants and rearing animals, put
machines into production, etc...). Especially in catching fishes and rear & grow
aquatic product, it needs investment in purchasing off-shore ships and boats and
apply strictly to process of rear & grow aquatic product as per industrial direction.
Area of artificial forest in 05 years from 1998 to 2002 is of 1,155 ha and
3,640,000 trees. Estimated to 2002, the households and units have managed 9,107.2
ha forest
+ Industrial sector: The province has paid attention to develop some
advantageous industrial sector such as: the industry of processing agriculture,
forestry, aquiculture related to development of material zone, high development of
construction material industry beside many preferential policies for enterprises
investing capital industrial zone.
The development direction in few years is to give priority to depth investment,
renovation of technology equipment, increase quality and decrease cost price of
products.
4.2 PROJECT IMPACTS
Categories of Project impacts:
Safe corridor for the substation is defined on the Decree No.106/2005/ND-
CP issued August 17th, 2005 by the GOV regulates in detail and guidelines to
implement some articles of Power Sector Law on the protection of the high voltage
networks.
FS on Dung Quat 220kV substation 36
Rcsettlecment Action P'lan ( RAP)
Investigation and statistic of project impacts are carried out from 2004. results
of surveys is as followvs:
- Permanent acquisition land for construction of the substation is 27,749 rn
Whereas:
+ Acquisition land area of substation and access road to the substation
: 26,177m 2
+ Acquisition land area of watching house in shifts and access road to the
house . 778 m2
+ Land area of irrigation canal : 794m 2
- Categories of impacted land: The substation area is intended to be
constructed on rice-field land, so land loss is mainly agricultural land.
Total agricultural land area occupied . 27,749 m2
Whereas:
+ Land area for planting rice with 2 crops : 24,998m2
+ Land area of irrigation canal . 2,751 m2
- Affected trees are wet rice
- In the construction site of Dung Quat 220kV substation, there are 37
households with 177 persons having impacted agricultural land. No impact to
houses and land tenure, so no househoulds have to remove their house.
FS on Dung Quat 220kV substation 37
RCscttIcinicrit Action Plani (RA(t\P)
CHAPTER 5
PUBLIC PARTICIPATION AND CONSULTATION
5.1 Objectives of information campaign and consultation program
Information dissemination to consultation with and participation of the
affected people and involved agencies (i) reduce the potential for conflicts (ii)
minimize the risk of project delays and (iii) enable the project to design the
resettlement and rehabilitation program as a comprehensive development program
to fit the needs and priorities of the affected people thereby maximizing the
economic and social benefits of the project investment.
The objectives of the Public Information Campaign and PAP Consultation
Program are as follows:
* To share fully information about the proposed project its components and
its activities with the affected people.
* To obtain the cooperation and participation of the affected people and
communities required to be undertaken for resettlement planning and
implementation.
* To ensure transparency in all activities related to land recovering,
compensation, resettlement and rehabilitation for PAPs.
* To obtain information about the needs and priorities of the affected people
as well as information about their reaction/feedback to proposed policies and
activities. PAPs will be entitled to participate in different stages during the process
of investigation, survey, RAP preparation and implementation. They will be invited
to participate in meetings organized by the owner and local authorities in order to
offer opinions on replacement alternatives, entitlement policies, listening to
procedures, process of grievance implementation, responsibility of competent
institutions and responsibility of PAPs during the process of RAP implementation.
5.2 INFORMATION CAMPAIGN, PAPs & AGENCY CONSULTATION
There are two phases of the public information campaign and RAP
consultation:
FS on Dung Quat 220kV substation 38
Rcscttlcmcnt Actlioll Mlan ( RAI')
Plhase 1:
During RAP planning and survey, make interviews with PAPs for theirexpectation and selection of compensation measures. During the process of
-~ -investigation, make coordination with local authorities for agreement on substationsite selection.
Plhase 2:
After RAP's approval, PMB and local authorities will organize meetingswith PAPs to announce information of project, compensation policy andentitlement, replacement solutions, allowances, subsidy mentioned in RAP plan.
To ensure that PAPs, their representatives and local governments of theaffected areas fully understand on the details of RAP, PMB will also announce to allPAPs the compensation and rehabilitation policy applied in the project beforemaking compensation and resettlement payment for PAPs.The RIB will contain information on the followings.
- Project description.
- Project objectives
- Implementation schedule
- Project impacts
- Entitlements policy for the project affected people- Institutions are responsible for resettlement
- Specific entitlements of PAPs
- Description of the detailed impact of the project on the specifichousehold- Compensation rates for each type of impact- Legality and Eligibility to compensation
- Resettlement and rehabilitation alternatives.- Implementation schedule for compensation and resettlement
5.3 INFORMATION DISSEMINATION AND PAP's CONSULTATION
According to policy applied in this project, all PAPs are entitled to projectinformation, entitlement to compensation. All PAPs have the right to take part inRAP implementation to ensure that they enjoy proper compensation.FS on Dung Quat 22OkV substation
39
Resettscllmielt Actiotin Plan (RAP)
PAPs will be informed and consulted through the following stages:
+ Staffs of District and Communal People's Committee had defined,
inientoricd the structures, land, houses and crops, tress affected by the project ith
the help of PAPs as well as the public structures affected.
+ PMB and Provincial Resettlement Committee will organize meetings with
PAPs, officially informed the participants of the project purposes. PAPs will be
asked for their opinions, their options for compensation modes.
The meetings schedule and participants are expected as follows:
The first time:
It is expected to organize before carrying out the compensation payment works
with the above mentioned content, but the compensation policy is pressed in order
to take advantage of PAP's participation, ensure the fair and adequacy of inventory
and survey work
Participants are:
- Representative of PMB
- Representative of Resettlement Committee of Quang Ngai Province
- Representative of District PC, Resettlement Committee of Binh Son District
- Representative of Binh Thuan Commune
- PAPs or their representatives
The second time:
It is expected to organize before resettlement and compensation payment,
with the same content of the 1st time but compensation policy and schedule are
pressed to ensure the fair and give favorable condition for site clearance work.
Participants are:
- Representative of PMB
- Representative of Resettlement Committee of Quang Ngai Province
- Representative of District PC, Resettlement Committee of Binh Son District
- Representative of Binh Thuan Commune
FS on Dung Quat 220kV substation 40
RcsettIcement Action Plan (RAP)
- PAPs or their representatives
The PMB works in combination with the local authorities for infonnation on
multi-media means such as newspapers. television, local radio station about the
project such as the stages of project development, information on RAP and project
impact on the community in the project area.
The RAP report of Dung Quat 220kV substation will be announced
information at Binh Thuan Commune - Binh Son District - Quang Ngai Province.
FS on Dung Quat 22OkV substation 41
Rcscutlcnicnt Actioni Ilan (RAP)
CHAPTER 6
GRIEVANCE AND APPEALS
The main objective of RAP implementation is to ensure the fair andadequacy during compensation payment for PAPs. The resettlement andcompensation program should satisfy both parts: Owner and PAPs. Grievances andcomplaints related to Project Owner and PAPs during RAP implementation. Tosolve them timely and effectively, relevant institutions such as PMB, ResettlementCommittees of Phu Hoa District and Phu Yen Province need to respond to thecomplaints of the PAPs speedily and sensibly, avoid project delays and difficulty forPAPs. The solution should be agreed by PAPs
During the project implementation, PAP's complaints and grievances will bedealt with according to the regulation of Vietnamese laws. PAPs raising complaints
will be treated fairly and guided by related agencies on the order, procedures and
complaints of RAP, in addition no fee will be paid for their complaints.
Since the entire resettlement and rehabilitation program is being carried outwith the participation of the PAPs. However, to ensure that the PAPs have avenues
for redressing their grievances related to any aspect of compensation andresettlement, detailed procedures of redresses of grievances have been established
for the project. The mechanism is designed to be easy, transparent and fair.
The procedures are as follows:
Complaints and grievances related to any aspect of RAP's, including thedetermined area and price of the lost assets, will be handled as follows:
First step:
If any person is aggrieved by any aspect of the resettlement and rehabilitation
program, he/she can lodge an oral or written grievance with commune authorities.
Commune People's Committee will resolve the issue within fifteen days from thedate it receive the complaint.
Second step:
FS on Dunfg Quat 220kV substation 42
ll~~~~~~ l l l l l I
Resettlcment Action Plan (RAP)
If any aggrieved person is not satisfied with the decision in stage 1. he/she
can bring the complaint to the District People's Committee (DPC) or District
Resettlement Committee (DRC) within fifteen days from the date of the receipt of
the decision in stage 1. The District People's Committee (DRC) or District
Resettlement Committee (DRC) uvill reach a decision on the complaint within
fifteen days.
Third step:
If the PAP is still not satisfied with the decision at district level, he/she can
appeal to the Provincial People's Committee (PCC) or Provincial Resettlement
Committee (PRC) within 15 days of receiving the decision of the DPC or DRC. The
Provincial People's Committee (PRC) or Provincial Resettlement Committee (CRC)
will reach a decision on the complaint within fifteen days.
Fourth step:
If the PAP is not satisfied with the decision of the Provincial level, the case may
be submitted for consideration by the District Court within 15 days of receiving the
decision of the PPC or PRC.
PAP's will be exempted from all administrative and legal fees.
Coercion for site clearance can not be applied while PAPs are waiting for
solving the complaints.
In case an oral compliant is made, it will be written on paper by the commune
and processed. Commune People's Committee will resolve the issue within 02
weeks.
In case of PAPs are illiterate persons, they can make an oral complaint with
the representatives of affected households and their representatives will record all
queries to submit to authority levels.
Every authority level will resolve the complaints as per the time regulated
above.
The disputes are organized publicly and implemented in accordance with law.
Detailed procedures for redress of grievances and appeal process shown publicized
among the PAPs during participation meetings and also in the offices of RBs.
FS on Dung Quat 220kV substation 43
I~~~~~~
Resettlement Actioni I'lann (RAP)
CHAPTER 7
MONITORING & SUPERVISION
Implementation of RAPs will be regularly supervised and monitored b) therespective PCs/PMB in coordination with the respective District and CommunesPeoples' Committees and Communes. The findings will be recorded in quarterlyreports to be furnished to EVN or MOI.
7.1. INTERNAL MONITORING & SUPERVISION
Internal supervision and monitoring include the following activities:- Verify that the baseline information of all PAP's has been carried out and
that the valuation of assets lost or damaged, and the provision of compensation,resettlement and other rehabilitation entitlements has been carried out in accordancewith the provisions of this Policy Framework and the respective RAP.
- Oversee that the Inventories and RAP's are implemented as designed andapproved.
- Verify that funds for implementing the Inventories and RAP's are providedto the respective PMBs at local level (provincial/district) in a timely manner and inamounts sufficient for their purposes, and that such funds are used by the respectivePMB's in accordance with the provisions of RAP.
- Record all grievances and their resolution and ensure that complaints are dealtwith in a timely manner.
7.2. Independent monitoring
An independent agency or individual consultant will be retained by PMB ofthe MOI and EVN to periodically carry out external monitoring and evaluation of theimplementation of RAP's. The independent agencies will be academic or researchinstitutions, non-Governmental Organizations (NGO) or independent consultingfirms, all with qualified and experienced staff and terms of reference acceptable to theWorld Bank.
In addition to verifying the infornation furnished in the internal supervisionand monitoring reports of the respective PMBs, the external monitoring agency willUS on Dung Quat 220kV substation
44
Resettlcment Action l'lan (RAP)
visit a sample of 20% of household PAPs in each relevant province six montlhs aftereach RAP implementation to:
- Determinie whether the procedures for PAPs participation and delivery ofcompensation and other rehabilitation entitlements has been done in accordance withthis Policy Framework and RAP.
- Assess if the Policy Framework objective of enhancement or at leastrestoration of living standards and income levels of PAPs have been met.
- Gather qualitative indications of the social and economic impact of Projectimplementation on the PAPs.
- Suggest modification in the implementation procedures of RAPs, as the casemay be, to achieve the principles and objectives of this Policy Framework.
FS on Dung Quat 220kV substation 45
Resettlement Action ii akn (RAP)
CHAPTER 8
IMPLEMENTATION ORGANIZATION ON
COMPENSATION AND RESETTLEMENT PLAN
8.1. MEASURES FOR THE PROJECT IMPLEMENTATION
8.1.1. Announcement to PAPs
All PAPs shall be thorough informed about the rights and policies of RAPincluding entitlement policies, rate of compensation for every type of impact, theactive participation right in land acquisition process, complaint and grievance. RAP
information will be prepared by PMB and announced to all PAPs or informed at themeetings in province, district and commune levels; on television, radio, newspaper,
hung in public places such as administrative quarters of communes and schools.
Public announcement tasks shall be implemented immediately after EVN andWEB's approval of project is obtained. The information announced consists of:
+ Schedule of project implementation
+ Eligibility and non-eligibility to compensation and resettlement
+ The compensation principle: only make compensation for households usingland before inventory making and the official announcement about land acquisition
of State.
8.1.2. Compensation deadlines
The project impacts conclude households with areas of agricultural landaffected permanently. PAPs agreed to receive compensation amount so the RAP iscarried out in package to PAPs. Compensation payment for land, assets, paddy andcrops; land delivery for resettlement should be done at least 02 months before theproject land acquisition.
PAPs will receive subsidies at the beginning of months and after theirreceiving, they will have to transfer land for Site Clearance Board at least onemonth before construction time.
8.2. RAP implementation process
RAP implementation will be included in 3 actions as below:
FS on Dung Quat 220kV substation 46
Rcsettlcuicnict Action Plan (RAP)
+ General actioni: Just at once whenl beginning the project implementation work
+ Separately action: at several timles, once for each component of the project
+ Continuously action: Continuously action for the stages of RAP
implementation.
Basic actions of the project
Action 1:
After RAP approved, PMB hires qualified agency for independent
monitoring, this agency must be approved by EVN and WB
Action 2:
Provincial authorities and PMB are required to supply Resettlement
Committees with fully costs and declare the tasks for RAP implementation.
Action 3:
District Resettlement Committees carry out the Detail Measurement Survey
of affected assets and socio-economic conditions, determining the compensation
unit price and if necessary, checking and readjusting it in order to make
compensation at market price and conversion price.
Action 4:
Immediately the ends of final inventory survey, Resettlement Committees
of Districts will inspect and define the official number of PAPs, impacted properties
and total compensation amount for PAPs.
Action 5:
Resettlement Committees will officially announce the RAP policy, schedule
of project implementation and information for RAP to PAPs at public meetings
including issues related to compensation, resettlement and land clearance.
Action 6:
It is suggested to give priority to compensation payment for households with
permanent impacts, assisting them in transferring the production mode and
F S on Dung Quat 220kV substation 47
Rcscttlciicent Action Plan (RAP)
mechlaniismii or with land for resettlem-ent and life stabilizinp. After that, makiingcomiipcnsationi payment for PAPs affected on other propertics.
Action 7:
During the project implementation, Independent and Internal MonitoringInstitutions will supervise/ monitor all actions of RAP implementation, at the sametime giving proposals, discussions or report the changes during projectimplementation as well as suggest solutions.
8.3. RAP implementation schedule
RAP will be implemented as per the schedule established to ensure the siteclearance work and schedule on project construction.
Payment of rehabilitation and fumishing of other restoration/assistanceentitlements is made in cash.
Organizational arrangement
Power companies and Quang Ngai Province will arrange full experiencedstaffs to ensure that RAP will be implemented smoothly as per the acceptedschedule.
FS on Dung Quat 220kV substation 48
Resettl ciictit Actionll Plan (RAP)
CHAPTER 9
COST AND BUDGETS
9.1. BUDGETS
Budget for RAP implementation will be from the self-financed capital andloans from WB. EVN entrusted Central Power Projects Management Board
(CPPMB) with management and directing project's activities as well as projectfinance management.
CPPMB has coordinated with the province, district, department of Financeand Goods Price, Resettlement Committee at all levels to implement compensation
payment.
9.2. DETERMINING THE COMPENSATION PRICE
Compensation cost estimate for temporary and permanent impacted houses,
structures, agricultural land, forestry land, cultivated land, trees and crops based on:
- Decree No.197/2004/ND-CP issued by GOV on December 3rd, 2004
regulates compensation, resettlement support for recovered land by GOV.
- The Government Decree No.188/2004/ND-CP issued November 16'h,
2004 by the GOV on the stipulation of method to determine the land price
and the frame for the price of land types.
- Decision No.19/2005/QD-UB issued February 7th, 2005 by the People's
Committee of Quang Ngai Province regulates compensation, resettlement
support for recovered land by GOV applied on the area of Quang Ngai
Province.
- Decision No.31/2005/QD-UB issued March 7"h, 2005 by the People's
Committee of Quang Ngai Province on the stipulation of the price of land
types, road classification, position of non-agricultural land on the area of
Quang Ngai Province.
rS on Dung Quat 220kV substation 49
l l l l l l l l l l l l l lm
Resettlelleiect Action Ilani (RAP)
9.2.1. Conmpensationi price for laInd
- The compensation unit prices of permanent acquisition land are applied
according to the Decision No. 3 1/2005/QD-UB issued March 71'1, 2005 by
the People's Committee of Quang Ngai Province on the stipulation of the
price of land types, road classification, position of non-agricultural landon the area of Quang Ngai Province.
Compensation unit price for permanent acquisition land: 26,000 VND/m2
9.2.2 Compensation price for trees and crops
The compensation unit prices for trees and crops in ROW are appliedaccording to the Decision No.19/2005/QD-UB issued February 7th, 2005 by thePeople's Committee of Quang Ngai Province regulates compensation, resettlementsupport for recovered land by GOV applied on the area of Quang Ngai Province.
Compensation unit price for paddy and crops: 2000 VND/m2
9.3. COMPENSATION COST ESTIMATE
9.3.1. Cost for RAP establishment
Cost for RAP establishment consists of:
- Preparation work: cost for document study, translation, preparation of
forms for socio-economic survey and PAPs'inventory.
- Site survey work: work with local authority for detailed measurement
survey (DMS) of PAPs and collecting compensation price list.
- Summarize data for establishment of report and RAP report.
- Making Reports at Quang Ngai Province, PMB and EVN
Survey work is carried out in two stages: Preliminary stage and DetailedMeasurement Survey.
9.3.2. Compensation cost
Based on the impacted area of land and crops and extent of impacts(described in the previous chapters), compensation costs of the project including of:
[S on Dung Quat 220kV substation 50
Rcscttleie tit Actioni l'lain (RAP)
- Compcnsation for pcrmancntly land acquisitioni for construction of
substation, control house and house for operating wvorkers.
- Compensation for paddy and crops affected area
- Subsidy for PAPs as stipulated in law.
Table 9.3: Coompensation costfor paddy and crops impacted by project
Unit Price of Quang TotalNo. area (i 2 Ngai Province Note
area _ (m )(VND/m 2 ) (VND)
Land area forplanted rice 27,749 26,000 721,474,000
2 Wet rice, crops 27,749 2,000 55,498,000
9.3.3 Management cost
Management cost consists of:
- Cost for staff of PMB and Compensation Committees includes in: physical
basis, salary and allowance for administration organization. Organizations of
Compensation Committees will be concurrently having many works during
the project implementation, only some members will be contracted to work
regularly.
- Cost for meetings, information notification to PAPs or their representatives.
- Total management cost is estimated at about 1 % of total cost of compensation
for project impacts as defined in items 9.3.2
9.3.4 Supervision cost
When carry out the project, PMB will signed a contract with independent
monitoring institution(s). Total supervision cost is estimated at about 2% of total
cost of compensation and RAP preparation as defined in item 9.3.1. and 9.3.2.
FS on Dung Quat 220kV substation 51
Rcscttlcict c it Action l'lan ( RAP)
9.3.5 Contingency cost
Contingency cost for unpredictable problems is calculated as 10%(o ot total
comiipensation cost for project impacts and cost for RAP cstablishlmielnt stated in item
9.3.1 and 9.3.2.
9.3.6 Total compensation cost for project
Total compensation cost for Dung Quat 220kV substation project:
No. Items Total (VND)
1 Total cost for compensation (a) 776,972,000
2 Cost for RAP establishment (b) 35,000,000
3 Management cost: 1%(a) 7,769,720
4 Supervision cost 2%(b+a) 16,239,440
5 Contingency cost 10%(a+b) 81,197,200
Total 917,178,360
FS on Dung Quat 220kV substation 52
Rcsetticmcit Action lPlan ( RAP')
CHAPTER 10
CONCLUSION AND PROPOSALS
10.1. Conclusion
After investigation, summing up data on damages in the susbtation
construction, consulting opinions of the relevant local authorities and community of
affected households. Through the making of RAP, we have the following
conclusions:
* Investment for work construction is necessary in order to meet the
requirements for stable and reliable power supply for Dung Quat Industrial Zone in
the East and Van Tuong City in future.
* The site of 220kV Dung Quat substation is situated on land area for planted
rice, so the compensation and land clearance works are carried out conveniently.
10.2. Proposals
* The CPPMB will propagate the deep and broad information on the project
by multi-media system, etc... to the habitants in order to minimize the negative
impact of individuals profiting from the standpoint, investment policy of the
government.
* The CPPMB, Resettlement Committee and Compensation Committee have
to inspect closely the execution of compensation and land clearance works in
preparation of work execution.
* Appointment of a standing team to solve in time the complaints and claims
of affected households.
FS on Dung Quat 220kV substation 53
Resettlemnent Actioni l'lan (RAP)
APPENDICES
FS on Dung Quat 220kV substation 54 |
l l l l l l l l l l l _l
Resettlement Action Plan (RAP)
ANNEX 1: ENTITLEMENT MATRIX
N° I Type of loss Application Definition of Compensation Policy Implementation Issuesentitled PAPs
Permanent land All PAPs PAPs - Consultation for I'AP's options onacquisition due have land with/without For PAP losiig productive land: land compensation.to construction and assets land - PMB and local authorities determineof substation on certificate a. Land loss less than 25% of their total ladlholdiigV and ensure that compensation will he atand access to permanently included in Cash compensation for the lost area if the remaining replacement cost at the time ofthe sustatin afected he inentor payment.to frth ot ra fte eiann
thesubtaton lanfctd de toho ablentor plot is still economically viable. pyetland due to or able to - PAPs receiving compensation willconstruction prove land demolish the impacted areas andof occupancy - Cash compensation for the whole impacted plot if reconstruct/or improve their housessubstation prior to cut- the remaining plot is not economically viable. themselves.and access off date.road to the - Full compensation for trees and f'ruitsubstation. - Cash compensation for properties associated with trees to PAPs at least 01 monitlh before
land land clearance. If l'AP is requested forb. Land loss equal or niore than 25% of their total cutting affected trees, PMB will pay
money for this work. PAP has righit forlandholdings: using salvageable trees.
PAP can opt for the followings: - Full compensation for impacted houseand allowances to PAPs before landi)"Land for land" with the same area and productive clearance.
of impacted area if the remaining plots are still _ No award civil work contract beforeeconomically viable and for the whole impacted completion of compensation andplots if the remaining plots are not economically completin of ompensation.viable. reorganizing houses or relocation
- Payment to PAPs will be delivered byii) Cash for land at the replacement cost. PMB and RCs
- Compensation for trees and affected fruit trees at the - Finance/ land available for
FS on Dung Quat 220kV substation g 56
Resettlement Action Plan (RAP)
N0 Type of loss Application Definition of Compensation Policy Implementation Issuesentitled PAPs
replacement cost. compensation/ rehabilitation and -elh I
- Rehabilitation assistance. informiiation disclose/ dissemiinate.- PMB consult witl PAIA who are 'eligible to rehabilitation for their optionls iand prepare proposal for rehabilitationiprograms in the period of R:A\Pimplementation.
- PAPs will be granted witlh lIand U-seRight Certificate without payment ofladministrative fees.
FS on Dung Quat 220kV substation 57
Resettlement Action Plan (RAP)
Annex 2: Inventory of Project Affected llouseholds for Dung Quat 220kV substation
Quang Ngai Province Binh Son District Binh Thltan Coinniiiune Dong Lo VillageLoss of I c-P,rAr
Loss of Assets ILoss of Crops Other assets Other l osses I -;Nuniber Structures Structures Area of Fruit Paddy Eg-Survey ~~~~~~ ~~No. of Total Land to be Loss as %Tonmbs. Residence liusiness lncomreSuno ron La nolng acquired in of and type permanent temporary residential trees area Other welbe. Rentd lostn lossNo. Nan fHa f persoOnis Landholding m' by type tO°fa lstructure (m2) (m2 an lost lo°st (li-) (Spec ify) (Nell etc. (rented) I ost ILossin Hhold of Hhold in m oflst (n)oitaadlot lstl1l) (peiy (No. &tpName of Head of I't'e oa tructures (nin Type
Household and___ __ __ __ ____ __ __ __ __ _ ___ __ __ __ _ __ __ __ __ __ __ N um ber_ _ _ _ _ _ _ _ _
I Pham Na 6 4.400 371 8,43 371
2 Huynh Dong 5 4.453 453 10,17 _ 4533 Vo Thj Mau 1 828 320 38,65 320
4 Pham Minhi 5 4.500 560 12,44 560
5 Huynh Quang 6 940 235 25,00 235
6 Le Quang Thai 7 3.207 707 22,05 7077 Huvn~h Bo 4 3.435 843 24,54 .__ 843
8 Huynh Thi Vfn 5 1.905 405 21,26 . 4059 Huynh Tong 5 5.036 1.086 21,56 1.086
10 Huynh Tin 5 3.851 851 22,10 851
I Huynh Dinh 6 2.518 1.401 55,64 1 .401
12 HuynhNghla 4 3.319 219 6,60 _ 219 =__13 Huynh M anh 6 4.67 1 200 4,28 _ _ _ _ _ _ _ _ _ _ _ _ 200_ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _
FS on Dung Quat 220kV substation 58
Resettlement Action Plan (RAP)
Quang Ngai Province Binhi Son District Binli Thuani Coiiiniune Dong Lo Village
Loss OfIco Loss of Assets Loss of Crops other assets Othcr Los.es
No. of Total Land to be Loss as % Number Structures Structure Area of Fruit Paddy area Eg.,Survey Persons Landholding acquired in of arid type of permaneti s residential trees lost (mn') Otier Tombs. ed B e co aNio Name of Head of in of Hhlold in m2 by typ well, etc.rlad lst Typ Lpecft los an t, pcHousehold Hhold M2 total lt (i) teprr ln lot T e(S cf) (No &tNpe (etd flsstructures y (iii' (in2 anid (reecd
Numnber srcuc
14 Huynh Bao 5.975 200 3,35 200
15 Nguyen Thi Nghia 4 5.717 878 15,36 878
16 V6 Thj Bin 2 2.654 300 11,30 300
17 Nguyen Tuan 4 3.028 528 17,44 528
18 Bui Van Minh 8 6.058 500 8,25 500
19 Ngo Th;i Duy 2 822 200 24,33 200 = . _
20 Le Quang L$p 7 5.604 1.054 18,81 1.054
21 Huynh Thanh San 4 3.230 250 7,74 250
22 Nguyen Pho 6 3.390 220 6,49 220
23 Pham ThiLQc 3 2.648 1.148 43,35 1.148
24 Huynh Binh 5 3.218 718 22,31 718
25 Bui Thi Huang 5 3.596 716 19,91 716
26 Nguyen Van Thieu 6 6.691 1.400 20,92 1_ 1.40027 Nguyen Thi My 4 3.707 907 24,47 907
28 B6i Dieu 5 6.005 1.300 21,65 _ J _____ 1.300 |
FS on Dung Quat 220kV substation 59
Resettlement Action Plan (RAP)
Quang Ngai Province Binh Son District Binh Tliuaii Commune Dong Lo Village
Loss ofLoss of Assets Loss of Crops Other assets Other Losscs
No. of Total Land to be Loss as % Number Structures Structure Area of Fr-uit l'addy, area s:9I(P-jf-Survey persons Landholding acquired in of and type of permanent s residential trees lost (II2) Otlher Tombs. Residcnc Business Income
No Name of Hlead of in of lHhold in m' b)typ wM eioa an otTp Nell. etc. e Lost I oss and t~ p.Household Hhold m2 type total lost (i2 ) ten°prar land lost Type (Specify) (No. &type (rened) It-structures y (nin (nm2 anidNLunber sr t1e
29 NguyEn Chi Danh 6 5.957 620 10,41 620
30 Le Quang The' 5 3.969 1.790 45,10 1.790
31 Nguyen Nguyen 2 5.214 814 15,61 814
32 Nguyen Thanh Srn 4 3.167 37 1,17 3733 Pham Minh Hing 5 3.754 905 24,10 905
34 Ng6 Mien 6 4.408 408 9,26 408
35 Ng6 Thanh Lam 6 6.050 1.050 17,36 1.050
36 Ng6 Long 5 7.500 350 4,67 35037 Huynh Tr6i 3 2.054 1.054 51,31 1 1.054
FS on Dung Quat 220kV substation 60
Resettlement Action Plan (RAP)
Annex 3: Entitlements of Project Affected PeopleQuang Ngai Province Binhi Son District Binli Tlitian Commune Dong Lo Village
Compensation for Land Compensation for Structures Compensation for Crops & Trees Compensation for OtherSurvey Name of Head of Unit PriceNo. Household Quantity Sq. Entitlement in Quantity Unit Entitlement Quantity Unit Entitlement in Quantity Unit Enttlement Total in DongSq. Metrs Metes Dong Sq. rc Enitlement Unit Price in Dong Unit Price 'in Dongsq. Meters Meters Dong Meters Sq. iDogDong in
Meters DongI Pham Na 371 26,000 9,646,000 371 2,000 742,000 10.388.000
2 Huynh Dong 453 26,000 11,778,000 453 2,000 906,000 12.684.0003 Vo Thi Mau 320 26,000 8,320,000 320 2,000 640,000 8,960.0004 Pham Minh 560 26,000 14,560,000 560 2,000 1,120,000 15.680.0005 Huynh Quang 235 26,000 6,110,000 235 2,000 470,000 6.580.00()6 Le Quang Th&i 707 26,000 18,382,000 707 2,000 1,414,000 19.796.(0()7 Huynh Bo 843 26,000 21,918,000 843 2,000 1,686,000 23.604.0008 Huynh Thi Van 405 26,000 10,530,000 405 2,000 810,000 11.340.0009 Huynh Tong 1,086 26,000 28,236,000 1,086 2,000 2,172,000 30.408.00010 Hu5nh Tin 851 26,000 22,126,000 851 2,000 1,702,000 23.828.00011 Huynh Djnh 1,401 26,000 36,426,000 1,401 2,000 2,802,000 39.228.00012 Huynh Nghla 219 26,000 5,694,000 219 2,000 438,000 6.132.00013 Huynh Manh 200 26,000 5,200,000 200 2,000 400,000 5.600.00014 Huynh Ba3o 200 26,000 5,200,000 200 2,000 400,000 5.6()0.00015 Nguyen Thi Nghlia 878 26,000 22,828,000 878 2,000 1.756.000 24.584.000
FS on Dung Quat 220kV substation 61
Resettlement Action Plan (RAP)
Qu ang Ngai Province Binli Son District Binhi Tliuan Commune Dong Lo Village
Compensation for Land Compensation for Structures Compensation for Crops & Trees A ssets (pond, lake Oh)Survey Name of Head of Unit PriceNo. Household Quantity Sq. Entitlement in Quantity Uni Entitlement Quantity Unit Entitlement in Quantity Unit Entitlement Total In DongSq. Meters eters Dong Sq. PientitlmntDn Unit Price in Dong Unit Price in DongSq. Meters Meters Dong ~Meters Sq.Dogi
Meters Dong
16 Vo Thj Ban 300 26,000 7,800,000 300 2,000 600,000 8.400.00017 Nguyen Tuan 528 26,000 13,728,000 528 2,000 1,056,000 14.784.000
18 Bui Van Minh 500 26,000 13,000,000 500 2,000 1,000,000 14.000.00019 Ngo Tlij Duy 200 26,000 5,200,000 200 2,000 400,000 5.600.000
20 Le Quang Lap 1,054 26,000 27,404,000 1,054 2,000 2,108,000 29.512.00021 Huynh Thanh San 250 26,000 6,500,000 250 2,000 500,000 70(00.00022 Nguyen Pho 220 26,000 5,720,000 220 2,000 440,000 6.160.00023 Pham Thi Loc 1,148 26,000 29,848,000 1,148 2,000 2,296,000 32.144.00024 Huynh Binh 718 26,000 18,668,000 718 2,000 1,436,000 20.104.000
25 Bui Thi Huamg 716 26,000 18,616,000 716 2,000 1,432,000 20.048,000
26 Nguyen VIn 1,400 26,000 36,400,000 1,400 2,000 2,800,000 39.200.00026 Thi~u 39__
__ _200__ __ _000 _ _
27 Nguyen Thi My 907 26,000 23,582,000 907 2,000 1,814,000 25.396.00028 Bui Dieu 1,300 26,000 33,800,000 1,300 2,000 2,600,000 _ 36.400.000
29 Nguyen Chi Danh 620 26,000 16,120,000 620 2,000 1.240,000 17.360.000
30 Le Quang The 1,790 26,000 46,540,000 1,790 2,000 3,580,000 50.120.000
31 NgNguyenNguyen 814 26,000 21,164,000 814 2,000 1,628,000 22.792.000
FS on Dung Quat 220kV substation 62
Resettlement Action Plan (RAP)
Quang Ngai Province Binh Soii District Binh Thiuani Cominulie Dong Lo Village
Compensation for Land Compensation for Structures Compensation for Crops & Trees Compensation for OtherCompensation for Land ~~~~~~~~~~~~Assets (pond. lake ...)Survey Name of Head of Unit PriceNo. Household Quantity Sq. s Entitlement in Quantity Unit inlDont Quantity Unit Entitlement in Quantity Unit Entitlement Total in DongSq. Meters Meters Dog Sq. Price Enitlement Unit Price in Dong Unit Price in Dong
og Meters Sq. iDngDong inMeters Dong
Nguye'n Thianh32 Sun 37 26,000 962,000 37 2,000 74,000 1.036.000
33 Pham Minih Hung 905 26,000 23,530,000 905 2,000 1,810,000 25.340.00034 Ng6 Mien 408 26,000 10,608,000 408 2,000 816,000 11.424.00035 Ng6 Thanii Lain 1,050 26,000 27,300,000 1,050 2,000 2,100,000 29.400.00)f
36 Ng6 Long 350 26,000 9,100,000 350 2,000 700,000 9.800.)00037 Huynh Tr6i 1,054 26,000 27,404,000 1,054 2,000 2,108,000 29.5I .(0()
FS on Dung Quat 220kV substation 63
Resettlement Action Plan (RAP)
Annex 4: Socio-Economic Household Data Sheet of Project Affected PeopleQuang Ngai Province Binli Son District Binhi Thuan Coninitiiue
EstimatedNo. Name of Household Ethnic Occupation and Sources of Employment Total IncomeAddress of Household Member Sex Age Group Education Income per Year____ Group ______________________ (VND)
Pham N& Man 37 Kinii High school Agriculture 15.000.0002 Huynh E)ng Man 52 Kinh High school Agriculture 17,400.0003 V6 Th j Mau Woman 80 Kinii Prilary Agriculture 4,100,0004 Pham Minh Man 39 Kiiln High sclhool Agriculture 19.000.0005 Huynh Quanig Man 34 Kiilh High school Agriculture 9,000.0006 Le Quang Th&i Man 48 Kinh High school Agriculture 15.000.0007 Huynh Bo Man 41 Kinil High school Agriculture 12.000.0008 Hu nh Thj Vfin Womanl 45 Kinil Priiary Agriculture 8,000.00(9 Huynh Tong Man 85 Kinil Primary Agriculture 11.000.00010 Huynh Tin Man 39 Kinih High school Agriculture 13.000.00()II Huynh Dinh Woman 35 Kinii Highi school Agriculture 13,000.00012 Dong Lo Village Huynh Nghia Man 33 Kinii Hioh school Agriculture 13.000.00013 Huynh Manh Man 44 Kinih Secondary school Agriculture 18.000.00014 Huynh Bao Man 38 Kinil High school Agriculture I 8.000.00()15 Nguyen Thi Nghia Woman 54 Kinil Primary Agriculture 15.000.00016 V6 Thi Ban Woman 64 Kinh Primary Agriculture 2,500.00017 Nguyen Tuan Man 39 Kinh High school Agriculture 12,000.00018 Bui Van Minh Man 52 Kinh Primary Agriculture 1 7.800.00019 Ng6 Thi Duy Woman 72 Kinh Primary Agriculture20 Le Quang Lap Man 57 Kinih High school Agriculture 2 1.000.00021 Huynh Thanh San Man 47 Kinih High school Agriculture 12,000.00022 Nguyen Ph6 Man 37 Kiiln High school Agriculture 15,000.00023 Pham Thi Loc Wo m a n 79 Kihiih Pri m ary Agriculture 12.600.00024 Dong Lo Village Huynh Binh Man 52 Kinh High schiool Agriculture 12.000.00025 B~ui Thi Hr&rng Woman 65 Kinih High school Agriculture 12,000.00026 _____________________ Nguyen VAn Thieu Man 36 Kiiln I-ligh school Agriculture 14,000,000
FS on Dung Quat 220kV substation 64
Resettlement Action Plan (RAP)
27 Nguyen Thi My Woman 43 Ki,.l, Primary Agriculture 9,000.00028 Bui Dieu Ma 70Prary Agriculture 15.000.00029 Nguyen Clii Danh Man 46 Kiih Higl school Agriculture 18.000.00030 Le Quang The Man 43 Kinil High school Agriculture 15,000.00031 Nguyen Nguyen Man_ 64 Ki_iii Primary Agriculture 15.000.00032 Nguyen Thanh Son Man 57 Kinh Priiary Agriculture 14.000.00033 Pham Minh Hung Man 48 Kinii Primary Agriculture 16.000.00034 Ngo Mien Man 89 Kinil Primary Agriculture 13,000,00035 Ngo Thanh Laiim Man 50 Kinii Priiary Agriculture 16,000.00036 Ng6 Long Man 51 Kinii Figh school Agriculture 13.000,00037 Humnh Tr6i Man 29 Kinii High school Agriculture 12,000.000
FS on Dung Quat 220kV substation 65
Res*ctiulmen Actioni I'I;1n ( RAP)
APPENDIX 5: MINUTES OF PUBLIC CONSULTATION
o
FS on Dung Quat 220kV substation 6 1
CQNG CHOA XA XQ1(I CHIUJ NGHIA VI);T NAMDoc lip - Txr (lo - Hanh phic
BIEN BAN THAM VAN CQNG DONGVE KE HOACH DEN BU VA TAI DINH CU
.,&r7R.74 ngay ....05... thang .. . nam 2005'Thanh phan tham dir::1. Dai di8n UBND:.......1~ ~ ~ ~ ~ ~ ~ ~ ~ ~~ ~~~~~. . a inI )........8/§P ;'s.....AS4( .........................................2. Nhirng ngu&i bi Anh huorng: ..................... . . .. Nam ...3.Dai dicn C6ng ty TVXD DienCac van de tham van:
1. Pho bien cnc chflnh sdclt lien quan de#n dSn bit - tdi dinh cw:- Nhfrng khu vuc trng dung dAt cho du an.- DV kien th&i gian tien hanh cho dir An.- PhB bien cac chinh sach cua Viet Nam va WB.- Cac quy dinh phap lufit Viet Namn va chinh sach WB co lien quan.- Cac chinh sAch d8n bu cho dix an.- Cac khu tai dinh cir (neu c6).
2. Ykien cuia d*ia phtwong ve ke hoach d:en bit vai tdi dinh cU'- Kha nang xay ra nhing anh hir&ng bat 1i czua dir dn: -
+ Di& v6i nhA cua:..........................................................................
............................................. ..............................................
., ~ ~~~~~~~ (
+- D6i vai cay ..i:. ............................................................................................................................... ................
................. . ...... K .0 . . .. .. ;...... . . .. . . .. . . .. ..
+ .......... cfiy... coi:..........................................................................
+D6iv6ic 6 ................................................................................ ..f.22b.44Kt>SRZC<.......... Sezfi4 .... ... ... ... : ."7 ..J aC. ;... . . . .. . . . . .. . . . .. . . . . .. . . . ... . .. ... . .... . .. . .
..........................................................................................................
+ D'ai vari moi tcn g tyr nhien - xai hbi: .............................. ........ .. ......
........... ..6c.. 7p?............... S.eh ...... ........ l ...... /0F
............................ .......... ....................................................................- Cac bien phap gidm thieu:+ Trong giai doun thiet ke:..../....fi. k... .z .... 4' .. . .. A;'.............. ... ............... ............ I.....................,------------ ----- ---r- ------ -
+ Trong piai doan thi c6ng: .......................
+ Trong gini 6o.n v.n h .. . ........................nh
t Trong giai doan v~n lianh: ................................................................................. I........... ................................................................... ;
- Cac cph2rm1ng a n dt5n bit, q uI triJth chii tra- dcen bit
+ G i d n b , hinh th c d b............................................................| ~~~~. . . . . . . . . . . . . . . . . . . . . . . |. . . ^. . . . . . 4 /.. . +. . . . . . . . . ^ . . . . . . . . . . . . . . . . , . . . . . . . . . . . . .
|~ ~ ~~~~~~ C-plf7,1 .6 b.. c<.i tr' -le .'.
+ Th&i gian thurc hien chi t ra den : ............................. , .
, ..... ...... J.............. w~~~~~~~~~~~~~~~~~~~~~~. . . ... . . .. . .. .. .. .. . .. . .@ /. .. . .. . . .. .. .. .. .. . .. .. .. . .. .-t . . . . r. -. -------
.............
+ Quy che khicu nai, giAm sat: .........................
I ~~~~..... ................................................... ............................................ ..
X ac n hfin cua Cong ty TVXD DiEn 4 Xiac nh an ciia ngtrbi bj anh htronng
X2ac nh an cuia cbinh quyeln dia phwro ng
1/47 Aj~ C?/7
49~
C(NG IIOA XAA 11(; Clll NGIliA VI'1'T NANID(c lAp - Tt.r do - Ilapnli phluc
-~~oOo-
GIAY YXAC NHANV/i' "`Xcc nhWin c6ng b6 th6ng tin ke ho;ch dd,i bt ii Unl /ni cir (RAP)
cho d4 an: Trqmn Biein Ap 220k VDwng Qudi"
D ai dicn UBND xa. . /.7 ll ........................
Ong (ba) ..... . Li.l Ctt ...........
Dai dien CBng ty 'lu van Xay duing Dign 4
Ong (ba) ...... 7...i<. /.2 ... . ......... . . .
Nay Cong ty Tu van Xay d.ung Dien 4 da c6ng b6 th6ng tin ve, kU hloacli dhnbu tai dinh cu cho du an: Tra m Bie n Ap 220kV Duing Quat
T a i ..... '. ./... . .. . .. . . .. . .. . . .............. ...Trong th6i gian . r.... < 9 .7t 7, L .X i
Vay kinh de nghi UBND xa .,.xac nhan CUng tv T'r vahi XaM drilaDien 4 da c6ng b6 th6ng tin tren.
Dai dicn doan c6ng ttic Dai dic! cliibil uyen dia phiuo'ng
~~~~~ , . ... .- "_ d S/ -4 ;^fi~~~~~~~~. ....................
I rd<s ey Vani Th~iia& , , Sv, _= g 7
., -. I . ,, '?.
I i . i1t. i, li i 11 l_.n. W | l . :v. 4 i ._ w-- =