for the PMBOK® Guide 5th Edition
Mind Map
THANK YOUThank you for purchasing a copy of the VisuAL PM® Mind Map by Projerra Management Inc. We hope that the presentation of the knowledge areas and processes in a visually oriented manner will provide valuable insight for you.
ABOUT VisuAL PM®
VisuAL PM® is Visually Assisted Learning for Project Management. It is a suite of products that can help you visualize the relationships and dependencies that exist between the knowledge areas, processes, and documents that are defined in the PMBOK® Guide Fifth Edition. The graphical presentation helps you see the associations between the processes and the various input and output documents.
For additional VisuAL PM® products please visit our website www.projerra.ca.
We appreciate receiving thoughts and feedback from the professionals that use our products. Please contact us at [email protected].
PUBLISHED BYProjerra Management Inc.439 John Aselford DriveOttawa, Ontario, Canada, K2W 1A8www.projerra.ca
COPYRIGHTCopyright 2010, 2012, 2014 by Projerra Management Inc. All rights reserved. No part of this document may be reproduced, stored, or transmitted, in any form or by any means, without the prior written permission of the publisher.
REVISION HISTORYFourth Edition © 2014 – for PMBOK® Guide 5th Ed.Third Edition © 2014 – for PMBOK® Guide 5th Ed.Second Edition © 2012 – for PMBOK® Guide 4th Ed.First Edition ©2010 – for PMBOK® Guide 4th Ed.
REFERENCESProject Management Institute. A Guide to the Project Management Body of Knowledge (PMBOK® Guide) – Fifth Edition, Project Management Institute, Inc., 2013. Copyright and all rights reserved.
REGISTERED MARKSPMI® is a service and trademark of the Project Management Institute Inc.
PMBOK® is a trademark of the Project Management Institute Inc.
PMP® and CAPM® are registered marks of the Project Management Institute Inc.
VisuAL PM® is a registered trademark of Projerra Management Inc.
HOW TO USE THE MIND MAPColor and graphics have been used to visually represent the relationships between the 47 processes, 10 knowledge areas, 5 process groups, and 200+ inputs/outputs that are defined in the PMBOK® Guide Fifth Edition. Outputs that are not explicitly identified as an output of a process, but are mentioned in the guide, have been identified as ‘Implied Outputs’.
Each sheet presents the processes associated within a single knowledge area. The header of the sheet identifies the knowledge area and the chapter where that knowledge area is defined in the PMBOK® Guide. Color been used to identify the different process groups and project phases. Icons have been used to help you identify the various inputs, outputs, tools and techniques that support the process.
Mind Map
For the PMBOK® Guide Fifth Edition
VisuAL PM® Mind Map for the PMBOK® Guide Fifth Edition. Copyright Projerra Management Inc. 2014. Page 2 of 12
M&C
Plan
Integration Management | Chapter 4
Integration Management
Inputs
Inputs
Outputs
Inputs
Outputs
Outputs
Outputs
4.4 Monitor & Control
Project Work
4.2 Develop Project
Management Plan
Tools & Techniques
Tools & Techniques
Tools & Techniques
Outputs
Change Management PlanImplied Outputs Configuration Management Plan
Close
4.6 Close Project or Phase
Outputs
Visual perspectives in project management and business analysis
VisuAL PM® Mind Map for the PMBOK® Guide Fifth Edition. Copyright Projerra Management Inc. 2014. Page 3 of 12
Mind Map for PMBOK® v5
Approved change requests
Change log
Approved change requests
Project mgmt information system
Meetings
Project mgmt information system
Meetings
Meetings
Expert judgment
Tools & Techniques
Tools & Techniques
Meetings
Project documents (updates)
Project management plan (updates)
Organizational process assets
Enterprise environmental factors
Change requests
Work performance reports
Project management plan
Project documents (updates)
Project management plan (updates)
Change requests
Work performance data
Deliverables
Organizational process assets
Enterprise environmental factors
Project management plan
Project charter
Expert judgment
Organizational process assets
Enterprise environmental factors
Agreements
Business case $$
Project statement of work
Inputs
Organizational process assets (updates)
Final product, service or result transition
Organizational process assets
Accepted deliverables
Project management plan
Project documents (updates)
Project management plan (updates)
Work performance reports
Change requests
Expert judgment
Organizational process assets
Enterprise environmental factors
Work performance information
Validated changes
Schedule forecasts
Project management plan
Project management plan
Expert judgement
Organizational process assets
Enterprise environmental factors
Outputs from other processes
Project charter
Tools & Techniques
Cost forecasts$
Inputs
Inputs
Analytical techniques
Analytical techniques
Init
4.1 Develop Project Charter
Exec4.3 Direct &
Manage Project Work
M&C
4.5 Perform Integrated
Change Control
Facilitation TechniquesFacilitation techniques
Expert judgment
Expert judgment
Change control tools
M&C
Plan
5.6 Control Scope
Scope Management | Chapter 5
Scope Management
Outputs
Tools & Techniques
Inputs
Outputs WBS
WBS Dictionary
Project management plan (updates)
Inputs
Outputs
Outputs
5.4 Create WBS
Tools & Techniques
Outputs
Tools & Techniques
Visual perspectives in project management and business analysis
VisuAL PM® Mind Map for the PMBOK® Guide Fifth Edition. Copyright Projerra Management Inc. 2014. Page 4 of 12
Mind Map for PMBOK® v5
Inputs
Inputs
Inputs
Plan
5.3 Define Scope
M&C
5.5 Validate Scope
Plan
5.1 Plan Scope Management
Plan
5.2 Collect Requirements
Inputs
Outputs
Work performance data
Organizational process assets
Requirements traceability matrixR
Requirements documentationR
Project management plan
Organizational process assets (updates)
Project documents (updates)
Change requests
Work performance information
Expert judgment
Expert judgment
Meetings
Scope management plan
Requirements management plan R
Tools & Techniques
Expert judgment
Project scope statement
Project documents (updates)
Project management plan
Project charter
Enterprise environmental factors
Organizational process assets
Scope management plan
Project charter
Requirements documentation R
Organizational process assets
Project management plan
Requirements documentation R
Requirements traceability matrix R
Work performance data
Accepted deliverables
Change requests
Work performance information
Project documents (updates)
Verified deliverables
Scope management plan
Requirements management planR
Stakeholder management plan
Project charter
Stakeholder register
Requirements documentationR
Requirements traceability matrixR
Scope management plan
Project scope statement
Requirements documentationR
Enterprise environmental factors
Organizational process assets
Project documents (updates)
Tools & Techniques
`
Scope statementScope baseline
Product analysis
Alternatives generation
Facilitated workshops
Inspection
Group decision-making techniques
Tools & Techniques
Variance analysis
Decomposition
Focus groups
Facilitated workshops
Group creativity techniques
Group decision-making techniques
Questionnaires & SurveysQ
Prototypes
Benchmarking
Context diagrams
Document analysis
InterviewsQ
Observations
Plan
Plan
Plan
Plan
Plan
Plan
Time Management | Chapter 6
Organizational process assets
Project documents (updates)
Project schedule network diagrams
Schedule management plan
Activity Attributes
Activity list
Time Management
Activity list
Schedule management plan
Expert judgment
Enterprise environmental factors
Project charter
Outputs
Inputs
Inputs
Tools & Techniques
Outputs
Activity duration estimates
Project documents (updates)
Inputs
Tools & Techniques
Outputs
Inputs
Outputs
Tools & Techniques
Outputs
Inputs
Tools & Techniques
Outputs
Project scope statement
Enterprise environmental factors
Milestone list
M&C
6.7 Control Schedule
6.6 Develop Schedule
6.4 Estimate Activity
Resources
6.3 Sequence Activities
Activity Attributes
Activity list
Resource calendars
Activity resource requirements
Risk register
Project scope statement
Inputs
Tools & Techniques Outputs
Inputs
Project management plan
6.2 Define Activities
6.5 Estimate Activity
Durations
6.1 Plan Schedule Mgmt
Schedule management plan
Schedule management plan
Enterprise environmental factors
Organizational process assets
Visual perspectives in project management and business analysis
VisuAL PM® Mind Map for the PMBOK® Guide Fifth Edition. Copyright Projerra Management Inc. 2014. Page 5 of 12
Mind Map for PMBOK® v5
Organizational process assets (updates)
Change requests
Schedule forecasts
Work performance information
Project management plan (updates)
Project documents (updates) Product documents (updates)
Schedule baseline
Project schedule
Schedule data
Project calendars 31
Project management plan (updates)
Organizational process assets
Enterprise environmental factors
Risk register
Resource breakdown schedule
Project staff assignments
Project scope statement
Project schedule ntwk diagram
Resource calendars
Activity duration estimates
Activity list
Schedule management plan
Activity attributesProject documents (updates)
Resource breakdown structure
Activity resource requirements
Organizational process assets
Enterprise environmental factors
Activity cost estimates$
Risk register
Resource calendars
Activity attributes
Activity list
Schedule management plan
Organizational process assets
Enterprise environmental factors
Scope baseline
Project management plan
Project schedule
Work performance data
Project calendars 31
Schedule data
Organizational process assets
Activity resource requirements
Milestone list
Activity attributes
Meetings
Expert judgment
Tools & Techniques
Tools & Techniques
Analytical techniques
Precedence diagramming methods (PDM)
Dependency determination
Leads and lags
Organizational process assets
Reserve analysis
Group decision-making tech
Three-point estimating
Parametric estimating
Analogous estimating
Expert judgment
Resource breakdown structure
Decomposition
Rolling wave planning
Bottom-up estimating
Project management software
Published estimating data
Alternatives analysis
Expert judgment
Schedule network analysis
Critical path method
Critical chain method
Resource optimization tech
Modeling techniques
Leads and lags
Schedule compression
Scheduling tool
Performance reviews
Project management software
Resource optimization tech
Modeling techniques
Leads and lags
Schedule compression
Scheduling tool
Plan
Plan
M&C
Plan
Cost Management | Chapter 7
Cost ManagementInputs
Inputs
Outputs
Inputs
Outputs
7.2 Estimate Costs
Inputs
Outputs7.3 Determine
Budget
7.4 Control Costs
7.1 Plan Cost Management
Visual perspectives in project management and business analysis
VisuAL PM® Mind Map for the PMBOK® Guide Fifth Edition. Copyright Projerra Management Inc. 2014. Page 6 of 12
Mind Map for PMBOK® v5
Organizational process assets
Work performance data
Project funding requirements $
Project management plan
Activity cost estimates$
Basis of estimates
Project documents (updates)
Project management plan
Project charter
Enterprise environmental factors
Organizational process assets
Cost management plan $
Scope baseline
Activity cost estimates $
Basis of estimates
Project schedule
Risk register
Agreements
Organizational process assets
Expert judgment
Cost baseline $
Project funding requirements $
Project documents (updates)
Meetings
Cost management plan $ Outputs
Resource calendars 31
Cost management plan$
HR management plan
Scope baseline
Project schedule
Risk register
Enterprise environmental factors
Organizational process assets
Expert judgment
Project management plan (updates)
Change requests
Cost forecasts$
Work performance information
Organizational process assets (updates)
Project documents (updates)
Tools & Techniques
Expert judgment Tools & Techniques
Tools & Techniques
Analytical techniques
Cost aggregation
Reserve analysis
Historical relationships
Funding limit reconciliation
Analogous estimating
Parametric estimating
Bottom-up estimating
Three-point estimates
Reserve analysis
Cost of quality
Project management software
Vendor bid analysis
Group decision-making techniques
Reserve analysis
Performance reviews
To-complete performance index
Project management software
Forecasting
Earned value management
Tools & Techniques
M&C
Plan
Exec
Quality Management | Chapter 8
Quality Management
Inputs
Tools & Techniques
Inputs
Outputs
Project documents
8.3 Control Quality
8.1 Plan Quality Management
Tools & Techniques
Flowcharting
Cause & effect diagramControl charts
Check sheetsScatter diagram
Pareto chartHistogram
Tools & Techniques
Outputs
Inputs
8.2 Perform Quality
Assurance
Visual perspectives in project management and business analysis
VisuAL PM® Mind Map for the PMBOK® Guide Fifth Edition. Copyright Projerra Management Inc. 2014. Page 7 of 12
Mind Map for PMBOK® v5
Outputs
Stakeholder register
Risk register
Requirements documentation R
Enterprise environmental factors
Organizational process assets
Approved change requests
Work performance data
Project management plan
Approved change request review
Organizational process assets (updates)
Project documents (updates)
Project management plan (updates)
Change requests
Process improvement planPIP
Project documents
Organizational process assets (updates)Organizational process assets
Project documents (updates)
Project management plan (updates)
Change requests
Work performance information
Quality metrics
Quality checklists
Project documents (updates)
Quality metrics
Quality checklists
Deliverables
Verified deliverables
Validated changes
Quality control measurements#
Quality metrics
Quality control measurements#
Seven basic quality tools
Statistical sampling
Inspection
Meetings
Quality management plan
Process improvement plan PIP
Project management plan
Quality management plan
Additional quality planning tools
Statistical sampling
Design of experiments
Benchmarking
Seven basic quality tools
Cost of quality
Cost-benefit analysis Quality management and control tools
Quality audits
Process analysis
Exec
Exec
Plan
Exec
Human Resource Management | Chapter 9
HR Management
Team performance assessments
Work performance reports
Issue log
Project documents (updates)
Inputs
Inputs
Outputs
Organizational process assets
Inputs
Outputs
Inputs
Outputs
Organizational process assets (updates)
Project management plan (updates)
Change requests
9.3 Develop Project Team
Project staff assignments
HR management plan
Enterprise environmental factor (updates)
9.1 Plan HR Management
9.2 Acquire Project Team
9.4 Manage Project Team
Tools & Techniques
Tools & Techniques
Visual perspectives in project management and business analysis
VisuAL PM® Mind Map for the PMBOK® Guide Fifth Edition. Copyright Projerra Management Inc. 2014. Page 8 of 12
Mind Map for PMBOK® v5
Expert judgment
Meetings
HR management plan
Team performance assessment
Enterprise environmental factor (updates)
Tools & Techniques
Tools & Techniques
HR management plan
Enterprise environmental factors
Organizational process assets
Project staff assignments
Resource calendars
Project management plan (updates)
Org charts & position descriptions
Networking
Organizational theory
Interpersonal skills
Training
Team-building exercises
Ground rules
Co-location
Recognition and rewards
Personnel assessment tools
Observation and conversation
Project performance appraisals
Conflict management
Pre-assignment
Negotiation
Acquisition
Virtual teams
Multi-criteria decision analysis
Interpersonal skills
Project management plan
Activity resource requirements
Enterprise environmental factors
Organizational process assets
HR management plan
Outputs
Resource calendars
Project staff assignments
Communications Management | Chapter 10
VisuAL PM® Mind Map for the PMBOK® Guide Fifth Edition. Copyright Projerra Management Inc. 2014. Page 9 of 12
M&C
Exec
Project management plan
Project communications
Communications Management
Project documents (updates)
Project communications
Communications management plan
Work performance reports
Project management plan
Enterprise environmental factors
Stakeholder register
Organizational process assets
Outputs
Inputs
Inputs
Inputs
Outputs
Issue log
Work performance data
Organizational process assets
Work performance information
Organizational process assets
Enterprise environmental factors
Project management plan (updates)
Tools & Techniques
Communications management plan
Project documents (updates)
Change requests
Project management plan (updates)
Project documents (updates)
Organizational process assets (updates)
Tools & Techniques
Organizational process assets (updates)
Outputs
Information management systems
10.3 Control Communications
Tools & Techniques
10.2 Manage Communications
Mind Map for PMBOK® v5
Plan10.1 Plan
CommunicationsManagement
Visual perspectives in project management and business analysis
Meetings
Information management systems
Meetings
Expert judgment
Communications requirements analysis
Communications technology
Communications models
Communications methods
Communications technology
Communications models
Communications methods
Performance reporting
Plan
Risk Management | Chapter 11
Organizational process assets
Project documents (updates)
Risk management plan
Risk register
Scope baseline
Risk Management
Risk management plan
Project management plan
Enterprise environmental factors
Project charter
Outputs
Inputs
Inputs
Organizational process assets
Project documents (updates)
Inputs
Outputs
Outputs
Inputs
Enterprise environmental factors
Risk management plan
Risk register
Inputs Tools & Techniques
Outputs
Project management plan
Work performance data
Risk register
Work performance reports Meetings
Inputs
Stakeholder register
11.2 Identify Risks
Tools & Techniques
Tools & Techniques
Outputs
M&C
11.6 Control Risks
Plan
11.1 Plan Risk Management
Plan
11.4 Perform Quantitative Risk Analysis
Visual perspectives in project management and business analysis
VisuAL PM® Mind Map for the PMBOK® Guide Fifth Edition. Copyright Projerra Management Inc. 2014. Page 10 of 12
Mind Map for PMBOK® v5
Expert judgment
HR management plan
Enterprise environment factors
Quality management plan
Schedule management plan
Cost management plan$
Risk management plan
Risk register
Organizational process assets (updates)
Project documents (updates)
Project management plan (updates)
Change requests
Work performance information
Risk management plan
Cost management plan$
Schedule management plan
Risk register
Enterprise environmental factors
Organizational process assets
Project documents (updates)Outputs
Expert judgment
Scope baseline
Stakeholder register
Project documents
Organizational process assets
Procurement documents
Activity cost estimates$
Activity duration estimates
Expert judgment
Meetings
Expert judgment
Expert judgement
Tools & Techniques
Tools & Techniques
Tools & Techniques
Analytical techniques
Risk probability and impact assessment
Probability and impact matrix
Risk data quality assessment
Risk categorization
Risk urgency assessment
Strategies for negative risks or threats
Strategies for positive risks or threats
Contingent response strategy
Project management plan (updates)
Risk reassessment
Risk audits
Technical performance measurement
Reserve analysis
Variance and trend analysis
SWOT Analysis
Diagramming techniques
Assumptions analysis
Checklist analysis
Information gathering sessions
Documentation reviews
Data gathering & representation tech
Quantitative risk analysis & modeling tech
Plan
11.5 Plan Risk Responses
Plan
11.3 Perform Qualitative
Risk Analyses
Plan
M&C
Exec
Close
12.4 Close Procurements
Procurement Management | Chapter 12
Procurement Management
Outputs
Inputs
Inputs
Inputs
Inputs
12.1 Plan Procurement Management
12.3 Control Procurements
12.2 Conduct Procurements
OutputsOutputs
Outputs
Visual perspectives in project management and business analysis
VisuAL PM® Mind Map for the PMBOK® Guide Fifth Edition. Copyright Projerra Management Inc. 2014. Page 11 of 12
Mind Map for PMBOK® v5
Work performance data
Work performance reports
Change requests
Project documents (updates)
Procurement management plan
Expert judgment
Project management plan
Requirements documentation R
Risk register
Project schedule
Stakeholder register
Enterprise environmental factors
Organizational process assets
Activity resource requirements
Activity cost estimates $
Make-or-buy decisions
Source section criteria ?
Procurement documents
Procurement statement of work
Procurement documents
Agreements
Approved change requests
Expert judgement
Procurement management plan
Project documents
Organizational process assets
Project management plan
Project documents (updates)
Change requests
Resource calendars
Organizational process assets (updates)
Project documents (updates)
Project management plan (updates)
Change requests
Work performance information
Organizational process assets (updates)
Project management plan (updates)
Tools & Techniques
Make-or-buy decisions
Seller proposals??
Source selection criteria?
Procurement statement of work
Procurement documents
Selected sellers
Agreements
Procurement documents
Closed procurements
Tools & Techniques
Project management plan
Tools & Techniques
Make-or-buy analysis
Market research
Contract change control
Procurement performance reviews
Inspections & audits
Performance reporting
Payment system
Claims administration
Records management system
Bidder conferences
Proposal evaluation techniques
Independent estimates
Advertising
Analytical techniques
Procurement negotiations
Procurement audits
Procurement negotiations
Records management system
Tools & Techniques
Meetings
Plan
Init
Exec
M&C
Stakeholder Management | Chapter 13
Stakeholder ManagementInputs
Inputs
Outputs
Inputs
Outputs
Inputs
Outputs
13.2 Plan Stakeholder
Management
13.1 Identify Stakeholders
13.3 Manage Stakeholder Engagement 13.4 Control
Stakeholder Engagement
Visual perspectives in project management and business analysis
VisuAL PM® Mind Map for the PMBOK® Guide Fifth Edition. Copyright Projerra Management Inc. 2014. Page 12 of 12
Mind Map for PMBOK® v5
Tools & Techniques
Tools & Techniques
Tools & Techniques
Procurement documents
Organizational process assets
Expert judgment
Meetings
Stakeholder register
Stakeholder management plan
Communications management plan
Change log
Organizational process assets
Project management plan (updates)
Change requests
Issue log
Project documents (updates)
Organizational process assets (updates)
Enterprise environmental factors
Outputs
Project charter
Stakeholder register
Enterprise environmental factors
Organizational process assets
Expert judgement
Meetings
Stakeholder management plan
Project documents (updates)
Project management plan
Issue log
Work performance data
Project documents
Information management systems
Expert judgement
Meetings
Work performance information
Change requests
Project management plan (updates)
Project documents (updates)
Organizational process assets (updates)
Project management plan
Tools & Techniques
Stakeholder analysis
Communications methods
Interpersonal skills
Management skills
Analytical techniques